HomeMy WebLinkAboutDrainage Reports - 07/06/1988 (2)I LJ 111 RWINC Engineering Consultants ' MASTER DRAINAGE STUDY FOR WILD WOOD FARM PREPARED FOR: ' G.T. LAND COLORADO INC. 3555 STANFORD ROAD, SUITE 100 FORT COLLINS, CO 80525 PREPARED BY: ' RBD, INC. ENGINEERING CONSULTANTS 2900 SOUTH COLLEGE AVENUE FORT COLLINS, CO 80525 1 ' INDEX INTRODUCTION 1 ' LOCATION DESCRIPTION DESIGN CRITERIA 1 DESIGN PROCEDURE 2 SUMMARY 2 ' REFERENCES 3 APPENDIX VICINITY MAP Al ' 10 YEAR STORM PRELIMINARY DETENTION POND SIZING A2-A4 100 YEAR STORM PRELIMINARY DETENTION POND SIZING A5-A7 POCKET ' MASTER DRAINAGE PLAN I ' LOCATION Wild Wood Farm is located in the Northeast quarter of Section 5, Township 6 North, Range 69 West of the 6th Principal Meridian in ' Fort Collins, Colorado. This site is at the southwest corner of the intersection of Harmony Road and County Road 9 (see vicinity ' map). This site is located within the McClellands Basin. This major basin is identified in the McClellands Basin Master Drainage ' Plan, by Greenhorn and O'Mara, Inc., 1986. The site is identified as part of sub -basin 216 that flows into gutter number 36 and then 32, according to the SWMM computer model from the above reference. DESCRIPTION ' This property, as it currently exists, is farmland with farm buildings in the northeast corner (see Drainage Plan in Pocket). Several concrete irrigation ditches lie within this site which ' are used for farming on this site and also to transport water through this property. The northerly ditch transports water from west to east through this property while the other ditches are used for on -site irrigation. Sequence for development of this ' area must be sensitive to this, as to not cut off irrigation water from any non -developed land. The slope of this farmland is ' from northwest to southeast while the irrigation ditches flow primarily north to south or west to east. The development of this property. is intended for businesses, ' health care, office and industry, in accordance with the Wild Wood Master Plan, ' DESIGN CRITERIA ' Master basin criteria for this study comes from the previously mentioned McClellands Basin Master Drainage Plan. The report outlines the entire major basin, identifying historic flows as well as proposed developed flows. The report suggests a dual ' release rate of 0.20 cfs/acre for a 10 year design storm and 0.50 cfs/acre for a 100 year design storm. It must be noted at this time that the 100 year release rate of 0.50 cfs/acre compares ' with a 0.30 cfs/acre + historic 100 year storm based on the 100 year peak flow, at gutter 36, of 41 cfs, divided by the sub -basin 216 area of 135• acres. City staff has agreed to the master ' drainage recommendations, from this report, and therefore estab- lished criteria for this area. Other drainage criteria used for the development of 'this property ' is to originate from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual. ' DESIGN PROCEDURE During the time of this report, the northwest corner of this property, ' shown on the drainage plan as a proposed site, is currently under design. All other lots and street right-of-way's are shown as approximate locations. The individual lots are to have onsite detention, however, the ' streets are to be ultimately detained in a permanent detention pond, as shown on the drainage plan. Any partial development of the streets must provide temporary street detention until a permanent pond is constructed. The flows, after being detained, are to ultimately be released to a proposed channel at the southeast corner of this property. These flows will then enter the County Road 9 roadside ditch as shown on the drainage ' plan. The flows in this ditch travel south to finally enter the McClel- lands Basin drainageway as is done historically. ' The development of the northwest site within this property will not greatly increase flows downstream from that of historic. The 0.2 cfs/acre difference, however, between the 100 year developed release rate (0.5• cfs/acre) and the 100 year historic release rate (0.3 cfs/acre) will become ' more noticeable as this property and other properties within McClellands Basin become developed. For the above reason the City must be aware that downstream regional drainage improvements will be of increasing need. The ' roadside ditch for the west half of County Road 9 is currently unable to handle 0.5 cfs/acre or 0.3 cfs/acre due to the flatness to the slope and the numerous driveways which block or dam up the flow paths. Due to the ' above problems design flows during a major storm could require the total county right-of-way along with some front of lot property. Future improve- ments to county road 9 will require it to be able to handle 26.74 cfs (133.7 ac. x 0.2 cfs/ac.) during a 10 year storm and 66.85 cfs (133.7 ac. x 0.2 cfs/ac.) during a 100 year storm from the Wild Wood Farm Property. SUMMARY t 1. The 10 year storm maximum release rate is to be 0.2 cfs/acre. 2. The 100 year storm maximum release rate is to be 0.5 cfs/acre. 3. On -site lot detention is required but should be combined with other ' lots when possible. 4. Streets are to have a permanent detention pond for full buildout. 5. Temporary street detention is necessary until a permanent pond is constructed. 6. The flows from this property will ultimately drain into the County Road 9 roadside ditch and then into McClellands Basin drainageway. D(V, �7� Future County Road 9 will need to be able to pass 10 year storm flows of 26.74 cfs and 100 year storm flows of 66.85 cfs from the Wild Wood Farm property. Additional flows may enter County Road 9 South of this, 0 property. \\p�UU1;111uu�ugp��� incerely, �•`°�o�QF'�j�gEC%lF,%� RBD, Inc. ... c o Brian Cole, P.E. Ted Borstad P.E. ' Project Engineer Project Manager ' 2 REFERENCES 1. McClellands Basin Master Drainage Plan, By Greenhorn and O'Mara Inc., June 20, 1986. 2. City of Fort Collins Storm Drainage Design Criteria and Con- struction Standards by City of Fort Collins, May 1984. 3. Urban Storm Drainage Criteria Manual, Volume 2, Section 5, By Wright -McLaughlin Engineers, Denver, Colorado, March 1969. 3 No Text VICINITY MAP , � f II ..tl- -�0 -. , II <9 9 a II 11 27 1 1.iI \ \ 1. v • 1N' !~ /� it ' it � �� I � 1• ', ��� 1\ I' it 0. t • - EAST ° HOR TOOTH — 1954 ROA I <9.!<Ij `l <8n II l i I \ i '•,\ \\� nWane v . 2 I\ It Park ( O I — I 0 I ^ Collindale Golf. urse - . t) -- - - - - — I •ll , • 1 I Trail Park I .I 1 • _ r "�j 1 1 �.? of ••• -_ li_- I ems• �;� �- \ I HARMONY HA I I' • M ROADLm-77N. ` � @I WILD WOOD IF I � 1 0 0 a' - l ( .:4 /l Z } 0 1RM / L) -- i .1 \ \ /.00 I\ .. �_.:•_�\- _ 1�,I _ _ _ I 1 �'MAIL +'CREE _D'TCH Al K •nn / n•nn. an• <aQ • mntlot—01 oaoOq �• wevar gs.on vleQ 10 YEAR STORM MASS DIAGRAM METHOD for DETENTION VOLUMES ` PROJECT: WILD WOOD FARM (TEMPORARY STREET DETENTION POND) COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE. (CFS) = RATIONAL EQUATION: Q = CIA C 0.9 TIME OF CON('-'ENTRATION = ? 0.14 .� � 0.72 C::f� TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 0.648 5.65 1098.36 42 1056-36 0.024250 10 0.648 4.4 1710.72 84 1626.72 0. 7344 15 0.648 3.7 2157.84 126 2031.84 0.046644 20 0.648 3.25 2527.2 168 2359.2 0,054159 25 0.648 2.85 2770.2 210 2560.20.058774 30 0.648 2.6 3032.64 252 2780.64 0.063834 35 0.648 2.35 3197.88 294 2903.88 0.066663 40 0.648 2.2 3421.44 336 3085.44 0.070831 45 0.648 2 3499.2 378 3121.2 0.071652 50 0.648 1.85 3596.4 420 3176.4 0.072920 55 0.648 1.75 3742.2 462 3280.2 0.0753O3 60 0.648 1.63 3802.464 504 3298.464 0.075722 70 0.648 1.44 3919.104 588 3331.104 0.076471 80 0.648 1.3 4043.52 672 3371.52 0.077399 90 0.648 1.2 ` 4199.O4 756 3443,04 0.079041 100 0.648 1.1 4276.8 840 3436.8 0.078898 110 0.648 1 4276.8 924 3352.8 0.076969 120 0.648 0.9 4199.04 100B 3191.04 0.073256 t5 ab ^?-bb vu�' I, 1 10 YEAR STORM MASS DIAGRAM METHOD f or DETENTION VOLUMES PROJECT: WILD WOOD FARM PERMANENT STREET DETENTION FOND COMMENTS: I() YEAR STORM / MAXIMUM ALLOWABLE RELEASE (CFS) = 2.65 ' RATIONAL. EQUATION: O = CIA O.Zc(a c2t C = (:).9 A(area) - 13.23 �COru SEeVA�vt TIME OF CONCENTRATION = ? S-rP.ELT AREA TIME CA I INFLOW OUTFLOW STORAGE ' (min) (in/hr) (cu ft) (cu ft) (ctA ft) (ac ft) S 11.907 5.65 20182.,36 795 19387.36 0.445072 10 11.907 4.4 31434.48 1590 29844.48 0.685134 15 11.907 3.7 3965o.31 2395 37265. 31 0.855493 20 11.907 3.25 4647-7.3 .3180 43257.3 0.993050 25 11.907 2.85 50902.42 3975 46927.42 1.077305 30 11.907 2.6 55724.76 4770 50954.76 1.169760 '• 5 11.907 2.35 59761.04 5565 5:3,196.04 1 . 221213-, 40 11.907 2.`) 62868.96 6360 56508.96 1.297_'67 ' 11.90745 1.907 `' 64297.8 7155 57142.8 1.31.1818 50 11.907 1.85 66083. 85 7950 58133.83 1.334569 55 11.907 1.75 68762„92 8745 60Ci1.7.92 1.377821 ' 60 11.907 1.63 69870. '27 9540 60330.27 1.384992 7i.1 11 . 907 1.44 7201.3„ 53 111:;0 60203.53 1.397693 80 1 1 . 90'7 1.3 74299. 68 12720 61.5 79. 68 1.413674 90 11.9o7 1.2 771. 5'7 ,, :=:6 1. 4:51 i i 6284.7.: ;6 1.442776 1'.. i) 11.907 1.1 78586.2 1590i i 62686.2 1.439077 11.0 11.907 1 78586.2 1.7490 61096.2 1.402575 120 11.9o7 0.9. 9 77157. 36 19090 58077. 36 1 . _ � 272 S�z4/as ' 3'c 2>.c- wc. )t6D "22(,-ooS .1 t A3 - - �� '������ ��N� m�� YEAR ��N�w�mmn�m N� MASS DIAGRAM METHOD m� for DETENTION VOLUMES m� PROJECT: WILD WOOD FARM (PROPOSED SITE) COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) 2.33 N� RATIONAL EQUATION: Q = CIA C = 0.43 A(area) = 11.52 ,--,I�����`^�`~�� c3c� ^E�.�e-�N-cuvr U� TIME OF CONCENTRATION = ? TIME CA I INFLOW OUTFLOW STORAGE -------------------------------------------------------------������������� (nin> (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 4.9536 5.65 8396-352 699 7697.352 0.176706 Q� 10 . 4.9336 . 4 4 . 13077 50 1398 . 11679 50 0 268124 . ~� 15 4.9536 3,7 16495.48 2097 14398.48 0.330543 20 4.9536 3.25 19319.04 2796 16523.04 0.379316 H� N� 25 4.9536 2.85 21176.64 3495 17681.64 0.405914 30. 4.9536 2.6 23182.84 4194 18988.B4 0.435923 35 4.9536 2.35 24446.01 4893 19553.01 0.448875 40 4.9536 2.226155.00 5592 20563.00 0.472061 0� 45 4.9536 2 26749.44 6291 20458.44 0.469661 50 4.9536 1.85 27492.48 6990 20502,48 0.470672 N� 55 60 4.9536 4.9536 1.75 1.6329067.72 28607.04 7689 838820679.720.474741 20918.04 0.480212 � 70 4.9536 1.44 29959,37 9786 20173.37 0.463116 80 4.9536 1.3 30910.46 11184 19726.46 0.452857 90 4.9536 1.2 32099.32 1258219517.32 0.448056 N� 100 4.9536 1.1 32693.76 13980 18713.76 0. 4729608 110 4.9536 1 32693.76 15378 17315.76 0.397515 120 4.9536 0.9 32099.32 16776 15323.32 0.351775 0� 8,`t sl L^,[cZ>,Dv'a c, � 100 YEAR STORM MASS DIAGRAM METHOD for DETENTION V(:)LUMES PROJECT: WILD WOOD FARM (TEMPORARY STREET DETENTION FOND) COMMENTS: 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 0.36 �o•S RATIONAL EQUATION: Q - CIA �{'IACRE C = 1. A(area) _ 0.72 SHEET A,Zl 'TIME OF rr_LNe.E::NTRATIaN == �� TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr) (cu •ft) (cut ft) (cu ft) (ac. ft) 5 0.72 9 194.4 J.E)8 1036 0„ 0421.48 10 i!.72 7.3 3,15:_T.6 21.6 2937.6 O.ii674._,8 1.5 0.72 6 3888 324 3564 D. i?81.818 20 0.72 5.2 4492.8 432 4i!6,:!.8 0.093223 25 0.72 4.6 4960 540 4428 0.101652 .30 o. 72 4.15 53,78. 4 640 4730.4 4 0.106595 35 0.72 3.8 5745.6 7`;6 4989.6 0. 1.14545 40 0.72 3.5 6048 864 5184 0.119008 45 0. 72 3.25 6318 972 5 ":46 0. 12.;'727 50 () . 72 3 _ 6480 1 i i80 5400 0.123966 55 0.72 2.8 6652.8 1188 5464.8 0.125454--* 60 0.72 2.6 6739.2 1296 5443.2 0.124958 70 0.72 2.: 6955.2 1512 5443.2 0.124958 8C i 0. 7:' 2.05 70e4. 8 1720 5356.8 0.122975 90 0.72 1.65 '7192.8 1944 524.8.8 0.120495 S ClO 0. 72 1.7 7.344 2160 51.84 0. 119008 1 IQ t .. '72 1 .55 73r 65. 6 2376 4989.6 0.114545 1`2!0 0.72 1.45 7516.8 2592 4924.9 0.113057 s /2 s/Sa (2Q..-c)u'sr, N A5 I 100 YEAR STORM MAsg DIAGRAM METHOD fr . . DETENTION VOLUMES PROJECT: WILD WOOD FARM PERMANENT STREET DETENTION POND COMMENTS. 100 YEAR STORM . MAXIMUM ALLOWABLE RELEASE (CFS) 6.62 . RATIONAL EQUATION: Q = CIA § c ! Acareaa = i3.23 - TIME! of CONCENTRATION = m TIME rmin; CA I (i INFLOW (cu OUTFLOW w u It) STORAGE <ce ft> (ac ft) hr) +t) s 1.3.23 9 35721 1906 33735 0.774449 10 l3.23 7.3 57947.4 3972 53975.4 1.239104 15 l3.23 6 71442 5953 65484 1.503305 20 13.23 5.2 92555.2 7944 74611.2 1.712837 25 l3.23 4.6 91287 99. 81357 1.867699 ;n l3.2J 4.1.5 98e2B.1 11916 86912.1 1.995227 35 1. 23 . 3.8 !0 75.4 13902 91673.4 2.104531 40 45 13.23 l3.23 25 111132 116 3.2 1588R 17874 9 55 2 44 98219.25 2"186501 2.2548o3 so 13.23 3 119070 19860 99210 2.27754e ss l3.23 2.8 122245.2 21846 l00399.2 2.' 248 60 l3.23 2.6 123832.8 23532 1 o0o.e 2.2957o2 70 1.2 33 3 127801.8 e04 99997.8 2.295633 Go 13.23 2. 05 1 183.2 31776 984 .2 2.259118 90 13.23 1.85 132167.7 35748 96419.7 2.213491 100 13.23 1.7 134946 39720 95226 2.1960ee 110 13.2= 1.55 lass .9 43692 91.650.9 2.1o4ol5j 120 1.3.23 1.45 138121.2 47664 90457.2 2.076611 .� #z26-woe � . \ A■ 100 YEAR STORM ' MASS DIAGRAM METHOD f or ' DETENTION VOLUMES PROJECT: WILD WOOD FARM (PROPOSED SITE) ' COMMENTS: 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) RATIONAL EQUATION: G == C I A �I C = 0.54 V7 A(area) = 11.52 T I ME Of-- CONCENTRAT" I ON = ? TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr) (c)_) ft) (cu ft) (c..LA ft) (ac ft) ------------__- 5 _---__.___ `,. 2208 91.6796. 1.6 1.746 150501.6 C).7�45504 ' 1() 6.22()B 7.3 27247. 10 3492 23755. 10 0.545342 15 6. ^.x.'r)8 6 ,.T,59.�?. ;:�? ,._. _,d '•_F3"=.J4..'S.t 0.650925 2r) 6.2208 )8 5.2 38817. 79 6984 1833. 79 0. 73090:', 25 6. 2:208 4.6 42923. t.52 8730 3419 5. ? 0.784975 ' 0 6. 2208 4. 1.5 46469.:"-7 1(-..)4'76 3599:3. 37 0, E326294 35 6. 2208 ._ . 8 49641.98 1.2222 17A• 19. 98 0. 859044 ' 40 A 5 6.22'?08 6.2200 :3..;`5 5 2 52254. 7'2 t` 4587. 5 13968 1 571. 4 ':8286. 72 '; �8873. 52 0.978942 0.892413 50 6.2208 55987.2 17460 39527.2 0.884462 55 6. 2208 2.8 57480. V? 19206 _8274. 19 0.879654 ' 60 6. 2208 2.6 58226. 68 2o952 37'274.. 68 0.955709 70 6. ?:'i �8 2. ,:. 60092.92 24444 35648. 92 0. 818386 B0 6.2208 2.05 61'212.67 27936 1.3.276.67 0.76:3927 9C) 6.2209 1.85 62145. 79 ' 14 ?8 '•:0717. 79 0.705183 ' 100 6.2208 1.7 6"35452. 16 34920 2e532.16 0. . 655008 110 6.2208 1.55 63638. 78 38412 25226.78 0.579127 ' 120 6.2208 1.45 64945.15 41904 2•_,041.15 0.528952 ' S/,e s/Ss aJ c a,.0 . �Qeo )ac. ' f'226-c0°i AT