EROSION CONTROL REPORT
FOR
LOTS 5, 6, 11. 12, 13, 15, 16, 17 AND 19
OF
WILLOW LANE
PREPARED
FOR
OILCOM CORPORATION
PREPARED
BY
STEWART & ASSOCIATES, INC.
103 SOUTH MELDRUM STREET
FORT COLLINS, COLORADO 80521
303/482-9331
FEBRUARY 28. 1994
0
STEWART&ASSOCIATES
Consulting Engineers and Surveyors .
February 28, 1994
Mr. Glen Schlueter
Storm Water Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado-. 80522
Dear Glen:
The owners of the remaining undeveloped lots in the Willow Lane subdivision
have requested that I prepare the necessary erosion control report and plan
for the development of these lots.
Overlot grading was completed on all of these lots in the 1970's, and
asphalt pavement was installed on some of the lots.
I have prepared the following report in compliance with the City of Fort
Collins Erosion Control Criteria.
Sincerely,
Phillip I . Robinson, P.E. & L.S.
Vice President
jrr
enclosures 4Z,Y.•G*STER4 .
4
502
,��i'rr •• �ii�•••l
James H. Stewart
and Associates, Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382
EROSION CONTROL REPORT FOR
LOTS 5, 6, 11, 12, 13, 15, 16, 17 AND 19
WILLOW LANE
SITE LOCATION
The Willow Lane development is located on the east side of Overland Trail
and approximately one—half mile south of Prospect Road. It is in the Southwest
a of the Northwest 4 of Section 21, Township 7 North, Range 69 West, of the
Sixth P.M., City of Fort Collins, County of Larimer, State of Colorado. The
site is located above the Pleasant Valley and Lake Canal ditch and, therefore,
is within the canal importation basin. The site is in a high rainfall
erodibility zone and -a moderate wind erodibility zone.
EXISTING SITE CONDITIONS
.The Willow Lane development was started in 1973, and building construction
continued through 1979. Nine of the building sites were overlot graded, but
no buildings were constructed. A plat of the original Willow Lane subdivision
is included with this report to show the areas of Lots 5, 6, 11, 12, 13, 15,
16, 17 and 19. These lots are the sites of the nine buildings proposed for
construction.
Lots 5 and 6 were overlot graded, but no construction was done, so
presently the lots are covered with 75 percent vegetation. Lots 11 and 12
are also overlot graded, and no pavement of buildings was constructed: Lots
11 and 12 have 70 percent vegetative ground cover. Lots 13, 15 and 16 were
overlot graded, and all asphalt driveways and parking areas were constructed.
There is 60 percent established vegetation on the unpaved portion of Lots 13,
15 and 16. Lots 17 and 19 are graded, and the asphalt drives and parking are
existing. Lot 19 also has a concrete foundation constructed during the 197O's.
The soil portion of Lots 17 and 19 has 50 percent vegetation.
The construction procedure will be to strip the building location site
and construct the foundation. Silt fence sediment barriers will be installed
on the low or runoff side of each building site, and gravel inlet filters will
be placed at the existing curb inlets on Ross Drive. On Lots 5, 6, 11 and
12 the asphalt drives and parking will be installed after the concrete
foundations are constructed and during the completion of the buildings.
A plan of the sites showing the proposed erosion control procedures is
included with this report. Also included are calculations of the performance
standards and calculations of the effectiveness of the proposed procedures.
A construction sequence and estimated cost of erosion control procedures is
included.
The rainfall erosion control procedures will be sufficient to control
wind erosion.
Phillip f. Robinson, P.E. & L.S.
A$ 4502 $;
� O S �
e0 y �u C & ,.;C %
ti
a
vi eem o
Cir ^
Ti er u
'a o
Radcliff $
o a
o'
/Clr J J
Y
Ct
o
Crehard
PI
Jaerger
or
Ct,
g �
_a
'0W Plu St
Y' � St.
J�
* E Q`
o
~3
� J
O
d
Poplar Dr,
r6 J
N
Tama►ac o
Dr
Afi
w
�7ja
�%
e
O
e
L
Willioms
lintrid PI.
�
L
�
0
burpr.
q
o.
m-0
s
�..�� (llk
IL
Q
L)
o o
v
Lake kSt.
Eve ;
S
9 Knotwood Ct
pr
W,
m
c) P O 5 PE CT
O� rn
VIS
_ ° c Holly St.
p • - r Govertr
St.
Stuart A
o�
tvtorggn ge19pQ v
ct.
CL
Clydesdale I desdole vr�
Ct.
Flpeslone C
LD ". GatdO° 4 '
.r �g)r
Bluegrass Dr.
Mt Royal Ct.
112
Orchard
1_
c`
m C Clgarvlev
N 6
u
c SP ngfie
6 > W Lak,
v
o:
Q
o N Seccomb
S� d
o` Rr�McKeo VICINITY "' Mnn
10
3
h
i
�
o a l
V
TAT E
e ro/a
'� c _�SS :'7"f•+e {+ere e.•y } { J�
�<ver ae Or<:�der+f o.+a �� Core/e 2. D� r• _ ��.�r<rer O
NCLVOED 70
THE AREA OF
ICH WILL rye
AAp2.OVE.D:
C iti PI •+d Zo.s:...e 0i
i
Ch o�rmo.+
.'r
s3
ACn2oyE.p
�_ v rl•+< cJf e01Cd of fne Cry
ma's /ervdo en fh.s
G. / •.i
STEWART&ASSOCIATES 103 PH. S. 93 DRUM,FAX FORT gOLLINS, CO 80521
Consulting Engineers and Surveyors
By: Date: Client: Oil com (friry Sheet No. of
Project: VA I tow Lane
Subject: ECo s l o h Ca K 4-t-o I
Lo..7.5 ._ 5 I G.! ( i! j f I L j=) 3 G 0
ea I f,.p)a 1'_ /.l9
715_7_� veJ,eai ioh (cover ! ! I I
I II i I � I '
- bnf7er' s�o!,ir clv�ln� CC/ - U. IAc.-
'L07s
I/ rem _ I Qi = 6 9.9- f) c I I I I!(
Pr'es�1_ 1 17u7 Ives�i-%Pay! �o✓er'
s� = I O.ZZ! A� i
bare -So;) dvrin' 'cans. = 10127 19c
I '
1-10.7S _�-13�.-11-5€i !;G_ i I L' =1 S L V
eti �- �ro,� I play Zt l•YU Ac
�./171rese�% . Ve5cover' j
Ipr'ese:, l I011-' ,Ac-i PU^4 I I I
bvli.dill r?s= 6, 3S 4c
-- hare_�soi1 LdLri;nS �o%ts�, i =� 0.?-
Lois ( !II !I q (( I I L Z801 I
/4 l`ec. - I Tri' o"x P I L _; 1.25
i4 c I I I j
i
�re s e �:'�I ' �_ s0 � I ✓e-Se?-a� i u� �o�er
o-e5,e�il 0.29 e-- j Pv.w� I i I ' I i
ese�� iO.ill IiQ c ' bl��. Fv✓��ai Doti
- , 5 ;
1 i {
I I I
1 '
I
.
Y
I
� �
l�iSl. rain � Mo�erci-� wrn �
--_�-RAINFALL-PERFORMANCE STANDARD EVALUATION
+-------- ------------------------------------------
PROJECT: Wil)o�vlaeze STANDARD FORM A
IBY:---------------------------------DATE_-- --L
--------- -
IDEVELOPEDIERODIBILITYI Asb I Lsb I Ssb I Lb I Sb I PS
SUBBASIN ; ZONE I (ac) I (ft) I (%) .I(feet) I (7.) I ( )
---------------------------I-------I-------I--------------I-
5 ` I-%IJc h i 360 ; l • Z —� ; 7(9,0
I I I i l I I
Lo75 I.1>ti ti
I I I I
i[ f iz 5 o.q4- I Z60 I i.77 lI i--- ; 81.0
I I
Lois
1311s €lC ; 5 I (•YU I Sa0 177.709G%
,oTS
►7 ( I q
141
s,za
���
1. s474
�.45l
78,7
EFFECTIVENESS CALCULATIONS
---------------------------------------------------
1 PROJECT: STANDARD FORM B
(COMPLETED BY: DATE: Z 2
I
Erosion Control.
C-Factor
P-Factor
Method
Value
Value Comment
---------------------------------------------------------
baca soil
(.UO
(-0a
build `"5
v.ol
1 66
' pv/vv .
Gxis- �le�e� aiioh -
. a. UI
0,04- To 0,08
(.00
s iW
-Fence
I.Ov
o.50
i i-i l e i
---------- ------------------------------------------------
-F Oer-
1100
0.' a-o
------------
MAJORI PS I SUB I AREA
BASINI (Y) IBASINI (Ac) CALCULATIONS
----- ------ ----- ------ -------------------------------------
741 Lo-rs ( Ic( barC 5011 = 0, s z .4c
5area 1>1 = 0.30 Ac
exist ��. 757 ; 0,57 Ac
c = 0, 29
knee = 0, 5 I
Ell = 1- (o.z, x.o,S)xN00
6
LoTs bare soil = 0,2? i4c
Iz 0.94 Qr-ern b) U•22 Ac I
exist. ve 707 = 0.43 Ac
LG = (0.2 1.0 +. o.ZNC0.0i)tC0.4s) 0.045 I
oR4
P - Si11 -Fence - 0s
(0•3.3 x0.$)xiuf! ?357 I
Lo7s bare foil: Q-21 Ac
13) 15 1.40 C Irew b) : 0.35 Ar,
1 are i\ P✓...# A c
/0073 Ac
C = o.z1 (1.�+ �.41)(0•a� h 0.93•)CO,od I
0,1
p_ 50 �encc = 0.S I
II . IEFF- 1- (d.wv0.$)X,uv : 13 I
�
---- I ------ I ----- I ------ I --------------------------------------------
I/SF-B:1989
EFFECTIVENESS CALCULATIONS
'------------ ---------------------------------------------------------
PROJECT: Wr'I�U�/ L-an� STANDARD FORM B
COMPLETED BY: DATE: 2 2d' `f5L
Erosion Control C-Factor -P-Factor
Method Value Value Comment
------------------------ ---------------------------------
------------------------
MAJORI PS I. SUB I AREA
BASINI (%) IBASINI (Ac} CALCULATIONS .
----- ------ ----- ------ --------------------------------------------
79 Lu7s 1.25 170tre Sod 0.21 Ac
17t19 Greg exls} �dr�%: O.24 Ac
grow. ey-(34- b _ 0.11 Ac
ct r-ec. n e✓ W l - 0 -17 Ac
I I Bxisi e5.C5o7:DA7 /ac
I I I C;�O.tl�l0}t�o•24�(a.a�t(o.n)(.ot�+�o.n�(.o� o.gtYo.oe
/. 2 S'
�= 0.Z0
= sAe�cc
EPr- = ) -(0.2ux,$) X«o = c/o 7
I7-07AL 17ct .S'zo I
Is,TeS I I II
EFF = ��.19XS'S.S�+(a•94�(83.5�+(1.9o)(y3)t(I.1s(5o.o
EFF - 88• q 7
---------------
DI/SF-B:1989
CONSTRUCTION SEQUENCE
PROJECT: 0 JLot.✓ LQrli STANDARD FORM C
SEQUENCE. FOR 19 ONLY COMPLETED BY: DATE: 2 Ze CL
Indicate by use of a bar.l.ine or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
YEAR 99
MONTH_
� s p �/ D
---------------1 T T----------------T t t
OVERLOT GRADING I— I I 1 I I I I I
WIND EROSION CONTROL
Soil Roughing
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other &M5 T-1
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation.
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mats/Blankets
Other axis-- 11e0.
-----------------------------
STRUCTURES: INSTALLED BY
ITIMiN IMIJILU 01
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON
HDI/SF-C:1989
JANUAaY 1991 8-20 DESIGN CRITERIA
STEWART&JkSSOCIATES 103 S. MEL-9331 FDRUM, FORT COLLINS482-9382 , CO 80521
PH. 482AX
Consulting Engineers and Surveyors
By: F) 71 Date: Client: Oilcavl, (for�-Q Sheet No. of
Project: Wld/`o,j La r?(?
Subject: (f 05 7L- o F—T- S J 0 V7 C U ol 4
Subje 1-0 -7C6� C 1'
Ido ell
LF' I Srl7 72ncej c,i 11.7 L r-
J
2-030. 75'
Z-Z3 .7
J
2c:::� 0 -7LO 1 r q-5e e,
CA
C/ 41 /.3 t i'i omZ 1 c I O. vo' CL C:
0.,30
T'9_ 2 ` t 1- I �i Gl . � � , 6 5 0, oa/ a c � { - ! ': r'� 13 7/. So
x zz 7 51 = 13350.13