HomeMy WebLinkAboutDrainage Reports - 10/07/1996 (2)PROPERTY OF Final A ved ReP01t FORT COLD NS UTI ITIES Z f DRAINAGE INVESTI ON FOR WEST PLUM STREET - P.U.D. CITY OF FORT COLLINS, LARIMER COUNTY, COLORADO Prepared for Vista Building Company P. O. Bog 885 Fort Collins, Colorado 80522 May 14,1996 (Revised August 9,1996) Project No. PLA -195 - 96 AUG2 p, HI9001MR Engineetg Associates 150 E. 29th Street, #238 Loveland, Colorado 80538 Telephone: (970) 663 - 2221 1 1 ' Engineering Associates August 8, 1996 Project No. PLA - 195 - 96 Mr. Basil Y. Hamdan Stormwater Utility 235 Mathews ' P. O. Box 580 Fort Collins, Colorado 80522-0580 Dear Mr. Hamdan, The enclosed report represents the results of the drainage investigation for the proposed "West Plum Street - P.U.D." to be located in the City of Fort Collins, Larimer County, Colorado. ' This investigation was based upon the proposed site development plan; proposed site grading plan; on -site observations; and available topographic information. ' The investigation was performed in accordance with the criteria established in the City of Fort Collins "Storm Drainage Design Criteria and Construction Specification Standards" manual. If you should have any questions, please feel free to contact this office. ' Respectfully Submitted, MESS Engineering Associates ' Dennis R. Messner, P.E. DRM/mkm 1 tEnclosures ' cc: Mr. Doug Viita Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 238 Loveland, Colorado 80538 Telephone: (970) 663-2221 TABLE OF CONTENTS Letter of Transmittal Table of Contents Scope Site Description "Historic" Conditions Proposed Development Erosion Control Measures Conclusions and Recommendations Drainage Summary Erosion Control Cost Estimate letter EXHIBITS Vicinity Map "Historic" Conditions Exhibit Proposed Conditions Exhibit Calculations ii SCOPE ' The following report represents the results of a drainage investigation for a proposed single family residential development to be located in the North Half of Section 16, Township 7 North, Range 69 West of the 6th P.M.in the City of Fort ' Collins, Larimer County, Colorado. The investigation was performed for the project developer, Viita Building Company. The purpose of this investigation is to determine the effects of the proposed development on the area's existing drainage ' conditions and to determine the improvements, if any, and the appropriate sizing for the proposed improvements so that it may be incorporated with the construction of the project. The conclusions and recommendations presented in ' this report are based upon the proposed site development plan; proposed building construction plans; on -site observations; and the available topographic information. The analysis was performed in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards" manual. SITE DESCRIPTION ' The site is considered to be rectangular and contains approximately 3.05 acres, exclusive of the adjacent 2.5 acre tract to the South that is to remain undeveloped. The site's East-West dimension is approximately 395 feet and its North -South ' dimension is 335 feet. The site abuts the southerly right-of-way of West Plum Street and the tract that is to remain undeveloped abuts the northerly right-of-way of West Elizabeth Street. The site is located in the CANAL IMPORTATION DRAINAGE BASIN. "HISTORIC" CONDITIONS ' The site is vacant and has been utilized as irrigated pasture. A small depression has been dug near the Northeast corner of the site to capture surface runoff for ' stock watering. The ground surface has been- roughly graded and a moderate ground cover of grasses is found on the parcel. The "historic" direction that the site slopes is from South to North. A small lateral ditch is situated along the crest of a hill adjacent to the southerly boundary of the development. The site is ' considered to be moderate with slopes ranging from 1 % to 6 %. The major portion of the site currently drains onto West Plum Street. The run-off generated on the rear yards of the adjacent lots to the West and East flows onto the site and then ' flows northerly across the site to West Plum Street. The runoff from the tract to the South that is to remain undeveloped flows to the South and East toward West Elizabeth Street. An existing developed area of approximately one acre situated ' immediately West of the site contributes run-off to the street flow along the North side of the site. The run-off in the street flows to the East along Plum Street to the intersection with Timber Lane. The flow travels North along Timber Lane for ' approximately four hundred feet where it is intercepted by storm drain inlets. The -run-off is directed through the inlets to an open drainage channel that flows easterly. 1 PROPOSED DEVELOPMENT The proposed development of the site is to consist of developing thirteen single family residences to be located on the northern three acres of the site. The homes are to be considered as affordable housing. The average proposed lot size is approximately 7,000 square feet. The house "foot print" is anticipated to be from 1,200 square feet to 1,500 square feet depending on the style of house to be constructed. A paved driveway and attached two -car garage are to be constructed with each home. The proposed site plan indicates that a cul de sac is to be constructed at the southerly boundary of the site. The proposed development plan indicates that the southern two and one-half acres of the site is to remain vacant. with a potential for future development.The cul de sac is intended ultimately provide access to the southerly portion of the site that is to remain undeveloped. This investigation has not considered this as tributary to the development that is currently proposed. As previously stated the run-off from the site flows onto West Plum Street. There are no other drainage facilities available to accept run-off from the site. The current City policies require that the difference between the historic rate of run-off and the developed rate of run-off be detained onsite. The release rate is to be no greater than the 2 Year Storm historic rate. The City's policies normally require that the adjacent street flows be incorporated with the onsite detention requirements. This policy applies most efficiently when the street construction and onsite detention are performed concurrently. In this instance, it is not physically feasible to combine the two flows since the flow generated on the streets can not be intercepted and directed into an on -site detention facility and then routed back into the curb and gutter. The area within the southerly half of the Plum Street right-of-way has been considered as tributary to the detention facility for sizing purposes. There are long term plans for improvements to be made within the Importation Canal Drainage Basin. These improvements could provide facilities that would eliminate the need to provide onsite detention for the proposed development. Therefore, the onsite detention facility may be considered to be temporary and may be better utilized for open space purposes when its function as a drainage facility is no longer necessary. L 2 EROSION CONTROL MEASURES Erosion control considerations are based upon the short term activities that occur during construction and the long term measures that are to be placed for the life of the facility. The long term erosion control measures are the proposed methods and materials to be used to provide surface treatments for the driveways, parking areas, walkways and the landscaped open areas. Landscape materials and plantings in the open areas will provide a combination of ground covers to deter erosion. The anticipated construction schedule should have the site grading completed, within one (1) month after commencing construction. The schedule for construction activities is anticipated to be: September 15 - September 20, perform site grading; September 23: - October 5 install water and sewer lines; October 7 - October 15 construct curb,'gutter and sidewalks and drainage related facilities; October 21 - October 24 place pavement; October 15 - October 25 install landscaping. The recommended short term erosion control methods to be incorporated with the construction activities consist of the following: upon completion of grading operations and at the time that the drainage outlet is installed a "Straw Bale Filter" is to be placed at the inlet; and a "Silt Fence is to be placed along the northern boundary of the site in order to control and contain mud and debris onsite. Wind erosion measures are to consist of water application and roughening of exposed surfaces. 3 CONCLUSIONS AND RECOMMENDATIONS 1. The proposed development will retain the "historic" drainage patterns. 2. The site is located in the IMPORTATION CANAL DRAINAGE BASIN. The site is not located within a defined floodway or flood plain. 3. All development is to be performed in accordance with City of Fort Collins criteria. A variance to the City's policies is requested from detention of adjacent street flows due to physical impracticality. 4. Onsite detention of storm water is required by the City of Fort Collins. The volume of run-off to be detained is estimated to be 10,836 cu. ft. The detention volume has been determined based upon the calculated volume of run-off generated by a 100 Year Storm. The entire site, one-half of the adjacent W. Plum Street, and the adjacent rear yards at the West side of the site have been considered as the tributary area to determine the volume of the detention pond. The calculated volume generated from the tributary area is to be released at a controlled rate determined by the sum of the `historic' rate of run-off from the site for a 2 Year Storm plus the rate of run-off for the rear yards of the area to the West of the site. The calculated release rate is 1.92 c.f.s. 5. The City of Fort Collins Standards for temporary erosion control measures are to be incorporated with the construction activities. Specifically, the following are to be incorporated in the site construction activities: a. A "Silt Fence" is to be placed along the northerly border of the site. b. "Straw Bale Filters" are to be placed at the the inlet end of the outfall pipe until inlet structures are in place. c. Water application is to be made to prevent dust during the site development phase of the project. d. Roughening of the exposed earth surfaces shall take place during the site development phase of the project. 9 STORM WATER DETENTION SUMMARY SITE DRAINS TO "IMPORTATION CANAL" DRAINAGE BASIN GROSS SITE AREA (includes 1/2 of W. Plum Street) = 144,935 Sq. Ft. = 3.31 Ac. ± NET SITE AREA = 132,858 Sq.Ft. = 3.05 Ac. ± HISTORIC "C" = 0.20 DEVELOPED "C" = 0.45 HISTORIC "Q2" = 1.39 c.f.s. CRITERIA BASED DETENTION VOLUME = 10,836 Cu.Ft. ± PLAN DETENTION VOLUME = 10,937 Cu.Ft. MAXIMUM DEPTH OF DETAINED WATER = 2.25 Ft. Q Elevation 5097.50 PEAK DISCHARGE FROM DETENTION, Q = "HISTORIC" Q2 + QOFFSITE = 1.92 c.£s. ± RUN-OFF SUMMARY Basin Area `C' —Ql_ Oloo (Acres) (c.f.s.) (c.f.s.) A 0.80 0.45 0.67 1.92 B 0.56 0.45 0.53 1.51 C 0.40 0.45 0.38 1.08 1 0.56 0.45 0.63 3.75 2 2.75 0.45 3.09 8.97 ' Engineering Mr. Basil Hamdan Stormwater Utility ' City of Fort Collins 235 Mathews P. O. Box 580 Fort Collins, Colorado 80522 - 0580 Re: West Plum Street - P.U.D., Fort Collins, Colorado Dear Mr. Hamdan, May 16, 1996 Project No. PLA-195-96 The estimated cost for erosion control devices for the subject site has been ' estimated to be: 1. Silt Fence 4751.f. @ $2.50/ft. _ $1,187.50 2. Straw Bale Filter 2 Each @ $75.00/Ea. $150.00 Total $1,337.50 Cost @ 150% = 1.5_x $1,337.50 = $2,006.25 ' The cost to re -seed the 132,850 square foot site at $0.0298/sq.ft. _ $3,959.17 150% of the re -seeding cost = 1.5 x $3,959.17 = $5,938.75 Therefore, the subject project's estimated erosion control security amount is determined to be $5,938.75. This amount is to be included as surety for the erosion control guarantee along with any other surety requirements that may be a part of the City's "Developer's Agreement" requirements. If you should have any questions or desire additional information, please feel free to contact this office. Submitted, ngineering Associates Dennis R. Messner, P.E. cc: Mr. Doug Viita, Viita Building Company Civil and Environmental Engineering Consultants 150 E. 29th Street, Suite 225 Loveland, Colorado 80538 Telephone: (970) 663-2221 No Text VICINTY MAP (Not -to -Scale) m Salazar PI I� L Plalna ym -+ Elm st %t ` E 0 O e ` m... F 2 m o O Y n c 2 Che St Cherry ° = --y Sycamore St ap Ln Cherry St �;;: 'St 3 y a rn Cher. s, Maple S -k Collins Ct -- c 2 m `LaylBnd Z 2al nd c `Golf,Course "� p_City' �. rkele Clr $ ` c-WoodvaUe !" c Da e= _y ntr Cir m m m Laurel s Ct ' o a U Lakes e Ib Radcliff77mberCt.;--Or - estv�e y 0 0, a , m JaergerCt E Orchard P E WL- 5 w Plum t rt c w roadvlew ca e` H. W Plum 3t t Plu Piumn St McAI m q Y Y S a D c D` D` i terra alone Is r 3 $ Lsesdale K a a .: o rabf f -$ r pv�� v Dr I 6a1e Flln dew a u m g Ct 't_paksrood /netk P c p Il Bred ug ° t m Pd S n r o a o Q W w o c Z c for WEST PLUM STREET - P.U.D. to be located in the North Half of Section 16, Township 7 North, Range 69 West of the 6th PJL in the City of Fort Collins, T arimer County, Colorado I r W 4 - cn I a•y. Z l (J O cn cc • a Conc. Pt. "A" Conc. Pt. "B" (Offsite Run-off to W. Plum St.) (Combined Offsite & Onsite Run-off on W. Plum St.) Area = 0.8 Acres ± Area=Offsite[0.8+0.6+0.4]+Onsite[3.3]=5.1 Acres ± 02 = 0.7 c.f.s. ± 02 = 3.3 c.f.s. ± 0100 = 1.9 c.f.s.+ 0100 = 10.7 c.f.s.± � �c1J�C(��[Ja��fiIO��(u DRAINAGE INVESTIGATION CALCULATIONS Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort Collins, Larimer County, CO By: D.R.M. Rev. 6/28/96 This investigation is being performed to determine the required detention volume, discharge rates, channel and structure sizing for the subject project site. The site is located in the "Importation Canal' Drainage Basin. RATIONAL METHOD Runoff Coefficients, "C Larimer County Storm -Water Management Manual Land Use Description "C Building/Roofs 0.95 Drives and Walks 0.95 Gravel Surfaced 0.50 Undeveloped n Areas 0.20 Grassed Landscaped Areas 0.15 RATIONAL METHOD Frequency Adjustment Factors Storm Return Period ears Freq. Factor "Cr, 2 1.00 5 1.00 10 1.00 100 1.25 EXISTING CONDITIONS: (Note that only the northern 3 ± acres of the site is considered in this investigation.) Building/Roof Street, Drives and Walks Gravel Surfaced Landscape Undeveloped Open Areas Landscaped Areas Area= 0 Sq.Ft. Area= 0 Sq.Ft. Area= 0 Sq.Ft. Area= 144,395 Sq.Ft. Area= 0 1 Sq.Ft. TOTAL SITE AREA Area= 144,395 Sq.Ft. Avg. C2 = ([(0.90 x 8,845)+(0.20 x 135,550)] + 144,395) x 1.00 Avg. C2 = 0.20 Avg. C5 = ([(0.90 x 8,845)+(0.20 x 135,550)] + 144,395) x 1.00 Avg. C5 = 0.20 Avg. C10 = ([(0.90 x 8,845)+(0.20 x 135,550)] + 144,395) x 1.00 Avg. C10 = 0.20 Avg. C100 = ([(0.90 x 8,845)+(0.20 x 135,550)] + 144,3951 X 1.25 Avg. C100 = 0.25 (Existing W. Plum St.) 3.31 Acres Page 1 of 7 DRAINAGE INVESTIGATION CALCULATIONS ' Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort Collins, Larimer County, CO By: D.R.M. ' Rev. 8/9/96 EXISTING CONDITIONS: (cons.) Time of Concentration Consider sheet flow across site from South to North ' L = 420 ft. Elev. Diff. 5106 - 5096 = 10.00 ft. Slope, S = 2.38 % ' T = 1.87(1.1-CCf)4L+(SAl/3)=1.87(1.1-(0.25x1.00))4143+( 2.38A1/3) = 25.84 Minutes ' Since surrounding area is developed consider for 'urbanized' condition as a check Tc = L / I80 + 10 for 'urbanized' condition with longest flow path considered ' Length, L = 600 ft. Tc = 600 / 180 + 10 = 13.33 minutes Average of the two methods = (24.41 + 13.33) / 2 = 19.59 minutes ' USE Tc = 15 minutes since area is mostly developed ' Rainfall Intensifies based upon 15 minute Time of Concentration: I2 = 2.10 in./hr. I5 = 3.00 in./hr. ' I10 = 3.70 in./hr. I100 = 6.00 in./hr. Determine Run-off from Site under present conditions: Q = CIACf Q2 = 0.20 x 2.10 x 3.31 x 1.00 = 1.39 c.f.s. ' Q5 = 0.20 x 3.00 x 3.31 x 1.00 = 1.99 c.f.s. Q10 = 0.20 x 3.70 x 3.31 x 1.00 = 2.45 c.f.s. ' Q100 = 0.20 x 6.00 x 3.31 x 1.25 = 4.97 c.f.s. ' Offsite Run-off @ Existing Conditions: Area "B": Consider the run-off generated from the rear lot areas of the single-family residential lots immediately West of the Site. ' Area = 65 x 375 + 43,560 = 0.56 Acres Time of Concentration = 15 minutes from previous calculations. ' "C" = 0.45 from Table 3-2 Page 2 of 7 DRAINAGE INVESTIGATION CALCULATIONS ' Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort -Collins, Larimer County, CO By: D.R.M. ' Rev. 8/9/96 EXISTING CONDITIONS: (cons.) ' Area "B": Q = CIACf Q2 = 0.45 x 2.10 x 0.56 x 1.00 = 0.53 c.f.s. Q5 = 0.45 x 3.00 x 0.56 x 1.00 = 0.76 c.f.s. ' Q10 = 0.45 x 3.70 x 0.56 x 1.00 = 0.93 c.f.s. Q 100 = 0.45 x 6.00 x 0.56 x 1.25 = 1.51 c.f.s. ' Area "C": Consider the run-off generated from the rear lot areas of the single-family residential lots immediately East of the Site. ' Area = 50 x 350 + 43,560 = 0.40 Acres Time of Concentration = 15 minutes from previous calculations. ' "C" = 0.45 from Table 4.2.6-1 Area "C": Q = CIACf Q2 = 0.45 x 2.10 x 0.40 x 1.00 = 0.38 c.f.s. ' Q5 = 0.45 x 3.00 x 0.40 x 1.00 = 0.54 c.f.s. ' Q10 = 0.45 x 3.70 x 0.40 x 1.00 = 0.67 c.f.s. Q 100 = 0.45 x 6.00 x 0.40 x 1.25 = 1.08 c.f.s. ' Area "A": Consider the run-off generated on the developed area to the West that drains onto Plum Street from Rocky Road. ' Time of Concentration = L / 180 + 10 Tc = (550 / 180) + 10 = 13.06 Minutes Length, L = 550 feet Therefore consider Tc = 15 minutes Area = [(425 x 75) + (50 x 60)] / 43,560 = 0.80 Acres ' Therefore the gutter flow from the West Area "A": Q = CIACf Q2 = 0.45 x 2.10 x 0.80 x 1.00 = 0.67 c.f.s. Q5 = 0.45 x 3.00 x 0.80 x 1.00 = 0.96 c.f.s. Q10 = 0.45 x 3.70 x 0.80 x 1.00 = 1.18 c.f.s. ' Q100 = 0.45 x 6.00 x 0.80 x 1.25 = 1.92 c.f.s. Page 3 of 7 I DRAINAGE INVESTIGATION CALCULATIONS 1 1 1 Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort Collins, Larimer County, CO By: D.R.M. Rev. 8/9/96 PROPOSED CONDITIONS: Building/Roof Area= 18,600 Sq.Ft. Drives and Walks Area= 36,400 Sq.Ft. Gravel Surfaced Landscape Area= 0 Sq.Ft. Undeveloped Open Areas Area= 0 Sq.Ft. Landscaped Areas Area= 89,395 Sq.Ft. TOTAL SITE AREA Area= 144,395 Sq.Ft. = 3.31 Acres Avg. C = [(0.95 x 18,600)+(0.95 x 36,400)+(0.50 x 0)+(0.35 x 0)+(0.20 x 89,395)] + 144395 Avg. "C" = 0.45 Flow path through back yard swales from Lots 6 to 2 and then in concrete pan to detention pond, therefore, Tc = 10 minutes I2 = 2.50 in./hr. I5 = 3.65 in./hr. 110 = 4.45 in./hr. I100 = 7.25 in./hr. Determine Peak Rate of Run-off at Proposed Condition: Area #1 - Area that is to flow undetained onto W. Plum street: Area #1 = 0.56 acres Q2 = 0.45 x 2.50 x 0.56 x 1.00 = 0.63 c.f.s. Q5 = 0.45 x 3.65 x 0.56 x 1.00 = 0.92 c.f.s. Q10 = 0.45 x 4.45 x 0.56 x 1.00 = 1.12 c.f.s. Q100 = 0.45 x 7.25 x 0.56 x 1.25 = 1.83 c.f.s. Area #2 - Area onsite that drains to the proposed detention pond: Area #2 = 2.75 acres Q2 = 0.45 x 2.50 x 2.75 x 1.00 = 3.09 c.f.s. Q5 = 0.45 x 3.65 x 2.75 x 1.00 = 4.52 c.f.s. Q10 = 0.45 x 4.45 x 2.75 x 1.00 = 5.51 c.f.s. Q100 = 0.45 x 7.25 x 2.75 x 1.25 = 8.97 c.f.s. Page 4 of 7 DRAINAGE INVESTIGATION CALCULATIONS Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort Collins, Larimer County, CO By: D.R.M. Rev. 8/9/96 DETENTION VOLUME CALCULATION FOR PROPOSED SITE CONDITIONS QRelease = Q2 (Exist. Conditions) + Q Offsite thru Det. Pond = 1.39 + 0.53 = 1.92 c.f.s. At Q100 Proposed = CIACf = 0.45 x I x 3.31 x 1.25 = 1.86 x I (in./hr.) Time min. Rainfall Int., I in./hr. Q100 Prop. c.f.s.) Vol. @ Q100 (cuft) Q Rel. @ 2 Yr. (c.f.s. Vol. Rel. cuff[ Vol. Diff. cu.ft. 10 7.10 13.21 7,926 1.92 1,152 6,774 15 6.00 11.16 10,044 1.92 1,728 8,316 20 5.15 9.58 11,496 1.92 2,304 9,192 25 4.55 8.46 12,690 1.92 2,880 9,810 30 4.10 7.63 13,734 1.92 3,456 10,278 40 3.45 6.42 15 408 1.92 4,608 10,800 50 2.95 5.49 16 470 1.92 5.760 10,710 60 2.65 4.93 17 748 1.92 6,912 10,836 70 2.35 4.37 18,354 1.92 8,064 10,290 80 2.15 4.00 19,200 1.92 9,216 9,984 90 1.95 3.63 19,602 1.92 10,368 9,234 100 1.75 3.26 19,560 1.92 11,520 8,040 110 1.60 2.98 19,668 1.92 12 672 6,996 120 1.45 2.70 19,440 1.92 13 824 5,616 ' Therefore, a minimum of 10,836 cu. ft. of Detention Storage Volume is desired for the site. ' DETERMINE POND SIZE: High Water Surface Area, At (175 x 40) = 7,000 sq.ft. ' Pond Bottom Surface Area, Ab (150 x 20) = 3,000 sq.ft. Max Depth, It = 2.25 ft. ' - Vol. = 1/3 ( Ab + At + 4AbAt) h = 10,937 cu.ft. 10,937 = 10,836 Therefore, OK ' Provide minimum of 1.0 ft. freeboard or additional 33% of total volume for safety factor. ' Elevation of Low Point = 5095.25 Design Top of Berm Elev. w/ 1.0' freeboard = 5095.25 + 2.25 + 1.0 = 5098.50 ' To attain 33% of total volume an additional depth of approximately 1.0' would be required. Therefore, maintain 1.0' freeboard. Page 5 of 7 ' DRAINAGE INVESTIGATION CALCULATIONS ' Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort Collins, Larimer County, CO By. D.R.M. Rev. 8/9/96 DETENTION OUTLET CALCULATION FOR PROPOSED SITE CONDITIONS Determine sizes to provide control at the outlet from the Detention Pond. Determine Orifice Opening Area for Discharge at Q2: ' Orifice Equation: Q = CA 42gh h = Depth - 0.5' = 1.75 ft. Q Release = 1.92 c.f.s. C = 0.65 ' A = Q / (C42gh) = 1.92 / [0.65 4(2 x 32.2 x 1.75] = 0.28 sq ft. tWith Round Opening A = 7rrA2 Radius, R = JA/n = J 0.28/7r = 0.30 ft. Radius, R = ft. x 12 in./ft. = 3.60 in. With Square Opening A = wA2 Width of Opening, W = qA = 40.28 = 0.53 ft. Width of Opening, W = ft. x 12 in./ft. = 6.36 in. ' Use 7-1/4" dia. Round Opening or 6-3/8" Square Opening for outlet control device. CHECK FLOW DEPTH IN PLUM STREET ' Q2 = 0.63 + 0.38 + 0.67 + 1.74 = 3.42 c.f.s. ' Q100 = 1.83 + 1.08 + 1.92 + 1.74 = 6.16 c.f.s. Theoretical Street Capacity, Q = 0.56 Z/n CIS yA8/3 ' n = 0.016 Z = 1 / Cross Slope = 1/0.02 = 50 ' S = Gutter Slope = 1.2 % = 0.012 ft. / ft. At Depth of Flow, y Minor Storm Allowable Depth, y = 6" = 0.5 ft. ' Q = 0.56 x (50 / 0.016) x 40.012 x 0.5A8/3 = 30.19 c.f.s. Reduction Factor= 0.80 ' Design Capacity = Theoretical Capacity x Reduction Factor = 30.19 x 0.80 = 1 24.15 c.f.s. ' 24.15 >> 6.16 Therefore, the existing street's Design Capacity greatly exceeds estimated flow for either the Minor or Major Storms. Page 6 of 7 DRAINAGE INVESTIGATION CALCULATIONS ' Client: VIITA BUILDING COMPANY Project No: PLA-195-96 Project: WEST PLUM STREET - P.U.D. Date: 14-Mar-96 Location: N 1/2 16 - 7 - 69, City of Fort Collins, Larimer County, CO By: D.R.M. ' Rev. 8/9/96 CROSS PAN CAPACITY AT PEAR STREET ' At 3" Flow Depth Pan Slope, S = 0.007 ft./ft. Pan Area, A = 3.06 sq. ft. ' Wetted Perimeter, Wp = 24.5 ft. R = A / Wp = 3.06 / 24.5 = 0.125 ft. ' n = 0.016 ' Q=1.486/n A RA2/3 SA1/2 = 1.486x3.06x(0.125)A2/3x(0.007)Al/2/0.016= 5.94 c.f.s. Flow over Cross -Pan from West side of Pear Street ' Q100 + Q Offsite = (0.45 x 7.25 x 1.0 x 1.25) + 1.83 = 5.91 c.f.s. 5.94 = 5.91 Therefore depth of flow at 3" - OK ' Determine Flow depth at Drainage Swale along rear lot -lines of Lots 11, 12 & 13 ' At 6 Flow Depth Swale Slope, S = 0.01 ft./ft. "V" shaped Swale 10 ft. wide by 6 in. Deep Swale Area, A = 5 sq. ft. ' Wetted Perimeter, Wp = 10.05 ft. R=A/Wp=2.5/10.05= 0.50 ft. ' n = 0.025 Q=1.486/n A RA2/3 SA1/2 = 1.486x2.5x(0.25)A2/3x(0.01)Al/2/0.025= 18.72 c.f.s. ' Flow over Cross -Pan from West side of Pear Street ' Q100 + Q Offsite = (0.45 x 7.25 x 1.0 x 1.25) + 1.83 = 5.91 c.f.s. Q x 1.33 = 5.91 x 1.33 = 7.86 c.f.s. 18.72 >> 7.86 Therefore depth of flow less than 6" - OK 1 Page 7 of 7 RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: West Plum Street - P.U.D. STANDARD FORM A COMPLETED BY: Messner Engineering Associates DATE: 3-14-96 DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBA�IN ZONE (ac) (ft) ($) (feet) ($) ($) Entire Moderate 3.05 525 1.9% 79.6 Site MARCH 1991 8-14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: West Plum Street - P.U.D. STANDARD FORM B COMPLETED BY: Messner Engineering Associates DATE: 3-14-96 Erosion Control C-Factor P-Factor Method Value Value Comment Bare Soil 1.00 1.00 Road/Walks 0.01 1.00 Silt Barrier 1.00 0.50 Sediment Trap 1.00 0.50 Gravel Filter 1.00 0.80 MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS Entire 79.6 3,:05 3.05 Bare Soil = 2.05 ac. Site Road/Walk = 1.0 ac. wtd 'C' _ (1.0 x 2.05) + (0.01 x 1.00) / 3.05 = 0.68 wtd 'P' = 0.5 x 0.5 x 0.8 = 0.2 EFF. _ (1 - (0.68 x 0.2)) x 100 = 86.4,-- 79.6 OK MARCH 1991 1 8-15 DESIGN CRITERIA CONSTRUCTION SEQUENCE ' PROJECT: West Plum Street - P.U.D. 5EOUENCE. FOR 19 96 ONLY COMPLETED BY: Messner Engineering Assoc.DATE STANDARD FORM C 3-14-96 ' Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for ' approval by the City Engineer. YEAR 1 -1996 MONTH I JANIFEB ! MARIAPR MAY IJUNEIJULYIAUG ISEP IOCT INOV IDEC ' ---------------------------- 1----------------------------------------------------------� OVERLOT GRADING xx 'WIND EROSION CONTROL Soil Roughing Perimeter Barrier. Additional Barriers 'Vegetative Methods Soil Sealant Other(Water Application) ' RAINFALL EROSION CONTROL STRUCTURAL: ' Sediment Trap/Basin Inlet Filters Straw Barriers ' Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows ' Terracing Asphalt/Concrete Paving Other ' VEGETATIVE: Permanent Seed Planting t Mulching/Sealant Temporary Seed Planting Sod Installation ' Nettings/Mats/Blankets Other ' STRUCTURES: INSTALLED BY ' VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HOI/SF-C:1989 MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON xxx XXXX xxxx xxxxxxxx xxx xxx FOR, aaairz '�� •1 TO SON 2 L I PLAT Rigooy Mal �roRE W ( THE PROAR OF 7a PRE mill rux ww" _SmiI ON) le -I oA u I FORT uu 5. IL rS• 4. - ESs' ORIFICE PLATE DETAIL -- 7xoi=ro=srn ' _T I 55 f7771 J'=e % J w , . P�'l LT �"imu ro zTAa ${� $ Ic.`a R- PIPE 'Ire4rL19;51".�aIT T rcw.urc� •_• SECTION AT DETENTION POND OUTLET --NOf ro srA,E - - -- I. IF y �1wE1 - j[fi 4N 24 rmwaRNORICTURE Wol M ORMA. x PAY INLET STRUCTURE DETAIL_ OR -FILTERaL FASSID WOOD TOST -RACKLUED TRENCH Ehr_ FARES gP OR R SE J,F oOD POST To POST E RE Plum TFRE] W CON J 3tr offRUNOFFE far OF FTNI R eas iCalOry vEw DR GMG fRTERNG velSaRE SILT FENCE DETAIL - o0T -0 SCAE L12._. _. rr„ F � Mal sic £on'"E a !Y ImmroiIDEEvo7�=01, MRm�+Arz, Is NMAffro A= { rax OR m mi ASS 3ErnaM A-6 T� WAY°Y7MMOM Wwumc. £2EA INLET FILTER STRAW BALES A NOT TO SCALE F'11ne r 1 1 It e a eMx e� HPo Al MOM SLCPES To Se 441 m we wne .wo emrzR.` SECTION_A-A. AT DETENTION POND NOT TO SfAL1- - -` I I I - Propbsed Slit Fence 5100_47- _ 1� if ro Mal •2Zf ' -' ALL aer swra TO % It SECTION B-8 AT DETENTION POND f'ore3eae OVERFLOW SECTION 1NOTT6-9511 a -g- a�nO'w�ic tii: Ir - i,p5 SECTION C C (A4woN PmPa,llu=1 Exii Gmund an tolia"i USER Gmrxary Safes To and one Pmwny G(mRM y Dle Pam L. I'M al IT lIV Rsrudune r� 20%Mu. I,J 1s so 0 30 9a 1" = 3G- Contour Interval 1' Cur - propgeed Silt Fence _� Sid Ik _ ---- s PropOaed Sidewalk Culvert Overflow -,Proposed 12"0 _-=j� S: N-12 Pipe Outlet %A' OOW D.D �fi - J T.O.F.Elev.= / 5102 5 / I1 0 1.00 Ele'v. TQF: Nav =B' 4 1 5.7 1 51005 I v- Ile 13 12 L� "OF P posed Sidewalk r 61027 - I� Cu erl (Safe Dethil Sheet'&) C - - z r --em�l ,r{, + �'� Detention 2,4 c 0 I' �� ' +� ate_ ss. - sa.9 C 7. Area 2' Wide IT HS Elev.- Proposed.r a a 0 Concrete Pan % E.O.F. Elev.- - _ '10 ti10.7 I I, 51030 _ MID + 5a95-. 2.6� L05i �' * 02 - -- �� 1 a o.'. Eev A- _ l 51027 - DOIL- 5104.0 r' � 3.3 .. _ 3.0 21 \ 8 i Ij s t - T.O.F. v. I li� \ TA cep= 5105.2, 5105.2 L1 i 5 045 - a.37 5 a�`O 5D ♦ 3 4.5 t_.-3to5r_ 4�j_*tl ITO F. Elev.- 5105.7 T.O_F_ 5105 _ 5106.7 e 1 Fall 7`6_ � SLOE 72 60 ®b - .a--- -�. NOTE: SITE GRADING OPERATIONS RHALL BE RESTRICTED TO THE IN PLUM STREET - P.UDP LIMITS. J,10 GRADING -OPERATIONS SHALL 4) x'` OCCUR ON THE PROPERTIES TO THE WEST OR EAST OFTHE,SITE.- j Oct _Inlet Str)Contro: Orifice Release (SEE DETAIL A^ yo / IeR' y0 Proposed I -Sdt °-ence O13-, i I STORK WATER DETENTION SUMMARY SITE DRNNS TO 7MPORTATON CANAL' DRAINAGE BASIN GROSS SITE AREA (Including 1/2 of adjacent W. Plum 9L)-I44.935 III -3.31 Acrn! NET SITE AREA - 132.1555 Sa R. - 3.05 Acreei HISTORIC 'C - 020 DEVELOPED 'C' - aeE5 , HISTORIC O2 1.39 c 1 e. CRITERIA BASED DETENTION VOLUME - 10,836 cu.N.! PUN DETENTION VOLUME - 10937 cu.l MAXIMUM DEPTH OF DUNNED WATER - 2.0 FILL e Devotion 5097.50 PEN( DISCHARGE FROM DETENTION, 0 HISTORIC' 02 + oaR919 - 1.92 cI RUN-OFFSUMMARY B6�tl (Acres) yy22.�,, (c.l.0.) c.f.e. A 0.80 0.0 0.67 1.92 B 0.54 0.465 D M 1.51 C 01 0A5 0.3e 1.05 1 0.50 OA5 0.63 1.75 2 2.75 0.0 3.09 &97 City of Fort Conine, Colorado UTILITY PLAN APPROVAL APPROVED. f _. ON - ra/ �9 CHECKED BY l�yt Vote3G " W- r t t r-7Cli I'ty CHECKED BY role.y CHECKED BY. Ts003 TiRecreotion'- -- -- " CHECKED BY - CHECKED BY CONIRRUCTON SEQUENI PROJEU YI E.U=Eii. _Rua c SMENCE MR 19% ONLY ea OF s,�.ecsae. EMIL ua_re. •GT E E_� rr'N,.NJI - - Typically Indicates Existing Ground Surface Contour 1 I .�1ar/ Tyyp call Indicates Proposed - 5101 Fmsh Surface Contour Typically Indicates Proposed Gurb, Gutter & Sidewalk - Tr' Typically Indicates Existing Cufb, Gutter & Sidewalk 10 x---x-- Typically Indicates 'Silt Fence' t ( Typically Indicates Drainage Flow Direction Typically Indicates Drainage Basin Limit Typically Indicates Concentrrat.On . OAF er0� Paint Identifier - SCALE: DRAWN CHKD Project No. PLA I95-96 SHEET 3 of '3 e-; .596