Loading...
HomeMy WebLinkAboutDrainage Reports - 08/01/1989RMINC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 3031226-4955 June 5,' 1989 Revised July 20, 1989 Ms. Susan Hayes Storm Drainage Department ,City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 RE: FINAL DRAINAGE REPORT FOR THE.WEBERG P.U.D. Dear Susan: The Weberg Furniture site is located about 1/2 mile south of Har- mony Road on the west -side of Highway 287 (College.Avenue in Fort Collins) in Larimer County Colorado. Annexation is currently underway to bring this site within City limits. More specifi- cally :this location is in the east half of Section 2, Township 6 North;.Range 69 West of the 6th Principal Meridian. This site currently is occupied by a residence with a large open grass field between it and College Avenue. The general slope of the property is at about 1% to 3% in a southeasterly direction. Existing drainage from this site flows in two directions. Exist- ing basin Hl (on plan in pocket) drains to a drainageway that ex- ists just south of this basin. Basin H1 is offsite and to the west of this site with an exception of proposed Basin A which is a small portion of Basin H1 located on its east side. Proposed Basin A will be re -directed to drain in the direction of Highway 287. Drainage from existing Basin H2 drains directly into High- way 287. Calculations for the existing flows from Basin H2 are shown in the Appendix. Some offsite flows from the north currently are captured into a drainage Swale near the north property line. This drainage Swale meanders on and off this property but exists primarily north of property line near an existing drive. The development of Lot 2 will require redefining this Swale north of this site or make provisions for the offsite flows to safely pass through this site. Prior to the development of lot 2, major storm flows might enter this lot, the flows will eventually drain to Fairway Lane and then into the detention pond for Basin "B". If the pond Other Offices: Vail, Colorado 3031476-6340 • Colorado Springs, Colorado (719) 598-4107 overflows, the storm water will spill, via emergency overflow direction, into Highway 287. Further offsite flows from proposed Fossil Boulevard, to the north, must be detained prior to flowing onto this site. The release flows onto this site must not exceed historic rates. These historic flows will be routed through this development. The flows that enter Highway 287 will drain in existing curb and gutter as they travel south of the site. At a point about 400 ft. south of this site, an existing 5' inlet will intercept_ some of the flows. This inlet collects the flows into a pipe which transports them to the east side of Highway 287, where the pipe daylights. Low flows from this pipe drain into an irrigation pipe, at this location, and then travel south and into Fossil Creek. The major flows sheet flow to a roadside ditch within the Fossil Creek Meadows Subdivision. Roadside ditches, along with culverts under existing roads within the subdivision, direct the flows to Fossil Creek. At the time of this report, a development entitled Fossil Creek Design Center P.U.D. is being constructed on the east side of Highway 287 near the daylighted pipe ex- plained above. This development will redirect flows from Highway 287 to drain south along a future extension of Snead Drive, then under Fossil Boulevard and finally into Fossil Creek. Flows that are not intercepted by the above mentioned inlet in Highway 287 will continue down the hill to existing 10' inlet. This inlet collects the flows to a pipe system which finally drains directly into Fossil Creek. This property is a part of the Fossil Creek Major Drainage Basin which is explained in the Fossil Creek Drainage Basin Master Drainageway Planning Study, by Simons, Li and Associates, Inc. August, 1982. Based on the above report, The City of Fort Col- lins does not require any storm water detention from this site in a totally developed condition. If drainage flows are directed to the ponds southwest of this site, however, the City Stormwater Utility Department requires an agreement with the downstream property owners to accept the additional runoff generated without detention. Such an agreement would involve all property owners between this site and Fossil Creek. This requirement is noted for the future development of the property to the west. No developed runoff is anticipated to flow to this area according to the final design, therefore no agreement is required for the Weberg site. Drainage water from this site flowing onto Highway 287 is required to be limited to historic runoff rate as stated in a letter to the City of Fort Collins,from the Colorado State Highway Department dated October 7, 1988. The approach that this report pursues is to release flows from this site at existing historic rates with these flows outfalling into Highway 287. This would require some storm water detention to keep the developed flows from exceeding existing flow rates. The final design proceeded based on this design requirement. The first design step is to calculate existing flows in Highway 287 to ensure that these flows do not already exceed the City of Fort Collins criteria during a 10 year storm. The allowable flow rate in Highway 287 at the south of this site based on Manning's formula is 18.9 cfs. Applying the city reduction factor of 0.73 brings this flow rate to 13.8 cfs. This allowable flow rate is greater than existing flows of 13.76 cfs (see calculations in appendix) and therefore is within City requirements. The next design step is to create detention ponds for the developed basins in order to reduce developed flows to existing rates. In order to approximate existing flows, the 10 and 100 year developed storms were calculated for release rates and detention requirements. The calculations for Basins A, B, C, D, and E show that ponds are necessary, in these basins, to reduce flows to existing rates of Basin H2. The results of the calculations are shown in the fol- lowing table: (cfs) (Ac.-Ft.) 100 YEAR PROPOSED DESIGN 100 YR STORM DETENTION MAXIMUM POND VOLUME RELEASE RATE (cfs) (Ac.-Ft.) 10 YR PROPOSED EXISTING 10 YR AND DESIGN DETENTION STORM MAX. POND VOLUME FLOW RATE Basin "A" 1.2 0.14 0.6 0.08 Basin "B" 0.6 0.07 0.3 0.04 Basin "C" 0.9 0.11 (roof top 0.4 0.07 storage) Basin "D" 0.8 0.10 (roof top 0.4 0.06 storage) Basin "E" 2.1 0.26 1.1 0.14 Basin "F" 1.7 ---- 0.8 Basin "G" 0.7 0.4 Basin "H2" 8.1 4.0 NOTE: The release rate calculations (existing 100 year flows) can be seen in appendix. All of the basins will either have ground surface or roof top detention facilities. The stage release (10 and 100 year storms) structure is designed and shown in the Appendix. The structures are of either an orifice type or weir type design. Local streets were checked for curb flow capacity and found to be within City criteria. The flows from these streets will enter developed basins through parking lot access locations, inlets, or sidewalk culverts. The calculations are shown in the Appendix. Storm water from this proposed development drains into a water quality facility prior to draining from this site. Table 1, in Appendix, from the paper, National Perspectives on Urban Runoff Technologies, by Larry A. Roesner, Ph.D., P.E. of CDM, shows dif- ferent types of facilities that can be used along with the average amount of pollutants that they remove. The facility chosen for this development is the infiltration type. This type of facility, as shown on Table 1, removes an average of 90% of the following pollutants: A) Suspended Solids B) Phosphorous (P) C) Dissolved P D) Nitrogen (N) E) Lead F) Zinc The infiltration facility design quality control berm. This berm pipes, near the southeast corner redwood posts and synthetic filter ing material with gravel bermed up pocket for detail). The gravel i a year and replaced every two year owners of the site. CONCLUSIONS AND RECOMMENDATIONS for this development is a water will be at the pond outlet of Lot 1. The berm consists of fabric connected to wire fenc- on both sides (see plan in s to be visually monitored once s. This is to be done by the The grading and drainage facilities shown on the drainage plan should be complied with and will provide for the safe transport of storm drainage water through the site. The calculations which support this design approach appear in the Appendix of this report. .oNN'TaND 0 REn., Sincerely, Brian Co 1 P E e, 24993 Project Engineer.- o 0 REFERENCES s,; �2 'aEnX 1) Fossil Creek Drainage Basin Master Drainageway Planning Study, by Simons, Li and Associates, Inc. August, 1982. 2) Storm Drainage Design Criteria and Construction Standards, by the City of Fort Collins, May, 1984. 3) Letter to Ms. Linda Ripley of the City of Fort Collins Plan- ning Department from the State of Colorado Division of Highway (DOH File 45100), October 7, 1988. 4) National Perspectives on Urban Runoff Technologies, by Larry A. Roesner, Ph.D., P.E. of CDM, this paper is from; Urban Runoff Water Quality Seminar by the American Public Works Association, American Society of Civil Engineers, American Water Resources As- sociation and Urban Drainage and Flood Control District. cc: 322-002 No Text VICINITY MAP .•1 Y.w.,,C i. { :' k`'.l B{.=p I'`ORT.. ,-....... .: . c,., _ ••� ' ,.�.^ _ =•,� + t \ t R ;il, .. . A,Q1'IOGt�Iln� •.L" i "' t7n '�.�`\�1 $�'� Y � � � � I1 LL\ wJ ,f �7 � �t ,�t..�a'�1. •t r_� � q•\l ',' 1 \ u.tl'•I 1 \ 1! ,u ,T� T.►r ��.+ ' i .� �.._ %- .!; 1 :I .'%J � "` � ,`- rN .�•'1!•' .-!A,��.A. P.,. 111I1�..'._.IAI....�.��f. it/j ;I V.. ` ... _ iLll, t — a.al�t.�..':,:IL 1 13 y '',•.7`,. ``:�1.. o,I.t•�,�' —` •t' 1'Ylr ,1 -!. 0 4."..II'.�II IM[/r\ .\�,. �'..�.� •I r� \/ yt .. .I;, ., ` .'1 ••f :�. Y''p 1i Mip .......•:f7 M Rt f,G�v....., •\ \ �' '�4 I �� ' ll:::...U: �F-.n{,IA I �t�[I� 9 f �'�Pw x t'• I ; (iI Cp.nyrn I' ! tr: •� •Sj( 1:..� I iy;:,:,] f i t! �•: .I ` 1^I: ` . ..,^ n:•L _ _•. tli. _ � _ ^�•�_•�, •�\r• i , I II i \ Ijf I 1 ' � . �. '' '\��� i..'y``\\ • .%•\•. � . i._Z'::..� I I/il: � e�C • \�,.. ` IG.: '.� �;!•,1D��11 S• L• ! , � ' =��1 i _ I . i�;,:;• � ,..ter S •/. �-( � _' It -/"_: a__..r" \1'• l� 11I �'y�/��, •X�4 ., �,Ir'.,0. /'.. •� �• [li..r \ �'•` 1')I' •�~,. / r,Ir I� ` i.Xfr•I! 1� tt '. , f•I�l%'�.+.�•4•C-11• • I ••i', ' �• 11r'., '' I. `'.''{ .1.�:: low": ar t• I�\. .. ! ' Lt 1 '✓'. 1 i � "1' 1' GGGiii :..'.:' 1 I. , .N 1�,�" �:.t::Y.7 $ �w, Pm ,:+1 � /.i(1} �I' � ` ,' `f^, i9ol .. sA�',y.^�r :.>i:!. .'•.': '..P: ! •'1 �•t,•M•! (( ��•��•_ of :j„(MM •O,y',�W'I,�,W 1;; ". �/�; ` 1' IlIh •:,• 1 i I` r'j•�/�.• •tit ���, �� �' ,• 'y�a. / il• l � I�I'n/M •1 • II' !f '�■ ,.:, Y. 1 '•, ,'1\;. '•t .P9!gt! •i , ! i..'I )�; I r�h,, ` �. "� 'la j.I�r' w:. .i �`�{ /' bvp '"n•_ ,.�pl +r.. _nm_���;.. _ __�,!�, _ r / 1 Il `�Jd i ti.�.�d �� 1 � E t' i 1 \1 ..'_.' ii `; \�— ip`' _��'"�i•••; t HORSETOOTH ROAdI If I It .1 1 is '' ,••� \ .I.._ -,..:. l�,t . \. ••ll •1 ' ;-t'1, t. 7�2 �,Y .. ..\ ••h `:;.It\4 ; Rea .root kr 'Z.' ?•' I •, .l ;\ �l r. �1',','i 9(\\i� 'n it -� : /-51 e.''C.. _^....e��j-.:, '7.i �✓ r..� �,�..o = _ HARMONY ROAD \�, C:f•;a` SITE LOCATION 77 1. 16 , : -,. p,url'. ,, �' f +Aa:. J .-},• •�.'�••-. P'I },n W 11�1 '%. ;I .�rru.... 1 ' . li^" :�''y %' .,.: .'i'i O•` r•'. �I� . , \I a•r•'A�f ):�• I', •' . 1' i, ` a 1 No Text ■som Engineering Consultants CLIENT t- L(L 46 - JOB NO. PROJECT w t-R C. CALCULATIONS FOR _ MADE BY d.''• DATE / «- ' CHECKED BY DATE • SHEET OF EST C'P�T ^ t.xIN -4S^ , _. I.. I 4 f '; Ir+I Ur II ;. i t�`,.W�.Lo'u.►tr�c SLNZ I V p{�lvl j, I t 1 I c �3 •'Q J I. , I 1 15 I­1- 3. T�C4 If0i�1 �. t I 1.55 G. Ora- I.FoXz.I` t L'�`icy E t_oPt.p F t_oW S No Text T:IDINC Engineering Consultants CLIENT PROJECT CALCULATIONS MADE By -DATE -CHECKED BY -DATE OF I �_F: Tt­HISTOR IC FLOWS TO HIG HWAY 2 8 7 _T, _114- T J_ L�-H-L -1d _j_.jI .-W_ i i LIJ Li 4- L A I -i v J.- T A 4_4 44­; C6 L 1fI Z. J-1-T t_25�4>�, it . ... ... Id- -T—T, L _j 0, -4l _TT_ _T( Lt L! _4 4- I L -4- T I L 7- -4- 4 1--i 'LL T F. �7_ J _4_1 - i_.-L i'_L. •.. .... tit 2s, 4_ I 4__F.1- -4- i_11L. S -14 -A i- I f L i 1 1 1 1__ L__ A0,_ 1 1 1 l I 771VIZ!5; IF ta CrVA i t 7V7 1_1 A__ 1_4.7_7_� A A. 4-4 .l 4--- 4- -7 7 7 7 7� HAMONY ROAD r _T ZZ Old zq- ---- -- kk V X'. 11 1 All "7%JVV0 IN A MAJUK ARTERIAL STREET � CLIENT' JOB NO. • - ■■�V■i/i%Ic PROJECT � � .. -� •. CALCULATIONS FOR - Engineering Consultants ADEBY DATE CHECKED BV DATE SHEET -'OF ' a.: • N • I'; r , I -- -rl I ' i tip ' L-.. �.. I. -'.- .L.T. �., ' I ' r;- I " ...... -i ff I I 4. W. - II , -; _.-._.... ._•r .�_: ' i i r i_r i Y t i L' , t_. _ , 1.�11; iVL I 1.. T t ' I 1 1.: F 0 - r .-._•J 4 aL1.7}_I. ^t•�- i-' .. �. 1"G 1 i T f 1r- ! 1 .UO O .-•' 1�1' ^I mot/ N �t II' - . t I ! . f i •r.� ..}.gip � I V J .—I I ,.. , 1 I " I llll it 1Lb i e LZ : � - i.r L I ' �. ! _.i. � :_ 1_. � -�..+ 1 i 1 i I � ' ! i - � ,q'-..t...}..! j.. p.: ,,; I , I - • : x'C.: -• 1 -• , , i. I I I i ' YY� I t ' 1 1' 1 -' _-., -...I '.l - e r .. .: i" .;~ y V i 4 N 0 _}.i•-:-i- i- t '� _ e. '- _ r -.i i o f IZ.,:I I • 4 RMINC CLIENT JOB NO. PROJECT CALCULATIONS FOR Engineering Consultants MADEBV DATE CHECKED BY DATE SHEET OF 1 A.� .. : _ 1 ; .! I �' i. ., ' ° O' ?�"���t�R!..i � f ,. !V�'i`a7..a> i-•' C � �J-:.5,2... i 1 I . r. } :..�_;..i....t-.;-i I,� I, l! �-2.' 1•'i--'I I I I I I � 1 ..� I i �, ' , J: ,, ", , ! I�'•i«��C.1 t. �3 l��i I t' / I .A�.CA:.'=I �:..Ll 0..�1 �-3 S':5._:'- ,.. : 1 I- � ..�*•z,.....:-t - .. -:j I ! 1 { t 4 j i�'1 t' i' STftf C I ! I I I I+ t I k ! A. 1 i 1 1 f 1:5 It I ' I Et.T C111L�. Z�E��r �A P/?crr�T.iF l� soT ! T 'G.O.�K�2. OF .S,lt r (;fhGJ C1\OM Ac'Ta2 3 r 31'78,9! o. 03 06! U b i I { 6•[(^]Co/1.3JL 7016 �'{i ,. c tR 00 in tA. a,; o FO ... R .a. .00 U za N ' uL4 0¢ W U �. • aoo o z x 00 � � w � 0 Q � Q w z :dCD •v q,o $� VY M � CD � $� O Feno .O� • ti °° p VI M ,. C. CD CD $� Ch N 00 _ .' O Cl N ' rn ON vi 00 '" N ,O ,J= o. v. v BAS111"A" MASS DIAGRAM METHOD for DETENTION VOLUMES PROJECT: WEBERG COMMENTS: 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 1.2 RATIONAL EQUATION- 0 = CIA, C = I I A(area) 1.08 TIME OF CONCENTRATION = TIME CA I INFLOW OUTFLOW' ­ - STORAGE ----------------------- (min) (in/hr) (cu ft) -------------- (CLI ft) (cu ft) (ac ft) 5 1.08 9 2916 777-77-7 i60 ----- 7 -- 2556 -------- 0.058677 10 1.0B 7.33 4730.4 720 4010.4 0.092066 15 1.08 6 5E332 --.,I,oeo 4752. 0.109090 20 1.08 5.2 6739.2 1440 5299.2 0.121652 25 1.0e 4.6 7452 1800 5652 0.129752 30-. _J..08. 4.15 ---- E3067 i .' 6 2160 5907.6 0.135619 35 1.09 3.e 8618.4 2520 6098.4 0. 14- 40 1.08 3.5 9072 2880 6192 0.142148 A5 1. os. 3.25 9477 ---7­4�20 3240 `­3600­- 6237 --- 0. 1431814f 50 3 - ­,-6jL26-� 0. 140495' 55 1.08- 2.8 9979.2 3960 6019.2 0.138181 60._,- 1 - CIS 2f* 6__-1-011X 8 ­0 43 20_-- -, 517 8 70 1.08 2.7. 10432. Ef 5040 5392.8 0.123801 so 1.0B 2.("-)5 10627.2 5760 4867.2 0.111735 90 1-08 -l'.85 10799. 2 6480 43 �09..2. 0.09892.5. 100 1. CIS f" 7", 10 '16 7200 - - 3616 -7-- 6 ib 0 8 6L 110 1. 08 55',L i i 64e. 4 7920 3128.4 '0 07jdj'(3,i pt. 120 3,03 EQ. 0.6 1.08 AP-tA '1. 45 l�'1275-.-2 �8640 263!5 2 bi C)-604c�t 0eX;%c.L- 64 A Ct)EPT*A - VA010% + _7 --T7-7- JJ- Eu -T 1:7 1 J-1- Xr-Q I- A--- 71 7 --- -- ------- ilo- 1 -1- --L- J--- f ols j 'j 4+ 4' t ppp If T -4 7 -4 4 -1J- 4! w�, BASIN MASS DIAGRAM METHOD for DETENTION VOLUMES PROJECT: WE BE RG COMMENTS:...100,YEAR.STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 0.6 RATIONAL EQUATION: 0 = CIA C A(area) = 0.53 TIME OF CONCENTRATION TIME CA I INFLOW OUTFLOW STORAGE' (min) ---------- ----------------------------------------------------------- (in/hr) (cu ft) (cu +t) (cu ft) (ac +t) 77 5 0.53 9 1431 ido '_ 1251 0.028719 10 0.53 7.3 2321.4 360 1961.4 0.045027 15 0.53 6 2862 540 2322 0.053305 20 0.53 5.2 3307.2 720- 2587.2 0.059393 25 0.53 4.6 3657 .900 2757 0.063292 30 0.53 ...4..15 3959.1' 1080 2879.1 0.066095 35 0.53' 3.8 4229.4- 12610­­­2969.4 0.068168 40 0.53 3.5 4452 1440 3012 0.069146 45 4650.75 1620 3030.75 0. 069576-&--k 50 0.53 3 4770 1806-­ 200 6.068181 55 0.53 2.8 4897.2 1980 2917.2 0.066969 60 2.6 ..4960.B 22160 2800. 8 0.064297 70 0.53 2.3 5119.e 2526- -2599. 8 c).059683 80 0.53 2.05 5215.2 2880 2335.2 0.053608 90 0.53 1.85 5294.7 3240 2054.7 0.047169 100 0.53 1.7 5406 360*0 18060.041460 110 0.53 1.55 5421.9 3960 1461.9 0.033560 120 0 5'T 1.45 5533.2 4320 .1213'.2 0.027851 0.ii (o,o4iii�\J_,SZ iz 03 cf5 L 7� Ti --- --- z•ot I - clwA T 1 4- Z`c J 4- _TL _j­I_4__i­:__!_j_. -1-1 J .... ... ij ri I + 7� It 7 A- IJ 14- 4 Tic r! TIF --- -------- BASIN "C" Z)L,4b de MASS`PIAGRAM METHOD -- or DETENTION VOLUMES PROJECT: WEBERG COMMENTS: 100 YEAR STORM MAX I MUM ALLOWABLE RELEASE . (CFS) 0.9 RATIONAL_ EQUATION: Q = CIA C _ 1 A(area) =° 0,81. TIME OF CONCENTRATION = TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr) -----------------------------•-------- (cu ft) (cu ft) (ci_t ft) (ac ft) 5 0.01 9. 2187 270 1917 0.044008 10 0.81 7.3 3547.8 540 3007.8 0.069049 15 0.01 6 4374 810 '3564 0.081818 20 0.81 .5.2 5054.4 1080• •''974. 4 C, ^- � 091 Lti 9 25 0.81 4.6 1 5589 1350 4239 0.097314 30 0. F31 4.15 6050. 7 '� 1620 4430.7 ;.i. 101714 'S 0.81 3.8 646.3.8 1890 4573N.8 0.105 40 0.81 3.5 . 6804 2160 4644 0.106611 45 0.81 3.25 7107.75 2 430 4677.75 0.107386+-� 50 0.81 3 7290 2706 4590 0.105371 55 0.81 2.8 7484.4 2970 4514.4 0.103636 60 0.81 2.6 7581.6 3240 4341.6 0.099669 70 0.81 2.3 71324.6 ;780 4044.6 0.092851 80 0, 81 2.05 7970.4 4320 7,,650. 4 0. 097,801 90 .0,81 1.85 (3091..9 4860. 3231.9 0.074194 100. 0.81 1.7 8262, 5400. 2862 0.065702 110 0. 81 1 , 55 '8'286: 3 5940 2346.3 0.053063 120 0.91 1.45 8456.4 6480 1976.4 C)-045371 BASIN "Doe:�w Ll. OPLp MASS D I AGRANI METHOD f �r DETENTION VOLUMES PROJECT: WEI!ER(. COMMENTS: 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) ,8 RATIONAL. EQUATION: C CIA C 1 A(area) = 0.7115 TIME OF CONCENTRATION TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr-) (c!.! •ft) (c!.! ft) (cu ft) (.ac f•!_) - 5 0. 75 c?..__-_.2025___----•240 _^ --17850, 040977 10 0. 75 7.3 3205 480 2805 0. 064393 15 0.75 6 4050 720 3330 0.076446 20 0. 75 5,2 4600 960 3720 0.085.399 25 0, 7 5 4.6 51'75 1200 3975 0. 09'1" 253 70 !?.75 4.15 5602.5 1440 4162.5 0.0955c J J7 35 0. 75 .7. 8 .5985 1680 4305 0.098829 40 0.75 3-5 6300 1920 4390 0. 100550 45 !.l, 75 3. 25 6 a81 . 25 2160 4421.25 0. 101497 +-s� 50 0. 75 3 675� � 2400 4350 0. 099662 0-1 0.75 2.8 6930: 2640 4290 0.098484 60 0.75 2.6 7020 2880 4140 0.095041 �95041 70 0.75 2.3 7245 3360 3805 0.089187 80 0.75 2.05 73RO 3n40 3540 0.081267 90 0.75 1.05 7492.5 4320 3172.5 0.07283f 100 0.75 1.7 7650 4800 2850.0.065426 1 10 0. 75 1.55 7672. 5 5280 239 2.5 J 0.0549 4 120 0. 75 1.45 7030 5760 2070 .0.047520 t RaoF S�o,Prc, _u �\1C A4 3c] Hcj(Zi�OI`�, f\ _) ?..x�. a :SS � !_t7EEP ' •,.IT.�11 =-\.51 GSw n-- -- __ i r. 1 ,I ^ iPq�PPE t �^� Z!il(tAFPET STYIKM _s A1' _ 1 coo 00 , 3obQ 4boa r 1 r 8cz coax: - h tuana 4 2 D.^e tl (t7 4 cF3_.. D(Sc tk 4 Vk @ 6 `tR �J BASIN "E" MASS 'DIAGRAKMETHOD for DETENTION VOLUMES F'ROJECT: WELIERG COMMENTS: 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) 2.1 RATIONAL EQUATION: 0 = CIA C = 1 A(area) TIME OF CONCENTRATION TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr-) (cu ft) (cu +t) (cu ft) (ac -Ft) 5 1.94 :9 5238 630 4608 0.105785 to 1.94 7.3 0497.2 1260 7237.2 0.166143 15 1.94 6 10476 1890 8586 0.197107 20 1.94 5.2 12105.6 2520 9585.6 0.220055 25 1.94 4.6 13386 3150. 10236 0.234986 1-0 1.94 4.15 14491.8 3780, 10711.e 0.245909 35 1.94 3.8 15481.2 4410 11071.2 0.254159 -40 1.94 3.5 16296 5040 11256 0.258402 45 1.94 3.25 17023.5 .5670 11353.5 0.260640 50 1.94 31 . 17460 6300 11160 0.256198 55 1.94 2.8 17925.6 6930 .10995.6 0.252424 60 1.94 2.6 18158.4 7560 10598.4 0.243305 70 1.94 2.3 18740. A. 8820 9920.4 0.227741 B0 1.94 2.05 190B9.6 1(-)080 9009.6 0.206831 90 1.94 1.05 19380.6 11340 8040.6 0.104586 100 1.94 1.7 197eB 126C)o 71 1 80 0.165013 110 1.94 1.55 1984-6.2 13060 5986.2 0.137424 120 1.94 1.45 20253.6 15120 5133.6 0. 117B51 Sk4tL-T- f-ar- 7--Q, %j-a.F-c> LI 3 -1 1, ir 1 t T 'T-Tf- -t.-A-t 4-4 L J 7- v BASIN "A" _MASS DIAGRAWAETHOD f or DETENTION VOLUMES . PROJECT: WEF+ERG COMMENTS: -10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 0.6 RATIONAL EQUATION: Q ='CIA C = 0.85 A(area) = 1.08 .TIME OF CONCENTRATION = w.. _. TIME CA _, .. Z......INFLOW _ OUTFLOW. (min) (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 0.918 5.65 __ •-------------•------------------ 1556.01 1. 180 1376.01 0.031588 10 0.918 4.4 2423.52 360 2063.52 0.047371 15 0.91B 3.7 3056.94 540 2516.94 0.057780 20 0.918 3.25 3580.2 726 2866.2 0.065661 25 0.918 2.85 3924.45 900 3024.45 0.069431 --. 30 0.91E 2.6 4296.24 1080 3216.24 0.073834 35 0.918 2.35 4530.37- 1260 3270.33 0.075076 40 0.918 2.2 4847.04 1440 3407.04 0.078214--!< 45 .0.918 2 4957.2 1620 3337.2 0.076611 50 0.918 1.65 5094..9 1800 3294.9 0.075640 55 0.918 1.75 5301.45 1980 3321.45 0.07625' 60 �.1918 1.63 _5386.824_• 2160, 3226.824 0.074077 70 0.919 1.44 5552.064 2520 3032.064 0'.669606 (30 0.918 1.3 5728.32 2680 2848.32 0.065388 90 0.918 1.2 5940.64 3240 2709.64 0.062181 100 0.918 1.1 6058.8 3600 2458.8 0.056446 _ 110 0.918 1 6056.B 3960 2098.8 0.048181 120 0.918 0.9_ 5949.64 4320 1629.64 0.037388 BASIN "B", _ 7. MASS DIAGRAM METHOD f or DETENTION VOLUMES PROJECT: WEBERG ._COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 0.3 •RATIONAL EQUATION: 0 = CIA _ C = 0.85 A (area) . = 0.5' _ TIME OF CONCENTRATION = TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 i i. 45 i5 5. 65 ------ 763. 5975 ----- ----------------------- 90 673. 5975 0.015463 10 0.4505 4.4• 1189.32 180 1009.32 0.023170 _.. 15 _ 0.4505 3.7 1500._165 270 1230. 165 0.028240 20 0.4505 3.25 1756.95 360 1396.95 0.032069' 25 0.4505 2.85 1925.887 450.4475.887 0.033881 30 0.4505 2..6. _2108.34 540 1568.34 0.036004 35 0.4505 2.35 2223.217 630 {159.:,. 217­ 6. 036575 ' ---- 40 0.4505 2.2 2378.64 720 1658.64 0. 038077 ---* _ 45 0.4505 _ 2 2432.17 810 1622.7 0.037252 50 0.4505 1.85 2500.275 900 1600.275 0.036737 55 0.4505 1.75 2601.637 990'1611.637 0.036998 _. 60 0.4505.. . 1,.,63 2643.534 .- 1080 „1563.534�00..•035893 70 0.4505 1.44 2724.624 1260 1464.624 .033623 _ 80 0.4505 1.3 2811.12 1440 1371.12 0.031476 90 0.4505 1.2 2919.24 1620 0.029826_ 100 0.4505 1.1 2973.3 1800 �1299.24 1173.3 U.026935. 110 0.4505 1 2973.3 1980 993.3 0.022803 120 0.4505 0.9 2919.24. 2160 759.24 0.017429 BASIN "C" -0;E.vE►.oPED MASS DIAGRAM METHOD for DETENTION VOLUMES PROJECT: WEBERG COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 0.4 RATIONAL EQUATION: Q = CIA C = 0.95 A(area) = 0.81 TIME OF CONCENTRATION ? TIME CA I INFLOW OUTFLOW STORAGE (min) -------------(in/hr) ----------- (cu ft) ----------------------------------- (cu ft) (cu ft) (ac ft) 5 0.7695 9.65 1304.302 120 1184.302 0.027187 10 0.7695 4.4 2031.48 240 1791.48 0.041126 15 0.7695 3.7 2562.435 360 2202.435 0.050560 20 0.7695 3.25 3001.05 480 2521.05 0.057875 25 0.7695 2.85 3289.612 600.,2689.612 0.061745 30 0.7695 2.6 3601.26 720 2881.26 0.066144 35 0.7695 2.35 3797.482 840 2957.482 0.067894 40 0.7695 2.2 4062.96 960 3102.96 0.071234 45 0.7695 2 4155.3 1080 3075.3 0.070599 50 0.7695 1.85 4270.725 1200 3070.725 0.070494 55 0.7695 1.75 4443.862 1320 3123.862 0.071714+-* 60 0.7695 1.63 4515.426 1440 3075.426 0.070602 70 0.7695 1.44 4653.936 1680 2973.936 0.068272 80 0.7695 1.3 4801.68 1920 2881.68 0.066154 90 0.7695 1.2 4986.36 2160 2826.36 0.064884 100 0.7695 1.1 .5078.7 2400 2678.7 0.061494 110 0.7695 1 5078.7 2640 2438.7 0.055984 120 0.7695 0.9 4986.36 2880 2106.36 0.048355 BASIN "D" MASS"DIAGRAM METHOD for DETENTION VOLUMES PROJECT: WEBERG COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = 0.4 RATIONAL EQUATION: Q = CIA C = 0.95 A(area) = 0.75 TIME OF CONCENTRATION= ? TIME CA I INFLOW OUTFLOW STORAGE (min) ------------------------- (in/hr) ------------------------------------- (cu ft) (cu ft) (cu ft) (ac ft) 5 0.7125 5.65 1207.687 i20 1687.687 0.024969 10 0.7125 4.4 1881 240 1641 0.037672 15 0.7125 3.7 2372.625 360 2012.625 0.046203 20 0.7125 3.25 2778.75 480 2298.75 0.052772 25 0.7125 2.85 3045.937 600 2445.937 0.056150 30 0.7125 2.6 3334.5 720 2614.5 0.060020 35 0.7125 2.35 3516.187 840 2676.187 0.061436 40 0.7125 2.2 3762 960 2802 0.064325w--4(- 45 0.7125 2 3847.5 1080 2767.5 0.063533 50 0.7125 1.85 3954.375 1200 2754.375 0.063231 55 0.7125 1.75 4114.687 1320 2794.687 0.064157 60 0.7125 1.63 4180.95 1440 2740.95 0.062923 70 0.7125 1.44 4309.2 1680 2629.2 0.060358 80 0.7125 1.3 4446 1920 2526 0.057988 90 0.7125 1.2 4617 2160 2457 0.056404 100 0.7125 1.1 4702.5 2400 2302.5 0.052858 110 0.7125 1 4702.5 2640 2062.5 0.047348 120 0.7125 0.9 4617 2880 1737 0.039876 _ ` ^ ~ - ^ ` ' ��y&N���� w��" ��m��v�mnm m� 1)E,4 ELOP f- c� MASS DIAGRAM METHOD for DETENTION VOLUMES PROJECT: WEBERG ` COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) RATIONAL EQUATION: Q = CIA C = 0.85 A(area) = 1,94 TIME OF CONCENTRATION = ? - TIME CA I INFLOW OUTFLOW STORAGE (min) (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 1.649 5.65 2795.055 330 2465.055 0,056589 10 1.649 4°4 4353.36 660 3693.36 0.084787 15 1.649 3.7 5491°17 990 4501.17 0.103332 20 1.649 3.25 6431,1 1320 5111.1 0.117334 25 1.649 2.85 7049.475 1650 5399.475 0.123954 30 1.649 2~6 7717.32 1980 5737.32 0.131710 35 1.649 2.35 8137.815 2310 5827.815 0.133788 40 1.649 2.2 8706.72 2640 6066.72 0.139272 45 1.649 2 8904.6 2970 5934.6 0.136239 50 1.649 1.85 9151.95 3380 5851.95 0.134342 55 1.649 1.75 9522.975 3630 5892.975 .135284 60 1.649 1.63 9676.332 3960 5716.332 0.131228 70 1.649 1,44 9973.152 4620 5353.152 0.122891 80 1.649 1.3 10289.76 5280 5009.76 0.115008 90 1.649 1^2 10685.52 5940 4745.52 0.108942 100 1.649 1.1 10883.4 6600 4283.4 0.098333 110 1.649 1 10883.4 7260 3623.4 0.083181 120 1.649 0.9 10685.52 7920 2765.52 0.063487 NA' - - BE SE AN . SA HALF „ILL BE BPLURE, .N,MM BE AT LEAST TX l: THIS SETS B OF ADJACENT NIA<INNIVY STUFF OR INDIA ORVILI THROVER THE WALES THE FIRST Atu °T �ESSROTOR.oTA e "�I 2, A" Alan ANALL AM ai HSD IEH IEIB MOB T I aeemwo — - g.� I' e' ;'_p• T TW ALONE �wnDU os AND me L MVi IEIYID pvp 1 � MFPDDw mo �OCAe I ONER cR CA HE CGVxi OM p[M 0 CALL WBOB II w (yyY R2T F ` R�LMTI HER .av m vxawsE FORMS EFFICIENCY) - F%RAFLT rt' - 2K RPRAP[T T°` FEF j. v j. W` FET Or N FINE t REPAIR ENi LAUs ttmva[uv CRwxB L Ron, xswT PILE Be xnoe ee-.rtLV As Memw. r COALAGAINN HE DRE 1% no SMALLa- e9ILT La 1 -- rwKxpe m+uwWBe SIDE Da omu E N OF ROOF C B'JfTOM OF Ali INIVL FEW PEm LV STABILIZED. 2-WEIRS MR STP.OE DKCNGR.E / Z-WEIRS FpR STAGE DISC AR6E [AUEw R31[sE[5 FIGWS NOPETH FRONT FUTURE STREET/FUtUCE MUHAT ee DETMIRIED ROOF TOP RELEASE / STflUCTUR�I ROOF TOP RELEASE / SxNUCTURE EROSION CONTROL MAT I DEJELGFMENT. s—A— E%15TIKG DRAINPGE SWAL FOR BASIN D / FOR BASIN - IDATA-- �� � EXI9TILIG EARTH DRIVEWgY I�PL �•%">> \., _ . BE - ,•K� N \4PZ LINE tO / x 10' R "I 2' METALPNERT 1q�IiOI AFALN '0 2E WEMOVED \ ey s FWLLVLINE pF M1GIINACAJ Y 287 FEI � A 0 ° m 10 .L / IV E%IZT. `� \ DETAIL-A� _ / 0 = A `u.¢ r YWIE4 IOA / \` ' I 5EP` TAN¢ 1 LEACH FIBLO6 _ M LOS ° _ �] —Aee. J` n ACE To eE eEMDVED l xp 6 / n ¢ENLACED V eNe cloaD AUeAL FLL� , 96 v /- 3C cAH AT%i , SNa , j> 4 ZEE 6 Poll Z VIA RIPRINARAI PLACED J L PLANS FOYV �VL 94OWN LO FT DEEP, 0 FILTER -PBRIC MIRAFI = �y \ I I NS S� MIRPFL -/� �AF•499TO °vx =FE 0S I et REXWD /pIR CONLREtI5EL9Og \ J Lble TNl2 Is N01 vR A CBEII PAN - \ ZLFI RD CTREE l POND INFORMATION r � / / f \ C a mB�Arr ISEARN�.a9s// / IN cum 2\ LET TREEIN Id CUI$4LEI REMAIN \ [vr .. I<Be .. / L9 p % �\ \. \ \ _ny9L[. GATEE Z-28' 1 Min / GATES ENTERED IN mvB'<'. LBO eta. + L' NDIL,4H OF PROF'D I B S B I T I SEE DEfRI TPIS S WAIT DR j/// 5'cUen WLET I J TERM bMAN) W ISO FAR mw _ ril i a. lB,D3 at. HATT 55 NGTE STREET pLiDNNENT 59UT Gi \ O THIS SITE IS NOT WIJDLI I Ica IN s�iO w� SHpNN ON THIS PLAN x l BETHANY OLAWS �124 It \\ \ \ \\ I J FUNI RATF �\ 6T¢EL 095 DEFFM _'See 7446 'ESIGN 4422 It HERB, RATE ��_ IMIKE 0.95 GSA,.'q IQ HE STAH \ NIwuE' Bb IS Ewa I. \F\ i ].I .s. I.I at. /x E%IZT. WAtEK�® WELL 2' META . SIDEWALK ', H2 CULVERT / 5AS / "S6 / I FF •4991.0 I �GaBHMED WALE 049 I.m{ —_ Butest "Wes ) _ TRAIJSIiHJN FROM _ OUTFILL.L C LAG TO 3SRIAQr1LOW C46 CVER OR,WN— DESIGNED CHECKES �APF 'TUN=RW1 3j2 WI 0.OVE0 GATE PROTECT X0. Engineering Consultants 2900 Swln CeA. RAFFIA DION N AIINFAY END., SHOP ]]a Fe.I CBAInc Gob9e<e t05]5 Oo 9pt•x9s, OWNER 80909 501220-A955 4-1504 'A DM D Ma TEAK PMy • ON uE1 607-2 Well. SHOP RbTE: NOTES 1 KMIN.X SAAAWS. ISM sIIPM TO A. 1 ITI SIT I' III OF UUMNALL TIFF CLIMB &KI ARTUM THROUGH CURB RSIVRN 1 so LSME4ME HAND rM ISLAND ynL. 4. SO SXER A FOR s1MW12 RMIS. l S. SFIRGgllggs cnow a FAIR MMONroro M Has sm A [URI191 /l gplOfiRyslsl4]c I�1110M YPMW OA APRI' , 981. TYI'5 winwv en SWC m INIA nix CITY of on (ARAB in miE OF THIS PART, S. AU, BOSnK FWASm wILOINes IIST Bc RAIWm PRIM N ARMY PPRSWWWTOMMI cQpgIICIEM. ]. TAP MAT WE pp si AV NETWRIxU nlE cP@ 10 OF A. ni IA kFs PLEIRESS FOR RE-SEMING SIXIVICITIMS IN III T 15'M Sol Vbus'i\ TRACTION. IPROFC`ED ROW LIME w m a 0 w WE 12f GRAPHIC SCALE t'AAw' MIRAFI GO N9L 00 MiRAt PG1, iYL. pp ANN, LEAD 9 '„ TAt V(IN[LLfOEF FjL�4) w ���� .. `41 ROM 11117O ROW IN �LE Pam, _w.+me P w WATER QUALITY CONTRC)L BERM DETAIL �� am Q Y J O U s :LEND \ -- NZ IyypglL pAyIN ICYfITIF1U1'LS] utE C W 9Z 5.D6 IYSiceIL FAZAi.PEP�ACRES) $ Z METAL 'iSICUALL ClAW"1 6 / D LCVFIOPED ¢A51N VeKJTIFLATION q ° rRgvsrtpI�Rl FGmm O. s' OT5 DEVLLOPrD EPSIN AREA (nce Es) J,1 i1ky CLIFFS I OEVEIOPED EFVIN UFFE NEB DUt HISTORIC ,C5AE1N LWE 6EE DETA14 TNIZ WT I S1DRM flPE BASE I WFLDW PU¢DI6UttEF qA OO RFpf Z' MEtAI SDEWALC cLLWEe{ OdifA0. CJKe + LLLttE^ P; CRRB �J� I1Ty} EKIST JG C�O TO MwICM ,f EtJ5ED L-bTEN9KJN OFSpEWALK U'JLVERT ecareRRf.LTION ELGCBPS. 116M IL pE>EZTAL To WHO FELO(AtED r% PF11PJ5® `#RT EI'EV IbeTH ONE: ZD'hH K PtOPoSFD COSIL (fY-i5 �l C CCL CHANNEL 51O NVACH w'E'T' -evor' ' NTS r 4 EXIST. %IzT. PC IL OFF [LL¢6 1 GUTTEF, PATER gY61TYf0A'T1Z0L CFRM UT SEE DETAIL Ff GINI9HED fLODR WMEC AUAO6PA V—s Q DES\LN PDINT MA[W ROPOSRD 6"DE 'Au 9%'d AAMAI o:Ab1TJ 6AENOCOK E BE A NA%. F 2' \hLH WEST OF 3'1 SLopf. MA%IMIJM S EDGE OF WALK � I) TSE FNTRE n¢EP 6ptTUY£ 4 mi C EIPez TELEPNDWE pEDeZTAL -�" 51u0. RE FSFLECTORIMET, ® ELIKO FIL PEDESTAL �.` i) ALL P.EFLFLTIK ;AMFpGE`. yyal RE'yyp/N - �S'..—� tm M C� �v WA1EC WELL OR PIPE, SEE PLAN SURFACE TYPE REFLccTVE yIEETN4' 5) ALL Y3£v'.s, COTS. WTS E VMSxEES'.ALNA CE LPLwYA2Eo oR GDNiUM pIy.TEP y DETENTION POND 4) FµEL 6TO EE """UPOI FbrED TO pi -' EMERGEFLCY OVERFLOW DIRECTION Ps allowN. - - N9e cR mee (+L PROPERTY LIME pp �RQ CAE TI�Y FLOW AfilROW AUB A'u ^^'� e cAf (WEIR) CURB CUT PETML TNAMEAL olar warp ARM "I INAES HAD xmxvA CHAIN .LINK FENCE r �- �OETI.I iHIS •SHEEIII.� CKD% PdRI r0 IjFlJ 4(•C 9E=cerRIL 9 f Av9t L 6-4"HDEWALD1E L' C UUfE0.1 If eDmo_(EAST 4EPR/tl-DOMED WEBERG FURNITURE N/R Q E FT. CURB CUT DETAIL 511iES GRADING & DRAINAGE PLAN 9 ri