Loading...
HomeMy WebLinkAboutDrainage Reports - 07/06/2015City of Ft. Collins ppro d Plans Approved By Date —15 Final Drainage and Erosion Control Report for Poudre Valley Hospital, A -Wing Replacement Fort Collins, Colorado March 25, 2015 • March 25, 2015 Mr. Glen Schleuter City of Fort Collins Water Utilities --Storm water 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for the Poudre Valley Hospital, A -Wing Replacement Project Dear Glen: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Report for the Poudre Valley Hospital, A -Wing Replacement Project. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully,. Aspen Engineering Prepared by: Ton illkomm, P.E. Senior Project Engineer oVA Y IV �V .�FtaN CJ ; O •, to O n� Q -a43251 a o% s'-q -r `cW Reviewed by: $�Xc A2 John Gooch, P.E. Principal TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 5 A. LOCATION 5 B. DESCRIPTION OF PROPERTY 5 U. DRAINAGE BASINS 6 A. MAJOR BASIN DESCRIPTION 6 B. EXISTING SUB -BASIN DESCRIPTION 6 III. DRAINAGE DESIGN CRITERIA 7 A. REGULATIONS 7 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 7 C. HYDROLOGIC CRITERIA 7 D. HYDRAULIC CRITERIA g E. VARIANCE g IV. DRAINAGE FACILITY DESIGN g A. GENERAL CONCEPT g B. SPECIFIC DETAILS 9 C. DETENTION POND 13 D. STREET CAPACITIES 14 V. STORM WATER QUALITY 14 A. GENERAL CONCEPT 14 B. SPECIFIC DETAILS 14 V.I. EROSION CONTROL 15 A. GENERAL CONCEPT 15 VII. CONCLUSIONS 15 A. COMPLIANCE WITH STANDARDS 15 B. DRAINAGE CONCEPT 16 C. STORM WATER QUALITY 16 D. EROSION CONTROL CONCEPT 16 E. EROSION CONTROL ESCROW ESTIMATE 17 REFERENCES 17 PAGE VICINITY MAP A RATIONAL METHOD HYDROLOGY B LID BASIN SIZING CALCULATIONS C CURB CUT, INLET, & STORM PIPE SIZING D EROSION CONTROL & RIPRAP SIZING ; EROSION ESCROW E PROPOSED DRAINAGE BASIN MAP & EXISTING DRAINAGE BASIN MAP F I. FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE POUDRE VALLEY HOSPITAL, A -WING REPLACEMENT PROJECT FORT COLLINS, COLORADO GENERAL LOCATION AND DESCRIPTION A. Location The Poudre Valley Hospital, A -Wing Replacement Project (referred to as "A -Wing Replacement" here -forward) is bounded to the north by family housing owned by PVHS and within the PVHS Campus, to the east by Luke Street, to the south by Doctors Lane and PVHS Hospital, and to the west by Lemay Avenue and Hospital Lane. The project site can also be described as situated in the northwest quarter of Section 4, Township 6 North, Range 68 West of the 6"' P.M., of the City of Fort Collins, Larimer County, Colorado. The A -Wing Replacement site is comprised of two areas: a proposed parking lot area north of Doctor's Lane and between Hospital Lane and Luke Street; and a proposed replacement of the existing PVHS Lemay A -Wing building, which will occur offthe northwest comer of the existing Hospital building. Proposed improvements are planned to occur over an area of approximately 3.47 acres. B. Description of Property The A -Wing Replacement site is comprised of a multi -story building expansion with an emergency access drive (for emergency vehicles only) off Lemay Avenue, an emergency department drop-off (for general public) along the south side of Doctor's Lane, a parking lot north of Doctors Lane, a plaza area along the east side of the new A -Wing building, and associated site and utility improvements to facilitate the building and parking lot expansion. Currently, the southern portion of the A -Wing Replacement site is occupied by an existing building with east and west access drives connecting to Doctors Lane. The northern portion of the proposed site is currently comprised of three existing buildings along with two parking lots, all located north of Doctor's Lane and between Hospital Lane and Luke Street. Within the north lot, the existing topography generally slopes from the southwest to northeast at 1.5% on the western two-thirds of the site and at 4% on the eastern third of the site. The southern portion of the proposed development (around and adjacent I® to existing A -Wing Building) slopes away from the building to the west, north, and east at varying slopes and grades ranging from 0.5% to 6%. DRAINAGE BASINS A. Maior Basin Description The A -Wing Replacement site lies within the City of Fort Collins Spring Creek Basin. In speaking with the City of Fort Collins Stormwater Department, the proposed development is to be evaluated to determine the change in imperviousness between existing and proposed conditions, while also providing LID and BMP's for the proposed development for any additional impervious areas, added by the proposed development, as well as provide additional water quality and detention, if imperviousness is increased for the overall site by the proposed development. It's important to note that per previous correspondence and agreements with the City of Fort Collins Stormwater Department, the proposed development will utilize the existing, abandoned Emigh Lateral irrigation line, to convey runoff from the A -Wing Replacement site. Runoff resulting from an increase in the impervious area will need to be detained. B. Existing Sub -Basin Description The existing A -Wing Replacement site is comprised of two basins: EX-1 and EX-2. EX-1 comprises the existing parking lot and three buildings north of Doctors Lane. Existing basin EX-1 contains approximately 1.32 acres with a calculated 'c'value of 0.90. Existing runoff from the majority of basin EX-1 is comprised of the asphalt parking lot and partial roof areas from the three existing buildings, with runoff from these areas generally flowing southwest to northeast to an existing concrete drainage channel, which conveys runoff east and discharges to an existing concrete pan in Luke Street. The remaining runoff from the roof portions of the three buildings fronting Hospital Lane, Doctors Lane, and Luke Street, sheet flow to the flowline of the adjacent streets, where runoff is conveyed in existing curb and gutter to offsite storm inlets. It's important to note that the majority of site runoff from EX-1 is conveyed north in Luke Street, with only a small portion of basin area being conveyed north in Hospital Lane and east in Doctor's Lane. Runoff from the entirety of basin EX-1 ultimately combines downstream and is captured by existing storm inlets. Existing Basin EX-2, located south of Doctors Lane, comprises the existing A -Wing Building, existing drive aisles and parking areas on the west and east sides of the A- Wing, and portions of roof areas from existing buildings on the east and south sides of the existing A -Wing building. Existing basin EX-2 contains approximately 2.15 acres with a calculated'c' value of 0.80. Runoff from the south- half of the west drive aisle and a portion of the existing A -Wing building currently drains to a curb cut in the southwest comer of the west drive aisle and discharges to the flowline in Lemay Avenue, which conveys runoff south down Lemay Avenue. Runoff from the north half of the west drive aisle drains north and out onto Doctors Lane, where runoff is conveyed east along Doctor's Lane, then north along Patton Street. The drive aisle and parking lot area east of the existing A -Wing, the remaining portion of the A -Wing Building roof, and partial roof areas from the buildings east and south of the A -Wing building convey their runoffnorth and into the existing curb and gutter in Doctor's Lane. Runoff combines with that from the west drive aisle and continues flowing east in Doctor's Lane, then north in Patton Street. Please see the Existing Drainage Basin Exhibit attached for the existing basin limits and the delineated pervious areas. M. DRAINAGE DESIGN CRITERIA A. Reenlations Since the subject site has been "grandfathered", the site is allowed to release un- detained, if the impervious area is not increased. The impervious area of the subject site has been reduced from the existing conditions, and therefore does not require additional onsite water quality and detention. However, LID improvements are required and have been provided for the subject site. Please see the LID calculations in Appendix C. B. Development Criteria Reference and Constraints The criteria and constraints from the City of Fort Collins will be met. C. Hydrologic Criteria The Rational Method for determining surface runoff was used for the project site. The 2-year and 100-year storm event intensities were used in calculating runoff values. 7 The City of Fort Collins intensity duration frequency curves were used to obtain rainfall data for each storm specified. Detention pond sizing is not required as the impervious area has been decreased with the proposed development. However, additional water quality for the subject site is being provided through the utilization of BMP and LID measures being incorporated into the proposed drainage development plan. Please refer to Appendix C for specific details and calculation. D. Hydraulic Criteria All hydraulic calculations, including final calculations and sizing for curb cuts, swales, and erosion control and riprap measures have been provided in accordance with the City of Fort Collins Drainage Criteria and can be found in the Appendix. E. Variance No variances are being requested for this project. IV. DRAINAGE FACILITY DESIGN A. General Concept Seventeen drainage basins will provide conveyance of drainage for the 3.47 acre site. Of this, 1.87 acres within the south area of the site will be routed to the existing storm pipe, located in Doctors Lane. The drainage will be routed east then south and combine with the outfall flow from the existing detention ponds, located along the east boundary of the overall PVH Lemay Campus. Site runoff will be treated, prior to entering the storm sewer, through the utilization of the proposed porous landscape detention basins and porous pavers with underdrain system for LID measures. The existing irrigation pipe in Doctors Lane will be used to convey storm runoff from the -- site to the historic outfall point, near the existing east detention ponds. The proposed parking lot, north of Doctors Lane, will concentrate a large majority of the runoff in LID basins before runoff will spill to the adjacent streets, as historically occurs for the basin area(s). The proposed porous landscape detention /LID basins, storm sewer pipe, inlets, and erosion control measures have been sized and calculations are provided in the Appendices. In comparing existing conditions to proposed conditions for the subject site, the c- values are 0.84 and 0.82, respectively. The imperviousness for existing conditions is 84%, compared to the 82% for proposed conditions. Therefore, there is a net decrease in impervious area for the development. Exhibits are provided in Appendix 8 E B. F showing the existing and proposed basin areas, drainage patterns and pervious areas. LID measures are provided for through the conveyance of approximately 42% (63,925 sf of the 151,214 sf site boundary) of the entire site areas, including the proposed building, parking lot, and green areas of the site being routed through the porous paver areas and LID basins. In addition, roof drainage from a portion of the existing building, east of the A -wing plaza, will be routed through the porous paver area for water quality treatment. Because 63,925 sf of the subject site versus the required treatment area (3,443 sf) is being routed to and through the porous pavers and LID basins, the project greatly exceeds the 50% requirement for LID treatment. Furthermore, the net decrease in impervious area of the overall subject site does not require any additional water quality or detention be provided for the development, as both items are already provided for in the existing detention pond. The LID basins, shown and called out in the plans, are anticipated to provide for 1' of ponding depth, prior to the basins overflowing and spilling to adjacent streets (in the north parking lot) or entering storm sewer and into the proposed and existing storm sewer system. Runoff from all of basin 17 and roof drainage from a portion of the building, east of basin 17, will be conveyed over and through the porous pavers located in basin 17. An underdrain (in basin 17) will convey the filtered runoffto the proposed 24" storm sewer. Please refer to sheets C-016 of the civil utility plans for details on the porous paver areas and LID basins. Specific Details North Parking Lot Basins Basins 1 Basin 1 conveys runoff overland to the west to a 2' curb cut at design point 1, where ---runoff from basin 1 passes through the curb cut and into the LID/porous -landscape detention basin. Overflow from the LID basin will drain through a 2' metal sidewalk culvert and 2' concrete chase, discharging to the east flowline in Hospital Lane. Runoff will flow south in Hospital Lane, then east along Doctor's Lane, and then north on Patton Street, as historically occurs. Basin 2 Basins 2 conveys runoff overland to the south to a 2' curb cut at design point 2, where runoff from basin 2 will pass through the curb cut and 2' concrete chase with 2' metal sidewalk culvert, discharging to the flowline in Doctors Lane. Runoff will flow east along Doctor's Lane, then north on Patton Street, as historically occurs. Basin 3 Basin 3 conveys runoff overland to the south and across the proposed access drive and into the curb and gutter along the north side of Doctor's lane, at design point 3. • Runoff is conveyed east along Doctor's Lane, then north on Patton Street, as historically occurs. Basin 4 Basin 4 conveys runoff overland to the northeast to a 4' curb cut at design point 4. Runoff passes through the curb cut and into the LID/porous landscape detention basin. Overflow from the LID basin will drain east through a concrete chase with 2' metal sidewalk culvert and out to the flowline in Luke Street. Runoff is directed north in Luke Street, then east in Elizabeth, as historically occurs. Basin 5 Basin 5 conveys runoff overland to the northeast towards design point 5, where a 4' curb cut captures the runoff and discharges it into the LID/porous landscape detention basin, located within basin 6. Basin 6 Basin 6 conveys runoffoverland to the northeast towards design point 6, where an 8' curb cut captures the runoff and discharges the runoff into the LID/porous landscape detention basin. Overflow from the LID basin will drain through a 4' concrete chase with 4' metal sidewalk culvert, which discharges to the flowline in Luke Street. Runoff is conveyed north in Luke Street, then east on Elizabeth, as historically, occurs. Basin 7 Basin 7 conveys runoff in a grass lined swale to the east towards design point 7, where runoff combines with flow from basin 6 in the LID/porous landscape detention basin. Overflow from the LID basin will drain through a 4' concrete chase with 4' metal sidewalk culvert, which discharges to the flowline in Luke Street. Runoff is conveyed north in Luke Street, then east on Elizabeth, as historically occurs. Basin 8 Basin 8 conveys runoff overland to the northwest towards design point 8, where a-2' curb cut captures the runoff and discharges it into the LID/porous landscape detention basin. Overflow from the LID basin will drain through a 2' concrete chase with 2' metal sidewalk culvert and discharge to the flowline in Hospital Lane. Runoff is directed north in Hospital Lane, then east along Elizabeth Street, as historically occurs. Basin 9 Basin 9 conveys runoff overland to the west-northwest across the access drive and into the curb and gutter on the east side of Hospital Lane, at design point 9. Runoff is then routed north in Hospital Lane, then east in Elizabeth Street, as historically occurs. 10 South Building Replacement Basins Basin 10 Basin 10 conveys runoff overland to the north and west to curb and gutter at design point 10. A portion of runoff from basin 10 will be captured by a 2' curb cut along the south side of the access drive, which will convey runoff west through a 2' chase with sidewalk culvert and into the curb and gutter on the east side of Lemay Avenue. Runoff from the remaining portion of basin 10 will drain through the access drive and into the curb and gutter in Lemay Avenue. It's important to note that curb cut with chase is required to meet City criteria for area allowed to drain/ discharge over a public walk. Furthermore, grading constraints between Lemay Avenue and the proposed building do not allow for runoff to be conveyed north and into the LID basin, as grades for the egress drive would become very steep, if grading forced runoff to the north side of the egress drive. Basin 11 Basin 11 conveys runoff overland to the west/southwest, where a portion of runoff from basin 11 will be captured by a 2' curb cut along the south side of the access drive, which will convey runoff west through a 2' chase with sidewalk culvert and into the curb and gutter on the east side of Lemay Avenue. Runoff from the remaining portion of basin 11 will drain through the access drive and into the curb and gutter in Lemay Avenue. Runoff is then conveyed south in the Lemay Avenue, as historically occurs. It's important to note that curb cut with chase is required to meet City criteria for area allowed to drain/ discharge over a public walk. Basin 12 Basin 12 conveys runoff from the west half of the building to a proposed internal roof -r- drain system which will discharge below grade at design point 12, along the north side of the building. The roof drain will connect to the proposed storm drain system located on the north side of the building. The canopy over the emergency drop-off area/drive discharges to three roof drains on the canopy columns. The northern most roof drain will discharge to a swale and flow north to the 2' concrete chase near design point 10, pass through a 2' metal sidewalk culvert and into the curb and gutter on the east side of Lemay Avenue. The two southern most roof drains will discharge to a swale and drain south then west to a proposed 2' concrete chase with 2' metal sidewalk culvert to enter curb and gutter on the east side of Lemay Avenue. Runoff from the canopy roof is then conveyed south in the Lemay Avenue, as historically occurs. 11 Basin 13 Basin 13 conveys runoff from landscaped areas north and northwest of the building to the proposed LID/porous landscape detention basin at design point 13. Overflow from the LID basin will drain to an 18" Nyloplast drain basin and in to the proposed storm drainage system, which discharges east and will tie-in to the abandoned Emigh Lateral piping system. Basin 14 Basin 14 conveys runoff from the east half of the building to an internal roof drain system. A single roof drain, shown at design point 14, will discharge below grade and connect to the proposed storm drain system, located on the north side of the building, which discharges east and will tie-in to the abandoned Emigh Lateral piping system. Basins 15 Basin 15 conveys runoff from the canopy over the north drop-off area/drive south towards the building face, where is it intercepted by the internal roof drain system at design point 15. Flow combines with that from basin 14 in the roof drain piping system and is discharged to the proposed storm drains system along the north side of building. Basins 16 Basin 16 conveys runoff overland to the east and north and across the egress drive and into the curb and gutter in Doctor's Lane, at design point 16. Flow from basin 16 continues is routed east along Doctor's Lane and then north on Patton Street, as historically occurs. It's important to note that though the area, flowing across the public sidewalk at design point 16, is greater than the 800 square feet allowed to discharge over a public walk, the area is smaller than the existing area that historically discharges north and out of the existing drive aisle and parking lot and into Doctor's Lane from the east side of the existing building. Basin 17 Basin 17 conveys runoff overland from the surrounding hardscape and landscaped areas, located along the east side of the new A -Wing Building, over and through porous pavers and into an underdrain system within the proposed plaza area. The 4" perforated PVC underdrain system will capture runoff which has filtered through the underlying paver media, and will convey runoff north in the 4" perforated PVC pipe. A 4" solid PVC pipe (at the far north end of the underdrain system) will convey runoff northeast and into the proposed 5' storm sewer manhole, located at design point 17. Runoff in excess of the porous paver infiltration capacity expected from large storm events will be intercepted by three grated manhole inlets, located on the 12 proposed storm sewer within the plaza area. Runoff from basin 17 will discharge to the northeast and into the existing, abandoned Emigh Lateral piping system, which will convey flows east. It's important to note that because the proposed development is decreasing imperviousness, the runoff that will pass through the existing, abandoned Emigh Lateral pipe is proposed to discharge in the existing pipe and around the northeast Campus detention pond, rather than be routed through the existing detention pond. LID measures within Basins 13 and 17 will increase and provide additional water quality for runoff from basins 13 and 17, which does not historically occur. Therefore, Aspen does not recommend discharging runoff into and through the existing detention pond, as this would mix "partially treated" runoff with dirty water from the existing east parking lot of the Campus. Overflow Conditions Basins 1.2. 4-8.10-11 Should the curb cuts, or concrete sidewalk chases clog within basins 1, 2, 4-8, or 10- 11, runoff will pond to curb height and spill to the street section corresponding to the respective design points at Hospital Lane, Doctors Lane, Luke Street, or Lemay Avenue. Basins 12-14 &17 Should the roof drains, inlets, or storm sewer pipes clog within basins 12-15 or 17, runoff will pond and spill west or north and onto Lemay Avenue or Doctors Lane, as applicable for the said basin. Should the inlets, porous pavers, or storm sewer pipes clog within basin 17, runoff will pond up and crest the egress drive and discharge to Doctor Lane, with flow then conveyed east along Doctor's Lane, then north on Patton Street as historically occurs. -- C. Detention Pond The existing northeast detention pond will not be utilized for the subject site, as the proposed development's impervious area is less than the existing site's imperious area. Therefore, additional water quality and detention are not required and will not be provided for in the existing pond. However, the proposed and reduced impervious area will flow overland across porous pavers east of the building, and to an LID basin northwest of the building. LID basins and porous pavers within Basins 13 and 17 will increase and provide additional water quality for runoff from basins 13 and 17 and a portion of the existing east building, which does not historically occur. LID basins will also be provided in 13 0 the north parking lot area, thus increasing water quality for the site. Please refer to the LID Table on the drainage exhibit for treatment calculations. D. Street Capacities The street capacity calculations are not required for the subject site, as no new public street construction will be built with this project and the impervious area has been reduced by this development. However, curb cut capacities have been analyzed and calculations provided in the Appendices of this report. V. STORM WATER QUALITY A. General Concept The water quality of stormwater runoff must be addressed on all final design utility plans. Therefore, Best Management Practices for the treatment of stormwater runoff for the subject site will include grass -lined swales, porous pavers, and LID pre - sedimentation basins. These water quality features will provide a mechanism for pollutants to settle out of the stormwater runoff before flows are directed off site ultimately discharging to the Poudre River, as historically occurs. B. Specific Details Best Management Practices (BMP) for the treatment of storm water runoffhave been incorporated into the final design for this project. LID measures are provided for through the conveyance of 63,925 square feet (of the 151,214 square feet total site area) over and through the porous paver areas and proposed LID/ porous landscape detention basins, with the total footprint of 3,445 sf for the combined LID basins. The 63,925 square feet of area being conveyed to the LID basins account for 42% of the total site area, thereby, exceeding the City's LID treatment of 50% of new impervious area (3,443 sf). It's important to note that because the area being routed over and through the porous pavers and LID basins exceeds the 50% requirement for LID treatment, and because imperviousness for the overall site has been reduced by the proposed development, the project exceeds that normally required for water quality and LID treatment. The LID basins, shown and called out in the civil utility plans, provide for approximately 0.7' to 1.0' of ponding depth, prior to the basins overflowing and spilling to adjacent streets or into the storm sewer and the existing detention pond. 14 Please refer to sheet C-016 of the civil utility plans, for details on the porous paver areas and LID basins. VI. EROSION CONTROL U`I A. General Concept The potential exists for erosion problems during construction, but should be minimal after completion of proposed development. Silt fence will be installed along the perimeter of the north parking lot and along the west and north sides of the building expansion area of the site to prevent sediment from leaving the site. Where silt fence is shown to cross hard surface areas, gravel inlet socks shall be utilized for these areas, as may be applicable during construction. A tracking pad will also be placed at entrance/exit to the north parking lot along Doctors Lane, and at the west emergency entrance on Lemay Avenue. Gravel inlet filters will be placed at proposed curb cuts and at proposed storm inlets, with straw wattles installed at the proposed storm sewer area inlets and sidewalk chases to mitigate the build-up of sediment and transport of debris into existing streets and downstream systems. Riprap will also be utilized at concentration points (curb cuts) as shown in the plans, to minimize erosion and increase soil stabilization. Please refer to Appendix E for riprap sizing. A. Compliance with Standards All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. The City of Fort Collins Stormwater Utility will not maintain the on -site storm drainage facilities within the subject site. The owners of the subject site will maintain their on -site storm drainage facilities on a regular basis. The following shall be implemented for the private stormwater improvements' operations/ maintenance procedures for the project on an annual or bi-annual basis: 1) Storm Sewer Inlets, pipes, curb cuts and concrete sidewalk culverts/chases, structures, manholes, and the water quality/ outlet control structures (as applicable) shall be cleaned through the removal of debris and sediment from the associated items to allow for adequate drainage through the site to the proposed detention facility (as may be applicable) or downstream systems 2) Sedimentation/ silting shall be removed to allow for adequate drainage along the bottom of the swales and LID/ porous landscape detention basins. Grass 15 scrubbing along the bottom of the LID/ porous landscape detention basins may be required to remove sediment and promote grass growth. 3) Re -vegetation through the use of Natural Seeding/ Sod shall be provided for disturbed areas and other permanent erosion controls shall be provided for areas where erosion has taken place and requires remediation back to the proposed condition shown in the plans The Stormwater Operating/ Maintenance Procedures listed above are guidelines to the minimum procedures that shall be implemented for the site, with these and additional measures being utilized on an as -needed basis. B. Drainaae Concept The proposed drainage concepts presented in this study and shown on the utility plans adequately provide for the transmission of developed on -site runoff to LID/ porous landscape detention basins and to adjacent streets and existing and proposed storm sewer systems. The proposed storm sewer will connect to the existing, abandoned, Emigh Lateral pipe along Doctors Lane and convey flow around the existing detention pond, located in the east quadrant of the PVH Lemay Campus. The combination of the existing, abandoned irrigation pipe and the proposed storm sewer system will provide for the 100-year developed flows to be conveyed downstream to existing storm systems, while increasing water quality for the overall Campus. If groundwater is encountered at the time of construction, a Colorado Department of Health Construction Dewatering Permit will be required. C. Storm Water Ouality The final design has addressed the water quality aspect of stormwater runoff. The LID/ porous landscape detention basins and porous pavers with underdrain system for the proposed site provide for additional water quality and treatment of runoff, prior to flows being directed downstream. D. Erosion Control Concept Proposed erosion control concepts have been provided for and adequately provide for the control of wind and rainfall erosion from the proposed development. Through the construction of the proposed erosion control concepts, the City of Fort Collins performance standards will be met. The proposed erosion control concepts presented in this report and shown on the erosion control plan are in compliance with the City of Fort Collins Erosion Control Criteria. 16 Erosion Control Escrow Estimate The Erosion Control Escrow Estimate for the subject property is approximately $20,701. Please refer to Appendix E for this calculation. 0 REFERENCES 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984, Revised January 1997, & Associated UDFCD Updates and New City of Fort Collins Stormwater Criteria manual, adopted January, 2012. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins, Colorado, January 1991, Revised January 1997, & Associated UDFCD Updates and New City of Fort Collins Stormwater Criteria manual, adopted January, 2012. 3. Urban Storm Drainage Criteria Manual Volume 1, Urban Drainage and Flood Control District, Denver, Colorado, March, 1969. 4. Urban Storm Drainage Criteria Manual Volume 2; Urban Drainage and Flood Control District, Denver, Colorado, March, 1969. 5. Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices; Urban Drainage and Flood Control District, Denver, Colorado, September, 1999. 17 • • 6 • APPENDIX 18 APPENDIX A VICINITY MAP 19 VICINITY MAP • APPENDIX B RATIONAL METHOD HYDROLOGY 20 r c U) In M r M CD O O M 'IT U7 M 1� N O 1- 1- In In r 1, r 00 N O r M 1` In CO O (O M 1� OOONN-T 6100066666M NM�N(OO IwIrMIq00OOmm(0r-N r r O CO to r O N O O r N 0 (n r 0 M O O O O O r O 0 6 6 0 N O r 6 6 6 Z W . M't M (O N (O U) m m 19T NU) O O Lo W ti ti O ti CA O N 1� 1� 00 O 00 N O O CA O 0 0 0 U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 >. a rn u, Oa 0 (p(ONOr0000NMhCDrrCDMf� L.? OOONN'tOrC 0(DaM COOON , � ~ O C M d QO 0 2 d � > W Q Q r N M u) CO 1� 00 CA C N cl) LO(0 r LU •� Z3 a r N M 'RT LO (O 1- 00 M O r N M 'cr In (D 1- r �Lo Q o 00 N V O N U _z uj LLI w Z 2 W Z LU a Q Developed Weighted Runoff Coefficients POUDRE VALLEY HOSPITAL A -WING REPLACEMENT 300 W3 1 0 1797 0 0 810 2,507 0.73 2 0 1.825 0 a 792 2.617 0.74 3 0 660 0 0 138 798 0.83 4 0 9.057 0 a 3,371 12.456 0.76 5 0 8.918 0 0 428 9.346 0.92 9 a 18.454 0 0 2.811 21.295 0.85 7 0 0 0 0 3.272 3,272 0.25 a 0 3,417 0 0 1.053 4.470 0.79 9 0 604 0 0 172 776 0.79 10 0 1" 0 0 229 1,510 0.84 11 a 2,673 0 0 693 3,266 0.82 12 38.278 0 0 0 3.429 41,707 0.85 13 0 130 0 0 4.924 4,954 027 14 26.387 0 0 a 0 26,357 0.90 15 2.6s4 0 0 0 0 2.644 0.90 18 0 1,186 0 0 0 1.166 0.95 17 0 9424 0 0 2.355 11,779 0.81 'y T ti{��N���^N��_NrF07Vi:.1C.��igM17ii'IVV.�6'rC'I+ - Total Acresge 1.54 1.37 0.00 0.00 0.58 3.47 Impervious Ratio 1 0 1797 0 0 810 2.607 70% 2 0 1.825 0 0 792 2,817 71% 3 0 Sao 0 0 138 798 84% 4 0 9,087 0 0 3,371 12,458 74% 5 0 8.918 0 0 428 9,346 96% 6 0 18.454 0 0 2.811 21,295 67% 7 0 0 0 0 3,272 3,272 5% a 0 3417 0 0 1.053 4.470 78% 9 0 604 0 0 172 776 79% 10 0 1,281 0 0 229 1,510 86% 11 0 2.673 0 0 593 3.266 83% 12 311,278 0 a 0 3,429 41.707 83% 13 0 130 0 0 4,824 4.954 7% 14 25,357 0 0 0 0 26,367 9D% 15 2,644 0 0 0 0 2,6" 9D% /8 0 1.186 0 0 0 1,166 1DD% 17 0 9,424 0 0 2,355 11,779 81% Tatel lleraage 1.54 1.37 0.00 0.00 0M 3.47 Lagthe w9eAYra ChererYeYOos PaoYltlYpvvbre[�e Beearse: CorMwrdY ers e5 eomooe ers BS ee4tleM e0 4MUM 75 Mr4eeebta radlleYW: W reea 90 oMnr he: 5 plmnwM : 10 SQeYe: 50 RYaoad areee: l5 U yes: lhbiirel Flow 2 0rariDrb. epec,tl4eY OII�OSow enir� M11Y1IYIG YY not donem 45 StreMa: Paved l00 OnsN 40 and eNewau: BD RooM1: 90 MM W 0 asnstemeW 0 'Refer to Figures Rai tivcugh RO5 in Runoff Chapter Z 0 Z W U Z 0 U LL 0 W g F- ti W z U n w o? . J N > Z N } J LU a 4 + 0 y r U~ 0000 ~II cco d M Y < M r W ¢ = N O O O O O C) I- O O O C)O C)M CD 0 Z ..St �r to to to to to to 0 to to tO N to to O to t0 t0 LL `-� C M W r M N M tO t` M M 00 h r 1, N 1, to E O O O O r r N O 0 66 r O r 0 0 0 r O 0) N tO W `7 h r r r r I- r V r O— O r 0 0 0 1Z M I� M Q 0 0 m m 0 m AM -j r (Ij N N N N r r r r r r'T r r W W 2 H W J a o 0 O N "T C) N r t O CD 0 0 0 0 0 0 t O t o o r r N N N N O O r r r r l, r O O r Q; co H J W 0 Zw ¢¢¢¢¢¢¢¢¢¢¢¢3¢¢¢¢ Qco aaaaaaaaaaaa�aaaa 2 U 0 �^. n 0 0 0 LO 0 N 0 M C) 0 0 0 CI) C',0 0 t o MCOrr IO Z N N N(OMM01 Nr cli J C0 to WMRO to NOr?I. Or V toWN V M N r M r r 6 N N N N V M M r r N W H g w W W O0 m\ v N N r O O t o t o r t 0 0 0 0 0 0 0 0 t o N N M N (,j N r N N N N r C) r N N r co F- Z r 0 �^.v toWtototn000t000t0Na0aLO Z �,. 'RN r'�rNN V'Nto tnhNOMMN W J U M M V m 0 N W tO 00 tt N tO 1'. 00 for hn0n0W Nr, N w w m N W OOO ¢ o00000000000a0000 Z � V 0(ONOr0000NM1�tOrr(p M1� co Nm Q Zrr N M R tO W n M OOrNM� tO W f� r r r r r r r r W O 4 O ^ U� I d O v l` II W O W U Z W o_ O ~ €U W Q MO Ci mJ0 Q U `maM LL �.� 0 a LU r } J 0 J LU 0 °a Y a M r w J ¢ C N O O O O O O M O 0 0 0 0 V 0 0 0 0 Z Er toLou-PLriu)u)ntnuitnLoLnw0totnw LL C M 0 , M MMnMMMnrnNntn y E 0 0 0 O r r N O O O O r O r 0 0 0 O y0 MMNtOM r V nrrrr nrV Vr V MMMMOMMMM r �OMnODnM J r N N N N N r r r r r r V r r r r w w 2 -iCLo 00000000000000000 W � ON V O N r tO W 000000 to tn0 r r N N N N O O r r r r n r O O r Q> H W m Zw Z a. Go D aaao_o_o o_aaa�D aaa U H n C)oMMO�NNNMNNNNaM-N NfOi Z D tn w J ..�' co 00 M Lo Mnn'T MOOMMVMWrn rrO rOOtnrOrrrtor000 w 0 z w LU O O O O O O O O O O. rJ. 0 0 0 o 0 0 vt1A 0 c N Nr 00000r000000000 0 N N M r r N r N N N N N N N N N N CO a Z 2 0 ^ tOODto tntn000M00tnN000tn Z V Nr V rNN VN tO tO nNM OM OMN w J m V MOD N w to MM V NNnaOLOr H V M n n o nM M N n n OD OD 00 N M MM OD ¢ 00000000000000000 Z W U N co co N Mr M M O NC') I,- to co Mn O O O N N V O r O 0 0 M r OD O O N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z m Q Zr rNM V to fD nODMOrNM V MCOn r r r r r r r r � m a l0 m W fb La 00 II N .No > OD 0 N CO) a 5 it C J ca m U � t N "(L 4) n Ua Z N Z W 2 W W Q m >> 3 D t B m o m ooOo0om0000m�nmooa r m :$ 2 'Sn a c o LL C mm n t5 S a U $ n 0 m c m LL m NC m q C � C Cm C D: O m � 2 m > m ma c m o n �m u U m o� apcoGOGoOOop�poppcOOopopocppippcp�OOOoOO pp pp yy mm mm qq NmOm��ONOO�NONmONm �(nV (CV. O� on pc COo pp--- S S 8 88 a0000a000vooa0000aa co 0o tip pa�po O� N O N� O m �!% � N 0 0 ar OOO c; N 6- cl ci 6 ��mm- d6 m rOpp mOOOO�mO mob O O O N N O O 0 0 0 W m 0 (nH O � m O t Q o o O O O G O o O O o o O O O O G 66 G O N �.' 0 Coo o ow oNm mm p0 �mm �y � N _C N tV N N N N lV N N N N N N N ry (V lV lV CI f`V V m QQ oo p mp {� A A m W (p N n tp m N m m W m n n m CMm O O O O O O o 0 0 6 0 0 o 0 0 0 0 00 O O o 0 -P C E O O O O O O n O o o o m o m O O O ow 0" ow mm h IN wi im YI NhbN 1A 6 Nmm N1G hm 1Am E ti 0o m_ O O O O O O O O O O O O O O O O O ow o" O o E o o o o o o c o o o o o o 6666 6 oo cni E LL CY @ YY X b N m O O O n o s J O v o ni l7 C 9 O O O O O O n O o o o m o m O O O 00 0 0 O O N m tonOi 1 f i 1 p m N Ci C4 m a( E C 55 555 5 UU UUU U vo¢ ee>eee `E dcio`�dci�p��moSa' 8sb _a o� 5 8� LL y �o nU a 6 9p p c LL C CCO O e F 5 8 s P �2 >o 0 8 3SL p ^^ yy��Nm�AmOOm�^v: W1� N� p OlP o� 4ocurfii Y1N�h�bNO� 17010p o.�ocoo:crocoei c� m\ �ri o� 1y88888888888-eoobm8 88 88 88 ¢' ooc000popo 000coopc oc o0 6d m A p 0 p n Y h m rz O+� mdo Q. yp00p b 1VNY �{0yy00P.Om �Ypl O� b C Y GT mOOOA qO ry0O O O O tmV N f 0� 0 0 0 0 b 0 OlV OOOOOOOOOO OOOCOG OOCO pO� O r 0p0 Y N OG � O ON DS O 0pO S Ea m P P mm mm m mmuo:daia�� um Pm mr mm8m88�m$88€.�'n,8o8$ mm 80 98 p nn`6nu0m0nmm cry m amm O OO OO 00 pOp pOp pOp pCp pOp pOp pO pOpCOpOO pOO pOO O O O O O O O O O O O c Y O S O O eo.crrie r�ri ui ai mviN Noo p00 O O Nm H a NN qCO A N nm SE C E O O O O O O O O O O O O O O O O O O m O N O O CC E ----------------- E IL C y G .p � Ti I I YI O O N 00 N O 0 0 0 A E O O O p O O P O 0 0 0 C Y 0 0 0 0 NNNbNN1�bbMl N�f.NHM00 O O NN O O NN O hN A m fV C C n _ rc f E APPENDIX C LID BASIN SIZING CALCULATIONS 21 Design Procedure Form Rain Garden (RG) 101 Designer. Company. Daft: Project Lotadw: ASPEN ENGINEERING February 26, 2015 PVN A -WING EXPANSION BASIN 1 FORT COLLINS, CO 1. Basin Storage Volume A) Effective Imperviousness of Tnbutary Area, 4 (100% 0 all paved and roofed areas upstream of rain garden) B) Tributary Area's Impervbusness Ratio (i = I,A100) C) Water Quality Capture volume (WQCV) for a 12-hour Drain Time (WQCV-- 0.81(0.911 P- 1.191 Pr 0.7810 D) Contrmuti g Watershed Area (including rabn garden area) E) Water Quality Capture Volume (WQCV) Design Vahan Vol = (WQCV / 12)1 Area F) For Watersheds Outside of the Denier Region, Depth of Average Runoff Producing Storm G) For Watersheds Outside of the Deena Region, Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume (Drily It a different WQCV Design Volume Is desaeo 2. Basin Geometry A) WQCV Depth (12-hxh maidmum) B) Rain Garden Side Slopes (Z = 4 min., horiz drst per unit vertical) (Use'M if rain garden has vertical walls) C) Minimum Fiat Surface Area D) Actual Flat Surface Area E) Area at Design Depth (Top Surface Area) F) Rain Garden Total Volume (VT= ((AT. + Mu.J / 2)1 Doh) I, = 70.0 % i = 0.70D WOCV = 0.22 watershed Inches Area = 2,607 sq ft Vim," = 48 cu It d, = 0.00 In Vep�,y oT�p = 0.0 cu it Vwxv usrx = cu it Dwow = 12 in Z= 4.00 ft/ft A,e„ - 32 sq it Army = 14 Sq it ACTUAL FLAT AREA <MINIMUM FLAT AREA ATm - 305 sq it Vr 160 cu it Oroose One 3. Groh" Media e&r PUM Garden Gova g Neola QDther (blit bl): . (SEE LANDSCAPE PLANS AND CIVIL PLANS) 2of2 Designer. AGW Comparry: ASPEN ENGINEERING Date: February 26, 2015 Project PVN AMING EXPANSION BASIN 1 Location: FORT COLLINS, CO PLDSiang-Basin 1, FIG 2MM115, 11:20 AM 0 ) \ ., .�. ) ( \ / ; ... { ( a ) \ \ Chowe Om NO SPRLNKLER HEADS ON FLAT SURFACE ,. ...�. \ \ ! \ _»n 1, RG 2126/20 >+am .r Design Procedure ForTn: Rain Garden (RG) Sheet 1 of 2 Designer. AGW Company: ASPEN ENGINEERING Data: February 26, 2015 Project PVH A -WING EXPANSION BASIN 4 Location: FORT COLLINS, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, 4 I, = 74.0 % (10D% if all paved and roofed areas upstream of rain garden) B) Tn'bddary Area's Imperviousness Ratio ( = U700) I = 0.740 C) Water Quality Capture Volume (WQCV) for a 12-mour Drain Time (WQCV= 0.8 • (0.91- P- 1.19.0+ 0.78.0 WQCV = 0.24 watershed inches D) Contributing Watershed Area (uaiudrg tabu garden area) Area = 12,458 sq ft E) Water Quality Capture Volume (WQCV) Design Volume Vwpy = 244 au it Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of da = ODD in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, V„oyrTgm _ 0.0 cu It Water Quality Caphre Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwo�v� = cu it (Only it a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch mardmum) Dwoev = 9 in B) Rain Garden Side Slopes (Z = 4 min., hairdist per unit verucai) Z = 4.00 ft / ft (Use "0' If rain garden has vertical walls) C) Mumimum Flat Surface Area Ara„ _ - 163 sq ft D) Actual Flat Surface Area Ar = 22 still ACTUAL FLAT AREA < NININ N FLAT AREA E) Area at Design Depth (Top Surface Area) Ara, = 300 Sq ft F) Rain Garden Total Volume VT= 121 cu it TOTAL VOLUME < DESIGN VOLUME (VT= ((Arm + Aamn) / 2) a Depth) 3. Grow'rg Media Chooseone (t8' Rain Garden Growtrg r4eda ISDUM (Euoin): (SEE LANDSCAPE PLANS AND CIVIL PLANS) 4. System se ChooOne A) Are unin A) Are underdra'vms provided? • B) Underdram system orifice diameter for 12 hour drain time f) Distance From Lowest Elevation of the Storage y= WA it Volume to the Center of the Orifice a) Volume to Drain in 12 Hors Vddz= WA cu It il) Orifice Diameter, 3B' Mrftum Do = - WA in PLDSizing-Basin 4, RG 2/26/2015, 11:27 AM 0 Shad 2 of 2 Designer. AGW ) - \ ! N. ƒ .......:, \ .. . . / . ... o.:......... \ ._,. } 0UN \ _ ) / e t- RLDSizing.Basi.aRG =612015, #: m n LJ Sheet 1 of 2 Designer. AGW Company: ASPEN ENGINEERING Data: February 26, 2016 Project PVH A -WING EXPANSION BASIN 6 Location: FORT COLLINS, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Am. I, 1, = 87.0 % (100% 8 all paved and roofed areas upsbeam of rain garden) B) Tributary Area's Imperviousness Ratio ( = V100) i = 0.870 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.30- watershed Indies (WQCV=0.8'(0.9rP-1.19 +0.78-D D) Contrumtuq Watershed Area (hududtrg rain garden area) Area = 21,295 sq ft E) Water Quality Capture Volume (WQCV) Design Volume vwq v _ 5W - cull Vol = (WQCV / 12) • Area F) For Watersheds Outside of the Dower Region, Depth of dr = 0.00 on Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region. Vwacvmrra = 0.0 -- cult Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vmpy user = cull (Only if a different WOCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-Inch madmum) DvAcv = 12 in B) Rain Garden Side Slopes (Z = 4 min., horn. dW per unit vertical) Z = 4.00 ft / ft (Use'0' ff rain garden has ver8cal wags) C) ktinimum Flat Surface Area Aw„ = 357 sq ft D) Actual Flat Surface Area A, = 326 sq ft ACTUAL FLAT AREA a M011MUM FLAT AREA E) Area at Design Depth (Top Surface Area) At. = 957 sq ft F) Rain Garden Total Volume VT= 642 a ft (Vr ((Arm t AAw) 12) * Dom) 3. Growing Medea Ocose one Qt8' Ilan Carden Growing Mudla @Mhu (Eoain): (SEE LANDSCAPE PLANS AND CIVIL PLANS) 4. th,da, System Qf A)Are � Qt0 B) Underdrain system office diameter for 12 her drain time 9 Distance From Lowest Elevation of the Storage y= WA it Volume to the Center of the Orifice g) Volume to Drain In 12 Hours V06= WA cu It to) Orifice Diameter. &r Mirmum Do = - WA in 0 PLDSmng-Basin 8, RG 2/28/2015, 11:40 AM 0 0 Designer AGIN / Company: ASPEN ENGINEERING February 26, \ \/., �' \ O ) ' / \5. Impermeable Geomembrane Uner and Geotextile Separator Fabric. t . Provided Ow j- .,......._.., \ \ .. § \. o..,. 2 �■.� . ... - Choose \ } *as . HEADS ON . . \\. ,....., .. \ \ , § a � ) » PLDSizing-Basin 2r2&2015,11«m i� u Design Procedure Forth: Rain Garden (RG) Sheet 1 of 2 Designer. AGW Company: ASPEN ENGINEERING Date: February 26, 2015 i Project PVH A -WING EXPANSION BASIN 8 Location: FORT COLLINS, CO 1. Basin Storage Volume A) Effective imperviouiness of Tributary Area, 1, y = 78.0 % (100% if aD paved and roofed areas upstream of rain garden) . 8) Trmutary Area's Imperviousness Ratio Q = IJ100) 1- 0.780 C) Water Quality Capture Volume (WQCV) far a 12-hour Drain Time (WQCV= 0.8' 10.91• h- 1.19 • F + 0.78' i) WQCV = 025 watershed iru3nes D) Coriftutlg Watershed Area (Including rain garden area) Area = 4,470 sq ft E) Water Quality Capture Volume QNQCV) Design Volume Vwocy = 94 cu It Val = (WQCV f 12) • Area F) For Watersheds Outside of She Denver Region, Depth of de = 0.00 In Average Runoff ProdUag Storm G) For Watersheds Outside of th Denver Region, VwpyaT _ 0.0 Wit Water Qua61y Capture Volume (WOCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume (Only if a differed WQCV Design Volume is desired) Vwpyuwi;t = cu It 2 Basin Geometry A) WQCV Depth (12-inch maidmum) Dom, = 12 in 8) Rain Garden Side Slopes (Z - 4 min.. hwiz dis per unit vertical) Z = 4.00 ft / ff (Us -(r if rain garden has vertical walls) C) Mimimum Flat Surface Area /�, - 63 all It D) Actual Flat Surface Area Ak - 5 Sq ft ACTUAL FLAT AREA < MINIMUM FLAT AREA E) Area at Design Depth (Top Surface Area) Alto = 218 sq it F) Rain Garden Total Volume (VT= ((Arm' Avg / 2)' Depth) VT- 112 cu ft 3. Growing Medla Onase One OW Rain Garden Growhg IAe�a Dt her (Flash): (SEE LANDSCAPE PLANS AND CIVIL PLANS) d. un n System A) Are A) Are urdeNra'vns provioed7 � Q10 B) Underdmm system office diameter for 12 hour drain time Q Distance From Lowest Elevation of the Storage Volume to the Ceder of the Orifice y= WA It 7 Volume to Drain in 12 Hours V0112= WA cull 7 Orifice Diameter, 3M- Krdmi m Do in WA in • PLDSmng-Basin 8, RG 228/2015, 11:48 AM \ . \ ,Company. ASPENENGINEERING ( ) .\A4W. ,CO : PIVI\ / Location: \ � ~ / } ) ~ \ K ( \ ..,, - -- y 4 \� { ( \ a.kkk . - : ) ( (� ) � $ \ A�� PLDSizing4lasin m _* 11am I sheet 1 of 2 Designer: AGW Compalry: ASPEN ENGINEERING Date: February 25, 2015 rya Project PVH A -WING EXPANSION BASIN 12& 13 Location: FORT COLLINS, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, 1.. 75.0 % (10D% it all paved mid roofed areas upstream of rain garden) . . B) Tributary Area's Imperviousness Ratio ( = V100) 1= 0.750. C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.24 watershed Indies f WQCV= 0.8 • (0.91* P- 1.19 - ? + 0.78.0 D) Cmlibudng Watershed Area (including rain garden area) Area = 46,661 sq ft E) Water Quality Capture Volume (WQCV) Design Volume V.= 932 cuff Vol = (WQCV 112) • Area F) For Watersheds Outside of the Denver Region, Depth of de = 0.00 in Average Rmnolf Producing Storm G) For Watersheds Outside of the Denver Region, Vwo v� = 0.0 - cu If Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv� = cu It (Only 8 a different WQCV Design Vohmre Is desired) 2. Basin Geometry A) WQCV Depth (124nch mwomum) D.- 12 in B) Rain Garden Side Slopes (Z = 4 min., flora. dist per unit vertical) Z = 5.00 ft / ft (Use *W If rain garden has vertical wells) C) Mimlmum Flat Surface Area Ar,= 621 sq It D) Actual Flat Surface Area A„mr = 749 sq ft E) Area at Design Depth (Top Surface Area) Ar. = 1665 sq It F) Rain Garden Total Volume VT= . 1,207 cult (VT= ((ATm + Av:.J 12) • Depth) O"'e One 3. Growing Media - (D18- Rain Garden Growlg Mega (Explain): (SEE LANDSCAPE PLANS AND CIVIL PLANS) 4. Vnderdrain System Onaose Ore A) Ave nmderdrains provided? &B (DN0 B) Underdiahn system orifice diameter for 12 hour drain time Q Distance From Lowest Elevation of the Storage y= it Volume to the Center of the Orifice - 0) Volume to Drain in 12 Hours V0112= WA cult El) Odfice Diameter, 3W Minimum Do - WA In mom PLDSiang-Basin 13, RG 2/2612015, 11:59 AM .��.�,'ia�'2..;:'1•...'1d"."'�a..Sv``�''.:�i���asS.�<.�.. S"' ^`' a�z�t-�i���'.-s�3.:r`.�5�'L �+J� .2L.-sLL't��1-'3t`Li�ab d:--i':�t-S�+Y�-s�:�: �"?�A`���' dYw.��c • -- Aj.. it Shoot 2 of 2 DesignerCompany. P.' V. a ASPEN ENGMEERING u, 5 Data:` EXPANSIONLocation: C' it FORT COLUNS, CO Q, r'9: y i' G N �fi 'j Cn`7i iT jTa • •- Q • �- �a • •"� �Y J, KBE +'J!„'+�..�n�� .�-r3 F�?G``'^�8'"i' frJ `x=� T.n,:' x, .�.4teF4:'zy yam`^-�' .Y�10s�."F a a:'•fY "7II'T`>Tr" t-r^' F n.�vr ,Tg},xt•.aTA- A!p-gpU^ x r7.v„ y.. K....+,� .-+:A�'�:.� .,_din. PLDSiang-Basin 13, RG 2/28/2015, 11:59 AM /A ' ' Wil ►:� 1� CURB CUT, INLET, & STORM PIPE SIZING 22 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® civil 3D® by Autodesk, Inc. DP1 & DP2 - 2' CURB CUT CAPACITY Rectangular Weir Crest = Broad Bottom Length (ft) = 2.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 0.55 Depth (ft) I.00 0.50 AI �f Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Top Width (ft) DPI & DP2 - 2' CURB CUT CAPACITY Tuesday, Mar 24 2015 = 0.22 = 0.550 = 0.45 = 1.23 = 2.00 Depth (ft) 1.00 0.50 e �� —0.50 Weir W.S. Length (ft) Weir Report Hydrafknv Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. DP4 - 4' CURB CUT CAPACITY Rectangular Weir Crest = Broad Bottom Length (ft) = 4.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 2.71 Depth (ft) 1.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ftts) Top Width (ft) DP4 - 4' CURB CUT CAPACITY 0 .5 1 1.5 2 2.5 3 3.5 4 Weir W.S. Tuesday, Mar 24 2015 = 0.41 = 2.710 = 1.63 = 1.66 = 4.00 Depth (ft) 1.00 0.50 -0.50 4.5 5 Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc, DP5 - 4' CURB CUT CAPACITY Rectangular Weir Crest = Broad Bottom Length (ft) = 4.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 2.13 Oepth (ft) 1.00 0.50 )w -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fVs) Top Width (ft) DP5 - 4' CURB CUT CAPACITY Tuesday, Mar24 2015 = 0.35 = 2.130 = 1.39 = 1.53 = 4.00 Depth (ft) 1.00 0.50 1 1I -0.50 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3138 by Autodesk, Inc. DP6 - 8' CURB CUT CAPACITY Rectangular Weir Crest = Broad Bottom Length (ft) = 8.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 4.86 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fVs) Top Width (ft) DP6 - 8' CURB CUT CAPACITY Tuesday, Mar 24 2015 = 0.38 = 4.860 = 3.03 = 1.60 = 8.00 0 1 2 3 4 5 6 7 8 9 Weir W.S. Depth (ft) 1.00 0.50 MY -0.50 10 Length (ft) Weir Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3D® by Autodesk, Inc. DP8 - 2' CURB CUT CAPACITY Rectangular Weir Crest = Broad Bottom Length (ft) = 2.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 1.00 Depth (ft) 1.00 0.50 MO -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) DP8 - 2' CURB CUT CAPACITY Tuesday, Mar 24 2015 = 0.33 = 1.000 = 0.67 = 1.50 = 2.00 Depth (ft) 1.00 0.50 M -0.50 Weir W.S. Length (ft) Channel Report Hydraflow Express Extension forAutodesk® AutoCAD® Civil 3136 by Autodesk, Inc. BASiN -/Z West Canopy Q100 (for 2 roof drains to south) Rectangular Bottom Width (ft) = 1.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 1.00 Slope (%) = 2.00 N-Value = 0.026 Calculations Compute by: Known Q Known Q (cfs) = 0.90 Elev (ft) 2.00 ---1 .25 .5 Section Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity fts) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) . EGL (ft) 75 1 1.25 Tuesday, Mar 24 2015 = 0.33 = 0.900 = 0.33 = 2.73 = 1.66 = 0.30 = 1.00 = 0.45 Depth (ft) 1.00 0.75 0.50 0.25 0.00 1 -0.25 1.5 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3138 by Autodesk, Inc. DP 10 Curb Cut Chase Rectangular Bottom Width (ft) = 2.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 1.00 Slope (%) = 2.00 N-Value = 0.015 Calculations Compute by: Known Q Known Q (cfs) = 0.34 Elev (ft) Section 2.00 1.75 1.50 1.25 1.00 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Cdt Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, Mar 24 2015 = 0.08 = 0.340 = 0.16 = 2.13 = 2.16 = 0.10 = 2.00 = 0.15 Depth (ft) 1.00 0.75 0.50 0.25 1 1Y 0 75 I I I I I I I -0 25 • 0 .5 1 1.5 Reach (ft) 2 2.5 3 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. DP 10 Curb Cut Rectangular Weir Highlighted Crest = Sharp Depth (ft) Bottom Length (ft) = 2.00 Q (cfs) Total Depth (ft) = 0.50 Area (sqft) Velocity (fUs) Calculations Top Width (ft) Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 0.34 Depth (ft) 1.00 0.50 f 11 -0.50 DP 10 Curb Cut Tuesday, Mar 24 2015 = 0.14 = 0.340 = 0.27 = 1.24 = 2.00 Depth (ft) 1.00 A1 4 M IO -0.50 Weir W.S. Length (ft) Weir Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3138 by Autodesk, Inc. DP 11 Curb Cut Rectangular Weir Highlighted Crest = Sharp Depth (ft) Bottom Length (ft) = 2.00 Q (cfs) Total Depth (ft) = 0.50 Area (sqft) Velocity (ft/s) Calculations Top Width (ft) Weir Coeff. Cw = 3.33 Compute by: Known Q Known Q (cfs) = 0.75 Depth (ft) 1.00 0.50 0.00 DP 11 Curb Cut Tuesday, Mar 24 2015 = 0.23 = 0.750 = 0.47 = 1.61 = 2.00 Depth (ft) 1.00 0.50 it -0.50 Weir W.S. Length (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. DP 11 - 2' Curb Cut Chase Rectangular Bottom Width (ft) = 2.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 1.00 Slope (%) = 2.00 N-Value = 0.015 Calculations Compute by: Known Q Known Q (cfs) = 0.34 Elev (ft) 2.00 --1 1.75 1.50 1.25 1.00 0.75 Section Tuesday, Mar 24 2015 Highlighted Depth (ft) = 0.08 Q (cfs) = 0.340 Area (sqft) = 0.16 Velocity (ft/s) = 2.13 Wetted Perim (ft) = 2.16 Crit Depth, Yc (ft) = 0.10 Top Width (ft) = 2.00 EGL (ft) = 0.15 Depth (ft) 1.00 0.75 0.50 0.25 IX -0.25 0 .5 1 1.5 2 2.5 3 Reach (ft) Area Inlet Design - Sump Condition Area Inlets for Design Point 17 (33% of Basin) (Neenah R-2533 Inlet Grate) Project No. 300-003 This sheet computes the controfng area wlet flow conditn Weir Equation: n Q, = CLH 2 where: H = head above weir Orifice Equation: Q.„,_ = C. A. -gH where: H= h z- h v Grate: Neenah R-2533Inlet Grate Weir. Orifice: G� = 3.20 C, = 0.65 L� = 2.91 It (1) Aw = 0.53 it` Factor= 0.30 Number of Inlets = 1 Flowfine elevation of grate = 4971.20 100 year Design Flow (ds) = 1.26 100 year WSEL (1.2566666 4972.20 Head (it) O..r O.M� Q row WSEL 0.10 0.21 0.61 0.21 4971.20 0.20 0.58 0.87 0.58 4971.30 0.30 1.07 1.06 1.06 4971.40 0.40 1.65 1.22 1.22 4971.50 0.42 1.78 1.25 1.25 4971.62 0.60 3.03 1.50 1.50 4971.70 0.70 3.82 1.62 1.62 4971.80 0.80 4.67 1.73 1.73 4971.90 0.90 5.57 1.83 1.83 4972.00 1.00 6.52 1.93 1.93 4972.10 1.10 7.53 2.03 2.03 4972.20 Notes: 1) This is the effective weir length which equals the sum of the open space lengths between bars In the predominant flow directions. Space width = 0.1040 ft. Bar width = 0.1350 It Number of bars = 6 Number of spaces = 7 Grate length - 1.33 It. Effective Grate Len 0.73 it Space width = 0.1040 It. Bar width= 0.0833ft Number of bars = 6 Number of spaces = 7 Grate Width = 1.02 ft Effective GrateWidth - 0.73 ft 3:00 PM 3/23/2015 Neenah Enterprises Page 1 of 1 NEENAH F O U N D R Y R-2533 - Inlet Frames & Grates R-2533 Inlet Frame, Grate Heavy Duty Standard Grata (shown) Type A Alternate Grate(sF rAruoe eRAtE NllMM TYPE so. Et. spin "M PMETER uREM rHT R-2M A 1.1 EB C YPe �Q YPe TYPE � RC R-5n -So a 1 S I]2 SA Available Ud: R-1710 Non -Rocking feature available. Catalog Number A 6 C E F R-2533 22 1-12 20 35 9 All dimensions are listed in Inches unless otherwise noted. To order Neenah Foundry products, please call 800.558.5075. 0 2015 Neenah Foundry, all rights reserved. • • 1.i+..-//.... ...«F........./«...«:..:«..1/«--A.,-+-/«-:«a Lt/ n Inn /^^I r fy 0 to C. W m C H O N O l+i l+! lV {V C (sp) 8de J O N O O O r N at O O O! O N O O m O N A C A G N N pMj O m b LL t ci c9Mv IC-9 W! � v o a N G m rn V ,�¢am mmz mmz m q O. N M O O M O N N O O N 0 N O O N O O O O O O O G 0 STIN t7 iN-A MH9SWR9-1 S7a1z.M q MH4SWR4-1 srAl-4A3 5T/N- MH3SWR3-1 S TbRr✓% A2 x N a x k w STmj4-A I �ST/N /%Z—I gT/N 4 2-2 � C 8 0 W 3 - CFO GM > a ?• A' R" �.u0.wp„ o oMo Lc o000N I CV N N; N t7 O go OL L O O O (I IO aqa o. a o: 000 o L(, o O 0 CD 0 o 0oo o 0 0 0 10 I q �I 03 ►a oL o' o 0 0 0 ►.i O C9 . y a1j &W o' o o: o o Co O O in y O- O O q OO .0 i O 0: O o O W) o O. %n O kn O v) O to CD kn x c .o.C; o 6I61 ^ C u o o O o o- 0 0.0 o 0 0 0 'o, �^ V 0 W o: O- O O o O 0 O 0 7 0 4 r- cn 0 0 O l� l� O IIIIIIII �: L(q=> Oo O� O O:M Off_ lam' p Gq ^ O w L(toi rn .--�14 00 110 ON I� O 00 s CIO 3,3�.3� wz GO��c.0 00 I �Nr rMr� re�w •• ta (i a El S e Ei a� 8 a' ^ a!� o v 00 .. O p ,.. 8 �' O O O O 00 N o� - a� v N; N i v, ; v� cN N M is I . Lr�t - •�' � p , ,Loc�l :Lwi Ll"6 N�� L.-On ctwn,) �tn oL,M• 0�1 p O. k 'n k 00 n Ll nl 03 L,(z=:>, L(w=) Lwc>) Lv(=) L,,=n O OLm�� Uj . vi N a' c '.L I I o 0 0 0 o o o 1 u•a' � p :L CD Lc) �o CD L L Lc, 0 L 0 VL 00 . N C+ c� a 0 ' �s� W Z F; W , 00 (Q N V) MM+ rA V W 0% GO h w G •L O LLLLL i pp LO 0L L. It— L L;:t4' O OL(C=tt: OL O�00 L;;, L(O.=C>) N.�: ~. .. ;:; �� �� a'a a a.a wi°oa a -D; �D �. i�i y I V1 O 00OOOOOa t L w .^- ,�foo : -�a� L:��2,o�o�,oL'�6' . --�� m � ; to to ; to . le) : to N to kn o; o[ o: o, o CD.o 0 o 0 0 0 0. o. o O (6 N N , 0\ N �o 00 od �,. .-1 0\ : M M 00 l0 O fr +^" Vl to t� 00 v; : O aO cG OO �O yam, , aN a. o� ON a �. rn, o� rn. ON rn o, O' �^ as o, o O C; O W O yr N. N- N' �: (V 00 t- O' m w (M ; on l- G oN • Ltz�r n N b oMo �j 00 N ; M 0\ N b L1 d iJ � 1:4 ��,�3333333 �z -.GnQnry): U)rnGOV2 # W 00 N M et m to ,0 �xx,x;xx aL: o Fly v ', N . C1 a N N' �pj 00 v wi k T cq: Cl r /1 O� � - M O : 00 b � ; �I b O� t- A N ' N N.. r O '� ^ N : 0\ v v as • _O w ` 100N . I 00\ w+ N M p � (� 00 r N I M .. 4-:.. VJ In q ii .qr N . n q YrA qb)o too q cat -4 IN, �` •X W ,W� W •�W-W•� d v c•i � cn ri ri o a, of N o! N 0 I L N� N N ... N I N N �I Lcc!q L;23 I' N N G tmi 1 o'Ln ' o 0 •j�,. � � N N N •p g ! ,r� ; a d NiN N N i U U ro,w v_.... o, 00 4) E.l-rA I N.wwN N m� ... NN N. �� �� ..�, U�n U yA yA b 81 o o, y... y - 0 "43 Qh: bO X : o Ei 00 bhp a) 00 y .bo N y boy bl1 w.N�I x342 .-y .--i rr .•w i O O O I O O '•. O O i 01 00 C* Oo0 ,V1„ 1 O O + O O OO 06 00 .-+ 00 00 00 00 V1 00!061 Ll O . h DO 00 u U U U U; en tn 00: t N fn r i i a�n L . a�at L rn rnNa00 Aaiyr va van v v �O M. O. N 'ct t� �. a. O O O O 0 0 �--� O ON A d \;MLtoo- MIt- 00 ^ Lw) \O �O l— i a : 00 : 00 04 00 00 ' �10 i s M M N 00 00 M N 00 (-: O� I— 00 o cl o 0 ON: -+ %o , 0 00 O z w) ,a " o; o; c. o, o c o 0 a co w,;+ LD� N,�O�OOO.00Op O,; 0 0 7 O O O 'Li 1 Ll�oorl 7 l�zrl NL'oo," L�a� I� 00 Tzz e d N1 N N-'I: N; 00, 1-�O C1 w r M; n cl, Wn_.q t~ Vi r y M ! V' dr eh :r kn l— Q A y, 00 N;M a 4n \O� x� 00 N; c^i ON tn, �o APPENDIX E EROSION CONTROL & RIPRAP SIZING; EROSION ESCROW 23 ASPEN ENGINEERING PVH A -Wing Building Replacement Riprap DP-1 upoateo: zs-near-io Box Width: W 24 in Box Height: H 6 in Discharge: Q 0.55 cfs ailwater': y 0.2 ft (unknown) • Assume that v=0.4•D if tailwater rnnditinnc are unknrn 1. Required rprap type: 2. Expansion Factor. 3. Riprap Length: By: AGW Checked: J�oil Type: Erosion Resistant Soil (Clay) Max Velocity v 7.7 ft/sec in RECTANGULAR CONDUIT CLIWH"5 = 0.78 < 6 —> use design charts H 0.50 ft Yt/H = 0.40 Q/WHA0.5 = 0.39 d50 = 0.01 in ----> 6 in —> Use 12 in Type M 1/2tanO= 6.8 At = Q/V = 0.07 ft2 L=1/2tanO . (At/Yt - D) _ -1 ft 4. Governing Limits: L>3D 2 ft L<10D 5 ft 5. Maximum Depth: - Depth = 2d50 = 2 (6 in / 12) = 1 ft e S. Bedding: 0-EWWahn An % r—T 1 1 1 1 1 1 1 1 3 1 2 S 4 A 6 7 9 9 TMLVATER DEPTH/ CONDDIT HEIGHT-Y M MD-24 EXPANSION FACTOR FOR RECrANGUTAR CONDUITS Use 1 ft thick layer of Type II (CDOT Class A) bedding material. o"T� '. YI/H YY H. 4 L m d .-....V91 911P.M Im Y9VMt.W I` w 1l..mr.l. 7. Riprap Width: 6«.. rye. same. a 3x aw.m.m.. apm.Im.a--Rgr;b wm..9m nReegaprsasaomr vaaar N-d":a Width = 3D = 3 (6 in /12) = 2 ft (Emend dprap to minimum of culvert height or normal channel depth.) Summary: NOTE: Use 3 Ft x 3 Ft Cobbles for Landscaped LID Basin 12 in Type M Length = 3 ft Depth = 1 ft Width = 3 ft 3/23/2015 ASPEN ENGINEERING PVH A -Wing Building Replacement Riprap DP-4 Updated: 23-Mar-15 [Discharox Width: W 48 in ox Height: H 6 in11 ge: Q 2.71 cfs all y 0.2 ft (unknown) ' Assume that y=0.4'D if tailwater conditions are unknown 1. Required rprap type: By: AGW Checked: Soil Type: Erosion Resistant Soil (Clay) Max Velocity v 7.7 ft/sec RECTANGULAR CONDUIT Q/WH's = 1.92 < 6 —> use design charts H 0.50 ft Yt/H = 0.40 Q/WHA0.5 = 0.96 d50 = 0.03 in —> 6 in > Use 12 in Type M e 7 2. Expansion Factor. R 1/2tan®= 6.8 �a 3. Riprap Length:g 3 `x At = Q/V = 0.35 ft2 5 L=1/2tanO ` (ANYt - D) = 9 ft 4. Governing Limits: 6. Maximum Depth: 6. Bedding: L>3D 2 ft L<10D 5 ft Depth = 2d50 = 2 (6 in / 12) = Use 1 ft thick layer of Type 11 (CDOT Class A) bedding material. 7. Riprap Width: 1 ft B g d TAILMATER DEPTH/CONDUIT HEIDHT-TI/N MD-24 EXPANSION FACrOR FOR RECTANGULAR CONDUITS •..�.! Ur Ha Wd d N a4vanr aa..pt Dm a�Ovcr��td Ns in Y pp�al. TM L of a aaroav d M aw.astr a RDda NDM-W� 11a P1Wdlm d R-M-Vy aaed OdYYW M QIW" R Width = 3D = 3 (6 in /12) = 2 ft (Extend riprep to minimum of culvert height or normal channel depth.) Summary: NOTE: Use 5 Ft x 5 Ft Type M 12inType M Length = 5 ft Depth = 1 ft Width = 5 ft 3/23/2015 ASPEN ENGINEERING PVH A -Wing Building Replacement Riprap DP-5 Updated: 23-Mar-15 Box Width: W 48 in Box Height: H 6 in Discharge: Q 2.13 cis ailwater': y 0.2 ft (unknown) ' Assume that y=0.4sD if tailwater conditions are unknown 1. Required rprap type: 2. Expansion Factor. 3. Riprap Length: By: AGW Checked: oil Type: Erosion Resistant Soil (Clay) Max Velocity v 7.7 ft/sec RECTANGULAR CONDUIT Q/WH'.5 = 1.51 < 6 —> use design charts H 0.50 ft Yt/H = 0.40 Q/WHA0.5= 0.75 d50 = 0.03 in --> —> Use 12 in Type M 1/2tan6 = 6.8 At = Q/V = 0.28 ft2 L=1/2tani3' (AWt - D) = 6 ft 4. Governing Limits: L>3D 2 ft L<10D 5 ft S. Maximum Depth: Depth = 2d50 = 2 (6 in / 12) = 1 ft 0 6. Bedding: 6 in TAILY TER DEPTH/CONDUIT HEIGHT-Y�/H MD-24 EXPANSION FACTOR FOR RECTANGULAR CONDUITS Use 1 ft thick layer of Type II (CDOT Class A) bedding material. i .4 a A to Y1/M tb H, i,. L p H dW..m NNerl !m LptX..iteHr :n W yenn. 7. Riprap Width: ..oX To. a 4 e.mX. a NI ao,n.v4on .. Np..roa-HWwee.+r nrXnm Xa.una�Xcemromaevaewaro+�"za Width = 3D = 3 (6 in /12) = 2 ft (Extend dprap to minimum of culvert height or normal channel depth.) Summary: NOTE: Use 5 Ft x 5 Ft Type M 12inType M Length = 5 ft Depth = 1 ft Width = 5 ft 3/23/2015 ASPEN ENGINEERING PVH A -Wing Building Replacement Riprap DP-8 Updated: 23-Mar-15 Box Width: W 24 in Box Height: H 6 in Discharge: Q 1 cfs ' Assume that y=0.4`D if 1 1. Required riprap type: 2. Expansion Factor. 3. Riprep Length: 0.2 ft (unknown) conditions are unknown By: AGW Checked: Soil Type: Erosion Resistant Soil (Clay) Max Velocity v 7.7 ft/sec RECTANGULAR CONDUIT Q I-11-5 = 1.41 < 6 —> use design charts H 0.50 ft Yt/H = 0.40 Q/WHA0.5 = 0.71 d50 = 0.02 in —> 6 —> Use 12 in Type M 1/2tanO= 6.8 At=ON= 0.13 ft2 L=1/2tan0 ' (AWt - D) = 1 ft 4. Governing Limits: L>3D 2 ft L<10D 5 ft 5. Maximum Depth: Depth = 2d50 = 2 (6 in / 12) = 1 ft 6. Bedding: in TAILWATER DEPTH/COMIT HEIGHT-Yf/R MD-24 EXPANSION FACTOR FOR RECTANGULAR CONDUITS Use 1 ft thick layer of Type II (COOT Class A) bedding material. rfix iti ML e 4 d N d4 zvMM h fiwegfep fie in M Om.tl. 7. Riprep Width: »ix. rm. r e siefo m ax zz.ean®. RpvYD]}.-Rlpq 6qM lraYlim a RsvgYvf'mOigW Ytlt4 alvH"zl Width = 3D = 3 (6 in /12) = 2 ft (Extend Amp to minimum of culvert height or normal channel depth.) Summary: NOTE: Use 3 Ft x 3 Ft Cobbles for Landscaped LID Basin 12 in Type M Length = 3 ft Depth = 1 ft Width = 3 ft 3/23/2015 EROSION CONTROL COST ESTIMATE ill: pig 11 X CITY RESEEDING COST Unit Total Method Quantity Unit Cost Cost Notes Reseed/mulch 3.47 ac $723 $2,508.81 Subtotal $2,509 Contingency 50% $1.254 Total $3,763 Notes: 1. A<=5 ac=$655/ac; A>5 ac---$615/ac. EROSION CONTROL MEASURES Unit Total Number Method Quantity Unit Cost Cost Notes Vehicle Tracking Mat 39 CY $30 $1,170 6 Gravel Filter 10 ea $300 $3,000 5 Straw Wattle Barrier 7 ea $150 $1,050 8 Sift Fence Barrier 1582 LF $3 $4,746 38 Gravel Mulch 2.47 ac $1,350 $3,335 39 Hay or Straw Dry Mulch (1-5% slope) 1 ac $500 $500 Subtotal $13.801 Contingency 50% $6,900 Total $20,701 Total Security $20,701 APPENDIX F PROPOSED DRAINAGE BASIN MAP EXISTING DRAINAGE BASIN MAP 24 EROSION CONTROL PLAN I.mALL�MDFMLT---- NeeEDErALNNIBTCPIN� I I SNDrIORanx, Resr. NOmn AlvarNDesDF IxeruLaRASa I Pwacwr,.e RavAR IMermTN� [till —J 1 h is As �S is s NBdLL IC DNx ETIorat n c �1 Ed 44 DOC70R+S LANE PVHS A -WING H H I • JD — FRCPOYL INI CONTOUR - 5 ET INTERVAL '\ 09 — PROPOSED INTERMEDIATE CONTgM - 1 FT INTERVAL s.; a `hXKKE 1RAIXINC PAD SF — SILT FENCE ® TYPE M RIPRAP I • IY WATTLE CHECK DAM ( RAY OR $TRAW DRY MULCH (1-sxl — GAYEL NET FILTER i NOTES 1) CONTRACTOR TO INSTALL SILT FENCE, PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES. TOTAL LENGTH OF SILT FENCE =1,58Y LF WHERE SILT FENCE IS SHOWN OVER HARDSCAPE (SIOEWALKS, ETC) CHECBEDBY'. IRO DESIGNED BY: AGW DRAwn BY AGW A OPAVEL SOCIOFILTER SWILL BE UTILIZED IN THESE AREAS DURING CONSTRUCTION, AS APPUCABLE 2) All DISTURBED AREAS ARE TO BE SEEDED AND MULCHED, OR LANDSCAPED AS SH NAN ON THESE PLANS AND THE LANDSCAPE PLANS. - - - ]) STOCK PILES SHALL NOT TO EXCEED 10IN HEIGHT. - e) ALL OFFSITE AREAS DISTURBED DURING CONSTRUCTION ME TO BE RE -VEGETATED AND RETURNED TO HISTORIC CONDEDOOF 5) VEHICLE TRACKING FOODS LOCATIONSN SAE BE DETERMINED BY 1 w THE CONTRACTOR AND PRIOR TO CONSTRUCTION, MD EMILL BE INOrALLEDACCORDINGLY ��jj Z FMf� Q S) SEE SHEEE CDG FOR BROWN CONTROL NOTES AND DETAILS, AND CONSTRUCTION/ EROSION CONTROL SEQUENCE CHART Wo a =U° wg° z in o JW7 <o Z > u m 030 W :a a CALL UTILITY NOTIFICATIO4 CENTER OF COLOMDO 1400-9224987 a.TX FORTW�NGOFUNWMHERmLU A aNw City Of Collins, Colorado w•"""'"""W�a UTILITY I LAN APPROVAL THESE PUNS HAVE BEEN REVIEWED BY 1THE ENOO RECrs LOCAL ENTRY FOR CONCEPT ONLY. THE APPROVED REVIEW DOES NOT IMPLY RESPONSIBILITY BY o�eN 'K& C y Engineer Dole THE REVIEWING DEPARTMENT, THE LOCAL Ir ! 043251 CHECKED B(: ENTRY ENGINEER, RR THE LOCAL THE FOR p Water WaabWoler Wily Gale ACCURACY AND FURTHERMORE. OF THE O CALCULATIONS. FURTHERMORE. THE REVIEW � •�—� _tp CHECKED BY: DOES NOT IMPLY THAT QUANTITIES OF ITEIMS a nNAIn� 51 rmWa4r UUfy Dole ON THE PUNS ARE THE FINAL QUANTIFIED ' CHECKED BY: REQUIRED. THE REVIEW SHALL NW BE Fair k Recrea40n Da4 CONSTRUED IN ANY REASON AS ACCEPIMCE ewwecrrlo: CHECKED BY: OF FINMEAL RESPONSIBILITY BY THE LOCAL DAM BV IDIOCIES lrollic Engineer Da4 EN ILIY MR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING ILE SHEET NO: 0007 CHECKED BY: CONSTRUCTION PHASE, ENironmenlal Ponner Dale 7 OF 18 ♦ SWAN WAriRES, EMBEDDED AND STAKED, AS S OM IN'WATIITF L SM FILTER' METATHIS ET. TV me ENSURE STABILZATN.' OF WATTLES. SPAO„C SWLL WE w w BASED ON vDgTCA. T T -HEAD nDwT (AT ; vAa« INTERVALS MNEPE 110' HEIGHT S E%CFF➢OF BY NU) YE HI A MOST O gTYF N OF wANNF1). BE HIGHER rill VNnIL VRbLfN MIN PfINiB (Turn 6rAltE (IYPI mP v I A . xroeaL SECTION A PLAN VIEW FRIA GENERAL INSPECT KP FACT-COMPACTEDATTLEgEPNR AND BEACH T RECESBAPr) ME B,(.CKFlLL FLOW WATTLE M1EP5 AFRR EACH sTNM EVENT. Ij % ALL WATTLESBE MUST REPLACED AFTER 11 1 MONMS UNLESS APPROVAL IS fAtMM BY W ENGINEERING DIVORIN FOR LONGER UY. _ • 3 PLEASE REFERWA 1 FINFO LNG Nw AND SNWNEB4IE FOR ADDITIONAL 1 M ALIA PROFILE VIEW NAn NOTES DwnLs�Nwnw.Wawm Par FNSTEmO 18" DIAMETER STRAW WATTLE CHECK DAM a'R s TO paNI 1 O I9J () (4) (Bf a 11 (7) (8) N (II) 02) (11) (15) (10) STMI DERMONAN08E016EHTC MOL PLAN =NBTIDCTON MOWS gaMrMer omewin The mtrtl bzceaer muss be maaetlakag lwenry-kur (U)harslnorm any [meuu[Imm INs b. TM1wn band wSIRandcot,eummambIng cDo wMb Petmrta emigmram lb acceptedDWIN ( 9 e stripping, h O I krxnBM Il ire- c I«t°my m4Wld d eatb/ (gmkW r9D d 8 1. ap nc r°Qu M wool rbcyres ylNl bengaheaa[Ew yandmocam Mm1q 1' 4 as-nti[aretl-n lbapNwW pgae WeNM cmrtuzEon Atal ti dmng,mx cbon,IN D AVg Snap rorexlonatla 4pw4gmd mltregrgaeais movon includingkeeping M OM" 1fi Wr ly Walaree so fern lridmiswixlMw,n Se , Else Dave n eel b raw d b VlinN and m. maHlg 4e nwbn[vrArd htiiu shorn hers Pone' eq elShall be o e ax,M1 paxLl R ag la of a°' s 9 9 M1 Ilb d N ( NWny lu en ed <m 'dN m•a_ w a Ip amn wor) W aW-gi hen coma e!( rgg ad"g WMg yn alai kptn9 Mkng Nt1 h [eh p upn ed au Try pMTq OaMOM 9Mntl bu al 1 h veptld om Pm aim Ceara BMng - y M Too T areM)dA dapgeFe a W ryr z°Iway sl all rumen eawsed by land asbpnpaCMiyb more than NM(Jgidys cefore mptatl twowym Mrmanememamcmeddpws ich,imM aWa Mybmmaed UnlrstlMMr a( edb)M•CKFFAR Ay, lna rlormlmkewm,on WWk al, YIImWmy(gmqurag ashcan mnWlmmarm Nak of Ba nape[tedrteminimum o/ebee[wry Ma(2)neMs and aBw rcF tiDlikprR etwmmll mtlreTe lreavrxmxrruttMai b[<srryn °rdamenaure Ne t°nDrmtlpnbmmmal Rmndn naea Sol R) a' dlt k'M bUma WOVMnCa MSesenouneim enMn.a aroaaanuWCMwyaWbeiwe ax entw WsM the woam cmntlnspera (cl Barmwe]ehar to vu nee been vlACierty 4adFZMrdelmniMbylM seem Gmtrtl "mat°` NTmlempwM If ANS ,MeM an dI w 11 d, arefiwmm NmdmA,r ansibk brm,tIW1 up mtl f II edmem end tlaxis tern all denag nhexbucmre entl °Cow WMt M1CIMas mwwram AN xch ay[kmepmymnlmcm nTAmNP y Iuaaed me'rq TM1e m t M1 w public men 'e Ik mer pual[igMxdwey,one makes°mseemandwabrayxern[IeanwlaMa end I h rF pdry. r P kMln Fe d ry pmwld al a at m rtl y t a 1n U .ed t Naas - Ak n 1 semi DII h n gn AI l tore T Ian - e1' mkrwll tnnspcaM as N g, tl rg, open k ilk g. Ray 1 kp "ag mow n Ny PB' aw alb hd a Ina. Tbeg mvaWrvo McVar ,fd noon ponmwll Wrnmleamdnw smwlnenWlbeclwnM „ponconplman&tMpmmtand babre wrningme mamtmmmmw mlMCM•Omnrya ammmwslAsmciwm MOAT Gay ordnance and Colorad°DkMmge mane Coaem(COPS) rawlramerea make A UNaahrlb disc elm or dim Me duharge of any polutam w contaminated wow Ew«nM0[tm seas. Pobwmxind°ee but No'It WRIGHT to divaided uunany niakuels, mmrelawdrwaxnwd ch kcros at entl ens w°auas userentl amaary warnTnedwmmesMllman4mntamekawwmenurn mnwmrymasmretimpmpar[odanmethane aspasal dpdMmban MeabinacmrdwlbwkM1 aM and all app'loble lomlffib. and kbra'pulaemi A bogwwl nth ANSI be lxonba m ssa bronnnaeuk[nvlew"M Tro aroa NLlba m° OodwaxbemrinwaNwtmataiMaPdbc.Wd m Imo B[y(M) W wry Iw° ne, rMwry mnsbl m UnaC IOW dConL lion achtW bn wmr wMMr mW will ore 'w mtl Kg dumW dohs to Be von b°ng,t men TOwswebmlII BMPS Mall be mA41W end mwWmW unit Mesas we wftw glisrl. esbkmvnedgtMera°°cmbdm Wr,"MaLa. CkyLMSOdII.SCREEN (L) Ba 419mbrdnwopwrM mesh @) DdmdmM Mm. (p) Nmeld mdmaer. (dJ OMw bmam4ifnwhd. ThaD nMa ltld mry wuramwwem<mtrd measwn in M3Em mxMatis sM1w mtMapMr. `M1e Dev.lmwslw mpwmwnewwmrrrosweawmp.e nemmary, azarm.eMMv tWLeweY SEEDING CHART i ]� (1' r < a ` � IF R t r m W g VO«IA ¢[ aq Table 11.2. Raomm nary Species and Application Roles of Sends Iw Tam Ve talon and/or GOver Cr Temporary Vegetation / Dore $peeH9 $BOSM1 puled PCUnda/Acre Annual RK9rou Cod 20 Oats Cod JO Cereal Re Cod 40 Neal Wheal - Spring q ew 60 Batley Cod 60 Millet Warm 30 Hybrid Sudan Warm 15 Sorghum Warm tO Cod uoson major 4 make Mole wrinmajog growth m the sable. Wamn season ikol make their major growls F late spring mtl wmmer. cable 11.4 Identifies planting dales for perennial and temp«ary/cowr crap grasses. Tab1811.1. Planting Dales (w Pwmntl and Tem Cover CI CraBae9. g pwary/ Op DATE PERENNIAL CROP GRASSES GRASSES CROP GRASSES W«m Cod Worm CBS,! ic4 p!•klq INpIKeeR yr Mpy.ilpbv [MI5 _ FoalymrH eWtl reue<ma aba a!•e.H i b W eYlea([selle brass<im m•tm uyeec[mm ea poor easier aeaanmlw eKAR KmkmeHt { { as n vy t [ e ._...r. Drrauv a Ed; 4CIm/Yq Pmea aln amla w 9reo knee - m Wt z, ba (Le OEM1 Waw .m xwt ad ae L [aatalia [eppb DEM11rsses tl weim ¢a.amvaee w ssa Poaee aminmw.@ftlaea laaELLYGb^ Taeiede we ab m a y H+a nme low ruawmr lm mar a' Benavetf - mw< turn Jm 01 - Feb 25 Yea Yea No No Met Ol - May IS Yes Yes No Ye .•„A,v s a Myj6,_.May, 31 Tea NO Yee NO J n 01-Jul 31 No NO Yes NO Aug Ol - Aug el No Ye¢ No yes Sep 01 - Sep 30t No NO No Yes Oct Ot DeC 31 " Teo Yea No NoaGRAVEL Mulchn shall be used t0 oumt n mloblmhment of w t tan One BE mor of theI(APPROK. 9 ge a ! a idlowing mulches shall be used With 0 perennial drriand grass seed mxture eo temporary Vegetation or cowr rop.WIRE Mu1M APDROOIkn Rote Acceptable Dates of use _ W 1' IeAA waaK'ms INLET - - -- r� •a+•—` FILTER � 3/4• DIA. CONCRETE *SMEENBLOCK (APPRO%. 1/2' MESH) 42rx4A WOOD STUD FILTERED WATER OF INLET SCREEN FILLER 2'x4'WOODSTUD PLAN VIEW SECTION A GENERAL NOTES: A 1. INSPECT AND REPAIR AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN ONE ONE HALF OF THE FILLER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. 2. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED -A�11 µ,FILK _se .di .-a. .r .w. LL [ebe, [tl g. -'All oa [mma u a bun cle [a•vf nu e` aw r • wHtue Eves ruck W p wsen a w ssa n w Iva LraapoyFmim Straw or Hoy Use Ot - Dec 31 1 1/2-2 tons/cPe Hydraulic (wood or paper) Mar 15 -May 15 1 1/2-2 ions/a0yeOVERNOW Erodon control (mob w blankets) Jan Ol - Day 31 Not 2-2appltome strow mulch shall be Gee Bf n Ws weeds and at least 50E of the fiber ENRN De lOrinMee «sharp In IMQIM1. 'hTen Beetling with nOlNp gmssas nay horn a n011w Ydung ¢a06 is a suggested mulching material, it avaidble.WIRE Ig ydf aMli g p in anon Is used, h suite mulches may be teal Irom M«ch 15 tMm h Se 3D:iedn4W&OUm<wgrtl a Straw Mulch 1. the or straw mulch wN be anchored to the ron by one or me Idlowing memos& (0) p ore hat which will crimp ins Ober four ibex or shelf Into the sot,. At least 505 th the Ober M011 be 10 Inches w more In length. mulch netting inalullea MARC the nay (D) Mr straw or straw acrording to manUlwtureri IrmWdlma according Md elunm(14) ®< ® ®CURB A &vastHa ¢ad BLe 4•lla{lm CHECKBDBY. nsslcrvsD BY nluwn BY IDAVEL Aow AOw AHay aLet - _ NDPE$ PERMIT NOTES 1. SITE DESCRIPTION: 0.Iconstr echdrof a width n* and Of gladinq utility work roadway conalrvdim and the construction of a UD Basin* and osswia[etl storm wtlall structure. FROM TRAVELED WAY OF ROADS EROSION CONTROL CURB INLET GRAVEL FILTER.2 w b. The major wlivitiea are planned n the following sequence: 1. Clearing and GmbbNg necessary for perimeter controls Iwatdlallon of wrimeter controls. -3. DemdHion of "[stirs asphalt, structures, and ache Hems. as applicable. E4 Dealing of Site. PaM1 g Lot, draw oiMes, ono "des and seamemNer D bms tl 'aRlegblal Snof CmVdnmmeare9aluctoll YIngrCm44uC1I0a The site contans ap roximately 30 wraA all of which is expected to undergo clearing Its or gradng, w padditiwd Bfeite Wading taking pl a to tie-in to existing t d/rtl ny w wN d, Rational •C' Ax 0,84 bete crostrucl for existing site The Ratbntl OC for proposed development roles frown 0.25 to 095. with the aver 'C• for the site bein 082 Me site IMa within the Mod«ate Rolnfoll Erotlbil ty on and Low Wind Erb�OBity ZmB pa the City of Fort Collins nme maps With the exstng site slopes of approximately 1% to SPA the new knprowmmts wW be subjected to both wind d raiofdl erosion . "The prMev opmml Property for the site Condab of parking let. drive roles, buNdings e Bond Imdscopkg Please refer to SWMP (under s amle cowr) 1« details Y and vehicle n a and Bmd4 anticipated I. $o rspd utm owning on s Me Fullhems Lemay C moue However, shone will ban vMkle (wage or dmnmq o site. Chemical stooge /a not antklpated m e [e Plmsa re(« lO lne Slolmwater 4a0Ya9BA ens Plm (under &paste o ) for complete list of anticipated pdlotim 4 a g. TIN may be anticyated nth-slarmwaler c«npenenb of discharge. Please refer ld the 5t«mWater Monag.mmt Pion (antler Separate cow) f« a complete list of omtKMAb1Md ychutiarn saalces. PC Blue tlownstrm recelvng water is Pwtl Riv«, Storm WOW the andiffority of the site 11 be c we d to ND/pre-aedi ration basins d �oposed and istin storm waters y curb gutter, g systems b rb H it ,carp cal¢, Mann&s entl o tonal sM1eel Iflow.COWACTEDSOILMD�D - .MAP: 2.. r- SIlF: Seqin gsai _ In Exhibit BE Erosion Control Plan 3,a MMWS FORiSMRMWAMR POLLUTION PREIENTICN Erosion and SR ent Controls. See Erosion Control Notes and Sequence Table (this a Bheet). n b, Materials Handling and Spill Pre mlim: Measures Mould be undertaken to control mnsWctlon materials mtl waste. and alaposal of a concrete (If wVlleable) to ensure the and Ocher matefids do not Imw Me site andtlemter Me Dubuc streets w ere. w ono whits numb II ou0 the detention p a Y ets to the Poudre Rive Concrete build) statCrkls, waste, ma ores byMay enter the p not tr dtsMro�d its et ti ^alto stomrl sewer system nor Mwla own enter the public streets « esae eetmtlm pad. In the t of i soli horn the site into storm sewer system or -site tletmlion pad. appropriate measures shorts be vntler[akm Mmetliately loaremow Inc spilled materials and prevent future II from Occurring.a spills 4. FERNAL STABILIZATION AND LONG-TERM STORMWATER MANAGEMENT: See Erosion Control Notes this Meet for Mal stMgizatb mmwlm to control pollutants in slormwaler tlecharges. 5. EITHER CONTROLS: 0. Measures should be undertaken to remoVe excess waste Products from Me site and dissp r of these waste materials oHIL In on approprpte manna. In addition, measured should be undwtMm to limit oil -site soil tracking of mud and debris roorltlwaK mtl alllage from owed es Ito enter nnm �potecled drainage water l Mud and debris lwnich OlaMarge ewd not Bad franked lntually into the Cache Lo Poaae Riv«. (c) I Tackifias spayed an the mulch to the nnufachil ecommendati . 2. All atrdw an must be free of noxious weed& - F J O C - IJ Q �" Z U IWFin O L W is 3: U 'x I¢ W I li J a Sol W I``� /y / ♦fL VV W Z /� LI 'Q O /k Yr 0 J 0 U Z J J Q 0 LL — W O Z J rOV Er Z I0 V Z 0 O Qa W Z a D: 0 iwuo t (Z I) ; a }m ta` Q ..::.. •. �•:................ _ _ :.. ...:.::::: ....... .... _ ...N;_.:,c:. E.,:..... ...:: .. AAA . 1 :'.'i:' Q m- f tern :F 0 - _ 8 • •'} (Ca ^^\\ �\ .. err ::.:.: r EROSION CONTROL BLANKETDEMIL w W a T._. Tmmr rr Ana le m r. / w FAR `tom mil man mMw aura �i¢nx xo nrxwn m rmT aMnma mVITElA mA raw owmaaTHE E _. rn melts r m rlf rarer rA.a ww.w f°RN SILT we aFENCEan TR�.D PPE/CULVERTPROTECiDN nru ,�� nry All er Son nww fm c .row 4: AT SF n ® ww.wwM..&� sARCOare PAT v� .a "Con • a[wm rm Bx.m w r , wva z�a A ag M I„LET EROLCTD„ 1 - - - ®sit - xm Irwin III AN -- W..w Row .„o„„ IIWL row ...mwmM. ..rI , ...,..'..o ..A ...�..c.«r...r.. ..... I MAN rnmr<nwREAKED xxreamal uL nmwn elm bt Mvr sw.ee STRAW OR R S FOR CHANNEL INSTALLATION PEF Tfl SCHAM alnnnETOHNG INCLUDING BMr TINAWgl wrwnw«uuEliAnLl]ER,ANTH I. PREPMEmaT«clFTxscxAxxw arArrxomxc THE auwrErmnen>�ldCn THmmvm MTHA WlxAweOKIwAR S tamp«ATELY OrstauoAaeAPART TO ONE a SETTINGOF THE THE wrlamrncx nx REMPARNING IT LOWN ECATION OF ELABLET BACK OAKS SEEDAND COMPACTED SOIL SECURE�KUT� mwaere, sra'L Wm AROW oF mnPLEsvT,wFs sonceo APPROXIMATELYz ay. AcnoasTHE NOT' aHIS aunxsr. - 3 REAL CENTER AAL N KETSM sTe $E$EcURE�rr.STeneorosCHANNEL THESOILARI SMALL xRFA EBONE STATES PATTERN MAINE ME RUN USING THE our BYGTW.s era s mt'a[s sGTAKNF $T oeNAPPRC�RlAAMLm ML von MEATTOW s ( wwa+IAP a&AwaelEHw«mMre4 4 PHASE a' Dme PAR mAwNO9NArtLr m(mml 5 FULL :k neeLOGROLLEPXV05NNAMBETRENCH SO HE LEAVES�OR`STAAPLING IB 6 ADJACENT WAST BE ft'mK< NDIws waaur+a DART AND STARTING 7 IN HIGH FrOw s(to )AP m uisn THE CHANNEL INTERVALS uaeA ENT) ON CENTER OVER ENTIRE WITH OF STEPLIN5 THE e nU Or SUM PPROxIRUTELY tx Ir .EAPMT I Artrbrp« TS MUST Be Px (1m)WOAlPF CHxBACxFauNDCOMPACTTHERFERCHArtea STwuw. A NOTE: B Faesiu C oscunEMTHE cnnW, CRITICALPOINTS wmsA MECHMWLSURFACE - IN IFPRH IF PROCEC'CTEso MAon E - USE a GTMIE ' ylcxnwELearouclOE TEAMI I ANY BE w tggS 1. rL cl TRV:m„O wT SNWL BE LGMD AT E\£R! FMRarF£/WT TO ME CdSTM YM sRE, z ASK TWLOINL N.T sMen ¢ M FROM M'NF➢wD 0 c _ mTDd4 FROM aFNG 190 J. 4DYwT AND OIXFR WIEPOL BP[tfD, pgPPEp rwilTTWF WO cm sM¢r slue BE ILMmW Y tltlD .y. 1 IH r gDEN t/r J/. AT HER u R "aa gO RECy nth F�oz O�/H�RyaA G,S a H3251 O� �vkr 'M,rWy/OrypL EWyI' m m C of FOrl Collins, Colorado M UTILITY PLAN APPROVAL APPROVED: City Erginmr Date CHECKED BY: Water h Wastewater UURy Date CHECKED BY: t forswear llliliry D W THESE PEAKS ILAVE BEEN REVIEWED BTI' THE LOCAL ENTITY FOR CONCEPT ONLY. THIS REVIEW DOES NOT IMPLY RESPONSIBILITOY BY THE REVIEWING DEPARTMENT, THE LOCAL EMOY ENGINEER, OR THE LOCAL ENTNIY FOR ACCURACY AND CORRECTNESS OF THE REVIEW CALSUUOiTONS. NRTIMPLY �Hi QUANTITIESE O RENTS ON THE PUNS ARE THE FINAL QUANF ITEMS CALL UTILITY NOTIFICATpN , CENTER OF COLgtAOO 1-800-922-1987 CALL 2 ANGELES DAYS IN For Mmnl eExunn. e' MN. VEHICLE T�CIall MAT 6. IMI ECRON AND MAINTENANCE: Inspection ono maintenance Mmld be undertaken on a regular basis as outlined in Section6 0( the Termsand Conditions of the CDPS eral Permit. CHECKED BY:. P rks A Re«moon to CHECKED W. Traffic ENinmr Dote REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON h5 ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR AODITIONAL QUANTITIES OF ITEMS SHOWN iMAY BE REQUIRED DUflIWG THE Pwgm xa wu O00003 g/B/Its 8HEET No: C-008 CHECKED BY:_CONSTRUCBCR ON PHASE. Fnsionnronid Plmur Dole 8 OF la J I II II /1 / 1 I .I a 1 pI 1 i OWE I I I I I tA 49>1 I II g 1 4971f H y eM an y 1 ] I I 1 - I j .'.. 49]Oi PROPPOIDDaLANNICk E — QUENMONSAINFEOORRGD ___ _ _� N RE DOCTOR'S LANE S 4971� 0 la wl RaOF 0 WFET'W I IN RD IPVHS A -WING ROOF I I moss RD I � I I �!rir► II ���� L I� 1 4.5 EN 1 eRta P.1pW LANLBfAAE LE�IAR E BNxFORMD I i 0 3B K 99 I 1 A I LEGEND 1 \\ � PwR6EDnrart�F-vav I1 1 —_-� mDlaax Eurv.xE — x wwo w on R0 11) NMIWF WMT7Wrt I \ GJ, 1Ij�I I I ITIW FgNY wcaAle - M9]0— 696'9-__ A.pnwcwaTw.ps � �5 6XxnNc.oxuRPEaWNNME � I mawuv IwNTAeaEe.slx LINE ur6 W E NI �Lj .RaPaaEDOxAx.DEDE3aNPDxT �1 I 49- PLowANRow 1 1 J � rwPaseDPDmwsuru 'P '^. m�DPOmDADDraRNNLD�,Mx I _4y_ 1T - wgA <' r 1— LDTA9lE NWaI mousA INeN rrwushe GiM 4 y IM Ivldwspear Msyuur9ammi 94alma PMMcr,Y Im MwipaRT M MDTRMMm1MPMnaM IIDBy.. rclarmuorrmOmemPmwlaeafmaum sm Wea �YdYSljS9 449 LautimPavmenLArea lx 4 a-m�9uwee iaAaa u Irgwam mxevvaa memAma eF AreaorPasersert d BnMry a x�00nMmiM N&L8094 N.OUIMB99e. M31M HM A11:7 gNrven IFI 91 N y To lWnaLArta w TleeLrn SNe 77 MN 51 NOTES 1) THE EASrIING IRRIGATION PIPE, LOCATED IN THE NORTH PARKING LOT AGO IN DOCTORS LANE. 15 AN INACTIVE PIPE MICHWLL BE USED FOR CONVEYANCE OF STORM NNTER. THE PIPE DRAINS SOUTHEAST FROM THE NORTH PARKING LOT TOA MANHOLE SOUTH OF DOCTORS LANE, THEM EAST TOWARDS THE CAMPUS DETENTION POND. ME PROPOSED STORM SEVER SYSTEM, CONSTRUCTED SOUTH OF DOCTORS LANE. HILL CONNECT TO THE EXISTING IRRIGATION/STORM MANHOLE. N ROOF DRAINS FROM THE PROPOSED BUILDING EXPANSION WILL CO MECT TO THE PROPOSED STORM SYSTEM ON THE MONTH SIDE OF THE BUILDING. AN EXISTING ROOF DFUJI FROM THE EXISTING BUILDING FAST OF THE PLI WILL DRAIN TO THE POROUS PAVERS. THUS IMPROVING NNTER QUALITY BEFORE RUNOFF ENTERS THE STORM SEVER S1j5TEM. 3)THE ROOF DRAIN LOCKTION3KONG ME WEST AOE OF ME WESTCANOPY RIDGE WILL DISCHARGE TO COBBLE LINED SWALESANO THROUGH ME PROPOSED LANDSCAPING. PRIOR TO DISCHARGING TO SIDEWAL)KCHASES TRAIF CARNET RUNOFF TOME FLOWLINEALONG LEMAY AVENUE. 3) POROUS RAVERS KILL BE CONSTRUCTED EAST OF ME BUILDING EXPANSION. THE PAVERS WILL PROVIDE INFILMDON AND IMPROVE WATER QUALITY FOR WE RUNOFF. A4' UNGERDMIN WILL CONNECT TO ME PROPOSES, STORM DRAIN IN THE PL.W ARFA(EASTOF THE BUILDING} 4) RUNOFF FROM THE MAJORITY OF THE NORTH PARKING LOTWILL DRAIN TO LOAROINTS, PASS THROUGH CURB CUTS,ANBCONCENTMTEINUDBASNS. MEMFATMRU}M:PFWILLSPILLFROMTHEUDB INSMRMGH CONCRETE CHASES AND METAL SIDEWALK CULVERTS TO THE ADJACENT STREET CURB 6 GLGETER. DRNNAGE PATTERMs WILL BE SIMILAR TO THE EXISTING CONDITIONS. BUT WILL IWVE ADDITIONAL VNTER QUALITY MEATM UNT PROVIDED BY THE LID BASINS. 5) ME MAJORITY OF ME RUNOFF FROM THE BUILDING REPLACEMENT RIDGE AREA THE NORTH LANDSCAPED AREA THE EASTPLNYAREA,ANDTHECANOPY OVERTHE NORMMCEMORNEWN M INTERCEPTED AND CONVEYED RYAPROWOSED STORM SEWER SYSTEM, TO ME EXISTING IRRILNTIONROORM PNE ALONG THE SOUTH SIDE OF DOCTORSIUNE. THE WEST SIOE EMERGENCY ACCESS DRIVE W LL gtNN TO LEMAY AVENUE, AS HISTORICALLY OCCURS_ 6) SEE SHEG:GN CRIER 6 CASE FOR LOCATIONS OF CONCRETE CHASES 6 METAL SIDEWALK CULVERT$ AS WELL AS SHEETS GROS 9 C015 FOR ME. STORM AND DPNNAGE DETNLS. PROPOSED DRAINAGE BASIN SUMMARY TABLE: O BASI BWN DESPOINT PCrM Evil Ms1xs AREA loom) 'C vxuE alai) OP, (aft) I 1 o06 —on 0,13 Go 3 3 ON 0.74 0.13 0.5E 3 3 0@ SAO OD4 010 4 4 O.A ON 0.112 z71 5 5 a21 ova--t uIMM �Ol0 - ,. z13 26 }38 " 0.49 1 1.19 4.68 T T 0.09 OUM oa 020 5 5 0.10 of On 1.00 9 0 0.03 O.Ts 0.04 0.19 10 10 0 W SAM OLO O N 11 11 0.07 DUR OAS 0J5 12 13 OAS OA5 2Y0 BA 13 13 0.11 O.n Op 0.n 14 14 0.61 BAD 1.b 9.az 15 15 0M BUD 0.10 0.00 is ID On SAM O.OT Om 17 17 on 0.31 0.82 S.n S11E SIM 347 BUD 1 CHECKIDBY. JRG MICHELE : ASK DIUi AM J IIIIIIx dFla awo m OWp W Z OU u) Paz m duo wz� Z Q�o �a City of Fort Collins, Colorado rill d UTILITY PLAN APPROVAL OM APPREI 2 GtY Engineer Gate D CHECKED NY: a Water & Wastewater Utility Date UV CHECKED BY: 5lmmwater Utility Date F ej UW I IX CHECKED B Pos & Recreation Pote 0 CHECKED BY: 0 ° TrMfie Engineer Gate CHECKED NT: Emir9ntal Planner Date pyo men^C�/y��0 THESE PUNS HAVE BEEN REVIEWED BY THE FOCAL 9U 'w tip UNITY FOR CONCEPT ONLY. THE REVIEW DOGS HOT 3043151 IMPLY RESPONSIBILITY BY THE REVIEWING LOCAL DEPARTMENT.ENTITY FOR ACCURACY AND NCORRC TWUH ESSOF Dy IN THE y THE CALCULATIONS. FURIHERMORE THE REVIIEW GOES it, ..i.I'll, NOT tMPLY THAT QUAGHHES OF ITEMS ON THE PUNS ARE THE FINAL OUANTITES REQUIRED. THE REVIEW paicuilicyr SCS I SHALL NOT BE CONSTRUED IN ANY REASON As FAREND III ACCEPTANCE OF FINANCIAL RESPONSIBWIY B/ THE LOI ENTITY FOR ADDMONAL QUANTITIES Or ITEMS SHEET NO: C-009 SHOWN THAT MAY BE REWIRED DURING ME CONSTRUCTION PHASE. 9 OF 18