Loading...
HomeMy WebLinkAboutDrainage Reports - 02/03/2006 (2)North Star �`w design, inc. December 9, 2005 Glen Schlueter City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 Re: Stormwater Requirements for 210 Magnolia Project No: 247-01 Dear Glen, ad Repoq Date This letter is in reference to the proposed improvements associated with the Urban Living Lofts at Magnolia located north of Magnolia Street and west of Mason Street in Fort Collins. The site is located in the Old Town Drainage Basin. The site encompasses approximately 0.33 acres (including half of the vacated alley) and currently has a building and parking lot on the site. It is proposed that the existing building will remain and be expanded into additional living units and a parking garage. The parking lot will be removed. The imperviousness for the calculated site was calculated and found to have approximately 9360 square feet of imperviousness and a percent impervious of 59. The proposed condition was also calculated and found to have 13,890 square feet of imperviousness and a percent impervious of 81. When the adjacent street was included in this calculation, the percent impervious went down to 79. These analyses were completed based on the conceptual review comments which indicated that no drainage and erosion control report is necessary if the increase in imperviousness is less than 5000 square feet ,(this project will increase by 4530 square feet) and if it can be shown that the total imperviousness, including on -half of any adjacent streets or alley, is equal to or less than the master planned imperviousness of 90%, the report and detention requirements are waived. The building currently exists in the 100 year flood plain. The flood plain elevation at this location is 4994.7 and the existing building finished floor is at elevation 4994.4. The new portions of the building will be floodproofed to 18" above the flood plain elevation as required. The existing building will be upgraded and will be floodproofed to 6" above 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 0 970-686-1 188 Fax the BFE. The lowest elevation proposed at grade garage floor will not be below 4992.5 which is below the floodplain elevation. Because this is only parking and not a residential living space, this encroachment into the floodplain is allowed and does not have to elevated or floodproofed. Also attached are the erosion control calculations for the site including the erosion control escrow amount required. If you have any questions or comments or need additional information, please call me. 'Sincerely, P*iaoetch, ••Q p90 n E(31 p: • � KRO.,F9% '= a 31306 '�4U 4 0 g g a. 2 ca � LL L) 0 } aL a /§o z _) )§°00 ) a { ! 0 �e !OR a ) )- e e , \}\ LU ) \ § / \ ( ( ) ) § k S q it § ) / - x ) § \ , § CL a. ca LLI ) ƒ 5025 5020 5015 5010 C� z 5005 w Li I 1 z 500C 0 a w J w 499° 499C 49 K 4980 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 STREET DISTANCE IN FEET No Text 0 a \ > § « z � q a ■ � 0 § � LL z � c _ } \ \ .0§k / o e P ��o 2 \ \ \ & / 0 0 ! / 2 = = u z c ° < 2 / \ ..un \� (A SE ) ` � \ ® ]( } )\ § f § / § 2ƒ ) §2 >§ }§ �2 A.0 [#] I§f /)$ Cd \0 Ca ,U \/l 7 o \ \\\ )2§ ECj \a\ /\ ƒjc t 0 ^ J r | i cc 10 I}Q m=k!( J7 -e:c= E ommov �U@ /> -x \{\"• \z/ 4j$§q 0. LLJ North Star Design 700 Automation Drive, Unit I Windsor, CO 80550 EFFECTIVENESS CALCULATIONS PROJECT: Magnolia Lofts STANDARD FORM B COMPLETED BY: PPK DATE: 09-Dec-05 EROSION CONTROL C-FACTOR P-FACTOR METHOD VALUE VALUE COMMENT BARE SOIL 1.00 1.00 SMOOTH CONDITION ROUGHENED GROUND L00 0.90 SEDIMENT BASIN 1.00 0.50 - ROADS/WALKS 0.01 1.00 GRAVEL FILTERS 1.00 0.80 PLACED AT INLETS SILT FENCE 1.00 0.50 STRAW MULCH 0.06 1.00 ESTABLISHED GRASS 0.08 1.00 STRAW BARRIERS I.00 0.80 EFF = (I -C'P)* 100 MAJOR SUB BASIN AREA EROSION CONTROL METHODS BASIN BASIN (Ac) 1 0.36 BARE SOIL 0.02 Ac. ROADSIWALKS 0.29 Ac. SILT FENCE 0.03 Ac. ROUGHENED GROUND 0.00 Ac. ESTABLISHED GRASS 0.02 Ac. NET C-FACTOR 0.15 NET P-FACTOR 0.40 EFF = (I-C*P)• 100 = 93.9% TOTAL AREA = 0.36 ac TOTAL EFF = 93.9% REQUIRED PS = 71.0% Erosion.xls 2 of 4 CONSTRUCTION SEQUENCE Project: Magnolia Lofts Date: December 9, 2005 Indicate with bar line when constructions will occurr and when BMP's will be installed/removed in relation to the construction ohase Grading (include Offsite) DetentionMQ Ponds Pipeline Installation (include Offsite) Sanitary Sewer • 'Concrete Installation (include Offsite) Pond Outlet StructuresCurb and Gutter Box Culverts, Bridges Street Installation (include OffsIte) Miscellaneous (include OffsIte) Irop Structures Other (List) :BEST MANAGEMENT PRACTICES Silt Fence Barriers Sediment Trap/Filter Vehicle Tracking Pads Flow Barriers (Bales, Wattles, Etc) Stream Flow Diversion Permanent Seed Planting Cost Est EROSION CONTROL COST ESTIMATE Project: Magnolia Lofts Prepared by: PPK ITEM IQUANTITY UNIT COST/UNIT ITOTAL COST Silt Fence 150 LF $3 $450 Wattle Filters 2 EA $150 $300 Gravel Inlet Filter 0 EA $150 $0 Construction Entrance 0 EA $550 $0 Subtotal Contingency (50%) Total $750 $375 $1,125 CITY RESEEDING COST Reseed/Mulch 0.36 ACRE 1 $775 $279 Subtotal Contingency (50%) Total $279 $140 $419 EROSION CONTROL ESCROW AMOUNT $1,125 Page 4