HomeMy WebLinkAboutDrainage Reports - 09/10/1997 (2)l ;Final rd ReDort D�¢e SHEAR ENGINEERING CORPORATIGN Final Drainage and Erosion Control Report for VANWORKS SUBDIVISION SECOND FILING Fort Collins, Colorado �L SEP - 31997 Prepared for: Vanworks, Inc. 900 East Lincoln Avenue Fort Collins, Colorado 80524 Y Prepared b P Y: Shear Engineering Corporation Project No: 1409-03-96 Date: August, 1997 w�Zl�� 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226.5334 FAX (970) 282.031 1 No Text April 18, 1997 Project No: 1409-03-96 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Vanworks Subdivision Second Filing; Fort Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for Vanworks Subdivision Second Filing. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March 1984, and the Erosion Control Reference Manual. All Stormwater Utility comments by Matt Fater dated March 28, 199 have been addressed as follows; Written comments 1 The proposed grading at the northeast corner of the. proposed addition to the Phelps Tointon building has been revised to allow for the Phelps-Tointon site to drain into the pond. ` 2 An offsite grading easement wiil;be.provided. The owner of Lot 1 also owns Lot 2 and is working with us with regards to easements. 3 Grading of the outfall swale is now shown. Erosion control measures are shown at the outfall of the pipe. The area will be seeded in accordance with the seeding notes on the drainage and erosion control plan. 4 We understand that a Floodplain use permit is required and have informed Vanworks Inc. of this requirement. 5 The outlet pipe diameter has been increased to a 15" ADS with slope of 0.004 ft/ft. The capacity of the pipe is 4.42 cfs, greater than the release rate of 3.71 cfs. Therefore pressure flow is no longer a concern. 6 An 8" orifice is still shown on the plans and in the report as the restricting device for the outlet structure. We have used an 8" orifice instead of a 9 1/4" orifice because it can be installed by putting a piece of 8" PVC into the forms of the outlet.box prior to pouring. It also restricts the release rate to less than required. This in our opinion will make the construction easier and improves the hydrology by reducing the flow from the site. Report Page 6 * The required 100-year W.S.EI. refers to the elevation calculated from the stage storage curve at which the volume requirement is met. This indicates that the release at this elevation is less than the allowable release rate. Therefore the volume requirement is met. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 April 18, 1997 Page 2 Project No: 1409-03-96 Plans Sheet 2 * The sanitary sewer is now shown in the plan view. Sheet 5 * Curb and gutter in parking areas are not required and will not be provided. * The 44 contour is now connected to the proper contour. * The Finished Floor Elevation is now labeled on the future building addition on Lot 1, the Second Replat of the North Lemay Subdivision. * Flows from Buckingham Street will not enter into the site. We are matching what was built with the Phelps-Tointon site to the east. The detached sidewalk will be higher than the curb and gutter. This prevents the water from entering the site. The pond has been sized with the 1/2 ROW area included in the calculations. Sheet 6 * A detail of the type 2 outlet structure is shown on sheet 7. A construction detail is provided on the detail sheet. * The C factor for sub -basin A is now 0.48 on the plan and in the flow summary. * Riprap is provided on the plan and profile of the outlet and the Swale ( Sheet 7).;Ls * The flow path for historic and developed conditions is not seriously affected by the development since the grade of the site will remain essentially the same except where the pond is deepened slightly. It is our opinion that the time of concentration for both existing and developed condition is essentially the same. Sheet 7 * Proposed contours which reflect the final grading of the offsite Swale have now been provided on the grading plan. If you have any questions or comments, please call Mark Oberschmidt or me at 226-5334. Sincerely, Brian W. Shear, P.E. Shear Engineering Corporation BWS / meo cc: Keith Hess; Vanworks, Inc. Bryan Tointon;_Phelps-Tointon F. •.Lr^(V a �- March 4, 1997 Project No: 1409-03-96 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Vanworks Subdivision Second Filing; Fort Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for Vanworks Subdivision Second Filing. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March 1984, and the Erosion Control Reference Manual. Please note that this report also serves as an amendment to the approved Storm Drainage Report for Lot 1, Second Replat of the North Lemay Subdivision, Second Filing prepared by Stewart and Associates, Inc. The reason for the amendment is that Phelps-Tointon, Inc., the owners of Lot 1, plan to construct an addition to the existing building on Lot 1 in the near future. Therefore we have considered this future addition in the redesign of the detention pond on the Phelps-Tointon site. All Stormwater.Utility . comments. by Matt Fater dated October .l8,-:1996 have been addressed -as follows; 1. The proposed pond on the Phelps-Tointon site has received -approval from the owners of the Phelps-Tointon property. All necessary easement descriptions and dedication language are included with this submittal. 2: A plan and profile of the outfall pipe and swale from the detention pond are now included in the plan set. An additional 10' Drainage Easement is now shown on Lot 2 of the Second Replat of the North Lemay Subdivision, Second Filing. This was necessary because of the location of the sanitary sewer for the K-Venture Property in the existing 20' Utility Easement along the southern property line of Lot 2. 3. A cross section of the outfall swale is shown on the plan and profile sheet. Grading is also shown. 4. An exhibit representing the limits of the 160-year floodplain is included in this report and shown on the plan. The proposed building on the Vanworks site is located outside of the 100-year floodplain. 5. A detailed cross section and plan view of the emergency overflow structure has been added to the drainage and erosion control plan. We have modified the planned detention pond on the Phelps-Tointon site to accommodate future expansion of the Phelps-Tointon Building according to data provided by Bryan Tointon. This has included regrading the swale along the west side of North Lemay Avenue and west into Lot 2, Second Replat of the North Lemay Subdivision, Second Filing. The existing outlet structure from the pond will be replaced with a Type 2 outlet structure. The outlet pipe from the detention pond will extend beyond the existing sanitary sewer line which services the K-Venture property to the southeast. PAGE 2 March 4, 1997 Project No: 1409-03-96 Re: Vanworks Subdivision Second Filing; Fort Collins, Colorado If you have any questions or comments, please call Mark Oberschmidt or me at 226-5334. Sincerely, Brian W. Shear, P.E. Shear Engineering Corporation BWS / meo cc: Keith Hess; Vanworks, Inc. Bryan Tointon; Phelps-Tointon September 16, 1996 Project No: 1409-03-96 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Vanworks Subdivision Second Filing; Fort Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for Vanworks Subdivision Second Filing. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March 1984, and the Erosion Control Reference Manual. If you have any questions or comments, please call Mark Oberschmidt or me at 226-5334. Brian W. Shear, P.E. Shear Engineering Corporation. BWS / meo cc: Keith Hess; Vanworks, Inc. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 Page 1 Final Drainage and Erosion Control Report Project No: 1409-03-96 L GENERAL LOCATION AND DESCRIPTION: A. Location 1. Vanworks Subdivision Second Filing is located in the Northeast 1/4 of Section 12, UN, R69W of the 6th P.M., Fort Collins, Colorado. The Project will consist of the replat of lot 11 and Lots 20-23 of the Replat of the North Lemay Subdivision, Second Filing and a portion of the Vanworks Minor Subdivision. 2. More specifically, the site is located at 900 East Lincoln Avenue. It is located in the Northeast section of Old Town Fort Collins near the Poudre River. 3. The site is bounded on the south by East Lincoln Avenue, on the west by Patrick Subdivision First Filing and unplatted property, on the north by Buckingham Street and on the east by The Second Replat of the North Lemay Subdivision Second Filing, the Replat of the North Lemay Subdivision and the North Lemay Subdivision First Filing. B. Description of Property 1. The project consists of the expansion of the Vanworks facility which will include the addition of a 100'x200' steel building and a parking lot to facilitate employee parking. This project and drainage analysis considers the North portion of the Vanworks facility only. 2. Total site area under consideration is 411,055 square feet or 9.44 acres, more or less. 3. There are existing utilities which will service the site. They are located in East Lincoln Street, Buckingham Street and within the site. 4. Development will only occur on the. portion of the Vanworks site defined by the Vanworks Subdivision Second Filing. Development of the site will consist of the following; a. Construction of a new 20,000 square foot building (100'x200') in the northern portion of the site and a . paved parking area to facilitate employee parking west of the proposed building site. b. The building will be used as a paint and body shop. c. Reconstruction of the Phelps-Tointon (Lot 1, Second Replat of the North Lemay Subdivision, Second Filing) detention pond and the downstream drainage channel along the south Lot 2, Second Replat of the North Lemay Subdivision, Second Filing property line between the Phelps-Tointon detention pond and the Lemay Avenue drainage channel. 5. A fire lane will be provided along the eastern property line in accordance with City requirements. This fire lane will connect East Lincoln Street with Buckingham Street through the Vanworks site. Page 2 Final Drainage and Erosion Control Report Project No: 1409-03-96 H. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is located within the Poudre River Basin as defined on the City of Fort Collins Master Stormwater Basin Map. a. There ismo=Basin Rate fee for the Poudre River Basin according to the development fee section of the City of Fort Collins Development Manual. 2. The flow pattern of this portion of Old Town Basin is generally easterly and southerly to the Cache La Poudre River. It is highly channelized as it is almost completely developed in this area. Street and roadside ditches are the primary means of stormwater conveyance at this time. 3. It is our understanding, that there is no Master Drainage Plan presently in place for this area. 4. There are no irrigation facilities located on site or within.100' of the site. . 5. The portion of the site being developed is not in the 100-year flood plain as delineated on the Flood Insurance Rate Map (FIRM) for the City of Fort Collins, Community Panel Number 080102-0004-C; dated March 18, 1996. Refer to the floodplain exhibit in Appendix III of this report " 6. According to the FIRM, the portion of the site where the proposed building is to be constructed is situated in Zone X which is defined as areas of the 500-year flood or areas of the 100-year flood with average depths less than 1.0 foot 7. The property to the south where the existing buildings are located, is in the 100-year floodplain. The FIRM represents a Base Flood Elevation (BFE) in this area of between 4942 and 4943 feet. 8. The southern portion of Lot 1 of the Second Replat of the North Lemay Subdivision (Phelps-Tointon Manufacturing), is also situated in the 100-year floodplain with a BFE of between 4941 and 4942 feet. 9. The southern portion of Lot 2 of the Second Replat of the North Lemay Subdivision is also situated in the 100-year floodplain with a BFE of between 4940 and 4941 feet. The existing Phelps-Tointon Building is not within the current 100-year floodplain. B. Sub -Basin Description 1. Runoff from the portion of the Vanworks site to be developed, flows predominately to the east into the existing detention pond located on Lot 1 of the Second Replat of the North Lemay Subdivision (Phelps-Tointon Manufacturing), then via channel flows to North Lemay Avenue and South to the Poudre River. 2. The site is extremely flat. The slope of the land is generally less than 1.0%. Page 3 Final Drainage and Erosion Control Report Project No: 1409-03-96 M. DRAINAGE DESIGN CRITERIA: A. Regulations 1. This final report and the final Grading, Drainage and Erosion Control Plans for Vanworks Subdivision Second Filing were prepared in accordance with the requirements of the current City of Fort Collins Storm Drainage Design Criteria and Erosion Control Criteria. Suggestions by City of Fort Collins Stormwater Utility personnel were also considered. B. Development Criteria Reference and Constraints 1. Buckingham Street will ultimately be widened to collector standards with detached sidewalk. This work is to be completed in the future by others. Detention is required in the Poudre River Basin. There is an existing detention basin to the east that was constructed with the development of the Phelps-Tointon property. We have received approval from the owners of the Phelps-Tointon property to utilize the detention pond to accommodate additional runoff from this portion of the Vanworks site. In addition to this, we have been informed by Phelps-Tointon that a 2400 sf addition is planned for the Phelps-Tointon site. a. The existing Phelps-Tointon detention pond drainage easement will be vacated. b. The new drainage easement will replace the existing drainage easement that is shown on Lot 1 of the Final Plat of the Second Replat of North Lemay Subdivision, Second Filing. 3. The proposed grading in the area where the new building will be constructed will maintain the existing flow path onto the Phelps-Tointon site in order to make use of the existing detention pond. 4. The site is bounded on the east and west by developed sites. All grading along the east and west property lines will match the existing conditions. a. The only exception to this will occur in the areas where grading is done to increase the capacity of the detention pond on the Phelps-Tointon site. 5. The future addition on the Phelps-Tointon property will have the same finished floor elevation of the existing building. 6. There is a mini -storage facility on the lot south of the Phelps-Tointon property. A fence has been constructed along the common property line. All grading along this common property line will match the existing grades at the fence line. 7. The pond is sized using the total area of the site and the 1/2 ROW of Buckingham site (14.76 acres). City Stormwater requires that the historic 2-year peak flow be used as the release rate from the pond. Due to site and street topography, it is not feasible to get all of the runoff from Buckingham Street into the site. Therefore the release rate has been reduced by the amount that bypasses the site. Page 4 Final Drainage and Erosion Control Report Project No: 1409-03-96 III. DRAINAGE DESIGN CRITERIA: C. Hydrological Criteria 1. The detention pond volume requirements were established restricting the release from the pond to the historic 2-year peak flow. Historic conditions were defined as; a. Existing conditions on the portion of the Vanworks site to be developed. b. Pre -developed conditions on the Phelps-Tointon site. 2. Developed conditions included the future addition on the Phelps-Tointon property. 3. The Rainfall -Intensity -Duration curves for the City of Fort Collins were used (Figure 3-1, attached for reference), in conjunction with the 'Rational Method" for determining peak flows to the detention pond. 4. Detention pond volumes were determined using the Mass Diagram Method (Cumulative Runoff Method). In order to divert as much water to the pond from Buckingham a 4 foot sidewalk culvert will be installed at the northeast corner of the site. Due to the site topography it is not possible to get all of the water from Buckingham to the pond. Approximately 1.34 cfs bypasses the sidewalk culvert. Therefore we have reduced the release rate from the pond from.3.71 cfs to 2.37 cfs. Refer.to pages 3. and 3A in the drainage calculations. D. Hydraulic Criteria 1. Drainage channel capacities were based on the Mannings Equation. The Mannings coefficients are as suggested by the City of Fort Collins Storm Drainage Criteria Manual. IV. DRAINAGE FACILITY DESIGN: A. General Concept 1. Runoff is conveyed to the detention pond located on the Phelps-Tointon site primarily by overland flow. 2. Expansion of the existing detention pond on Lot 1, Second Replat of the North Lemay Subdivision is required to detain the additional developed flows from the northern portion of the Vanworks site. Page 5 Final Drainage and Erosion Control Report Project No: 1409-03-96 IV. DRAINAGE FACILITY DESIGN: B. Specific Details 1. The existing detention pond on the Phelps-Tointon site was designed by Stewart and Associates in conjunction with the plans for the existing building on the site only. a. The original required storage capacity was 32,298 cubic feet according to the drainage plan and report for the Phelps-Tointon site. Apparently, no freeboard was considered or required. b. The pond currently has 36,689 cubic feet of available storage capacity. This is based on an as -built survey performed by Intermill Land Surveying on August 2, 1996 in association with Vanworks Subdivision Second Filing. 2. The top of the berm along the southern and eastern property line is to be raisedto an elevation of 4942.0 feet. The bottom of the pond is to be regraded as well. Refer to the Grading plan for more information. These modifications to the existing pond will be provided in order to achieve the additional detention volumes required due to increased flows from the Vanworks expansion and the addition proposed to the Phelps-Tointon building. 3. The following table summarizes the proposed design and as built information for the detention pond on the Phelps-Tointon property. Existing Pond Proposed Pond Bottom of Pond elevation 4939.85 feet 4938.92 feet Top of Berm elevation 4941.60 feet 4942.0 feet Detention Volume Provided 0.84 ac-ft 1.88 ac-ft 36,689 cf. 81,859 cf. Detention Volume Required 0.74 ac-ft 1.76 ac-ft 32,298 cf. 76,630 cf. Required 100 -year W. S. Elev. in pond 4941.35 feet 4941.91 feet Actual 100 year W. S. Elev. 4941.35 feet 4941.94 feet Total Contributing Area to Pond 7.46 acres 14.76 acres Maximum Allowable 100 year release rate (Historic Q2) 2.04 cfs 2.37 cfs A M t4: Page 6 Final Drainage and Erosion Control Report Project No: 1409-03-96 IV. DRAINAGE FACILITY DESIGN: B. Specific Details 4. The following table summarizes the stage -storage relationship of the expanded pond Storage Storage Stage ft. Volume cf.) Volume (ac-ft) 0 0 0.00 0.25 149 0.00 1.25 23,269 0.53 2.25 81,859 1.76 - 5. A drainage and access easement will be dedicated by separate document for the expanded pond. 6. The existing outlet structure consists of a 12" ADS storm pipe at a headwall with a restrictor plate. bolted to the headwall. It will be replaced with -a new headwall which will have an seven and seven eigths inch (7 7/8") orifice on the upstream side and 415 lineal feet of 15" ADS N-12 with a slope of 0.004 ft/ft. The 7 7/8" orifice will be created by installing an orifice plate Release Elevation Rate Note (ft.) (cfs) 4939.75 0.00 4940.00 0.00 4940.50 1.13 4941.00 1.66 4941.50 2.07 Top of Type 2 outlet structure 4941.91 2.35 Req'd 100-year W.S.EI per stage storage 4941.94 2.37 Actual 100-year W.S.EI. per outlet hydraulics 4941.95 2.37 Overflow Weir Elevation 4942.00 2.98 Top of berm A 20 foot wide emergency overflow weir has been provided at an elevation of 4941.95 feet. A detail of the overflow weir is shown on the Drainage and Erosion Control Plan. 7. The outlet pipe, a 15" ADS N-12 pipe, has a capacity of 4.42 cfs based on a HW/D ratio of 1.0 and a Mannings n of 0.012. Riprap with a D. of 12" will be placed at the outfall of the pipe. Refer to page 8 in Appendix I. Page 7 Final Drainage and Erosion Control Report Project No: 1409-03-96 IV. DRAINAGE FACILITY DESIGN: B. Specific Details 8. The roadside ditch along North Lemay will be regraded in order to lower the bottom of the detention pond on Lot 1 of the Second Replat of the North Lemay Subdivision. The swale has the following geometry and flow capacity. Refer to page 9 in the drainage calculations located in appendix I. a. Slope = 0.0105 ft/ft b. Bottom width = 1.0 feet c. Depth = 2.0 feet d. Side Slopes = 2 : 1 (H:V) e. Capacity = 47.76 cfs V. EROSION CONTROL: A. General Concept 1. Erosion control measures are identified on the Master Drainage and Erosion Control plan. a. Maintenance of erosion control devices will remain the responsibility of Vanworks, Inc. until the project has been completed. B. Specific Details 1. Haybale dikes will be provided at the detention pond outlet structure. 2. A 20 foot long riprap apron will be placed at the downstream end of the outlet pipe from the detention pond. The riprap shall be Y wide. The riprap shall have a Dso = 12". e ter., Page 8 Final Drainage and Erosion Control Report Project No: 1409-03-96 VI. EROSION CONTROL SECURITY DEPOSIT: A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C : SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. 1. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. a. The cost to install the proposed erosion control measures is approximately $ 590.00 Refer to the cost estimate attached in Appendix I. 1.5 times to install the erosion control measures is $ 885.00. b. Based on current data provided by the City of Fort Collins Storm Water Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 5.74 acres), we estimate that the cost to re - vegetate the disturbed area will be $ 3,650.64 ($ 636.00 per acre x 5.74 acres). 1.5 times the cost to re -vegetate the disturbed area is•$ 5,475.96. The $ 636.00 per acre for re -seeding sites of greater than was quoted to us by the City of Fort Collins Storniwater Utility staff. 2. The erosion control security deposit amount required for this project will be $ 5,475.96. See the Erosion Control Security Deposit Requirements document located in Appendix I. 3. The erosion control security deposit is reimbursable. VII. VARIANCE FROM CITY STANDARDS A. Variance from City of Fort Collins requirements 1. With this report, we are formally requesting a variance from the City of Fort Collins Standard regarding the minimum slopes in detention ponds and freeboard requirements for detention ponds. Approval of this report represents the City's acceptance of these requests. This request is based on the following design constraints; a. The pond that will be modified to detain the runoff from Vanworks Second Subdivision is an existing pond and the existing slopes are less than 1.0%. The pond design was approved in 1993, apparently with no freeboard requirements. b. There is an existing high point at the south end of the site which is at an elevation of 4942.14 feet. The proposed top of berm was set so as not to exceed this elevation. Exceeding this elevation with the top of berm would result in unrestricted flow leaving the site in a southerly direction. c. An agreement has been reached between the 2 owners regarding the detention easement. This restricts the amount of land available for detention. Page 9 Final Drainage and Erosion Control Report Project No: 1409-03-96 VIE. VARIANCE FROM CITY STANDARDS A. Variance from City of Fort Collins requirements (continued) 2 With this report, we are formally requesting a variance from the City of Fort Collins Standard regarding detaining all of the runoff from the 1/2 ROW of Buckingham Street which fronts on the street. Approval of this report represents the City's acceptance of these requests. This request is based on the following design constraints; a. A four foot sidewalk culvert will be constructed at the northeast corner of the site to intercept some of the flows from Buckingham Street. b. Due to street slopes the inlet does not intercept all of the Q100. c. We have . reduced the allowable release rate from the pond by the amount that bypasses the inlet during the 100-year event. VIM CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual. 2. Proposed drainage improvements generally conform with the recommendations of the City of Fort Collins Master Drainage Plan. 3. Proposed erosion control measures generally conform with the recommendations of the City of Fort Collins standards. B. Drainage Concept 1. The proposed drainage design for the Vanworks Subdivision Second Filing is effective for the control of storm runoff with absolutely no downstream effects. 2. The proposed drainage design for the Vanworks Subdivision Second Filing has absolutely no effect on City of Fort Collins Master Drainage Plan recommendations. 3. This report should be considered for the future Phelps-Tointon Addition with no major design requirements for Phelps-Tointon when a building permit for the addition is applied for. This report considers the future Phelps-Tointon Addition. Page 10 Final Drainage and Erosion Control Report Project No: 1409-03-96 IX. REFERENCES: 1. City of Fort Collins "Storm Drainage Design Criteria and Construction Standards'; May, 1984 2. City of Fort Collins 'Erosion Control Reference Manual"; January, 1991 3. Storm Drainage Report for Lot 1, Second Repiat of the North Lemay Subdivision, Second Filing; prepared by Stewart & Associates, Dated October 27, 1993; Approved October 29, 1993 APPENDIX I Drainage Calculations Erosion Control Calculations FLOW SUMMARY FOR VANWORKS SECOND SUBDIVISION PAGE 1 DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc 12 I10 I100 Q2 Q10 Q100 DESIGN POINT SUB 2,10 100 BASIN(S) ac. min. min iph iph iph cfe cfe cfe rrrrr+rr+r+rrrrrrrrrr+rrrr:rrrrrr:e rrre rtrttt rrrttrt rtttrrrrttttratrtarr rr++r++rrr:rrrrrr+rrrrrrr+rr DP A -EXIST 14.76 0.31 0.31 0.39 72.00 69.50 0.81 1.42 2.31 3.71 6.50 13.30 DP A -DEVELOPED 14.76 0.48 0.48 0.60 72.00 69.50 0.81 1.42 2.31 5.74 10.06 20.45 1 ROW 0.36 0.83 0.83 1.00 5.00 5.00 3.29 5.64 9.30 0.98 1.69 3.35 NOTE: RELRATE = RELEASE RATE FROM DETENTION POND IS THE HISTORIC 2-YEAR FLOW THE ACTUAL RELEASE RATS FROM THE POND IS LESS THAN THE HISTORIC 2-YEAR FLOW FROM THE OVERALL . AREA IN ORDER TO COMPENSATE FOR SOME OF THE BUCKINGHAM FLOWS WHICH DO NOT ENTER THE SITE DUE TO THE TOPOGRAPHY OF THE ROAD AND THE SITS. SUBBASIN A INCLUDES ROW ROW IS THE 1/2 ROW IN FRONT OF THE VANWORKS SITE BEING DEVELOPED SHEAR ENGINEERING CORPORATION PAGE 2 SUBBASIN BREAKDOWN PROJECT: VANWORKS SECOND SUBDIVISION PROJECT NO 1409-03-96 DATE: 06/12/96 PROJECT LOCATION :BAST LINCOLN AVE BY HBO FORT COLLINS FILE: VANRUN SITES PLATTED AREA 1/2 ROW AREA ON BUCKINGHAM VANWORKS 9.54 ACRES 0.28 ACRES PHELPS-TOINTON 6.01 ACRES 0.30 ACRES TOTAL 15.55 ACRES 0.58 ACRES IM- BASIN PERVIOUS PERVIOUS ROOF/ GRAVEL LAWN C2 C100 SF ACRES DRIVES 0.95 0.50 0.20 x rt t++r++++++f:rtterre+r+++r+f++++tx:rrrrr+f++tr:rrr++t+trf+t+t++r+trxxr DEVELOPED CONDITIONS VANWORKS SITE - NORTHERN PORTION TO BE DEVELOPED STREET-1 12138 0.28 0.24 0.00 0.04 0.85 1.00 I ONSITE 309711 7.11 0.46 4.42 2.23 0.44 0.54 OFPSITB 46052 1.06 0.00 0.00 1.06 0.20 0.25 SUBTOTAL 321849 8.45 0.70 4.42 3.33 0.42 0.52 PHELPS-TOINTON SITE STREET-2 13068 0.30 0.24 0.00 0.06 0.80 1.00 ONSITE 261796 6.01 2.74 0.00 3.27 0.54 0.68 SUBTOTAL 274864 6.31 2.98 0.00 3.33 0.55 0.69 TOTAL 596713 14.76 3.68 4.42 6.66 0.477 0.596 1/2ROW VW 15568 0.36 0.30 0.00 0.06 0.831 1.000 ♦tr+rrr+rrrf r++++r+fftftrtrtrrrrrf++fffttrrrrrff+♦++tttrrrrrfrrttrrrf+f ♦ttttrr+e• HISTORIC C FACTOR TO POND ON PHELPS-TOINTON SITE PHELPS-TOINTON SITE- PRBDBVBLOPBD STREET-2 13068 0.30 0.24 0.00 0.06 0.80 1.00 ONSITE 261796 6.01 0.00 0.00 6.01 0.20 0.25 SUBTOTAL 274864 6.31 0.24 0.00 6.07 0.23 0.29 VANWORKS SITE- EXISTING CONDITIONS ONSITE 309711 7.11 0.00 4.27 2.84 0.38 0.48 OFFSITE 46052 1.06 0.00 0.00 1.06 0.20 0.25 STREET -le 12138 0.28 0.13 0.00 0.15 0.55 0.68 SUBTOTAL 367901 8.45 0.13 4.27 4.05 0.36 0.45 NO STREET 617559 14.18 0.00 4.27 9.91 0.29 0.36 TOTAL 642765 14.76 0.37 4.27 10.12 0.31 0.38 ♦rxrttttxtrtrrxtrrr++f rrtt++tttrxrrfr++rttrtttrxtr++ttrttttttxtf tr+trtxt NOTES: ONSITE 2 VANWORKS IS ASSUMED TO BE 604 GRAVEL AND 404 GRASS OFFSITE IS ALL GRASS THE EXISTING BUILDING ON THE VANWORKS SITE IS NOT CONSIDERED STREET -le IS 15.75 FEET ASPHALT AND 18.25 FEET GRASS(46i/54i) CONCLUDE:USE HISTORIC C FACTOR TO DETERMINE RELEASE RATE FROM POND. SEE PAGE 3A USE DEVELOPED C FACTOR TO DETERMINE REQUIRED POND VOLUME. SEE PAGE 6 f ' SHEAR ENGINEERING CORPORATION ' HISTORIC FLOW TO PAGE 3 DETENTION POND SITE ® PHBLPS TOINTON SITE AND BUCKINGHAM STREET PROTECT: VANWORKS SECOND SUBDIVISION DATE 06/11/96 LOCATION:900 EAST LINCOLN AVENUE PROJ. NO.1409-03-96 FORT COLLINS BY .HBO FILE: VANRUN AREA (A)= 14.760 ACRES RUNOFF COEF. (C) , 2 YEAR 10 YEAR 100 YEAR C 0.31 0.31 0.39 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH = 500 FEET SLOPE 0.43 1 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 49.72 49.72 46.96 TRAVEL TIME (TO=L/(603V) y. FLOW TYPE L (ft) = 730 S (6) = 0.6 LAWN V (fps) = 0.54 Tt(min)= 22.53 L (ft) _? S (;) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (•) _? ? V (fps) =7 Tt(min)= 0.00 • (ft) _? S 00 _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (6) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (i) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (4) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) 22.53 Tc =Ti+TOTAL TRAVEL TIME " 2 YEAR 10 YEAR 100 YEAR Tc (min)= 72.25 72.25 69.49 USE Tc = 72 72 69.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 0.81 1.42 2.31 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 3.71 6.50 13.30 NOTES: INCLUDES 7.11 ACRES FROM VANWORKS SITE INCLUDES 1.06 ACRES OFFSITE AREA WEST OF VANWORKS INCLUDES 0.58 ACRES 1/2 ROW FRONTING ON BOTH SITES INCLUDES 6.01 ACRES FROM PHELPS TOINTON SITS CONCLUDE:ONLY SOME OF THE STREET FLOWS ARE DIVERTED INTO THE SITE. THEREFORE REDUCE RELEASE RATS FROM POND BY THE AMOUNT OF Q100 IN STREET THAT BYPASSES. SEE PAGE 3A SHEAR ENGINEERING CORPORATION DEVELOPED PLOW FROM BUCKINGHAM STREET PAGE 3A TO NORTHEAST CORNER OF SITE. PROJECT: VANWORKS SECOND SUBDIVISION DATE 06/12/96 LOCATION:900 EAST LINCOLN AVENUE PROJ. NO.1409-03-96 PORT COLLINS BY HBO PILE: VANRUN AREA (A)= 0.36 ACRES RUNOFF COED. (C) 2 YEAR 10 YEAR 100 YEAR. C = 0.83 0.83 1.00 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH = FEET SLOPE =NA It 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (Tt) =L/(60*V) PLOW TYPE L (ft) = 458 S (4) = 0.5 GUTTER V (fps) = 1.5 Tt(min)- 5.09 L (£t) _? S (t) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (!) _? ? V (fps) _7 Tt(min)= 0.00 L (ft) _? S (i).=? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (t) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (i) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (i) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) 5.09 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 5.09 5.09 5.09 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.98 1.69 3.35 CONCLUDE:INSTALL 4 FOOT SIDEWALK CULVERT T = 7.2 ft Sx - 0.0269 ft/ft FROM FIGURE 5-5 QI/Q = 0.75 INTERCEPTED PLOW = 2.51 CPS REDUCE BY 80.00lt ACTUAL PLOW INTERCEPTED = 2.01 CPS BYPASSING FLOW = 1.34 CPS REDUCE RELEASE RATE FROM POND BY 1.34 CPS SHEAR ENGINEERING CORPORATION FOR REFERENCE ONLY DEVELOPED FLOW TO PAGE 4 DETENTION POND SITE ® PHELPS TOINTON FROM PHSLPS-TOINTON AND VANWORKS SITES PROJECT: VANWORKS SECOND SUBDIVISION DATE 06/11/96 LOCATION:900 EAST LINCOLN AVENUE PROJ. NO.1409-03-96 FORT COLLINS BY MEO FILE: VANRUN AREA (A)= 14.760 ACRES - RUNOFF COBF. (C) 2 YEAR 10 YEAR 100 YEAR C 0.48 0.48 0.60 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) SAME AS EXISTING CONDITIONS OVERLAND TRAVEL TIME (Ti) LENGTH = 500 FEET SLOPE 0.43 i 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 49.72 49.72 46.96 TRAVEL TIME (Tt)=L/(60*V) PLOW TYPE L (ft) = 730 S (14) = 0.6 LAWN V (fps) = 0.54 Tt(min)= 22.53 L (ft) =7 S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) =7 S (k) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S M _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (6) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S M _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (a) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 22.53 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 72.25 72.25 69.49 USE Tc 72 72 69.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 0.81 1.42 2.31 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 5.74 10.06 20.46 NOTES: INCLUDES 7.11 ACRES FROM VANWORKS SITE INCLUDES 1.06 ACRES OFFSITR AREA WEST OF VANWORKS INCLUDES 0.58 ACRES 1/2 ROW FRONTING ON BOTH SITES INCLUDES 6.01 ACRES FROM PHSLPS TOINTON SITE CONCLUDR:DETAIN FLOWS IN PHSLPS TOINTON POND AND RELEASE AT HISTORIC 2-YEAR RATE SEE PAGE 3A SHEAR ENGINEERING CORPORATION PAGE 5 AVERAGE END AREA METHOD FOR DETENTION BASIN VOLUMES EXISTING POND- ASBUILT PROJECT :VANWORKS DATE: 08/27/97 PRAT. NO:1409-03-96 BY MBO LOCATION:900 B LINCOLN AVE FILE: POND2 NOTES :EXISTING POND ON PHELPS - TOINTON INC. SITE DESIGNED BY STEWARTS & ASSOCIATES INVERT 4939.95 FEET FIRST EVEN CONTOUR 4940 FEET INCREMENT 1 FOOT TOP ELEV 4941.6 FEET STAGE BLEV. AREA VOLUME CUM. CUM. CUM. (A2) (V1) VOLUME VOLUME VOLUME ft ft aq ft cf cf cy ac-ft +e+++•+• •erne ee+ re+:e++• ++e++++r +e+e++:+ +r•+++re rerererr ._ .. 0.00 4939.95 0 0 0 0 0.00 0.05 4940 30 0 0 0 0.00 1.05 4941 18813 9422 9422 349 0.22 .y 1.65 4941.6 72076 27267 36689 1359 0.84- reeeeee:e:r++r++r+++++rt+tre++r+a +rre+rt+t ttttee a+er+++rrr+++r+ . DETENTION REQUIREMENT PER STEWARTS REPORT = 32298 CP OUTLET PIPE FROM POND IS A 12 "ADS N-12 PIPE INVERT Q POND 4939.95 FEET BASED ON TOPO SURVEY BY INTBRMILL PIPS LENGTH = 20 PERT _ INVERT W OUTPALL = 4939.91 PERT BASED ON TOPO SURVEY BY INTERMILL SLOPE 0.002 PT/PT 0.20% PIPE CAPACITY USING MANNINGS & ASSUMING N = 0.012 & HW/D -1.0 AREA = 0.79 SP SLOPE = 0.002 PT/PT CIRCUMFERENCE = 3.14 FT n = 0.012 HYD. RADIUS (R) 0.25 FT CAPACITY = 1.73 CPS RELEASE RATE FROM POND PER STEWARTS REPORT = 2.04 CPS SHEAR ENGINEERING CORPORATION ` PAGE 6 DETENTION VOLUME REQUIRED FOR PROPOSED POND PROJECT: VANWORKS SECOND SUBDIVISION DATE: 08/27/97 PRO7.NO. 1409-03-96 FILE: POND2 BY MEO CUMULATIVE RUNOFF METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.60 RELEASE RATE: 2.37 CPS AREA: 14.76 ACRES RELEASE RATE COMPENSATE FOR BYPASSING FLOWS INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sac iph cfe cf cf cf ac-ft +11ff11f tf 1f}r 111fff}f}!}!l+tlf}!tf!}lftl1t 1f 1ff 1t 11 t1r+)11rf+fYYr if lftr ' 5 300 9.30 82.36 24708.2 711.0 23997.2 0.55 10 600 7.14 63.23 37939.1 1422.0 36517.1 0.84 15 900 6.06 53.67 48300.6 2133.0.. 46167.6 1.06: 20 1200 5.21 46.14 55367.7" 2844.0 52523.7 1.21 25 1500 -4.63 41.00 61504.9 3555.0 57949.9 1.33 30 1800 4.20 37.20 66951.4 4266.0 62685.4 1.44 35 2100 3.91 33.74 70856.9 4977.0 65879.9 1.51, 40 2400 3.60 31.88 76515.8 5688.0 70827.8 1.63 45 2700 3.28 29.05 78428.7 6399.0 72029.7 1.65 50 3000 3.02 26.75 80235.4 7110.0 73125.4 1.68 55 3300 2.80 24.80 81829.4 7821.0 74008.4 1.70 60 3600 2.60 23.03 82892.2 8532.0 74360.2 1.71 65 3900 2.43 21.52 83928.3 9243.0 74685.3 1.71 70 4200 2.30 20.37 85549.0 9954.0 75595.0 1.74 75 4500 2.17 19.22 86478.8 10665.0 75813.8 1.74 80 4800 2.07 18.33 87993.2 11376.0 76617.2 1.76 85 5100 1.96 17.36 88524.6 12087.0 76437.6 1.75 90 5400 1.87 16.56 89427.9 12798.0 76629.9 1.76 •* 95 5700 1.77 15.68 89348.2 13509.0 75839.2 1.74 100 6000 1.70 15.06 90331.2 14220.0 76111.2 1.75 105 6300 1.63 14.44 90942.3 14931.0 76011.3 1.74 110 6600 1.57 13.90 91765.9 15642.0 76123.9 1.75 115 6900 1.50 13.28 91659.6 16353.0 75306.6 1.73 120 7200 1.44 12.75 91819.0 17064.0 74755.0 1.72 ffrrrlrrrrrr:frr rr lure rrr!•}}rr}!t!♦1tl11tftt+rlf!}}er: rrrllrrrlrr:f tf! DETENTION VOLUME REQUIRED = 76630 cf DETENTION VOLUME REQUIRED - 1.76 ac-ft EXISTING POND HAS 36689 CF OF AVAILABLE STORAGE VOLUME 0.84 AC -FT CONCLUDE:PROVIDE 39941 CP OF ADDITIONAL STORAGE 0.92 AC -FT SHEAR ENGINEERING CORPORATION PAGE 7 AVERAGE END AREA METHOD FOR DETENTION BASIN VOLUMES PROPOSED POND PROJECT :VANWORKS DATE: 08/27/97 PROS. NO:1409-03-96 BY MEO LOCATION:900 E LINCOLN AVE FILE: POND2 NOTES :REDESIGNED GRADING OF POND ON PHELPS - TOINTON INC. SITE INVERT 4939.75 FEET FIRST EVEN CONTOUR 4940 FEET INCREMENT 1 FOOT TOP ELEV 4942 FEET r+rrrtrt rtttttrr rrrr r+++ rrr:rrtr ttr++r++ r+rr+trr tr+rrrr+ STAGE ELEV. AREA VOLUME CUM. CUM. CUM. (A2) (V1) VOLUME VOLUME VOLUME ft ft sq ft cf cf cy ac-ft t rrrr+++ rr:rrr r: Terre rrr •����++r rrrrrrrr err tt t++ rr rrrr rr 0.00 4939.75 0 0 0 0 0.00 0.25 4940 1800 149 149 6 0.00 1.25 4941 44441 23121 23269 862 0.53 2.25 4942 72739 58590 81859 3032 1.88 rt ttt t++rr+rre:rrr+r+r:+rrrrtt t:tt++t+++r+++r+rrrtrttr t+++++r++ DETENTION REQUIREMENT = 76630 CP .1.76 AC -FT REFER TO PAGE 3 IN DRAINAGE CALCULATIONS EXCESS STORAGE VOLUME = 5229 CP = 0.12 AC -FT POND VOLUME 1 FOOT BELOW TOP OF BERM = 81859 CP c 76630 CP REQUIRED W.S. BLEV. = 4941.91 FEET SET EMERGENCY OVERFLOW ELEVATION N 4941.95 FEET APPROXIMATE VOLUME @ EMERGENCY OVERFLOW 78929 CF 1.81 AC -FT CONCLUDE:POND HAS ADEQUATE VOLUME REQUEST VARIANCE FROM 1 FOOT FREEBOARD REQUIREMENT SHEAR ENGINEERING CORPORATION PAGE 8 PROPOSED'OUTLET STRUCTURE PROJECT: VANWORKS DATE: 08/27/97 PROJECT NO 12409-03-96 BY MEO PROJECT LOCATION :BUCKINGHAM STREET FILE: POND2 PORT COLLINS INPUT FOR OUTLET STRUCTURE HEADWALL WITH ORIFICE PLATE LOWER ORIFICE DIAM. (ft).= 0.65 TOP OF BERM (ft) - 4942.00 DETERMINE ORIFICE LOWER ORIFICE INV. (ft) = 4939.75 INIT. DELTA (ft) = 0.25 SIZE" LOWER ORIFICE CORP. (Cl) - 0.65 DELTA HEAD (ft) - 0.50 FOR 100-YEAR STORM 100 YR RELEASE RATE (cfe)= 2.37 OVER PLOW yes Q= CA(29H)"0.5 Q100 TO POND (cfe) = 20.45 WEIR TYPE BROADCRESTED A = Q/(C(29H)A0.5 OUTLET PIPE DIAM. (£t) = 1.25 WHIR LENGTH (ft) = 20.00 H (ft) - 2.16 PIPE SLOPE (t) 0.40 WHIR INVERT (ft) = 4941.95 C = 0.65 MANNINGS n, = 0.012 WEIR COEF. (Cwo) - 2.60 Q (cfs)= 2.37 100.YR WSEL REQUIRED (ft)= 4941.91 A (of) = 0.31 tr♦+rr+r r+++++++ rtrrtrtr *OUTPUT* trrrrrrr trrr rr rt tr+trttr r:rrrxrt R (ft) = 0.314 PIPB AREA (SP) = 1.23 WETTED PERIMETER = 3.93 FEET D (ft) = 0.627 HYD. RAD (FT) = 0.313 PEST RA2/3 = 0.4603 OUTLET PIPE CAPACITY = 4.42 CPS LOWER ORIFICE'ARRA".(A) _ 0.3310.SQUARE.FBBT rt+++++ +r+r++t +e+rrtt *OUTPUT* tt ttrt• ttttret erettrt rrrrr rr OVERFLOW SPILLWAY xt+t+x+ t+txt+t ttrxrrt HEAD SUB HEAD BLEV. OVER LOWER TOTAL OVER WEIR TOTAL LOWER ORIFICE FLOW WHIR FLOW PLOW ORIFICE PLOW ft ft cfe cfe ft cfe cfe 4939.75 0.00 0.00 0.00 0.00 0.00 0.00 4940.00 0.00 0.00 0.00 0.00 0.00 0.00 4940.50 0.43 1.13 1.13 0.00 0.00 1.13 4941.00 0.93 1.66 1.66 0.00 0.00 1.66 4941.50 1.43 2.07 2.07 0.00 0.00 2.07 4942.00 1.93 2.40 2.40 0.05 0.58 2.98 4941.942 1.87 2.37 2.37 0.00 0.00 2.37 4941.91 1.84 2.35 2.35 0.00 0.00 2.35 4941.95 1.87 2.37 2.37 0.00 0.00 2.37 r rttttt+ t:rttttt ettrttrr txxxxxxx rxttttrt rtrrtrtr trrrrttr ORIFICE EQUATION: CA(29H)"1/2 WEIR FLOW BQTN. : CWL.HA3/2 NOTE: HEAD OVER ORIFICE = HEAD OVER CENTER OF ORIFICE CONCLUDE:TARGHT ELEVATION IS EQUALED 4941.94 > 4941.91 RELEASE RATE - 2.37 CPS ® ELEV. - 4941.942 PEET ADEQUATE STORAGE IS PROVIDED SEE PAGE 7 FRBEBOARD PROVIDED = 0.06 FEET - REQUEST VARIANCE SHEAR ENGINEERING CORPORATION PAGE 9 CHANNEL CAPACITY -OUTLET FROM POND PROJECT NAME: VANWORKS DATE: 07/23/96 PROTECT NO. 1409-03-96 BY : MEO PILE: VANCHAN SWALE DESCRIPTION:WEST SIDS OF LEMAY AVENUE CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRAPEZOIDAL DESIGN PLOW (cfe)= 31.42 CHANNEL LINING: GRASS Capacity of 30" ADS W 0.5k Da Db Dc Sc n W I (ft) (ft) (ft) (k) (ft) (ft) ---- ---- ---- ---- ----- ---- ---- 4.00 4.00 2.00 1.05 0.032 1.00 0.25 0.50 = LEFT BANK SLOPE 2 1 (H:V) 0.50 = RIGHT BANK SLOPE 2 1 (H:V) DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2. Q V (e.f.) (ft) (e.f.) (ft) (A/P) (cfe) (ft/sec) ----------------------------------- -------------- ------- 2.00 9.00 10.00 9.94 1.00 0.10 47.76 4.78 1.75 6.00 7.88. 8.83 0.93 0.10 34.73 4.41 1.50 7.00 6.00 7.71 0.85 0.10 24.16 4.03 1.25 6.00 4.38 6.59 0.76 0.10 15.84 3.62 1.60 7.40 6.72 8.16 0.88 0.10 28.10 4.18 ee ttt+trtr utter+tetttttrrrrtereet tttttrr eteeeerrttt+t+errrrr+++rttrtree DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (B.f.) (ft) (e.f.) (ft) (A/P) (cfe) (ft/sec) NOTE: DESIGN PLOW IS BASED ON DESIGN CAPACITY OF 30" CULVERT AT K-VENTURE PROPERTY ON NORTH LBMAY PLOW DEPTH FOR THE DESIGN PLOW IS APPROXIMATELY 1.60 FEET CONCLUDE:CNANNEL IS ADEQUATE SHEAR BNGINSBRING CORPORATION ' PAGE 11 CHANNEL CAPACITY -CHANNEL ALONG EAST PROPERTY LINE PROJECT NAME: VANWORKS DATE: 07/24/96 PROTECT NO. 1409-03-96 BY : MEO - FILE: VANCHAN SWALE DESCRIPTION:WEST SIDE OF LBMAY AVENUE CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRIANGULAR DESIGN FLOW (cfs)= 2.01 CHANNEL LINING: GRASS FLOW FROM BUCKINGHAM SIDEWALK CULVERT Da Db Dc Sc. n W I (ft) (ft) (ft) (4) (ft) (ft) ---- ---- ---- ---- ----- ---- ---- 8.00 8.00 0.50 0.50 0.032 0.00 0.10 0.06 = LEFT BANK SLOPE 16 1 (H:V) 0.06 = RIGHT BANK SLOPE 16 1 (H:V) DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (s.f.) (ft) (s.f.) (ft) (A/P) (cfe) (ft/sec). -------------------------------------------------------- 0.50 16.00 4.00 16.03 0.40 0.07 5.21 1.30 0.40 12.80 2.56 12.82 0.34 0.07 2.87 1.12 0.30 9.60 1.44 9.62 0.28 0.07 1.33 0.93 0.20 6.40 0.64 6.41 0.22 0.07 0.45 0.71 0.35 11.20 1.96 11.22 0.31 0.07 2.01 1.03 ++rrr+rer+r•rrrr+++++++++r++rrr++++e+r+r++r++++rr+rrrr+rrr+r+rr+rrrer+++ DEPTH WIDTH' AREA PERIM R 2/3 Sc 1/2 Q V (s.f.) (ft) (s.f.) (ft) (A/P) (cfe) (ft/sec) NOTE: DESIGN FLOW 'IS BASED ON FLOW INTERCEPTED BY SIDEWALK CULVERT FLAW DEPTH FOR THE DESIGN FLOW IS APPROXIMATELY 0.35 FEET CONCLUDE:CHANNBL IS ADEQUATE SHEAR ENGINEERING CORPORATION PAGE 10 CHANNEL CAPACITY -OUTLET FROM POND PROJECT NAME: VANWORKS DATE: 07/24/96 PROJECT NO. 1409-03-96 BY : MEO FILE: VANCHAN SWALE DESCRIPTION:IN EASEMENT ON LOT 2 SECOND REPLAT OF NORTH LSMAY SUBDIVISION CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRAPEZOIDAL DESIGN FLOW (cfe)= 20.45 CHANNEL LINING: GRASS Da Db Dc Sc n W I (ft) (ft) (ft) (4) (ft) (ft) 5.00 5.00 1.25 0.50 0.032 2.00 0.25 0.25 - LEFT BANK SLOPE 4 : 1 (H:V) 0.25 - RIGHT BANK SLOPS 4 : 1 (H:V) DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (s.f.) (ft) (s.f.) (ft) (A/P) (cfe) (ft/sec) ------------------------------------------------- ------- . 1.25 12.00 8.75 12.31 0.80 0.07 22.89 2.62 1.00 10.00 6.00 10.25 0.70 0.07 13.79 2.30 0.75 8.00 3.75 8.18 0.59 0.07 7.32 2.95 0.50 6.00 2.00 6.12 0.47 0.07 3.11 1.56 1.19 11.52 8.04 11.81 0.77 0.07 20.45 2.54 r rrr+ttrrrrrrrrrtrtt rrr+r+rrrrr:rtr:errrrrtrr+rrrrrer ttrrtttttttttr ttrrr DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (e.f.) (ft) (s.f.) (ft) (A/P) (cfe) (ft/sec) FLOW DEPTH FOR THE DESIGN FLOW IS APPROXIMATELY 2.19 PERT FOR Q100 = 20.45 CPS FLOW DEPTH = 1.19 FEET CONCLUDE:CHANNEL IS ADEQUATE July 24, 1997 Project No. 1409-03-96 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Vanworks Subdivision Second Filing; Fort Collins, Colorado Dear Basil, Attached is the erosion control security deposit estimate for Vanworks Subdivision Second Filing. ESTIMATE 1: 1 - Hay bale barrier at outlet structure ® 125.00 each $ 125.00 3 - Haybale barriers in swale ® 125.00 each $ 375.00 3 - cubic yards riprap apron @ 30.00 per cubic yard $ 90.00 TOTAL ESTIMATED COST: $ 590.00 . x 1.50 $ 885.00 ESTIMATE 2: re -vegetate the disturbed area of 5.74 acres at $ 531.00 per acre $ 3,047.94 TOTAL ESTIMATED COST: $ 3,047.94 x 1.50 $ 4,571.91 The total required erosion control security deposit will be $ 4,571.91 If you have any questions, please call at 226-5334. Sincerely, J U5 \V' V �� Mark Oberschmidt Shear Engineering Corporation MO / meo cc: Keith Hess Dave Stringer, City of Fort Collins 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.0311 July 24, 1997 Project No. 1409-03-96 SHEAR ENGINEERING CORPORATION Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS: Vanworks Subdivision Second Filing; Fort Collins, Colorado A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $ 1000.00. 1. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. a. The cost to install the proposed erosion control measures is approximately $590.00. Refer to the cost estimate attached in Appendix I. 1.5 times to install the erosion control measures is $ 885.00. b. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 5.74 acres), we estimate that the cost to re - vegetate the disturbed area will be $3,047.94 ($ 531.00 per acre x 5.74 acres). 1.5 times the cost to re -vegetate the disturbed area is $4,571.91 The $ 531.00 per acre for re -seeding sites of greater than was quoted to us by the City of Fort Collins Stormwater Utility staff. CONCLUSION: The erosion control security deposit amount required for Vanworks Second Subdivision will be S 4,571.91 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226.5334 FAX (970) 282-0311 I RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: VANWORKS SECOND SUBDIVISION STANDARD FORM A COMPLETED BY: MEO DATE: 09/11/96 ; rrrixrxr+r+rr•++ftYe+Yr+ii++xtxrtrrxx+f♦fftYf r+iYtritxrrrrxr;x;rxr;trtf trf +irtrrrrf rfftrt DEVELOPED ERODIBILITY Aeb Lob Sob Lb Sb PS SUBBASIN ZONE (ac) (ft) (6) (feet) (4) (a) tfftrxxr+x;ixr+•rtf rt♦r+ftrttrf tY++xtrtx+r+f rftf+f+rrrirxrtxrtrr+rxx;•rffffrttf: itrrr;•;fr A MODERATE 14.76 1230 0.53 18154.80 7.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 •ffttYti+r iixYtxxt+;+;+;+tl Yf ktffYtf rirYYxxYrrt+;;t;tt+ftt+ft Yf YrYYYxxr+ 14.76 1230.00 0.53 SLOPS LENGTH 0.50 0.53 1.00 1200 72.7 73.042 78.4 1230 1300 72.7 73.042 78.4 PERFORMANCE STANDARD = 73.04% I EFFECTIVENESS CALCULATIONS PROJECT: \(q\iJVJpRyS Svf3DIVIS10N STANDARD FORM B d o COMPLETED BY: MCu' SlidRR E,NGIN6 Cp,,\1(r DATE: cjkkb Erosion Control C-Factor P-Factor Method Value Value Comment nlrii RuovHbsv6�� I,o 110 1?i�, i i5A3,�� ICJ o.8d C-x 0,1X 1.J Viif\V L C)"Z I'�V - �np 0\0 sEO��=nsi5tgs' !,u ()So MAJOR PS SUB AREA BASIN M BASIN (Ac) CALCULATIONS 73,v 14-zo Grp rc�\td\ Ares = 8.b7 0,46 ac = o•-lj . t (0,-)k)(.061 1 �.Zv G ,-ns $' 13 o �1 X 50 + 0 4)) L ALI)] MARCH 1991 8-15 DESIGN CRITERIA , O 0 Cho 00 o vV'IninUn Ln omD000 o 0% (A ONON000000' o vvvvtnLnUnuitnln v o m m ao 00 0 0o ao 00 0 o wmCN00rnrnrnrnrnrnrn0oo o vvvvvvvvvvvvtntntn M M O W 00 CD CO O Co 00 CO O 00 0 00.00 o ncococorna+rnrnrnrnrnrno+rnrnrno,rnrnol . . . . . . . . . . . . . o v v v v v v v v v v v v v v v v v v v v N 00000C000000COCO00000O0O000000 O OMaTIntD10w0r,r-rnnnrrrnnr00CID 000000c0. O O v 44 44 v 44 v vv 4,4444 .vvV4 v Vv 4;1;1; vvv A .-1 00 OD 00 00 00 00 CO 00 CO 00 CO 00 CO OD OD 00 CO 00 00 00 00 CO CO CO Co CD O CO NM V'U)U)U11D%D%D%D%0tDnrnnrrnnr_nO00 p a c, M v v v v v v v v v v v v v v v v v v v v v v v v v O OD000000CID 0000CD00000CID 000000CID oo0000000000 U O tD O N M v V' In 1n U1 U1 %o %o %o t0 tD 1D %D 1D tD tD n r n n r r In O Mvvd' V' 44444 4444 4 vv V V V V V V V 'Zi CO O CO O O DD CO CO 00 CO O CO W CO 00 00 O W CO CO O CO O CO CO CO H a O v01rtNMMvvvvtnlnln111lnlnlfllnln�tD1010�1Or a. ........... .............. O r M M v v v v v v v v v v v v v v v v v v v v v v v v U o CO 0 0-00 00 0 0 OD 00 00 0 OD 00 w OD 00 00 00 0 0 00 0 CO 0 00 E-H O 0t0000HHNN(nMMMv V vv V V'vvU)InU)V)%D%D . x O 10 mc4c4vvvvvv4V'vvsYvvvvvV'V'vvvvv w 00 00 CO 00 00 CO CO 00 0 00 0 00 00 00 CO CO CO CO 00 CO OD o CO 00 0 00 40. o U1NU1nto01OOHHHNNNNNMMMMMvvvvv 1 O dB . . . . . . . . . . . . . . . . . . . Ow —U1 NMMMMMvvvvvvvvvvvvvvvvvvvv CO W 0 0 00 00 0 CO 0 0 0 CO CO W W 00 CO CO O O O 00 W 00 0 CO W cn W i.]O G4In H W H M ;tMM%DWnrr0000000000OOQ101Qt00000 a v N N f4 M C4 M M M c I C4 M M M M f4 M M M c 1 M M v v v v v E+ 0 cn CO CO CO CO 00 CO 00 00 00 00 Co 00 0D CO Co 00 Co 00 Co co CO 00 00 0 CD 00 0%oLncoorlNMvvinlnlnto%o%Dko%Drrrroococoo+rn E.I f n v r I N N e 4 M M M M M M M M M M M f' C 1 M M M M M C 1 M M M M 00 CO CO O CO. O O W CO CO CO W W Co CD O 00 O 00 00 00 O 00 O 00 W W U U1 Hr1Lc) r0o00rINNMMM-it vv V V'U1U1to1D10tDrr z. ............ ........... M e-i N N N N M M M M M M M M M M M M M M M M M M M M M COOCO CO 00O W oD0O000 COOCO COOCO CO CO 000ODD CO CO p 0 MN1000O1 1r NMMM V V V V V V LI LU U1U1t010t010 w . . . . . . . . . . . . . . . . . . . . . . . Ri M Ori.-IrIriNNNNNNNNNNNNNNNNNNNNN W 00 W OCO W a0O00 WC0o0 W W DDC00000COO W COOCOCO a U1 InU101NM V'U1tOrrrCID 00CID ON. O101ON0%0%000000 a a N 01 O O 4 rt rt rt 4 rl rl rf 4 ri ri r+ rl rt 1; 4 4 N N N N N N a' r00Ot0 W W W W OaDOaDoO W oDOaDt0O0O00a0 W 0 w z O V' U10 M U110 W W M 000 H H H H N N N N M M M M MM N . . . . . . . r r O OD O oo w ao ao O to w oo ao to CO o0 oD O OD W O O O to 00 U) CONCOrIV'U1rr00010t00r Hr 1-iHNNNMMMMM 4 . . . . . . . . . . . . . . t0000001O1C1010t010101000000000000000 r r r r to r n r n n r 00 Co Co CO Co CO Co CO 00 Co 00 0o Co Co w 0 P M0V n1tOrINMMV'1U)U)U)U110tOt010rr.. ... . . . . .. .... . . . ....rrrrrrrrnnnnnrrrnnrrrnrrr 11 1111 V 1 r:COCDnnr101D10U1v V MMNN01tD V rl01tD . . . . . . . . . . . . . . . . . . . . . . . . . O ONNNNNNNNNNNNNNNNNNNHrlrlr100 nrrrrnrrrrnrrnnrnnnnrrrnnn x 3H� 100000000000000000000000000 O U P 00000000000000000000000000 azw r1NMVIn10r000�OrINMV'U11Dr000101nOtnOlflO w W � ri ri r♦ rl rl rl rl rl rl r♦ N N M M V' V' U1 a .uAOrU 1001 Q-A IIFGGIU CRITFRIA Table 8B C-Factors and P-Factors for Evaluating EFF Values. Treatment C-Factor P-Factor BARE SOIL Packed and smooth................................................................ 1.00 1.00 Freshly disked........................................................................ 1.00 0.90 Rough irregular surface........................................................... 1.00 0.90 SEDIMENT BASIN/TRAP................................................................. 1.00 0.50"' STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG ........................ 1.00 0.80 SILT FENCE BARRIER..................................................................... 1.00 ASPHALT/CONCRETE PAVEMENT ................................................... 0.01 1.00 ESTABLISHED DRY LAND (NATIVE) GRASS .......................... See Fig. 8-A 1.00 SODGRASS................................................................................. 0.01 1.00 TEMPORARY VEGETATION/COVER CROPS .................................... 0.4512) 1.00 HYDRAULIC MULCH @ 2 TONS/ACRE........................................... 0.10"' 1.00 SOIL SEALANT....................................................................0.01-0.60141 1.00 EROSION CONTROL MATS/BLANKETS............................................ 0.10 1.00 GRAVEL MULCH Mulch shall consist of gravel having a diameter of approximately . 1 /4" to 1 1 /2" and applied at a rate of at least 135 tons/acre.............. 0.05 1.00 HAY OR STRAW DRY MULCH After planting grass seed, apply mulch at a rate of 2 tons/acre (minimum) and adequately anchor, tack or crimp material into the soil. Slope (%) 1 to 05.............................................................................0.06 1.00 6 to 10............................................................................. 0.06 1.00 11 to 15............................................................................. 0.07 1.00 16 to 20............................................................................. 0.11 1.00 21 to 25............................................................................. 0.14 1.00 25 to 33.............................................................................0.17 1.00 > 33.......................................................................... 0.20 1.00 NOTE: Use of other C-Factor or P-Factor values reported in this table must be substantiated by documentation. (1) Must be constructed as the first step in overlot grading. (2) Assumes planting by dates identified in Table 11-4, thus dry or hydraulic mulches are not required. (3) Hydraulic mulches shall be used only between March 15 and May 15 unless irrigated. (4) Value used must be substantiated by documentation. MARCH 1991 8.6 DESIGN CRITERIA APPENDIX H Charts & Figures No Text R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area, of 6,000 square feet. R-L-M Low Density Multiple Family District — areas containing low density multiple family units or any other use in the R-L District with a minimum lot area of 6,000 square feet for one -family or two-family dwellings and•9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B Highway Business District — designates an area of automobile -orientated busi- nesses with a minimum lot area equal to 1 /2 of the total floor area of the building. B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District — designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District — designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt...................................................................................................................................... 0.95 Concrete........................................................ 0.95 Gravel................................................................................................. 0.50 Roofs.......................................................................................................... 0.95 Lawns, Sandy Soil: 0.1 Flat<2%............................................................................................. 7% 0.5 Average2 to .................................................................................. 0.20 Steep>7%.......................................................................................... Lawns, Heavy Soil: 0.2 Flat<2%.........1.................................................................................... 0.25 Average2 to 7%.................................................................................. 0.35 Steep>7%......... :..................................................................... ........... MAY 1984 3-4 DESIGN CRITERIA 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Tima ` Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report Figure 3-2). Tc =1.87 (1.1 - CC,) D 12 So Where Tc = Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet Cf = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. - Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor a (years) C,i 2 to 10 1.00 11 to 25 1.10 i$ - 26 to 00 51 to 100 1.25 "..$ Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination arid/or verification of runoff at specific design points in the drainage system. These methods are (1), the .Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = CfCIA Where Q = Flow Quantity, cfs A = Total Area of Basin, acres Cf = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) I = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph _ Procedure be used for such ana!ysis. This procedure is detailed in the Urban Storm Dra; 'e Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA No Text APPENDIX HI Floodplain exhibit N arimer Count 1 lEA NOT INCLUD D ZONE A COMMUNITY —PANEL NO. .080102 0004, C MAP REVISEDMAR.1891996 LEMAYDS PROF ILE BASELINE T MAGN01 STREET El v 4334 ILI APPENDIX IV Stuffer Envelope Grading Plan Drainage and Erosion Control Plan T I uxvuTlLo hux P I tttt��, T— I%%%_ \ \1 LOT 231 WE 3 R MA UBDlEAjCN, ON RUNG till GRAIPHIC SCALE I li9ch AN IN ft. LEGEND Y pp ..----- EXISTING I' CONTOUR YW]o EXISTING 5' CONTOUR 1 �� � PROPOSED CONTOI L I BASIN BOUNDARY A A . BASIN DESICNATCN B . AREA IN ACRES ® C C . 2-YEAR RUNOFF COERICIENT OD . DESIGN POINT DESIGNATION FINISHED FLOOR ELEVATION 1� STRAW BALE DIKES SILT FENCE LOT 2 (tow I Rap mw h morkyl a SIRES rS Iw¢ Pi"v NO my All mf,ilN paLmm, silt OLIVER I W iAck pilvr m any kod ,fimp activity Iv¢4ViLnW nnPPin{, gillIIL1 ,V 1 WARE XpW. ,xlalnui.n luEM n.mswsa still ON PAINlhJ ll SEAL oyymy,ia[ ET—oY«Now 1pmtt1..lu .¢m 1s"Wall.typirm w mpp iE III, . yym..d ojet .munwdu VI .. n.l AL.moEIEnnvWn. AL IN. NA,1$ YWiVA °mns "VILAI, situ LN Pikk'IJ Nmirrcd - iT, +ntxLL, yyv1LIL X.m If WAwInmL If L.,LJny.LyemJtn xpW ,Lail W Iil 1. top teq.iuJ IN L iol lam "Ifi wu 'CETROIm WNd pipLOCIPiwgvNNIIIN 14.nes VmvtiW ytivltf VAN. N,IF l bi FRV 'NNET 1 AVI ru Ilig YJI Is 4Y .. _sAJ1.IF-FW I I tt�uNN 1uLR q y y G J 1 a u IIJ uxk ptk , t t I J I bill f V Pit J Y — (30aAnd/yl fit N... 1« hill 1 It w. INSENCE by TOit Y .112111 pip 01111HOPLAIIIII (yyyw 5 1 il JL II NOVICKI (Ii dPRICA ,nol JAWly hN. F%. BIl6 bQ I fu yII 1 b J fly E. ' y ANFi. o a.a} � t LOT 1, Cl SECOND LOT 2, HE SECOND Atli PC I I 1 IOLUCIUNICLAW.. pip SELL111 IN L Im, INCIE 3 REPEAT 00�� NORTM REPEAT OF NORM E u P a I. Wx.v ] LEMAY 9.(BDI VISION x LEMAY SUBOVASION pond r 11 I ti JE 1 1r urm At &PLOCo pond 111 Y WILL AN AA J I'L bit' My SEC FlUNG SECOND HUNG W - «kw uuu wy T 1 a fit, wL Y q8' y xC OppCO- Nu W 5q1 I.II (it) r N EVE NI NI REV: ppp' P' bpk 1 11 ne y J I Ol Itn SY mrfva <Q 4 '.T« 55 silt fulk Aq SUSS t, r I JE [� yu1p1 R Iu >!«]u,L�aWalmWON1wJIIN a .. W TOP ff BFSW M. N.V. IVYLW 11, Oy VISIONmr vaLW Y. J, p+�! m RVERA E ur .6 ALPp MOPFlrrc ulE t y w r a1.ml.urr4«nM mrnu, my PillIN. 5. .,.. I F.I W}I RV NEwnul rhod WhwW L, VAREJ n n n n I$ I rjESJf I I I I It I I LL I TII� /1rA %4� Iml I I I I I I i l l l A� LJ lJ u LJ u u I n f-1 n n in n � kILI Liuuuu T. e=161811R.yZif,CdiSE:R/ Y: R l W - I AN law 'y •\ 1 WAY Dart. W YIILYMYE N/IOPw f rvYNiv 11m5FE OEIFNNCN �91EET \ It � \I bal LOTw, REPEAT OPTHB NOKITI LBMAT SUBDIVISION SECOND PILMCI ma PROPOSED DRAINAGE & EROSION PLAN I SCNF: 1• - IOV W IM 10 W Do 1 m. 4.11 1.11 1.11 6.116.20 3 3, ,Err ,sr 0.96 1.10 I.E, .tar. waW m Lor ma m Val Woup n 1uluau 1a 11 TM' III sm I1 ervm of VERY rv«W1..I VIEW m«mam URNArm ANDyBAlfil iE. VENEINLNirrec L SELL City If ELSE C4uim:wY 9" be u,IwnJ°k ON IN. Ill M C.,ln Ja°vf.11 e "LL x, PINLAilAl 'III Nall .WL1W.uNu( WIS intilop 11..,L:w[J....Cm 5, If J.xmnin u to LI useJ w Will ,nililivi JOE a Sqv C u 11 City o' y YL tj ti I ' ':w J'l. toy ..'A"Ofth'thowdswiNy a o "n VIIItop Plyp 1, inStfulily by A lif f G W 1 I' SL f C Ja upp s IfEll Lien N) f C J di p M1 1' 1 M 1 J L /p VINELPAIII ! !' W EVIL 5 MJ hl pk bl I LO C. 6 WWrd ittlikock PC W LVIVAULL ELEACCO 4 RA Lipp. IPIPE IVi4 N iIN V JISIN JKD 'r4o1 1IC 5 ° Juubl 1PC J f IJ VF L b µglid by lu lly W It VALL.kJ I'I WY WE Not ,WpI J l I., NEW N RRICALL III 6 At PECILITUNINCESEAVECIA pif IN and EANICAAL VI W ( VC s Gyp a+Ym Spip ZVOILLS by SI... LW 11111 C qII III I4J. JJdi'ny IN, ..sJ.nl r 111MILLAWLAIN, ALLY COUNCE. ONALLIEN,PR to I.E.C.L.151JACLANS YINCRAILL No by MinoN. ..If PLIEW muo Itn IN, PAN I. DahxllxK ud3WWKuwr EliM g9 M PluWuad 4 Ibm[l WWekulwn -O l5 kn 1491 EVIL 'rW"(LennekvVl'm: •4AEA0fnl •VHI.W EaI Look Valmnr PENNI - WAR w-0 •IALI W-fl •35]J6[ubi[APPLE 91.1"Olkkn Locum nVaunNNnIAml •au:.n - mAk •YoSolO !"t kkaEA)ubhlm Xry'I lalY[+ W.S. M,. NA •YW1.91 FILE Ap 1W Por W.AFkr. •4194II5E«E • YN L'ENI Town,m rioomail .n Ywi •7A6sr« • N.nwm IEWWWY+kass NlwWM k,u lXix„h Ql) •]WIN A 217[N Nms: GWnY N^W41f«wJon[uuJm A[LuN aurveYhl'unullllmrlSmeYinY pWrPLO -x�CkMrw lip 1.Scl NAR19bI NsoaYkn.IJL.. LOCAL. famlO N T.1915. NA•Nw AroihLk &,IuirN I Wyrm W Y. 4lee L kavJ an awav aurvp arrr ON Prvyunl NO NlwaLlr ml[aunuv u l[albn Ym numtl[ DYLr Ilm In mAIIILmnplmNf"th flux vl,l[h4YEIm YIvm NueW,Ylu,,,. Anwl lwyew W.X19rr. 4INCE 1111 LyIONCIS,111LuwANCE r[Ol Uy W LwtlM «Seam ne uILJ] da. SM NkW Wrolmw«yuiod AN bm4vn&I as AVIN,: Look LIV «YSubJrvluw Sa[und Fia's •I Wuuv RAN W 1.1 4 Jof N[I , Inuy SWEPLEi:iun •036w'rvkn IENAINA(5 N h 5 L b. YULE, I by tn. limmL d I W ( I : a b I"L Jt' LoAll 'JIM IIIf .. OPOSElY. NIs ELI(fit his P.mPillbi AN A VmVpAuh rtp4,WuL N[i u ON Noy I* W.E.N. LANII 11. vrtul e,b ,v k JOW. ru lxuc]wnxENuxncE SYAIUMCEYVK (pok CUd1YLITEl UY: AIEf1l YAm CnuWurll'y4kv. 4=4 ly REAL N u W IL y'° 611.111 ewfon [mural „ Wlµ'1 ,It to La xWNI a u uulqurNvh,Wk Wor ALLEY, s�l lint a Lim Calm" Mvypurully1AV CU VK4.«.y 1I ovEgLorGMDM Y rwnxw bit CALL Nlobdl Cop aTlw LL CLAILLIiSik�iFl+ . ... ... ... A., ... 6p. CLEAN Op Sid INIFICAL. slxuL URCEN INzrau.Iv n':.V1YNX6_ 31ALTulneuuv. — _ rwsraTxarwmxlra:cwnunnm _111YNRA_._. _._...—__— —_-.. W1CVr1YAKEW W@SQ} I mwwltrtm 61AS% GRAPHIC SCALE 200 0 IN LW 10] 1 V Loch PC NO ft. SCALL P . 100' 'rYY Eli Wallw .•twwa aul I.C. CNI YpY Lwtl EN1EkdOkWkp mw v« rCk � NO w`Waw`4NWE W CO cAk W Nk EPA m .sLONEwr , CLAI w wm.. IS �W,wLn tl L,,x,pW drwNE: rip yJJ.11.ff AylwpriLy Joll...NAALI ININ.&�w" da P..LLICEP :C COL. Pe wdy�w kipi A. Ad c..l..nl['.nL, CIP op =maws CROPOR1 S la.. of .. Irv.. _ WE I AN 01 'IWIe u N WE =bV YµoI Nitiol'til in AN WIN CAP(illlINInNAN11uLilLuvrsr'OVw�WJFLONNES CAI A.AI t. •` Al uary N lIII 1 lIW4 Al ry,A.m.b. WA Vil IMJvfufti.0 Ll AL i , k+1 e fmwnL.wmluxm.alA..RnLLa41� U... .. L } ...•. E..,b,5LICE ,m. PL. a.� A IN IN' .1 16 WILL ANIP ILL SELL VIA ml Nuir Pill fill 1 «s.mf+� xAL....wd.wa-,..1.„wmu..Am[.su. wlo-..i.✓'•u.w: 1 VAN L. LIONE City of Port CoWKa, Colorado UTRAIT PLAN APPROVAL MVROWD--- V. by PRECONAR, o.rz CHEERED BY n. arteY �2.1� ENDING ram CHEC%CD all CHECKED BY' CHECKED VE mN REVISIONS b NO Ce«Jpu6n— ury o..eJpuon— Wk e�—unWJn— oak Dab DI O.M.C.INEW SIIEAR ENGINEERING CORPORATION I PIECE:DRA Field Bwk �.nVANWORKS, INC Di $0. COLLEGE AVE, SUITE 12. FONT C NS, COLORADO VANWORKS cNed. 1•.19P A?ockeo e.ws. PHONE: (9T0) 226-SSM (9T0) 226-AA51 FAX: (9]0) 282-0311 FILING I PYa,'YA xJ. f NEW I• WATER City of Fort Collins, Colorado DHPv.TTDo rtw cwnl s STOP xEr/ e'- PwIE sERW¢f A r vATcx A NADf arcs UMXry PLAN APPROVAL t IeEIER TL ,Yx wYfrc S1tET[:. rD Lwrcx w ei NEW VF0.L DRIVE .PPPD<CN pEEMXED WPYt RRE LINE WIBLOIXW(ORX GNWpVE'��NH NIURE ROW Eo- P 6 °"°"X^"° art —_— — _ __ —___ 2YF%RDY/ —� CHECKED mK rzwm upon ®-a'a HUCXINGHAIA STREET' a Raw CL EX. RD, CHFIXFO R uW --____ ---_-- _ — �'—__---__—_---- CHECKED FIT rXaW xm auwn I>rz — — — — — — — _ — — — — — — CHECKED f l art ,li / 8 $ 18 W'OETAtllEO WALK I Row / 1 I I ( CHECKED RGAS - �1 FRT T1 Tj Ff r( F i j NORTH LEAIAY SUBUTA4N, LOT 3 LOT 2 P� x D SECOND RUNG 1 I \ 3 No 18 ILL 1J 11 ll ll \\\\\\\ LOT 2S ; k I I I ` 4 1\\V IL — — — ee I 1 8 If e I P I i t FF = <attcc.w I ,', \ �vyY K� ,. �, ,..; � -•-- �� � \ _M, ,�, .�I H.. 9X. y �- EX GRAPHIC SCALE -� � , •: �-_ ..,. _. .. :.._ :: yI w 0 ff' w HaD �� \ \ - I I II $ LOT 1. THE SECOND LOT 2, IlHE1 SECOND .. \ \ \ I I \ I II I•' I LEEMAYTOF SIIB IIVISION REPLAT OF NORTH / N �� \ ' I LENAY SUBDIVISION I wAN - ,w It. / \ \�� it AS r A% FT III I I LEGEND ; I f•k.�bE ly1 III I I > 4911------- EXISTING V CONTOUR I % -1 1 e•foobbppbf' wTD EXISTING 5' CONTOUR // ` I .x IIxepoeoo`w 1 e•20.00 // / IITL LwLQ _ PROPOSED CONTOUR . _ _ _ _Tr' fF.T9u0 FINISHED FLOOR O-EVATON y IIII 1 \ __a IIII I I NEW mDlnax USINENT LxIEs STRAW BALE DIKES / j j I I / ' / /� -� -"'� /- , I \ / I g ALONG FERTY LINE R£v. wlzap /'AVTUIE eImDlxa mow/ / $ 1 ATTARP ran HWE y DRAINAGE FLOW ARROWS fY P.R.�a' q i aryl xf.DWOD'E T:iewD°°Npo'°° W ip IIII I / TAT I a / I i L- 29.2r IXNW. f ACCESS ESXL I I I ` er Y AN VS ( $ I _ I£VwU wS Ha EsAi. WE UV ARY W/AIP RA A / PCM a DITCH SHEET / /=A ` .H _ ... ,.v.,, 5 _:::•� E ,„. a e ,?rn; I.',;.'1 \I \ I g .. / Y / sI Am 5}� / (1 I S 1 ,. SECTION X-X Our •5a, er 0140. 1.5ee/e , I / O OiW. Ore / Ct � AD TONAL Ho' DWwx Am. 1 1 EX. MGCarl I I I Fi. -w.Slr r — —------- --'_ smrww Of.RIYSILI I r EX—RHN,—L. =_ II F 1 F r I F I f 1 I w'-- DR. Sir xR a TO xEen OVWILa RIY I I I I DRAW MT. I I I I I n wad _Ex RE MHD� I I I I I I I I I I I I wffJ 11 a l y —I I I I I I I I I I I I I L014,R LAEOPTHB ORTH LBh1AY SUBDIVISION SUCCINCT FLLINO F - xP�w 10 QEXIST LLVGHF I D � I REVISIONS Dcte� Dra Du.c yoW, SHEAR ENGINEERING CORPORATION T11° GRADING PLAN Fr 5"IRFn Field B05X Cheri 4838 SO. COLLEGE AVE, SUITE 12. FORT COLLINS. COLORADO VANlWCRKS Su DIVISION SECOND FILING D,FeT XD. om av oeXHWoo ked EWs. VANWORXS, INC. Ps 140_ �3 5 8 Ds 4 oeuiµ ScOIe HIl 'iD` AD Zed eWS HONE: (W0),226-5334 (970).226-4451 FAX: (970) 282-0311 FO COLLINS, COLORADO Dx. W IV