Loading...
HomeMy WebLinkAboutDrainage Reports - 08/01/2007City of Ft Colkrm PNM Approved By FINAL DRAINAGE AND EROSION CONTROL STUDY FOR UNITED WAYHOUSING SERVICES DAY CENTER PREPARED FOR: ARCHITECTURAL WEST, LLC REV: APRIL, 2007 DATE: OCTOBER 2006 PROJECT NO.205 CONSULTING ENGINEER: LOONAN AND ASSOCIATES, INC. 1435 N. CLEVELAND AVE. LOVELAND, CO 80538 'I .C�oo�aoi � �Qdoc. �Iac. 14.35It. ' Z d, &0 So538 (970) 461-0550 57,45r (970) 461-0551 April 24, 2007 City of Fort Collins Stormwater Utility ' 700 Wood Street Fort Collins, CO 80526 RE: UNITED WAY HOUSING SERVICES DAY CENTER — AKA — REPLAT OF LOTS 2 AND 3 OF CONIFER INDUSTRIAL PARK Dear Sirs: ' Loonan and Associates, Inc. is pleased to submit this Final Drainage Report and Plan for the proposed United Way Housing Services Day Center site, which is located at the ' southwest corner of the intersection of Conifer Street and Blue Spruce Drive. Please review this Final Drainage Report and Plan at your earliest convenience. We look forward to your comments and ultimate approval of the Final Drainage Report. ' Please feel free to contact me at (970) 461-0550 if you have additional questions. ' Sincerely, Zoo"* a«d A&Wwrea, rlix. 1 ' James R. Loonan PROFESSIONAL ENGINEER'S CERTIFICATION I hereby certify that this Final Drainage Plan and Report for United Way Housing Services Day Center was prepared by me or under my direct supervision in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria for the owners thereof. Loonan and AssoOi�'S� i S Ov HA F� 91QK n! 13 State of Colorado TABLE OF CONTENTS SECTION I - GENERAL PROJECT LOCATION AND DESCRIPTION Paee No. Location 1 Description of Property I SECTION II - DRAINAGE BASINS & SUB -BASINS Major Basin Description 1 Sub -Basin Description 1 Offsite Tributary Area 2 SECTION III - DRAINAGE DESIGN CRITERIA Regulations 2 Development Criteria Reference and Constraints 2 Hydrological Criteria 2 Hydraulic Criteria 2 SECTION IV - DRAINAGE FACILITY DESIGN General Concept 3 Specific Details 3 SECTION V — REQUEST FOR VARIANCES 3 SECTION VI — CONCLUSIONS Compliance with Standards 3 Drainage Concept 4 SECTION VII — EROSION AND SEDIMENT CONTROL Discussion 4 General Erosion and Sediment Control Measures 4 Erosion and Sediment Control Plan 5 SECTION VIII — REFERENCES 5 APPENDIX EXHIBIT A - Drainage and Erosion Control Plan rl- 00 E. WILCOX LANE im (n O Q W U � � � � W J J O U W U EC z J n U V) w U W Q J o m SI TE w 0 W of NEI I CONFER STREET VICINITY MAP NOT TO SCALE General Location and Description ' A. Location Lots 2 and 3 of Conifer Industrial Park are located in Section 1, Township 7 ' North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. The site is bounded on the south by Conifer Street and on the east by Blue Spruce Drive. Vacant land is immediately west ' of the site. B. Description of Property ' The site to be developed consists of approximately 1.41 acres and is generally sloping at approximately 1 % easterly/southeasterly although several portions ' of the site are fairly flat. The site currently consists of native vegetation and disturbed ground. The site is to be developed into one commercial building with associated parking and driveways. 1 II. Drainage Basins and Sub -Basins A. Major Basins Description The site is currently located in the Dry Creek Basin as described in the City of ' Fort Collins Master Stormwater Basin Map. The site is located within the 500 year floodplain. Currently, a small area adjacent to Blue Spruce Drive is located within the 100-year flood plain. ' All of the runoff from the site has been included in the "Final Drainage Report for Conifer Industrial Park" as prepared by Stewart & Associates, Inc., dated ' December 28, 1992. Within said report, the 2-year release rate was determined for this site. The release rate for new development within the Dry Creek Basin is the 2 year storm. Stewart's study designated this site to have a ' detention pond on the southeast corner and to provide detention for the undeveloaed land to the west and north (the difference between the 100-year Historic runoff and the 2-year Historic runoff). In addition to the proposed ' detention pond on this site, Stewart's Report stated that each lot will have their own detention pond that would detain the difference between the 100- year developed and the 2-year historic runoff. In light of the detention ' requirements for each lot and the nearness of the 100 year flood plain, detaining for the undeveloped conditions (the difference between the 100-year Historic runoff and the 2-year Historic runoff) should not be required. B. Sub -Basin Description ' In the developed condition, there will be six subbasins, five of which contribute runoff to the southeastern detention pond. One sub -basin is undetained with runoff directed to Blue Spruce Drive. C. Offsite Tributary Area ' There is a very small amount of offsite area that currently drains onto this site. There are a few feet of landscape area (0.003 Ac) along the northern boundary that drains onto the northern parking lot. The property to the t north has two onsite detention ponds that releases onto Blue Spruce Drive. The vacant parcel of land located to the west of this site drains to the south and onto Conifer Street. A very small area from the west could drain onto ' this site. The parking lot drainage system can convey the runoff from the small tributary offsite areas. When the vacant land to the west develops, it ' will have to provide onsite detention ponds. There is an existing storm sewer located in Conifer Street that the vacant land could connect to or they could continue to drain onto Conifer Street. III. Drainage Design Criteria A. Regulations The design criteria for this study are directly from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual. B. Development Criteria Reference and Constraints The developed site will convey runoff to the southeastern detention pond in Lot 2 in a safe and effective manner. C. Hydrological Criteria In accordance with the Fort Collins' policy, a minor and major storm for the Fort Collins area is identified as the 2-year and 100-year storms, respectively. A major storm for the Fort Collins area has a recurrence interval of 100 years and a total rainfall depth of 3.67 inches for a 2-hour design storm, with a peak intensity of 9.95 in/hr. These storms have been used as a basis for planning and system design. The peak flow rates for design points have been calculated based on the rational method as described in the Storm Drainage Design Criteria, with storm duration set equal to the time of concentration for each sub -basin. D. Hydraulic Criteria ' The majority of the runoff produced by the site will be conveyed to the detention pond located southeast of the site. Most of the runoff produced by the site will be conveyed to the proposed inlets or sidewalk culverts within the ' development. The inlets were sized for the 100-year storm along with their corresponding storm pipes. 2 ' IV. Drainage Facility Design ' A. General Concept Runoff from Sub -basins A, B, C, D, and E will drain to the detention pond. ' These sub -basins consist of rooftop, pavement and landscape. Sub -basin F, located along the eastern boundaries of this site, consists of ' mostly landscape areas with a small amount of sidewalk. The runoff from this sub -basin flows as sheet flow to Blue Spruce Drive. B. Specific Details Sub -basin A which includes the northern parking lot and a portion of the ' proposed building roof top, will drain to a 5-foot Type R inlet. From there, the runoff will be conveyed via a storm pipe, southerly to the detention pond. Sub -basin B consists of sidewalks and an outdoor storage area that will drain ' to a proposed area drain and into the detention pond. Sub -basin C consists of the western parking lot and will drain through a sidewalk culvert and directly into the detention pond. Sub -basin D consists of the majority of the building ' roof drainage and will drain via underground roof drain pipes to the storm pipe from Sub -basin A. Sub -basin E consists of the landscape area and roof top that drains directly into the detention pond. Sub -basin F consists of the ' landscape area located between the building and Blue Spruce Drive. Sub - basin F will sheet flow to Blue Spruce Drive. V. Request for Variances According to the "Final Drainage Report for Conifer Industrial Park" as ' prepared by Stewart & Associates, Inc., dated December 28, 1992, the combined total allowable release rate for Lots 2 and 3 (this Site) is 0.36 cfs. The undetained 100-year runoff (Sub -basin F) is 0.30 cfs. Normally, the ' release rate for the detention pond is the allowable total flow of 0.36 cfs minus the undetained runoff of 0.30 cfs or 0.06 cfs. However, a release rate of 0.06 cfs will require a small orifice opening which will cause maintenance ' problems. Therefore, we are requesting that Sub -basin F be allow to runoff the site undetained and the release rate of the detention pond remains 0.36 cfs. ' In addition, we are requesting a variance to the minimum freeboard requirement of one foot. The detention pond as design will have 0.79 feet (9 inches) of freeboard. ' VI. Conclusions ' A. Compliance with Standards All storm drainage calculations followed the guidelines provided by the City ' of Fort Collins Storm Drainage Design Criteria. 1 3 ' B. Drainage Concept t The drainage system has been designed to convey the runoff to the designated inlets in an effective manner as safe as possible. The allowable release rate for our detention pond was 0.36 cfs. The 100-year water surface elevation of 64.97 feet and the top of berm is 66.5. The total required 100-year detention volume for the site is 11,020 cubic feet. The water quality volume that is required is 1330 cubic feet. Adding the water quality volume to the detention volume yields a total required volume of 12,350 cubic feet. The detention pond outlet is a Water Quality Inlet and has a grate elevation equal to the 100 year water surface. In the event of a storm greater then a 100 year event or if the orifice plate is plugged, the Water Quality Inlet and the 15 inch outlet pipe will convey additional flow to the existing storm system prior to overtopping the pond. In the event the pond is overtopped, runoff will be directed via the northeastern driveway which will overflow onto Blue Spruce Drive. Blue Spruce Drive is currently located within the 100 year flood plain of Dry Creek. VIl. Erosion and Sediment Control This section describes methods recommended to control wind erosion, soil erosion and sediment from storm runoff during and after the construction of ' drainage structures and site grading. This development of erosion control criteria establishes the methods and guidelines used to perform the erosion analysis and develop the erosion control plan. ' A. Discussion The clearing and stripping of land for site grading, overlot grading or for the t construction of drainage structures and swales may cause high -localized erosion rates with subsequent deposition and damage to offsite properties. Uncontrolled, such erosion could destroy the aesthetic and practical values of ' individual sites and cause damage to downstream property. ' In general, erosion and sediment control measures may consist of minimizing soil exposure, controlling runoff across exposed areas and controlling sediment at drainage structures. Each of these measures is described below ' and shall be utilized by the developer and/or the contractor during any construction activity occurring at this site. B. General Erosion and Sediment Control Measures Minimizing Soil Exposure: Where practical, the construction area and ' duration of soil exposure should be kept to a minimum. All other areas should have a good cover of vegetation or mulch. Grading should be completed as soon as possible after it is begun. A temporary cover crop, a permanent ' vegetative cover crop or other landscaping should be established in disturbed 1 4 areas. Re -vegetation may consist of native grasses, lawn grasses or various winter wheat. Decorative rock, flower gardens or shrubs may also be utilized in the final landscaping to cover the soil. Re -seeded areas should be mulched with straw or hay to protect exposed soil until vegetation is established. Controlled Runoff Across Exposed Areas: Where practical, construction may include constructing temporary swales to intercept and direct storm water around exposed areas. Swales can be constructed to control surface water, which collects on exposed areas and prevents gross erosion in the form of gullies. Riprap, straw bale dikes or other temporary erosion control devices may be installed to control storm water velocities across exposed areas. Sediment Control: Temporary and/or permanent sediment control devices may be installed at the major drainage structures and flow concentration points shown on the Drainage Exhibit. Such structures shall be used to intercept and trap sediment once it is produced and prevent it from being conveyed offsite onto downstream property. C. Erosion and Sediment Control Plan The following summarizes the overall erosion control plan for this project. The details will be shown on the construction drawings. 1. Silt fence will be utilized downstream of construction activity before it exits the site. Vehicle tracking control will be utilized at the site exit. 2. Other erosion control measures will be used as necessary to help minimize erosion for this project. VIII. References Final Drainage Report for Conifer Industrial Park" as prepared by Stewart & Associates, Inc., dated December 28, 1992. 5 APPENDIX co O O N O W Q O V) W J Q U W cn a 2 O o :.i F Z J D cr d N O G G ON tO OM O)tr)OO-T E 0 U o 0 0 �: 0 0 U 0 d U O � 0) LOee}} m (O O)MN E O O O O C O U N U 0 0 0 00 N N N NN !p 0 0 0 00 N 4C:, aLO NO 0 0) O, O Co. O LLl O O O O O O Q O O O O O U lc:) in Lo�NN� 0 0 0 0 0 0 N m U U Q o 0 o o o o Q O O O O O O LL1 000000 m )n )n to )n U) to U W 0) O) O) O) O) 0 0 0 0 0 0 a d > a U Q l0 N N O O Q N O N O O O LL1 O O O O O O Q N to to h in LO U m m m m 0)O w 0 0 o 0 0 6 0 Of C eo0Ornr0 o00000 CD O O O O w Q U m a v r m r q o oM 1C)l .- �� 00000a m 2 z O F C y 0 2 O m F U m W G ¢ m U O W u. Z) 0 W a O .J W LU W O 1� L< C ` C cs O n � C C C A IL LL Ln Q N > C N 0z LL 0 Q Z Q W H Q W (AU!=J 0]n W ' } ~ m 0 W Fng t CO > D J U 1 Y w W K J Z1!'1 a) 1l'1 lA —0 co LL 7 v9 .- O M M 0-0-0 Y W = 2 U � U J N N N O N Q O F V NN0t0 CD N O N O W r 000f 0co 0 0 0 0 1 O Ln a a LL n co 00 Lb 0 co W J N N N N N 1 F IJJ c LO �LL W CINNNNCIA H 0 W = F o CDo�CD J < LO LO LO O co w W Sao.=orr ❑o a N 7 N N 0)L O 0 U N Cl Lu >� 7 H 3 it vLLo -q (DCD _ U z J U < ; r o i CDr m 0 - 000000 q Q Q N 0 � O U H O O O N L O 01 O N O N CD N ❑ Z O O 0000 m 0 U U U O 0 a W 0 Q co U❑ W W ❑ W ❑ 0 0 00 L 01 c A 0 T I O LL o w y Z O O 09 LL Z �v L0 0 ¢ Z U >i LL HOW M w t- Z z K F Z) 7 [il Z W O F V5 >D D Q !A U Y W K U J �npo�ur u � rn Z LL �rl O thM Y F � Z U J N N O N O Q O H + - 0 0 0 N N OpoOoO'� O O O O p o 0 1: o 0 0- o N a a LL In 00 00 1* 0 ro W NCV NN N f > w a° > w ll io Q?NNN N N �o LL F m 0 0 O n 0 z J O Opp O Q? O v N OOr r E oe N N N LID O W > J co 1= 5 2F vvco 'i v 0 Coco _a Z J U Q y r rn r o voc�iCD O O O o o o s ~ Q c 2 O Z U ~ m m N N m V - N N Z o- 0 0 0 m O h C C7 a W 9Qm 0a W tr_ 0 > W 0 o co O a N m 0 Z, a O tll m d m v C a 0 n y (n N y O a Uf0 U-e po U d II V _ U O 1 Z z-W,C9 0 � W Sao 1 aW 1 rn W� ow y U w O CWL � o - 0 a z! o _ C �Z �o c� 1 1 0 0 N J N J i R'Oa' i �n ��n■an MINIMUM m III �i K O UZ Z n pe w nao 0 N N 11� �sn o� w> z� D� 0 UU zLU 0 X W Sao w W� rn ow LL w0 a o w z0 z �¢ oz 0 20 U� �i���mommmmu�� �IIII����@BIIIII �I.IIo0o00011111 UNITED WAY 100 Year Storm DETENTION POND TRIBUTARY AREA (acres) = 1.42 AVG C = 0.70 C x A = 1.00 UPSTREAM POND (Qin), cfs = 0.00 DESIGN Qout, cfs = 0.36 Qtrib-in TOTAL VOLUME in VOLUME out VOLUME OF TIME i (CCFiA) Qpond-in Qin (Qin x T x 60) (gout x T x 60) PONDING MIN. in/hr cfs cfs cfs CU FT CU FT CU FT 5 9.95 9.90 0 9.90 2970 108 2862 10 7.72 7.68 0 7.68 4609 216 4393 15 6.52 6.49 0 6.49 5839 324 5515 20 5.60 5.57 0 5.57 6686 432 6254 25 4.98 4.96 0 4.96 7433 540 6893 30 4.52 4.50 0 4.50 8095 648 7447 35 4.08 4.06 0 4.06 8525 756 7769 40 3.74 3.72 0 3.72 8931 864 8067 45 3.46 3.44 0 3.44 9295 972 8323 50 3.23 3.21 0 3.21 9642 1080 8562 55 3.03 3.01 0 3.01 9949 1188 8761 60 2.86 2.85 0 2.85 10245 1296 8949 70 2.65 2.64 0 2.64 11074 1512 9562 80 2.40 2.39 0 2.39 11462 1728 9734 90 2.25 2.24 0 2.24 12089 1944 10145 100 2.10 2.09 0 2.09 12537 2160 10377 110 2.00 1.99 0 1.99 13134 2376 10758 120 1.90 1.89 0 1.89 13612 2592 11020 UNITED WAY Detention Pond Volumes Delta Volume=(D/3)(A I +A2+SQRT(A I A2)) DELTA ELEV AREA VOLUME VOLUME FT FT FT FT 61.72 0 0 0 62 641 60 60 62.5 2671 770 830 63 4173 1697 2,527 64 4982 4572 7,099 65 5814 5393 12,491 66 7571 6673 19,164 WQ VOLUME TOTAL Required Volume = 1330 11,020 12,349 FT W.S. Elevation = Elev655 - Elev65 (V01Rq,,;,,d-V0165.5)+Elev65.5 V0165.5 - Vo165.5 = 64.97 FT 100-year Depth (D) = 3.25 FT Top of Berm = 66.50 FT Freeboard = 1.53 FT Orifice Opening Q= CA(2gH)1/2 A= Q C(2gH)in_ C = 0.65 Qout = 0.36 cfs g = 32.2 fps diam = 0.22 FT H = D-1/2diam 3.14 FT A = 0.04 FT' A = 5.61 IN diam = 2.67 IN Emergency Spillway Q = CLH312 C = 2.67 H = 0.5 FT Q 100 = 7.99 cfs L = 8.46 FT V=Q/(L*H) = 1.07 FPS Use 2 5/8" diameter opening with trash screen Use 10 FT UNITED WAY WATER QUALITY Total acreage to detention pond = I = (Area of Pave + Roof)/(Total Area) = Time = 40 hours, from Figure EDB-2 or SQ-2. WQCV = Required Storage = (WQC V/ I2)•Area = or 1.31 acres 0.71 0.28 watershed inches 1330 cubic feet 0.03 acre-ft DELTA ELEV AREA VOLUME VOLUME FT FT FT' FT' 6L72 0 0 0 62 641 60 60 62.5 2671 770 830 63 4173 1697 2527 64 4982 4572 7099 65 5814 5393 12491 66 7571 6673 19164 Elev = Elev,,,, - EIev62.5 (V01R,,,;, 1-Vol,,,.,)+Elev,t,=,, V 016,, - V01 6,., = 62.74 F F HwQcv = 1.02 FT From Figure EDB-3, Area per row a=(WQCV/K40) K40= 0.137454651 where K=0.0 I 3DwQ 2 +0.22DwQ-0. 10 a = 0.2221 in' Figure 5 Use 2 column 3/8" AkE-4 1. Zxr a S��M �iPE I NeoUDS Results Summary Page 1 of 3 NeoUDS Results Summary Project Title: United Way Project Description: Storm Pipe I Output Created On: 4/24/2007 at 3:39:05 PM Using NeoUDSewer Version 1.6.7 Beta Release. Rainfall Intensity Formula Used. Return Period of Flood is 100 Years. Sub Basin Information Time of Concentration Manhole Basin Overland Gutter IBasin Rain I Peak Flow Comments ID # Area* C I (Minutes) (Minutes) (Minutes) (Inch/Hour) (CFS) 1� 0.00 0.0 0.0 0.0 0.00 0.3 0 0.00 0.0 0.0 0.0 0.00 0.3 The shortest design rainfall duration is 5 minutes. For rural areas, the catchment time of concentration is always => 10 minutes. For urban areas, the catchment time of concentration is always => 5 minutes. At the first design point, the time constant is <_ (IO+Total Length/180) in minutes. When the weighted runoff coefficient => 0.2, then the basin is considered to be urbanized. When the Overland Tc plus the Gutter Tc does not equal the catchment Tc, the above criteria supersedes the calculated values. Summary of Manhole Hydraulics Manhole Contributing Rainfall Rainfall Design Peak Ground Water ID # Area C Duration Intensity Flow Elevation Elevation Comments (Minutes) (Inch/Hour) (CFS) (Feet) (Feet) 0�� 0.0 0.00 0.3 65.50 64.97 �� 0.0 0.00 0.3 67.50 65.75 C� Summary of Sewer Hydraulics ' Note: The given depth to flow ratio is 0.9. Manhole ID Number I I Calculated Suggested F.xictina Sewer ID # U stream �� Downstream Sewer Diameter (Rise) Diameter (Rise) Diameter (Rise) Width Shape I (Inches) (FT) (Inches) (FT) (Inches) (FT) (FT) file://C:\Program Files\NeoUDSewerBeta\reports\3386590744.htm 4/24/2007 NeoUDS Results Summary Page 2 of 3 ��� Round 4.2 8 10 N/A Round and arch sewers are measured in inches. Box sewers are measured in feet. Calculated diameter was determined by sewer hydraulic capacity. Suggested diameter was rounded up to the nearest commercially available size All hydraulics where calculated using the existing parameters. If sewer was sized mathematically, the suggested diameter was used for hydraulic calculations. Design Full Normal Normal Critical Critical Full Sewer ID Flow Flow Depth Velocity Depth Velocity Velocity Froude Number Comment (CFS) (CFS) (Feet) (FPS) (Feet) (FPS (FPS) 0.3 3.0 0.18 3.5 0.25 2.2 0.6 1.77 A Froude number = 0 indicated that a pressured flow occurs. Summary of Sewer Design Information Invert Elevation Buried Depth Sewer ID Slope lo e r% Upstream (Feet) Downstream (Feet) U stream (Feet) Downstream Comment =1 1.91 65.50 63.80 1.17 0.86 Sewer Too Shallow Summary of Hydraulic Grade Line Invert Elevation Water Elevation Sewer Sewer Length Surcharged Length Upstream Downstream Upstream Downstream Condition ID # (Feet) (Feet) (Feet) (Feet) (Feet) (Feet) �1 88.89 17.44 65.50 63.80 65.75 64.97 Jump Summary of Energy Grade Line Upstream Manhole ]ewer Manhole Energy Sewer ID # ID # Elevation Friction (Feet) (Feet) 17F 2 -IF 65.821F 0.85 Juncture Losses IF Downstream Manhole Bend K Bend Lateral K Lateral Manhole Energy Coefficient Loss Coefficient Loss ID # Elevation (Feet) (Feet) (Feet 0.03 0.00 0.00 0.00 1� 64.97 file://C:\Program Files\NeoUDSewerBeta\reports\3386590744.htm 4/24/2007 NeoUDS Results Summary Page 3 of 3 Bend loss = Bend K * Flowing full vhead in sewer. Lateral loss = Outflow full vhead - Junction Loss K * Inflow full vhead. A friction loss of 0 means it was negligible or possible error due to jump. Friction loss includes sewer invert drop at manhole. Notice: Vhead denotes the velocity head of the full flow condition. A minimum junction loss of 0.05 Feet would be introduced unless Lateral K is 0. Friction loss was estimated by backwater curve computations. Summary of Earth Excavation Volume for Cost Estimate The user given trench side slope is 1. Manhole ID # Rim Elevation (Feet) Invert Elevation (Feet) Manhole Height (Feet) �1 65.50 63.80 1.70 2� 67.50 1 65.5011 2.00 Upstream Trench Downstream Trench Width Width Earth Sewer ID On Ground At Invert On Ground At Invert Trench Length Wall Thickness Volume # (Feet) (Feet) (Feet) (Feet) (Feet) (Inches) (Cubic Yards) 0 4.9 3.1 _ 4.3 3.1 88.89 1.83 31 Total earth volume for sewer trenches = 31.18 Cubic Yards. The earth volume was estimated to have a ' bottom width equal to the diameter (or width) of the sewer plus two times either 1 foot for diameters less than 48 inches or 2 feet for pipes larger than 48 inches. If the bottom width is less than the minimum width, the minimum width was used. ' The backfill depth under the sewer was assumed to be 1 foot. The sewer wall thickness is equal to: (equivalent diameter in inches/12)+1 ' file://CAProgram Files\NeoUDSewerBeta\reports\3386590744.htm 4/24/2007 No Text NeoUDS Results Summary Page 1 of 4 NeoUDS Results Summary Project Title: United Way Project Description: Storm Pipe 2 - 100 Year Output Created On: 4/24/2007 at 3:40:37 PM Using NeoUDSewer Version 1.6.7 Beta Release. Rainfall Intensity Formula Used. Return Period of Flood is 100 Years. Sub Basin Information Manhole Basin ID # Area C Time of Concentration Peak Flow Comments (CFS) Overland (Minutes) Gutter (Minutes) Basin I(Minutes) Rain I (Inch/Hour) �11 0.00 0.0 0.0 0.0 0.00 5.1 �2 0.00 0.0 0.0 0.0 0.00 5.1 3� 5.07 339.3 0.0 0.0 1.001 5.11 ® 0.00 0.0 0.0 0.0 0.00 5.1 The shortest design rainfall duration is 5 minutes. For rural areas, the catchment time of concentration is always => 10 minutes. For urban areas, the catchment time of concentration is always => 5 minutes. At the first design point, the time constant is <_ (1 O+Total Length/180) in minutes. When the weighted runoff coefficient => 0.2, then the basin is considered to be urbanized. When the Overland Tc plus the Gutter Tc does not equal the catchment Tc, the above criteria supersedes the calculated values. Summary of Manhole Hydraulics Design Manhole Contributing Rainfall Rainfall peak Ground Water ID # Area * C Duration Intensity Flow Elevation Elevation Comments (Minutes) (Inch/Hour) (CFS) (Feet) (Feet) 5.07 339.3 1.00 5.1 66.50 64.88 C� 0 5.07 339.3 1.00 5.1 67.00 65.16 �� ®� 0.0 0.00 5.1 65.83 65.22 Summary of Sewer Hydraulics ' file://C:\Program Files\NeoUDSewerBeta\reports\3386590837.htm 4/24/2007 NeoUDS Results Summary Page 2 of 4 Note: The given denth to flow ratio is 1. Sewer ID # Manhole ID Number Sewer Shape Calculated Suggested Existing Upstream Downstream Diameter (Rise) (Inches) (FT) Diameter (Rise) (Inches) (FT) Diameter (Rise) (Inches) (FT) Width (FT) ��� Round 15.6 1]81 18 N/A ��� Round 15.6 18 18 N/A 3=®0 Round 15.6 1-8]1 18 N/A Round and arch sewers are measured in inches. Box sewers are measured in feet. Calculated diameter was determined by sewer hydraulic capacity. Suggested diameter was rounded up to the nearest commercially available size All hydraulics where calculated using the existing parameters. If sewer was sized mathematically, the suggested diameter was used for hydraulic calculations. Design Full Normal Normal Critical Critical Full Sewer ID Flow Flow Depth Velocity Depth Velocity Velocity Froude Number Comment (CFS) (CFS) (Feet) (FPS) (Feet) (FPS) (FPS) 7.4 0.91 4.5 0.87 4.8 2.9 0.92 0 5.1F 7.4 0.91 4.5 0.87 4.8 2.9 0.92 0 5.1 7.4 0.91 4.5 0.87 4.8 2.9 0.92 A Froude number = 0 indicated that a pressured flow occurs. Summary of Sewer Design Information Invert Elevation Buried Depth Sewer ID Slpesm � Downstream eeaFeeF U (et)Downstream Comment �1F 0.50 62.29 62.21 2.71 1.79 0 0.50 62.83 62.29 2.67 2.71 3� 0.50 62.93 62.83 1.40 2.67 �_� Summary of Hydraulic Grade Line Invert Elevation Sewer Surcharged Sewer Upstream Downstream Length Length Water Elevation Upstream Downstream Condition ID # (Feet) (Feet) (Feet) (Feet) (Feet) (Feet) 0 15.491 15.49 62.29 62.21 64.88 64.97 Pressured file://C:\Program Files\NeoUDSewerBeta\reports\3386590837.htm 4/24/2007 NeoUDS Results Summary Page 3 of 4 108.02I 108.02 62.83 62.29 65.16 64.88 Pressured 0 20.7111 20.71 62.93 62.83 65.22 65.16 Pressured Summary of Energy Grade Line Upstream Manhole Juncture Losses Downstream Manhole Sewer Bend Lateral Energy Energy Sewer Manhole Elevation Friction Bend K Lateral K Loss Loss Manhole Elevation ID # ID # (Feet) (Feet) Coefficient (Feet) Coefficient (Feet) ID # (Feet) �0 65.01 0.04 0.03F 0.00 0.00 0.00 1� 64.97 00 65.29 0.25 0.25F 6.03 0.00 0.00 0 65.01 �® 65.35 0.05 0.11 0.01 0.00 0.00 3� 65.29 Bend loss = Bend K * Flowing full vhead in sewer. Lateral loss = Outflow full vhead - Junction Loss K * Inflow full vhead. A friction loss of 0 means it was negligible or possible error due to jump. Friction loss includes sewer invert drop at manhole. Notice: Vhead denotes the velocity head of the full flow condition. A minimum junction loss of 0.05 Feet would be introduced unless Lateral K is 0. Friction loss was estimated by backwater curve computations. Summary of Earth Excavation Volume for Cost Estimate The user given trench side clone is 1 _ Manhole ID # Rim Elevation (Feet) Invert Elevation (Feet) Manhole Height I (Feet) �1 65.501[-62.2111 3.29 66.5011 62.2911 4.21 01 67.00]1 62.83 4.17 1®1 65.8311 62.9311 2.9011 Upstream Trench Downstream Trench Width Width Sewer ID On Ground At Invert On Ground At Invert Trench Length Wall Thickness Earth Volume # (Feet) (Feet) (Feet) (Feet) (Feet) (Inches) (Cubic Yards) 8.5 3.9 6.7 3.9 15.49 2.50 13 file://CAProgram Files\NeoUDSewerBeta\reports\3386590837.htm 4/24/2007 NeoUDS Results Summary Page 4 of 4 1 2 8.4 .3.91 8.51 3.91 108.021 2.501 102 5.9 3.9 8.4 3.9 20.71 2.50 16 Total earth volume for sewer trenches = 130.68 Cubic Yards. The earth volume was estimated to have a bottom width equal to the diameter (or width) of the sewer plus two times either 1 foot for diameters less than 48 inches or 2 feet for pipes larger than 48 inches. If the bottom width is less than the minimum width, the minimum width was used. The backfill depth under the sewer was assumed to be 1 foot. The sewer wall thickness is equal to: (equivalent diameter in inches/ 12)+l file://CAProgram Files\NeoUDSewerBeta\reports\3386590837.htm 4/24/2007 I E 0,4•tr Z...cor �oiv/J -. saes PPS 3 Al ®wrw,/� fa--�al a6d G NeoUDS Results Summary Page 1 of 3 NeoUDS Results Summary Project Title: United Way Project Description: Storm Pipe 3 Output Created On: 3/12/2007 at 2:55:43 PM Using NeoUDSewer Version 1.6.7 Beta Release. Rainfall Intensity Formula Used. Return Period of Flood is 100 Years. Sub Basin Information Time of Concentration Manhole Basin Overland Gutter Basin Ram I Peak Flow Comments ID # Area * C (Minutes) (Minutes) (Minutes) (Inch/Hour) (CFS) 1� 0.00 0.0 0.0 0.0 0.00 0.1 0 0.00 0.0 0.0 0.0 0.00 0.1 The shortest design rainfall duration is 5 minutes. For rural areas, the catchment time of concentration is always => 10 minutes. For urban areas, the catchment time of concentration is always => 5 minutes. At the first design point, the time constant is <_ (1 O+Total Length/180) in minutes. When the weighted runoff coefficient => 0.2, then the basin is considered to be urbanized. When the Overland Tc plus the Gutter Tc does not equal the catchment Tc, the above criteria supersedes the calculated values. Summary of Manhole Hydraulics Manhole Contributing Rainfall Rainfall Design Peak Ground Water ID # Area * C Duration Intensity Flow Elevation Elevation Comments (Minutes) (Inch/Hour) (CFS) (Feet) (Feet) �� 0.0 0.00 0.1 65.50 63.85 00 0.0 0.00 0.1 65.83 63.85 Summary of Sewer Hydraulics Note: The given depth to flow ratio is 0.9 Manhole ID Number Calculated Suggested Existing Sewer Upstream Downstream �� Sewer Diameter (Rise) Diameter (Rise) IDiameter (Rise) Width ID # Shape (Inches) (FT) (Inches) (FT) (Inches) (FT) (FT) file://C:\Program Files\NeoUDSewerBeta\reports\3382872943.htm 3/12/2007 NeoUDS Results Summary Page 2 of 3 1=00 Round 3.0 8 1 IJENA Round and arch sewers are measured in inches. Box sewers are measured in feet. Calculated diameter was determined by sewer hydraulic capacity. Suggested diameter was rounded up to the nearest commercially available size All hydraulics where calculated using the existing parameters. If sewer was sized mathematically, the suggested diameter was used for hydraulic calculations. Design Full Normal Normal Critical Critical Full Sewer ID Flow Flow Depth Velocity Depth Velocity Velocity Froude Number Comment (CFS) (CFS) (Feet) (FPS) (Feet) (FPS) (FPS) ❑1 0.1 4.6 0.1d=E:E 3 0.9 0.0 Veloc�Low A Froude number = 0 indicated that a pressured flow occurs. Summary of Sewer Design Information Invert Elevation 11 Buried Depth Sewer ID Slo e 0/0( U stream pFeet ) Downstream (Feet) ) Upstream (Feet) Downstream (Feet) Comment 0.50 61.68 61.55 2.90 2.70 Summary of Hydraulic Grade Line Upstream Downstream Upstream Downstream Condition (Feet) (Feet) (Feet) (Feet) 61.68 61.55 63.85 63.85 Pressured Summary of Energy Grade Line Upstream Manhole Juncture Losses 11 Downstream Sewer Manhole Sewer Manhole Energy Bend K Bend Lateral KleCoefficient Energy Loss ZE (Feet) (Feet) file://C:\Program Files\NeoUDSewerBeta\reports\3382872943.htm 3/12/2007 ' NeoUDS Results Summary Page 3 of 3 lUU 63.85 0.00 0.03 0.00 0.00 0.00 1 63.85 Bend loss = Bend K * Flowing full vhead in sewer. Lateral loss = Outflow full vhead - Junction Loss K * Inflow full vhead. A friction loss of 0 means it was negligible or possible error due to jump. Friction loss includes sewer invert drop at manhole. Notice: Vhead denotes the velocity head of the full flow condition. A minimum junction loss of 0.05 Feet would be introduced unless Lateral K is 0. Friction loss was estimated by backwater curve computations. Summary of Earth Excavation Volume for Cost Estimate The user given trench side slope is 1. Manhole ID # Rim Elevation (Feet) Invert Elevation (Feet) Manhole Height (Feet) �1 65.50 61.5511 3.95 2= 65.83 6 1. 68]1 4.15 Upstream Trench Width Downstream Trench Width Sewer ID On At On Ground At Invert Trench Wall Earth Volume # Ground Invert (Feet) (Feet) Length Thickness (Cubic (Feet) (Feet) (Feet) (Inches) Yards) �1 8.7 3.6 8.3 3.6 25.88 2.25 23 Total earth volume for sewer trenches = 23.19 Cubic Yards. The earth volume was estimated to have a bottom width equal to the diameter (or width) of the sewer plus two times either 1 foot for diameters less than 48 inches or 2 feet for pipes larger than 48 inches. If the bottom width is less than the minimum width, the minimum width was used. The backfill depth under the sewer was assumed to be 1 foot. The sewer wall thickness is equal to: (equivalent diameter in inches/ 12)+l file://C:\Program Files\NeoUDSewerBeta\reports\3382872943.htm 3/12/2007 ' 5/8i2�G7x W RAISED PATTERN NON— SKID, GALVANIZED STEEL PLATE (AASHTO M-111) 1 - 8 'a 1 t0 0's A 40m MIN. SECTION .II XXx XXII I x l. PLACE FIRST SCREW DETAIL °A" IIXXX xx 1l 66 FRONT EDGE 11 X X xx 4 OF PLATE L 11 .4: A PLAN VIEW ' 4!6" zis - 4 v N \ i FLOWUNE !AS SHOWN ON PLANS) SECTION A -A r1 .0 2,Cr r e SLOPE PLATE TO MATCH SIDEWALK 2:1 SLOPE 11 oll 2:1 SLOPE 30 BRASS SCREW—18"QC. W/COUNTERSUNK MEAD FLUSH W/PLATE 1. GALYANRED 4NGLE. ANCHOR —18 O.C. DETAIL 'A' 5160 — SECTION B—B NOTE: WHEN THE CURB IS SER4RATED FROM THE SIDEWALK THE STEEL CONCRETE CHANNEL CED THE WITH THICK WALLS LS ON EACH SIDE) CONTINUED INTO THE CURB AND GUTTER. METAL SIDEWALK CULVERT FOR VERTICAL CURB, GUTTER AND SIDEWALK CITY OF FORT COLLINS, COLORADO ENGINEERING SERVICES UNIT DATE: IONS: D— l O ti s U 0 O L gb ate+ 3 = v Cd a� z ,1a to O kn N kn N 2 N � U U � II d II II ¢ U II o II II �x II L 0 IMMMA -2ININIMIMI�IV,I Irl �I�Icllfl ollfl olollrl olIrl olkrl ol QI `-'IOIOI�I^'lkn r- <DI al �I�I�ININI�IMI�I �I°INImknI10r-w uj„ o000000 kn O kn O 3¢N �n�ory�n�o a w a ^ n 'nkn V11 0 0 0 0 0 0 0 U ^ o V% o kn o V'j o H M M M M M M M p., ❑ o000000 o 0 0 0 0 0 0 U nnV•. `V �I 333 � �) V v 1.0 12 5 10 4 ' 9 11 8 r 8 10 6 :p,y3 O w 2 >r- 9 04 U. /) - �' U.' .7 x 3 8 w z 1.5 ylh a ^, j • ' • 6 b tyi ate, _ !, P c E�mi`ey / / z I.0 C�j4u` �J : y y�ir a .8 w 5.5 x Z 6 0 ' w 0 .7 U 4 z z .4 = w 6 4.5 Z ao .3 w ,- 4 z 0 2 0 .5 ' Z z o '3 3.5 W w '' w .4 1 0_ J w o O .I w , U. w 0 0 .08 .25 3 ~o .06 .3 x x c� co z _ = x .04 z 25 2.5 2 a .03 a r � U. a .02 0 2 ' a x 2 a f- v a ' 15 .01 0 .15 L ta. O O mcr=__ __ Yo C 1.5 x ' a-2 h 10 .1 1.2 ' Figure 5-2 NOMOGRPAH FOR CAPACITY OF CURB OPENING INLETS IN SUMPS, DEPRESSION DEPTH 2- Adapted from Bureau of Public Roads Nomograph MAY 1984 5-10 DESIGN CRITERIA ' CITY OF FORT COLLINS I (in/hr) time (min) 2 10 100 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.40 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.13 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.80 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.60 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.90 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.40 2.86 I (in/hr) time (min) 2 10 100 61 0.82 1.39 2.84 62 0.81 1.38 2.82 63 0.81 1.37 2.79 64 0.80 1.36 2.77 65 0.80 1.35 2.75 66 0.79 1.34 2.73 67 0.78 1.33 2.71 68 0.77 1.32 2.69 69 0.76 1.31 2.67 70 0.75 1.30 2.65 71 0.74 1.29 2.62 72 0.73 1.28 2.59 73 0.72 1.27 2.56 74 0.71 1.26 2.53 75 0.70 1.25 2.50 76 0.69 1.23 2.48 77 0.68 1.21 2.46 78 0.67 1.19 2.44 79 0.66 1.17 2.42 80 0.65 1.15 2.40 81 0.65 1.14 2.39 82 0.64 1.13 2.38 83 0.64 1.12 2.37 84 0.63 1.11 2.36 85 0.63 1.10 2.35 86 0.62 1.09 2.33 87 0.62 1.08 2.31 88 0.61. 1.07 2.29 89 0.61 1.06 2.27 90 0.60 1.05 2.25 91 0.60 1.04 2.24 92 0.59 1.03 2.23 93 0.59 1.02 2.22 94 0.58 1.01 2.21 95 0.58 1.00 2.20 96 0.58 1.00 2.18 97 0.58 0.99 2.16 98 0.58 0.99 2.14 99 0.58 0.98 2.12 100 0.58 0.98 2.10 101 0.57 0.97 2.09 102 0.57 0.97 2.08 103 0.56 0.96 2.07 104 0.56 0.96 2.06 105 0.55 0.95 2.05 106 0.55 0.95 2.04 107 0.55 0.94 2.03 108 0.55 0.94 2.02 109 0.55 0.93 2.01 110 0.55 0.93 2.00 I I 1 0.55 0.92 1.99 112 0.54 0.92 1.98 113 0.54 0.91 1.97 114 0.53 0.91 1.96 115 0.53 0.90 1.95 116 0.52 0.90 1.94 117 0.52 0.89 1.93 118 0.51 0.89 1.92 119 0.51 0.88 1.91 120 0.50 0.88 1.90 DRAINAGE CRITERIA MANUAL (V. 3) STRUCTURAL BEST MANAGEMENT PRACTICES Orifice Plate Perforation Sizing Circular Perforation Sizing Chart may be applied to orifice plate or vertical pipe outlet. Hole Diu (in) ' Hole Diu (in) Min. se (in) Area per Row (sq in) n=1 n=2 n=3 1 /4 0.250 1 1 0.05 0.10 0.15 5/16 0.313 1 2 0.08 0.15 0,23 3/8 0.375 1 2 0.11 0.22 0.33 7/16 0.438 1 2 0.15 0.30 0.45 1/2 0.500 1 2 0.20 0.39 0.59 9/16 0.563 1 3 0.25 0.50 0.75 5/8 0.625 1 3 0.31 0.61 0.92 11/16 0.688 1 3 0.37 0.74 1.11 3/4 0,750 1 3 0.44 0.88 1.33 73/16 0.813 1 3 0.52 1.04 1.56 7/8 0.875 1 3 0,60 1.20 1.80 15/16 0.938 1 3 1 0.69 1.38 1 2.07 1 1.000 1 a 1 0.79 1.57 2.36 1 1 16 1.063 1 a 1 0.89 1.77 2.66 1 t 8 1.125 4 0.99 1.99 2.98 1 3 16 1.188 4 I'll 2.22 3.32 1 14 1.250 4 1.23 2.45 3.68 1 5/16 1,313 4 1.35 2.71 4.06 1 3 8 1.375 4 1.48 1 2.97 4.45 17 16 1,438 4028 3.25 4.87 1 1 2 1.500 4 3.53 5.30 1 9 16 1.563 4 3.83 5.75 1 5 8 1.625 4 4.15 6.22 1 11 16 1.688 4 4.47 6.71 1 3 4 1.750 4 4.81 7.22 1 13 16 1.813 4 5.16 7.74 1 7 8 1.875 4 2.76 5,52 8.28 1 15 16 1.938 4 1 2.95 5.90 8.84 2 2.000 4 1 3.14 6.28 9.42 n - Number of columns of perforations 'Minimum steel plate thickness 1/4 5/16 3/8 " Designer may interpolate to the nearest 32nd inch to better match the required area, if desired, Rectangular Perforation Sizing Only one column of rectangular perforations allowed. Rectangular Height = 2 inches Rectangular Width (inches) Required Area per Row (sq in) _ 2" Rectangular Hole Width Min. Steel Thickness 5" 1 4 6" 1 4 ,. 7" 5/32 „ 8" 5/16 9" 11 /32 " 10" 3/8 .. >10', 1/2 .. Urban Drainage and Figure 5 Flood Control District WQCV Outlet Orifice Drainage Criteria Manuol (V.3) Perforation Sizing File: vJ-outlet oeloes.any Figure 5. WQCV Outlets Orifice Perforation Sizing. Rev. 6-2002 Urban Drainage and Flood Control District SD-7 rot p 43 t 55 53 7.3.. } 54,z j 7 102 4 � ' .a0 105 /h 7 22 \Ey • r.p 1. 73 j, 105 2 t 73 22 aw�i%• o, G • V it ... 91 wns�;� cAvac +53 - r' z� C / � :i�p 73 • 5 09 s O Ij� t 76 0 0 6400 yy 3S 73 ~m —� . �'�. ; 34 *_ •� .. 95 '1 _ ? ` - 3D5 c Loawoo soup WU _ _ . Y4in �' . ► _ 1 _ Andy twill• 22 64 7 ` � 22 `.` 33 P -'F<i c.•-. •z,Arf•.-4 92 B-. am - - r•. - 76 33 V dry'` ` •YS - 64 105 7¢ _ y - ' CA co • i '- �+S'-]eG•"'.*#r - fr►, '�. '-L 105 c. .+fait" spa ° .:#� ._. .. ..}, - _-- •'•. I011�• ! '+a►64 '-7{ .r a r��:i �'� . ►,i. J. •`' zi � • - 94 35. 64 dd S frLi:• Rom' "�,+i a .-f-+ ..J, s r: 36 42 O 64 r S4 105 54 = - w s,.. -9ys� 2E33 94. 95 98 105 c � be 54 � 53 64 H 3 36 _ i'w i3r`• 3 94 54 V 101 4 e • `:i. - g�, __ 102 101 105 35 b2 ,�c�— r." ^�.�,, t FINAL DRAINAGE REPORT FOR - CONIFER INDUSTRIAL PARK DECEMBER 28, 1992 STEWART & ASSOCIATES. INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 303/482-9331 FINAL DRAINAGE REPORT FOR CONIFER INDUSTRIAL PARK SITE LOCATION ' The proposed site is Lots 1, 2, 3 and 4 of the Conifer Industrial Park, being a replat of Lots 10, 11 and 12, Block 4, of the Replat No. 1 of Evergreen ' Park situate in the West ? of Section 1, Township 7 North, Range 69 West of the Sixth P.M., Fort Collins, Larimer County, Colorado. The site area is 3.0367 acres more or less. The site is bounded on the south by Conifer Street, on ' the east by Blue Spruce Drive, and on the north and west by undeveloped lots in the said Block 4. The proposed site is located in the Major Drainage Plannino Dry Creek Study completed by Gingery Associates. Inc.,. dated April, 19 y �veY✓� 4a.5 ti EXISTING SITE CONDITIONS ' Conifer Street and Blue Spruce Drive are constructed. The site is grass and weed covered and slopes from northwest to southeast to the corner of Conifer Street and Blue Spruce Drive at an average slope of 0.75%. There is no offsite runoff from the south or east. There is runoff from the west and north. All ' of Block 4 except for the existing structure will be required to have onsite detention as per the Dry Creek Study. All drainage designs will be required to meet City Standards. Presently, there is approximately 2 acres from the north and west that flow across the proposed site. DEVELOPED SITE CONDITIONS ' There are no planned buildings on Lots 1, 2 and 4 at this time. When each lot is developed, a final drainage report for that site will be completed. Lot 1 will have to be designed to allow the historic 100—year offsite .flows to runoff to Conifer Street. When the offsite property is developed, the runoff will be detained on the offsite lots, and the offsite flows will be reduced to 2—year historic flows. Lots 1, 2 and 4 will also have to provide onsite ' stormwater detention. Lots 1 and 2 will drain to Conifer Street, and Lot 4 will drain to Blue Spruce Drive. ' The drainage site area will not be increased to include Blue Spruce Drive and Conifer Street. That area is in the 100—year flood plain and is designed to'flow directly to the regional pond. ' Lot 3 will be constructed at this time. Runoff will be directed to.a 2.0 foot wide concrete pan on the east side of the building, then south in the pan to a detention pond on the south side of the building. The pond is ' sized to store the 100-year flow of 5558 cubic feet, and the restriction plate on the outlot structure is designed to release at the 2—year historic rate of 0.182 c.f.s. Conifer Industrial Park December 11, 1992 Page 2 There is no offsite flow onto Lot 3. If the outlet pipe is plugged, the spillway will release the onsite 2—year historic flow in place of the pipe. The 15—inch outlet pipe will be cut into the north wall of the existing curb inlet at the corner of Conifer Street and Blue Spruce Drive. The existing inlet discharges through a storm drain under Conifer Street into an existing drainage swale that carries stormwater to Dry Creek. EROSION CONTROL The entire site will.be.stripped and rough graded assoon as a building permit is issued. Then the building foundation will be constructed, which will eliminate any wind erosion for that area. Also, curbs and the pan in the parking area will be poured concurrently. Base material will be placed after the concrete is poured. That will leave the detention pond area and the other landscaped areas unprotected. As soon as the pond is graded and the outlet pipe is constructed, it will be protected with straw bales at the headwall. The straw bales will remain in place until the landscaping is completed. Storm drainage and erosion control calculations and the grading and drainage plan are included with this .report. a• . Richard A. Rutherford, P, E. & enclosures j%1IM111,,,��� N' kul 5028 � •A a Gi':. Hillside Ct, • tL (q : F E h oSPOuldIn� 9 c L one t o 30 � E •ton St x , .owe Pao ••Q � o � \; •. u 3 E. Willox " Ln �.•'-� \ u ,cQ U Cp. J or A Bromblebush St. undan Cir. f 3c tJ hutch rouse Cir. �rp m N V 0 � ,� o c a p• il Run z a \ Bristlecone Or ,�`"" r t $it t- $ C 1 Hib 3%' u r i n �r T 1\ n v 3 0 �� O q Cl. p o tk ClarkSt. Hicory St v —•- m L u CUQ CB ,.. ..\ ontfe St �i"i � �u � Lu ine01' /� � `\Hemlock St ' 1'o ow Cir, Z E Spur Pinon St Ctr. 1 ^s t. Woviown z Ipine $t n �I Main N N L E. Vine Drive i0 0 Trujillo St I N / Linden San Cristo St Center I I_ VICIAllryO 1 1 �3 No Text COiVIPl3TATIQNS James H. Stewart & Assoc. I i I i ; I ! Fort Colllns, Colorado By: —Date /a Client ����'/%��� r Sheet No. of Ch d By: Date Prolectr';fi"i Subject 1 I . I - -1- - a I ' I 1 � I i , , I I I I � r r I I i O�C}�F 4i fiCi r le- Ili � Y �'�_.`.._ �L.• 1 4t,f'1 I � �i(I �I I .] I I L �r'r C.:00per; er Job No. 5 j c)°t v'r. ^r'�? Al111 I^/ I c:.• 7 i /i/ ' fir' I � �s' -'' J', � . . I j COMPU ATIONS James H. Stewart & Assoc.: Fort Collins, Colorado Client: Date �9 Shoot No. of Chkd By: Date Project- Job No. 0 subject • j Aye ON: 1-f AE: 0.7 • i I.: 1 A T OIIIIP �'I NS James H. Stewart & Assoc.: I i I i Fort Colllne, Colorado 1 , I . 1. .• I i � � I I I � By: G=., 1�. Date =`- Cllent:l '� '' - Shen No. of I , I I -t- - I ' r� Ch d By: Date Projec�''7 � j Job No. Subject I i I I : i I ram; � �•. ' 4�-j�• • ' �, i� Jr'! T . � , . I I I � ' ' I i� 1 j � j I'-I� •I I� ,� I i I I f 1 I-- 1 Y� i I L IJ T. . I l C r+el 11�1i� I ; � .; i I� 'i• A�V 1,v�s I , � R M I 1 I I 49 j i i IZ Q , Is 3�Z 3 IL9�I 9 o O,bo �IZ I0 C,Ff� �4• I !sr3 • 1 � /: j I i I r/ I. i • I . COI111PiJTATIQNS James H. Stewart & Assoc. i I ; i I i I. I ! I j Fort Collins, Colorado I I By: J Date �'�' Clle •. '� Sheet No.-��of , i �G I •- nt. ;�`' Chkd By; Date Project: � ° ` � �� r Job No. ' Subjecti I I % i I :.. I ����:'✓� "I war...-dYl - .�ci' - i I • I j ��� I I I I ! , - -- - - I • � �-�`.� i~ ; � I , Fri. ����i ' II 1 ; I ;1 1 , I , I I _ ,..... ....:.... :.. .... . . .. . .. i� . COMPATIQ I James H. Stewart & Assoc. , ! Fort Collins, Colorado Y Sys 2 Bye Date Cllent:, .:' ' :.. . , `; d eel t No r ' �, , . - : Chkd By: � Date Project: ��� 1—✓7 �� Job No. ' Subject I ! I ,' '.' . .' -•-`•--'i _�.I.I!-.r. I i i;-I! %III`-�/mary�_..,,-`,. ,•^),i f�'ri%.„�,:�fi° .j.,-:I�i �I =i�Iir •Yr.,' 'a ;'�� !J{=j.I : `o x.?f =I!i �,}I � �n 0I��i II;I I�j COMP III C! 1 I I IOi.�V.IP�-.�.AI/. ✓Il' jI/•� � S Jmes P. Stewart & Assoc. 'LI . ��,IIIII ! 1 iI G.I.II-I i?i I .j 'j...•.�I�.5I1I, I . "�lIIIIIi aiI �c FI�7 orj ;t It I /CI. ioi�I lliII �III II nI s, ' II CoII.; � lorado �/ZCBy:. Date lient: � Sheet No. of Chkd By: Date ProtNo. Subject 1 !itwy Ve I' U; II id - Iv 1 I ` I r� I I I I SUBJECI By 477Id �/�Z---- SHEETO.---U--- T—,-- n — PROJECT NO.---------- - , o. 727 7, Z.-X 7Z7. 4,7 z,; ie _ /o 0.�s4 4.71 ZD •5.. 2 ja 4,2 ■ Lo Z� ' 8p l�fl /40 1 - 3 4D Z. 7S O.96 p, 76 D.G 9 �87-(1 /141,9 Z"1/7 4-08 0 0/5 �1gS0 32c 4(aZZ 547Z 437 so 3 s 533 ¢ .5880 � I Z o GSS" S4G5 &30o 764 53L 6Y-3Z z'7-;z gf-3 SSS's -- SI (.S3 9— 5 S 6:,9 40 70 710 /G3 S 3 6 z 1 4-S z: /EGG 5 4 6 SUBJECI DAH: SHEET NO. --- PROJECT NO.- N hp F-L STEWART&ASSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 ' Consulting Engineers and Surveyors By: a A 2 Date: Dec. 29, /492 Client: JAB ,t W tL L. r A M 1 Sheet No. /3 of Zo ' Project: n i'J I C E e— T A/ n v r -r P. A I a K ^ / Subject: b e AiAI A a E ( AL! u LAT/OA/S r02 N % PA)o Ie.TN or- R(//LD/Ni l n7— j P, r- 172Ai.,UA6 E AF-C-ae6, - 3734- Frl COtiC. -PA N :A2ER F-r CAvDSC-APCP AeA 9 x IS SSS FT' ASSVME COTS Z 4-' P.Vc/OFF 'STAy.r oN L04J 4— LmF-ep—vtovi, AjeEA O..0 Ar— 51.8% ' FE-P-V1OVJ AREA I ' C = �lX o.8/e� 4 0./9L) 0. 85 Dgv. Qzyp- - :0. 85 X z,3S x 0.11 -. 0.Z*7 cis. DEv. Qlo y,e - O. $S X S,0 x O, /l _ O. 1-7 DBE• 0100y4�857 /G 7.Z X 0,// = 0.79 c,s, x o•oo�S Z 7:0.35C,r.5, z. D k- 0. 35 Z A; STOP—M DEPTH O• /7 • DRAINAGE CRITERIA MANUAL RUNOFF 1 1 1 1 1 51 3( z w U cc w a 1C z Ill IL 0 5 U) w 3 0 U 2 w F- a 1 _�■. ,"'_, I FAK 1pffM �� 1111/A I FAIrm i FA M ' I I ■I.��i�I����■■■■� MIA .2 .3 .5 , 1 2 ' 3 5 VELOCITY IN FEET PER SECOND 10 20 FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR I USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELQPED" LAND • SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5-1-84 ( ^� URBAN DRAINAGE 8 FLOOD CONTROL DISTRICT \ 14 No Text No Text RAINFALL PERFORMANCE STANDARD EVALUATION ------------------------------------------------------ PROJECT: COT $, CON/FED =NDvtT,e /AL PA.e E STANDARD FORM A COMPLETED BY: i2A,0- . DATE: Der a./9rz - ------------------------------------------------- DEVELOPED ERODIBILITY Asb Lsb I Ssb Lb Sb PS SUBBASIN ZONE---,_(ac)--I-(ft) -- M . (feet)- -- M ( ) ----------------- ------ ---- -I- COT 3 MOD ECATC 0.73Ac.1 Z4Q I 1.38X i %7•3 �0 ------------------------------------------ DI/SF-A:1989 f I -I\ EFFECTIVENESS CALCULATIONS PROJECT: C or 3, CON/FBG :Z'+V--------- -�--------------- ao�'r P-q z - STANDARD FORM B COMPLETED BY: P, A Ae DATE: oar z,,s9, Erosion Control Method C-Factor Value P-Factor Value Comment - W A-,r J--..--.---- --------/ -- -------------------- fi S P i 14 7 O �qze Sore. /•00 /.ov 0, ra- q�, D, Zs Ac , •ST2•AW BADE ,� O• BO ------------------------------------------- -------------------- MAJOR PS. SUB AREA BASIN (p) BASIN (Ac) CALCULATIONS -- ------ ----- ------ ------ ---------------- ---------------------- LOT 3 77,3 0.73A� W7t, C-FACT-oe Q.01) �- �O,LSK /•00)t(6.3¢ x0,01)= WTD 1' �gcroe = 0.30 E F F = C/.0 - o,ar x b.bo l'xtoo - 80,0 $0.00/-; i 77•3° 6 ----------------------------------- ------------------------------ ,nT fer n_ Ann - _ . ----- CONSTRUCTION SEQUENCE (QdECT: •Lo-r 3. CociiFgr, Xvp&,rr�ei.aa OIL& UENCE. FOR 19 93 ONLY. COMPLETED BY: • iep;� STANDARD FORM C DATE: jw4,y 3oo1 W �dicate by use of a bar Iine-or symbols when erosion control measures will be installed. jor modifications to an approved schedule may require submitting a new schedule for �proval by the City Engineer. YEAR 1_ MONTH. ---------------------- RLOT GRADING �D EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers ,Vegetative Methods Soil Sealant Other- 13un v/M6 *Fov.vPine4 IINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters 'Straw Barriers Silt Fence Barriers Sand Bags 'Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving ' Other F-I At-1-.-1-M-I-J I-J-I A I s I o I N I a -�- -7- -T- ------ EGETATIVE: I Permanent Seed Planting j Mulching/Sealant I. ~ Temporary Seed Planting Sod Installation ! i Nettings/Mats/Blankets i Other •. i j ------------------------------------------------ -------------------------------------- l�TURES: INSTALLED BY MAINTAINED BY iETATION/MULCHING CONTRACTOR ISUBMITTED fF-C:1989 APPROVED BY CITY OF FORT COLLINS ON • \,\�q° \�„-•... �. :t a I Vt r i 'a c.. ''t a i.� p ' t '•� ���/ �Z r• yyyy� 0/ i � J / \' �\,`(�;;11 • ri �� rr a \ <^'l-. �a <r:' '1`~'r > - •t I1 r t~T <..-. ' � f � \\ r. .. � .�`y r -'e•^�`•1 '/° fin! \\ .\• \ � �_ .� .-•\U f, I `+�< . '�..� h kt :-,a:;. aT-.. . _-xt . .e'Y � �.::.1�p,e.:.. ! i]�1 F �`4 1�1 -mil• r' r '•�n ,s .y \y J �, � �/•:.••-.-. � �. i ,i r' -�. \. -> '\ < " I f�, %\ �. 'lUh`r -v -s�. L •y /„v oa'c�' ` � 1 ;� �1 i�'fl'i !{I � 1 f n .J ! I , , / 1• J� `. J� ;%. - L %i `\ai\� i{ •`'•. L\ �' Srr .r. �\ J •` I�' � 1 4�' -"1 lrl It yl �.. i � ' 11 _� /' /�^.. � /� • t _ h . a �� _ !. �,: I . r, \ r \ ._ .i_ •.\ . > l �_. ... _.i. 1,.:�1 �' t�i` 1 .ems;+ : _ .',r"': - �/� r ilr. \ Ci �•� : a .` :.FY. d' ."A' . �`; 1 ^k�l '��"s.�•, a A 1 i�r j° '.'�� - J��' - \ \ � // _� • : ice!„' .;1l� �',�� r-.a .i•.. •�;. b: •.;� � .�.��`•,IC .>,. I _ . ea•^' i r 1 K.ia' :P 1 yr/�• C c, y/ � .r `.♦ "i<ti• .•ebb , ..r;v,'r'v `+. i' .\?�• J,/•..G'3Y'... r#:` `n '',\-. 1 - � �t 1 'i!`• ry. �r ':+. "r//ii • ,,,� _ f• \: l 'v< '�� -.v 'x9s*. , a�� I �'Kr; �'•;,. �i .' aT' .:ir /' ,Pa -•� _.tip ..'•��fL. .�:.. - `.i. i• / /{1,� \ t . -!/.w ,., 4 �-3.e, rt- .� '^ �• ..t. `�... R'.; /- X� �y�'\ � / [/\�'. / J\ \ • L�_~ .�:. 5 '�> •l l l 1 ' / \-V � y • - i- f .�e.� �"� - <'. b • :2., aa.1.:`:, . /. -/ '_ \^ - Fr :c4' \ \ a' i�' ^\'^ - �i! ') �•, r`..."•" '^y 'Y-'"�1 '.\ C .� v': j` -�Ia. ea /. I :�I ;,',o� 0 �� a`° !\.: 'VuCt 'U .a, "\... `.\. ..t, :r .a :_ _a'L. '.: \� _, i� 'o.�t' / , , J'• ``;l'- •.fir /•. �. -/ Tv. -'F a.l�' ...i"` �! 1. ./" '-r• -• ''[: ``.�.- r a •'� /� � <'w-,>. �v \C.n- F., ;y _ ._-'9 +i '1:. I\I\11 .s,%w--v- j� OJ .i' iY .1, "!f. a. 5 y � '/� 1 I/)/7/ '\`� • / c• -`,'•Y.\r��- .>� L �. ti'�> � _l i.'_ \. �5 .)} \� t 9 �- ♦Y r h' ��4•. 1'4 �.',T':T �"''• 1 �•�+-y. � �'C' �/ •�1 ` ,.A` / A0. .ram.. ,!. .L L.' _I�n 1 1S 4.r.:•Y :T. .fY; 5.: .� / .» a�. .a- .H, .S4•. n... L--' aa,:.l_ �\ �'� _ - .w., .. }, '••.., _ '' A...r .4• :.?...-f?tr'"r sr' �.' =G( .t ':'`• ys ,, •>. ,.tk' .rj''.t a� a '/ / 0 kom r.. ��. ,;r� �!\ 1 i:.�:Jj .1 ,X; i. .a :_o: �v 4lr :' r •+. _NY �`:. ;Y. •:;,{: .. '�q4= a 1 •, .I/• �\ \: �-: - t _,\, .:: • ?,' •.4 _ �: . �a _r .l �Cq't .rr at:`:.. '+ _ ... a .Lf� - '=1.,,> e •�0. I .I i � a ��-_; �\ __ ^•'n• :� � - .1' / .�' : %��':: - y w�: _ r /-'r•'e,f`'< : j>�' '7•r + "a •\+J-• !1 T• .t • •\-, f ..`:>. :V- ::..;• r {^.. �.. ' .r- -a. .>:'�. I T 't - _a'1> t t._,+: .r :7. . r. ,'. r ..'� < '# '�' "%� . V r:l 0 e\ � � _ a�. _ - i ` , .e• I . i `\, {'. � � , t � Y,<'�.''Sri. ..J+`� • r-.�.:-• >_ ' ^'•i - •�'. �br r' a ` r�` •�• <' _J.f[ 'i.fy-i:c :w r.na. y.. .. ,'. .'>i' 1 y. •�a .i• �r :F. .,`. �ra,..Yo-.�� x .f:i.., .%+�. ..t :•- r� �{1j+�..: .;� �r._.' -•9sr '+'+� t. :rh1b .' S_.` / '�2v9'i� r M .. ,.p ✓ Al a. ,s.,.i.. 'n.. S s. ^e�>.-.-. ••'. ':i 7 f S ... r '> > .:.v /�O-•�r.]w' r:: >; i V e a• '.y' - aY.: A _ }.a .�', ^" C3 iC t.. e.: ..k. :! Y >`::-j.Y t Z... ,.f - $...<t i > r^ •�\'� .:`� a�� �<�: C \- /� \ aW �/ / .� • /r rJ V � w'i'.• .>Tn' �/ may. ' � 1' ,..w ' { „a . � / '\ as '�;. �c� ., '/' � ��'.r' �_., ..�' ': r�_..,]��. .•+, wi:, �d �!' ?`,.= ! /�,� - _�•• �''� ;i- a' .:, •� > �'.. > ..)�' %'`�- ,���... -i�t, ,7 _ _7w.ega �..' li,J I /.. � VV.�. -:4'; ( :.:.5�,, �; •y[y .} "rr 4L�.,t -/// i I.� 1 /:;iY •Sid ,� -.: '.::.-r:^�l-:3: - ? � .•/r r: ./ : `•\� q. . �7" , _ :. `J/ri. /� 1 .� t l: 'c. .�'?' G1.� ie'.,,> . �!� .�'.1:-: 'r: i\ �.:N� •t•, r�iK' ,. � �-1, a J' _'f =c:'. '� 0.0 •\ :F°. L � - ' yi a '\•.. f a,+ Qs.' :5 ,�.a� - - 1 a � �y'.:,• .� 1 • \?>' '! i•'.Yi. --� r. ':< > p . .,t�� -,r- +,. $-. .. p.'r.d D / _ ° ..\. ..r -';4• t •.\✓. ,( •`:x ♦ `. \. Ci a- - +_'W� - ^�['.:. ,:-+�iR::: ��.!v f `'/ .: .: y. < r '.i, ..�. .+� �''J -;� , '? - :�- ...y q• _ JR4.. ,�4��.'�L -r "01. "- � � "1"z.tr. - `.+' :•r,t}. > •3: > .'�w�. "'i M1' ' '•"!• .'IJ' , ,i:' :%1 ye Y a -'�...' iy F '-` < roa a: qt ?t '.t: ._.. r�,,.�r �:',sr .:y. i 1 �*'...�" �1•.: .r.'T'='F...t'�' , ..� �'+ "-'�'I.h'�`F.:: .>..i. *_-"'S; n<-f.. _.ne 't<.,�>- �i �<'\' :� O 'If ♦♦ ..r f`: :✓: lC :.<r .lam rl '1. '�. - - -C>e •{ `\\� ')o, '.\\:a-- ��/ ���'ryiryii�,,yyy,,,'l .> M• r Y'. '. �-.. - >�V:��.l�:"�. :�N� � ♦. /'r�• _t•' :..� 1. �,_ s ,esr ,"�.•(: '�.T?;:�°; •. :'{� \.. ((11 ^ D '�`} \ \/ ' ^)': w0 w„y' S ..,.,-' [�a�ya> £` ,,.�� 1�• • " a} 1- .y- _�'A""�`j/ ..''J . tee.. :Q \ \ T• �� �' `" ` �.`0/ >'�71�Y< _ ^a: _ �Y la. \ .\• 1{ .O• ��TJ' �.:. .\'S�:�✓..• .I �•. ra ��>.. ,a >„ .D - �r/l� : �//\�-'�'-'. 3i4- aH' ..d y� � • >.:` `;\. '. ,.` .`; �' �. - \\ s:.. .i, ) Q'Q ,/ - ✓•"� K•. W/ >r �-'�s' ��.. :ii s �jj .\, ' : 1 <�jj. G ... p�'� 5y �i� _.gip; ar..,••- > - 7 r + '�.♦% ��' ��� �.�[ 'i'a f Y .1Lr ai G.T :i , -+,. /. '7-.yrr V �'a" 47, Ry `: \ \`� .`` ': / '� `'' . i 't"' .:, '''1v,'sl.' 'ro .t. ' >!, '�•,(:.:� �:. _;R,r -,` \ 9. : a •> ! _ %., 1 /: 'a. �4 ..: i;:.. "iy,:`'• -i • \,. , 1 - 4; "tea[ : + •' J/J �i ' .� + '�• \ . I ;_j• ,�.Sy yI •I O.• (✓ _ r•:� .1. X\ .., .: w' ttl��J/ - ✓±�;?, t''��n✓ J "( _.y ,>y'• .\ .i' \ >4 ♦- t,..lF.a �' as ` .-t✓ Y4 - :1. ..-::•,Y1 y� : r\ 1s.'k' '!N ,'-, it'=� c \.r.. ,* :% ` •'. l r.%': . �a,`\ .�� t>•...1/Al f�.., a•. k •i -"" Via., %v, a2. .sue .? -'°a::T�LOO'�W41' \. �. a •1� _t�.-« \ •�, .t_hr, T'.ar�•.. Ala>. •' -$ i'.` h if ..�><. •k .�, <7 w•.i '\, z. �. Y __SSww .'v`_.,.i �. �i x /� - 'I�r 1 r `` �+`NYj� '. ic: » .f�i`w. •__ �. �� >,• -16 .f' • 1.1 -%-'•��.� .ram .3. f�� :f:�. _`- i { �/� 1 �? � �i Jib 1i i•<`s+6� e._R' .. /��:r� ���'/;: vie Jq t..i _ 35�,1�� y, i� :<".{ '•�'aJ' .4.) '!C'�./rra. _ <.� ..` '.:C. - L r - �' .:L• y /,� ��� _ \ . ✓. b 1 Ci� II` -t _ [_•:+.1� '�rx: ! . L^1;iFP.`, CFsa •l .?6+• < _ J:. , l:ii•C ` J ;]. '•W i :" : _ .r.. /:i.. ,'1..,-: .+ �,.-��- �_-- 2 1'•^, .1 .;;,�.CT+1. '.aiT\,�S ..+. i.� (^_ t�.a.e V v-:. T vtw: `: a.. a.: .►. sue.. _ - , ,-F?�+ � - �:��-r;:^ � �� = '�` .: X.. I {r �i 3 : ' l � ` , i_..� tlj� _ ;Yf'-. -•.i• . r t - �.'• ' -s _ �7 LT a ! ,.a: / .V f sirii:<€ �¢�' •r. ':.i: -`.� .�. t< wc.,. ..7:. .: r,�.r':9 .�, _ •. 1 p :�' .+•f_ i_-V � mow: lc J .r. �T `�V' y}' ._ .q .xc • .,rs- ..i ., 2?; I ''s>1.'� rY! - .';{.- << r. y a K .Sii<.`T.�J^. t :�-t -A'/ .r -- .\ 1.- - t•I� .:,.y . t i :1 1 /. .at; ••�' ` 1 - ., .�` 1 t WW1 � !.. 'O� . p . \,l .r .4, c- : J,.< ?.' i/'. .� ,'� r e\`-._'/'. ,�: .. 1ST'. •.�. 'a ! 1 1 5 ) 'i ka.���. ..o.i. :1_�rr"1• �.1 ,�+.x ��3 ". v. j�^'��...��:. .�`.°?3 - 7�-.' - 'a:' �'`-^ `% ••`.�:\cC.$a:{,� g')<.•i 1 rI '1 1 1/, ;`,' -4 �7� 1. .i.♦ i [ 1 1 1:T. � } -3i V�vr.`.+� �'•fa .r✓i 4' .> >:Lmr.. 1 .lY :1t.:a ., 4 '• 1 . {`,'' ..'�' .r. 11 M.thJ• :4 1 '^� ,5� >: - -�' - .'< '--> :�>, -:_� P .i• +. ,r<Fr,,,':: i 1 �./•. � � :F .'il � "! '.M \ _ :1' 1)) .1 �� t.l�• .?7.•"d�r :'.(e {r��'y-. :9Ff S". ,r„ 3L. ,!Z' •.r'. ..�.aF ��+ >.e ! �` .1 j 2 I C!_ `�a' � 1 -1.' : �f .y r - 1: f . yi 'Y R' •a'�<Y A`.' - r a • ..< >/j:•. '�� ` :<.< - / :.'f.'_ �j}'. [`` s :E r:.� M' :F> rNYG-�..... _w 'i:u°Y..:.Y �_:. /.' ..!':.' 1 - �.,. ar;.'L .�.:.J> '.i'. n. .t ;l ./+'.'�!. 1` •c. {{-i? `1. FMaI J: .Y'' ..C. .:�-e'-'-,t�,.: - :. ..L _ j w 'a. r� !/.:. 't r_y�-;.i. v ?r •' , ro^ .. < •1:.1 y, , .{'. Jdr y.Ti3 { ^�? 'r • `-Y"!;: l r` - % • rya ��->'.• :•< .\.`' ,JY _S ., f'. ..}.. et•. - i '•�: t :,t31 -7.1 1'r •!� `�`G�,'.).<�'C�e. fir-••r.'+w :ii-Pi-xL>.... /: r t -� t .,.n- ✓':`: 5 ::i[.. : `: eta: 'L 1',/ `S;•_, 1r-'~ a,•,4,• .,,a r�i s �-�a. 7' .: •• . : 4x' ,A; �. 1?T Y-:•t s' , -r." II4•d' - i2< .J ''-''• - .�s:r .i1� _��' - \r�.�-J:k��7c+�.,4 '. ' r +,l f �S• y. `..a 1 �':.-t c. ..>I r +` t_� .•1... ,t 9.-:• a'r.-L-a. A{`.,6 1 �. aa �.� \ c\ 1 , i t ' 1 "': -+: v J.. i+. w .: .^r3:. rv.r":%... _ .? 'iY.. r.�.1��_..�.� y:,a .b��•.:'.. t. ..:: ' . ) ` .. _ 1l _ y "l .ii a: ,� ; .. �`'`{��' ; ;•.1 1, 4K� p�,.> * .:> f �� . �r 6• n,' . �,. •,T,':. >.+ex, �.1 :, .< s :n`i `. N r,•,F' r �..'.. 1 •^',.:•<... ^4rir_.: .'Ya, . 'a.(a•�' Y; ..iv . �:> >C •+ -� `^t ..-i,r•r�:,! •�A_''L^'_�j 1:1 ♦._.'I //`A :,r "Y • k ,r I 1'1� .:� .Y 'J ' �' :/ �` >>a1•L . ,, e. ..±±��..: r' ;4 ♦..>• j {: � 7 'r f - r� t:._•- / +,. T. _ �� a'✓.a•.- r-.+• � . j�: - _ b�, _ lr C. •., <. - _ ,.t. '.;-Z.•a. "-�5';?'..• ai rl. -�<1.}, ...r t � • r.' _. •. :"•:.J• Y �_. �; ••�. iip- i 'r.c \ S. s'. - .R .y •, -.� •='s..:'r'. .q` J3 .�=�i+. �-"r' :'�. w.;:t 5' q. �'^V: /' .a /.ss..,.=n I�'• \:• / f :>. r^•,y. _. ,;.Ya.']r"k;: - :_`^•�. "^".i. ni. ..$fora %�C : Y ', i:., ay,ir'• if ; •.','1,r.-'I::<< v? :a: ° t:..: •. urD; .. < Vim•, `••� • 'Y� rS'Y..�r^� S. C'l. � i)\. ai.>•, 1 �T'. ... i.:� �"y A^1 •/_ , - yQ i ':`�`"i o-. - `.a . ii:47F`+ � ^'• \L: R.:.a✓ J- y. rT �4•-Tyro• .� V t In a"O. 4[- r.. _ '1"- ,_'?. _-?-.'•,.�.p.} xD 1Z`" :�:.-:-.�.. }....-k» .1� fir, ..}.. r'.. r*-Y.. •:>', DsG': � �:•+T - wi - -.< ..-_ �. , � •Y 'it. i . r . I.. r 7a ,.'f :< •>sZ ! ^�' 9 , \ ;]L� � l;¢:1' 'Y �.. - 4S� 3•y:-..�.. �_i �i'�`yrM: .'1ti 3" ief..i' 'L'_\. _ 1 � : �i .r / IFS s_T �lrs }M1�" N�'•` r r r .n ,y:.. _ . efy 1 ':' 'ti >: ��ti �{:JvY. $T},i�i�-,����_-_ �. •r �� ai'4/-...-�. 'y 1-.: ri i. lr �� .4.�:.:` i � _. �•�:�h� T ti:+'. `ir*s� >{.��� ��;.:a:T -R.a�7:..•w._• '�i2'�'i` �" ':r '.iC ,1�+��\ it },. .:r �!. r_ _ X" - D'�'<V' i•: / \ r . % !a f1<"rb/ ` ♦ �¢. § ♦r.,q _: y�Tii=.vt `"d'_. •14 w .%„t > is �, ..� �+•• i.u. ,ice \' '. >�. .a/ -�.. �a-r_ •'a.. _,� 'v:f ♦�;�:I •' j�r' ., _ � 7� - KT�� p :-xy 'L't .'. :7. ` r•� ,�.. .. a'rrFi ..q -v _ �-�'... '/ i �. 1 ', � i 1 � .•.< r%/ /. .�,,t .,�{. \ �.: ,1 ' V; •a 'V ;.`Y a. /i : ?f ] ��' � 1 .'� i rl1 ��r'1 y ti. - >•, - -;Y = _�� ... ... � /i i . l.� ; i L�'`L� 1 � �)`ti. � � ,/ �,,e��(•. �' x '"• •,�'� .f/+a .<.Y?•; � �4 <�. 31 /� �1'i'�)I • .9L k� •' ' -[ •rq` -. +w ," .. /-- 1: .1' 1 i /I .1 i/_ }•. a.f :'f '> _ .v` �t -> y���A'��_aw.: 'a;,i• S rZ" �MF r � J'�l ��. jl r 1 �:...... _�• ._.... � � f ti � r - } 1 - a: \i- . ~ �l <r 1 • v ' 1 ��rrr _T y .ti �Y�], rl'.+� . ' °. DESIGNED JG8 DATE a Q CITY OF FORT COLLINS? DRY CREEK H S_ DATE g 79 ' ASSOCIATES INC. CHECKED FFM. DATE I'2/79 LARIMER COUNTY1 a CCLORADO DRAINAGc1NAY PLANNING SHEET s oF' GINGERY DRAWN REVISED DATE ',�A (,OjVv�c;��faaTION BOARD SCALE Irr= 400t (Zoe �I PHASE 2 E%T. STI w p FENCED VI II STOR'G all WII - z / ou 00 all / 1l� oz z W I I I EM a' N6 CURB AND 4U ER L L---J i A 9 MUSEUM iaMW1 14-161 EXT. FENCED STOORR'G PHASE 2 PHASE 2100 ____T '� PVC STORM POPE I� 1 I it FUTURE ® BUILDING + AREA INLET f I i/T1="%r i III � PROPOS M Is D 1 PROPOSED RETAINING _ WALL (OE9GN BY OTHERS) -THE TOP OF FOUNDATION ELEVATIONS SHOWN ME ME MINIMMM ELEVATIONS REWIRED FOR PROTECTION FRAM ME 100-YEAR STORM. MINIMUM FINISHED FLOOR ELEVATIONS ABOVE THE 100-YEAR WATER SURFACE IN STREETS, CHANNELS, DITCHES SWALE9. OR OMER DRAINAGE FACILJTES. AS ILLUSTRATED BY A MASTER GRAONIG PLAN ME TO BE SHOVM.' I SUMMARY OF DRAINAGE DA MINOR COLLECTOR ( 8V ROW ) NOTE CONTRACTOR SHALL AJUFY LOCATION OF DOWNSPOUTS MI ARCHITECT. SUBBASIN I CRES) I C2. CIS AND CIO I C1QU I (cFs) I (CFS) IOO INANE (A CRIES) ACCESS EASEMENT 1 1 5' TOPE R INLET y I I / E 65.83 1jr HOPE 1 I 0663.13 1 STORM I I 0 0.50E OTY HIGH RISK 1W VR I 1 FLOWPLAIN I �� PROPOSED BUILDING � ` FINISH ROOK \ r ELEV-66.g0 \ I y nDe I T I �I ~ PLAY 1 it AREA I 1 y 1 1 I / 1 � / 1 � / 1 � 1 1 R Ql; l 1 1 � 1 1 (n I 1 1 1 � I L � I 1 J I 1 I I ]IFRGFNCY I OVERFLOW � I 1 I 1 I I PREFAB 1 I e i'X i6' IEEq 1 rX 22 1/2'I � RETAB BFNdI1.� 1 ' 9' UTILITY AMID 1 ACCESS I EASEMENT i 11 1 I 6a0 M TEMAI .FLDQUMAIN I SAW VA 11 MUM * F 1!�L-amx tr TIE 2� Vac I y / STANDARD EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES SEPTEMBER. 2003 It I MF EROSION GONmO INmrrTOR MUST BE NOTIFIED AT I FAST TV4Ntt_rralR (241 HFURS PRIM M ANY C.,ONSTRUOTON M THIS SITE. (2.) THERE SHALL BE NO EARTH -DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE ACCEPTED PLANS. (3.) ALL REWIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCI(PILING. STRIPPING, GRADING. ETC). AL OTHER REQUIRED EROSION CONTRM MEASURES SHAL BE INSTALLED AT THE APPROPRIATE TIME IN ME CONSTRUCTION SEWENCE AS INDICATED W ME APPROVED PROJECT SCHEWIE, CONSTRUCT{ON PLANS, AND EROSION CONTROL REPORT. (4.) AT ALL TIMES DURING CONSTRUCTION. ME DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONMOLUNG ON -SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE "M BLOWN SEDIMENT, THE DEVELOPER SHALL ALSO BE REWGNSBLE FOR INSTALLING AND O MAINTANING ALL EROSION CONTROL FACILITIES SHOWN HEREIN, M 0 (5.) PRE -DISTURBANCE VEGETATION SHALL BE PROTECTED AMp RETAINED WHEREVER POSSIBLE, REMOVAL OR DISTURBANCE OF EASING VECETATOR SNAIL N U E BE UNITED TO ME MEA(S) REWIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS. AND FOR ME SHORTEST PRACTICAL PERIOD OF TIME. o oV (6.) ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY ($TRIPPING. GRATING, UTILITY INSTALLATIONS, STWKPIUNG, FILLED, ETC.) SHALL BE KEPT IN A (� ROUGHENED CONDIEION BY RIPPING OR DISKING ALONG LAND OUTOURS UNTIL MULCH, VEGETATION, OR OMER PERMANENT EROSION CONTROL BMPS ARE N m INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT SMUT RIGHTS -OF -WAY SHALL REMAIN EXPOSED By NANO DISTURBING ACTIVITY FOR MORE THAN THIRTY C O (30) DAYS BEPoRE REWIRED TEMPORARY OR PERMANENT EROSIOB CONTROL (EX SEED/MULCH, LMDSCAPNG, ETC.) IS INSTALLED, UNLESS OTHERWISE NO O APPROVED BY ME Ott/COUNTY. GUI. O C N 0 (J.) IN ORDER TO MINIMIZE EROSION POTENTIAL. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL: 00 0 — (a.) BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) VICEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS 4, 4)d4ocy NECESSARY IN ORDER TO ENSURE ME CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION m y^j (b.) REMAIN IN PLACE UNTIL SUCH TIME AS ALL ME SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABIUM AS DETERMINED BY ME EROSION CONTROL INSPECTOR. b0 c (c) BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY ME EROSION CONTROL INSPECTOR. W (8.) WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL Q O O1 SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND DINER PUBUC FACILITIES. G 1000 (9.) ME COINACTOR SHALL IMMEDIATELY CLEANUP MY CCNSTRUCTION MATERIALS INADVERTENTLY DEPOSMD ON EXISTING MEETS. SIDEWALKS, OR OTTHER �� AyW U 0 O I' PUBLIC RIGHTS OF WAY, AND MME SURE STREETS AND WALKWAYS ARE CLEANED AT ME END OF EACH WORKING DAY. VV 0 m (10.) ALL RETAINED SEDIMENTS, PARTICULARLY MORE ON PAGED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION U G SO AS NOT TO CAUSE THEIR RELEASE INTO MY WATERS OF THE UNITED STATES. o r U (11.) NO WE STOCKPILE SHALL EXCEED TEN (10) FEET IN HE3QHT. ALL SOIL STOCKPILES SHALL BE PROMCMD MOM SEDIMENT MANSPORT BY SURFACE I ROUGHENING, WATERING, AND PERIMETER SET FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (W) DAYS SHALL BE SEEDED AND MULCHED. Z c i (12.) ME STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER ONES WILL BE CLEANED UPON COIPLETW OF lldE MI O PROJECT AND BEFORE TURNING ME MAINTENANCE OVER TO THE CITY/COUNTY OR HOMEOWNERS ASSOCIATION (HOA). < > 0 .m. (13.) CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (COPS) REQUIREMENTS MAKE IT UNLAWFUL M DSCHARGE OR ALLOW ME DISCHARGE OF MY POLLUTANT OR CONTAMINATED WATER MGM CONSTRUCTION SEES. POLLUTANTS INCLUDE. OUT ARE NOT LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE MUCK WASHOUT, CHEMICALS, OIL AND GAS PRODUCES, LITTER, AND SANITARY WASTE. ME DEVELOPER SHALL AT ALL TIMES TAKE WIUTEVER MEASURES ARE NECESSARY TO ASSURE ME PROPER CONTAMMENT AND DISPOSAL OF POLLUTANTS ON ME SITE IN ACCORDANCE WITH MY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. (14.) A DESIGNATED AREA SHAM BE PROVIDED ON SIZE FOR CONCRETE TRUCK CHUTE WASHOUT. THE AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST FIFTY (50) FEET AWAY {ROIL ANY WATERWAY WRING CONSTRUCTON. UPON COMPLETM OF CONSTRUCTOR ACIDITIES ME CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO ME AREA BEING RESTORED. (15.) TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF ME FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL ®E INSTALLED AND MAINTAINED UNTIL THE LOTS ME SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION Coll INSPECTOR. (WITHIN LOWLAND CITY OMITS ONLY). (A.) BELOW ALL GUITER DOWNSPOUTS. (B.) OUT TO DRAINAGE SWAES. I ALONG LOT PERIMETER. SCALE: )e=2O1 (D.) OTHER LOCATORS, IF NEEDED. (16.) CWD IONS IN ME FIELD MAY WARRANT EROSION CONING MEASURES IN ADDITON TO WHAT IS SHOWN ON THESE PLANS ME DEVELOPER SHALL DRAWN: KMZ IMPLEMENT WHATEVER MEASURES ME DETERMINED NECESSARY, AS DIRECTED BY ME CITY/COUNTY. CHECKED: GSF CONSTRUCT" SEQUENCE APPROVED: JRL PROJECT: LOT 2 and 3, CONIFER INDUSTRIAL PARK m STANDARD FORM C SEQUENCE FOR 2005 ONLY. COMPLETED WI: JRL DATE: 10/9/2006 Indicate byuse of a bar Wine or symbol when erosion control o Z s measuresIII be Installed. Major "Ificetion 1* on approved schedule may rations submitting a new schedule for (.) LJ.I U) approval by the City Engineer. (_i O Z J ,l YEAR 2006 Monte M A M J J A S O N In QWJ PROPOSEDTIE OUT \ DE-TENRON/WAMR QUALITY POND STRUCTURE W D VOL1330 cu ft 9' UTILITY EASING SEE DETAII W O OEPTI ft EASEMENT BOUNDARY SNEER 11 OPFNNING OF CNEA FICE PTE- 3' ACCESS 2 COL X 3/8'01 HOLES EASEMENT �6� __` DETENTION VOLUME REGD-11,020 a ft -EIDSTNO WIND _METAL VOLUME REODw12.350 no It 1W M W.S: 64.9J ft AND BUTTER 1W M DEPTHI IF PROPOSED lr OPENNING OF ORIFICE PLARE-2 5/8' __65-_ PVC STORM PIPE MOO OUT-0.36 cfa --------------- ------------------ LEGEND - - - - - - -5ZKS- - - - - -- MISTING CONTOUR PROPOSED FLOW DIRECTION - - - - - - - 5065 - - - - - - - EXISTING INDEX CONTOUR X SILT FENCE 93 PROPOSED CONTOUR oo PROPOSED INDEX CONTRM 'Imi VEHICLE TRACKING CONTROL PROPOSED STON SEWER DIP X PROPOSED DESIGN PONT ® PROPOSED STORM INLET PROPOSED BASIN BOUNDARYNBOUNDARYPERMANENT SEEDING PROPOSED SPOT ELEVATIONN �{) SUBBASIN NAME PROPOSED BASIN LABEL mil® SUBBASIN AREA CIP) NLEr PROTECTION ACRES) ® 'sty WATTLE FILTER OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter III Additional Barriers Vag lalive Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Futers Straw Barrier, Silt Fence Barriers Sand Bags Bare Soil Preporallon Contour Furrows I Terracing Asphalt/Concrete Paving Mar VEGETATIVE: Permanent Seed Planting Mulching / Sealant Temporary Seed Planting Sod mslalianon Noting / Mals /Blankets Mar NOTE: FOR EROSION CONTROL DETAILS, SEE EROSION CONTROL DETAIL SHEE. GRAPF%C SCALE 0 w 11 Inch!MEET )20 R CALL BEFORE YOU DIG cau unuTr NonFlcnnoN CENTER OF COLORADO AT 1-800-922-1987 www.un C0.of9 CITY OF PORT COINS, COLORADO UTILITY PLAN APPROVAL APPROVED: CITY ENGINEER DATE CHECKED BY: WATER R WASTEWATER DATE UTILITY CHECKED WI: STORMWATER UTILITY DATE CHECKED BY: PARKS R RECREATION DATE CHECKED BY: CHECKED 61: } p CL 3:NMJ 2<0 LEI > w> ~ W /LLJJ J Z1d _ =NQ0 Z Z 0 (/) Q =) w _� A PROJECT NO. 0205 SHEET 4