Loading...
HomeMy WebLinkAboutDrainage Reports - 04/01/2015City of Ft. Collins Ap ve Plans '✓`.. �'` Approved B Date C 0Lss0N ASSOCIAYLS June 12, 2014 Glen Schlueter Stormwater Engineering City of Fort Collins 281 North College Avenue Fort Collins, CO 80524 RE: Drainage and Erosion Control Letter Rigden Farm Filing Six, Tract Z — Multifamily Dear Mr. Schlueter: Olsson has completed an analysis of the drainage design to determine the changes from the proposed to the original design of Tract Z of the Rigden Farm — Filing Six project based on the Final Drainage and Erosion Control Report for Rigden Farm — Filing Six, prepared by JR Engineering, dated December 13, 2000, revised February 8, 2002. The original basins' imperviousness was compared to the imperviousness of the proposed to determine if further analysis would be required. The original design used a percent imperviousness of 70 percent for the multifamily areas including Tract Z. The percent imperviousness of the proposed site is calculated to be 55.2 percent. Based on the calculations, a reduction of the developed runoff would be anticipated. See attached calculations and supporting material. Since the intended drainage patterns will remain the same, detailed analysis of the changes will not be required. If you have any questions or need additional information, please contact me. Sincerely, Olsson Assoc Daniel Hull, PE Senior Project Enclosures 5285 McWhinney Blvd., Suite 160 TEL 970.461.7733 Loveland, CO 80538 www.olssonassociates.com Project: Tract 2 Multi -Family Project Number: 13-2449 Proposed Design Basin Area (SF) AREA(AC) Landscape Paved Roof Percent Impervious Al 42,151 0.97 9,583 19,166 14,810 77% A2 20,828 0.48 1,861 11,160 7,807 87% A3 32,705 0.75 22,938 1,763 8,004 27% A4 17,156 0.39 10,122 464 6,570 37% A5 15,831 0.36 9,979 1,116 4,736 34% Total 1 128,6711 2.95 1 54,483 1 33,669 1 41,927 1 55.5% 6/12/2014 Olsson Associates Copyright 2014 A Engineering 2620 E Prospect Rd.. Ste, 190 Fort Collins, CO e525 RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Rigden 11 PROJECT NO: 9164 12 and 9164.15 COMPUTATIONS BY: B. Strand DATE P- // Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt): Sidewalks (concrete): Lawns (fiat c2%. sandy soil): General multi -farm r area: General single-faml)y area: General commercical area: Runoff % coefficient Impervious C 0.95 100 0.95 96 0.10 0 0 65 70 0.65 55 0.85 90 SUBBASIN DESIGNATION TOTAL AREA (ac l TOTAL AREA (sa.!t) SIDEWALK AREA (s0 h) PAVED AREA (so n) LANDSCAP AREA (sa r) SINGLE- FAMILY (34111 COMMER. AREA (so.It) RUNOFF COEFF (C) % trnp"ous MULTI* FAMILY 169 0.25 11.040 915 4.442 2.144 0 3.539 0 0.69 66 170 0-81 35.134 920 4.990 9.778 0 19,446 0 0.55 47 171 1 11.50 500.771 15,460 0 342,427 0 142.854 0 0.28 19 172 0.33 14.273 2.325 8,896 3.052 0 0 0 0.77 78 173 0.86 37,59E 4,000 19.609 6.710 0 7.279 0 0.74 73 174 2,49 108.350 4,750 17.209 34.368 0 52.023 0 0.54 46 175 1.55 80,533 0 0 50.233 0 30.300 0 0.31 21 176 3.76 763,947 9,400 35,857 11.840 0 4,06.750 0 0.69 63 177 0.49 2 1. 182 2250 7.313 1.954 0 9,665 0 0.73 70 178 t08 46.946 0 0 33,377 0 13.569 0 026 16 179 1.D4 45.424 0 0 13.509 0 31,914 0 0.49 39 4.80 t59 69,708 6.937 10.230 14.208 19.326 18.408 0 0.61 59 lei 1.30 56,840 3.770 13,955 4.969 34.146 0 0 0.70 73 182 165 71.843 7.525 7.325 29.782 33.203 0 0 0.46 45 183 2.75 119,524 4,890 0 103,321 11413 0 0 0.19 11 184 114 49,455 4.670 11,838 19.909 13.038 0 0 0.53 51 185 1.14 49.533 3,275 13,861 7.581 24.016 0 0 0.67 69 186 4.40 191,467 6.415 7,325 133.111 24,361 0 0 0.22 16 187 0.46 79,925 1,325 4,628 7.392 0 12.580 0 070 64 188 0.86 37,276 1,690 6.387 2.211 28,988N 0 0.88 72 189 1.35 58.945 4,145 12.618 7,324 0 0 0.67 61 190 243 705.837 6.250 20.242 7,785 71.559 0 0,68 72 191 3.10 735,034 3,705 17,067 40,641 _ 56,714 _ 0 0.52 49 492 1.62 70.510 3,200 71,812 17,552 0 0 0.58 51 193 026 11,384 0 0 6,950 0 D 0.31 21 194 125 54,270 650 0 21.522 0 0 O44 34 195 O.B9 3e.923 0 17.042 0 27.8810 0.74 79 196 1.76 76.572 900 0 33.482 0 0 0 st 31 916400* +As is unofficial copy was downloaded on Aug-15-2013 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com Page 3 CAOLSSON A SS OCI AT E5 Glen Schlueter Stormwater Engineering City of Fort Collins 281 North College Avenue Fort Collins, CO 80524 RE: Low Impact Development Letter Rigden Farm Filing Six, Tract Z — Multifamily Dear Mr. Schlueter: September 24, 2014 Per the City of Fort Collins Ordinance #152: (1) No less than fifty percent (50%) of any newly added impervious area must be treated using one or a combination of LID techniques; and (2) no less than twenty five percent (25%) of any newly added pavement areas must be treated using permeable pavement technology that is considered an LID technique. Based upon the ordinance and the newly added impervious area of 75,596 square feet within Rigden Farm Filing Six Tract Z, a total of 37,798 square feet must be treated by LID techniques. With the newly added pavement area of 33,669 square feet, a total of 8,417 square feet of pavement area must be treated with permeable pavement technology. This will be accomplished by the following: A rain garden will be implemented on the northern side of the site to treat runoff from Drainage Basin Al which includes 33,976 square feet of impervious surfaces. Additionally, permeable pavement will be implemented on the southern side of the site to treat runoff from Drainage Basin A2, a total of 18,967 square feet of impervious surfaces. Therefore, the total area of impervious surfaces treated by LID techniques totals 52,943 square feet, exceeding the required treatment area of 37,798. Please see the attached calculations and supporting material. 2. Of the 18,967 square feet of impervious surfaces treated by permeable pavement within drainage basin A2, 11,160 square feet consist of pavement. The total area of pavement treated by permeable pavement is 11,160 square feet, exceeding the required treatment area of 8,417 square feet. The excess treatment area was a result of the design requirements of permeable pavement. Please see the attached calculations and supporting material. If you have any questions or need additional information, please contact me. Sincerely, Olsson Associates Daniel Hull, PE Senior Project Engines Enclosures 5285 McWhinney Blvd., Suite Loveland, CO 80538 www.oissonassociates.com IN Project: Tract Z Multi -Family Project Number: 13-2449 Proposed Design Basin Area (SF) AREA (AC) landscape Paved Roof Percent Impervious Al 42,151 0.97 9,583 19,166 14,810 77% A2 20,828 0.48 1,861 11,160 7,807 87% A3 32,705 0.75 22,938 1,763 8,004 27% A4 17,156 0.39 10,122 464 6,570 37% A5 15,831 0.36 9,979 1,116 4,736 34% Total 1 128,6711 2.95 I 54,483 1 33,669 1 41,927 1 55.5% 6/12/2014 Olsson Associates Copyright 2014 Area -Weighting for Runoff Coefficient Calculation Project Title: Catchment ID: Illustration y. too Instructions: For each catchment subarea, enter vaiues for A anc C Subarea Area Runoff 000ii Product ID acres Coeff. A C* CA input input input output Pavement 0.43 100.00 43.00 Roof 0.36 90.00 32.40 Landsca a 0.18 0.00 0.00 Porous 40.00 0.00 Sum: 0.97 Sum:J 75.40 Area -Weighted Runoff Coefficient (sum CA/sum A) = 77.73 'See sheet "Design Info" for inperviousness-based runoff coefficient values. 132449_Runoff Calm Weighted C 1212 -, 4 3 24 PM CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Project Title: Rigden Farm Filing Six. Tract Z MF Catchment ID: Al I. Catchment Hydrologic Data Catchment ID = Al Area = 0.97 Acres Percent Imperviousness = 75.40 % NRCS Sal Type = B A. 8, C, or D 11. Rainfall Information I (inch/hr) = C1 ' P1 /(C2 + Td)AC3 Design Storm Return Penod, Tr = 2 years (input return period for design storm) C1 = 28.50 (input the value of Cl) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P 1= 0.85 inches (input one-nr precipitation —see Sheet "Design Info") 111. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.51 Overide Runoff Coefficient, C = (enter an ovende C value :f desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0.54 Overide 5-yr. Runoff Coefficiert, C = Reaclk 3 (enter an everide C-5 value if desired, or leave blank to accept calculated C-5 1 Reack 2 Illustration f v w-erLad Beach I now Flaw Directiurt catchment BouruLry NRCS Land Type i Heav; Meadow diage/ i Field i Shor Pasture/ I Lawns Neany Bare Grcurd gassed Swales/ Waterwa ?aved Areas & Shallow Paved Swalas (Sleet Flow; Conveyance 2 5 E5 7 10 15 20 Calculations. Raach tD Overland Slope S ft/ft input Length L It Input 5-yr Runoff Coeff C-5 output NRCS Convey- ante input Flow Velocity V fps output Flow Time Tf minutes output 0,0100 25 0.54 N/A 0.08 5.02 1 2 3 4 5 1 0.0100 Sum 359 384 20.00 2.00 Computed Tc = Regional Tc = User -Entered Tc =, 2.99 8.01 12.13 801 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 2.51 inch/hr Rainfall Intensity at Regional Tc, I = 2 13 inch/hr Rainfall Intensity at User -Defined Tc, I = 251 inch/hr Peak Flowrate, Op = 1.24 cfs Peak Flowrate, Qp = 1.06 cfs Peak Flowrate. Qp = 1 24 cis 132449 Runoff Caics, Tc and PeakQ 6/12/2014, 3:25 PM Design Procedure Form: Rain Garden (RG) Designer: Company. Date: Project: Location: ssz OLSSON ASSOCIATES October 1, 2014 RIGDEN FARM TRACT Z FORT COLLINS. CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area. I, (100% if all paved and roofed areas upstream of rain garden) 8) Tributary Area's Imperviousness Ratio (i = I.110C) C; Water Qualify Capture Volume (WQCV) for a 12-hour Drain Time (WQCV= 0.8' (0.91a i'- 1.19' ?+ 0.78' i) 0) Contributing Watershed Area (including rain garder area) E) Water Quality Capture Volume (WQCV) Design Voiume Vol = (WQCV ! 12)' Area F) For Watersheds Outside of the Denver Region, Depth of Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, Water Qcality Capture Volume (WQCV) Design Volume H) User Irput of Water Quality Capture Volume (WQCV) Design Volume (Only If a differer! WQCV Design Volume is desired) Basin Geometry A) WQCV Depth (12-Inch maximum' B) Rain Garden Side Slopes (Z = 4 min., horiz disc per unit vertical) (Use "0" i( rain garden has vertical walls) C) Mimimum Flat Surface Area D) Actual Flat Surface Area E) Area at Design Depth (Top Surface Area) i Rain Garden Total Volume (V? ((ATm + AAe ) / 2) ' Depth) 3 Growing Media 4 Underdrain System A) Are underdra:ns provided? B) Underdrair system orifice diameter for 12 hour drain time I. = 78.0 = 0.780 WQCV = 0.25 watershed inches Area = 42.051 sq 4t VWQcv = cu r! de = 0.43 in Vwocv OTHER = 886 6 cu It Vwccv usrR 2 to It avocv = 6 in Z= 4.D0 h/ft AM„ = 591 sq ft A °,,,,, = 1710 sq it AT. = 2165 sq it VT= 969 cu 1t �00 18" Rain Garden Growing Media Q Other (Explain): Choose One rG YES 0 NO i) Distance From Lowest EievatK n of the Storage y= 2,0 h Volume to the Center of the Orifice li) Volume to Drain in 12 Hours iii) Orifice Diameter. 3/8' Minimum Vol,?= 887 cult Dc = 0.69 ir Shoat 1 of 2 Rain Garden.xlsm RG 10/1/2014112:07 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Desigrer- SSZ Company: OLSSON ASSOCIATES Date: October 1, 2014 Project: RIGOEN FARM TRACT Z Location: FORT COLLINS, CO Choose One S Imoermeable Geomembrane Liner and Geotextile Separator Fabric r QYB A) Is an impermeable liner provided due to proximity Q No of structures or groundwater contamination? Choose Cne 6. Inlet / Outlet Control Sheet Flow- No Energy Dissipation RequiredA) Inlet Control r(� Concentrated Flow- Energy Dissipation Provided Chon� One 7 Vegetation QQ Seed (Plan for frequent weed controll Q Plantings Q Send Gram or Other Nigh Infiltration Soc Choose One 9 Irrigation G fcc NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garder be irrigated? Notss: --- — NG Rair GardenAsm. RG 10/1/2014, 12:07 PM Design Procedure Form: Permeable Pavement Systems (PPS) Designer: ss2 Company: Olson Associates Date: June 12. 2014 Project: Rlgden Farm Filing six, Tract 2 MF Location: Fort Collins, Colorado 1 Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the and use and activities, proximity to adjacent structures and soil characteristics I B) what type of wearing r-ourse7 2 Required stcrage Vuume A; Effective Imperviousness of Area Tributary to Permeable Pavement. I, B) Tributary Area's Imperviousness Ratio (I = 111/ 100) C) Tributary Watershed Area (irclading area of permeable pavement system) D) Area of Permeable Pavement System (Minimum recommended permeable pavement area = 6314 sq h', E; Impervious Tributary Ratio (Contributing irrpervwos Aroa / Permeable Pavement Ratio) F) Water Quality Capture 'Volume (WOCV) Based on 12-hour Dram Time (WOCV•M8'(091'ion-119'iv.0.78'i)/12)'Area) G) Is flood control volume being added' 3. Depth of Reservoir A) Minimum Depth of Reservoir (Minimum recommended depth Is 6 inches) B) Is the slope of the reservorrisubgrade interface equal io 0%7 C) Porosity (Porous Gravel Pavement < C 3, Others < 0 40) D) Shupe o' the Base Course/Subgrade Interlace E) Length 9etwe-en Lateral Flow Barriers (max = 18 79 C I F) voume Provided Based on Depth of Base Course Fiat or Stepped V = P' ((Dm..rY12)' Area Sloped V = P ' I(Om,,,. (Don„- 6'SL-1)) / 12)' Area 4 Lateral Flow Barriers A) Type of �Ieral Flow Barriers B) Number of Perrteable Pavement Cells 5 Penmaler Berner A, Is a perimeter barter p"ovldeo on all sides of the pavement system? (Recommeded for PICP, concrete gnd pavement or for any no.,nfltration se0cir, ) O No InhRraeon Q Partial Infiltration Section Q Full infiltration Seam Choose One. O PIC➢ Q Concrete rid Pavement 0 Pervious Concrete O Parma Gravel = 870 = 0 870 A; �. = 2C.828 sq ft Air:: = 6,967 sq fl Rt s 1 7 WOCV = 524 cu It Choose One O YES p No Dm,,, = 6.0 inches Goose One Q YES- Rat or Stepped Installation Q NO Sloped installation P = 040 S= OV20 E/ft L a 18.8 ff V = 639 cu 8 Volume assumes uniform slope 6 lateral flow barer spacing. Goose Dre O Concrete walls Q PVC geomembrane installed normal ;o crow O N/A Flat instaliatlan Q Other (Describe) Cells = 10 Chwa One rp YES m NO Sheet 1 of 2 Design Procedure Form: Permeable Pavement Systems (PPS) Designer. Company: Date: Project: Location: SSZ June 12, 2014 Rlgdan Farm Filing Six, Tract Z Fort Collins, Colorado Pr1W, 6 Fitter Material and Urderdram System Choose Ork A) Is the underdram placed below a 6-inch thick layer of COOT Class C fitter matenal7 ®yam C NO O NIA choose one B) Diameter of Slotted Pipe (slat dimensions per Table PPs-2) — ® 4inct O 61nU C) Distance from the Lowest Elevation of the Storage Volume y a 0.7 it (i.e the bottom of the base course to the certar of d.e orKce) choose One �o Ly Choose Dne Q Placed above the Bner O p aoad above and below the km 6 Outlet (Assumes each call !as similar area. subgrade s:ope. and length between lateral barriers ;unless subgrade is flat) Calculate cells individually where leis varies ) A) Depth of WOCV in the Reservoir Gwmv = 450 :riches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain 'ime Do,r,=, • 066 inches (Use a minimum crifice diameter of 3/8-inches) Notes, / i�48 18 LF OF 8' HOPE OUTLET STRUCTURE SEE DETAIL I4887.6 4887.6 4886.7 INSTALL 87 LF OF 4' SLOTTED PIPE 3.0' TOP OF RAIN GARDEN _ ELEV: 4887.6 BOTTOM OF RAIN GARDEN ELEV: 4886.75 INSTALL 90' SWEEP BEND TO SURFACE CLEAN OUT WITH WATER TIGHT CAP. m• I 7 \ N Z� ¢ ou cn O I A N J Q O 4887.606 4887.60� 4887.40\� �4887.60 \ 010` 20' 40' . • 4886.75 - \ SCALE IN FEET 18.5' OVERFLOW PATH RAIN GARDEN NOTES •' ELEV:4887.40 •' •' •' •' •' • 1. CLASS C FILTER MATERIAL SHALL BE GRADED AS FOLLOWS: 100% • • . • . • . • PASSING N4•. 60-100% PASSING NO. 4, 10-30% PASSING NO. 50, 0-10% • PASSING NO. 100, 0-3% PASSING NO. 200 • 2. UNDERDRAIN SHALL BE 4' SLOTTED HOPE PIPE: SLOTS SHALL BE 1—X6 • • • • • • • LONG BY 0.032' WIDE, SLOT CENTERS AT 0.413•. 1.90 SQUARE INCHES OF OPEN AREA PER LINEAR FOOT. • 3. SEPARATOR FABRIC SHALL HAVE A GRAB STRENGTH OF 180 LBS (ASTM D 4632), A PUNCTURE AND TEAR RESISTANCE OF 70 LBS (ASTM D 4833 h 4887.60 4533), A PERMITTIVITY OF 0.02/SEC (ASTM D 4491), AND AN ULTRAVIOLET DEGRADATION OF LESS THAN 50% AT 500 HOURS (ASTM D • • 4$$6.75 4355).4. 18' GROWTH MEDIA LAYER SHALL CONSIST OF: 4.1. 7.5% CLASS 1 STA REGISTERED COMPOST (APPROXIMATE BULK • DENSITY OF 1000 LBS/CY) • • • 4.2. 7.5% LOOSELY PACKED SHREDDED PAPER (APPROXIMATE BULK DENSITY 50 TO 100 LBS/CY) • • • 4.3. 55% COARSE SAND (EITHER CLASS C FILTER MATERIAL (PER COOT) OR ASTM C-33 SAND) 1 .. • • �'� 5. THE FILTER AREA SHALL BE SEEDED WITH NATIVE SEED MIX (NOT • SODDED). z „• \'� 6. 6' FILTER MATERIAL LAYER SHALL CONSIST OF COOT CLASS C FILTER g Q . . • • • 4886.75 MATERIAL > (L �• � w� J I] \' co fr ¢ W �.LU Z \ LL� v 0 N FIGURE 1 m_ N x w s o m m �n C r O� 0 co W r Ou �N) O (n v I N m J"< m O z a a ; in II a c II- z o Ln N ►- v �> Q mw w o wz(D p-ga Z W 0�^ QL0.op W �Z 3W� � Crw� O\' w F O a oo Z J (n Lrn) F- ao LO w Q N J _ S L.&,wa F- 00 ro io a Lki O w > I I o aw \ LLJ m w II- ra m �� w O < � 0 C) II a ��D M w O[2g = O Om II Q awp ct i O < � m w 0 ^ _j I�� I m a a J a z0 II mow a I I a z=� 0 I- oh- o Ix k, a J \ CONCTNIRATCO NnOW HEADWALL OR HAIRED END SECDON yl w 0 ME VE OR l RIPRM Z F Q GEOTE[OlE SEPARATOR EADRK O U y,0 � ^ •i N INPEINIOUS %� --,A - f V I vl AEA RNN GARDEN GROWING YEUM Q .- .. COOT CLASS C FILTER O MATERIAL (FOR UNO(RLIRAR) lJ � FILTER AREA (FLAT) NTS AODTIRYLAL DVOLUME (OPFgNAL) WOCV WISE INLCI1N DRAI[D INICT m I VEGETATED FILTER AREA ELM tits ADr1ED CURB ORIFICE PULE TO DRAM W OVER 12 NODRS _ Figure B-1 wMm STOP — Typical Rain Garden Plan and Sections RNN GARDEN GROWING MECLA WOGV WSE - WATER TIGHT CAP ON SOLID CIFAN OUr SOLID1' GLEAN OU7, 9O SWEEP km x.-6. ADDITIONAL CIMNr10H ORRICE (OPFIONAL) A' SLOTTED PIPE PER TABLE 0-0, SLOPE TO OLITLO N75 OR( OR x) 45' KENOS n2i22 N V g � f0 (MAX) = 10' (am) J H Q SEPARATOR FABRIC - W J WHEN SUOGRADE IS of NOT COYPATIOIE WITH — SLOTTED PIPE ~ n1-TER MATEIM MEETING TARIE 8-7 iZ Z cLJ _LUM&1*0__ FILTER ANTCRNL MEETING CK TABLE B-x Mrs C o RAIN OWEN GROWING MEOIA 'O Jk Q O WOCV WISE WATER TIGNi CAP ON 0_ TT• SOLID CLEAN' OUT QI SLDPE (S7RNGHF GRADE) SIRIGRADE (x-1OS) TO UNDERORNN TO REDUCE H LU SATURATED SOIL CONDRiONS BETWCEN STORY FVEMS (OPTIONAL) H l�IL, 1 SOLID A' GLEAN OUT. BO SWEEP Z A - OR (2) 45' BENDS W i of i-SEnON _9 rrN 0 of Z NS m Z J Q O Cy C F SEPARATOR FABRIC WHEN SUBGRADE 15 NOT COMPATIBLE WITH SLOTTED PIPE FILTER µATERIAL MELTING TABLE 0-7 FILTER MATERIAL MEEMC TABLE B-x N< B EMiBii ) 2 TYP 3 TYP CELL 1 CELL 2 1 TYP CELL 3 CELL 4 CELL 5 \ CELL 6 BUILDING #3 5-PLEX CELL 7 CELL 8 BUILDING #7 8-PLEX t / OCONSTRUCT 4' SLOTTED HDPE UNDERDRAIN AND LATERAL FLOW BARRIER, SEE PERMEABLE PAVEMENT SECTION C—C. CONSTRUCT STORMWATER VAULT, SEE PERMEABLE PAVEMENT DETAIL THIS SHEET. CONSTRUCT 40 HDPE PIPE (NON —SLOTTED). CELL 9 PERMEABLE BUILDING #4 0' 10' 20` 40' SCALE IN FEET PAVEMENT NOTES CLASS C FILTER MATERIAL SHALL BE GRADED AS FOLLOWS: 100% PASSING �4 , 60-100% PASSING NO. 4, 10-30% PASSING NO. 50, 0-10% PASSING NO. 100, 0-3% PASSING NO. 200 2. UNDERDRAIN SHALL BE 4' SLOTTED HDPE PIPE: SLOTS SHALL BE 1—Xe LONG BY 0.032" WADE, SLOT CENTERS AT 0.413". 1.90 SQUARE INCHES OF OPEN AREA PER LINEAR FOOT. �-P� E/` / 3. SEPARATOR FABRIC SHALL HAVE A GRAB STRENGTH OF 180 LBS (ASTM D 4632), A PUNCTURE AND TEAR RESISTANCE OF 70 LBS (ASTM D 4833 h 4533). A PERMITTIVITY OF 0.02/SEC (ASTM D 4491), AND AN ULTRAVIOLET DEGRADATION OF LESS THAN 50% AT 500 HOURS (ASTM D 4355). 4. CONTRACTOR SHALL INSTALL LATERAL FLOW BARRIERS OF IMPERMEABLE GEOMEMBRANE PERPENDICULAR TO THE DOWN GRADIENT FLOW AT A SPACING OF 40 FEET. GEOMEMBRANE SHALL BE 30 MIL THICKNESS (t5% ASTM D 1593), WITH A TENSILE STRENGTH OF 70 LBS/IN (ASTM D 882, METHOD B). THE LATERAL FLOW BARRIERS SHALL BE ORIENTED VERTICALLY, AND SHALL EXTEND FROM THE TOP OF THE BASE COURSE DOWN TO 6" BENEATH THE FILTER MATERIAL LAYER. PLEASE NOTE THAT THE BARRIER SHOULD RUN PERPENDICULAR TO THE UNDERDRAIN, AND ~ NOT PREVENT DRAINAGE TO THE UNDERDRAIN. LL ZZ J 5. STORMWATER VAULT ORIFICE DIAMETER WALL BE 34 . w a Z 6. EXCAVATION OF SUBGRADE SHALL NOT COMMENCE UNTIL AFTER THE d Q PRE -CONSTRUCTION MEETING. L o m� C 7. SUBGRADE SHALL BE EXCAVATED USING LOW GROUND PRESSURE (LGP) w wo TRACK EOUIPMENT TO MINIMIZE OVER COMPACTION OF THE SUBGRADE.* f Z m Z) 8. GRADING AND COMPACTION EQUIPMENT USED IN THE AREA OF THE a PERMEABLE PAVEMENT SHOULD BE APPROVED BY THE ENGINEER PRIOR CELL 10 TO USE. 9. LOOSE MATERIAL SHALL NOT BE STORED ON THE PERMEABLE PAVEMENT AREA. 10. THE CONTRACTOR SHALL, AT ALL TIMES DURING AND AFTER SYSTEM / INSTALLATION, PREVENT SEDIMENT, DEBRIS, AND DIRT FROM ANY SOURCE FROM ENTERING THE PERMEABLE PAVEMENT SYSTEM. 11. PLACEMENT OF THE WEARING COURSE SHALL BE PERFORMED ALB FINE GRADING AND LANDSCAPING IN ADJACENT AREAS IS COMPLETE. IF THE WEARING COURSE BECOMES CLOGGED DUE TO CONSTRUCTION ACTIVITIES, CLEAN THE SURFACE WITH A VACUUM MACHINE TO RESTORE THE INFILTRATION RATE AFTER CONSTRUCTION IS COMPLETE. FIGURE *FOR PARTIAL AND FULL INFILTRATION SECTIONS ONLY. 1 0 0 U) z O U O LL No Text r_ z w 2 w Q CL �{ z a , o k- w L-may � Z 5w L w LU J m w u/i 1..1.E Z Fe oK Ir W C z z O Z w 2 w Lij .J m w 2 Of ^w Ch v 4 s CCU Wn mti r 0 U yc G P � 31W _A NN _1-