Loading...
HomeMy WebLinkAboutDrainage Reports - 02/25/2015L City : r Ft. C lins Approve ns Approved By Date %-s/zo Is - ENGINEERING Final Drainage and Erosion Control Report for PVHS Harmony Campus Emergency Department Fifth Filing Fort Collins, Colorado January 9, 2015 January 9, 2015 Mr. Glen Schleuter City of Fort Collins Storm Water Dept. 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for PVHS Harmony Campus, Emergency Department Fifth Filing Dear Glen: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Report for the PVHS Harmony Campus, Emergency Department Fifth Filing. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, Aspen Engineering Prepared by: D7+ Tony`'Willkomm, P.E. Senior Project Engineer tm/'cF Reviewed by: 43251VA John Gooch, P.E. Principal TABLE OF CONTENTS PAGE I. GENERAL LOCATION AND DESCRIPTION 5 A. LOCATION 5 B. DESCRIPTION OF PROPERTY 5 II. DRAINAGE BASINS 6 A. MAJOR BASIN DESCRIPTION 6 B. EXISTING SUB -BASIN DESCRIPTION 6 III. DRAINAGE DESIGN CRITERIA 7 A. REGULATIONS 7 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 7 C. HYDROLOGIC CRITERIA 7 D. HYDRAULIC CRITERIA 8 E. VARIANCE 8 IV. DRAINAGE FACILITY DESIGN 8 A. GENERAL CONCEPT 8 B. SPECIFIC DETAILS 9 C. DETENTION PONDS 11 D. STREET CAPACITIES 12 V. STORM WATER QUALITY 12 A. GENERAL CONCEPT 12 B. SPECIFIC DETAILS 12 VI. EROSION CONTROL 13 A. GENERAL CONCEPT 13 VII. CONCLUSIONS 13 A. COMPLIANCE WITH STANDARDS 13 B. DRAINAGE CONCEPT 14 C. STORM WATER QUALITY 14 D. EROSION CONTROL CONCEPT 14 E. EROSION CONTROL ESCROW ESTIMATE 15 REFERENCES 15 APPENDIX PAGE VICINITY MAP A RATIONAL METHOD HYDROLOGY B LID BASIN SIZING CALCULATIONS C CURB CUT, INLET, & SWALE SIZING D EROSION CONTROL & RIPRAP SIZING ; EROSION ESCROW E PROPOSED DRAINAGE EXHIBIT & EXISING BASIN EXHIBIT F FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE PVHS HARMONY CAMPUS, EMERGENCY DEPARTMENT FIFTH FILING FORT COLLINS, COLORADO I. GENERAL LOCATION AND DESCRIPTION A. Location The PVHS Harmony Campus, Emergency Department Fifth Filing (referred to as "Emergency Department" here -forward) is bounded to the north by Harmony Road, to the east by Wildwood Farms (Mountain Crest), to the south by a private drive, and to the west by Snow Mesa Drive within the PVHS Harmony Campus. The project site can also be described as situated in the northwest quarter of Section 5, Township 6 North, Range 68 West of the 6`h P.M., of the City of Fort Collins, Larimer County, Colorado. The Emergency Department building site is comprised of approximately 3.549 acres. The drainage analysis includes 3.17 acres of the onsite area and 1.37 acres of offsite area for a total area of 4.54 acres which matches the existing drainage basin 105 area established with the PVH Master Infrastructure Plan. The balance of the onsite area 0.379 acres is within existing drainage basin 106 and will continue to drain north then east as occurs historically. Please refer to the vicinity map in Appendix A for the site location. B. Description of Property The site is comprised of an approximate 18,024 +/-square foot building footprint along with associated parking lot, emergency entrance, drive -up entrance, private drive improvements and utility improvements. Previously, the Emergency Department building site was fallow agricultural land. Enhanced landscaping is established within the northwest corner of the lot and along the Snow Mesa Drive frontage. Existing landscaping and site features include sod grass, trees, shrubs, and short retaining walls. Along the north side of the property, an existing concrete -lined open -channel, irrigation ditch flows east along the south frontage of Harmony Road. An existing concrete sidewalk is also constructed adjacent to the south side of Harmony Road, and is contained within the property. An existing 30" water main an electrical duct bank also exist along the south side of Harmony Road and are contained within existing easements, which parallel Harmony Road. An existing concrete sidewalk is also constructed within the right-of-way and along the east side of Snow Mesa Drive (along the site's west property boundary). To the south, a private drive, constructed of concrete curb and gutter and asphalt pavement, drains to the east and provides access to the property to the south. Site drainage flows generally to the north and east. An existing open ditch, which flows east through the center of the proposed site intercepts runoff from the south half of the site and directs flow east to an existing swale, which then flows south to an existing detention pond located in the southeast corner of the PVHS Harmony Campus property. The existing pond was constructed with the PVHS Second Filing and provides (and will provide) water quality and detention needs for the existing conditions of undeveloped lots today, as well as the future full -build -out ofthe entire PVHS Harmony Campus, in the future. Please refer to the PVHS Second Filing Drainage report for details. The majority of existing topography of the Emergency Department building site generally slopes from the west to east/ northeast at approximately 0.50% to 2%. II. DRAINAGE BASINS A. Maior Basin Description The site lies within the McClellands Drainage Basin, with site drainage previously accounted for in the PVHS Harmony Campus Master Plan drainage study. The approved grading and drainage master plan and SWMM Model for the PVHS Campus (PVHS Second Filing) provided for the runoff from the entire PVHS Campus being ultimately routed to the southeast corner ofthe PVHS Campus to the existing detention/water quality pond, constructed with the PVHS Second Filing project. The proposed Emergency Department building site meets the intent of the "Final Drainage and Erosion Control Study for the PVHS Harmony Campus", by the Sear - Brown Group, dated March, 1999, and the "Final Drainage and Erosion Control Study for the PVHS Master Infrastructure Plan", by Stantec, dated April 14, 2004. The proposed improvements appear to have little effect on the existing drainage system and facilities, and meet the intent of approved plans and drainage reports for the PVHS Harmony Campus, with the site imperviousness being 65% versus the allowable 80% from the SWMM Model. B. Existing Sub -Basin Description The existing Emergency Department building site is contained within existing sub - basin 105 and basin 106 of the PVHS Second Filing. Existing basin 105 contains approximately 4.54 acres (3.17 acres of the offite area and 1.37 acres of offsite area). Drainage basin 105 was modeled with the entire 4.54 acres having a percent 0 imperviousness of 80% for the developed condition of the basin with all flow from the basin being allowed to flow un-detained to the existing detention pond 593 (from PVHS Second Filing), where all required water quality and detention needs are provided for PVHS Harmony Campus site. Because the Emergency Department building site has a combined imperviousness ratio of 65%, the 100-year developed runoff from the site will be conveyed directly to existing pond 593, in accordance with the drainage masterplan. The balance of the onsite area, being 0.379 acres on the north edge of the site, is within existing Basin 106 and will not be disturbed. This area will continue to drain north into the existing irrigation ditch, then east as occurs historically. Existing Basin 105 flow (which overlaps the majority of the proposed development) is conveyed in an existing drainage channel to the south and into the existing detention pond (Pond 593). No offsite areas contribute overland flow to or through the Emergency Department building project site. Please refer to Appendix F of this report for the existing and proposed drainage basin exhibits for the subject site. HI. DRAINAGE DESIGN CRITERIA A. Regulations Since the subject site has been previously modeled, the site is allowed to release un- detained to existing detention pond 593, which has been sized to provide water quality and detention for the developed 100-year runoff from the subject site. However, LID improvements are required and have been provided for the project. Please see the LID calculations in Appendix C, as well as the LID Table on sheet C- 006, which provides impervious area calculations for LID and porous paver treatments. B. Development Criteria Reference and Constraints The criteria and constraints from the City of Fort Collins will be met. The calculated 65% impervious ratio for the proposed development is less than the allowed 80% impervious ratio, from the PVHS Masterplan. The attenuated release in the existing detention pond will remain in -tact and will not be altered. C. Hydrologic Criteria The Rational Method for determining surface runoff was used for the project site. The 2-year and 100-year storm event intensities were used in calculating runoff values. 7 • Q E. The City of Fort Collins intensity duration frequency curves were used to obtain rainfall data for each storm specified. Detention pond sizing is not required, as detention and water quality are provided for the subject site in the existing detention pond (Pond 593).from the previous infrastructure improvements ofthe PVHS Master Infrastructure Plan. However, BMP's and LID measures are being incorporated into the proposed drainage development plan, with specific details and calculations shown in Appendices C and F of this report. Hydraulic Criteria All hydraulic calculations, including final calculations and sizing for curb cuts, drainage channels, swales, and erosion control and provided in accordance with the City of Fort Collins found in the Appendix. Variance riprap measures have been Drainage Criteria and can be A variance is being requested for the provided 10,027 sf of porous paver area vs. the required 12,933 sf for this project, as the site greatly exceeds the water quality normally required for development through the utilization of porous pavers with sub - drain systems, the provided LID Porous Landscape Detention basin (both required per City requirements), and in addition to the existing water quality and detention already provided for the 65% impervious site, which per the Masterplan SWMM model is allowed to be 80% impervious and release un-detained to the regional pond in the southeast corner of the PVH Harmony Campus. IV. DRAINAGE FACILITY DESIGN A. General Concept Nine drainage basins will provide conveyance of drainage for the 3.17 acres of the 3.549 acre site. The drainage will be routed to the existing detention pond via swales, curb and gutter, and storm sewer pipe upstream of the proposed pre- sedimentation/LID basin. The remaining 0.379 acres will continue to drain north into the existing irrigation ditch, then east, as historically occurs. Existing detention Pond 593 provides storage for the combination of detention and water quality and was been sized to receive the 100-year developed flow from the Emergency Department building site (developed imperviousness ratio of 65%), with an allotted overall imperviousness ratio of 80% (from the PVHS Master Ll Infrastructure Plan). The calculated composite'C' value for Emergency Department building is 0.65. Please refer to the rational calculations in Appendix B, and the Drainage Basin Exhibit and PVHS Campus Master Infrastructure Plan, Drainage Exhibit in Appendix F for additional information. LID measures are provided for through the conveyance of approximately 89% (2.82 acres of the 3.17 acre site boundary) of the proposed building, parking lot, and green areas of the site being routed through the porous paver areas and LID basin. Because the area being routed to and through the porous pavers and LID basin exceeds the 50% requirement for LID treatment, and because water quality is already provided for in the existing detention pond, the project exceeds that normally required for water quality and LID treatment. Please refer to Appendix C for LID calculations, as well as sheet C-006, which provides an additional LID table, as required by the City of Fort Collins Stormwater Department. The LID basin, shown and called out in the plans, provides approximately 2,000 ft3 of storage volume with a maximum of 1' of ponding depth, prior to the basin overflowing and spilling south and into the existing drainage swale and ultimately entering the existing detention pond. It's important to note that 1.47 acres of the site runoff will filter through a 2' wide soft pan before entering the LID basin. Additionally, approximately 0.52 acres will drain to porous pavers and drain through the underlying porous paver media enhancing water quality. The LID basin will contain a 24" Nyloplast Standard H-20 grate with perforated riser to enhance infiltration, prior to flow overtopping the basin and entering the drainage swale and existing detention pond. Please refer to Appendix C and sheets C-008 and C-010 of the civil utility plans for details on the porous paver areas and LID basin. B. Specific Details Basin 1 Basin 1 conveys runoff from a small portion of the roof overhang and the parking lot southeast across the parking lot and porous paver areas towards design point 1, where a 5' curb cut conveys runoff into a drainage swale in basin 3. Underdrains will be installed within the porous paver areas and will discharge runoff east under the east access drive and into the subgrade of the LID basin media, as required by the City, and due to grading constraints for the site. Basin 2 Basin 2 conveys runoff from a small portion of the roof overhang and parking lot overland to the southeast and across the parking lot and porous paver areas towards design point 2, where a 6' curb cut conveys runoff through a riprap channel and 6' sidewalk culvert and into a grass -lined swale in basin 3. The upper portion of basin 2 (approximately half the basin area) will overland flow to a 3' curb cut and pass through a 3' sidewalk culvert and concrete chase before reaching design point 2. E n u Underdrains will be installed within the porous paver areas and will discharge runoff east and into the subgrade of the LID basin media, as required by the City, and due to grading constraints for the site. Basin 3 Basin 3 consists primarily grass/landscaped areas, located in the southeast quadrant of the site. Runoff from basin 3 combines with that from basins 1-2 and is conveyed east in a grass -lined drainage swale to design point 3. Combined runoff from basins 1-3 enters 2- 12" RCP storm pipes and is discharged under the east drive access and in to the LID basin, located within basin 8. It's important to note that during major storm events, calculations show that the swale within basin 3 may pond to an elevation of approximately 4959, in which runoff could potentially spill south out of the swale and onto the private drive, due to grading constraints and capacity of the culverts at design point 3 (please refer to culver calculations) . Should runoff spill south out of basin 3, the runoff will flow east down the private drive, then northeast and into the LID basin. Basin 4 Basins 4 conveys runoff from the north half of the private drive and drains east in existing and proposed curb and gutter which discharges to a riprap pad, before draining northeast and into the LID basin in basin 8. Basin 5 Basins 5 conveys runoff from the building roof to roof drains with lambs tongues, which discharge runoff north and onto riprap pads, prior to flows being directed east in the proposed swale. Runoff from basin 5 combines with that from basin 8 in the proposed swale along the north side of the building and is ultimately conveyed south and into the LID basin, located within basin 8. Four roof drains will be located within basin 5 (north side of building) and will contain overflow scuppers, in the event of clogging or an overflow situation. Basins 6- 7 Basins 6 and 7 convey runoff from the eastern side of the parking lot overland to the east across the parking lot and through porous pavers to design points 6 and 7, where 3' curb cuts, in each basin, convey runoff into the soft pan in basin 8. Flow is then conveyed south and into the LID/PLD (porous landscape detention) basin. Basin 8 Basin 8 conveys runoff from the landscaped area north of the building and east of the parking lot to the LID Basin. A drainage swale conveys runofffrom basins 5 and 8 to the east, along the north side of the building, with flows then directed south over/through the soft pan swale. Runoff from basins 6 and 7 also combines in the soft pan swale, before entering the LID basin. The proposed soft pan Swale will consist of a 50/50 mix of sand and topsoil and will be 2' wide x 1' deep. 10 n The runoff from basins 1-8 combines in the LID Basin and is directed to a proposed 24" perforated HDPE drain basin riser with 24" Nyloplast Standard H-20 grate. The LID basin is designed to provide a ponding depth of approximately 1.00' and allow pollutants and sediment to settle out of the runoff, prior to spilling southeast into the offsite drainage channel and into existing Pond 593, while promoting infiltration, as required by the City of Fort Collins. The nyloplast riser will serve as a dry -well and allow monitoring of the infiltration ability of the LID basin. Should the LID basin fill up during large storm events, a 2' concrete chase with metal sidewalk culvert, located near the east end of the south sidewalk, will allow for overflow from the LID basin and into the existing swale system southeast of the site. Basin 9 Basin 9 conveys runoff from the narrow, landscaped area along the west side of the building and parking lot. Runoff will overland flow west to Snow Mesa Drive and enter the existing curb and gutter. It is not possible to drain this area into the lot due to grading constraints of the site. The basin area disturbance will be limited to grading near the lot and building as it is currently landscaped with sod trees and small walls. Runoff will drain to the street inlet in Snow Mesa Drive and discharge to the existing Pond 593 via storm sewer. The 100-year flow from basin 9 is 1.24 cfs, which is considered negligible and will have little to no affect on the capacity of the existing 10' Type R Inlet. Please refer to the PVHS Second Filing drainage report for existing inlet and street capacities along Snow Mesa Drive. OS1 Offsite Basin OS 1 contains 1.37 acres, and is the remaining balance of the basin area from existing basin 105, from the PVHS Drainage Masterplan. Runoff from west side of Basin OS 1 will flow east along the south side of the private drive and into the existing swale, directly east of the private drive. Runoff from the east side and majority portion of OS 1, will be conveyed overland to the east/ southeast through the existing grass and into existing swale, which conveys runoff south and into existing Pond 593. Area to North of Existing Basin 105 The runoff from the area north of existing basin 105 (also a portion of proposed basin 8) will continue to follow its historic drainage pattern/flow to the north/northeast and into the existing irrigation ditch. No improvements will be provided in this area and historic drainage patterns will not be altered in this area. C. Detention Ponds No detention pond(s) are required for the subject site, as detention and water quality are provided for in the existing detention pond (Pond 593), which was constructed with the PVHS Harmony Campus Infrastructure. D. Street Capacities The street capacity calculations are not required for the subject site, as no new public street construction will be built with this project. However, curb cut capacities have been analyzed and calculations provided in Appendix D of this report. V. STORM WATER QUALITY A. General Concept The water quality of stormwater runoff must be addressed on all final design utility plans. Therefore, Best Management Practices for the treatment of stormwater runoff for the subject site will include grass -lined swales with a soft pan, porous pavers, LID pre -sedimentation basin, and the utilization of the existing grass -lined detention and water quality pond south of the site. These water quality features will provide a mechanism for pollutants to settle out of the stormwater runoff before flows are directed to the McClellands Drainage Basin. B. Specific Details Best Management Practices (BMP) for the treatment of storm water runoff has been incorporated into the final design for this project. This will include continued utilization of extended detention in the existing, offsite detention pond, in which the grass -lined pond will trap sediment, prior to releasing controlled flows downstream. The existing detention facility has adequate capacity and will continue to provide water quality and detention for the developed condition of the subject site, prior to releasing flows downstream. LID measures are provided for through the conveyance of2.82 acres (ofthe 3.17 acre total) over and through the porous paver areas and into the proposed LID pre - sedimentation basin. The footprint of the LID basin is approximately 2,500 square feet, with a depth of approximately 1.0% and provides approximately 2,000 ft3 of storage volume. It's important to note that with 2.82 acres of the 3.17 acre site area (89% of site area) being conveyed over and through the porous pavers and LID basin, and because water quality is already provided for in the existing detention pond, the project exceeds that normally required for water quality and LID treatment. The LID basin, shown and called out in the civil utility plans, provides for approximately 1.0' of ponding depth, prior to the basin overflowing and spilling south/ southeast and into the stone drainage swales and eventually into the existing 12 .0 _ detention pond. Please refer to Appendices C and F, and sheets C-008 and C-010 of the civil utility plans, for details on the porous paver areas and LID basins. Please also refer to the LID Table on sheet C-006 for impervious area calculations and specific LID calculations, as required by the City of Fort Collins. VI. EROSION CONTROL A. General Concept The subject site lies within the Moderate Rainfall Erodibility Zone and the Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. The potential exists for erosion problems during construction, but should be minimal after completion of proposed development. Silt fence will be installed along the north, east, south, and west sides of the site to prevent sediment from leaving the site. A tracking pad will also be placed at center entrance/exit to the site. Gravel inlet filters will be placed at proposed curb cuts, with straw wattles installed at the proposed pipe and drain inlets and wattle check dams to mitigate the build-up of sediment and transport of debris into existing Pond 593. Riprap and erosion control fabric will also be utilized at concentration points (curb cuts) and sloped areas, as shown in the plans, to minimize erosion and increase soil stabilization. VII. CONCLUSIONS A. Compliance with Standards All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. The City of Fort Collins Storm water Utility will not maintain the on -site storm drainage facilities within the subject site. The owners of the subject site will maintain their on -site storm drainage facilities on a regular basis. The following shall be implemented for the private stormwater improvements' operations/ maintenance procedures for the project on an annual or bi-annual basis: 1) Storm Sewer Inlets, pipes and flared -end -sections, curb cuts and concrete sidewalk culverts/chases, structures, manholes, and the water quality/ outlet control structures shall be cleaned through the removal of debris and sediment from the associated items to allow for adequate drainage through the site to the proposed detention facility 2) Sedimentation/ silting shall be removed to allow for adequate drainage along the bottom of the swales and LID/PLD basin. Grass scrubbing along the 13 L `EXHIBIT B' Standard Operating & Maintenance Procedures for PVH ED Fort Collins, Colorado Prepared By ASPEN ENGINEERING February 19, 2015 A. SITE MAINTENANCE OF PRIVATE STORM INFRASTRUCTURE All proposed storm sewer pipes, inlets, manholes, swales, curb cuts, concrete chases, metal and concrete sidewalk culverts, located on private property, shall be maintained annually, or as needed, with leaves and all other debris being removed to prevent the clogging of the structures. Drainage swales, channels, trickle pans and other conveyance paths shall also be cleaned, as necessary, to provide positive conveyance of storm runoff to the proposed detention pond area. The LID/PLD basin shall be maintained twice a year (once in spring; once in fall (after leaves have fallen) through thatching/aerating of the LID basins. Trash and debris shall be removed from the LID basin on an as -needed basis. Should standing water become evident in LID basin, removal of the saturated zones and replacement with new topsoil and seeding may be required for long term maintenance of the LID basins and to promote LID and BMP measures. The proposed LID/PLD outlet structure shall be cleaned two times a year: once in spring; once in fall (after leaves have fallen), or as necessary, to prevent sedimentation in front -of the structure, which may occur during and after rain events. The outlet structure shall be thoroughly cleaned when sediment, leaves, and other debris begins plugging or obstructing the inlet grate on the structure. Areas of the site have been designated for use of modular block pavers (MBP) to improve the water quality of runoff from paved surfaces. Runoff infiltrates between the paver stones, drains through a gravel media, infiltrates into a perforated drain pipe and discharges to a drainage structure or detention pond. The use of porous pavers are implemented to satisfy the City of Fort Collins LID goals and ordinances. Maintenance of the permeable pavement system is necessary to minimize clogging and extend the effective life of the infiltration system. Routine maintenance and inspections will help to avoid major maintenance and repairs in the future. Routine Maintenance Table for Permeable Pavement Systems Required Maintenance Objective Action Frequency of Action Inspect the pavement condition and observe infiltration either during a Inspection rain event or with a garden hose to At least annually. ensure that water infiltrates into the surface. Debris Use a regenerative air or vacuum Removal, sweeper to maintain infiltration rates. Vacuuming is recommended twice annually Sweeping and Replace infill aggregate between and at a minimum, annually. Sweeping is as Vacuuming pavers with #8 crushed rock (3/8" necessary. washed). DO NOT apply sand to the MBP surface. Mechanical snow and ice Snow Removal removal should be used. Rubber As necessary. snow plow blade attachment must be used on snow removal equipment. If the surface is completely clogged and rendering minimal surface Full and Partial infiltration rate, restoration of surface Replacement of infiltration can be achieved by the Pavement or removing the first /2 to 1 inch of Infill Material soiled aggregate infill material with a vacuum sweeper. Refill the openings with clean #8 aggregate infill materials. Routine — Annual inspection of hydraulic and structural facilities. Also check for obvious problems during routine maintenance visits, especially for plugging of outlets. PAGE 2 OF 3 r Should stormwater leach out Trash Enclosure Pollutants from the trash enclosure Leakage, or area, or should other similar As necessary, based on routine observation other Surface contaminants collect in the paver and inspection by the professional property Contamination/ Joint filler aggregate, said material management and maintenance contractor. shall be removed and properly Pollution disposed of, and replaced with new infill aggregate. PAGE 3 of 3 bottom of the LID/PLD basin may be required to remove sediment and promote grass growth. 3) Re -vegetation through the use of Natural Seeding/ Sod shall be provided for disturbed areas and other permanent erosion controls shall be provided for areas where erosion has taken place and requires remediation back to the proposed condition shown in the plans The Stormwater Operating/ Maintenance Procedures listed above are guidelines to the minimum procedures that shall be implemented for the site, with these and additional measures being utilized on an as -needed basis. B. Drainage Concept The proposed drainage concepts presented in this study and shown on the utility plans adequately provide for the transmission of developed on -site runoff to the existing detention pond, located south of the subject site. The combination of the existing and proposed storm conveyances will provide for the 100-year developed flows to reach the existing detention pond. The existing release rate of the existing pond will be adhered to. if groundwater is encountered at the time of construction, a Colorado Department of Health Construction Dewatering Permit will be required. C. Storm Water Ouality The final design has addressed the water quality aspect of stormwater runoff. The existing grass -lined detention pond and extended detention will provide an opportunity for stormwater pollutants to filter out of the stormwater runoff before flows are directed downstream. Furthermore, the LID items presented in this report for the proposed site provide for additional water quality and treatment of runoff, prior to flows being directed downstream. D. Erosion Control Concept Proposed erosion control concepts have been provided for and adequately provide for the control of wind and rainfall erosion from the proposed development. Through the construction of the proposed erosion control concepts, the City of Fort Collins performance standards will be met. The proposed erosion control concepts presented in this report and shown on the erosion control plan are in compliance with the City of Fort Collins Erosion Control Criteria. 14 Erosion Control Escrow Estimate • The Erosion Control Escrow Estimate for the subject property is approximately $16,588.00. Please refer to Appendix E for this calculation. 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984, Revised January 1997. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins, Colorado, January 1991, Revised January 1997. 3. East Harmony Portion of McClellands Basin 100-Year Master Plan, by Icon Inc., Fort Collins, Colorado, August 1999. 4. Final Drainage and Erosion Control Study for the PVHS Harmony Campus, by the Sear -Brown Group, dated March,1999. 5. Final Drainage and Erosion Control Study for the PVHS Master Infrastructure Plan, by Stantec, dated April 14, 2004. 15 APPENDIX 16 APPENDIX A VICINITY MAP 17 VICINITYY MAP APPENDIX B RATIONAL METHOD HYDROLOGY 18 • Z _J C1� 0 O W 5%Z +�+QO (n Lu Do 0 CL v 0W 3 LU ow W CIO CL O O W M M' sf M '7NM��MNf�NO O O N N i CM O � M O O CM f� M 1� M OMOOOMOMNI� ��OOe-00000 N h M 0 0 0 0 O M O MMM1�-MODGONcMN 0 0 0 0 0 0 0 0 0 0 OMOtfl�--MN�Of� V O. N't�Nf�-MM 0 0 6 0 0 0 0 0 0 � �NMv-U)0r� 0OO �NeMtOtof--00O!/i O 2q ao � N N 2 W Z C9 W Z W CL Q Developed Weighted Runoff Coefficients PVHS EMERGENCY DEPARTMENT- 5TH FILING 400-002 1 729 1L, 1,565 0 3,346 19.478 0.82 2 459 18,9-. 1031 0 2,559 22.991 0.87 3 0 44 483 0 3,830 4,357 0.33 4 0 6.059 2,241 0 2,997 11,297 0.75 5 17.9% 0 0 0 0 17,996 0,90 6 0 4.621 535 0 674 5.830 0.86 7 0 8,055 912 0 822 9,789 0.89 6 0 73 1,808 0 29,134 31,015 0.29 9 0 101 1,766 0 13,349 15,216 0.33 OS1 0 2925 980 0 55,854 59,759 0.20 tai SITE 19.'184 517d2 10.34! .. 0.. -M&7iI .. 13✓`:9t,8 066 2 459 18,942 1,031 0 2,559 22.991 89% .... 3 0 44 483 0 3,830 4,357 16% ` 4 6 0 17 9% 6,050 0 2.241 0 0 0 2,997 0 11,297 75% 17,996 90% 6 0 4,621 535 0 674 5,830 89% 7 0 8,055 912 0 822 9,789 92% 8 0 73 1,308 0 29,134 31,015 11% 76C 0 13,349 1.5,216 17% { OBI a . ^: Set 0 55,854 59,759 11% Told SITE^ 19,184 51 l02 10,'^' nn n 'Total SITE Includes Basins 1 through 9 and excludes OS1. Land Uw or sudau ChasNristics Pvrcerd Mpsrviousrress Business: Commercial areas 95 Ne' hh.rhocd area9 85 R I,id.sial: s' le-reml WWuna (deWchedj 60 MulBUldt albched 75 Half-.cre lot or I. ., ' nmenre 80 mtlaawl: Light areas 80 He areas 90 Parks cemeteries: 5 Playground.: 10 schools: 50 Rall.d rtl areas: 15 Undev.lo dareas: Hlst.ncal Flow MalyIim 2 GreerWM, a ncultuml On� now aRalyae when land use not dented 45 stra.b: Peved 100 Gravel c 60 Drivers s and siderras[s: so Roofs: 90 .. santl sW 0 Lavms, cla soY 0 -KeTer r0 Flgnra5 KVJ mrougn KWD In Kunon, VnWWr 7,54 PI.,, A9PEX ENGINEERING 1112512C I, 4 + C) O � U I Uj .V U 00 ~II Z J_ a ti Z [[� O � 2 �W 0 Z E' I' w cao Z mad O v WO o U n`y d LL w U O W N W � W W j a W J Q ,C N O CD 0 0 0 In r Z E n n LL w r rM C) a t['S N. r f N N CO V IT M r` w a m rn O M 0 O r J N N r r r M Mt-- W W 2 LU J O LO O �- a s U? tM M CD w �- �- �- M N O r O Q Cf) Q' f- J W N a°°aa..ayna..a-CL U ooMao t�orno O I,- Z M !� N O LO O I- N W [v x-rMN� f) M J C [V N 00 t0 CO (O N r W H 0 Z J WCL o �� O O d O 0 a 0 d 0 0 DO J N N N N •- [V N N N N Q Z H NN t0 0000000I Z N �- rV N Lo N N -1 v W Nr�M to O w m C37 M 00 W M r- M M 00 N cn Q a 0 0 a 0 a C7 0 0 0 N Lo C? O CO r M N r tM V r!') — tV q r N f! M QWT O O O O O O O 0 0mZ �-- r N M v tM w r- 00 O QZ M + to � _ N Vm m II II I Uj00 �= U i` V Z J lL ti Z to O t= E Z `o W Z N W - p U VO) O o U �}v LL >' U Ooz LU O LIJ ~ W zi W co Q co 1j;e I S NO CDto 0 0 0(D `O t- " E — N to (o in Ln to M M r- LL ,C w O M 0 N V cn m N t- `J E '' N (V O O (D (n U in O O Ln N c (V N CO V V cor`(Drnrn(oOMtn q J N CV w w �w (L -- 000000tnooao -� w O\ M O 0 0 0 V co O O > M N O -- O U f- J w m Q a°Oaa�4aaa..0.c7�C7 x U S OOMootn(-0tno' OM N co, M -. WN to r J C '� M to N N C,, r t- M to .- E(O oo n o0 ntom wv H Z w w w a. -, 00oo00oo00 > O o ,n0.0000000o0 O J cV N N N r N rV N N N fn Q Z x f- 0- ,q co N (D co O O 00 0 0 Z CN N" to N N V V w J N (") to O (O O C7> M O (� w co M n m w w N M N Q O O O o 0 O 0 0 0 0 0 Z vInMo(D, MN� tnr� N fv It to , N V— NMM Qa O O O O O O O o O r m Z (V M V to (D I- M m (n IQ Z O CO m T m ar m N rn rri m o C� �n 7 U U tU U N C � 3 O J > oS i O Q N _Z%a N 11 ca C J ca U � L > Y ^ v 11 ° a. Z (6 5 5 K UUPi.a U..�vr; ; m i a i m fi m CmC t� C LL D b O — m 6 a w U $ T 4 m m � c m 3 0 LL O N C w w O O C C C L C C m w O K m O y O w m C g w S m � y O D U w ab m �O" o c4 S C Si n X Y 8€ ,, t E F o a o > V LL O C m � 5 N " m m m r " C � m J w C a° `o m `m E c, m m � m o m 0 c o ; 0 LL o � Z] ^ 4 V aao c m 30 LL m H C_ m' m m L 7 � C n C C m m _ O e� N Om m 2 y O N 0 u m nG_ J -- = o c � T F C U U - - E - n> c - m E i c F F c 2 LL C _ � � N " O I- C < J v v m c m APPENDIX C LID BASIN SIZING CALCULATIONS 19 Design, Procedure Form: Rain Garden (RG) - Sheet 1 of 2 Designer. JRG (un/P, f Company: ASPEN ENGINEERING Date: January 14, 2015 Project PVH ED Location: FORT COLLINS, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I, = 65.0 % (100% if all paved and roofed areas upstream of ran garden) B) Tributary Area's Imperviousness Ratio (i=1./100) i C) Water Quafry Capture Volume (WQCV) for a 12-hour Drain Time WOCV = "_.' _ 0:20,.-.. i watershed Inches rWQCV=0.8•(0.91•rs- 1.19•F+0.7e•D D) Contributing Watershed Area (urctudng rain garden area) Area = 122,752 sq it E) Water Quality Capture Volume (WQCV) Design Volume Vwacv =':2,086 cu It y Vol = (WQCV / 12) - Area F) For Watersheds Outside of the Denver Region, Depth of da = 0.00 in Average Runoff Producirg Storm G) For Watersheds Outside of the Denver Region, V, cv 0, m = '.•'OAs� , , cu it Water Quality Capture Volume (WQCV) Design Volume 14) User Input of Water Quality Capture Volume (WQCV) Design Volume V�us� = cu It (Only if a d'ifferem WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (124nch mardmum) Dwacv = 12 in B) Rain Garden Side Slopes (Z = 4 min., hortz dust per Lung vertical) Z = 4.00 ft / ft (Use V if ram garden has vertical wab) C) Mimimum Flat Surface Area Aar, = - 1386 sq It D) Actual Flat Surface Area A� = 1500 sq it 4Y 2Y Jao !t. SF ZOgO �✓ E) Area Design Depth Surface Area) at (Top ATW = 2500 sa ft a(5 r1 F) Rain Garden Total Volume AS Vr , .- 2,000...' cu ft �/ / TOTAL VOLUM€ c DESIGN VOLUME �.j. p&K (VP ((AT. * A,,w) / 2) • Depth) / , by 3. Growing Media Choose One 0 18- Rain Garden Growing Media O Omer (FqWin): (SEE LANDSCAPE PLANS AND CNIL PLANS) 4. Underdrain System A) Are underdrams provided? Choose One O YES ONO B) UndeNrein system offm diameter for 12 hour drain time ) Distance From Lowest Elevation of the Storage y = ft Volume to the Center of the Orifice Volume to Drain in 12 Hours V0'12 = WA, . _ cu ft m) Orifice Diameter, 3/8' Mimimum Do = WA in PLDSiring.)dsm, RG 1/14/2015, 9:43 AM LID RATING CURVE 1-13-15.txt PVH ED PROJECT LID BASIN RATING CURVE W/ FB ELEV @ 58.00 JRG 1-13-15 #units=Elevation,ft,Area,ft2,volume,ft3,volume,ft3 # Elev Area Cumml Avg Cumml conic # ft 58.0000 ft2 3877.4202 ft3 3047.0976 ft3 2728.8062/ 57.0000 1108.2196 554.2777 375.9501 56.0000 0.3359 0.0000 0.0000 Pt PLAW : Ak4 (t-6Vr?Awr) o F or L16 06k m rpRu,r) of S9,or� 2 2�Soo Si- toycr5 Foil %D T°P 574a 9,I,Son SF 6071e%1*6& S4 Page 1 0 I Q Jp i� 8 g a y 4 a $R a 4 LHIHX3 NISYS 3SYNI"a — 7a O Ol07'SNlll00 BOA `9NI71dHIS "Jd3OAON3VH3W3`sndWVO $ i U - ga ANOWUVH W31SAS H1TC3H A37-IVA 3manOd ga n r�r� �r A ��3v�Yb`a'� > q E y g $ •� sNOMIMESAOWVE milillill Millilloolli MOORE II■!� APPENDIX D CURB CUT, INLET, & SWALE SIZING 20 Weir Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 31® by Autodesk, Inc. DP1- CURB CUT - Q100 Rectangular Weir Crest = Broad Bottom Length (ft) = 5.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 4.45 Depth (ft) 1.00 0.50 ml -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) DP1- CURB CUT - 0100 0 1 2 3 4 Weir W.S. I1 Monday, Nov 24 2014 = 0.49 = 4.450 = 2.45 = 1.82 = 5.00 Depth (ft) 1.00 0.50 -0.50 7 Length (ft) Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. DP2- CURB CUT - 0100 Rectangular Weir Crest = Broad Bottom Length (ft) = 6.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 5.25 Depth (ft) 1.00 0.50 M -0:50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) DP2- CURB CUT - Q100 Monday, Nov 24 2014 = 0.48 = 5.250 = 2.90 = 1.81 = 6.00 Depth (ft) 1.00 0.50 We] -0.50 Weir W.S. Length (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 31M by Autodesk, Inc. DP2- SIDEWALK CHASE - Q100 Rectangular Bottom Width (ft) = 6.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 1.00 Slope (%) = 1.00 N-Value = 0.015 Calculations Compute by: Known Q Known Q (cfs) = 5.25 Elev (ft) 2.00 - 1.75 1.50 1.25 1.00 0.75 Section Monday, Nov 24 2014 Highlighted Depth (ft) = 0.25 Q (cfs) = 5.250 Area (sqft) = 1.50 Velocity (ft/s) = 3.50 Wetted Perim (ft) = 6.50 Crit Depth, Yc (ft) = 0.29 Top Width (ft) = 6.00 EGL (ft) = 0.44 0 1 2 3 4 5 6 7 8 Reach (ft) Depth (ft) 1.00 0.75 0.50 0.25 -0.25 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 31XD by Autodesk, Inc. DP2a- CURB CUT - 0100 Rectangular Weir Crest = Broad Bottom Length (ft) = 3.00 Total Depth (ft) 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 2.63 Depth (ft) 1.00 0.50 -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) DP2a- CURB CUT - 0100 0 .5 1 1.5 2 2.5 3 3.5 Weir W.S. Monday, Nov 24 2014 = 0.48 = 2.630 = 1.45 = 1.81 = 3.00 Depth (ft) 1.00 0.50 MN -0.50 Length (ft) Channel Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil 3D® by Autodesk, Inc. DP2a- SIDEWALK CHASE - Q100 Rectangular Bottom Width (ft) = 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 1.00 Slope (%) = 2.00 N-Value = 0.015 Calculations Compute by: Known Q Known Q (cfs) = 2.63 Elev (ft) 2.00 ---1 1.75 1.50 1.25 1.00 0.75 Section Monday, Nov 24 2014 Highlighted Depth (ft) = 0.20 Q (cfs) = 2.630 Area (sqft) = 0.60 Velocity (ft/s) = 4.38 Wetted Perim (ft) = 3.40 Crit Depth, Yc (ft) = 0.29 Top Width (ft) = 3.00 EGL (ft) = 0.50 0 .5 1 1.5 2 2.5 3 3.5 4 Reach (ft) Depth (ft) 1.00 0.75 0.50 0.25 OF$ -0.25 Channel Report Hydraflow Express Extension for Autodesk®AutoCAD® Civil MM by Autodesk, Inc. 13132- Swale B-Basin 2 - Q100 Triangular Side Slopes (z:1) = 4.00, 10.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 1.10 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 5.25 Elev (ft) Section 3.00 2.50 90 1.50 1.00 Tuesday, Nov 25 2014 Highlighted Depth (ft) = 0.58 Q (cfs) = 5.250 Area (sqft) = 2.35 Velocity (ft/s) = 2.23 Wetted Perim (ft) = 8.22 Crit Depth, Yc (ft) = 0.52 Top Width (ft) = 8.12 EGL (ft) = 0.66 2 4 6 8 10 12 Reach (ft) 14 16 18 Depth (ft) 2.00 1.50 1.00 0.50 -0.50 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. DP6- Swale - Q100 Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 8.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 1.33 Elev (ft) Section 3.00 2.50 2.00 1.50 1.00 0.50 1 2 3 4 Monday, Nov 24 2014 Highlighted Depth (ft) = 0.30 Q (cfs) = 1.330 Area (sqft) = 0.36 Velocity (ft/s) = 3.69 Wetted Perim (ft) = 2.47 Crit Depth, Yc (ft) = 0.37 Top Width (ft) = 2.40 EGL (ft) = 0.51 5 6 Reach (ft) 7 8 9 10 Depth (ft) 2.00 1.50 0.50 M -0.50 Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3DO by Autodesk, Inc. DP6- CURB CUT - Q100 Rectangular Weir Crest = Broad Bottom Length (ft) = 3.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 1.33 Depth (ft) 1.00 0.50 "I -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) DP6- CURB CUT - 0100 Monday, Nov 24 2014 = 0.31 = 1.330 = 0.92 = 1.44 = 3.00 Depth (ft) 1.00 0.50 M I1 -0.50 0 .5 1 1.5 2 2.5 3 3.5 4 Weir W.S. Length (ft) Weir Report • Hydraflow Express Extension for Autodesk® AutoCAD® Civil 31® by Autodesk, Inc. DP7- CURB CUT - Q100 Rectangular Weir Crest = Broad Bottom Length (ft) = 3.00 Total Depth (ft) = 0.50 Calculations Weir Coeff. Cw = 2.60 Compute by: Known Q Known Q (cfs) = 2.24 Depth (ft) 1.00 0.50 O e, -0.50 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Top Width (ft) DP7- CURB CUT - Q100 Monday, Nov 24 2014 = 0.44 = 2.240 = 1.31 = 1.72 = 3.00 Depth (ft) 1.00 0.50 MY -0.50 0 .5 1 1.5 2 2.5 3 3.5 4 Weir W.S. Length (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D@ by Autodesk, Inc. DP7- Swale - Q100 Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 8.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 2.24 Elev (ft) 3.00 —, 2.50 2.00 1.50 1.00 0.60 Section Monday, Nov 24 2014 Highlighted Depth (ft) = 0.36 Q (cfs) = 2.240 Area (sqft) = 0.52 Velocity (ft/s) = 4.32 Wetted Perim (ft) = 2.97 Crit Depth, Yc (ft) = 0.46 Top Width (ft) = 2.88 EGL (ft) = 0.65 1 2 3 4 5 6 7 8 9 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 rI M -0.50 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 31® by Autodesk, Inc. DP8- Swale - Basins 5-8 Q100 Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 0.80 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 7.53 Elev (ft) Section nn Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fVs) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Monday, Nov 24 2014 = 0.67 = 7.530 = 3.14 = 2.40 = 7.52 = 0.54 = 7.36 = 0.76 0 1 2 3 4 5 6 7 8 9 10 11 Reach (ft) Depth (ft) 2.00 1.50 1.00 0.50 11, -0.50 12 Channel Report Hydraflow Express Extension for Autodesk® AutoCADE) Civil 3EM by Autodesk, Inc. DP8- Swale - Basins 5-8 Q100x1.33 FB Trapezoidal Bottom Width (ft) = 2.00 Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 1.00 Invert Elev (ft) = 1.00 Slope (%) = 0.80 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 10.02 Elev (ft) 3.00 --7 2.50 2.00 1.50 1.00 0.50 Section 4 5 6 7 Reach (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Monday, Nov 24 2014 = 0.76 = 10.02 = 3.83 = 2.62 = 8.27 = 0.63 = 8.08 = 0.87 Depth (ft) 2.00 1.50 1.00 0.50 IMI 1 -0.50 8 9 10 11 12 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 31® by Autodesk, Inc. DP8- Site to Swale - Basins 1-8 Q100 Triangular Side Slopes (z:1) = 4.00, 4.00 Total Depth (ft) = 3.00 Invert Elev (ft) = 1.00 Slope (%) = 0.80 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 16.44 Elev (ft) 5.00 --1 4.00 2.00 1.00 0 M Section 1 5 10 15 20 Reach (ft) Tuesday, Nov 25 2014 Highlighted Depth (ft) = 1.17 Q (cfs) = 16.44 Area (sqft) = 5.48 Velocity (ft/s) = 3.00 Wetted Perim (ft) = 9.65 Crit Depth, Yc (ft) = 1.01 Top Width (ft) = 9.36 EGL (ft) = 1.31 25 30 Depth (ft) 4.00 3.00 2.00 1.00 we 1 4.00. 35 Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3136 by Autodesk, Inc. Monday, Nov 24 2014 DP3- CULVERT - Q100 Invert Elev Dn (ft) = 56.56 Calculations Pipe Length (ft) = 40.68 Qmin (cfs) = 5.92 Slope (%) = 0.39 Qmax (cfs) = 9.92 Invert Elev Up (ft) = 56.72 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 12.0 Shape =Circular Highlighted Span (in) = 12.0 Qtotal (cfs) = 9.92 No. Barrels = 2 Qpipe (cfs) = 9.92 n-Value = 0.015 Qovertop (cfs) = 0.00 Culvert Type =Circular Concrete Veloc Dn (ft/s) = 6.41 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 6.32 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 57.52 HGL Up (ft) = 58.52 Embankment Hw Elev (ft) = 58.98 Top Elevation (ft) = 59.50 Hw/D (ft) = 2.26 Top Width (ft) = 25.00 Flow Regime = Inlet Control Crest Width (ft) = 22.00 a. 'r; DP)- CULVERT - Q100 +. C"p !M 3A Culvert Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3DhJ by Autodesk, Inc DP5- CULVERT - Q100 Invert Elev Dn (ft) = 58.20 Pipe Length (ft) = 70.00 Slope (%) = 0.64 Invert Elev Up (ft) = 58.65 Rise (in) = 12.0 Shape = Circular Span (in) = 12.0 No. Barrels = 1 n-Value = 0.015 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 62.50 Top Width (ft) = 50.00 Crest Width (ft) = 10.00 9n E, 59 00 sx SIM WX 69W vx s* m Monday, Nov 24 2014 Calculations Qmin (cfs) = 1.11 Qmax (cfs) = 4.11 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 1.11 Qpipe (cfs) = 1.11 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 1.83 Veloc Up (ft/s) = 3.30 HGL Dn (ft) = 58.92 HGL Up (ft) = 59.09 Hw Elev (ft) = 59.28 Hw/D (ft) = 0.63 Flow Regime = Inlet Control OPS CULVERT - 0100 APPENDIX E EROSION CONTROL & RIPRAP SIZING; EROSION ESCROW 21 ci 0 0 O O N Dui o n o N ma M U r IIo JU') N Y J J a� Q Q U C!1 I Q H N N O O Z � CD N 3 n n o O ip ,--' O N n r N N p O cli `.. .. a -C �. Y a a m2, r � m J CL 7 3 Cf1 [!7 Lu it Q v o J J 0 a N a° LU 21 n Hn 0 mU w m a m F*Ytlk****** .ORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 'ORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS OROJECT NAME: PVH ED PROJECT NO.: 400-002 COMPUTED BY: JRG DATE: 11/25/2014 ROM STATION/REACH: DP1 TO STATION/REACH: DP1 `RAINAGEAREA: DESIGN FREQUENCY: K********************##**#***************#***#**************#*#************* INPUT PARAMETERS 'hannel Discharge : 4.5 cfs (.13 m^3/s) eak Flow Period : 1 hours 'hannel Slope : 0.25 fUft (0.25 m/m) ^hannel Bottom Width: 5.0 ft (1.52 m) .-eft Side Slope : 50:1 .ight Side Slope : 50:1 "hannel Lining: C350 Staple E Mix 75-95% .-ermi. Shear(Tp) :9.00 psf (430.9 Pa) Phase = 2 Class = D Vegetation Soil = Clay Loam Allowable Soil Shear(Ta):3 psf (143.64 Pa) **********************#*****#*#*#********#**#*******************#**#******* CALCULATIONS ***********************#*******************#***#****************##********* itial Depth Estimate = 0.16 * (4.5 /(0.250^0.5))^0.375 = 0.36 ft (.11 m) 'final Channel Depth (after 11 iterations) _ .22 ft (0.07 m) rIow Area = (5.0 * 0.2)+(0.5 *0.22^2 * (50.0+50.0)) = 3.4 sq.ft (0.3 m^2) let Per. =5.0 +(0.2*(((50.0^2)+1)^.5 +((50.0^2)+1)A.5)) = 26.7 ft (8.1 m) ydraulic Radius = (3.4 / 26.7) = 0.1 ft (0.0 m) "hannel Velocity=(1.486/0.145)*(0.1^0.667)*(0.250^.5) = 1.3 fps (0.4 m/s) .hannel Effective Manning's Roughness_ alculated Shear (Td) = 62.4 * 0.22 * 0.250 = 3.39 psf (162.1 Pa) "afety Factor = (Tp/Td) _ (9.00 /3.39) = 2.66 _ifective Stress on Blanket(Te) = 3.4*(1-0.75)*(/0.145)^2 = 0.07 psf (3.2 Pa) safety Factor = (Ta/Te) = (3.00 /0.068) = 44.24 C3 75 -75 E fA Le) O O CD CD C3 cli Oil 21 c:i II M II Uri M.S LIL O C) czi7 LO OL U M— ,u d) Gn U) -t:; C3 0 a-M Cc) Qx LO 0 CL 90 01 a I Pa CL L) 0 Lu 1DP-z .ORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 'ORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS 13ROJECT NAME: PVH ED PROJECT NO.: 400-002 . OMPUTED BY: JRG DATE: 11/25/2014 ROM STATION/REACH: DP2 TO STATION/REACH: DP2 `RAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS . hannel Discharge : 5.3 cfs (.15 m^3/s) eak Flow Period : 1 hours 'hannel Slope : 0.02 ft/ft (0.02 m/m) "hannel Bottom Width: 6.0 ft (1.83 m) weft Side Slope : 50:1 .ight Side Slope : 50:1 "hannel Lining: Rock Riprap 12in ermi. Shear(Tp) :4.00 psf (191.5 Pa) Phase = 0 CALCULATIONS 'nitial Depth Estimate = 0.16 * (5.3 /(0.02010.5))10.375 = 0.62 ft (.19 m) oral Channel Depth (after 10 iterations) _ .33 ft (0.10 m) .ow Area = (6.0 * 0.3)+(0.5 *0.33^2 * (50.0+50.0)) = 7.6 sq.ft (0.7 m^2) 'et Per. =6.0 +(0.3*(((50.0^2)+1)A.5 +((50.0"2)+1)A.5)) = 39.4 ft (12.0 m) "ydraulic Radius = (7.6 139.4) = 0.2 ft (0.1 m) •.hannel Velocity=(1.486/0.100)*(0.2^0.667)*(0.020^.5) = 0.7 fps (0.2 m/s) 'cannel Effective Manning's Roughness = 0.100 ^alculated Shear (Td) = 62.4 * 0.33 * 0.020 = 0.42 psf (19.9 Pa) .1afety Factor = (Tp/Td) _ (4.00 /0.42) = 9.60 c n 2 r O � J J N O Q lTi In D o o O o p Eoci LL m a N n (r1 O J p O N C � o y .o u N V1 y fmrl l[1 orEL I 5 oL d o 4 n T s E J T C3 N 3 m Z C.) o al- o t d =Q 0 f Teti. .i v -- V > a ss N a s � fiy �y;UJ cc ` ' o �MM I L L r e 4 a m LLrn R'R'Rf'4'4A'�1'*fi�F4'ffi*'k'X'fA"k1'##A'at'X11`ir�Ff"R'X*'Rf3'Xi"R*�Fi'i"RR**f*'R'R'kf'Rat'R'R'X'R'k4*'R#'�F'MA'*#`A"R* A'A"R .ORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 'ORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS OROJECT NAME: PVH ED PROJECT NO.: 400-002 COMPUTED BY. JRG DATE: 11/25/2014 ROM STATION/REACH: DP2 SWALE TO STATION/REACH: DP2 SWALE `RAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS .:hannel Discharge : 5.3 cfs (.15 m^3/s) eak Flow Period : 1 hours 'hannel Slope : 0.011 Wit (0.011 m/m) "hannel Bottom Width :.0 ft (.00 m) "eft Side Slope : 4:1 .ight Side Slope : 10:1 ^hannel Lining : Unreinforced Vegetation Mix 75-95% .-ermi. Shear(Tp) :3.33 psf (159.4 Pa) Phase = 1 Class = D Vegetation Soil = Clay Loam Allowable Soil Shear(Ta):0.05 psf (2.39400003567338 Pa) CALCULATIONS itial Depth Estimate = 0.16 * (5.3 /(0.011 ^0.5))^0.375 = 0.70 ft (.21 m) 'inal Channel Depth (after 9 iterations) = .57 ft (0.17 m) �IowArea = (0.0 * 0.6)+(0.5 *0.57A2 * (4.0+10.0)) = 2.3 sq.ft (0.2 m^2) let Per. =0.0 +(0.6*(((4.0^2)+1)^.5 +((10.0^2)+1)A.5)) = 8.1 ft (2.5 m) ydraulic Radius = (2.3 / 8.1) = 0.3 ft (0.1 m) "hannel Velocity=(1.486/0.029)*(0.3^0.667)*(0.011^.5) = 2.3 fps (0.7 m/s) _hannel Effective Manning's Roughness = 0.029 alculated Shear (Td) = 62.4 * 0.57' 0.011 = 0.39 psf (18.8 Pa) "ifety Factor = (Tp/Td) = (3.33 /0.39) = 8.48 _rfective Stress on Soil(Te)=0.4*(1-0.75)*(0.0156/0.029)^2 =0.03 psf (1.4 Pa) Jafety Factor = (Ta/Te) = (0.05 /0.028) = 1.76 w �44 }] �rad � jp. '! � 1�-{.{Y�'L^-?w.aT' � 'e ".)a�r�'.... Y'.. {r �s y. ,{' R.4 {" q 0. ���' �'�' a' )✓P�,..i S , O rL w Q U n r ¢ n t2• �.�, p CD Em ts p p cn lf] QL Y 0 N ^ y. e✓ $' a il' LO i2` T77 I �L N y 8 } N N a 'a "may CL W y'V JI�y yj CL E i �erx m o °' -:,-s ..egg -1 fir' d IL CA .22 i LL7 ;*i eV}�ms�... �5 '�P yiy O a 03 RD y v �y. p ui CD to J 7 •s �- m n c t m a ' o zrvr I- 'o fu 0 yy( wy� .: d s 3 OI z; z .. `m yco Z : o$s Z _ v w a.. a JORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 IORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS "ROJECT NAME: PVH ED PROJECT NO.: 400-002 -:OMPUTED BY. JRG DATE: 11/25/2014 ROM STATION/REACH: DP6 TO STATION/REACH: DP6 )RAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS :hannel Discharge : 1.3 cfs (.04 m113/s) eak Flow Period : 1 hours hannel Slope : 0.08 Wit (0.08 m/m) "hannel Bottom Width: 3.0 ft (.91 m) eft Side Slope : 50:1 tight Side Slope : 50:1 "hannel Lining: Rock Riprap 12in -fermi. Shear(Tp) :4.00 psf (191.5 Pa) Phase = 0 CALCULATIONS *************************************************************************** kitial Depth Estimate = 0.16 * (1.3 /(0.080^0.5))10.375 = 0.28 ft (.09 m) -inal Channel Depth (after 9 iterations) _ .15 ft (0.05 m) iow Area = (3.0 * 0.1)+(0.5 *0.15A2 * (50.0+50.0)) = 1.6 sq.ft (0.1 m^2) let Per. =3.0 +(0.1 *(((50.OA2)+1)A.5 +((50.0"2)+1)A.5)) = 18.0 ft (5.5 m) 'ydraulic Radius = (1.6 / 18.0) = 0.1 ft (0.0 m) :hannel Velocity =(1.486/0.100)*(0.1^0.667)*(0.080^.5) = 0.8 fps (0.3 m/s) hannel Effective Manning's Roughness = 0.100 'alculated Shear (Td) = 62.4 * 0.15 * 0.080 = 0.75 psf (35.8 Pa) safety Factor = (Tp/Td) _ (4.00 /0.75) = 5.35 O � W 4 � E J a U ¢ � O _ O O p O 00 � Efh lLL n N O O 20lie ® OL N mT p V7 _a Y H y c m '�t � m 0 O N � om w O J f cn t7J W a: z 4ORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 'ORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS ^ROJECT NAME: PVH ED PROJECT NO.: 400-002 ,:OMPUTED BY. JRG DATE: 11/25/2014 ROM STATION/REACH: DP7 TO STATION/REACH: DP7 RAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS ,:hannel Discharge : 2.2 cfs (.06 m^3/s) _ eak Flow Period : 1 hours hannel Slope : 0.08 ft/ft (0.08 m/m) " hannel Bottom Width: 3.0 ft (.91 m) eft Side Slope : 50:1 ..fight Side Slope : 50:1 " hannel Lining : Rock Riprap 12in -ermi. Shear(Tp) :4.00 psf (191.5 Pa) Phase = 0 CALCULATIONS itial Depth Estimate = 0.16 * (2.2 /(0.08010.5))^0.375 = 0.35 ft (.11 m) -final Channel Depth (after 11 iterations) _ .19 ft (0.06 m) .ow Area = (3.0 * 0.2)+(0.5 *0.19^2 * (50.0+50.0)) = 2.3 sq.ft (0.2 m^2) 'et Per. =3.0 +(0.2%(50.0^2)+1)^.5 +((50.0"2)+1)A.5)) = 21.8 ft (6.6 m) "ydraulic Radius = (2.3 / 21.8) = 0.1 ft (0.0 m) :hannel Velocity=(1.486/0.100)*(0.1^0.667)*(0.080".5) = 0.9 fps (0.3 m/s) cannel Effective Manning's Roughness = 0.100 'alculated Shear (Td) = 62.4 * 0.19 * 0.080 = 0.94 psf (44.9 Pa) -afety Factor = (Tp/Td) _ (4.0010.94) = 4.27 I LOU 6 --lO a coO O rcN CDm II n m or_ Cot y � O � U 3 O C m C N [D O V M M v CV 0 f T W W Z J i N W J � Q cr (n Cn O li NN LL� N m a N m N 7 T a (`r'1 N 0 U m co O , N L U LO m m ti in ti Cl) O to E m !Cl a+ m M O o ds cn N C M m v N a ~ x E S 0 U a P q O U � Ll a+ rn m 7 a s a H I _N m O QCh _ O — 7 N n m m I~ m U a o m c to I U U m m .JORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 IORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS IROJECT NAME: PVH ED PROJECT NO.: 400-002 :OMPUTED BY: JRG DATE: 11/25/2014 ROM STATION/REACH: DP8 TO STATION/REACH: DP8 RAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS :hannel Discharge : 7.5 cfs (.21 m^3/s) eak Flow Period : 1 hours hannel Slope : 0.008 ftKt (0.008 m/m) "'hannel Bottom Width: 2.0 ft (.61 m) eft Side Slope : 6:1 tight Side Slope : 4:1 ,hannel Lining : Unreinforced Vegetation Mix 75-95% Fermi. Shear(Tp) :3.33.psf (159.4 Pa) Phase = 1 Class = D Vegetation Soil = Clay Loam Allowable Soil Shear(Ta):0.05 psf (2.39400003567338 Pa) ««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««««« CALCULATIONS .itial Depth Estimate = 0.16 « (7.5 /(0.008^0.5))^0.375 = 0.84 ft (.26 m) °nal Channel Depth (after 8 iterations) = .62 ft (0.19 m) low Area = (2.0 « 0.6)+(0.5 «0.62A2 « (6.0+4.0)) = 3.1 sq.ft (0.3 m^2) .let Per. =2.0 +(0.6«(((6.OA2)+1)^.5 +((4.0^2)+1)".5)) = 8.3 ft (2.5 m) ydraulic Radius = (3.1 / 8.3) = 0.4 ft (0.1 m) hannel Velocity=(1.486/0.029)«(0.4^0.667)«(0.008^.5) = 2.4 fps (0.7 m/s) whannel.Effective.Manning's_Roughness = 0.029_ alculated Shear (Td) = 62.4 « 0.62 « 0.008 = 0.31 psf (14.7 Pa) 3fety Factor = (Tp/Td) = (3.33 /0.31) = 10.82 .-ffective Stress on Soil(Te)=0.3«(1-0.75)«(0.0156/0.029)^2 =0.02 psf (1.1 Pa) ,afety Factor = (Ta/Te) = (0.05 /0.022) = 2.25 3 V) ra I . 4ORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.3 IORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISH/S.I. ' ISER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS -IROJECT NAME: PVH ED PROJECT NO.: 400-002 :OMPUTED BY: JRG DATE: 11/25/2014 ROM STATION/REACH: DOWSTREAM CHANNEL TO STATION/REACH: DOWNSTREAM CHANNEL RAINAGE AREA: DESIGN FREQUENCY: INPUT PARAMETERS :hannel Discharge : 16.4 cfs (.46 m^3/s) . ,eak Flow Period : 1 hours hannel Slope : 0.01 fdft (0.01 m/m) ,hannel Bottom Width: 2.0 ft (.61 m) eft Side Slope : 4:1 %ight Side Slope : 4:1 hannel Lining : Unreinforced Vegetation Mix 75-95% Oermi. Shear(Tp) :3.33 psf (159.4 Pa) Phase = 1 Class = D Vegetation Soil = Clay Loam Allowable Soil Shear(Ta):0.05 psf (2.39400003567338 Pa) CALCULATIONS ,itial Depth Estimate = 0.16 * (16.4 /(0.010^0.5))^0.375 = 1.08 ft (.33 m) -�nal Channel Depth (after 8 iterations) _ .89 ft (0.27 m) �IowArea = (2.0 * 0.9)+(0.5 *0.89^2 * (4.0+4.0)) = 4.9 sq.ft (0.5 m^2) .let Per. =2.0 +(0.9*(((4.0^2)+1)^.5 +((4.0^2)+1)A.5)) = 9.3 ft (2.8 m) .ydraulic Radius = (4.9 / 9.3) = 0.5 ft (0.2 m) 'hannel Velocity=(1.486/0.029)*(0.5^0.667)*(0.010^.5) = 3.3 fps (1.0 m/s) ..hannel Effective_Manning's Roughness = 0.029 alculated Shear (Td) = 62.4 * 0.89 * 0.010 = 0.55 psf (26.4 Pa) 3fety Factor = (Tp/Td) _ (3.33 /0.55) = 6.03 cffective Stress on Soil(Te)=0.6*(1-0.75)*(0.0156/0.029)^2 =0.04 psf (1.9 Pa) -iafety Factor = (Ta/Te) = (0.05 /0.040) = 1.25 EROSION CONTROL COST ESTIMATE Project: PVHS EMERGENCY DEPT. 101-001 Prepared By: AGW Date: 11/24/2014 CITY RESEEDING COST Unit Total Method Quantity Unit Cost Cost Notes Reseed/mulch 4.54 ac $723 $3,282.42 Subtotal $3,282 Contingency 50% $1,641 Total $4,924 Notes. 1. A<=5 ac=$655/ac, A>5 ac=$615/ac. EROSION CONTROL MEASURES Unit Total Number Method Quantity Unit Cost Cost Notes Vehicle Tracking Mat 28 CY $30 $833 6 Gravel Filter 6 ea $300 $1.800 5 Straw Wattle Barrier 4 ea $150 $600 8 Silt Fence Barrier 1285 LF $3 $3,855 38 Gravel Mulch 2 ac $1,350 $2,700 39 Hay or Straw Dry Mulch (1-5% slope) 2.54 ac $500 $1,270 Subtotal $11,058 Contingency 50% $5,529 Total $16,588 Total Security $16,588 APPENDIX F PROPOSED DRAINAGE EXHIBIT 0 EXISTING DRAINAGE EXHIBIT 22 ___ __1r______ EX PROPFR� PROP LOD W 0 Z N EROSION CONTROL PLAN HARMONY ROAD 1-r Ian NLTFFN— _ _ _ _ _ _ _ • AD+AEEIm.aN.M Aawc«B°EBw _ _ _ _ Res" _ _ __ __ , as - 000da — 88 __— _ I MNWP nPR.NP 81 60 �• N MMIPP I -. « I I PROPOSED BUILDING I I I FF ELEV=4962.50 � III I I I 111 I I WCl"Rilil WW) PRW P�V�6�M UYER�B RI B (PRIVATE DRIVE) rxeLALL ER IF CIP Pat FENCE »..Wr._ Ir- l frm RK wMET GRAVEL KPIR 0041 METALS —J. ________________ Y r LOU I I I i Nm°wwxeoee //� mWM DBVIY SEPARTE"J DOCUMENT RECE➢FNI I xBTALLr3,B LF CF&LT FENCE mcmakNEST eGEMW ADN:EMMFAB. ABNAYMpOA ARM SEMENTAION SMNFFOOKLDDIREMARK I I ISENT I I I I IX PRg9IY BOVNHRY I I I I I 1 I I I I I I I I I I I 50 PROPOSED NYIEX CONTOUR - s FT INTERVAL 59 PROPOSED MHRM IE ONTOUR -I FT 11TER1AL TY WATTLE CHECK DAM VEHICLE TRACKING PAD — SF SLT FENCE TYPE M MPRAP • IB WATTLE INLET FILTER CCCa HAY OR STRAW DRY MULCH (I -SS) G • GRAVEL NUT FILTER = CRECKEDBY. AG DMIGNEUBY. AO NOTES DRAWN BY ANV 1) CONTRACTOR TO INSTAL SILT FENCE, PRIOR TO BEGINNING CONSTRUCTICNAOTNITIES. TOTALENGTHOFSILTFENCIE=IEnU MERE SILT FENCE IS SHOWN OVER HARDSCAPE (SIDEWALLKS, II A GRAVEL SCREW FILTER SHALL BE UTILIZED IN THESE AREAS DURING CONSTRUCTION, AS APPLICABLE. U) 7 P) AL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED. CR LANDSCAPED AS SHOWN ON THESE PLANS AND THE LANDSCAPE (i PUNS. 2 - 3)A-SOFT PAR' CONSISTING OF A MIM SUMMER TOPSOIL MIX WILL BE Q PLACED ALONG THE BOTTOM OF THE PROPOSED SWALE LOCATED /Y ALONG THE EAST SIDE OF THE LOT THE "$OFT PAN"WLL RE 3' WIDE K V 1DEEP AND WILL ALLOW FOR VEGETATION TO BECOME E9'TABLISHED 1` OVER TIME MILE INCREASING WATER QUALITY FOR THE SITE . �rJ PLEASE REFER TO THE GRADING PLAN FOR SOFT PAN'LOCATONS. U L ul SEE SHEET C-010 FOR DETAILS. 1 Z z /I STOCK PILES SMALL NOT TO EXCEED I PIN HEIGHT. I010� J F(ly 5)AL OFFSITE AREAS DISTURBED DURING CONSTRUCTION AIRE TO BE °5 11r��} ,• O ^ RE -VEGETATED AND RETURNED TO HISTORIC CONDITION. O La, rF}Yr J S) VEHICLE TRACKING FACIE) LOCATIONS SHALL BE DETERMINED BY rile i Q THE CONTRACTOR AND PRIOR TO CONSTRUCTION. AND SHALL BE I! I'= a' 0 INSTALLEDACCORDINGLY. C W LL_ i T)SEE SHEET C-0OS FOR EROSION CONTROL NOTES AND DEiNLS.AND LL 0 CCNSTRUOTIOW EROSION CONTROL SEQUENCE CHART. 1{I_I 0 Z PROVIDED 0 0 0) A WATTLE CHECK DAM OR GRAVEL INLET FILTER SMALL BE W? MOUND THE DRY WELL WIN TO PREVENT SEDIMENT FROM � V CLOGGING DRY WELL. BECAUSE THE LID MEDIA IS NOT AMnCIPATED f TO BE INSTALED UNTIL NEAR THE END OF CONSTRUCTION.A Z J Z SEDIMENT TRAP MAY BE REQUIRED TO PREVENT SEDIMENT FROM REQUIRED J W 0 0_ ENTERINGTHEDRYWELL. SHOULD THISBE REQUIRED. AS U BY THE CITY EROSION CONTROL INSPECTOR. THE SEDIMENTTRAP Q V UI SHALL BE NSTALED PER THE DETAIL SHOWN ON THIS SHIEST. F. 2 Q O dA ��.. U W W Jp JW Qx 0WEyy CALL UTILITYNOTINCATON q y� CENTEROFCOLOIRADO Q 1-8001987 .922. `jS( RI �VAO a Q ' o R r. City of Fort Collins, Colorado UTILITY PLAN APPROVAL THESE PUNS HAVE BEEN REWEIMED BY THE , ? LOCAL ENTITY FOR CONCEPT THE .✓°ej—EG g`O/ 0. APPROVED: REVIEW CODS NOT IMPLYRESPONSIBILITY BY pONSI Iu _ Gly Engineer Dote ARTM WE REVIEWNG DEPARTMENT WE LOCALAP z � , CHELNED Br: ENTITY ENGINEER. OR THE LOCAL ENTITY FOR THE p � - ' Water k Wasterater OR% Dote ACCURACY AND CORRECTNESS Of pT' CACUVRONS. NRTHERMORE, THE REVIEW Q ..�� G` FONAL CHECKED BY: DOES NOT IMPLY THAT OUAMRIE9 OF ITEMS ?O „"",°"''"" np SUD" mer UtBBy Dote ON THE PUNS ARE THE CHECKED BY: ALL UT HEITIEs REQUIRED. THE REVIEW SHALL NO'F BE Parka k Recreotlw Date CONSTRUE➢ IN ANY REASON AS ACCEPTANCE erxa <DGODRIB OF R RESONAL IUtt BY THE LOCAL DA11C CHECKED BY: ENTITY FOR ADDITIONAL QUANTITIES § OF ITEMS FOR TraNic Engineer DDIe SHOWN THAT MAY BE REQUIRED DURING ME SHEET SHEET NO: C004 CHECKED HY: CONSTRUCTION PHASE. C OF 11 nmwm ntal Manw Date 19Y SmIW WArT£s, EMBEDDED AND STANDS As 'RW£ SHOWN IN napol rLTR' Di rNs SHUT 1TI MSIME STABUZA l OF WATTLES, SCA xc sHAu 9E BASED me SERIICAL TOE ro HEAD No I V.a N INTERVALS waral IS- HEIGHTS EXCEEDED BY St. tPA NT A MOST BOF CHANNEL BE HIGHER TU,N - ACKA-COMPACTED v FLOWWATTLE£ ��AL NOTES SSAR THE RE 1. wSPECT .AMID REHMR PLCE E IEQn BACKFlLL ELTEHs SUCH G1 SINN EVENT. ) ] 4MIHSrUrIIFp SECPANIEpRBV 1NE I Ny�fMOpVA�L ENGINEER NG IpNGEq NSE. rw J. PEEASE REIER rO Exllra XnoxL AOpDIPWIK WAiRE xo MDR VIEW PROFILEUnited ��S miAWwn N TEs AND DErA Ls .-..p.wa,e«T m 1R" DIAMETER STRAW WATTLE CRECE DAM N Up CURB INLET O GRAVEL FADER (APPROX. 3/4" DIA.) CONCRETE /Li HIRE BEEN BLOCK �� (APPROK. I/2' MESH) 0" WOOD STUD OVERFLOW KFILTERED WATER RUNOFF MRE SCREEN CURB INLET AWL FILLER 2"x{" WOOD STUD ...__ SCREEN PLAN VIEW SECTION A GENERAL NOTES: A I. INSPECT AND REPAIR FILTERS Ali EACH STORM EVENT. REMOVE SEDIMENT WHEN ONE HALF OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FlLMRING MEASURE. 2. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM TRAVELED WAY OF ROADS. GRAVELEROSION ICONTRQL CURB INLET T CALL UDIITI' NOTFICATR)N CENTER OF f.OIKIRADO 1-800-922-1987 woo; cea%Io"RuuvAR lips Tie wino+[ auxDS OF IF lmllrEsn. sT/NOARD EROSOM ANp MDIWN T MNMOL COMMUR ON PLAN NOTES Seplembw, M3 NJ Th mtl nWMtw must be nmim a kas Wearyry bw RID M1mrs Met to my cmdwdimm axis ato. (2.1 Them &NETbe no 0mna[mlWng etbHy mmhr Melmnx emsman m the a¢agm vox. t].) M reryirm law me N sin a no can Wumzw %as,9wall As nzmlled pDpL is any lend dap Doing e[aAy (4acXplbq, Oppall gong Oct. An alter DwWm auxin nall,mamm wall be Indeed ante aLyropiam Bose,, me mnActim seymo as me[ame in the aWFWW pmjM i OWla Cwxmr[am punsma winos [olmi rapm. 0) At Ed Lmu during crosautnan the DnMMw shall W respmsble ear pevWing and mla M users Moson step ng the pweM atncienty"wW m es he MINMp wind Nowt[myMnL TM Deetlmw Pall him M nepmude fop mstaing out Maimmmnt all wwon m fa WbmMroml heran (6J PpetiP ce v"a m shall be geected and Maned Mpewer[assble Remwalwddwbnceof emitting y9a11m shall be limited to Me er®(x)DryupW mrmmeeate cWsWdim m Mmi and tbxh°ewt patllgl pwlW of time (SJ Al Sp avWme WnnglanddSWDoiyatw,y(enppns. grating. Nily bslMltivn[,9rcYplmq filling All [eke0inamp mW[mdwnbroingadNdngPmgmnecmmmpeelankh. agtlmim, v mhv mrrmnmlamslm caNtl gMPo are,nffiIlm. No sah h am[ oNP6 Mo rifts yAm Permanent anion Wwlane esm2ingmevbrfa more men mint( lldrysb s Deapri ate dapermenam emam embtl tog amFrukM1,Imhtyxnq Y[)is InPellad uNnsdMpMm In I t w, zeam,Ny a) pmmmmod , met. dl Len MD(Z w Lmeolmeaaccnm III Dam wee( n w a Beim a morn dome two w..ka.,�a.A. mina imam cam w.n I T v le worry to m merino to mppneaadW as px<ezm maawme mom. [anmaee DmDmenwd W a W m - nem Mnnm. @)as mMramnm by the ero art omra mpav nNn9dW 2m apwsaro sul! emy Ladlladi of Be wma%rlhoatehasbMn%Mi0dyaebil,ndesdNwminmbytMe,Owwcwtd NET Man wyam,mmnVd measures as mmoved rue Draow snell[e'Car l RA me clean upward min al ° Hal secimed and deans kwn all damp channel endoNw Wtlk awdies. LIT The carte[Ivasea immeda*clean m amy... deems, mLviPs inedvbmy Ww,n din among smash, d lks or cone public who, of way, am Cookie am o a ad walkways madminmat me and w& working my HIT) A1� W WJpmNm mWW4 mine an swd vd eumws Nell be,emmW and a,s Wof and amnion so as mat to cause mar rants nos any wastes Piano UMW Slta. (11J Na soon byrplle shalu[em g, NOl Tee. nlayH. AE mil oncting Any scat a lm mn ng iDwN Lmn[port o orrice ,wq,ninp nd mic me MmemD an kn[mg. Mr si stWAle mpnnne one INey PN own anal be Memdmem@hm. (tz) The Pompvmmrvomme[ysdy dome ever Wnmwillmr.amroe maamnzpne Lnasmlmclmnm Hm[a w, onrcroa prop[[mebekvemmn9memaimnnce tea mtl4Cey.Cwmya Hm.srDmwx MODIC Halt Bay Ordnance end GOlwem Discharge Parma Byam (GBPSI nmkemeae mass nudaMAm (1{J cortall Am gn AS as xM1Plbe Mw,hamature mtortnWaitedwokwaeMN.TM ana Dylan mature aWaitedel e IWOme filly I50) Cast was exay bean am xemmry rangd and uon.Uponosed of br toMEsa nbn ativlirs me cancrere WeahM rmunYxYlM war endpgar does not Diem 0 err Pingft oneo O6J Tomaremat ourrol roeenmmweoNdaclammbh one or mad of are edgingsmedto tamlidechDBUMN shall eeieror eMm maintained CRY mete zero olr[Nrtly 4milisd as eeterml neagme er cmlmrnzpector (N[M1in Lwxlmeeiry Lknns Onryl. Ba�al Up.Corp ..age gar; pm z. (b.) Oamamnage Wwa- t (C) Ia W,imeter. (Q) mOma btermillnsbr. (1!J SM11Tanrs Orhoomng Wan amembrsa determined nftm pelsAwmdNo the pm[. tine MlYWenMe mpemem MaMw measures era aaernnm nxessery. as rrmmtl q the DLp(%ny MY mttm DART art a Rome SILT S TENCH .r CONTRA D a wins 1. win TRICIWG wT S BE L m T E\£Ar TImRWCE/EN TO ME CMSTRuclpli SIR. z. ASS NIIOOM'prA W � W mWMLRTMMM BEING .iT KM OMO tlM STRER. Erg 3. SE MT MD OTHER wTERM1 SMYFD. MtOR'£D Yq� OR r KM Onto OIY SIMEI 51LW BE IMI6MIELY (AT' OWED - REIGYID 1 - r lip I - 3/4M1 LAYER 6 �j7*]Qw of Y r1.fN Y i � G�i I:Y 9 rN��Y 0000000mmoou ____________ JDPES PERMIT NOTES SITE ME lPTMN d. Onslte cwstmction which cwsMts Of and utility work, Driwle roadway construction and Me crostmclim of an LID Basin d a mioled alarm drainage swales. p. The major wtiAties we planned In the following sequence: 1. Clearing and Drubbing necawry for Dsimelen controls 2. Instillation of perimeter can zJop 3. Demdllion of ixlating asphalt and site Items, as applicable. 4. Grading of Site. Parking Lot, driWE aisles, and swales and sediment/LID basin. 5. Utility construction to sew site (Sanitary Sewer. Water k Storm Sewer). 6. Private Roadway and Parking Lot Construction, Building Construction. Z Stabilization, including seeding and iamilation of permanent BMP's. 8, Removal of central measures. o. The platted one boundary cr s of oppr4.54 imathis historic acres, Proposed Brad d Brourn heaina 1-9 account for , with acres of the 4.5{ acre historic drainage burin area (I the 4Pal.54 Mast oplonl), with the remaining twill acres pared to in offsite basin o The {54 acre f ca site mtl olsout areas will be canveyatl iD p ti o d MEd ocated a LID south, as well er of the sour and nto the existing detention Dons located s the expectant cannerdof the PrpHring property. ing and WWI b. 3.3 acres of site was b expected to undergo Gearing and/or grading and aril De dsturbm. d. Rational 'C" AN 0.25 before construction with a Rolianol "C" value of 0.80 allowed alter caostruclim. par the PMHS Drainage Minter im. The Rationd 'C" varies from 0.25 to 0.95. with are average "C" being 0.65 for the PVHS Harmony Campus Emergency DWartmmt site, The site lies within the Moderate Rainfall Erodibllily Zone and Low Wind ErodBlllly Zone per the City of port Collins zone maps. With the existing site slopes of approximately 0.5% to 2X the new Improvements will be Wbjeated to DOME wind and rainfall erosion. UN The OedevM meat property for the site consists of open land vegetated with Wws and wens. R. Soil and gap fuel and fluids are antkpated pollution smrces for the PWS Harmony Campus Emergency Depar"ent site. However, there will be no vehicle storage or cleanng an site. Chemical slorege is not a,tkipated on site. Please refer to the Sto nnom er Management Plan for a complete list of onlicipoled polution sources. W. There may be anticipated nos sttrmwaler Portugal of discharge Please rent to the Slornmerer Management Plan for a complete list Of ant [pates polutwn sources An. The ultimate downstream recwvng water a the Poudre RiWEr Storm water runoff from the developed portion of the site will be cmWEM by curb k gutter, curb cul swoles and o"Hwd sheet flow to an existing drainage Swale, whcbBNchorges Swtb to an existing ,letentan pmd. located 1n the swWeasl comer of the PVHS property. SEE MAP: d- Sen Drainage Basin Emp as Erosion Cmlrol Plan. -BMP'S Ii STCRMWAMR PIX UTON PREVENTION: d. Erosion and Sediment Conlrolc Sam Ermim Central Noto and Sequence Table phis sheet). tp. Materiels Handing and Spill Prevention: Measurm should be undedN to central crosWction materials and waste, ad dHpoaal of a ce s concrete (If applicable) to re this and other materials do not leae site and enter Me public streets or Meuve th detention pond whim eventually ou0ets to Use Pandre River. Concrete, building materials. waste, and de nup by-products should not be discharousting ed into the on -site ogee e system nor should they enter the public stable w pstin &tentim Dona. In Me event of a soil from the site Into storm sewer system or existing delmtim pond. appropriate meowres shwld be undertaken immeaiatdy to remove the spilled matsiala and prevent Nlurp spills from occurring. FINAL STA8Il1ZATI0N AND LONG-TERM STORMWATER MANAGEMENT: d. See Ermlan Control Notes this sheet for final stabilization meawres to Cmtrd Pollutants in stormwater discharges. OTHER CONTROLS: Cap Measures should be undertaken to remove excess waste prodlcts tram the site and dispose of theme waste materials off site In an pprnprmle mmnm. In addition. m�sures ffimid be undwlaken to limit off -sole Mil frocking of mud and debris Willa" from vehicles leav!ng the site. Mud and debris should not be erackM along roaaways and allowed to enter nos-wotmted drainage Ways which discharge eventually into Me Cache En Poudre River. INSPECTION AND MAINTENANCE: a. Inspection and ra tenance should be undertaken on a regular basis as Outlined 'h o Section 6 of the Tams and Cmdilims of the COPS Gmsal Permit. Table Mg. Recommended Species and Application Rates of Seeds fa Temporary Vegetation and/or Coves Crops S mmar Seosan 1 Or01ed Pounds/Aare Annual RyegrasI Cool 20 Oats Coal 70 Cneol Rte Cool 4D Wheat - Winter Cool {0 Wheat - Spring Cool 60 Bonney Cool 50 Millet Warm W Hybrid Sudan Warm 15 Sorghum Warm 10 Cod season If es make Hper major growth in the spring Wom, season grosses make their majer growth In late spring and summer. Table 1T4 identiries planing dates for pore nid and temporary/coves crop grosses. Table 11.4. Planing Data for Perennial and Temporary/Cover Crop Gmsxs DATE PERENNIAL TEMPORARY/COWER GRASPS CROP GRASSES Warm Cad Warm Cod Jan Ot - FM'{6 Yes Yee No No Mar 01 - May 15 Yes Yes No Yes May 16 - May 31 Yes No Yes No Jun 01 - Jul 3 No No Yes No Aug 01 - Aug I No Yes No Yale Sep 01 - Sep 0 No No No Yes Oct 01 - Dec 1 Yes Yes No No Mulching shut be used to assist in eslablishmmt of vegetation. One or moreof their mulches shall be used with a DerennW tryfand grass seed mixture or a temporary vegetation or corer map. Mulch Acceptable Doles of use Application Rolf Straw or Hay Jon 01 - Mae: 31 1 1/2-2 tons/ate Hydraulic (wood or paper) Mar 15 - May 15 1 1/2-2 tons/awe Erosion control (mats or blankets) Jan 01 - Dec 31 Not applicable Hay or straw mulch shall be free of noxious worker; and at least 50% of the fiber 0011 be 10 inches or more in length. Wren seeding with native grasses hay from a native grace is a suggested mulching material, if a liable. If Irrigation is used, hydraulic mulches may be applied iron March 15 through Sep 3D May or Straw Mulch 1. Hoy or straw mulch All be anchored to the $0 by one of the following methpp (a) A crimper which will crimp the fiber four Inches or move into the aril. At least 50% of the Bbs shall be 10 Inches or owe In length. M) Manufactured mulch netting installed OWED the hay or straw according to manufacturers' Instrucllons. (C) Tockifiers sprayed an the mulch to the manufacturer's recommendation. 2. All area* w hav must be Rap of noxious so etle. :I .........e...� p`M"p AA6��0� VIAT ' ANW e'" �...m,m[.tm ep ate.. n..m. STRAW WATTLE OR GRAVEL FILTER¢ FOR ePt etrr FINE cam.ES, IN S. fic STRUCIURE City of FortCollins, Colorado UTILITY PLAN APPROVAL APPRMM: City Engine* Date CHECKED W. Water TicWmte*aUpter L WM CHECKED BY: Sturmwua Utility Date CHECKED B Parka AT Recreal'ron Date CHECKED B)D Traffic Engines Oete CHECKED BY: Environmental Planror Gala CHECKED BY: FIND 1 OFSiO BY AG 1 p "BY'. AM 1 U) a Q U Z 0U Z J_ Ld Q few II Vl Us N F ' Z JW QU �= U_ W( Q Cap Q 0 a O O J O V Z Z J U H. 0 9' Q lops in 0 V) F- 0 Z J 0 Qe Z 0 U Z 0 N 0 W W LOCAL ENTItt ORTHESE PLAINS ECONCEPT ONLYBEEN �THE THE y ED AAFp'eON REVIEW DOES NOT IMPLY RESPONSIIBILITY BY THE REVIEWING DEPA TMENT, THE LLOCALEMIiY ENGINEER. OR THE LOCAL All FORACCURACY AND CORRECTNESS OF TTHE CALCULATIONS. NRDIEAMDRE, THE REVIEW NOT IMPLY THAT QUWMES �OF ITEMS ON THE PUNS ARE THE P1 OIIRNNTIES QGOES REWIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON f5 AGCEPTANCE No: i000O2 DP FINANCIAL RESPONSIBILIT" BY THHE LOCAL tie 02c i1B ENTIT" FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REWIRED DURING THE SHEET NO: Q-005 CONSTRUCTION PHASE. 5 OF 11 ---------------- --------------- _I_—__--__.�________ I I I I 1 1 I 1 MISTING DETENTION Z 0 m fP D '9 rn m am I I I I I 1 I 1 I I HARMONY ROAD 9�6D— 81__�____ _� -- on - -------h--- eo \ RD PROPOSED BUILDING i \ FF 4962.50 i RUNOFF FROM THE DEVELOPED SITE HALL BE ULTIMATELY CONVEYED l AGE SWALE, WHICH FLOWS SOUTH ALONG THE EAST SIDE OF THE PV IS DETENTIONPOND. M.. EDONTHESMALLRUNOFFFROMTIISGRASSAAEA(0.27CFSAND1.24CFSFCR2-YRANDI0 YRRUNOFF, RESPECTIVELY), THE EXISTING INLETS CAPACITY WILL NOT BE ADVERSELY AFFECTED, AND RUNOFF ME BE CONVEYED TO THE SAME OUTFACE POINT (EXISTT ING DETENTION READ) AS INTENDED IN THE DRAINAGE MASTERPLW. 2) PLEASE REFER TO THS RATIONAL METHOD CALCULATIONS FOR COMBINEW ATTENUATED FLOW FROM COMBINED BASINS. 3)17OFCOOTCUSS'A' BEDDING WTERIALSHALL BE PLACED UNDER ALL RIPRA➢SNDAN ALLRIPRAPSHALLBECOVEREDWTHWOF TOPSOIL. 4) ROOF ORDERS FROM THE PROPOSED BUILDING NQL BE PIPED INTERNALLYAND DISCHARGED NA LAMBS TONGUES FLOW N1LL RE CONVEYED EAST, THEM SOUTH IN A SOFT PAN SWALE AND TREATED IN THE PRE -SEDIMENTATION BASIN. PRIOR TO FLOWS SPILLING SOUTHEAST, THEN SODUM IN THE EXISTING SWALE SYSTEM AND INTO THE EXISTING RETENTION POND. 5) POROUS PAVERS HILL BE CONSTRUCTED IN PARKING BAYS AS SHOWN IN THIS PLAN. PAVERS WILL BE ALLOWED TO PERCOAT[IMO THE SOIL AND PROVIDE ADDITIONAL WATER DUALITY, PRIOR TO BEING CONVEYED DOWNSTREAM VIA THE SUBDRAIN SYSTEMS. 5) RUNOFF FROM THE PARKING LOT WILL GRAIN TO LOW POINTS, PASS THROUGH CURB CUTS, SIDEWALK CHASES, Sial AND SOFT PANS BEFORE ENTERING AWL UD BASIN AT THE SOUTHEAST CORNER OF THE SITE. A POROUS, RIPSAW LINED INFILTRATION WIN. WALL ENHANCE INFILTRATION WITHIN 4HE LID BASIN. OVERTOPPING FLOW HILL DRAIN SOUTHEAST TO THE EASING SMILE MIT WILL THEN BE DIRECTED SOUTH AND INTO THE ILEXISTING DETENTION POND, IN ACCORDANCE WITH! THE DRAINAGE MASTERPUN. T) RUNOFF FROM THE PRI,LVt DRIVE WILL MEETING CONI EAST IN THE MENG AND PROPOSED CURB ANDGUTTER. THENORTHECO'MIME MASTER LEGEND. B) SEE SHEET C402 FOR e R LOCATIONS OF CONCRETE 6 METAL SIDEWALK CULVERTS, CURB CUTS, CHASES, AND SIDEWALK DRMNS. 9)SEE SHEETS C4 FOR DETAILS OF CULVERTS C1 G. .SEE SHEET C407 FOR ATABLE WT PRIVATE DRIVE ti ------------ I PROPOSED DRAINAGE BASIN SUMMARY TABLE: DRAINAGE WIN DESIGN POINT I PROPOSED DRAINAGE BASIN SUMMARY TABLE: DRAINAGE WIN DESIGN POINT gW E BASIN AREA pveq 'C VALUE Da BAN _. OUT all 1 1 045 O o LAOS 4L45 2 2 0.53 OST 131 S.0 3 3 010 033 O.W 0311 4 4 025 OTS 0S5 2N 5 5 011 090 1as 4.11 5 5 013 055 0M 1M T 3 0.22 0.50 0.67 2.Be B B O.71 OA an 114 9 B Bm OS3 032 tb 051 t0 1.37 OSG 0.38 lA SITE SITE 317 065 1 1y,Va BA11 4eawxwr. � 1 1 I � I I\ III 1 \ I I I IIII IIII I III I 105 I I I I I I I I I I 4.54AC I I I I I I FTITILq SWALE H 1 0S1 I „� Ili ll PROPPREANDIMENMUUWNFORNaMEASURE IIIII ON I I ��wILIETATIONe"eIN 11 l Ni,FNESEDYEHT.LIgx aWRHmN,FIEV.,T}N i l I I �I — — — FMRNMLFWin VnDPFF1Y 6'NMWv p --- PRDRasED.LawLINE g 54960— scoxrows Easnxs mlrtou -----4959 --- � :� �.NTI„cxT�MPIPE.M,N�,� --� PUDEXEDSTanxrlxEPRI o DRAINAGE BOUNDARY LINE _ PROPYA �AIMEAN ID ENIDAILRE � ° oPRaPaas)tWEINAGEOEMGNPLANT ELD.ARRDw c 105 —HISTORIC DRAINAGE BASIN ID (FROM PVHSS500N0 ELxANVATERPux DEN WAVE STUDY 4 ®®6 - ® 4.54AC - ACRES CHECKEDBY', AEG 0� PRMWED ROEi NUNN LOCATION DOUNEDer'. !RG DRAWN BY AWL ORA6619061INED •x.G s+m EAERIc 1m YR MO L ff F. 2.00' 0.6I' M1�MA LJ� BUD 2.6 &G' *SWALE A -A CROSS SECTION Dm=D®a G.•ba'IR01 a.•rp6n DRASSIwau NSD •NYi51m G ess" 1m Yl l 0.5g' 1 1'6V ry��Qi Aa� g,( 00' 16' SWALE I CROSS SECTION D.•523aN WTI a...lezli wl a.•cvro.m .mr�c S•1.+M N ca L U z OZ J m av O 2 D F2 k2 W F 4 O Z tll a,- U W Z m fx W 0 Z QU F W J 0� 0 yIy V 0 Jp City of Fort Collins, Colorado J UTILITY PLAN APPROVAL y APPROVED: 2 City Engineer Date 0 W CHECKED W. F Water a Wastewater Utility Date O CHECKED RA: - Stortnw0ler Utility Date F U O O CHECKED BY: w PDrlu IT Recreation Dale 00 a a K 0 CHECKED RA: a 0 TMticEngineer Date CHECKED BC �uINIIwI M, _1 Emimnmental Planner Dale THESE PUNS HAVE BEEN RENEWED By ME LOCAL - WIFE FOR CONCEPT ONLY. THE REVIEW DOES NOT '= B IMPLY RESPONSIBILITY BY ME REVIEWING DEPARTMENT, THE LOCAL ENTIfl ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF S /pNA'„NdG ME CALCULATIONS. FURTHERMORE, THE RENEW DOES NOT NPLY THAT QUANTITIES OF ITEMS ON THE PUNS ARE ME FINAL QUANTITIES REQUIRED. THE RICOM SHIM-1-SHIM-1-NOT BE CONSTRUED IN ANY REASON AS P1WNJmcTN m 4onmf TIC 02A1TA15 ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE SHEET No: C-006 LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED WRING ME 6 OF 11 CONSTRUCTION PHASE.