Loading...
HomeMy WebLinkAboutDrainage Reports - 04/03/1992Final nnroved Report Date�Q� THIS PRELIMINARY AND FINAL DRAINAGE STUDY AND REPORT FOR SUNSTONE VILLAGE 6TH SUBDIVISION (FILING 6) WAS PREPARED BY LAND DEVELOPMENT SERVICES USING THE CITY OF FORT COLLINS STORM DRAINAGE DESIGN CRITERIA, dated May, 1984. The results of this drainage study are reported in the enclosed text and supporting documents, and are shown in further detail on the Utility Plans submitted concurrently with this report. This report is a revision of the original report dated July 1, 1991. Signed this 121h_d,2Y_Q£_March, 1992. Dennis L. Donovan, P.E. Land Development Services 309 W. Harmony Road — Unit A Fort Collins, Colorado 80526 Phone (303) 225-9244 W SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL STORM DRAINAGE REPORT I. GENERAL INFORMATION Sunstone Village 6th Subdivision P.U.D. (6th filing) is a proposed single family subdivision in the City of Fort Collins, Colorado. The site is generally located east of Timberline Road and north of Harmony Road in southeast Fort Collins. The Sunstone Village 6th filing is a part of the Timberline Farm P.U.D., which consists of the West 1/2 of the Southwest 1/4 of Section 32, T7N, R68W, Sixth Principal Meridian, Larimer County, Colorado. The proposed development consists of 34 lots on 9.76 acres, which is consistent with the approved Master Plan. The 6th filing is bounded on the north by Sunstone Village 5th Subdivision P.U.D. (5th filing), on the east by Harmony Village Mobile Home Court, and on the south and west by undeveloped land that is also a part of Timberline Farm P.U.D. The 6th filing is a part of the property identified as Timberline Farm — Phase B on the Master Drainage and Utility Plan prepared for the City by Engineering Professionals, Inc. (EPI) of Fort Collins. EPI also prepared the Master Drainage Report for Timberline Farm P.U.D. and both the Preliminary and Final Drainage Reports for Sunstone Village 5th Subdivision P.U.D. All of the 6th filing is a part of Drainage Basin 2, as identified in the Master Drainage Report. The Sunstone Village development includes four filings that are located outside of the Timberline Farm P.U.D. boundaries. The 5th filing ,was the fist development within Timberline Farm P.U.D. All of the Sunstone Village and Timberline Farm property is located within reach 2 of the City designated Fox Meadows Drainage Basin. The 6th filing has historically been used for agricultural purposes. It is part of a larger basin that drains to the north. The site has slopes of 1/2% to 1 and 1/2%. Off —site drainage onto the site consists of sheet flow from the undeveloped area to the west. There are no active irrigation ditches within the site. A drainage swale and detention system exists downstream from the 6th filing within the 5th filing. The existing swale in the northeast corner of the 6th (and southeast corner of the 5th) filing provides a storm water discharge point for the easterly portion of the site. Most of the westerly portion of the site will drain northerly and then westerly into the streets, storm sewer system and, ultimately, the detention facilities in the 5th filing. The remainder of the site consists of back yard areas that will flow easterly onto developed lots and along lot lines to the drainage improvements in the 5th filing. All of the storm drainage systems are in general accordance with the Master Drainage Plan. SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL STORM DRAINAGE REPORT The storm water detention system downstream in the 5th filing was designed to accommodate direct (undetained) storm runoff from the 6th filing. Accordingly, no detention facilities are provided within the 6th filing. Additionally, no basin —wide improvements for the Fox Meadows Drainage Basin are required for the 6th filing. A preliminary street and grading plan was prepared for the off —site area to the south of the 6th filing in order to estimate the impact of storm runoff after future development to the storm drainage system in the 6th filing. This area of Timberline Farm P.U.D. — Phase B will probably be developed in 1992 as the 7th filing. II. Proposed Storm Drainage Plan The proposed drainage plan for the 6th filing is in general compliance with the Master Drainage Report. The site has been divided into eight (8) sub basins for design purposes. In addition, three off —site sub —basins were identified as being contributory to the storm runoff design considerations within the 6th filing. The 8 sub basins within the 6th filing are identified at Exhibit A, which is the Grading and Drainage Plan (Sheet 7 of 8) of the Construction Drawings for the 6th filing. Exhibit B (identified as the Overall Drainage [lap) is also included at the end of this report showing the three off site sub basins, as well as the 8 on —site sub basins. Sub basins #1,#2 and the westerly one—third of #3 will drain to the intersection of Stoney Creek Drive and the cul—de—sac serving Lots 16 through 27. There, the runoff will be joined by future flows from off —site sub basin #0-1 and on site sub basin #4, which will drain from the south in Stoney Creek Drive to the intersection. The flows from sub basins #0-1 and #4 entering the 6th filing in Stoney Creek Drive from the south (after future development) are identified at Exhibit A as Design Point A. The storm runoff intersection from the runoff from the north filing to comprise all Storm runoff from the tract on the east side Point B on Exhibit A. reaching the Stoney Creek Drive/cul—de—sac west and south will be joined by storm from off —site sub basin C-6 in the 5th of the storm runoff at this intersection. intersection to the east into the drainage of the 6th filing is identified as Design According to the Master Drainage Report, Timberline Farm P.U.D. area south and west of drain to and along the Drainage Tract on the more -of the the 6th filing will east side of the 6th SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D.. PRELIMINARY AND FINAL STORM DRAINAGE REPORT filing. However, a storm water detention facility to be constructed within the off —site area will limit the discharge during a 100 year design storm to 8 cubic feet per second (cfs). The Master Drainage Report identifies a pipe culvert and overflow swale to carry storm runoff in the Tract on the east side of the 6th-filing between the proposed detention facility to the south and the existing detention facility in the 5th filing. The swale connecting the existing and proposed detention facilities is identified on Exhibit A as Section B—B. However, the 5th filing Final Drainage Plan and Report did not include the pipe culvert. Considering the low design discharges to be contained within the drainage tract on the east side of the 6th filing, only a drainage Swale is proposed in this location. Since the slope of the drainage swales are less than two (2) percent, a two foot wide concrete low flow pan has been designed and included to protect both swales (Section A —A and B—B) invert from damage from nuisance flows. On —site sub basins #5,#69 and #8 will drain to the intersection of Stoney Creek Drive and Summerstone Court. Additionally, off —site sub basin # 0-2 will contribute storm runoff to this location, which is identified at Exhibit A as Design Point C. The Hydrologic Characteristics for the on —site and off —site sub —basins, as well as for the combined sub basins at the three Design Points are included oh,the following page as Table I. PAGES HYDROLOGIC CHARACTERISTICS SUNSTONE VILLAGE 6TH FILING 2 YEAR 100 YEAR BASIN AREA C VALUE TIME OF TIME OF 12-YR i 100-Y Q 2-YR Q 100-YR DESIGN DESIGNATION CONCEN- CONCEN- IGN NT TRATION TRATION (ACRES) (MIN) (MIN) (in/hr) (in/hr (CFS) (CFS) ON -SITE #1 1.79 0.4 14.2 11.4 2.2 6.7 1.6 6.0 #2 2.19 0.5 18.3 14.7 1.9 6.0 2.1 8.2 03 1.35 0.5 13.9 12.3 2.2 6.5 1.5 5.5 #4 0.15 0.25 10.0 10.0 2.5 7.2 0.1 0.3 #5 1.23 0.6 11.0 10.0 2.4 7.2 1.8 6.6 #6 1.26 0.6 10.8 10.0 2.4 7.2 1.8 6.8 #7 1.40 0.25 10.0 10.0 2.5 7.2 0.9 3.2 #8 0.40 0.8 10.4 10.0 2.5 7.2 0.8 2.9 OFF -SITE #0-1 #0-2 #C-6 COMBINED FLOWS #0-1 & #4 #2,#3,W1/3 OF #1,#4, #0-1 & #C-6 #5,#6,#8, & # 0-2 2.62 0.6 13.1 10.0 2.2 7.2 3.5 0.30 0.5 10.0 10.0 2.5 7.2 0.4 0.80 0.5 15.1 12.0 2.1 6.6 0.8 2.77 0.6 13.1 11.4 7.61 0.54 18.3 14.7 3.19 0.63 16.9 13.1 2.2 6.7 3.7 1.9 6.0 7.8 2.0 6.5 4.0 12.6 1.4 2.9 13.9 A 30.8 B 16.3 C Pa6F � SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL STORM DRAINAGE REPORT The Time of Concentrations were determined using the equation for overland flow in the design manual, and then by adding the time of gutter flow - which was estimated to be at a velocity of 1.5 feet per second for the 2 year storm and 2 feet per second for the 100 year storm - to the point of discharge from the particular sub basin. The formula for Time of Concentration is: Tc = [1.87 (1.1 - CCf) D1/21 / S1/3 The following is a summary of the 2 year, or Minor Storm, Hydrologic calculations for the eight sub basins (i.e. Cf = 1.0): Overland Flow Gutter Flow Total Time Sub basin L Delta H S Tc L Tc Tc ft ft % min ft min min 1 60 1.6 2.7 7.3 620 6.9 14.2 2 230 4.2 1.8 14.0 390 4.3 18.3 3 160 3.6 2.2 9.7 380 4.2 13.9 4 minimum 10.0 5 115 2.1 1.8 8.2 250 2.8 11.0 6 120 2.6 -2.2 7.9 260 2.9 10.8 7 minimum 10.0 8 270 1.9 0.7 10.4 N/A 10.4 The following is a summary of the 100 year, or Major Storm, Hydrologic calculations for the eight sub basins (i.e. Cf = 1.25): Overland Flow Sub basin L Delta H S ft ft % 1 60 1.6 2.7 2 230 4.2 1.8 3 160 3.6 2.2 4 minimum 5 minimum 6 minimum 7 minimum 8 minimum Gutter Flow Tc L Tc min ft min 6.2 620 5.2 11.1 390 3.6 8.6 380 3.7 Total Time Tc min 11.4 14.7 12.3 10.0 10.0 10.0 10.0 10.0 The Time of Concentration for combined sub basins was determined using the longest time of concentration for any of the sub basins contributing at that point. III. DESCRIPTION OF STREET FLOWS AND DRAINAGE IMPROVEMENTS Due to the relatively small areas of the on -site sub basins and the off -site sub basins that will contribute storm runoff to the 6th filing, the concentration of discharges in the street gutters will be somewhat minor. /' '# 61= E SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL STORM DRAINAGE REPORT The largest flow in a gutter will be from the combined sub basin #,s 5.6 and 8. There a 2 year "minor" design discharge of 4.0 cfs is estimated, and a 100 year "major" design discharge of 16.3 cfs is estimated. The slope of the street at that location is 0.8 percent. According to Figure 4-1 of the design manual and using the following criteria: Cross Slope of 2 %, so a Reciprocal (Z) of 50; a Roughness Coefficient (n) of 0.016 from Table 4-3; and an allowable depth of flow in the gutter of 6 inches during a two year storm, the gutter will carry about 25 cfs before exceeding City criteria. That capacity is about one and one—half times the 100 year storm discharge at Design Point C. Obviously, street flow encroachment is not a problem. For the streets at 0.5 percent gutter slope, the capacity is about 20 cfs at 6 inches deep. The largest gutter flow in a street at this minimum slope is only about 2 cfs. Obviously, street gutter flows in the 6th filing are well within City of Fort Collins criteria. Storm drainage facilities, or improvements, for the 6th filing include cross pans at the intersections, a 12 foot cross pan across Stoney Creek Drive, a 12 foot sidewalk culvert from Stoney Creek Drive to the drainage tract between Lots 30 and 31, and open channel/swale improvements in the drainage tracts. Because of a lack of positive drainage in the abutting lots in the existing 5th filing, drainage swales with concrete pans on the rear of 6th filing Lots 5, 10, 11, 15, 17 & 18 will be required to intercept flows from the 6th filing. A portion of the flows will drain to the existing drainage swale/easement between Lots 67 & 68 of the 5th filing. The remainder will flow to a new 10 foot sidewalk culvert into Stoney Creek Drive at the northeast corner of Lot 15 in the 6th filing. Cross Section C—C is provided at Exhibit A that provides hydraulic characteristices of the swales along the rear lot lines. Cross Sections A —A and B—B are shown at Exhibit A that provide the hydraulic characteristics of the open channels that are to be constructed in the drainage tract. For the reach from Stoney Creek Drive downstream between Lots 30 and 31, the Swale will carry 37.9 cfs at a depth of 1.8 feet. The 100 year storm discharge is estimated to be 30.8 cfs, so the channel section is adequate to pass the major storm discharge. The larger channel running south to north in the drainage tract on the east side of the 6th filing will carry 52.7 cfs at the minimum depth of 2.0 feet. The major storm near the north end of the channel (where it will tie into the existing channel in the fifth filing) is estimated to be only 39.6 cfs. The channel section will easil.y handle the 100 year storm. FA G E SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL STORM DRAINAGE REPORT During the interim time prior to development of the 7th filing and the proposed detention pond in the southeast corner of Sunstone Village, the Swale along the east side (Section B—B) will be adequate to pass the 100 year historic flows from the area to the west. Maybe two acres of crop land will drain into the swale. That equates to only 3 or 4 cfs. Most of the area that will be routed through the proposed detention facility flows southeasterly to a natural swale that does not pass trough the 6th filing. When completed, landscaped, and subject to a warranty period for the improvements, the City of Fort Collins has agreed to accept ownership of the drainage tract for future maintenance of the integrity of the drainage capacity. In summary, the proposed storm drainage for the Sunstone Village 6th filing is rather minor in scope, and the resulting storm drainage system should adequately protect life and property on the site. 40-rF : Ne�(T 3 PA mars A R E C� LG U Lf� Tl O NS F d 1Z 0 Y'P� AULI SW A L E-5 PA G -C -7 INTERMILL LAND SURVEYING, INC. 1301 North Cleveland Avenue LOVELAND, COLORADO 80537 (303) 669-0516 MDMJM Zb1�1�c,Gmmt Wa0N71. TOONe MKTOLLFRU 14WMM JOB 5 t �o }- SHEET NO. OF +� CALCULATED BY p L n DATE _ CHECKED BY DATE ecAi F INTERMILL LAND SURVEYING, INC. 1301 North Cleveland Avenue LOVELAND, COLORADO 80537 (303) 669.0516 JOB SHEET NO. OF PLD CALCULATEDBY— DATE CHECKED BY DATE SCALE ........... . ........ .... - ... .. . .. .......... ................. ...................... ............................. ............ ...... ............... ........ .......... ....... ........... ...... .......... ....... .. VLA- .. ... . .......... CA .. L.c. ...... ........... ...... .......... ...................... ............ ........... .... ... ....'.4-o . ... ... r] .. �h.J-6 ...... . C, ................... ....................... S� A [_ice,_... ........... .......... .................... ............ ........................ .............. . .......... ....... ............. ......................... ........... ........ ....................... ............ ....................... ....... 0? ...... ........ Gi .................. .......... ............... .......... ........... ........ ....... ......... ...... - .... .......... ................... ... 2-1 ...... YJ ............ ... .... ...... 2 t P ....... ........ ; ................................ ............. . .......... .......... ............... ............... ...... .......... ........... .................................... ......... . . ........ ........ ..... .............. ....... ...................... . ........... ........... ............... .................... ....... ......... .......... ......... ............ . . .......... . ....... ... .............................................. .......... ....... .......... . ..... ............... ................. ...... . ........... ..................... .................... ........ ..... .. ....................................... ....................... ........................ ......... .................... ...... .......... .... ................. ...................... -T .......... ........... .. ........ ...... ... ... .......... ....................... ........... - ....... . ........... ........... ..................... ....... ....................... ........ .......... .......................... ........... ....... 0 ........... ...................... .......... . ...................... ................................... ........... ....... ........ ........... ........ ........... ... - ........................ 30 ........ ..... ... .......... ........ ........... .......... .......... ........ - ..... ....... ............. ............ ...... . . .... ........... ........ ........ ........... .............. . ...................... ........ ...... .......... ........................... ...... ........... .......... ......... ........... . ...... - ...... ......... - - ..... .................. ....................... ------- ...................... ......... .. ........ .. .. .gyp.. ........... .......... .......... . .......... ....................... ...... .... . ..... ....................... ........... ..... w .. ....... ......... ........... .......... ........ ......... ... ...... ...................... ........ .......... ......... .................................... ........ . . . . ... ...... .. . ........ ......... .... ...... - ..... .......... ....... ....................... ............. ........... ... . ... ....... .......... ........... .......... ......... ......................................................... ............ . .................................. ...................... ........... ....................... .......... ..................................... ................. ........ - ........ . ..... ....................... ................... ........... ....... .......... I ......... . .................... ......... ...... .......... ....... . ......... ......... .............. ...... .,31 .......................... ...................... ... ... ...... ... ... .......... ..... ...... . ........... ....... .......... .......... .... .. ..... ........... ................. ...................... . . ...................... ........... .. ............ .... . ........... ........... ......... ..... ji 1 . It ...... ... ................ .......... ......... . .......... ........... ................... ................ .............. ........... ........... ........... ...................... - ....... ........... .............. ....... ..... .......................................... ........ 5..es) . ........ .............. ........... .......... ............... . ......... .......... . .......... .......... .......... ................................. . .......... ......... ....................... ......... . . ............ ........... .......... ...... Z-1- ......... - ................ . .......... ........... ............................ ......................... .................... ........................... ........... .......... 1 ......... ......................... ....... ........... ........... .......... - ........ - ........... ........... .......... .......... ......... ....... .......... ........... ....................... ...................... 1 7 ............ ......... .......... .......... .. ..... ................ ........ ............... ...... .......... . .......... .. .............. . .......... .......... ......... ........... ......... . ... ........... ............................................ ........... .......... ................ ........... .... ..... . ................ ................ .......... .......... .......... . . .......... ..... .... ........ ......... . .......... .. .. ... ......... .. ........ ...... .................. ....................... ........ .......... .......... ..... ........ ...... ............. .. .......... ....... ........... ................... .......... .......... ............ .... ....... .. . ........ .......... .......... .. ............ .......... .......... ........... ............. ............ ....... ........... ............. ........ ....... ...... ........... .. . ........... ...... .......... . ....---------- ............ ........... ............ . ....... ...... ............ ............ P .................. ............................ . ...................... .......... .......... ........... ........... .......... ........ .................................. ...... ....... - .......... .......... ........... ......... ....................... ........ ..... .......... ......................... ........... ....... ........... ... .................. .......... .......... .......... ..................... ................... ........... ........... ........ ....................................... ........... .......... ........... .......... .......... .......... ......... .......... .......... ........ .......... ........... iD ........... . .. ......... ........... ................. . .......... .......... .......... . . .......... ........... .................................... .............. ... ........... ..... ...... ........... ........ .... . .... - ... . .......... .......... ....................... ........... .......... t P ............ .......... .......... ........... .............. ........ - ... ............ - ....... . .......... . 1 0 ....................... ............ .......... .......... .......... ....... ........... .................... ........... ....... .......... ........... ........... .......... ........... .................. ........... ...... . . ..... ........ . .......... . .................... .......... ...... ...................... .. ...... j ........... .......... ....... .......... ........... ................. . . . . .......... ........... 1 4;0 1 ........ .. ........... ----------- .......... .......... ......... ........... ............ .......... .......... .......... . .......... .......... - ... .......... ........... ........... ....................... ...................... . ....... ........... ............... ........................ ........... .......... ......... PMDJCT Ml�k, GIM Mm 061. To Oft PHONE TOLL FPH 140bMM INTERMILL LAND SURVEYING, INC. 1301 North Cleveland Avenue LOVELAND, COLORADO 80537 (303) 669-0516 SHEET NO. / OF ` CALCULATED BY IJ -P DATE CHECKED BY _ DATE I o : ..... .. .... ........ .. _ ..... ,.... .. �N) J .' Z. 0 ........: ...:. ...... ...:...... ... i 0. .. ........................................... 0..... . o 6 2Co fe �a v� 5 L. nc r.e .... ..... w...�., ... w : A Zf 3 ..... .... 5'tz. V . . Q . ....... ;....... CST)................n .. ..... ... .. .....,...... ............ 0.:Z Q.o s .. Z.a... ..... O Zo .......... :... ...... 0.215:.........6, �_OS Z.ZS . ....Q.`t o. �f Q.o38 , ;4' .... a,g .. _,3y2..... �,`h 11 .. .......... , . .................. ........:... .... t>.2: .......... :... ...... . .... ......: . D,5.. ..... ...... ...... .. : 4ido �Z 5GF5 e.. _.... ..........'....... D,3. . ;. .... DG..... .... .. ... ....,.L.. . i ... ................... i...... .. .... .. ....... ... .:.... Z� -3 : ....................... .... , .. ... ... .. 4............... ......... .............. ... _. ....:.. ,....................... ........... ................ ............... ... .. ... o ... .. i .. .. .. ... .. .. .. PWOM7 Ml1Q .GVMY OWL T.00e MM TOLL ME 1,WM4 o THIS PRELIMINARY AND FINAL EROSION CONTROL PLAN REPORT FOR SUNSTONE VILLAGE 6TH SUBDIVISION (FILING 6) WAS PREPARED BY LAND DEVELOPMENT SERVICES USING THE CITY OF FORT COLLINS EROSION CONTROL REFERENCE MANUAL for Construction Sites, dated January, 1991. The results of this erosion control study are reported in the enclosed text and supporting documents, and are shown in further detail on the Utility Plans.submitted concurrently with this report. This report is a revision to the original report dated July 1, 1991. Signed this 1$£h_daY_Q£_February, 1992. Dennis L. Donovan, P.E. Land Development Services 309 W. Harmony Road — Unit B Fort Collins, Colorado 80526 Phone (303) 225-9244 SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL EROSION CONTROL PLAN REPORT The erosion control concepts and general design consideration for the Sunstone Village 6th Subdivision P.U.D. (6th filing) are outlined in the following paragraphs and shown in further detail on Exhibit A. The exhibit is the same as for the storm drainage report, and is Sheet 7 of 8 of the Construction Drawings titled OVERALL GRADING, DRAINAGE & EROSION CONTROL PLAN. It was determined from the reference manual and a Wind Erodibility Zone Map that the Erodibility Zone for both Rainfall Erosion and Wind Erosion is moderate for the site. Standard Form A "RAINFALL PERFORMANCE STANDARD EVALUATION" follows this text. It identifies the two areas of concern for an erosion control plan and identifies their pertinent basin characteristics.. Sub basins 1,2 and 3 will drain to the northeast corner of the site and exit into the existing Swale and detention facility in the 5th filing. That area requires a Performance Standard of 78.0 percent from Table 5-1 of the manual. Sub basins 5,6 and 8 will flow to the 5th filing at the intersection of Summerstone Court and Stoney Ridge Drive. Table 5-1 indicates a required Performance Standard of 76.0 percent. Sub basins 4 and 7 are not needing to be disturbed with grading, so they can be left in their current situation planted with crops. Standard Form B "EFFECTIVENESS CALCULATIONS" follows Form A and identifies the recommended erosion control measures and their effect on the site. Sub basins 1,2 &3 contain will be concrete and pavement. will not have to be disturbed Rainfall erodibility deterents culvert at Stoney Creek Drive, tract at the northeast corner, swale as it daylights into the 5.33 acres, of which 0.81 acres About one—third of the remainder during the grading activities. include a filter over the sidewalk a sediment basin in the drainage and hay bales at the bottom of the 5th filing Swale. The sediment basin is sized to accommodate 348 cubic yards of sediment. The bare ground covers 3.03 acres, and the sediment basin size is larger than the 300 cy of available volume required. at 100 cy per acre. The combination of the improvements for sub basins 1,2 &3 yields an Effectiveness of 81.1 :, which is more than the 78.0 Performance Standard required. In sub basins 5,6 and 8, the area is 2.89 acres. Of that, a relatively large area of 1.33 acres will be sidewalk and paving (there are lots on only one side of the streets in much of the L SUNSTONE VILLAGE 6TH SUBDIVISION P.U.D. PRELIMINARY AND FINAL EROSION CONTROL PLAN REPORT area). By planting the disturbed area in temporary crop cover after grading, an effectiveness of 82.0 : is achieved. This is in excess of the Performance Standard required. To minimize wind erosion from the site it is recommended that the northwest perimeter of the site be provided barriers of some type. Snow fence, hay bales, windrows perpendicular to the northwesterly winds would each be a helpful improvement. The construction schedule for the project is to begin grading (with the sediment basin and drainage swales to the basin being at the beginning with the grading activities) in early March, 1992. It is a relatively small phase of development, so it is anticipated that grading should only take 4 to 5 weeks. The seeding activities required should occur in May. During construction, adequate watering of haul roads and areas being graded during construction should also be provided. Standard Form C Follows Form B to identify the Construction Schedule and timing for installation of erosion control measures. The erosion control measures should be maintained by the developer until the majority of homes and landscapede lawns have been completed and the developer is allowed by the City Engineering Inspector to remove the sidewalk culvert filter and the hay bales, and to fill in and landscape the sediment basin. RAINFALL PERFORMANCE STANDARD EVALUATION --------------------------------------------------------------------- PROJECT: 3u►J5T-otJ E UI LL AC g �j' STANDARD FORM A COMPLETED BY: O L,Ip DATE: --------------------------------------------------------------------- IDEVELOPED ERODIBILITYI Asb Lsb Ssb Lb I Sb I PS �SUBBASIN-+ -_ZONE---_-(ac)(ft)_- -_(%)_ (feet) I _(%)- I -(_)-- I .5.3 3 1 6Z 0 i), v 1 (0Z o! I, 1 19. 6 '15, 41a llg l�o�era�� -Z63 1 ego 1 6.8 { 8. 1 0,? I -7�. 0 u DI/SF-A:1989 EFFECTIVENESS CALCULATIONS PROJECT: 6UN5'i0 N� 711-t-A'{GE (CTH STANDARD FORM B j +COMPLETED BY: %LLD DATE: 7-1-21 1 Erosion Control C-Factor P-Factor Method ValueValue Comment R"D5/IA/ VILKS 6.61 ---•---- ---------- 110 I GRAVEL FI L.'TERS 1.6 6"a 5-rAA 1v BA LE5 1.6 6.8 'T E MPCROP o.y5 1.6 E5TAB,GRq S• S�.0tMENT RAP 110 ----------------------------------------------------------------------I MAJOR I PS SUB AREA BASIN (`%) I BASIN (Ac) ----- ------ ` ------ 5.33 --------------CALCULATIONS RoAp6 b.'eI RG �ST,4e,6RASS / 49 I -76,b .C3ARI: GRouND 3,D3Ac WTD C-FAGToP-27= JEO,01 X0.91)+-(419Y0,67) �� / �'VT') P FgGToR 0.8xb.8X0'5 EFF=�—(D,5':?.x0,32]fl o D 8 1 ,1 % 6 K Avo-rE: U51Nr- GRAYELA"r 5iD`=WALK CuLYER'r�NAY BALES Ai NE GORNF-P` da SEDiAi5&ST I 13A51AJ IN EAS'rERLy pRR/nJA(gr-F RoRD-5 J,33,4G CSTAB GRASS 0.5A / fZ£ GRoulll� I.D614G WTD C'1-AcToR = �(0,6111.33)4-k.5X6,6i E F F = LI — (6,38X I,o)]x10o = 6Z,o% AFDD GRDUiISb CovER To D157U► 6-5L AREA WrIDC—FAcre2 = [(D,o1%X.1.33)iCO,SXo,o7� EFF=�—(o.ISX 1.0��YIDD—SZ,OxoOK I0D Rol�IoN WILL- BE AtipRu75.5E4D C31 TFfr= GRoui OVER IPLAqTING iA NO BARR 1 E-R5 ALoNG'T+JC M6J?THW&5-j 1=RIM+TER 10r TNI-- 517-61 ---------------------------------- ------------- ----------------------- DI/SF-8:1989 2.89 to CONSTRUCTION SEQUENCE PROJECT:. Sutil5'T[1 w F V LL L 4G 1= 6Tfi Fl L I N 16 STANDARD FORM C gEQUEYCE. FOR 19 9Z� ONLY COMPLETED BY: l?L p DATE: 2—8 Z Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 1r19Z MONTH IF IMI�► i��Iv iv l ISI ---------- --------- --------- OVERLOT GRADING ✓------E ---- ------------ -------- --------------------- 1iT1 t-i-r'Y 1 nl5-rALLA f 10 ✓ �----� WIND EROSION CONTROL Soil Roughing i/ ..... Perimeter Barrier Additional Barriers ' Vegetative Methods Soil Sealant Other vi RAINFALL EROSION CONTROL STRUCTURAL: ' Sediment Trap/Basin f"� ✓ Inlet Filters K,H Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting' Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other 011JID -------------------------------- -------------------------------------------- -------------� STRUCTURES: INSTALLED BY �%V�[_pp E r2 MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HDI/SF-C:1989 APPROVED BY CITY OF FORT COLLINS ON 40. DETENT/oN POND A/0 1 . lop .41 % % A Q,-- - - 1p 4.17 000 / Q N.P. ri / e R- c� tv�- &EA%AI O,eGA✓AgB PNOnJ QB74/4 5tGT/O.J C-C AmENRE F a46 i e' k £Nv' Jlwvx< Cfuvicer /Auer /toTG0 rf4U ron]ff) .1.6]E Oa cke .2.9t ,6 b 2 - •- .av9s � of ,:3dkAR7 eRe k ee kFf l,]d3 kw'.. Ga]E Oeroka A.w k 4 ouk/�nkA. GarcE:� Gp.JGILJE y/e/✓G6f P✓ �Gl/2 zz�e eRe 4ESN%IAR eAm &6,1 AA6 4,A) A -A Kts.) AN1 • e.316 ✓ • 0455% �tiR��-c .<.a au,.am ,a✓ eXER av w .L.efl OR p,y9 I ........ p, ,y.q' ✓. oRs� Oey.,/j . BB o9h able Mw y4aR..e. 31cfs _i e Gu /✓/ne 4•e.Gp+d•6ch m_ eo' /ech/ (RE, axee o e� � a1f11 ,L.S.R. !n& e e d /A:.6' T �i JG S.vwcE (n.kfi A/0.6OceP S/(.f/O.aI O'G N• ofQ.H. 1IIL��a''L cT A.e INTERMILL LAND SURVEYING, INC N CIb4u0 SUNMERSTONE / COURT 0 L9 w io0 SCALE I'=5O' CONTOUR INTERVAL: I FOOT LEGEND MR CONTOUR. WSW---• MtA] Gb' p.� Ir F M•.e Y:/Yql. i EXIST CONTOURS _�At1W ♦RO4160 PROP. FINISH [ SPOT ELEVATIONS jo r.. MINIMUM TOP Of DS B / FOUNDATION ELEVATION \ FLOW DIRECTION ARROW GAb4V.J �ieMTLOL F \Y. ' 1 E A XVOPO�W IE VILLAGE IERIFILIN VILLROE 6]X FILING • =e / 3 YERP rW AM SIN NER O/NM TIES OF IM I£ 1 R-YR 1 IW-Y O a-YM 0 IM-YR IIEPOINTT msi mnm COVLEN- CO EN- / ]RA]101 TRA71M ACRES) 01N) IMINI. IIN6e) Un/R) ICES) KFS) /0 SITE 1 I.10 0.5 I4.3 14.6 a.9 6.0 1.1 e'0 a - SI] 0.5 I3.9 16.] .9 6.5 3.1 3 1.15 0-0 10.0 13.3 34 6.3 01 S.0.3 1.IS 0.25 .6 11.0 20.0 LS ].3 O.1 6.6 S IS3 0.6 11.0 0.0 3.6 ]4 I.I '6 1.36 0.6 10.10.0 3.R ]f 6'6 .40D10.0io'702,90oe :o 2.5 .2 0: OlSITE -1 O.w 0.5 15.1 12.0 23 6:6 3.9 12.6 0." 0.5 10.0 0.0 3.3 .3 .f 1.6 O.RO 0.5 I5.1 Ip.O 3.1 6.6 0.® 7'9 cm PINES I AN so' 6 .a 3.77 0.6 13.1 11.6 33 6.] a.f 19.9 A 93 .nn 7.61 0.56 18.3 .] 1.9 6.a '].n 30.e O OF 1 .94. P 6 9N 45.1 1.06, 3.19 0.63 169 13.1 3.0 6.5 4.0 16.3 [ 3 y3 '10.... �Xhilar GENEVA HOMES I OVERALL GRADING DRAINAGE 8 EROSION CONTROL PLAN 4,E-,N AE4L / ?�r/9 t. NA ELT XO IWO 01 SNLE 6 RO,LCT N 7 1 8 1P-91-1700