THIS Y AND FINAL DRAINAGE STUDY AND REPORT FOR SUNSTONE
AG 7T UBDIVISION (FILING 7) WAS PREPARED BY LAND
SERVICES USING THE CITY OF FORT COLLINS STORM
DRAINAGE DESIGN CRITERIA, dated May, 1984.
The results of this drainage study are reported in the enclosed
text and supporting documents, and are shown in further detail on
the Utility Plans submitted concurrently with this report.
This report is a revised version of the original report dated May
30, 1992, a second report dated June 30, 1992, a third report
dated September 10, 1992 and.a fourth report dated April 28,
1993..
Signed this ftL-day_aE-May, 1993.
Dennis L. Donovan, P.E.
Land Development Services
309 W. Harmony Road - Unit A
Fort Collins, Colorado 80526
Phone (303) 225-9244
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
01 PRELIMINARY AND FINAL STORM DRAINAGE REPORT
I. GENERAL INFORMATION
Sunstone Village 7th Subdivision P.U.D. (i.e. Sunstone 7th
filing) is a proposed single family subdivision in the City of
Fort Collins, Colorado. The site is generally located east of
Timberline Road and north of Harmony Road in southeast Fort
Collins. A general Vicinity Map is provided at the end of this
report.
The Sunstone Village 7th filing is a part of the Timberline
Farm P.U.D., which consists of the West 1/2 of the Southwest 1/4
of Section 32, T7N, R68W, Sixth Principal Meridian, Larimer
County, Colorado. The proposed 7th filing development consists
of 28 lots on 7.62 acres, which is consistent with the approved
Master Plan.
The 7th filing is bounded on the north by Sunstone Village
6th Subdivision P.U.D. (6th filing), on the east by Harmony
Village Mobile -Home Court, and on the south and west by
undeveloped land that is also apart of Timberline Farm P.U.D.
The 7th filing of Sunstone Village is a part of the property
identified in the "Master Drainage Report for Timberline Farm
P.U.D." (i.e. Master Drainage Report) prepared for the City on
behalf of G T Land., Inc. by Engineering Professionals, Inc. (EPI)
of Fort Collins.
As identified i
is located partially
in Drainage Tract 2.
shown on an Exhibit
Drainage And Utility
drainage and utility
C.
n the Master Drainage
in Drainage Tract 1,
The location of the
to the Master Drainage
Plan". That drawing
plan) is included in
Report. the 7th filing
Phase `B' and partially
drainage Tracts are
Report titled "Master
(i.e. the referenced
this report as Exhibit
The Master Drainage Report referenced in this report is EPI
Project No. 248.8 dated September, 1989, Revised November, 1989.
The report--i.tself is quite lengthy and, other than the inclusion
at Exhibit-G, is not attached as a part of this report. The
report is available at the Stormwater Utility Department of the
City of Fort Collins.
The Sunstone Village Subdivision consists of four (4)
filings of single-family residential lots that were developed °
prior to inclusion of the Timberline Farm P.U.D. Portion.of the
Sunstone Village development. The 5th filing was the first
Sunstone Village phase of development located within the
Timberline Farm P.U.D. boundary.
In conjunction with the Master Drainage Report for
Timberline Farm P.U.D,. EPI prepared both the Preliminary and
Final Drainage Reports for Sunstone Village 5th Subdivision
P.U.D. This office prepared the Sunstone Village Subdivision
P.U.D. 6th filing "Preliminary and Final Storm Drainage Report".
Fl
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.-
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
All of the Sun'stone Village Subdivision (including the
Timberline Farm property) is located within Reach 2 of the City
designated Fox Meadows Drainage Basin. The Master Drainage
Report for Timberline Farm P.U.D. by EPI not only reported the
storm drainage considerations for Sunstone Village P.U.D., but
also updated/modified the Fox Meadows Master Plan.
Basin wide improvements are required for all of the City
Designated Storm Drainage Basins. Certain basin storm drainage
improvements are identified in each of the Drainage Basin Utility
Construction Plans. Drainage Basin Fees are collected in each
City designated basin to offset the anticipated cost of basin
wide improvements. Information regarding the City designated Fox
Meadows Basin can also be obtained in current form at the City
Stormwater Utility Department.
The land contained within the 7th filing has historically
been used for agricultural purposes. The site is at a ridge
between previously irrigated farming plots, however, there are no
active irrigation ditches within the site. No stormwater runoff
will discharge onto the 7th filing from off —site. The historic
irrigation water flowed to -the north and south from the ditch
along the ridge line in the 7th filing.
The northern portion of the 7th filing is a part of Drainage
Tract 1, Phase 'B' that drains northeasterly from the site. The
southern portion of the 7th filing is a part of (Master) Drainage
Tract 2 that flows southeasterly into drainage and detention
facilities to be completed with the 7th filing improvements.
Storm runoff from the northern portion of the 7th filing
will drain directly into an existing storm drainage system in the
6th and 5th filings. The existing drainage system downstream
includes streets, inlets, culverts, swales and detention
Pond/basins.
Storm --runoff from the north side -of the 7th filing — along
with the entire 6th filing - will flow directly (undetained)
through the` drainage system into the existing detention pond in
the northeast corner of the 5th filing. The detention system
downstream in the 5th filing was designed to accommodate direct
(undetained) storm runoff from the .6th, and northerly portion of
the 7th, filing. Accordingly, no detention .facilities for
Timberline Farm nor basin —wide improvements for the Fox Meadows
Drainage Basin were required for the 6th filing nor the northerly
Portion of the 7th filing.
Storm runoff that flows southerly through 'the 7th filing
drainage system to the new detention pond on the south side of
the 7th filing (i.e. Detention Pond No. 1) will flow easterly
through the detention pond to an 18 inch culvert at the
2
SUNSTONE VILLAGE 7TH SUBDIVISION P:U.D.
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
downstream end of the pond. A two foot wide concrete trickle
channel at a minimum 0.2 percent slope to the -east will allow for
low, nuisance type, runoff to pass through the pond.
The detention pond is located within Tract A of the 7th
filing (see the final plat) and within additional property south
of the 7th filing which was included as a part of Detention Pond
No. 1 by agreement with the adjacent property owners to the
south.
The release structure from Detention Pond No. 1 is an 18
inch pipe culvert daylighting into a drainage swale approximately
200 feet south of the northeast corner of the 7th filing. The
Previous plans for this project reflected an additional 60 foot
long culvert just upstream from the release point into the 6th
filing.
The 60 foot long culvert has been eliminated in the final
drainage plan and replaced with a 2 foot wide trickle pan in the
drainage Swale. The small ponding area that was shown upstream
of the 60 foot of culvert does not provide enough effective
detention to be included in the plan, as the only area draining
directly into the small pond was from the back yards of Lots 14
thru 18. That portion of D.A. #7-2 contains only 0.42 acres.
The peak discharge from the back yard areas into the
Pond/swale area is about 1.5 cfs. The stormwater runoff volume
from such a small area is less than 0.03 acre feet. Five (5.0)
acre feet of detention volume are provided in the downstream
Detention Pond #2, so the impact of deleting the 60 foot of
culvert is minimal. In fact, the additional depth required to
store the 0.03 ac—ft across the surface of the 2.5, or so, acre
surface of Pond #2 is about 0.01.feet. The result of removing the
unnecessary 60 foot of culvert is insignificant to the overall
drainage plan.
From the drainage swale at the outlet to the 18 inch
culvert, st-9rmwater discharge will flow northerly through the
drainage swale to be constructed in the northeast corner of the
7th filing`;= through an existing drainage Swale on the east side
of the 6th (and a portion of the 5th) filing, and into the
existing detention facility at the northeast corner of the 5th
filing (Detention Pond No. 2 on the Master Drainage Plan).
The southerly portion of Sunstone 7th filing, as well as the
future Retail/Business Park south of Sunstone 7th filing (which
extends to Harmony Road), will contribute storm water runoff to
Detention Pond No. 1 (as designated on the Master Drainage
Plan). Construction of the majority of the detention pond
facilities will occur with the 7th filing development.
3
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
At such time as the commercial area to the south develops,
it is a requirement that the additional detention facilities and
other overall drainage improvements relative to Detention Pond
No. 1 will be designed and completed.
II. Proposed Storm DrIainage Plan
The proposed drainage plan for the 7th filing is in
compliance with the Master Drainage Report. The site has been
divided into eleven (11) sub basins for design purposes. Nine
sub basins (i.e. D.A. 7-1 through D.A. 7-9) will contribute storm
runoff from the 7th filing into existing or proposed downstream
drainage and detention facilities.
For design purposes, Tract A of Sunstone 7th filing is
considered a sub basin within Detention Pond No. 1. The offsite
sub basin to the south of Tract A is also a portion of Detention
Pond No. 1. The two sub basins (i.e. D.A. TA-1 and D.A. 0-1)
constitute the entire detention pond limits required for the 7th
filing. The two sub basins comprising Detention Pond No. 1 have
been identified because they also contribute to the storm runoff
design considerations for the 7th filing.
The 9 sub basins within the 7th filing, and the 2 sub basins
that contain Detention Pond No. 1 are identified at Exhibit A,
which is the Grading and Drainage Plan (Sheet 6 of 7) of the
Utility Plans for the 7th filing.
Exhibit B (identified as the Overall Drainage Map for the
6th filing) is also included at the end of this report to
identify drainage basins expected for the 7th filing during
design of the 6th filing. The nine sub basins resulting from the
7th filing design do not vary significantly from the patterns
shown on Exhibit B.
The storm drainage basins (i.e. Sub basins 0-1 and 6-4)
identified during the 6th filing storm drainage report were
estimated .fo-contain 2.77 acres and have 2 and 100 year peak
discharges;�of 3.7 and 13.9 cfs. The same sub basins identified
during the 7th filing evaluation and report contain 2.95 acres,
and 2 and 100 year peak discharges of 3.9 and 14.1 cfs. These
differences are insignificant.
In the 7th filing, Sub basin #7-1 will flow in the easterly
curb and gutter of Stoney Creek Drive into the 6th filing (shown
as Design Point #1 at Exhibit A). Storm runoff from sub basins
7-3 and 7-4, as well as sub basin 4 from the 6th filing, will
flow in the westerly curb and gutter of Stoney Creek Drive into
the 6th filing (shown as Design Point #2 on Exhibit A).
At the intersection of Creststone Court and Stoney Creek
Drive, the storm runoff from the above identified sub basins will
be joined by runoff from sub basins within the 6th filing. The
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
flows from the contributory sub basins in.the 7th and 6th filings
from Stoney Creek Drive at Crestone Court to the east to the
drainage Swale between Lots 31 and 32 (6th filing) will not vary
significantly from the amounts estimated in the 6th filing
report.
According to the Master Drainage Report, the Timberline Farm
P.U.D. area south and.west of the 6th filing will drain to and
along the Drainage Tract on the east side of the 6th filing.
However, the storm water detention facility to be constructed at
the south end of the 7th filing, as well as on the northeasterly
most portion of the off —site commercial area to the south, will
limit the discharge during a 100 year design storm to 12 cubic
feet per second (cfs).
As a result of the uncertainty of the ultimate drainage
sub —basin stormwater runoff patterns and other storm drainage
characteristics for .the currently undeveloped off —site commercial
area to the south and the multi —family property to the west of
the 6th and7th filings, final design of the storm water
detention on the south and east side of the 7th filing can not be
finally determined at this time.
At the time of development
thereof) the storm drainage and
required by the City to meet or
and earlier studies and reports
of those properties (or portions
erosion control design will be
exceed criteria intended by this
for this area.
The Master Drainage Report identifies a pipe culvert and
overflow swale to carry storm runoff in the Tract on the east
side of the 7th and 6th filings between the proposed detention
facility to the south and the existing detention facility in the
5th filing. For whatever reason, the culvert was ommitted in the
fifth filing design — leaving the drainage Swale as the only
runoff carrying facility between the two detention ponds.
The swale connecting the existing and proposed detention
facilities in the 7th filing .(as identified on Exhibit A of the
7th filing report) needs to be lowered by one (1) foot from the
design grades identified on the original 6th filing design and
report. This modification'is warranted to lower the minimum
invert elevation of Detention Pond No. 1 to 4954.62, which is
just slightly higher than anticipated by the Master Drainage
Plan.
The Swale and detention facility grading plan for the
easterly and southerly portion of the 7th filing is shown on
Exhibit A. The detention pond (No. 1) requires a detention
volume of 3.8 acre feet, according to the Master Drainage Plan.
As designed (see the grading on Exhibit A), the.detention pond
has a volume of about-3.1 acre feet as designed.
5
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
and 7-9 will also contribute storm runoff to the detention pond.
The location where the concentrated flows enter the detention
Pond is identified as Design Point #4 at Exhibit A.
A temporary swale, riprap and the 15 inch storm sewer system
carrying storm runoff from Design Point #3 will be provided to
drain the reach of Milestone Drive to be constructed for Sunstone
Village 7th filing. When Milestone Drive is extended to
Timberline with the development of the commercial land to the
south of Sunstone, inlets will be constructed just south of the
7th filing to replace the temporary swale and discharge storm
runoff into Tract A.
Storm runoff from sub basin 7-5 will sheet flow into
'drainage swales (for which easements were provided in the 6th
filing) on lots to the east of the 7th filing. Storm runoff from
sub basin 7-6 will flow northerly into the 6th filing along
Winterstone Court. The sub basin flow is relatively minor and
does not adversely impact the downstream system in the 6th and
5th filings.
The Hydrologic Characteristics for the sub -basins in the 7th
filing, for the small off site sub basin in the 6th filing (i.e.
6-4) that contributes storm runoff to the 7th filing at Design
Point #2, as well as for the combined sub basins at Design Point
#'s 3 and 4 are included on the following page as Table 1.
'No
TABLE 1
HYDROLOGIC CHARACTERISTICS
SUNSTONE
VILLAGE 7TH FILING
2 YEAR 100 YEAR
BASIN
AREA
C VALUE
TIME OF TIME OF i 2-YR i
100-Y
Q 2-YR
Q 100-YR
DESIGN
DESIGNATION
CONCEN- CONCEN-
POINT
TRATION TRATION
(ACRES)
(MIN) -(MIN) (in/hr)
(in/hr
(CFS)
(CFS)
7-1
1.50
0.6
13.3 12.3
2.2
6.5
2.0
7.3
1
7-2
1.45
0.3
10.0 10.0
2.5
7.2
1.1
3.9
7-3
0.65
0.6
10.0 10.0
2.5
7..2
1.0
3.5
7-4
0.65
0.3
13.3 12.3
2.2
6.5
0.4
1.6
7-5
0.30
0.3
10.0 10.0
2.5
7.2
0.2
0.8
7-6
0.50
0.6
10.0 10.0
2.5
7.2
0.8
2.8
7-7
0.71
0.6
12.3 10.3
2.3
7.0
1.0
3.7
3
7-8
0.38
0.7
10.0 10.0
2.5
7.2
0.7
2.4
7-9
0.20
0.9
10.0 10.0
2.5
7.2
0.5
1.6
6-4
0.15
0.3
10.0 10.0
2.5
7.2
0.1
0.3
A-1 8 0-1
1.91
0.3
16.2 11.1
2.0
6.9
1.1
4.9
COMBINED
FLOWS
7-3,7-486-4
1.45
0.45
13.3 12.3
2.2
6.5
1.4
5.3
2
7-7,7-887-9
1.29
0.68
14.3 11.3
2.1
6.8
1.8
7.5
4
7-7,7-897-9
3.20
0.45
23.9 16.1
1.7
5.8
2.5
10.4
5
+TA-1 8 0-1
NOTE:
"C"
VALUES
ARE BASED ON 0.3 FOR
LOT REAR
YARD
AREAS,
0.6
OR 0.7
FOR FRONT YARD AND STREET
AREAS,
AND
0.9 FOR
STREET RIGHT OF WAY
AREAS
e
FA
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
The Time of Concentrations were determined using the
equation for overland flow in the design manual, and then by
adding the time of gutter flow - which was estimated to be at a
velocity of 1.5 feet per second for the 2 year storm and 3 feet
Per second for the 100 year storm - to the point of discharge
from the particular sub basin.
The formula for overland flow Time of Concentration is:
Tc = C1.87 (1.1 - CCf) D1/21 / S1/3
The sub basins in the 7th filing are relatively small. The
maximum time of concentration for any of the sub basins .in this
filing is just over 13 minutes for sub basin 7-1. A 10 minute
minimum time of concentration was used for sub basins 7-2, 7-3,
7-5, 7-6, 7-8 and 7-9.
The Time of Concentration for combined sub basins at the
Design Points is determined using the longest time of
concentration for any of the sub basins contributing at that
point. The longest time of concentration was 23.9 minutes during
a two year storm and 16.1 minutes during a 100 year storm at
Design Point 5, which is the downstream end of Detention Pond #1.
III. DESCRIPTION OF STREET FLOWS AND DRAINAGE IMPROVEMENTS
Due to the relatively small areas of the sub basins that
will contribute storm runoff from the 7th filing, the
concentration of discharges in the street gutters will be
somewhat minor.
The largest flow in a gutter will be from sub basin 7-1.
There a 2 year "minor" design discharge of 2.3 cfs is estimated,
and a 100 year "major" design discharge of 8.1 cfs is estimated.
The slope of the street at that location is 1.6 percent.
According to Figure 4-1 of the design manual and using the
following criteria: Cross Slope of 2 %, so a Reciprocal (Z) of
50; a RougMhess Coefficient (n) of 0.016 from Table 4-3; an
allowable depth of flow in the gutter of 6 inches during a two
year storm: and an eighty percent reduction factor, the gutter
will carry about 25 c.fs before exceeding City criteria for the
two year, or Minor, storm. .That capacity is about three times
the 100 year storm discharge at Design Point 1. Obviously,
street gutter flows in the 6th filing are well within City of
Fort Collins criteria.
Storm drainage facilities, or improvements, for the 7th
filing include cross pans at the intersection of, Stoney Creek
Drive and Touchstone Court, a 2 foot sidewalk culvert into Stoney
Creek Drive from the drainage swale on the north side of Lots
13, swale and detention improvements in the drainage tracts, and
CJ
r
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL STORM DRAINAGE REPORT
an inlet and storm sewer from the north side of Stoney Creek
Drive at Milestone southerly under the easterly curb and gutter
of Milestone to the west end of Detention Pond #1.
Also, a drainage Swale with concrete pan is required on the
rear of 7th filing Lots 6 thru 13 to intercept flows and pass the
runoff to the sidewalk culvert near the northeast corner of Lot
13 and into Stoney Creek Drive. Cross Section D—D is provided at
Exhibit A that provides hydraulic characteristices of the swale
along the rear lot lines. the sidewalk culvert will pass most of
the 100 year storm under the 2 foot wide steel grate. City
Practice indicates 1 or 2 percent of the 100 year flow should
pass under the sidewalk culvert, so the 2 foot sidewalk culvert
is more than adequate in this location.
During the interim time prior to development of the
commercial ground to the south and southwest of the 7th filing,
the proposed detention pond in the southeast corner of Sunstone
Village will be oversized beyond that required for storm runoff
from the 7th filing. The runoff from sub basins 7-7 thru 7-9
will be temporarily carried into the detention pond with a
temporary drainage berm/swale at the south end of Milestone Drive
to be constructed in this phase.
When completed, landscaped, and subject to a warranty period
for the improvements, the City of Fort Collins has agreed to
accept ownership of the drainage tract for future maintenance of
the integrity of the drainage capacity.
As shown on Exhibit A as Design Point 3, the inlet on the
north side of Stoney Creek Drive will only receive about 1.0 cfs
during a 2 year storm, and 3.7 cfs during a 100 year storm.
Figure 5-2 of the City Drainage Criteria manual shows a
theoretical capacity of 1.2 cfs per foot of length within the
allowable 6 inch depth and 8 inch heigth of opening for the 2
Year storm. A Reduction Factor of 80 percent shows 0.96 cfs per
foot actual capacity. The four (4) foot inlet will accomodate 4
times 0.96j;--9r 3.84 cfs. .This is more than the 100 year storm
discharge,_�so a four foot inlet is more than adequate to
accomodate"'those flows within City Criteria.
A 15 inch storm sewer (City of Fort Collins minimum size)
will easily pass these flows to the detention pond with
insignificant depth of flow in the culvert. Hydraulic
calculations are provided immediately after this sheet to show
the performance of the 15 inch culvert under Milestone, as well
as the 18 inch culvert releasing stormwater from Detention Pond
#1.
In summary, the proposed storm drainage for the Sunstone
Village 7th filing is -rather minor in scope, and the resulting
storm drainage system should adequately protect life and property
on the site.
11
owl
Ig
Xp
RP T!
7 7.;
w..s
%
% IG*' %
OUTu"K %
%
19
10
KWP
IP rp
bP
I p'! I
;7RE7... 4 . I . 0
jLbL 5
.:f. e
oc
0
RL'P
HLP
LLI
ca IP
p
....... ... 00
v z me IL
'HARMONY ROA
bp/-,
IP
w
bp 1p
T IP
rp
rp
U� I
T
4. ;!A 1:
vi @MAP
bp TttFiLtAjG
E7
dp
JOB l�J STQ ISI E TH �/ L Af G
INTERMILL LAND SURVEYING INC. $MEET NO. OF
1301 North Cleveland Avenue
LOVELAND, COLORADO 80537 CALCULATED BY // DATE
/1na\ "a -Az l a
Ui
W
0
o�
IMan
F -Ic
M
�
fl
U
—!- W I I
A113013A
(�(�
1
1311fl0
W
_ r n
C) O ~ ~
rN
Z
U' ltl
W Q p p
N1110111NO3
�l
1'
39
x
W Q
�Q�.,�
U) N "I > W
>
n n
Q
cc
w J
W W
x
U
O
Z
I � Z
H
N N
=
V
2
Z .
Q X
s
W Ltd I i
J
N
t\1
W x w
O
�
J
o
yl
F
G
H
x
t
O
It.
2
u
3c
x
IN
U
O
O
'�
...�
cr
W
►-
Z Q 11 I1 ct
F
Z
p
�I
O W 2 MOC
4' 00 �1
;
O
5
M
H J
a
1.-
e
'
x
zi--
J
J a a O
--�
_
0
W W
l J _j n o
O
tu
Via!
w
J
;
x
4i
LO
W p W W N<
CO8
Z
O
Z Q Q W
Q� d 3 3�
O
o u
W!
Z
Z %J 'T' 4 . O H
`
\�
Q 3h ?a Z Y
.: •k f
y
v t. O U
O
a
v
F-
C9 ��1S J j� W 3;
O do U
W
W
0
O Q O 11 11 r �N
d' q N 0 0
C s
J
O
m
-QO���
F_
N
a
K
0.Q
=
jL
I W
A`
W
U
W
WWI
U O -
A
a
t
V)
"W" M-M
Figure 6-1
DESIGN CbMPUTATION FORM FOR CULVERTS
MAY 1984 6-2 DESIGN CRITERIA
W
1
�
F
1
IMallN
tl
O
U
[\
�V
a
+
o
J
W
I I
A110013A
A31Afl0
Cn
N
z
f-
`�y� V v
w O
N1110Y1N00
F
3
H
W Q
Y F 7�
U q W W
O
O
n n>>
I
x
w J Q z
S
O
W W
U
z
I 0: C
F �
N N
JQ
z
Q x
S
W
W Q
J
Ln
w
J
= J
W
0
x
r
>
a
n
;
0
x
x
2
I
J
0
0-I
W
w
H
t1N
J
z
I I 11
f
2
e
-
O �� Z z z
3
U
0
0 0
0
,.
e
o
a s °
_
C
<
>> a
W W 0:
0
_
O
U.
OC O
J J of O
w
N
Z w W W Ccc
Z
N
w
z
��
c�
1
Q Q W
3 3 .4all
$
S
z
z
o
In
x
�
_��
X
C
Z
O
O
UI
LU
Nl W S
Q
H
U
O
J
w
o U
„ ,.
y
W
3
O
3
11 1/ N
z0
a
�-
a
=��
T
�w
uo
:
a
>c
,o°
2j
H
1
X1.
I
I
Flinn Orm
Figure 6-1
DESIGN COMPUTATION FORM FOR CULVERTS
MAY 1984 6-2 DESIGN CRITERIA
INTERMILL LAND SURVEYING, INC.
1301 North Cleveland Avenue
LOVELAND, COLORADO 80537
(303) 669-0516
MO VZ6-14EMk One. MW M To OaMdE TOLLM@M*Mm
Joe
$MEET NO.
OF
CALCULATED BY DATE ` _IZ— 13
CHECKED BY
DATE
MOPJVM /A�lft Gi .11 Ml TGO�M l70LL!�QY07mm
NgpJC}WIA�RGl MWOuts T4" POO TOU-U'ilAm
THIS PRELIMINARY AND FINAL EROSION CONTROL PLAN REPORT FOR
SUNSTONE VILLAGE 7TH SUBDIVISION (FILING 7) WAS PREPARED BY LAND
DEVELOPMENT SERVICES USING THE CITY OF FORT COLLINS EROSION
CONTROL REFERENCE MANUAL for Construction Sites, dated January,
1991.
The results of this erosion control study are reported in the
enclosed text and supporting documents, and are shown in further
detail on the Utility Plans submitted concurr.ently with this
report.
This report is a revised version of the original report dated
the 30th day of May, 1992 and a second report dated June 30th,
1992.
Signed this loth day of September, 1992.
Dennis L. Donovan, P.E.
Land Development Services
309 W. Harmony Road - Unit B
Fort Collins, Colorado 80526
Phone (303) 225-9244
r
0
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL EROSION.CONTROL PLAN REPORT
The erosion control concepts and general design
considerations for the Sunstone Village 7th Subdivision P.U.D.
(7th filing) are outlined in the following paragraphs and shown
in further detail on Exhibit A. The exhibit is the same as for
the storm drainage report, and is Sheet 6 of 7 of the
Construction Drawings titled OVERALL GRADING; DRAINAGE 8 EROSION
CONTROL PLAN.
It was determined from the reference manual and a Wind
Erodibility Zone Map that the Erodibility Zone for both Rainfall
Erosion and Wind Erosion is moderate for the site. Standard Form
A "RAINFALL PERFORMANCE STANDARD EVALUATION" follows this text.
It identifies the two areas of concern for an erosion control
Plan and identifies their pertinent basin characteristics.
Sub basins 7-1, 7-3 and 7-4 will drain to the northeast
corner of the site, thru the 6th filing and finally exit into the
existing swale and detention facility in the 6th and 5th
filings. That area requires a Performance Standard of 79.9
Percent from Table 5-1 of the manual.
Sub basins 7-2, 7-7, 7-8 and 7-9 will flow into the
detention pond on the south and east side of the 7th filing.
Table 5-1 indicates a required Performance Standard of 77.6
Percent for this area.
Sub basins 7-5 and 7-6 will flow into the 6th filing at the
northwest corner of the 7th filing.
Standard Form.B "EFFECTIVENESS CALCULATIONS" follows Form A
and identifies the recommended erosion control measures and their
effect on the site.
Sub basins 7-1, 7-3 and 7-4 contain 2.8 acres, of which 0.42
acres will be concrete and pavement. About one-third of the
remainder will not have to be disturbed during the overlot
grading activities. Rainfall erodibility deterents include a
filter over. ---the sidewalk culvert at Stoney Creek Drive, and an
existing sediment basin with trap in the drainage tract.at the
northeast corner of the 6th filing.
The sediment basin in the sixth filing was sized to
accommodate sediment from these sub basins. The combination of
the improvements for sub basins 7-1, 7-3 anf 7-4 yields an
Effectiveness of 89.4 %, which is more than the 79.9 percent
Performance Standard required.
In sub basins 7-2, and 7-7 thru 7-9, the area is 2.74
acres. Of that, a relatively large area of 1.45 acres will be
almost entirely left in its natural undisturbed state. Sidewalk
and paving will cover=another 0.25 acres of the area). By
planting the disturbed area in -temporary crop cover after
grading, an effectiveness of 88.6 % is achieved. This is in
SUNSTONE VILLAGE 7TH SUBDIVISION P.U.D.
PRELIMINARY AND FINAL EROSION CONTROL PLAN REPORT
excess of the Performance Standard required. The detention pond,
or area, will also function as a :settling basin for these sub
basins.
Sub basins 7-5 and 7-6 are only 0.E2 acres in size. The
areas in these sub basins should be reseeded after utility
installation to minimize erosion impacts on the downstream
property. Additionally, the downstream properties have erosion
control improvements so that there will be no significant impact
from erosion in this area.
To minimize wind erosion from the site it is recommended
that the northwest perimeter of the site be provided barriers of
some type. Snow fence, hay bales, windrows perpendicular to the
northwesterly winds would each be a helpful improvement.
The construction schedule for the project is to begin
grading in early September, 1992. It is a relatively small phase
of development, so it is anticipated that grading should only
take 2 or 3 weeks. After the grading is completed in early
October, utility installation will continue into mid -October.
The reseeding activities required should occur when the
utilities are completed in late October. During construction,
adequate watering of haul roads and areas being graded during
construction should also be provided.
Standard Form C Follows Form B to identify the Construction
Schedule and timing for installation of erosion control measures.
The erosion control measures should be maintained by the
developer until the majority of homes and landscaped lawns have
been completed and the developer is allowed by the City
Engineering Inspector to remove the sidewalk culvert filter and
the hay bales, and to fill in and landscape the sediment basin.
RAINFALL
PERFORMANCE STANDARD EVALUATION
-------------------------------
PROJECT:
5UN15TO9F
-- ------------------
VILL,4Ge 75LQ?o Po
STANDARD
FORM A
COMPLETED
---------------------------------------------------------------------
BY: _ Paoi
n i s L . Donn✓AN
)�sV
DATE:
� —10-cf
-
DEVELOPED{ERODIBILITY1
Asb I Lsb Ssb Lb
Sb
PS
SUBBASIN
---- ----
ZONE
-------
(ac)
-------
(ft){
-
I --
(%) .{(feet)
-------II
{ W
I W
7-I,-7-3
Moa.
2,8
{ 5Z0{
).Z5
------
1 5&
--- ----I-------
! 1.25
79,9
7-4 7-7
MoJ , {�
2,7 �-
{ 56
�
C .�
i �-f 50
{ 1.6
i -77• a
B�q �
r
1
I
!
I
I
-7-,6 1 14v4, 1 0.5Z12501 1.Z512501 I,Z51 7%,
-7- 5
med.
f 6,30
00
l,o
)0 0
r
1.0 I-71-.�
n
I
--------- I----------------------------------------------
DI/SF-A:1989
EFFECTIVENESS CALCULATIONS
----------------------;1-/-----------------------------------------
PROJECT: 5LJnl5TNE I o 1 L L ,4 GE 7 7HS Ug)p pU DSTANOARO FORM 8
J
COMPLETED BY: s n e) t/a N DATE: -30�TZ
Erosion Control C-Factor P-Factor
Method Value Value Comment !
--------------------- I
Slw----atk5 ------O.0 1 1.0 ---------------------
Gre, rs
Sri r17 4Fn+ -Tre, p
remP. Crop
5�-YoLV 7341e5'
------------
MAJORI PS
BASINI W
---- -1------
7; A
7+�
1171W
75,9
77,6
SUB I
BASINI
-----1
7-Z
7-7
AREA
-(Ac)-
Z, $
2.7,t
77, 17-410.5z�
I I
hl ; -
71�, G 7 0,30
------ ---------------
II/SF-8:1989
'
o,a
!
CALCULATIONS
------------------------- I
-------------------
Roa�is 0-ft4e- ITSTAE GRA,55
13a r= Gre and 1. 97 (5c'et:4 w/-rAt p.C,'r1i,,p)
VA17a C =0-oA1 X0,4-1)+ 0.44)<0,67)
4- i,9?xa< -0Z,B= 0,33 I
wT,� PF�c�r-oiz = o.8xo.8xo,� =a,3z�
f
1v14h)ee5 1MProVChi en
IrmMe4reAt"ei c�awrlsfr�a w! I
1�o act s D, Itl Rc
Grass 6,3Ac
WTDCFRcro�' = DA1 3K0,4P+19)6POUAJ0
-C.ZOL
L p
4 a,3Xo,07,
4-0 3X0 , 45�3
WTD PrACTvbZ = 0,8 X0-6X0,8=6,
too
I�oG,:45 D .ZZhe- 0,10 &6
G✓clunc� o,ZOAc- GSQed Grvuhd w/'
►Vr,o if L"o.�1 x0.ZZ 4 o .1xo.0-7+ 0,ZYI
5 374 c
er)
5.(w
Z
i; K. a K
e-
etv Cover)
81,0 oe-
'
CONSTRUCTION SEQUENCE
PROJECT: sy N 5 To N E
U L LL AGE 7
STANDARD FORM C
SEQUENCE. FOR 19 92, ONLY
COMPLETED BY: (% L D
DATE: — 3D
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting
a new schedule for
approval by the City Engineer.
YEAR
MONTH
Au6I SeQiOz-'rl kvi ac! I I
I I I I I
----------------------------
OVERLOT GRADING
-----------------------------------------------------------I
LJT! L—rTY INSTALL�Tro
WIND EROSION CONTROL
Soil Roughing r
f-----�'
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
I
Other
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters ✓_
I
Straw Barriers ✓
(----}
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
I
Asphalt/Concrete Paving
✓ �---
Other
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
H
`
Sod Installation..
Nettings/Mats/Blankets
Other -•
----------------------------------------------------------------------------------------I
STRUCTURES: INSTALLED BY Owe) C r ( MAINTAINED BY Ovuh C
VEGETATION/MULCHING CONTRACTOR SGV1I�l fGl �" �Qr Lh 13u OeJCrS �
DATE SUBMITTED — APPROVED BY CITY OF FORT COLLINS ON
"II/SF-C:1989
1
9790S I oN CON7-R6 L * -r So gsTo�jC V I LLAC,E
Fi,L r(A,
DWN�25� �STI�'�1tiT� o� C©sT
�, Co s T aF �Rd 51 Uo� CoN-rrRo�. /'(�Tt-1al�s
GRAVEL FI L -r=
E3, OAy 6 cry (BURIED) 80
If o L,CeZ
C. 5sp/J1!lZ60
RY Gs o u N o .Ca v;E
q;Z AcC 3 c�jA l�L-76
T 07-A L
�Cos T 0FC-ry'5 unfiT P/e/cf.
PoR SESD/NG i�-/4uLG4/NG
.�V,-e
�_
Q -F 7, To T,4L' o" Ly 4-. 2 Ac. MAX. n SE. !/ls-ry R&
L A RdSR Co sT = s,3�8.�9
Co',7- n 150°1a =' 81'46801a
S�cuRi�Y h��Q�iR�O o� ���468.18
P
.� �d.,4�A