Loading...
HomeMy WebLinkAboutDrainage Reports - 09/08/2014�jt'A1 te:aivmra � rrnrw APProved By Date DE NORTHERN ENGINEERING Drainage Letter Report ADDRESS- PHONE:970.221.4158 200 S. College Ave. Suite 10 WEBSITE: WEBSITE: nengineering.com Fort Collins, CO 80524 FAX: 970.221.4159 Date: July 14, 2014 Project: Plum & Shields Greek Housing Project Development Plan/Final Plan Fort Collins, Colorado . Attn: Mr. Wes Lamarque 1 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: Project No. 970-001 This letter serves to address the stormwater impacts of the Plum & Shields Greek Housing project. The existing building is situated towards the northern portion of the site. The site currently consists of rooftop, concrete walks, asphalt parking areas, turf, trees, and other vegetation. It presently functions similar to a 'B' lot, with historic drainage being splittowards Plum Street to the north and towards Shields Street to the east. The total impervious area of the existing site is approximately 12,326 square -feet. The existing percent impervious for the entire site is 65.1%. The existing total runoff from the site is 3.7 cfs in the 100-yr event. The proposed redevelopment will leave the existing building footprint unchanged, aside from the removal of a small addition on the west side of the building, while expanding the parking area south of the building. Portions of existing paving will be modified, and a paver area will be added at the northeast corner of the new parking area. A second paver area will be added at the driveway entrance from Plum Street. While very minor grading changes will occur, the,addition of the paver area at the Plum Street entrance will modify the existing drainage basins so that some areas of the site that have historically flowed to Plum Street will now be directed to Shields Street via the paver subdrain. The total impervious area of the proposed redevelopment is roughly 12,861 square -feet. This. is a slight increase from the existing condition. The proposed percent impervious for the entire site also increases slightly to 67.0%. However, due to the addition of pavers, the removal of some concrete paving along the north side of the building and the redirection of some flows to Shields Street, total runoff from the site will decrease to 3.4 cfs in the 100-yr event. The site is located in the Old Town Drainage Basin. On -site detention is not, required so long as there is no increase in runoff. Since the redevelopment does not propose an increase in runoff, detention storage is not required. Calculations using the rational method to determine the existing and proposed runoff are attached to this letter, as is a drainage exhibit. An exhibit depicting existing and proposed impervious areas has also been provided. . There are no regulatory floodplains associated with the project. Page 1 of 2 D:\Projects\970-001\Drainage\Reports\Drainage Report\970-001_Drainage-Letter.docx NORTHERN ENGINEERING Although stormwater quantity detention.is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since the approximately 11,707 sf area of disturbance for the project is less than one acre, a comprehensive Stormwater Management Plan will not be prepared for this project. Post construction water quality and erosion control will be achieved by.a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape,. landscape, or building structure. There are no existing stormwater BMP's currently on -site. In order to bring the site into compliance with the Low Impact Development Standards adopted by the city, water quality mitigation and permeable pavers will be provided on -site. Water quality treatment will occur through a variety of methods. The first method is the use of a raised bio-retention area (Infiltration Planter) along the south side of the existing building that intercepts runoff from rooftop downspouts. This planter bed will have an engineered section designed to remove particulates and contaminants from the runoff. While most minor events are expected to infiltrate into the ground, a subdrain is provided to drain the Infiltration Garden should it become overburdened. The underdrain will outfall directly into Shields. In addition to treating the roof runoff, a paver area is being provided in 3 of the new parking stalls, which will allow minor rain events to infiltrate into the soil rather than leaving the site. An additional paver area is also being provided at the entrance from Plum Street. The final method that is being utilized'on the north side of the building is to discharge roof drains into landscaped areas. The City LID requirements specify that no less than 25% of all new paving shall be treated using permeable paving technique. In the case of this project, 792 sf of permeable pavers will be provided, which is 74% of the total 1,069. sf of new paving, which far exceeds the requirement. The City LID requirements also specify,that no less than 50% of any new impervious areas must be treated using LID techniques. The combination of treatment provided by the Permeable Pavers, Infiltration Planter, and Landscaping Strips will treat 6,365.sf of impervious area on the site, which is 804% of the new impervious areas proposed with the project, which again far exceeds the amount required by city code. Of the total impervious area on the site, including all existing and, proposed areas, 48% will be treated as a result of the improvements proposed with this project. 1. To summarize, the proposed grading concept closely matches existing elevations and drainage patterns. On -site detention is proven to be unnecessary. Stormwater quality has been provided, and exceeds the city requirements for Low Impact Development paving and treatment. Therefore, it is my professional opinion that the Plum & Shields Greek Housing satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, YU� Andrew Reese Nicholas W.'H.aws, PE, LEED Project Engineer Project Manager AP enc. Page 2 of 2 D:\Projects\970-001\Drainage\Reports\Drainage Report\970-001 Drainage-Letter.docx on �. U e� � C � 0 II Y C m c O _ cS 00 0� 01 o E� d o00 y o L c� O E 13- o otf a� N S t d Vi o u Lo000n C 600 V y Q 00 d i.� °c u Lo0wr, a` .' _ o00 Z NE O: 0 W—' - U E c• o W° u N cmi o00 o 0 T Q ¢`� my N LL J e `o Z u 000 A QU'CIL o00 C'o Q m c E W •2 0001 V N 00 ae o w000 A 000 N` m 001 r y Q 0 0 0 H L E W a 2 N c N E. d V ininoLoO in in' o c N O U mu',r� O c Ol 60000 Ol U O V .-iN 00 Q 000 0 0 0 c u � u W • U d G m m C1 V 0 0 0 OOp W m Q n m o CL qqc Q Q V' O O 0 N N V S •L. N N C ai °�° v 0 c m� cmi .G o 'US*5 000 L2 m `ZM. yj p m W 0 cU. E Q 0�0 .[ G c n m..' y .. in r N 9 v > O C m G ui I.- C m T 73 SOi Z (n a C m O C C Ir 0.0 y 41 m U N ,. . . 00 _ Cl! \ . ! k IL0 - ®i# > > 00 ,ƒk mw 0S '. t�eo, . ! - k _2 -E ; q . . »k§§ 0 0 � ! R --- m G � Lki q | 7 \wa�� I , �| _ amp -w � ■ � " $ ; to 2s - «A§§0, o=}cc oo - � � | to \ w } > } } °� - } E-! | ° ® —— )/�!! z� e.0 o. w V 7 Ci � ti N C O S C7 � a a o N 3 N wm Lo 0 Q ti o O N � T L y m V O` p IC F IL CO . Ol l Orn _g _ Y m m C u m U � roro c ^ h. Ln co io 00 Z _ N N O C OO ti m ` N C �•'� co m V'OOON O'INNN O O ' �.•1 M M ri F O V q F 0 00 O O V 8 0 l0 00 00 J. e „i Nan ,� p• M 19 V Y F m T C .r N U LL U q T C O N U 0 00 6 N Q ` 0 00 N U N O O �. LL Q Q ' O � « v •y; Z N ui m V m . O K K �^ ¢ EXISTING RUNOFF SUMMARY TABLE DESIGN BASIN TOTAL 2-yr T, lO-yr 100-yr Q2 Q10 Q100 AREA 0z 010 0100 T` T` POINT ID (min) (cfs) (cfs) (cfs) (acres) (min) (min) N N 0.18 0.64 0.64 0.81 5.0 5.0 5.0 0.3 0.6 1.4 S S 0.23 0.80 0.80 0.99 5.2 5.2 5.1 0.5 0.9 2.3 D:VProjectsl970-0O11DrainagelHydrology1970-001_Rational-Calcs Existing.xlsxlSummaryTable § E OR ) �w &.2(0m , k E Z9 6 46 2 \ -a u o e ƒ G a - (k%)$G} 2 /04 . m 0cc 0 } / a - U co § k ƒ®� |a%)®®4 % 3 2/20 - G � Law ■ \a00. � }/!R)�coo LL. ~ e 46 / Z �k§2)q8 !]J£acoo O - $f.0 -- �E■ / °°/ @�\ § ¥ «G }00 E . & _ 'IT -2a �%) e r000 % ) }2- � ■t 2 § k -a § as LLA � S/\ ]It ..e � a : § a m L _ CL ! - �zt ( LAJ p U §0 , a= e \ § m 0 W � ik \)ƒ&)§20\ � m T C o ~ 'E O N c 0 00 Y o a. C .n U T C O Lq E u " EL o q w 00 m Q C C ~ Q Q qo IL E .. z z 0 quq •E. O O 3 > lZ�. O O O LL q > q y �c J co � 2 ~ E N N �.i S� uu L Lq O O O O W > v rPye! Q W O O O vl p�p W c LLI w S c ~ m a 0 W u N Q A ¢ o L � N LL ' N a N N C O O1 . w 2 O o ri O co n O 01 00 U LT v i (.T T C u� ; v rl U II O O w m Uy N U II �" I, ¢ >> N z Z _ 6 a _A E ~ ~ o o " N II. d J a p o m e z rn a' ���>> G $ O a ' L—y C7 ... N by c •y 0 Y S G N O d Ci 0 0 d N ry N LO 22 y .�. Q O O N (L ] m W m C F LO O� M d. O ro. N • 2 Ol OD u ro V .. .. e C CO o Y C Z C N W V O 00 S Mo V G 000m O.�NNL O '� LL. � oNo O a LV o U 00 • y P co 0 g o V OR 41 N' O o. 0 0 a J d W 0,00 n c o N e NNN.1 0 O. F Ill o6 ^ 0 m ys o y U LL U T C_ O H O IO C U Ia O m Lq � m N 117 00 O c oC N ti N U m O O r C LL Q O U � - C O U S M LL y y Z (n w 5 w m X m 0 U is M y �U E� o. o I I y. w "w •o z w r E p a I2LL' DEVELOPED RUNOFF SUMMARY TABLE DESIGN BASIN TOTAL 2-yr Tc 10-yr 100-yr Q2 Q10 Q100 AREA C2 I C10 C1oo T` T` POINT ID (min) (cfs) (cfs) (cfs) (acres) (min) (min) N N 0.13 0.58 0.58 0.73 5.0 5.0 5.0 0.2 0.4 1.0 S S 0.28 0.82 0.82 1.00 8.5 8.5 8.2 0.6 0.9 2.4 D:IProjectsl970-0011DrainageWydrology1970-001_Rational-Calcs Proposed.xlsxlSummary Table EXISTING PROPOSED NORTHERN ENGINEERING 200 South College Avenue, Suite 10 PHONE: 970.221.4158 FAX: 970.221.4859 Fort Collins, Coloratlo 80524 w .northennengineenng.m w w V) U) 0 J _w 2 SURFACE AREA (SF) eh IMPERV. IMPERV. AREA (SF) ROOFTOP 3,110 100% 3,110 CONCRETE 3,215 100% 3,215 ASPHALT 6,000 100% 6,000 LANDSCAPE 5,648 0% 0 TOTAL 17,971 TOTAL= 12,325 I EXISTING & PROPOSED IMPERVIOUS AREAS w w U) J w_ U) SURFACE AREA (SF) %IMPERV. IMPERV. AREA (SF) ROOFTOP 3.052 100% 3.052 CONCRETE 3,289 100% 3,289 ASPHALT 6.203 100% 6,203 PERMEABLE PAVERS 792 40% 317 LANDSCAPE 4.05 0% 0 TOTALS 17,971 TOTAL= 12,861 Shields & Plum Greek Housing DRAWN BY: A. Reese EXHIBIT SCALE: 1 in=20 ft ISSUED: July 14, 2014