Loading...
HomeMy WebLinkAboutDrainage Reports - 06/25/2014Prepared for: Steve Allen Local Geico Office 115 E. Harmony Rd, Suite 110 Fort Collins CO 80525 Prepared by: { NORTHERN ENGINEERING 200 South College Avenue, Suite 100 Fart Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 w .northemengineedng.corn This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double -sided printing. ' NorthernEngineering.cohn // 970.221.4150 Project Number: 959-001 I 1 NORTHERN ENGINEERING ADDRESS: PHONE:970221.4158 200 S. College Ave. Suite 10 WEBSI�� rthernengineering com Fort Collins, CO80524 FAk970.221.4159 June 9, 2014 City of Fort Collins ' Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 ' RE: Final Drainage and Erosion Control Report for Geico Office Building Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for ' your review. This report accompanies the 10.16.12 Basic Development Review submittal for the proposed Geico Office Building. Comments from the Basic Development Review Letter dated May 13 , 2013 have been addressed. Written responses thereto can be found in the comprehensive ' response to comments letter on file with Current Planning. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), ' and serves to document the stormwater impacts associated with the proposed Engines Geico Office Building project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Bud Curtiss, PE VC�Snowdon ' Principle Project Engineer F NORTHERN ENGINEERING TABLE OF CONTENTS ' I. GENERAL LOCATION AND DESCRIPTION................................................................... 1 A. Location..:....................................................................................................................................1 ' B. C. Description of Property................................................................................................................2 Floodplain........................................................................................................................:...........3 ' II. A. DRAINAGE BASINS AND SUB-BASINS.......................................................................4 Major Basin Description...............................................................................................................4 B. Sub -Basin Description..................................................................................................................4 ' III. DRAINAGE DESIGN CRITERIA...................................................................................4 A. Regulations..................................................................................................................................4 B. Four Step Process........................................................................................................................5 C. Development Criteria Reference and Constraints.........................................................................6 ' D. E. Hydrological Criteria....................................................................................................................6 Hydraulic Criteria.........................................................................................................................6 F. G. Floodplain Regulations Compliance..............................................................................................7 Modifications of Criteria..............................................................................................................7 ' IV. A. DRAINAGE FACILITY DESIGN.................................................................................... General Concept..........................................................................................................................7 7 B. Specific Details.............................................................................................................................8 ' V. CONCLUSIONS................................................................:.......................................9 A. Compliance with Standards..........................................................................................................9 ' B. Drainage Concept........................................................................................................................9 References....................................................................................................................... 10 1 APPENDICES: APPENDIX A — Hydrologic Computations APPENDIX B — Hydraulic Computations ' B.1 — Storm Sewers B.2 — Inlets B.3 — Detention Facilities ' APPENDIX C — Water Quality Design Computations APPENDIX D — Erosion Control Report IPreliminary Drainage Report W I NORTHERN ENGINEERING LIST OF TABLES AND FIGURES: Figure 1 — Aerial Photograph................................................................................................ 2 Figure 2— Proposed Site Plan................................................................................................3 Figure 3 — Existing Floodplains........................ ......... .:................ ........... ............ ................... 3 Figure 4 — Harmony Road Drainage Area................................................................................ 4 MAP POCKET: C400 - Drainage Exhibit Preliminary Drainage Report .V NORTHERN ENGINEERING I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Geico Office Bui 2. The Geico Office Building site is located in the southwest quarter of Section 31, Township 7 North, Range 68 West of the 6' Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located just northwest of the intersection of Harmony Road and Timberline Road. 4. Currently the existing lot does not have any stormwater or water quality facilities. All runoff from the site is routed via overland and discharged directly into the Dixon Canyon Lateral. Harmony Road is slightly elevated to the project site creating a ridge line running east and west along the right-of-way line. There are currently two drive cuts into Harmony Road. The west drive cut is slightly graded back to Harmony, but flows within the gutter above 0.7 feet will overtop the sidewalk and be routed through the site and into Dixon Canyon Lateral. The east drive cut is graded back towards the site and any drainage within the northern section of Harmony is currently routed through the site and into Dixon Canyon Lateral. The overall site grades from the south to the north. 5. The project is currently border to the south by Harmony Road, west by a commercial building, north by Dixon Canyon Lateral and east by Timberline Road. Preliminary Drainage Report NORTHERN ENGINEERING B. Description of Property Geico Office Buildi 1. The Geico Office Building property is approximately 0.55 net acres. Figure 1 — Aerial Photograph 2. The Geico Office Building project consists of two properties, 2024 & 2016 East Harmony Road. The 2024 East Harmony Road or western property consisted of two building used for commercial use. A single drive access point exists from East Harmony Road. The areas in front of the two buildings consist of gravel parking area and the remaining property consists of over grown weeds. Stormwater is routed though the site from south to north via overland flow and is discharged directly into Dixon Canyon Lateral. Earlier this year, the existing buildings were deconstructed because of the "Dangerous Building Issue" policy through the City. The 2016 East Harmony Road or eastern property currently consists of a commercial office building with associated outbuildings. There is an existing drive access point from East Harmony Road. The area to the west of the building consists of a paved parking area with associated landscaped areas. Stormwater is routed though the site from south to north via overland flow and is discharged directly into Dixon Canyon Lateral. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, 74 percent of the site consists of Nunn clay, which falls into Hydrologic Soil Groups B, while the remaining site consists of Fort Collins loam, which falls into Hydrologic Soil Groups B. More site -specific exploration found primarily sandy lean clays with a groundwater encountered 15 to 17 feet below existing site grades. See the Geotechnical Engineering Report by EEC (EEC Project No. 1132073) for additional information. 4. The proposed development will include the deconstruction of the existing commercial building on the western property and the existing paved parking area. The proposed site will a new commercial building located to the east of the project along Timberline road. It will include two drive access points from Harmony and an associated parking lot. The majority of the parking lot will be paved with permeable pavers and will act as the projects water quality and detention facility. Preliminary Drainage Report 2 NORTHERN ENGINEERING acl+�u eearea Geico Office Buildi f,OrCRE�F WNI � .rl=ii_s____—_.___ ...axrs3eaetl. •u�,r•��•"� ' * ( �� 1 su•x nwr+ron. riuea .•'1ra.Y/ 1WO SITE PLAN - 2024 East Harmony Road Figure 2— Proposed Site Plan 5. The project is bordered to the north by Dixon Canyon Lateral Irrigation Ditch. There is an existing private irrigation system associated with the existing property to the west. No other irrigation facilities are known at this time. 6. The project site is within the Harmony Corridor District (H-C) Zoning District. The proposed project is not requesting a change in the land use. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. 2. The FEMA Panel 08069C1000F has not been printed for this location. It is noted that the vertical datum utilized for site survey work is the City of Fort Collins Benchmark #1-96 (Elevation = 4941.81, Fort Collins NVGD 29 — Unadjusted) , • Existing City Floodpldn Nap _ ❑ 41� PR7 ti F, — rU'\ Figure 3 — Existing Floodplains Preliminary Drainage Report 3 NORTHERN ' ENGINEERING Geic ' II. DRAINAGE BASINS AND SUB -BASINS ' A. Major Basin Description 1. The Geico Office Building project is located within the Fox Meadows Basin, which is located between East Horsetooth Road and East Harmony Road from north to south ' and approximately South Lemay Avenue and Fossil Creek Reservoir Inlet Ditch from west to east. ' B. Sub -Basin Description 1. The subject property historically drains away from the existing buildings. Stormwater is routed through the site via overland flow and discharges directly into the Dixon ' Canyon Lateral (0.7 cfs for the 2-year storm and 3.2 cfs for the 100-year event — onsite only). A more detailed description of the projects proposed drainage patterns follows in Section IV.A.4., below. ' 2. No drainage is routed onto the property from the east, west or north. Due to an existing drive access cut from Harmony Road, all of the drainage conveyed through the northern curb and gutter is discharged directly onto the property. Through the ' widening design done by the City of Fort Collins, this existing drive cut is located at the high point within the curb and gutter and the amount of runoff that is conveyed to the existing drive cut is minimal. This stormwater is routed through the site and ' discharged directly into the Dixon Canyon Lateral with an overall 100-year release rate of 3.23 cfs. See the figure below illustrating this area. 1 1 1 1 W HARMONY ROAD Figure 4 — Harmony Road Drainage Area DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Geico Office Building project. Preliminary Drainage Report 4 ■� I NORTHERN ENGINEERING B. Four Step Process The overall stormwater management strategy employed with the Geico Office Building project utilizes the "Four Step Process" to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1— Employ Runoff Reduction Practices ' Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: ' Conserving existing amenities in the site including the existing vegetated along the Dixon Canyon Lateral. Providing large vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales and grass buffers to increase time of concentration, promote infiltration and provide initial water quality. ' Providing permeable paver areas with underground detention area to increase time of concentration promote infiltration and provide water quality. Step 2 — Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with ' Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and ' water quality. Stormwater generated from the proposed building will be routed through landscaped swales and into a proposed storm collection system. This storm collection system is proposed to discharge directly into the permeable paver area and routed through ' this section to achieve water quality. The stormwater generated from the proposed parking area will be routed via overland flow to the permeable paver area. Step 3 — Stabilize Drainageways ' The project site currently discharges to the Dixon Canyon Lateral. While these drainage patterns are being maintained with the proposed grading, measures have been proposed to decrease the amount of run-off discharging into Dixon Canyon Lateral as well as the ' quality of the storm water being released. The existing onsite area is releasing 0.7 cfs for the 2-year event and 3.2 cfs for the 100-year event undetained and untreated. Currently ' the existing drive cut is located within a high point of Harmony Road and a minimal amount of runoff generated from Harmony Road and routed through the site. Within the proposed design, the runoff from Harmony Road is being rerouted to remain within the street section. The western half of the drive access will drain to the west and the eastern ' half of the drive access will drain east. The additional runoff that will be generated from closing the drive access is negligible. Water quality will be provided through a permeable paver section and will treat all runoff generated by onsite site improvements. Furthermore, ' this project will pay onetime stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. ' Preliminary Drainage Report 5 I [J .V I NORTHERN ENGINEERING Geico Office B Step 4 — Implement Site Specific and Other Source Control BMPs. The Geico Office Building project includes a new building with an associated drive and parking area, all of which will require the need for site specific source controls including: IKa A localized trash enclosure at the rear of the building for the disposal of office waste. C. Development Criteria Reference and Constraints 1. There are no known drainage studies for the existing properties. 2. There are no known drainage studies for any adjacent properties that will have any effect on the Geico Office Building project. 3. The subject property is essentially an "in -fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: n� Existing elevations along the south and east property lines adjacent to Harmony Road and Timberline Road will be maintained. Existing elevations along the west property lines will be maintained. N� Existing elevations and vegetation on the north side of the subject property will be preserved. N� As previously mentioned, overall drainage patterns of the existing site will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity -Duration -Frequency Curves, as depicted in Figure RA-16 of the FCSCM, sere as the source for all hydrologic computations associated with the Regency Lakeview development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula -based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 801 percentile rain event, which has been employed to design the project's water quality features. The second event analyzed is the "Minor," or "Initial" Storm, which has a 2-year recurrence interval. The third event considered is the "Major Storm," which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria ' 1. As previously noted, the subject property historically drains directly to the Dixon Canyon Lateral, The majority of the site drains stormwater via overland and swale flow. ' 2. All drainage facilities proposed with the Geico Office Building project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District's (UDFCD) Urban Storm Drainage Criteria Manual. ' Preliminary Drainage Report 6 11 .� I NORTHERN ENGINEERING 3. As stated in Section I.C.1, above, the subject property is not located within a FEMA regulatory floodplain. 4. The Geico Office Building project does not propose to modify any natural drainageways. F. F000dplain Regulations Compliance ' 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed Engines and Energy Conversion Lab development is not requesting any modifications to criteria at this time. ' IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Geico Office Building drainage design are to maintain ' existing drainage patterns and ensure no adverse impacts to any adjacent properties, and to maintain the detention concepts as outlined within the "Fox Meadows Master Drainage Plan Update," by Icon Engineering, August 1999. 2. The existing site does have off -site from Harmony Road. The existing runoff will be ' rerouted to remain within the existing Harmony Road street section. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the ' sections to which the content best applies. 4. The Geico Office Building project divided the site into four (4) major drainage basins, ' designated as Basins A, OS, OE and ON. The project further subdivided Basin A in to four (4) sub -basins, designated as Basins Al, A2, A3, and A4. The drainage patterns anticipated for each basin and sub -basin are further described below. ' Basin A Basin A consists of the improvements within the project area. Basin Al encompasses the most areas within Basin A. This basin includes all of the proposed parking area ' and a portion of the proposed sidewalk. Runoff through this basin is routed through a combination of overland and gutter. Runoff from this basin is primarily routed across the proposed permeable pavers and underground detention. The portion of runoff that ' is not intercepted by the permeable paver system will be intercepted by a proposed curb inlet. An orifice plate is proposed within the curb inlet to restrict the released flow from the underground and above ground detention. Basin A2 is composed of the northwest quarter of the building and the building frontage. The stormwater is routed via overland and swale flow. All runoff from this basin is intercepted by a stormwater collection system that discharges directly into the permeable paver system discussed ' above. Basin A3 is composed of the southwest quarter of the building and the building frontage. The stormwater is routed via overland and swale flow. All runoff from this basin is intercepted by a stormwater collection system that discharges ' directly into the permeable paver system discussed above. Basin A4 is composed of the eastern half of the building and the landscaped areas around the building. The stormwater is routed via overland and swale flow. All runoff from this basin is ' Preliminary Drainage Report 7 1 . NORTHERN ' ENGINEERING Geico Office Buildii intercepted by a stormwater collection system that discharges directly into the ' permeable paver system discussed above. Basin OS ' Basin OS consists of two sub -basins and is composed of primarily of the landscaping south of the parking area. This area was redesigned with the closing of the two existing drives and the proposed landscape design. Basin ON Basin ON1 consists of the northern property boundary. No improvements are proposed in this area and historic drainage patterns will be maintained. Basin OE Basin OE1 consists of the eastern property boundary. No improvements are proposed in this area and historic drainage patterns will be maintained. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Specific Details 1. The main drainage problem associated with this project site is the deficiency of water quality present within the existing site and the amount of offsite runoff being conveyed onto the property from Harmony Road. Currently the entire site drains overland and discharges directly into the Dixon Canyon Lateral without water quality. The existing two outbuildings also drain directly into Dixon Canyon Lateral without any water quality. The proposed site will mitigate this issue by instituting the following water quality devices: N9 All of the runoff generated from the proposed building will be routed through a landscape area. NB All improvements generated from the site will be routed through a permeable paver detention system. 2. A hybrid approach was utilized to compute the maximum allowable release rate associated with the FAA detention sizing calculations. The 100-year peak runoff rate was calculated for the pre -development impervious areas for the eastern lot. This essentially "grandfathers" the existing impervious areas by allowing the respective 100-year peak discharge to be added to the maximum allowable release rate. The release rate for the remaining undeveloped land (pre -development pervious areas and the entire western lot) was established by calculating the prescribed 0.23 cfs per acre. The total of these two discharges (i.e., 1.07 cfs and 0.13 cfs) establishes the overall maximum allowable release rate, 1.20 cfs, from the project site. The allowable release rate of 0.92 cfs utilized within the FAA procedure detention storage computations (Refer to Appendix A for these calculations) and was established by subtracting the undetained release of 0.28 cfs, from the overall maximum allowable release rate. The overall existing runoff being routed through the site and discharged directly into Dixon Lateral was 3.23 cfs for the 100-year event. The total runoff leaving the proposed site through the use of detention is only 1.20 cfs for the 100- year event. Preliminary Drainage Report 8 NORTHERN ENGINEERING Geico Office Building 3. The FAA method was used to size the on -site pond for quantity detention. ' Calculations for this area, based on the characteristics of basin A and adjusted release rate, indicated a detention volume of 2917 cu. Ft. This includes the 384 cu.ft. of Water Quality Capture Volume (WQCV). During the water quality events the water ' quality capture volume will release over 12-hours. This section is considered a no - infiltration section because the in -situ soils in this area are USCS Nunn Clay Loam. 4. The storage volume available within the reservoir areas (i.e., No. 57 and No. 2 open - graded aggregate) of the MBP section is ±2917 cu. ft. The MBP section is designed with an increased No. 2, open -graded aggregate, material depth in order to provide storage for storm events in excess of the water quality (80"' percentile) storm event. In addition to the volume within the MBP section, parking lot detention is designed to account for an additional 203 cu. ft. ' 5. There is a Nyloplast Drain Basin located on the southern, eastern and a portion of the western building boundary. These area inlets are designed to intercept local flows, as well as the flow generated by the proposed buildings. These basins will convey runoff through landscape areas before discharging into the drain system. The drain basin is ' connected directly to the MBP section; therefore, runoff conveyed through the drain system will be treated. ' 6. The emergency spillway will be located at the low point on the northern side of the parking area. The spillway will utilize the low point within the curb with an elevation 1' lower than the lowest finish floor elevation. In the event that an emergency overflow occurs, the drainage will flow to the north, into the existing irrigation lateral. ' V. CONCLUSIONS ' A. Compliance with Standards 1. The drainage design proposed with the Geico Office Building project complies with the ' City of Fort Collins' Stormwater Criteria Manual. 2. The drainage design proposed with the Geico Office Building project complies with the City of Fort Collins' Master Drainage Plan for the Fox Meadows. ' 3. There are no regulatory floodplains associated with the Geico Office Building development. ' 4. The drainage plan and stormwater management measures proposed with the Geico Office Building development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential ' damage or erosion associated with its stormwater runoff. Geico Office Building will detain for the pervious area converted to impervious areas to release at the historic 100-year release during the 100-year event. 2. The proposed Geico Office Building development will not have any impact on the Master Drainage Plan recommendations for the Fox Meadows. ' Preliminary Drainage Report 9 1 1 1 1 ■� `� NORTHERN ENGINEERING References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Subsurface Exploration Report, Geico Insurance Office Building 2024 East Harmony Road, October 14, 2013, Earth Engineering Consultants, Inc.(EEC Project No. 1132073). 4. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 5. Soils Resource Report for Larimer County Area. Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright -McLaughlin Engineers, Denver, Colorado, Revised April 2008. Preliminary Drainage Report 10 I 1 1 1 1 ' NorthernEngineering.com // 970.221.4158 I I I / I I I I I I I I I \) \ z !� \R CIw i \ /)\ \ Io 3 $ el•� o tƒ !- % /§) k�� • ! to & ]§ § !� ° - a: !` 00 2o $ $/!22\ �/) k ,\{ �`_ §* q|e e ! o � - ae % %■) //2§7 2k §§§j ci ci 1c, Jcs 226q) $ }} \ ■ o a }I\ 8@m== % f - 2 \ : ) _ § ) : COG ` . § . _ t {|[_$ kL�§|)|.f kfla��I:o� �`� { a7l |¥- : ! )&! �a � = 4 ƒ»&!I }} $�« \ �| � / � !■.a;» ±{#;C5 ,,� ®%!cr kk 2 Cl! \ -\ a , ;�)*§ « � � � tzm u � � >- § _> _ - Q �� §/\} ) ■- 22 /}\) 0! { I I I I I I I I I I I I ■: \ Z � T I § # ! ! \ ) 0 !a! $ , k J a 2 ] /Jtmpq$q $_§ )0000 ¥ !&! � � # / ! \ # \ � \i k k � _ � OR ul ; � ee�:= | � |) � k ) ))§§) u - ~ - ! } \ k �- F` I re O p o o a u o a e E E N N M d o Doo a N ,o W ^-,r ba c 0 U e n m � U O O MC r C CS 000 T O O U oE� cr �u W 0 OO'D 0 - 0 N 0 0 0 n 0 ZvNc Eo 0 C 7 U L) O o J \ T � m � T O O C ILO (n A N T p. C u ID O 00 00 OIn 00 LL7 In OInti N -+ n n J m !n O 0 0 00000 O 00 O u Q V U o cL CO i « N O Ao D 00 O n n O n n 2 Laio u `" N E 0 00 0 W o Un o o N o o o Ln o U ) _ U U LL.o W E 0 C u A 4 NN n0000m Lo M O p ` a A 0 0 0 0 0 0 0 0 N V a� o0oo0oo00 O O E Q "o t2 o O O O O O O O O ` (n 0 0 01010 O O 0)i 12 y q �p Q` G. O 0 O 0000000 O O O O O O O O Z z 0 Nm E r 000 0 0 0 0 `O y 000000000 000000 O O O y Z o O 0 0I. 00 A O O O O O O O O O 4: u d --� O Qi N n m Q c9 oo o0000lIl 0 O Z d E It _ N n 0 W 2 ' � C u �m LO0) �N m e,�rrr �e b V 0 00 ON 000000000 N <t V 00 0000 00 lt W W �� o0000 00 � y m a` 000000000 0 a z o � \ U d R o m �` A u u y 1 N V 000000000 O o CD 0 n' 1 0 O� 0101010 D O O � u C Q` U 0 0 0 \ U m N a00 0 0 0 0 0 0 0 W m t u m 000000000 0 0 0 0 0 0 0 0 O pC p Q Q 0 0 0 0 0 0 0 0 0 i Q W O N CL O MNto V 00 rn.-. in n c° Q N N 00 00000 in W N r C V N O O O O O O O O O W v o m A W ¢` m m^0r .avm 00m a N O W � act cr w S Li cr W q m ] N 4 w vN UZ u� O oM8m Q U 0 0_ a c N U� a � ; o C 'u pp � C m N M V +J 00 Z N 000 Nw J H F I I I I I I I / I I I I I I I I z I ! _ / J{�7,��,.,.� §RI�r�„�,: J ƒa ®i zzzozzzz 3\>7sea)!««« �}®/i}&)/#» £�e,0,mo H ! § \ �7 Oz zz }` = \ \ i»!7}i!>};} I-*)zzzzzzz 2 ® k a ! - \ ! �� \ ®{EM00 Mm»IN,,,�,! ui o . ~! / ®iib;2± 4lI3 0 ae m £._"mmw @Gm,2,m&! "0kK § a „w,,a = Q ) ,00,2_e0 �<-a !�- ! - { ! f {§$2G2=ge= ��&o,00000r A ' ,100000000 §ul 0 LY \ \U & \ } §) ! 1010101010 E \ } \ 2 ;k22<00 22§0 ƒ � \ \ ( ) \ }k} ;§�dE , :o+ ! \r ;gg7i0¥) )}})] &� I 1 1 1 Cz Z W N f0 d d tV t0 d d d D d N N U) C d o a d d c a a d d c c T xi = p T d d d d II c c a a K 8 0 r 30 8Z 0 w Q u "0 00 0 0 0 0 0 O O O O 0-i O 0 0 0 O O a m 0 o o 3 0 ; O Ty� L O V O O O O O O O O � W c I C7 U i 1y A in Q m m m m M M m 8 m A C mm OSm mmmm U � IA W co W W W W W C l0 W CO 00 W W W CO o C o — Q 8 Om000�0 m m m Z CCC 000n V O 000 O O CN W � �oODom0 0�m+ W V Q p O u l0 W W 00006600 Im t.O.Nn,Ojp m 82234 ,o r C LL U m 0 E ry 0 E N 4 N u�"00 0 0 0 0 0 0 0 0 0 0 0 c <` W 00000060 E UQ T �\ p U N u E e N c a�o0 ma aaby oo q Y g d d p d 0 0 0 0 O `o w d a I @ I I / I I I I [j I I / / I I //32 ) ()%!g Z kk\ \ { §Jza f a § / { q � ($%), Mn o §I)% ; % - �- 3 3 \ \ §kk\G - 2f�ia Q % I o u ,00 LA. 2 - � .� q ) )!, , Z aju �,. - �f] § £r/ _ \ _(Jb§ })\ 2f f 0 S:s.2 - m 6666 j§\ })\ ) \J9 � ° o B S � , o _ If's C - 0 d - % � 2 m- - § w ::::: .:! ct di to -:;�:;-;:, - �:::::-::! m f::; cr IL IE /\))\��/ j Ir k° !§^E 0 | _ \\/ &~° � ta! ! k o tt2 k k \ƒ C ... | :! - | \ \ \ Liu LU || I _■ ® - : �51 ��l: § || \#| 0 2 k�7g ■ � E ` � ) o=&= e &a \ \ } > \ e - / 12 - § \ ®} m ; ■`\ { \ | - ; { ¥:a m £a7r f }cy \\� 0a#2 A/) - IL j \ f $ u f |gf & B ) - % o § ! Q | 00 ci o Z ct ,k � o Lai)| u 0ko ukD LAJ f0 |� CD 2 §■°�04\&R7r � 2 � �) % o }{R7z \ f\Rf r N � ® ! § , E \ �\ �IL § Y; 1 1 ' Z" =_ W 0: 1� 1 n N� V M O N m .2 C N N lD O N O 0 Id & CV O 00000 O ol O Ql O In . 00 .--� .-� a) 00O - N OOO O N d r C p p 0 0 0 00 0 0 'E 6 Sri ui m ai Sri Lo Lo Lo r 'E N 0 0 0 0 0 0 0 0 o tou)toLOLiuiU)LO U-) 8 m o p 00 D, �D D, m N ,.., W O O iD .-+ N .-+ .--i c0 U 00000 O C �000�u'�O� LO0 lD 00 w Uf .-� N . .-+ 0 u 6666666 0 0 J QQ y� m N w V 00 0 .-i LO LO �yj N V lD N N 000000 N m. n , O O 't O Q F 10 O O O O O O O 0 0 Z N v Q Q- a a¢ Q p 0 0 0 CO Q Z F Z •-1 N M d .ti ti .-i N .r a c w m cr i- 0 0 0 a� m m a I I I I 1 J B.1 — Storm Sewers B.2 — Inlets B.3 — Detention Facilities NorthernEngineering.com !! 970.221.4158 m I V29 - Veloory H*W I 11 NorthernEngineering.com // 970.221.4158 M V O fV O M 01 W 0 N �+ c `o E z m O O E n ui c O O u% A N LL � y O O d cn 2 3 m rn F m N m_ f ED 1D A CD A. < < V V V S O S S 8 8 St. o+00.00 - Outhu Grnd. El 4964.15 Inv. FL 4862.92 In x r o' Bts 0t13,272 - Lr: 1 OrnC. EL 086.10 Inv. El. 4962,09 Out Inv. EI.4952,99 In m Q N W O i ea D.M.467 - Lr: 2 Ornd. El. 4N3.70 Inv. El.4953,11 Out o Inv. El. 4953.11 In C m 0 0 s 0 S rn 0 Bts 0+83.B02 - Lr: 3 Omd. EI. 4984M Inv. El. 4953.24 Out 0 m 0 0 0 0 A A �Ap A A A O fV. W p�V 1 1 1 1 O S S OO 0 mO mS v v a a Y v S 8 0 m 0 v � U Y lO9 ;^O 38'EW '13 9O'9081 ,13'PWp 4 U1-9VOL+osm 0 w O J t W it 1987 *13 AUI L£'C887'13 PWEI AVID - Off OC+O 148 0 0 o 0 o S S S o w ' E N N C L1 I i 1 1 I 0 0 0 0 0 0 roco O <0 W a v a v v v 0 0 m A m O L to U f6 N a O N N O J N � W 3�� 1L'ifiet'13 -eul io L>'fPE9 '13 'Pw0 ' s :ul - zLr¢�+a•ie J " th O J (7 S UI LQ'teel►13 'AuI 9L'esae9113 'PLUD II4ln0 - 06't}Q+0 ME 0 o 0 0 0 0 0 r N e co v W I I I I @ I I 11 / I v 0 CL �4) � � E E l) Cl) � 4) @ co E. 0 U) � k� ) ) 0 !§) L - , . # ) k § J x\£ \ !£ 6 § cs CR co 2 0) CC)In£ B ) _ « CD CD CO CD CO E �!£ -It v z \CL &/ ; ; 3 3 ; �CR SLU CD CD « ■. �a 2 § !�£ ® ® - \I£ 2 d 5 k § rg G a 3 4 a _ (0m . > .._ .�� CO§ ; m ; £ea . f 3 ! ■ ui ) / 7 - @ 7 ; « # .2 « cL _ cL ( ( ( k 4 J LL 16 o , � _ _ L §) . k ! m IL r L 1 11 11 1 m N N m N 0Q co 0 O O O O O O O O V m 0 V C O 0 C') J _ n O) r M CD N N N v U 7 W 'K 0 W 0 0 a? v CDv 0) v O J C _ q Cl) N 0) W C CD m R R t0)) O) N co v 0 a e 00) IT 0) IT O� N m N COD v v IT v v J _ N W (A+) N N bi m C =C G '� (�O pp (O c00 C C) a v v v C) 0 o.� COo a v v E z 10 LL Q N O O O O 0 O m O O m J W m N N N N N > P ca O o O 0 O 0 O 0 O 0 cm CL J F m m N (o co O (D C N C J M C O 1N N V v U)) J y ,-, 0 O 0 0 0 N (O (O O _N N N N CD N CND m C > m COC CO (DD ID v v v v 0) C G 'X co co w (ND (D v v v v v E C a�D o v cw CD 0) 0)v a (7 E co O O C7 m C w e E 7 3 7 (n c, m (O m N of M m cw a (D CDv (D co a co 0)_� a C7 O 0m a f0 N W co U m tL O O O O G tL C O N m a N U m S W nz d z I q I I |] I I I I ■. S & & a § &a £ 0 _ .. . . w co co r--_ -!£ { � 7■Z § f{ q Q f w . . A m B §!£ § B § co B .� !!£ ® k cq D m i - 0 ' k \ E t 0). m g k m 2£ j m a/ Iq x!E \ § CD§ § !!£ § § § w § ! £ Cl) & k § / § co co co uj!£ ¢ ¢ � � f ■ ! � Cl) cn . 0 ! k ; 2 ; ; 0 £ ; A t Lo § § co ¢ B �!£ . . ! !!£ § § § § $ k D { m § « ; . $ \ j . 0CD | ® t CD co co k = A & 2 , n _ I ! k ) F I 1 1 NorthernEngineering.com // 970.221.4159 m DESIGN PEAK FLOW FOR ONE-HALF OF STREET BY THE RATIONAL METHOD Woiksnael Protected Project: Galan Office Building Inlet ID: Design Point Al I (Design Flow a Gutter Flow i Carty -over (Flow I 10 i-LOVNp ` STREET I iOVFLpVNp y —GUTTCR rLOV PLUS LORRY -AVER rLOW ♦�—Iiiiiiiiiiiiii ♦GUTTER FLOW Stow Details INLET INLET ——1/eSTREET — Design flow: ONLY a already defetminecT ugh inner atedtodi Minor Sbrm Me' r term (local peak flow for 112 of street. pka flow Eypassing upstreem subratcarmanls): 'O = 0.5 2./ cfs I it uahn d I: fah., Furs 'loci tt- mSt of in sheet and prutiesid IO sha¢t O-AaaW eogra0 a Information: Later data In the blw ce nt % I1{^�e�.,��. SubmeM raltliArse {J PerceInaervlousress = NRCS Sall Type= B. C. or Site Type. Slope (fHf[ • Slat S Utw� Ooenand Flow = O 5e a Bon-lahan GMer Fbw= am a n orma an: rel Y = tp1mc."PrTIM Minor mlatl Storat Design Storm Reran Period. T,=m 1 lyears Rohm Period One-Hour Pbn Pt'1 liclws UserAefined Stofm Runoff Coeffiders (leave INS Gamic to accept a calwleled value), C = User -Defined Syr. Rutafl Coefficient (leave tie Mark to accept a ralcubted value), Cs = Bypea (CWW4)ver) Flow from upstream Subcalckments, Oy' ant Total Design Peak Flow, D al 0.6 1 1.5 de .. IN THIS SECTION IN THE .TIONS BELOW Inlet DP Al As, O-Peak 3/512014, 3:26 PM INLET IN A SUMP OR SAG LOCATION Project = Sunshine House - FC 139 Inlet 10 = Design Point A2 RGed, MWd we Lo IGI ka an Infurmrtbn flnout) 'Yoe of Inlet Inlet Type arai Depression Additional a cor/mwus gueer Eepmsswn'a'fmm'Q-AlbW) any lumber of Unit Inlets (Grate or Gum Opening) No 'bw, Depth outside of Local Depresson at Inlet Flow Depth :role Taft .rstlon ergth of a Unit Grate 4 (G) Volt, of a UM Gets W. area Opsmlg Ratio for a Grate (tyyical values 0.IM 90) A. Ibgging Factor for a Santis Grate (typical valor 0.50 - 0.10) Ci (G) Irate Web Coefficient (ypbel value 2,15 - 3,60) C,. (GI lane Danes Coefficient (typical value 0.60 - 0,80) C, (G) :urb Operi 1Morawboa engtn of a Um Cum Openrg L. (C) lariat of Vemoal Cum Doering in hones Hwe (eight of Curb QMae Throat in Inches H. mile of Throat I. USDCM Figure ST-5) Thais 'ae Width for Depression Pan (typically the gutter width of 2 feet) We' :bilging Factor for a Single Curb Operung (typical value 0.10) Cf (C) :urb Open t, Weir Cpsti RM.1 value 2.3.3.6) G (C)' :ua Opei4g Orifice Coefficient (rypI i value 0.60 -0.70) Ce (C)' -01al Inlet Interception Capacity (assumes clogged condition) Q. e rot Capaclty IS GOOD for Mn. ,.-. .or Storms (O PEAK) 0esvweeo.! MINOR MAJOR CDOTlDemrer 13 combination 2.W 1 6.0 120 3.00 1.73 0.43 0.50 0 50 3.30 0.60 3.D0 6.50 5.25 D.00 2.00 0.10 0.10 3.70 0.66 IILna, ncrns eel eel net tones ones agrees eel Inlet OP At.As, Inlet In Sump 31512014, 3:26 PM (sla) f4pedeo ' Project No. 959-001 Northern Engineering Services, Inc. Geico Office Building Calculations By: CNS 1] DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins ID - Project Number 959-001 Project Name Geico Office Building Project Location Fort Collins, Colorado Pond No Permeable Paver Detention Input Variables Results Design Point a1 Design Storm 100-yr C = 0.82 Tc = 5.00 min A = 0.56 acres Max Release Rate = 0.92 cfs Required Detention Volume 01117 ft3 0.07 ac-ft Time (min) Ft Collins 100-yr Intensity in/hr) Inflow Volume a (ft) Outflow Adjustment Factor 0;,,, (cfs) Outflow Volume 3 (ft) Storage Volume W) 5 9.950 1364 1.00 0.92 276 1088 10 7.720 2117 0.75 0.69 414 1703 15 6.520 2682 0.67 0.61 552 2130 20 5.600 3072 0.63 0.58 690 2382 25 4.980 3415 0.60 0.55 828 2587 30 4.520 3719 0.58 0.54 966 2753 35 4.080 3917 0.57 0.53 1104 2813 40 3.740 4103 0.56 0.52 1242 2861 45 3.460 4270 0.56 0.51 1380 2890 50 3.230 4429 0.55 0.51 1518 2911 55 3.030 4571 0.55 0.50 1656 2915 60 2.860 4706 0.54 0.50 1794 2912 65 1 2.720 4849 0.54 0.50 1932 2917 70 2.590 4973 0.54 0.49 2070 2903 75 2.480 5101 0.53 0.49 2208 2893 80 2.380 5222 0.53 0.49 2346 2876 85 2.290 5339 0.53 0.49 2484 2855 90 2.210 5455 0.53 0.49 2622 2833 95 2.130 5550 0.53 0.48 2760 2790 100 1 2.060 5650 0.53 0.48 2898 2752 105 2.000 5760 0.52 0.48 3036 2724 110 1.940 5853 0.52 0.48 3174 2679 115 1.890 5961 0.52 0.48 3312 2649 120 1.840 6056 0.52 0.48 3450 2606 'Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. 1 Page 1 of 1 959-001 DetentionVolume FAAModified Method.xls �INORTHERN ENGINEERING ADDRESS: Pum. 97D221.4158 200E College Ave. Suds 10 WERStiE: PAX; 970221.4159 Fort Collins, Cl w .nurtwonengmeonng.com Project Title Geico Office Building Project Number 959-001 Client Steve Allen Pond Designation Permeable Paver Detention Area 4964.39 ft Water quality Volume 384 cu. ft. 100-yr Detention Volume 2917 cu. ft. Total Pontl Volum 2917 cu. ft. Date: April 30, 2014 Cates By: C. Snowdon Paver Volume W Surface Volume Volume Elevation (8) Surface Area (ft') Incremental Depth (It) Incremental Vol. (R) Total Vol. 1000%CaPacity(fts) Total Vol. 400% Caparityfl) Surface Area (0') Incremental Depth (ft) Incremental Vol. (ft) Total Vol. (ft') Total Volume In) 4,962.40 'A2\iA N/A 0 0 N/A N/A N/A U 4,962.50 431.56 0.1 15,67 15.67 6.268 N/A N/A N/A 0 6.268 4962.60 1,510.75 0.1 91.66 107.32 42.928 N/A N/A N/A 0 42.928 .70 2,582.62 0.1 202.29 309.61 123.844 N/A N/A N/A 0 123.844 .80 3,437.20 0.1 299.97 609.59 243.836 N/A N/A N/A 0 243.836 .90 3,859.56 0.1 364.63 974.22 389.688 N/A N/A N/A 0 389.688 .00 3,892.57 0.1 387.61 1361.83 544.732 N/A N/A N/A 0 544.732 .10 3,894.39 0.1 389.35 17S1.17 700.468 N/A N/A N/A 0 700.468 .20 3,896.22 0.1 389.53 2140.71 856,284 N/A N/A N/A 0 856.294 .30 3,898.05 0.1 389.71 2530.42 1012.168 N/A N/A N/A 0 2012.168 .40 3,899.87 0.1 389.9 2920.31 1168.124 N/A N/A N/A 0 1168.124 _ .50 .60 3,901.70 3,903.53 0.1 0.1 390.08 390.26 3310.39 1324.156 N/A N/A N/A 0 1324.156 3700.65 1480.26 N/A N/A N/A 0 1480.26 .70 3,905.35 0.1 390.44 4091.1 1636.44 N/A N/A N/A 0 1636.44 3,907.18 CIA 390.63 4481.72 1792.688 N/A N/A N/A 0 1792.688 3,909.01 3,910.94 0.1 0.1 390.81 390A9 4872.53 1949.012 N/A N/A N/A 0 1949.012 5263.53 2105.412 N/A N/A N/A 0 2155.412 3,912.66 3,936.32 0.1 0.1 391.18 387,44 5654.7 2261.88 N/A N/A N/A 0 2261.88 6042.14 2416.856 N/A N/A N/A 0 2416.856 3,608.35 0.1 372.18 6414.32 2565.728 N/A N/A N/A 0 2565.728 3,231.89 0.1 341.94 6756.16 2702,464 4,964.40 0.95 N/A 0 2702.464 2,747.45 0.1 298.64 7054.8 2821.92 4,964.50 76.24 0.1 3.86 2825.78 2,223.23 0.1 248.07 7302.87 2921.148 4,964.60 303.69 0.1 19 2940.148 1,S52.02 0.1 187.76 7490.63 2996.252 4,964.70 687.66 49.57 3045.822 1,213.53 0.1 137.93 7628.56 3051.424 4,964.82 1,158.82 i 92.32 3143.744 832.43 0.1 101.7 7730.26 3092.104 4,964.SO 1,717.68 143.83 3235.934 375.39 0.1 58.89 7789.16 3115.664 4,965.00 2,355.38 203.65 3319.31A ADDRESS: PHONE: 970.221.4158 ENORTHERN NE I 200 S. College Ave. Style 10 w w-north ENGINEERING Fort Collins, C080524 FAX:970.221.4159 www.northernengmeenng.con' Project Title Geico Office Building Date: April 30, 2014 Project Number 959-001 Calcs By: C. Snowdon Client Steve Allen Pond Designation Permeable Paver Detention Area Q=CA -EJ11 Q = Release Rate (cfs) C = Discharge Coefficients (unitless) A. = Area Allowed of Opening (ft) g = Gravity (32.2 ft/s2) Eh = High Water Surface Elevation (ft) E; = Elevation of Outlet Invert (ft) Cos 9 2 = -► 0 = 2Cos ' FAII VR S=Rl9 A =nRZ-K RZ % -Sur I K= 2 H = Height of Opening (in.) R = Inner Radius of Outfall Pipe (in.) A = Top of Plate to Center of Pipe (in.) S=Arc Length of Open Area (in.) A, = Area of Opening (ins) 6 = Angle of Plate on Pipe to Center Pipe (radians) 2-1/4 in Q = 0.92 cfs C = 0.605 Eh = 66.25 ft Ei = 63.06 ft 0.106095 ft2 15.27765 in' ADDRESS: NORTHERN PHONE: 970221.4158 WEBSrtE: 200 S. College Ave. Suite 10 E N G I N E E R I N G Fort Collins. C080524 FAA: 970.221.4159 www.northernengineenng.rom Project Title Geico Office Building Date: April 30, 2014 Project Number 959-001 Calcs By: C. Snowdon Client Steve Allen Pond Designation Permeable Paver Detention Area Q = Release Rate (cfs) C = Discharge Coefficients (unitless) A. = Area Allowed of Opening (ft) g = Gravity (32.2 ft/s`) Eh = High Water Surface Elevation (ft) El = Elevation of Outlet Invert (ft) Ec = Elevation of Outlet Centroid (ft) Circular Orifice Orifice Size (in.) 4 - 1/4 in. Area (in') 14.22 sq-in Q, - - . 0.89 cfs Rectangular Orifice 4 - 3/4 in. Orifice Width (in.) 3 in. Area (in2) 14.22 sci-in Q 0.89 cfs C = 0.65 E„ = 66.25 ft E; = 63.06 it E, = 63.24 ft Circular E, = 63.26 ft Rectangular 10.09875 ft` 14.219970 In P Required Water Quality Storage Provided Water Basin ID (ac-ft) Quality (ac-ft) ' B 383.814 0.009 1 1 1 I� Pond Spillway Pond Volume ■ North ernEngineering.com // 970.221.4158 ■ NORTHERN ADDRESS: PHONE: 970.221.4158 wEBSITE: ENGINEERING 200 S. College Ave. Suite to g g Fort Collins, CO 80524 FAX: 970.221.4159 www.northernen ineerin com Project Title Project Number Client Pond Designation Geico Office Building 959-001 Steve Allen Permeable Paver Detention Area Date: April 30, 2014 Calcs By: C. Snowdon WQCV=a0.91i'-1.19i2+0.78i to 12hr - a = 0.8 WQCV = Watershed inches of Runoff (inches) i = 51.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) MWQCV = 0.167 in Water Quality Capture Volume 0.45 a 0.4 L c 0,35 a 0.3 s m` 0.25 3 0.2 > 0.15 V 0.1 3 0.05 0 - 6 h, U h, 14 hr 40 h, 0 0 0 a a in m v 0 io 0 0 0 0 0 0 0 0 0 0 0 0 Total Imperviousness Ratio (i = 1.4100) Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event V=Il rWQ12 V ) 0.53 ac 0.0088 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 1.2 = 20%Additional Volume (Sediment Accumulation) I I 1 E&enorefl D'elef"KN Pfo,ndeo �'' Qf•em `Ovalfofr Alw, N Nornml V"Ier Ler �j t orrnnY 5rwmwoy �- - �a \ Pnnrwrif�nt '• EmeryenClj� Pant -> ,sp+ti,•ay SPIf'1Y • �^ \ A, uat:K LvFnieankrnent ddka I LC- Pon'] ory ED Po d AW PW,d .h ED Ob, Chwn Pfol*eton) VWrf CD Pana Fri VwHlana . NorthernEngineering.com // 970.221.4158 - fl3ms'kLwA, MMwv,Tw INorth ernEngineering.com /1 970.221.4158 NORTHERN ' ENGINEERING Geico Office Building A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included ' with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during ' construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented ' during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 — Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill ' containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. ' Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will ' be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division — Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor ' shall develop a comprehensive Stormwater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. r, Preliminary Erosion Control Report W I NORTHERN ENGINEERING Geico Office Buildi Preliminary Erosion Control Report