Loading...
HomeMy WebLinkAboutDrainage Reports - 12/14/2010NORTHERN ENGINEERING Drainage Letter Report City of Ft. Coil! jApp ad Plans Approved Date ADDRESS: PHONE:970.221.4158 WEBSITE: 200 S. College Ave. Suite 100 Fort Collins,C080524 FAX:970.221.4159 www.nodhernengineering.com Date: December 13, 2010 Project: Appleblossom Subdivision Project No. 574-001 Replat of Lots 17 and 18, Block 5, Westlawn Addition Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the above referenced residential redevelopment. The existing home is situated towards the western portion of the site, but does occupy portions of both lots. The site currently consists of rooftop, concrete walks and patio, turf, trees, and other vegetation. It presently functions similar to a 'B' lot, with historic drainage being split towards the northeast and southeast. The unpaved alley adjacent to the western properly line has a high point such that it too drains to the north and towards Laurel Street on the south. The total impervious area of the existing site is approximately 2,223 square -feet. The proposed redevelopment will completely remove all existing above -grade, structures and hardscape. The new project will consist of a duplex on the western lot (Building A), a triplex on the eastern lot (Building B), and a permeable paver courtyard between the two. A new parking lot will be constructed north of the residential units, over half of which will consist of permeable pavers. Concrete pedestrian connections will be made from the units south to the Laurel Street sidewalk. The total impervious area of the proposed redevelopment is roughly 7,196 square - feet. The off -site alley adjacent to the project will get paved with a cross-section according to LCUASS Figure 7-12F. The existing curb cut and concrete apron to Laurel Street will remain as -is. The area of paved alley draining south across the Laurel sidewalk will be approximately 650 square - feet, which is less than the maximum 750 square -feet allowed by LCUASS. The site is located in the Old Town master drainage basin, and therefore, on -site detention is not required so long as the increase in impervious area is less than 5,000 square -feet. The total increase in impervious area proposed with this development is approximately 4,973 square -feet (7,196 — 2,223). A detailed breakdown of the existing and proposed impervious areas, along with graphical site depictions can be found on the attached Exhibit 1. Page 1 of 2 D:1Projecls,574-001\DrainagOPeports\Drainage ReporBDminage-Lettrs 12-13-10.dacx NORTHERN ENGINEERING Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. This portion of the Old Town basin receives regional water quality mitigation in the Udall Natural Area; therefore, on -site water quality treatment in not required. However, sustainable design practices and environmental stewardship are part of the goals and vision of this project. As such, this development will remain sensitive to quality of stormwater runoff leaving the site. A permeable paver system will be employed, not only to limit the increase in total impervious area, but also to help cleanse and treat runoff prior to leaving the site. Landscaped buffers on either side of the concrete walk along Laurel Street will further treat surface runoff and applicable roof drainage prior to entering the adjacent curb and gutter. While a good portion of historic runoff does travel north and east towards existing single-family residences, a slight modification to current drainage patterns for the site is proposed in an attempt to improve this condition. First and foremost, on -site infiltration will be encouraged to the maximum possible extent. However, sub -surface soils conditions, combined with the proximity to building foundations, demand an underdrain system. Therefore, a shallow underdrain will relieve near surface waters and discharge into the curb and gutter along Laurel Street. Additionally, areas that historically sheet flowed across adjacent properties are now minimized to strictly the pervious 6' utility easements along the northern and eastern property lines. All downspouts and runoff from impervious surfaces will be discharged away from off -site properties. Exhibit 2 further documents that there will be no adverse increase in runoff to the adjacent properties east of Appleblossom Subdivision. The proposed grading concept closely matches existing elevations and drainage patterns, and only varies in an effort to improve the existing condition and to help ensure that adjacent properties are not adversely impacted. On -site detention is proven to be unnecessary. Stormwater quality has been considered, and will be addressed in a manner beyond the minimum requirements. Therefore, it is my professional opinion that the triplex and duplex proposed at the Appleblossom Subdivision (Replat of Lot 17 and Lot 18, Block 5, Westlawn Addition) satisfy all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely "QWmm=%0P" LEED Nicholas W. Haws, PE AP enc. cc: Dave Derbes, LEED AP — Brinkman Construction Page 2 of 2 DaP,,Ti cts,.574-0010minage`ReportsTfainage ReportlDminage-Letter_12-13-10Awx 1 �c J a t H w w N J S 0 W U) cn Q O w a a� O Q U) off$ O_ O > Z O� H W U d X w EXISTING PROPOSED lid • I _. -.._ - _. _ _ a7 b, \ Et 1 cu .� 4 1 t f Lei I 1 c,t A 14)ma I I �i 04 J �sY n LUZI ti Z r� r l �'1 r•ra rrrr _ I W I I R1 FFE-5C13, ( ~ I I III FFE-014.7 I; III a I i *9 I 0'�n 2-3r I" 100-yr Inve miy. Irdeinay. Flow, FIM, FOW. Poet Bwn(s) (c ) Tc Tc Tc C2 C10 C100 8 il0 ice'• i100 (Rim (min) 0ue) (i ow liryAr) DW Mrs) (cfs) (cf )) A Pi 0.03 8 B B 0.78 0.38 0.72 2_40 4.110 i30 0.0- 0.13 0.33 a. Rl 0.02 3 3 3 0.72 0.72 0.00 185 4 B7 0.43 O.oa 0.06 0.16 A El 0.14 14 16 13 0.33 035 04A 1.02 3.20 7.04 0.00 016 0.33 8 E2 0.03 3 3 3 0.30 0.30 0.42 2.83 4.87 0A3 0.03 O.05 0.13 - - _.._ -___ __ -__, - _ -,_ _._.__-__. _._-' -• _----,-- •- •-...-�-.,..a.-.., ..o ,.,�..., ....o, ....ate.. -v.:o NORTHERN EXISTING S PROPOSED Appleblossom SubdMsion�� ENGINEERING DRAINAGE PATTERNS �nn,.L. A� T .M 5�101y lsa M\K MA1. Y'!)Si µi of K)tt�i1` a..OB.a. irwa. OfYI wewMtra�.nl�. s3LEA 19 DEC L