Loading...
HomeMy WebLinkAboutDrainage Reports - 09/09/2003 (2)fin. ro f d Report Owe2j3jc)3 FINAL DRAINAGE AND EROSION CONTROL REPORT WARDS REDEVELOPMENT UNIVERSITY MALL PUD REPLAT NO.2 September 5, 2003 �V J•R ENGINEERING A Subsidiary of Westrian 1 1 1 1 1 1 1 1 FINAL DRAINAGE AND EROSION CONTROL REPORT WARDS REDEVELOPMENT UNIVERSITY MALL PUD REPLAT NO.2 September 5, 2003 Prepared by JR ENGINEERING 2620 E. Prospect Rd., Suite 190 Fort Collins, Colorado 80525 (970)491-9888 Prepared for GDA Real Estate Services 8301 East Prentice Avenue, Suite 210 Greenwood Village, Colorado 80111 (303)221-5500 Previous revision dates October 3, 2000 February 23, 2001 September 19, 2001 January 16, 2002 Job Number 9059.03 I September 5, 2003 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Final Drainage and Erosion Control Report for Wards Redevelopment - Revised ' Dear Basil: n We are pleased to submit to you for your review and approval, this revised Final Drainage and Erosion Control Study for the Wards Redevelopment. This revised report and plan incorporates responses to Stormwater's review comments of October 9, 2001 and August 1, 2003. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, 1 Michael Brake, PE, PIS Director of Operations Attachment 1 1 I TABLE OF CONTENTS ' PAGE LETTER OF TRANSMITTAL TABLEOF CONTENTS............................................................................................................... I ' 1. INTRODUCTION.................................................................................................................2 1.1 Project Description............................................................................................................ 2 ' 1.2 Purpose and Scope of Report ............................................................................................ 2 1.3 Design Criteria.................................................................................................................. 2 1.4 Master Drainage Plan and Related Drainage Reports....................................................... 2 ' 2. EXISTING SITE DRAINAGE............................................................................................. 3 3. PROPOSED DRAINAGE PLAN......................................................................................... 3 3.1 Off -site Flow Routing....................................................................................................... 3 3.2 On -Site Flow Routing....................................................................................................... 4 ' 3.3 Hydrologic Analysis of the Proposed Drainage Conditions .............................................. 3.4 Allowable Street Flow Capacities..................................................................................... 6 6 3.5 Storm Drainage Structure Design...................................................................................... 6 ' 4. WATER QUALITY.............................................................................................................. 7 ' 5. EROSION CONTROL.......................................................................................................... 5.1 Erosion and Sediment Control Measures.......................................................................... 7 7 5.2 Dust Abatement................................................................................................................. 7 5.3 Tracking Mud on City Streets........................................................................................... 8 5.4 Maintenance...................................................................................................................... 8 5.5 Permanent Stabilization.................................................................................................... 8 ' 6. MISCELLANEOUS..............................................................................................................8 6.1 Variances...........................................................................................................................8 ' 6.2 Irrigation Ditches............................................................................................................... 9 6.3 Maintenance Agreements.................................................................................................. 9 ' 7. REFERENCES......................................................................................................................9 APPENDIX A - HYDROLOGIC CALCULATIONS APPENDIX B - STORM DRAINAGE STRUCTURE DESIGN Final Drainage and Erosion Control Report Page i Wards Redevelopment September 5, 2003 I 1. INTRODUCTION ' 1.1 Project Description ' The Wards Redevelopment is the redevelopment of the existing Montgomery Wards site adjacent to the University Mall. This site contains approximately 6.6 acres. The proposed redevelopment will include adding a new fagade to the building and upgrading the parking lot and landscaping. ' The site is located in the southwest corner of Rutgers Avenue and South College Avenue, in Fort Collins, Colorado. It is bounded by College Avenue on the east, the University Center ' on the south, Burlington Northern railroad tracks on the west, and an existing commercial center on the north. The site lies in Section 23, Township 7 North, Range 69 West of the ' Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. A vicinity map is included after the Table of Contents of this report. ' 1.2 Purpose and Scope of Report ' This report defines the proposed drainage and erosion control plan for the proposed Wards Redevelopment. The drainage plan includes consideration of all on -site and tributary off -site ' runoff. 1.3 Design Criteria ' This report and associated calculations were prepared to meet requirements established in the ' "City of Fort Collins Storm Drainage Design Criteria and Construction Standards" (SDDCCS), dated May 1984 and updated January 1997. The new rainfall criteria as ' amended by Ordinance 42.1999 was used for the 10-year and 100-year design storms. Runoff computations were made using the rational method. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual' (UDFCD), 1984, developed by ' the Denver Regional Council of Governments, has been utilized. 1.4 Master Drainage Plan and Related Drainage Reports This site is included in the Spring Creek Major Drainage Basin and a report entitled "Spring ' Creek Master Drainageway Plan' was prepared by Engineering Professionals, Inc., in March 1988. It is not anticipated that the proposed redevelopment of the Wards site will have a 1 Final Drainage and Erosion Control Report page 2 ' Wards Redevelopment September 5, 2003 ' 3. negative impact on the Spring Creek Major Drainage Basin, as the site is currently almost entirely impervious. In fact, the redevelopment of this site will slightly reduce the runoff with the proposed additional landscape areas. A portion of this site was included in the "Drainage and Erosion Control Report, University Center PUD", prepared by Bucher, Willis and Ratliff Corporation, and approved by the City of Fort Collins on July 24, 1998. EXISTING SITE DRAINAGE The existing drainage for this site consists of the flow being split between the east and west portions of the site. The flows from the eastern portion of the site enter three (3) existing sump condition area inlets within the parking and drive area. Said inlets are conveyed to an existing storm sewer system in College Avenue which outlets directly into Spring Creek. The flows from the western portion of the site are conveyed westerly towards the railroad tracks. Immediately adjacent to the west edge of the existing parking lot, there is an existing depression/ponding area that the runoff enters. This depression acts as a sediment basin/water quality pond. When this area fills with runoff, it overtops and the flows enter an existing swale along the railroad tracks. The flows are then conveyed northerly in said swale to the Sherwood Lateral. The soil on this site is Nunn clay loam, which consists of nearly level soils on high terraces and fans (USDA,1980). Pertinent characteristics of this soil include slow to medium runoff, a slight hazard of wind erosion, and a moderate hazard of water erosion. Nunn clay loam is categorized in Hydrologic Group C. PROPOSED DRAINAGE PLAN 3.1 Off -site Flow Routing No off -site flows enter this site. Final Drainage and Erosion Control Report Page 3 Wards Redevelopment September 5, 2003 0 n 1 3.2 On -Site Flow Routing The site was graded so that stormwater runoff is directed away from the existing building and the proposed building envelope. The flows are still routed as historically with the flows from the eastern portion of the site conveyed to the existing area inlets and the flows from the western portion of the site conveyed to the railroad swale and eventually into the Sherwood Lateral. A qualitative summarization of the drainage patterns within each sub -basin is provided in the following paragraphs. Runoff from Subbasin A is conveyed via roof drains and sheet flow across the rear parking and drive area to the aforementioned depression along the western portion of subject site. Said depression acts as a sediment basin/water quality pond/retention pond. In the major storm event, said depression overtops and the flows enter the existing swale along the east side of the railroad tracks, is diverted northerly and conveyed in said swale to the Sherwood Lateral. The amount of runoff generated from this basin does not change from historic amounts. Runoff from Subbasin B is conveyed via sheet flow and gutter flow across the existing parking and drive area north of the northwest corner of the existing building . to the aforementioned depression along the western portion of subject site. Said depression acts as a sediment basin/water quality pond/retention pond. In the major storm event, said depression overtops and the flows enter the existing swale along the east side of the railroad tracks, is diverted northerly and conveyed in said swale to the Sherwood Lateral. The amount of runoff generated from this basin does not change from historic amounts. Runoff from Subbasin C are conveyed via sheet flow northerly to the existing parking lot/property north of the Wards Redevelopment site. The amount of runoff generated from this basin, a total of 0.01 acres, does not change from historic amounts. Runoff from Subbasin D is conveyed via sheet flow and gutter flow across the existing parking and drive area to an existing sump condition area inlet in the access drive to this site from College Avenue. Said area inlet is located in an existing low area that acts as a small detention area as the release of flows is controlled by the Final Drainage and Erosion Control Report Page 4 Wards Redevelopment September 5, 2003 capacity of the existing pipe in College Avenue, the size of the outfall pipe and the size of the inlet. In the event that the area around said inlet overflows, a sidewalk chase has been added to allow the flows to enter Subbasin G and be collected in the existing area inlet. (The existing area inlets in Subbasins D, F, and G all interact to provide collection for this site.) Runoff from Subbasin E, the very northeast corner of the site, is conveyed via sheet flow northerly to the existing parking lot/property north of the Wards Redevelopment site. The amount of runoff generated from this basin did not change from historic amounts. Runoff from Subbasin F is conveyed via sheet flow and gutter flow across the existing parking and drive area to an existing sump condition area inlet in the existing parking lot just north of the southeast corner of subject site. Said area inlet is located in an existing low area that acts as a small detention area as the release of flows is controlled by the capacity of the existing pipe in College Avenue, the size of the outfall pipe and the size of the inlet. In the event that the area around said inlet overflows, a sidewalk chase has been added to allow the flows to enter Subbasin G and be collected in the existing area inlet. Runoff from Subbasin G is conveyed via sheet flow to an existing sump condition area inlet in the existing parking lot. Said area inlet is located in an existing low area that acts as a small detention area as the release of flows is controlled by the capacity of the existing pipe in College Avenue, the size of the outfall pipe and the size of the inlet. In the event that the area around said inlet overflows, a sidewalk chase has been added to allow the flows to enter Subbasin D and/or F and be collected in the existing area inlets. Runoff from Subbasin H is conveyed via sheet flow to an existing low area in the north side of the southerly access to the site. Historically runoff generated from this portion of the property wass conveyed to Subbasin F area inlet via surface flow through the low area. The new design will not change the historic drainage pattern. The amount of runoff generated from this basin did not change from historic amounts. Final Drainage and Erosion Control Report Page 5 Wards Redevelopment September 5, 2003 ' 3.3 Hydrologic Analysis of the Proposed Drainage Conditions ' The Rational Method was used to determine the 10-year and 100-year peak runoff rates for each subbasin. Runoff coefficients were assigned utilizing Table 3-2 of the SDDCCS ' Manual. Rainfall intensity was based on the recently adopted design storm information for Fort Collins. Details of the hydrologic calculations associated with each subbasin are included in Appendix A. Table 3.1 provides a summary of the resulting peak flows for all ' subbasins and Design Points (DP's) associated with this site. Q101 in the table includes applicable carry over flows. 1 1 1 1 WARDS REDEVELOPMENT Table 3.1- Drainage Summary Table Design Point Tributary Sub -basin Area (ac) C (10) C (100) to (10) (min) to (100) (min) a(10)tot (CIS) 0(100)tot WS) 1 A 2.57 0.92 1.00 5.0 5.0 11.5 25.6 2 B 0.63 0.78 0.98 5.0 5.0 2.4 6.1 3 c 0.01 0.49 0.61 5.0 5.0 0.0 0.1 4 D 1.53 0.84 1.00 5.0 5.0 6.3 15.2 5 E 0.09 0.95 1.00 5.0 5.0 0.4 0.9 6 F 0.96 0.76 0.95 5.0 5.0 3.6 9.1 7 G 0.79 0.91 1.00 5.0 5.0 3.5 7.9 8 H 0.18 0.85 1.00 5.0 5.0 0.7 1.8 3.4 Allowable Street Flow Capacities The proposed development of this site does not affect any street flows. Therefore, street flow calculations are not included in this report. 3.5 Storm Drainage Structure Design Storm drainage structures for this site include sidewalk culverts, curb cuts and existing area inlets and storm drainage pipes. The capacity of sidewalk culverts and curb cuts was determined using the computer program FlowMaster, which uses Manning's Equation. FlowMaster results are included in Appendix B. The sidewalk culverts and curb cuts have capacity to convey peak flows from the 10-year storm within criteria set fourth by the SDDCCS Manual. 100-year flows will overtop the curb and follow the drainage paths as indicated on the Drainage and Erosion Control Plan included in the back pocket of this report. Final Drainage and Erosion Control Report Page 6 Wards Redevelopment September 5, 2003 ' 4. WATER QUALITY An existing depression along the western property line of this site acts as a sediment basin/water quality pond/retention pond. As part of the redevelopment of this site, this area will be cleaned up so it functions better. (Some small trees as well as brush, weeds and trash will be removed. In addition, the grassy area at the west edge of the existing parking lot will be re -graded to allow sheet flow into the existing depression (there is no curb and gutter) so that more of the runoff is directed to this area.). In an on -site meeting with Glen Schlueter of the City of Fort Collins' Stormwater Department, it was stated that this facility was adequate for this site. For the eastern portion of the site, the existing area inlets are being utilized and the parking lot is being modified only slightly. Therefore, the implementation of new water quality structures is not possible. EROSION CONTROL 5.1 Erosion and Sediment Control Measures Erosion and sedimentation will be controlled during construction by inlet filters, and seeding and mulching or sodding in all landscape areas. These measures are designed to limit the overall increase in sediment yield due to construction activities as required by the City of Fort Collins. Erosion control calculations are not included, as the existing site grading is not significantly changing, and all drainage structures are existing. 5.2 Dust Abatement During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. Final Drainage and Erosion Control Report page 7 Wards Redevelopment September 5. 2003 1 1 1 1 1 6. 1 5.3 Tracking Mud on City Streets It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights -of - way unless so ordered by the Director of Engineering in writing. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. 5.4 Maintenance All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Straw bale dikes will require periodic replacement. Sediment traps (behind straw bale barriers) shall be cleaned when accumulated sediments equal approximately one-half of trap storage capacity. Maintenance is the responsibility of the developer. 5.5 Permanent Stabilization All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. No soils in areas outside project street rights of way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/ mulch, landscaping, etc.) is installed, unless otherwise approved by the Stonmwater Utility. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature and stable enough to control soil erosion as specified in paragraph 11.3.10 of the City of Fort Collins Storm Drainage Construction Standards. MISCELLANEOUS 6.1 Variances As stated in Section 4, Water Quality, water quality is being provided in the rear of the site by an existing depression and the existing parking lot in the front of the site does not allow for the creation of water quality provisions. It is proposed that water quality not be provided in the existing parking lot in the front of the site due to the current lack of space for water quality and due to the fact that the site does not currently provide water quality. This minor Final Drainage and Erosion Control Report page g Wards Redevelopment September 5, 2003 amendment will not significantly alter stormwater characteristics from present day conditions, and it is not anticipated that public health, safety, and or welfare problems will be created if this variance is approved. Therefore, due to the constraints of the exiting site, a variance is requested for water quality. No other variances are required or are being ' requested for this site. ' 6.2 Irrigation Ditches There are no irrigation ditches impacted by the development of this site. (The flow to the ' Sherwood Lateral is not changed.) 6.3 Maintenance Agreements The developer will be responsible for the maintenance of all temporary and permanent drainage structures. ' 7. REFERENCES City of Fort Collins, "Storm Drainage Design Criteria and Construction Standards", (SDDCCS), dated May 1984. ' 2. "Drainage and Erosion Control Report, University Center PUD", by Bucher, Willis and Ratliff Corporation, and approved by the City of Fort Collins on July 24, 1998. ' 3. "Spring Creek Master Drainageway Plan" by Engineering Professionals, Inc., March 1988. 4. Soil Survey of Larimer County Area, Colorado. United States Department of Agriculture Soil Conservation Service and Forest Service, 1980. ' 5. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March 1969, and Volume 3, dated September 1992. Final Drainage and Erosion Control Report page g Wards Redevelopment September 5, 2003 0 APPENDIX A HYDROLOGIC CALCULATIONS 1 1 t 1 RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: WARDS REDEVELOPMENT PROJECT NO: 9059.03 COMPUTATIONS BY: M. Brake DATE: 9/5/2003 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks (concrete) Roofs. Lawns (flat <2%, sandy soil), Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.10 0 JR Engineering 2620 E. Prospect Rd., Ste. 190 Fort Collins, CO 8525 SUBBASIN DESIGNATION TOTAL AREA (ee.) TOTAL AREA (sq.ft) ROOF AREA (sq.n) PAVED AREA (sq.ft) SIDEWALK AREA (sq.tt) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious A 2.57 111,900 70,300 38,000 0 3,600 0.92 91 B 0.63 27,443 0 22,062 0 5,381 0.78 80 C 0.01 436 0 200 0 236 0.49 46 D 1.53 66,647 0 58,206 0 8,441 0.84 87 E 0.09 3,920 0 3,920 0 0 0.95 100 F 0.78 33,977 0 32,512 0 1,465 0.91 96 G 0.79 34,412 0 32,947 0 1,465 0.91 96 H 0.18 7,841 0 6,875 0 966 0.85 88 TOTAL 6.58 :A Eauations - Calculated C coefficients & % Impervious are area weighted C=I(Ci Ai) /At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's 905903f1ow.xls M } O G 1 1 Y w 0 0 0 qlqlqlq 01 J w N w N N N w tq b w w N z 2 E L 1 LL O N N I?N N N h O 2LLI m = m E o � Y tl N O Q 0 WZZ _J m N N d d n n N N m V Ix F v GD m O m N m m E NIT O N O NT- � a Mnoppmmm m m O ccVV N C N— d O N N O O m N m LL E J W Nm mZ lrflcqlc� N N N m N U CEO Q � C G O O 0000 FFW — 0 0 0 0 N O O U ag �NNN�niN Nv _LI f O O O O Olu N m 0 J m N d O d N N m Q f Z J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a v m O O O O O O O O 0 coN c 00o00ao0 5 W m n a m m & -i 'muO O 000000 a m t E N m 0 p W r n m N OO OO OO OO OO OO U z mQ m U O w LL (7 x m m Z mZ �~ y mf 0 Q mZQ G 'Nm d Iq fDh m 0 O O E E E co C s~ 0 r Z _0 f a N f 2 W LL z no Q V c LL a0 yw r Y W Q J O N O O N UI O O N N O O N N O N O N N f7 N N N �- A 4 C m Z m w0 � E m � ` O W vN Um ¢ F u 7 N N 7 N m V # � TIN m op lh N �p Y N 0 l0 Cl J LL = O m m N N N N 0 (C U W m 0 0 0 N 0 0 mp W L ttOO ��yy J w �gFZ 2 x O O O O O O O O 2.-. 600ccccc a E m 0 0 0 0 0 0 0 m . 0 d o d 0 d d L 0 0 0 0 0 0 0 0 8Wm88888 U ttVV W qq n O cs m 6 N y¢j E d o d d d d d d a i� _ F � m Cidd dd0o fz� m N z z y G w LL O O E C m a D C $ E c 1O d II v F m E a E E E 11 c R 0 W LO W JR Engineering 2620 E. Prospect Rd., Ste. 190 Fort Collins, CO 80525 RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 10-Yr Storm) LOCATION: WARDS REDEVELOPMENT PROJECT NO: 9059.03 - COMPUTATIONS BY: M. Brake DATE: 9/5/2003 10 yr storm, Cf 1.00 DIRECT RUNOFF CARRY OVER ITOTAL REMARKS Design Point Tributary Sub -basin - A (ac) C Ct tc (min) i (irVhr) Q (10) (cis) from Design Point O (10) (cfs) 0(10)tot (ols) 1 A 2.57 0.92 5.0 4.87 11.54 11.5 2 B 0.63 0.78 5.0 4.87 2.40 2.4 3 C 0.01 0.49 5.0 4.87 0.02 0.0 4 D 1.53 0.64 5.0 4.87 6.28 6.3 5 E 0.09 0.95 5.0 4.87 0.42 0.4 6 F 0.78 0.91 5.0 4.87 3.47 1 3.5 7 G 0.79 0.91 5.0 4.87 3.52 3.5 8 H 0.18 0.85 5.0 4.87 0.74 0.7 Q=gCiA Q = peak discharge (cfs) C = runoff coefficient Ct = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) I = 41.44 J (10. ic)OJ'4 905903flowads JR Engineering 2620 E. Prospect Rd., Ste. 190 Fort Collins, CO 80525 RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 1 00-Yr Storm) LOCATION: WARDS REDEVELOPMENT PROJECT NO: 9059.03 COMPUTATIONS BY: M. Brake DATE: 9/5/2003 100 yr storm, C1= 1.25 DIRECT RUNOFF CARRYOVER ITOTAL REMARKS Des. Point Area Design. A (ac) C Cf tc (min) i (hlhr) O (100) (CIS) from Design Point O (100) (CIS) O(100)tot (CIS) 1 A 2.57 1.00 5.0 9.95 25.56 25.6 2 B 0.63 0.98 5.0 9.95 6.14 6.1 3 C 0.01 0.61 5.0 9.95 0.06 0.1 4 D 1,53 1.00 5.0 9.95 1522 152 5 E 0.09 1.00 5.0 9.95 0.90 0.9 6 F 0.78 1.00 5.0 9.95 7.76 7.8 7 G 0.79 1.00 5.0 9.95 7.86 7.9 6 H 0.18 1.00 5.0 9.95 1.79 1.8 Q=CiA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from City of Fort Collins OF curve (4/16/99) A = drainage area (acres) I = 84.682 / (10+ tcf'P'6 JR Engineering WARDS REDEVELOPMENT Table 3.1 - Drainage Summary Table Design Point Tributary Sub -basin Area (ac) c (10) c (100) tc (10) (min) tc (100) (min) Q(10)tot (cfs) G(100)tot (cfs) 1 A 2.57 0.92 1.00 5.0 5.0 11.5 25.6 2 B 0.63 0.78 0.98 5.0 5.0 2.4 6.1 3 c 0.01 0.49 0.61 5.0 5.0 0.0 0.1 4 D 1.53 0.84 1.00 5.0 5.0 6.3 15.2 5 E 0.09 0.95 1.00 5.0 5.0. 0.4 0.9 6 F 0.78 0.91 1.00 5.0 5.0 3.5 7.8 7 G 0.79 0.91 1.00 5.0 5.0 3.5 7.9 8 H 0.18 0.85 1.00 5.0 5.0 0.7 1.8 905903flow.xis, SU MMARY r, J I 1 APPENDIX B STORM DRAINAGE STRUCTURE DESIGN 1 JR Engineering DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: WARDS REDEVELOPMENT PROJECT NO: 9059.03 COMPUTATIONS BY: M. Brake DATE: 9/5/2003 Equations: Area trib. to pond = 1.53 Developed flow = Qp = CIA C (100) = 0.91 Vol. In = Vi = T C I A = T Qp Developed C A = 1:4 Vol. Out = Vo =K Qao T Release rate, Opo = 2.6 storage=S=Vi -Vo K= 0.9 Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67") rainfall acre acre cfs (from fig 2.1) Storm Duration, T (min) Rainfall Intensity, I (inthr) Op (cfs) Vol. In Vi (ft) Vol. Out Vo (ft') Storage S (ft) Storage S (ac-ft) 5 9.95 13.9 4173 702 3471 0.08 10 7.77 10.9 6515 1404 5111 0.12 20 5.62 7.9 9430 2808 6622 0.15 30 4.47 6.2 11245 4212 7033 0.16 40 3.74 5.2 12549 5616 6933 0.16 50 3.23 4.5 13564 7020 6544 0.15 60 2.86 4.0 14394 8424 5970 0.14 70 2.57 3.6 15096 9828 5268 0.12 80 2.34 3.3 15706 11232 4474 0.10 90 2.15 3.0 16246 12636 3610 0.08 100 1.99 2.8 16729 14040 2689 0.06 110 1.86 2.6 17169 15444 1725 0.04 120 1.75 2.4 17571 16848 723 0.02 130 1.65 2.3 17943 18252 -309 -0.01 140 1.56 2.2 18289 19656 -1367 -0.03 150 1.48 2.1 18612 21060 -2448 -0.06 160 1.41 2.0 18916 22464 -3548 -0.08 170 1.35 1.9 19203 23868 -4665 -0.11 180 1.29 1.8 19474 25272 -5798 1 -0.13 Required Storage Volume: 7033 fts 0.16 acre-ft 905903flow.xls,FAA-100yr -Basin D JR Engineering DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: WARDS REDEVELOPMENT PROJECT NO: 9059.03 COMPUTATIONS BY: M. Brake DATE: 9/5/2003 Equations: Area trib. to pond = 0.79 Developed flow = Qp = CIA C (100) = 0.91 Vol. In = Vi = T C I A = T Qp Developed C A = 0:7 Vol. Out = Vo =K QPo T Release rate, QPo = 2.6 storage = S = Vi - Vo K = 0.9 Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67) rainfall acre acre cis (from fig 2.1) Storm Duration, T (min) Rainfall Intensity, I (in/hr) Qo (cfs) Vol. In Vi (ft3) Vol. Out Vo (ft) Storage S (ft) Storage. S (ac-ft) 5 9.95 7.2 2155 702 1453 0.03 10 7.77 5.6 3364 1404 1960 0.04 20 5.62 4.1 4869 2808 2061 0.05 30 4.47 3.2 5806 4212 1594 0.04 40 3.74 2.7 6480 5616 864 0.02 50 3.23 2.3 7004 7020 -16 0.00 60 2.86 2.1 7432 8424 -992 -0.02 70 2.57 1.9 7795 9828 -2033 -0.05 80 2.34 1.7 8110 11232 -3122 -0.07 90 2.15 1.6 8388 12636 -4248 -0.10 100 1.99 1.4 8638 14040 -5402 -0.12 110 1.86 1.3 8865 15444 -6579 -0.15 120 1.75 1.3 9073 16848 -7775 -0.18 130 1.65 1.2 9265 18252 -8987 -0.21 140 1.56 1.1 9443 19656 -10213 -0.23 150 1.48 1.1 9610 21060 -11450 -0.26 160 1.41 1.0 9767 22464 -12697 -0.29 170 1.35 1.0 9915 23868 -13953 -0.32 180 1.29 0.9 10055 25272 -15217 -0.35 Required Storage Volume: 2061 ft3 0.05 acre-ft 905903flow.xis,FAA-100yr -Basin G JR Engineering 1 1 1 1 DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: WARDS REDEVELOPMENT PROJECT NO: 9059.03 COMPUTATIONS BY: M. Brake DATE: 9/5/2003 Equations: Area trib. to pond = 0.96 Developed flow = Qp = CIA C (100) = 0.90 Vol. In = Vi = T C I A = T Qo Developed C A = 0.9 Vol. Out = Vo =K QPo T Release rate, Oao = 2.6 storage = S = Vi - Vo K = 0.9 Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67') rainfall acre acre cfs (from fig 2.1) Storm Duration, T (min) Rainfall Intensity, I (in/hr) OD (cfs) Vol. in VI (ft) Vol. Out Vo (fe) Storage S (ft) Storage S (ac-ft) 5 9.95 9.0 2687 702 1985 0.05 10 7.77 7.0 4194 1404 2790 0.06 20 5.62 5.1 6070 2808 3262 0.07 30 4.47 4.0 7239 4212 3027 0.07 40 3.74 3.4 8078 5616 2462 0.06 50 3.23 2.9 8731 7020 1711 0.04 60 2.86 2.6 9266 8424 842 0.02 70 2.57 2.3 9718 9828 -110 0.00 80 2.34 2.1 10110 11232 -1122 -0.03 90 2.15 1.9 10457 12636 -2179 -0.05 100 1.99 1.8 10769 14040 -3271 -0.08 110 1.86 1.7 11052 15444 -4392 -0.10 120 1.75 1.6 11311 16848 -5537 -0.13 130 1.65 1.5 11550 18252 -6702 -0.15 140 1.56 1.4 11773 19656 -7883 -0.18 150 1.48 1.3 11981 21060 -9079 -0.21 160 1.41 1.3 12176 22464 -10288 -0.24 170 1.35 1.2 12361 23868 -11507 -0.26 180 1.29 1.2 12536 25272 -12736 -0.29 Required Storage Volume: 3262 W 0.07 acre-ft 905903flow.xis,FAA-100yr -Basin F & H ' Worksheet Worksheet for Circular Channel Project Description ' Project File untitled.fm2 Worksheet Existing Pipe Assumption Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 ' Channel Slope 0.5000 % Diameter 12.00 in ' Results 1 1 C r Depth 1.00 ft Discharge 2.52 cfs Flow Area 0.79 ft2 Wetted Perimeter 3.14 ft Top Width 0.00 ft Critical Depth 0.68 ft Percent Full 100.00 Critical Slope 0.007704 ft/ft Velocity 3.21 fUs Velocity Head 0.16 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 2.71 cfs Full Flow Capacity 2.52 cfs Full Flow Slope 0.005000 ft/ft t07103 03:58:01 PM FlowMaster v5.15 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1