Loading...
HomeMy WebLinkAboutDrainage Reports - 04/22/20141 1 1 i This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. ' When a hard copy is absolutely necessary, we recommend double -sided printing. April 11, 2014 City of Ft: Collin pprov d Plans Approved By� Date FINAL DRAINAGE AND EROSION CONTROL REPORT FOR Global Village Academy Fort Collins, Colorado Prepared for: Global Village International Schools 3398 Musson Road NW Stanton, MI 48888 Prepared by: ■� I NORTHERN ENGINEERING 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 v .northernengineering.com Project Number: 924-003 NorthernEnatneerina.com It 970.221.4159 W (NORTHERN ENGINEERING April 11, 2014 ADDRESS: PHONE:970.221.4158 WEBSITE: 200 S. College Ave. Suite 10 www.northernengineering.com Fort Collins, CO80524 FAX:970.221.4159 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for Global Village Academy._........ .. _... _ .....__.... ... Dear Staff: Northern Engineering is pleased to submit this Final Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Global Village Academy development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. �otx— Aaron Cvar, PE Project Engineer��, .V NORTHERN ENGINEERING 1 TABLE OF CONTENTS "I.: GENERAL LOCATION AND DESCRIPTION.......::.........................................::::. 1 A. Location.............................................................................................................................................1 B. Description of Property.....................................................................................................................2 C. Floodplain...........................................................................................................................................4 II. DRAINAGE BASINS AND SUB-BASINS....................................................................... 4 A. Major Basin Description ..............:..............,...................... .,,..;:,.:.:.:.,...,.....,,..,.......... _._..,........... .4_.:,.., III. DRAINAGE DESIGN CRITERIA .......... :...................................... ......... ....................... ...... 5. A. Regulations................................................................................................:.......................................5 B. Four Step Process.............................................................................................................................. 5 C. Development Criteria Reference and Constraints............................................................................6 D. Hydrological Criteria.........................................................................................................................6 E. Hydraulic Criteria..............................................................................................................................6 G. Modifications of Criteria...................................................................................................................7 IV. DRAINAGE FACILITY DESIGN.................................................................................... 7 A. General Concept...............................................................................................................................7 B. Specific Details..................................................................................................................................7 V. CONCLUSIONS........................................................................................................8 A. Compliance with Standards..............................................................................................................8 B. Drainage Concept..............................................................................................................................8 References....................................................................................................................... 10 APPENDICES: APPENDIX A — Hydrologic Computations APPENDIX B — Inlet Calculations APPENDIX C — Storm Line Calculations APPENDIX D - Storm Line Outlet Protection Calculations APPENDIX E - Water Quality Design Computations APPENDIX F — Stormwater Management Model (SWMM), Detention Calculations APPENDIX G — Erosion Control Report Final Drainage Report (NORTHERN ENGINEERING LIST OF FIGURES: Figure 1- Aerial: Photograph ........:......... , :::..:::::::..............:. _...........::::....................::.:..:-.::. 2 ..... Figure 2— Proposed Site Plan................................................................................................ 3 Figure 3 -Existing Floodplains................................................................................. _:......._._..•..:• 4 MAP POCKET: Proposed -Drainage Exhibit Final Drainage Report OBIKE� ■� _, I NORTHERN I ENGINEERING Global Village Academy 1 1 t 1 6. No significant offsite flows are directed into the site. The adjacent Bronson Street, South Taft Hill Road, and Horsetooth Road prevent offsite flows from entering the site on the north, east, and southern boundaries of the property. Minimal offsite drainage enters the site from the backs of lots to the west of the property. B. Description of Property 1. The development area is roughly 5.0 net acres. Figure 1 — Aerial Photograph 2. The property is currently open ground. The ground cover generally consists of native grasses. Existing ground slopes are mild to moderate (i.e., 1 - 6±%) through the interior of the property. General topography slopes from west to east. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey website: hftp://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx, the site consists of Paoli fine sandy loam and Table Mountain Loam, which fall into Hydrologic Soil Group B. 4. The proposed project site plan is composed of a school grounds development. Associated drives and parking, water and sewer lines will be constructed with the development. Two water quality/detention ponds will be constructed with the proposed development. Final Drainage Report 2 NORTHERN ENGINEERING Global Village Academy 11 I I 1 - ------------------_ , - 1 ------------------♦ . ,. •) ,1 r •I I I I 1 I I 1 • yyy 4 I 1 1 � 11 J Ire---- � ' 1 ' 1 1 r I 1 ------------------ 1 {' I 1 1,• I 1 I I I Ii 1 1 I 1 ' r I, I I ' I 1 1 I ,1 I I , ,I 1 44) NORTH Figure 2— Proposed Site Plan 5. No existing irrigation facilities are located within the property. 6. The proposed land use is a school campus. Final Drainage Report 3 NORTHERN I ENGINEERING Global Village Academy I 1 [] C. Floodplain 1. The project site is not encroached by any City or FEMA floodplain. NORTH Figure 3 —Area Floodplain Mapping 2. No offsite improvements are proposed with the project. II. DRAINAGE BASINS AND SUB -BASINS FEMA High Risk - Fbodway 0 FEMA Hgh Risk - 1 DO Year 0 FEMA Moderate Risk - 1001500 A. Major Basin Description The project site lies within the Spring Creek Basin. Detention requirements are set by the Silver Oaks Third Filing Drainage Plan, per City of Fort Collins Conceptual Review dated November 1, 2013. This plan specified a 2- year historic release rate total release rate (1.0 cfs for the overall site) into the Rossborough channel. Final Drainage Report 4 u ■� NORTHERN ENGINEERING Global Village Academy B. Sub -Basin Description 3. The subject property historically drains overland west to east. Runoff the site has historically collected in the existing storm drain systems in Horsetooth Road and South Taft Hill Road, which has directed all runoff into the existing Rossborough channel which runs along. -the east side of South'Taft Hill Road and conveys drainage north in the channel.. The.proposed site will generally maintain these historic . . -drainage patterns. Xrriore detailed description of the project drainage patterns follows in Section IV.A.4., below. i III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the "Four Step Process" to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 — Employ Runoff Reduction Practices ' Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the ' current use by implementing multiple Low Impact Development (LID) strategies including: N7 Conserving existing amenities in the site including the existing vegetated areas. Nil Providing .vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected imperious areas (MDCIA). ' M Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. ' Step 2 — Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated using extended detention methods prior to exiting the ' site. Step 3 — Stabilize Drainageways ' There are no. major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality where none previously existed, ' sediment with erosion potential is removed from the downstream drainageway systems. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway ' stability. Final Drainage Report 5 1 11C NORTHERN ENGINEERING Global Village Academy ' Step 4 —implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: NEI Trash, waste products, etc. that were previously left exposed with the historic trailer park will no longer be allowed to exposure to runoff and transport to receiving drainageways;- The proposed develgpmeht•will eliminate these sources of potential ' pollution. C. Development Criteria Reference and Constraints The subject property is surrounded by currently developed properties. Thus, several -constraints have been identified -during the course of -this -analysis -that will impact the -- proposed drainage system including: ' W Existing elevations along the property lines will generally be maintained. NH As previously mentioned, overall drainage patterns of the existing site will be maintained. N7 Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity -Duration -Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations ' associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. ' 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. ' The first design storm considered is the 801h percentile rain event, which has been employed to design the project's water quality features. The second event analyzed is the "Minor," or "Initial" Storm, which has a 2-year recurrence interval. The third ' event considered is the "Major Storm," which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. ' E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with ' criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. ' 3. As stated above, the subject property is not located in a City or FEMA regulatory floodplain. ' 4. The proposed project does not propose to modify any natural drainageways. J Final Drainage Report 6 ' (NORTHERN ENGINEERING Global Village Academy ' F. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV.- DRAINAGE FACILITY DESIGN A. General Concept i 1. The main objectives of the project drainage design are to maintain existing drainage patterns, and to ensure no adverse impacts to any adjacent properties. 2. A list of tables and figures used within this report can be found in the Table of Contents at the front.of-"the.document. The.tables and.figures.are located -with in. the sections to which the content best applies. 3. The drainage patterns anticipated for proposed drainage basins are described below. Basin A Basin A consists of future potential building area, drive, and the parking area for the current phase building. The basin will drain via sheet flow and gutter flow into Pond 1. ' Basins B and C Basins B and C consist of future (phase 2) building area, and a future (phase 2) parking area, as well as a drive connecting to Bronson Street along the property north boundary. These basins will drain via sheet flow and gutter flow into Pond 2. ' Basins D. E. and F Basins D, E, and F, consist of paved and landscaped areas that drain offsite to adjacent Right of Way. These basins are relatively small, and will create insignificant drainage additions to adjacent Right of Way. Basin OS Basin OS consists of landscaped area that drain onsite. This basin is 0.02 acres in size and will have insignificant impact to the site. The basin "drains directly into Pond 1. ' A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. '. B. Specific Details 1. Standard water quality treatment in the form of Extended Detention is being ' provided for the proposed development in Ponds 1 and 2. 2. LID features have been incorporated in the overall drainage design for the site and include the design of soft bottom swales running along the lengths of ' Ponds 1 and 2. Additionally, the future parking area to be constructed with phase 2 of the development will include the required 25% of paved area as permeable pavers. This parking area will incorporate permeable pavers for ' 25% of the overall site, including both the paved area for the current phase and the future phase 2. Final Drainage Report 7 .V (NORTHERN ENGINEERING LVIII 3. Table 1, below, summarizes detention and water quality volumes for Ponds 1 and 2. Please refer to Appendix F for detention computations and SWMM modeling output. Table 1 — Pond Summary Table 100-YR ....._ ' DET. VOL. WQ VOL. TOTAL VOL. RELEASE —POND ..(AC -FT) ...: (AC -FT) (AGFT) (CFS). 1 (SE CORNER) 0.42 0.05 0.47 0.55 2 (NE CORNER) 0.74 0.07 0.81 0.37 4. Proper maintenance of the drainage -facilities -designed with the -proposed - development is a critical component of their ongoing performance and effectiveness. The water quality pond will be designed at Final to be easily accessed by maintenance staff via gentle slopes provided to the bottom of the pond. 5. The drainage features associated with the proposed project are all private facilities, located on private property. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins' Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with requirements for the Spring Creek Basin and the Silver Oaks Third Filing Drainage Plan. 3. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing detention and water quality mitigation features. 2. The drainage concept for the proposed development is consistent with requirements for the Spring Creek Basin. H Final Drainage Report 8 (NORTHERN ENGINEERING Global Villa References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stoiiriwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service,"United-States Department'of'"Agriculture: 5. Urban Storm Draina>e Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright -McLaughlin Engineers, Denver, Colorado, Revised April 2008. Final Drainage Report 0 i APPENDIX A Hydrologic Computations 0 I APPENDIX B ' Inlet Calculations 1 1 1 1 1 i 1 1 1 1 7 APPENDIX C Storm Line Calculations APPENDIX D ' Storm Line Outlet Protection Calculations 1 i 1 1 1 i 1 _1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1 1 1 1 APPENDIX E Water Quality Design Computations ' APPENDIX F ' Stormwater Management Model (SWMM), Detention Calculations 1 1 1 1 i 1 1 1 1 1 1 1 1 APPENDIX G Erosion Control Report MAP POCKET ' Drainage Exhibits 0 r- NORTHERN ■v ENGINEERING Global Village Academy ' EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs'depicted, and additional or different BMPs from those included may be necessary during construction; or as required by the authorities having jurisdiction. ' It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constant) ada tin to site y adapting conditions and needs. The Contractor shall update the _... _ location of..BMPs_as they are installed „removed or mod ified,.in.,conjunction with construction„_,,..,...., activities. It is imperative to appropriately reflect the current site conditions at all times. ' The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 — Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site ' restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In ' addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General ' Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division — Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan ' (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. 1 Final Drainage Report APPENDIX A ' Hydrologic Computations I I t 1 I 1 1 �z o aaaaaaa aE E mu mm in �n E roco ID w w wO 0 U o T W � o m U Q Q C ' C N 0 C N_ N w l w w In tmp O_ II W T 2 V m E y o o O O O O O O O O ~ U U T 9 p o U C7Q� L 3 _ m y o ' O � Aw d u 000000O O U 6 U o m U g « c V rv- Z u 000 0 0 C. 0 cT rEd o000000 N V U U N W �c O' n 00 00 0 0 0 N C N g 0 000000 C; V O O O O O O O W �3 y COi W A O Q' z v a O o yy O. y T H Z O N Q W m= Z cz oaoaaa aaa aaa mgu 0 0 o000000 0 0 0 0 0 O odO'TN� o00 00oOO o Oo Oo OO Oo Oo a E O W a = 01 u�m om.no m 0 o no o�n u� g.. M m�T-00 T w 1� � N N N m � L V t� �0000000 OO O 0 0 0 y - O 0 0 0 O O U W N d y q 0000000 0 0 0 0 0 0 0 Q U— 0 06 06 0 0 U � A.. o00000O W a-C o000000 H CL - O a c .N U � a m Y �O �n COOOO CL W ; m N '< ui o U W Q Gae A m N 3 y 0 E y c LL v Pa 'aa 'ao � V` p Q Q U C7 K a N C N U °c ¢ m U 0 W W N O U N S I i II I 1 1 I c CC � E O w Sri w 0 0 ui . 0 0 ui i!i 0 vi p T CA q a y e T C o� E h CO N�iri M O ui O O iri iriN m _ _ > W � c v u N � E � n iti iti iti iti u'i G m °' e 4 QQ QQQ Q z zzzzz z U n z z z z z Z Z w w > p N N � L C J Z J C 1.' E r m N Q Q Q Q �c--z`zzz — o 0 o 0 o Q o Q Q Q Z Q z z z z O �> J Z W ~ O Eno.-mmmm U ^ 2 ~ Emma N NNNitI ... O W C C oNo N ; Q O W t V) c C J C O C O C U �N Kim^mmmo O V Op .y U „y II m m. 0000000 M CO N ¢ u o I; N w cT O O O O O O O U LCC �Q. J S z z z z z z z n A c n V O u O n m W A u L� V O C N N o N o It II o C~ w > > = c E G I <Imlu O w W 0 o m o 3 w �I it II II o o Off' O ~ i ¢mUOwLLO 7 > > I I I 1 11 I I o ..., a000O u7O N o u� N T 0) M t\ O O �y 0 ' 0 0 0 CD T 3 ow N V\ O N d u V IO 0 --� NN O LL l 0 0 00 U o m > ^' N v� o .� m O 0 0 0 0 C7 Q V ^ Y T d in N in 'N p In ti lSi In In o o cv rn m rn rn 0)rn C. m a — m c u N CO 00 N W CO d - V V V V 00 7 C N T 00 OJ CO OJ co o C N N N N N N N l� I� 0 00 CO Lo 00 00 co In o O m I\00000N U O O O O O O O V 0 0 000010 0 O U I� lD n n N 6666660 Q 0000000 W N U \n 0 nnnN N a0 ¢ O O O O O O O 9 � f0. 00 H LO QD n Ln n LO Ufl r U LL C ID ao un X) LO LO �n A A c lD 00 lD LL7 LD In li') a 3 E `o N Q '^ c r In zr M to N is Out r0000 U Q v --�ONOOOO c a o t _ y C 0 �\ W \ w Ls 'm m a GmU0ww 0 \ GC _ V v 0a ms F �i I 1 APPENDIX B 1 Inlet Calculations 1 1 1 1 1 1 i 1 1 1 I 1 1 1 1 1 I 1 1 1 1 1 1 1 1 i i i F 1 1 1 1 INLET CAPACITY SUMMARY Project: 924-003 By: ATC Date: 3/1/2014 Inlet Inlet Inlet Design Design ID Type Condition Storm Flow Inlet Capacity (CFS) (CFS) 2-2 Single Combination Inlet Sump 100-yr 4.50 6.20 3-2 Single Combination Inlet Sump 10-yr 5.40 8.90 1 INLET IN A SUMP OR SAG LOCATION Project >< 926-003 k" IDS Combo Inlet Calculation -DP B Lo (C) X H-Curb H-Vert Wo Wp w Lo (G) Wammg Warning in Information (Input) of inlet Inlet Type Depression (additional to cominuous gutter depression'a'from'O-AiloW) aur.' oar of Unit Inlets (Grate or Curb Opening) No r Depth at Flowltne (outside of local depression) Flow Depth r Information in of a Unit Grate L. (G)'' n of a Unit Grate W. Openng Raao for a Grate (typical values 0.15-0.90) A..' ling Factof for a Single Grate (typical value 0.50- 0.70) C, (G) I Wen Coaffivam (typical value 2.15 - 3.60) C.. (G)'. i Orifice Coefficient (typical value 0,60 - 0.60) Co (G) " OpeMrg Infix WA n U of a Unit Curb OpaNng 4 (C)' tt of Vertical Curb Opening in Inches H, tt of Curb Orlflm Throat In Inches rtwo r of Throat (see USDCM Figure ST-5) Theta Width for Depression Pan (typicaty the gutter vndth of 2 feet) Wc' ling Factor for a Sella Curt, Opening (typical value 0 10) CG (C) Opening Weir Coef6uem Itypical value 2.3-3 6) C. (C) " Opening Onhce CoeHiuem (typical value 0 60 - 0 70) C„ (C)' al Inlet Interception Capacity (assumes clogged condition) Q. ° NING: Inlet Capacity, less Man 0 Peak for I OR Storm Qe . ne.uri laming 1: Dimension entered is not a typical dlmonstnn for inlet type specified. Denver No. 15 Combination 200 inches 1 6.0 115 inches MINOR MAJOR 3.00 feet 2.00 eel 031 0-50 0 50 3.60 060 300 650 5.25 0,00 2,00 0A0 010 3.70 0.66 ail Iches Iclres agrees Sat UO Inlet 3.1-combomlet-dpa. Inlet In Sump 3111/2014, 2:07 PM INLET IN A SUMP OR SAG LOCATION Project = 924-003 _ Inlet ID = Combo Inlet Calculation -DP B ,�-Lo (C)-,f M-Curt H-Vert Wo Wp W Lo (G) Naming in Information (input) of Inlet Inlet Type' Depression (additional to continuous gutter depression' a' Imm'Q-AIbW) 4m+' wo of Unit Inlets (Grate or Curb Opening) No r Depth at Fbwllna (outside of local depression) Few Depth r Wormetlen In of a Unit Grate Ile (G)' 1 of a Unit Grate WD' Opening Ratio fora Grate (typical values 0.15-0.90) rlaa' prig Factor for a Single Grate (typical value 0.50 - 0 70) 4 (G)' i Weir COemCi.nt (typical value 2.15 - 3.60) C. (G) " i Orifice Coefficient (typical yaee 0.60 - 0.60) C. (G)' Opening information M of a Unit Curb Opening b (C)' n of Verucal Curb Opening in boles Hwn " V of Curb Orifice Throat in Inches H. i of Throat (sea USDCM Figure ST-5) Theta' Width for Depression Pan (typically Into guner viol of 2 feet) Wo' prig Factor for a Single Cue Opening (typical value 0.10) Cr (C) " Opening Weir Coefficient (typical value 2.3-3.6) co (C)' Opening Orifice Coefficient (typical value 0.60 - 0.70) C. (C)'' III Inlet Interception Capacity (assumes clogged condition) Q. r Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Ore asaauneo'' taming 1: Dimension entered is not a typical dimension for Inlet type sya:itu at Denver No. 16 Combirle0on 2.00 - Inches i 6.0 6.0 Inches MINOR MAJOR 3.00 foal 2.00 feet 0.31 0.50 0.50 3.60 0.60 3.00 6.50 5.25 0.00 2.00 0.10 010 3.70 0.66 MINOR MAJOR eat nches nches legreas eat UD Inlet 3.1comboinlel-dpe, Inlet In Sump 311112014, 2:04 PM APPENDIX . C Storm Line Calculations 1 m of 11 s c O c a � � c C7 v 0 N C C O O W pj O a J z cl 0) � 7 N i n _ N 0 O N c_ J C7 a — l0 N .. ... aN S� `o NLO N Q J 3 E (7 O — In z xo- N N c0 C O "` J fA p LD G N - N _ C JLu Z n C _j N _ C J _ W ► wL O N C C J d � C � U c J fn W C N C Ow O 0) w LL } E � d N Q J v y a O F � d U d C) � d' LL U v W F O y c p a z J z C_ V w o J o y � U v N 0 N `OT IL O o Y W O � LCAa U > .. �..IT... ,.. .. .. .. c K..,,. ,. y � LO O m J > N W d) o N C L O R N to t0 ... U.... 7 Ln C O C ` P z L m a ? G J > y N S m Ln IT C m N C y N C J m y e O 09 J > N_ W aL - LO 9 N OD LO 7 L c N 0 E d x > d c _ m 3 o � a ... L LO G _ O m N J > Uy_ to N_ S u to r V C S' Lo N N 11 w C7 T co O � a — w � u 00 m N Ccu LL U U J No Text I I 1 1 cl m E E L R 0 rE L. c O U 7 H C N � V O N i d C C C M a J z m J V (� 7 r (M N O rC O J 6 CA'"' N N O M J ; N S0 N Z 01 r N C O — J (A p _ dC N _ CJ �. N N yC O N _ >J "' cWC N L r � cc— r J N Ol a� CL U .c r J 1/I N C N C J U) '- y O O LL m `ci R } O � � n o J v cr d 0 w d N 73 a m � � U w W F O y c p a z Jz o _ C_ W N O O J O •- v >T N N � N W O O Y U Cl) d L m U > 0 0 co co c y m O c J > N W in A N O N t` to j N C_ O N Q N E Z L � 6 N _ O J > d N i N In CD d > _ CAC d In c � J � N N r J > N _ L - W .... d N 9 rn > L O E N ° i2 U) c m rn Q w o 0 L Cp o o J > � N 07 In cq C Z 0 N Cl) a N lO � 2 II Lo O U c a J I ' APPENDIX D ' Storm Line Outlet Protection Calculations 1 1 1 1 N 0 2 f� o a q 0 1 3 o n'K - o m N a a OV L ry O O :3 ; n o ti Q O � c � 5 f m m � � N O II `a o M o LU a m .o i s m to n g - a C 0 ry a s — >>2 T a Z Z W o m n x a a airzz s p Q 0 LL V � o Y ao QQ u o0 q L v � vmi i 3 u r F C L w u ;y1 � u 9 x x u 5 J O d q — U O 0 O�qO W y L U � Q Q C a ry w m a m C Q mN r N o uJ m J E E F'a y VI y O O e a C 6 0 10 I ' APPENDIX E Water Quality Design Computations TY POND DESIGN CALCULATIONS ATC :QUIRED STORAGE & OUTLET WORKS: BASIN AREA = 1.750 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 85.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.8500 <--CALCULATED WQCV (watershed inches) = 0.362 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.053 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = 1.000 <-- INPUT from stage -storage table AREA REQUIRED PER ROW, a (in2) = 0.217 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 112 <-- INPUT from Figure 5 n = 3 <-- INPUT from Figure 5 t (in) = 1/4 <-- INPUT from Figure 5 number of rows = 1 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY POND DESIGN CALCULATIONS POND 2 Project: 924-003 By: ATC Date: 3/10/14 - =IRED STORAGE & OUTLET WORKS: BASIN AREA = 3.050 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 65.00 <--INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.6500 <-- CALCULATED WQCV (watershed inches) = 0.254 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.065. <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WO Depth (ft) = 1.000 <-- INPUT from stage -storage table AREA REQUIRED PER ROW, a (in2) = 0.263 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/2 <-- INPUT from Figure 5 n = 3 <-- INPUT from Figure 5 t (in) = 1/4 <-- INPUT from Figure 5 number of rows = 1 <-- CALCULATED from WQ Depth and row spacing 0 Calculating the WQCV and Volume Reduction Chapter 3 1 Once the WQCV in watershed inches is found from Figure 3-2 or using Equation 3-1 and/or 3-2, the required BMP storage volume in acre-feet can be calculated as follows: r WQCVI ..' :.. V -.\ 12 / A � .: .: , . _ .... Equation 3=3 . ' Where: V = required storage volume (acre-ft) ' A = tributary catchment area upstream (acres) WQCV = Water Quality Capture Volume (watershed inches) ' 0.500 0.450 ' r 0.400 c 0.350 ' 0.300 t y 0.250 ' 0.200 c 0.150 C 0.100 t 0.050 0 Mn "I mil -------- 2 4 drain I --'W '- ' 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0:8 0.9 1 Total Imperviousness Ratio (i = la/100) ' Figure 3-2. Water Quality Capture Volume (WQCV) Based on BMP Drain Time ' 3-6 Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volume 3 August 2011 ' APPENDIX F ' Stormwater Management Model (SWMM), Detention Calculations SWMM RATING CURVE POND 1 Project: 924-003 Date: 3/10/14 By: ATC STAGE FT DEPTH FT SURFACE AREA OF CONTOUR SF STORAGE CF STORAGE AC FT RELEASE CFS 5123.6 0 10 0 0.000 0.00 5124 0.40 3,339.73 641.27 0.015 0.00 5125 1.00 7,382.79 6578.05 0.151 0.39 5126 1.00 9,827.20 15166.47 0.348 0.52 5127 1.00 12,465.23 26295.97 0.604 0.63 OUTLET RATING CURVE POND 1 100-YR ORIFICE RATING Orifice Dia (in) 3.50 Orifice Area (so 0.0668 Orifice invert (ft) 5123.6 Orifice Coefficient 0.65 Orifice Area SF Stage FT Outlet release CFS 0.0668 5,123.60 0.00 0.0668 5,124.00 0.00 0.0668 5,125.00 0.39 0.0668 5,126.00 0.52 0.0668 5,127.00 0.63 1 1 1 1 1 1 1 SWMM RATING CURVE POND 2 Project: 924-003 Date: 3/10/14 By: ATC STAGE FT DEPTH FT SURFACE AREA OF CONTOUR SF STORAGE CF STORAGE AC -FT RELEASE CFS 5121.2 0 1489 0 0.000 0.00 5122 0.80 15239 8004 0.184 0.18 5123 1.00 17562 24396.9 0.560 0.28 5123.8 0.80 119492 39214.5 0.900 0.34 OUTLET RATING CURVE POND 2 100-YR ORIFICE RATING Orifice Dia (in) 2.75 Orifice Area (sf) 0.0412 Orifice invert (ft) 5121.2 Orifice Coefficient 0.65 Orifice Area SF Stage FT Outlet release CFS 0.0412 5,121.20 0.00 0.0412 5,122.00 0.18 0.0412 5,123.00 0.28 0.0412 5,123.80 0.34 0 N O N N N_ 1 T O O ti C O U LL —A N 0) cc a 1 1 1 1 k m # + ro a x + v x L m I molnrrn v.� I omo t N m « at I m o c N o a rn l o c o t O « N U I t av •+ ❑ c 1 Moorno 0 1 000 > I < « m m+ o o I •• x t ro v+ o0 x Y c E t o 0 -.i Y i O O Q1 Y I OJ O N r O1 N UI Y 1 O r O x ro o++ E v 1 �o o io m N fl E v l o m o + '�7 L C+ N N a W l V'O.-1NOr a U1 I ONO U o 1 1 .+o o.-ioo 0 f l ono + ro E N+ N N O O O N , O1 I 1 7 W 1 + rl O O t W I 1 m N I N I + a U a+ z> H •• •• •• U I U I t m U) t 1) QN N In OO ro I ro l + a N + m m m + mt+ W 00 W 00o.1-� 00 oo.tio W o - + m> U+ U N Z Z r Z Z S Y 2 Z o 0 0 o m k U m ro + « Y ro N« + c x + Y+ x m 0 m+ :rob ct « w Y+ 0 O >. .. + O+ O U 0 0 0 # N m a+ # m+ W Ul Y Y ❑ a Ul t t Y m m w N # c# H ri r-1 + Y m+ + + .. O 3 >i a) N N Y x >� + ro m O In O x 0+ W W W # E •-1 v+ E x x 0 rn o >. m e Y �' �. o a w N « U+ c C c # E a N+ #.1 +• rl a N c.l v N m n, as +H t .l a w v c Y ❑ UI U/ x Y k a c O U W x tr+ x + m v c t + at 0 a ro Y Y Q ro o c ro a) a)Y Y F E k c+ c o c ro # c k N N N + N o+ # o+ m O ro a 7 f1 .1 ❑ Y E m + ro t U 0 r1 a w ?i u k ..1 + UI N O t v t + k YE.i a F, a 0 rnaYY m F x ax v--I Ya NY # Yx r.tY + a) ro ❑ a)El v v « ak N Y ro a �j x a k Y Y ro C, 0 + F o m x + -.1 k E c 0 C: u c m w E c .0 N N O c V E E # s w ro N v to a t O s ro ro t 7t + mk ❑ m c 3 a 3'O UI Ya'I b+0Y C c x W x N aJ U c x ax N Nb 0 k •• 'O -n + x ?� + El El 0/ .� O O O c Y Y c U N F F .1 « �-1 O rl ro + + 3 3 t W U) t k .10 t -H N U ro c N .i O N 'I N O Y 0+ M- x O x ro CL�W ro x 0 x a + F m t rot O O a V1 U' W 0.i 3 W O N 'O Y a Y >, 0 O '0 « C k ro W N c a m" # O« > 0 O k O ro 0 x k C x N c rl Y G c O N N O 0 0 o # 7 x O> c 7 0 a) + H# N Ol N t zd ct c t Qt f, W a H W m W Qa30a Cr x ax F W Hm W U + W x 03C9 O O m 0 0 0 N O O N O O O Ol O O H O O O N 0 0 0 0 0 0 0 U U U N UI Q1 I O 0 01 0 0 0 m 0 I O O (•' 1 0 0 0 W O O O O O O I O O O O O 0 0 0 0 0 0 0 0 o000.-i I I I mm rn I I + Ul + I + N + I k + t ty + I rot I • � QI r H + + E + ro W + m + I • a w oW # A t H k m k m t W t I . •H El + ro# A + + a + w+ 1 o a wt ro a+ an aac o+ 3 3 J 4 + m+ rJ + N+ a)O1 a)'O O + C t I • 3 0 O O O + a + I • Orl ri U1 "dam H # Ht # m# mmm O1 W a) + a+ I w W W w3+ 3 C a a to O 41 + O+ N + E+ E E E N + C+ O H OO O .-1 a m o w -rI H + E+ I Ul + U+ I H (U QI (II N JJ # ,# U # U + I H W O .a C c + t .-I lT o + a+ a a) x a) N> + + I A x a > IL W W HUIHwU + x+ Q + a+ XaXaa + m+ I Irm I � N ri O. G I o 0 m ro- 1 0 0 1 i 1 • O w I O O E I . c c l 0 0 ro O.H 00 � c I • O a 1 0 0 E+ 0L a G ro u 0 v H H a a) m a 1 1 1 1 0 0 N N w w 00 H F I I + N + I # m # I E # s E s I a # # U) + I # # I # 3 # I + O + I # H # I # W # I + C + I # H # I H N # # I vro # v+ I C C O # O O O + ao. z+ 1 H a v H m O E m H a rn O w H F c O H , < 0 H H 3 v H m O E m U W H C O l0 ro H > < a o H % v c ro u £ c E E UI w O Sr L a v U m E u � m O m F •O E m 3 In a ro O W E 0� H U W X F C m H E E H 3 m m O W E N H U m m H Ea In r io In 0 0 0 0 O O N m o oio In O O H N 0 0 o O r o 0 0 •I rIPP N N O O 0 0 0 0 0 o r m O O N Ol O Ol9 M H N L I L 3 N I M w 1 lT O v I P N H W I W m U N N O I S I I N O 1 • D 1 0 N i A W I I 1 L I I 1 w I 1 I I I I 7 I v l o 0 O I CP I I m 1 >a m l 1 I a t l I N I O U I 1 m I S 4 I 1 m l 7 1 I H I I I I I I H I I I avi < 3 v z a 0. 1 00 m* 3 I 1 + H+ v + ro+ I a+ N 1 1 + + o + a+ 1 (n+ a l I t 7+ H + m+ I + U I I # to + W t t 1 v k U I I + + + m+ I v * E t I SIk 1 I + c# >a + a+ 1 N# OI I I * O t U1 t + I O# 0 7 1 O I O O k p t O + W+ I z# m 1 z 1 as + z+ z + mt I ro c H 1 E U a I awl cM N 0) f0 IL ?Z: O O m � • I .y m I m 3 O' N I m 01 I m O W C I I W w W I m m I O1 1 I + # I 1 I # # I 1 •-1 1 t + I I N I # H+ I I W I # t0 # I 1 11 I + E + I 7 1 # E t N I rl O I + a+ I 0 1 roL 0 Z I W 0 0 1 O # rl I 0 I .-1 + + I .-I I iI E o # W # I ro t Iv I v # # I 7 1 ro 0 1 O I lI L I m # a# I 0 X -1 1 0 £ W U1 I ❑ I I I I 31 X rl O I x N 7 rI I I 1 I E — u 7 U N E O y I N > w E — 1 1 I I X c l r o ro u .H N •• I N N W H H I 0 0 O H L I 7 I U1 U> 0 0 C C E U T ti .i O ro l O O F I m m E—m 1 rin rnN m N EO U i u .i rl 1 O O C'1 r1 I I � � I O C c U I N N W ro ro v T 100 + ro Y Ip 7 7r1 F I❑❑ + E# L L L I + E# U F F v I + a + H I + N + 7 I + + Ul N N + C c E O O rl I + H + H N ro + O c O c+ rot, 7 7 + + O O c C 0 14 I o o Y O+ z Q Q F h co APPENDIX G Erosion Control Report ' INORTHERN ENGINEERING Global Village AcademN ' EROSION CONTROL REPORT ' A comprehensive Erosion and Sediment Control Plan (along with associated details) has been included with the final construction drawings. It should be noted, however, that any such Erosion ' and Sediment Control Plan serves only as a general guide to -the Contractor. Staging and/or- phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the. authorities having jurisdiction. ' It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living ' document, constantly adapting to site conditions and needs. The Contractor shall update the ._location of BMPs as they. are..i.nstalled, removed or_modified in conjunction with.construction _ activities. It is imperative to appropriately reflect the current site conditions at all times. ' The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 — Construction BMPs will be utilized. Measures may include, but are ' not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site ' restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In ' addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General ' Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division — Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive Stormwater Management Plan ' (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. Final Drainage Report MAP POCKET Drainage Exhibits No Text