Loading...
HomeMy WebLinkAboutDrainage Reports - 07/31/1996- E �. Y IF PROPTY FORT COLUNSU711LI -ES �1 Final Drainage and Erosion Control Report for SUNSTONE TOWNHOMES P.U.D. Fort Collins, Colorado Prepared for: Mark Twain Homes Inc. PO Box 270218 Fort Collins, Colorado 80527 Prepared by: SHEAR ENGINEERING CORPORATION 1 Project No: 1516-01-96 DATE: May, 1996 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226.5334 FAX (970) 282-0311 No Text PAGE 1 Project No. 1516-01-96 Final Drainage and Erosion Control Report L GENERAL LOCATION AND DESCRIPTION: A. Location 1. Sunstone Townhomes P.U.D. is located in the Southwest Quarter of Section 32, T7N, Range 68 West of the 6th P.M., Ft. Collins, Colorado. 2. More specifically, Sunstone Townhomes P.U.D. is located in the southeastern part of Fort Collins, Colorado. Sunstone Townhomes P.U.D. is located approximately 2400 feet north of Harmony Road at the southeast corner of the intersection of Caribou Drive and Timberline Road (See Vicinity Map). 3. The site is bounded by Timberline Road on the west, Caribou Drive on the north, Stoney Creek Drive on the east and Summerstone Court on the south.. The following subdivisions adjoin the site: a. Sunstone Village Second Subdivision to the northeast. b. Sunstone Village 5th Subdivision P.U.D. to the east and southeast. c. Sunstone Village 6th Subdivision P.U.D. to the southeast. d.. Sunstone Village 8th Subdivision P.U.D. to the south. e. Block 9 of Sunstone Village P.U.D. Fourth Subdivision to the north. 4. The site is located within the area studied in the Timberline Farm Master Drainage Plan and Report. All recommendations of that report and plan will be adhered to. B. Description of Property 1. The site is currently undeveloped and open. Existing ground cover consists primarily of native dry land grasses. There are existing utilities around the perimeter of the site. There is an existing 27" sewer line traversing the site in a north -south direction. 2. The site area is approximately 5.95 acres. 3. Development of the site will consist of 34 townhomes and 7 single family homes (41 total units) and the necessary utilities to service them. 4. There are no major drainage ways located on or within 150 feet of the project site. PAGE 2 Project No. 1516-01-96 Final Drainage and Erosion Control Report H. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is situated within the Fox Meadows Drainage Basin as designated on the City of Fort Collins Stormwater Basin Map. a. The Basin Fee Rate for the Fox Meadows Drainage Basin is $ 6,468.00 per gross acre according to the development fee section of the City of Fort Collins Development Manual. b. This fee may be reduced if detention is provided. B. Sub -Basin Description 1. According to the Timberline Farm P.U.D. Master Drainage and Utility Plan, the site is situated in Drainage Basins 4 and 2. Drainage Basin 4 drains to the northwest corner of the Sunstone Townhomes P.U.D. site where a detention basin is specified (Detention Pond #4). Drainage Basin 2 drains to the northeast corner of the Timberline Farm site where another detention basin is specified (Detention Pond #2). Detention Pond #2 has been constructed and is not analyzed with this project. a. Actual existing field conditions vary slightly from those shown on the Timberline Farm Master Drainage and Utility Plan. Refer to the Master Grading Plan for Sunstone Townhomes P.U.D., attached in Appendix IV of this report, for the actual topography of the site and the surrounding area. b. According to the Timberline Farm Master Drainage Report, Detention Pond 4 is required to have a maximum release rate of 9.0 cfs and a required storage volume of 0.9 acre-feet for the 100-year storm. c. A maximum release rate of 6.0 cfs and a required storage of 0.10 acre-feet for the 2-year storm are also recommended. This pond will be constructed as part of the development of Sunstone Townhomes P.U.D. 2. The majority of the site slopes from south to north. There is approximately 6-7 feet of relief across the site. 3. Development will split the site into seven sub -basins. a. Stormwater runoff from sub -basins Ia-If will be conveyed to the proposed detention pond located in the northern portion of the site (Detention Pond #4 of the Timberline Farm Master Drainage Plan). b. Stormwater runoff from sub -basin Ig will be conveyed to Summerstone Court and Stoney Creek Drive. This stormwater is eventually conveyed to the Timberline Farm Master Drainage Plan Detention Pond #2. This pond has been constructed and is located in Sunstone Village 5th Subdivision P.U.D. PAGE 3 Project No. 1516-01-96 Final Drainage and Erosion Control Report II.. DRAINAGE BASINS AND SUB -BASINS: B. Sub -Basin Description (continued) c. Stormwater runoff from sub -basin Irow will be conveyed to Timberline Road. 4. Flows from offsite sub -basins Ie & Irow are included in the peak flow calculations as well as the flow summary. IIL DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: A. Regulations 1. All storm drainage design criteria from the City of Fort Collins Drainage Criteria Manual were adhered to. 2. Storm drainage design criteria modifications were utilized based on data provided by City of Fort Collins Stormwater Utility personnel based on conclusions presented with the Master Drainage Report for Timberline Farm P.U.D. 3. All erosion control design criteria from the City of Fort Collins Erosion Control Reference Manual were adhered to. B. Development Criteria Reference and Constraints 1. Previous studies and plans which were considered : a. Master Drainage Report for Timberline Farm P.U.D. prepared by Engineering Professionals. b. The Timberline Sump Plan and Profile prepared by Landmark Engineering. c. Warren Lake Trunk Sewer Plans, particularly the plan and profile of the portion of the sewer which traverses the site. This is shown on Sheet 4 of 14 of the plans prepared by Stewart and Associates; dated December 14, 1977. 2. The surrounding streets mentioned above are built out to the curb and or sidewalk. All proposed grading will match the existing grades at the curb or sidewalk. 3. Sanitary sewer service for the proposed townhomes will be provided by the existing Warren Lake Trunk Main. The proposed finish floor elevations of the town home units consider the depth of the existing sewer. PAGE 4 Project No. 1516-01-96 Final Drainage and Erosion Control Report M. DRAINAGE AND EROSION CONTROL DESIGN CRMRIA• B. Development Criteria Reference and Constraints (continued) 4. Some offsite areas to the east (sub -basin Ie) will contribute stormwater to the proposed detention facility. The proposed grading in Tract "B" provides a means to convey the stormwater from the existing pan located in Stoney Creek Drive to the detention facility. 5. The grading for the proposed detention pond considers the depth of the existing 27" sanitary sewer which crosses the proposed location of the pond. The grading of the pond ensures that the pipe has adequate cover. a. According to the plan and profile for the Warren Lake Trunk Main for this site, the sanitary sewer is a 27" RCP or VCP. b. Field survey has shown that the sewer is approximately 8-9 feet deep in Tract "A" where the detention pond will be constructed. C. Hydrological Criteria 1. The Rational Method (Q = CIA) was used to determine the pre -developed and/or post development peak flows for the 2, 10 and 100-year storm events at critical points. 2. Detention requirements and design are based on the recommendations of the Master Drainage Report for Timberline Farm P.U.D. prepared by Engineering Professionals. D. Hydraulic Criteria 1. Orifice and weir equations and coefficients suggested by the City of Fort Collins Storm Drainage Criteria Manual were utilized. 2. Storm sewer and drainage channel capacities were based on the Mannings Equation. The Mannings coefficients are as suggested by the City of Fort Collins Storm Drainage Criteria Manual. IV. DRAINAGE FACILM DESIGN: A. General Concept 1. Stormwater will be conveyed to the detention pond located at the northern end of the site via a combination of overland flow, gutter flow and storm sewer flow. PAGE 5 Project No. 1516-01-96 Final Drainage and Erosion Control Report IV. DRAINAGE FACILITY DESIGN: A. General Concept (continued) 2. The detention pond is sized according to the recommendations of the Master Drainage Report for Timberline Farm P.U.D. prepared by Engineering Professionals. The detention pond is divided between 2 tracts. The primary detention pond is located in Tract "A" on the north side of Gemstone Lane. The secondary detention pond is located in Tract "B" on the south side of Gemstone Lane. 3. Stormwater from the pond will be conveyed to the "Timberline Sump Outfall". The "Timberline Sump Outfall" consists of an existing 42" RCP pipe on the east side of Timberline Road which drains the swamp on the west side of Timberline Road and conveys stormwater. to. the north. According to the Timberline Farm Master Drainage Plan, the 42" RCP will be flowing under pressure during the 100-year storm. a. The flow in the pipe was originally estimated to be 47 cfs in the Master Plan for Fox Meadows Basin. b. The Master Drainage Plan for Timberline Farms P.U.D. amended the Master Drainage Plan for Fox Meadows Basin by revising the basin delineation and the detention design to "provide a more workable drainage scheme for the site". ' c. The estimated peak flow in the 42" pipe is now 56 cfs according to the Master Drainage Plan for Timberline Farms P.U.D. d. The hydraulic grade line slope of the 42" pipe establishes the minimum allowable 100-year W.S. elevation in the detention pond. This W.S. elevation is required in order to "force" the water to flow north in the pipe. 4. Offsite flows from Sunstone Village 5th Subdivision P.U.D. are considered in the design of the drainage infrastructure and the detention pond. 5. There is an existing area inlet near the northwest corner of the site. This inlet will be converted to a Type 2 outlet structure to restrict the outflows from the detention pond to those recommended by the Timberline Farm Master Drainage Plan. 6. Stormwater from the open space between the townhomes and the single family homes (Tract "C") will be conveyed to Stoney Creek Drive overland. Grading will be done so that the runoff sheet flows to Stoney Creek Drive between the single family homes on lots 35-37. 7. Stormwater from the open space between the townhomes and Timberline Road (Tract "A") will be conveyed to the detention pond via a pair of grassed swales. A landscaped berm will separate the swales. 1 MastrrDrainngeBehnrt for ThnhrrlincX= R[LD- PAGE 6 Project No. 1516-01-96 Final Drainage and Erosion Control Report IV. DRAINAGE FACILITY DESIGN: B. Specific Details The detention pond volume and release requirements are based on the recommendations of the Master Drainage Report for Timberline Farm P.U.D. and are summarized below. a. The required volume for the 100-year storm is 0.9 acre-feet (39,204 cubic feet). b. The maximum allowable release rate for the 100-year storm = 9.0 cfs. c. The required volume for the 2-year storm is 0.10 acre-feet (4,356 cubic feet). d. The maximum allowable release rate for the 2-year storm = 6.0 cfs. 2. The pond design has provided adequate volume and freeboard. The detention pond is located in Tracts "A" and "B". These tracts are designated Drainage and Access easements on the Final Plat. The primary detention pond is located in Tract "A". The stage -storage relationship along with the stage -release rate relationship is summarized in the table below. STAGE - STORAGE - RELEASE RATE SUMMARY . FOR PRIMARY POND Elevation Stage Storage Storage Release Rate (ft.) (ft.) (cubic feet) (ac-ft) (cfs) 4944.7 0.0 0 0 0 4945.0 0.3 52 0 0.56 4946.0 1.3 5585 0.13 1.17 4947.0 2.3 21690 0.50 5.65 4948.0 3.3 44713 1.03 7.65 4949.0 4.3 71138 1.63 20.75 a. The top of the pond is at an elevation of 4949.0 feet. b. The total volume provided in the primary pond is 1.63 acre-feet (71,138 cf). c. The required water surface elevation for the 100-year storm is 4948.57 feet. This is required in order to provide the necessary Hydraulic Grade Line slope for the 42" RCP along Timberline Road. Refer to portions of the Master Drainage Plan for Timberline Farms P.U.D. attached in Appendix IV. d. The existing area inlet located in the northwest corner of the primary detention pond (Concentration Point "A") is to be replaced with a Type 2 outlet structure. PAGE 7 Project No. 1516-01-96 Final Drainage and Erosion Control Report IV. DRAINAGE FAC]LrrY DESIGN: B. Specific Details (continued) 3. The Type 2 outlet structure will consist of the following: a. A 6 inch diameter orifice at an invert elevation of 44.70 feet. b. A 12 inch diameter orifice at an invert elevation of 46.00 feet. c. The top of the box is at an elevation of 48.50 feet in order to ensure that the required 100-year Water Surface Elevation (W.S.E.) is obtained. d. The outlet pipe from the structure is an existing 15" RCP. e. The slope of the outlet pipe is approximately 1.79%. f. The capacity of the outlet pipe assuming a HW/D ratio of 1.0 is 8.64 cfs. g. The water surface elevation required for a release rate of 9.0 cfs is 48.57 feet. li. The slope of the Hydraulic Grade Line (HGL) for the 15" pipe is 8.34% . i The capacity of the outlet pipe using Mannings Equation and the slope of the HGL is 18.65 cfs. j. When the W.S.E. exceeds 49.00 it will overflow the berm along Caribou Drive and Stoney Creek Drive. The length of the portion of the berm which will act as the emergency overflow is approximately 150 feet. 4. A five (5') foot Type R inlet is to be installed in sump condition on the south side of Gemstone Lane at centerline station 6+36.64 (Concentration Point "C"). a. The 100-year peak flow to the inlet from sub -basin Ic is 6.88 cfs. b. The capacity of the inlet using the allowable flow depth of 0.87 feet is 8.00 cfs. c. When flow depths exceed 0.69 feet, the water will overflow the sidewalk into the detention ponds. 5. A ten (107 foot Type R inlet is to be installed in sump condition on the north side of Gemstone Lane at centerline station 6+36.64 (Concentration Point "B"). a. The 100-year peak flow to the inlet from sub -basin Ib is 9.39 cfs. b. The capacity of the inlet using the allowable flow depth of 0.87 feet is 16.00 cfs. c. The capacity of the inlet using the flow depth up to the back of walk, or 0.69 feet, is 12.4 cfs. PAGE 8 Project No. 1516-01-96 Final Drainage and Erosion Control Report IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) d. When flow depths exceed 0.69 feet the water will overflow the sidewalk into the detention ponds. 6. Approximately 23 lineal feet of 18" ADS N-12 storm sewer conveys stormwater from Tract "B" to the inlet on the south side of Gemstone Lane. a. The overall 100-year peak flow to the Flared End Section in Tract "B" (Concentration Point "D") is 12.73 cfs. b. The slope of the 18" ADS N-12 storm sewer is 1.25%. c. Mannings "n" for ADS N-12 pipe is 0.012. d. The capacity of the pipe assuming a Headwater to Depth Ratio (HW/D) of 1.0 is 12.73 cfs. 7. The inlets are connected by approximately 29 lineal feet of 24" RCP storm sewer. a. The overall 100-year peak flow to the inlet on the south side of Gemstone Lane (Concentration Point "C") is 18.01 cfs. b. The slope of the 24" RCP storm sewer is 1.0%. c. Mannings "n" for RCP is 0.013. d. The capacity of the pipe assuming a Headwater to Depth Ratio (HW/D) of 1.0 is 22.62 cfs. 8. Approximately 23 lineal feet of 24" ADS N-12 storm sewer conveys stormwater from the inlet on the north side of Gemstone Lane to Tract "A". a. The overall 100-year peak flow to the inlet on the north side of Gemstone Lane (Concentration Point "B") is 25.07 cfs. b. The slope of the 24" ADS N-12 storm sewer is 1.04%. c. Mannings "n" for ADS N-12 pipe is 0.013. d. The capacity of the pipe assuming a Headwater to Depth Ratio (HW/D) of 1.0 is 24.98 cfs. PAGE 9 Project No. 1516-01-96 Final Drainage and Erosion Control Report IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) 9. A three (3� wide valley pan will be provided in the primary detention pond located in Tract "A" to facilitate "trickle" flows. a. The design slope of the valley pan is 0.50%. 10. One (1) four (4') foot wide concrete sidewalk culvert is to be installed on Stoney Creek Drive (concentration point E) to convey stormwater from the offsite areas (sub -basin Ie) and the open space between the single family homes and the townhomes (sub -basin If) to the secondary detention pond. a. A transition section from the 12' wide valley pan located at the low point on Stoney Creek Drive to the concrete sidewalk culvert will be required. b. The overall 2-year peak flow to the sidewalk culvert is 3.57 cfs. c. The capacity of the sidewalk culvert assuming a Headwater to Depth Ratio (HW/D) of 1.0 is 4.77 cfs. Refer to page 9B in the Drainage Calculations located in Appendix I. d. The curb is not overtopped during the 2-year storm in accordance with the City of Fort Collins Stormwater Criteria. e. The curb will be overtopped during the 100-year event. This is allowed by the City of Fort Collins Stormwater Criteria. 11. The 1/2 street capacities using the 2 cross sections of Gemstone Lane are summarized below. The capacities are based on Mannings Equation and the slopes noted in the summary. Flowline 2-year 100-year Slope /Intl width storm storm feet cfs cfs % 30 166.8 866.1 2.05 0.016 28 82.8 381.3 0.5 0.016 12. All the grassed swales on the site are triangular in shape. Capacities of the swales are noted on the Master Grading Plan (sheet 6). The grassed swales have the following geometry. a. Side slopes = 4:1 (run:rise) b. Minimum slopes = 2.0% (0.02 ft/ft) c. Depths range from 0.5 feet to 1.0 foot PAGE 10 Project No. 1516-01-96 Final Drainage and Erosion Control Report IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) 12. The peak flows to concentration points G & H are summarized below. The stormwater from sub -basin Ig to concentration point is not conveyed to the on site detention pond. The stornwater from sub -basin Ig is conveyed to the Timberline Farm Master Drainage Plan Detention Pond #2. This detention pond is located in Sunstone Village 5th Subdivision P.U.D. Flows from sub -basin Irow are diverted into detention pond via a depressed curb and concrete channel near the intersection of Timberline Road and Caribou Drive. A concrete sidewalk culvert is provided to convey the stormwater under the sidewalk into the pond. Concentration 2- year 10-year 100-year Contributing Point cfs cfs cfs Sub-basin(s) �e�e:fk�tyF*7F7F7Fk �t'k7P*9ck 9F*ihkkiFk it9e k�F*7F* �t**7t :Ftlt9ck*ic G 0.65 1.14 2.35 Ig H 1.45 2.53 5.11 Irow V. EROSION CONTROL: A. General Concept 1. Erosion control measures will be as identified on the Drainage and Erosion Control Plan. 2. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1,000.00. 3. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. i The cost to install the proposed erosion control measures is approximately $3,750.00. Refer to the cost estimate attached in Appendix I. 1.5 times the cost to install the erosion control measures is $ 5,625.00. ii. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 5.95 acres), we estimate that the cost to re - vegetate the disturbed area will be $3,867.50 ($650.00 per acre x 5.95 acres). 1.5 times the cost to re -vegetate the disturbed area is $5,801.25. The $650.00 per acre for re -seeding sites of between 1 and 10 acres was quoted to us by City of Fort Collins Stormwater Utility personnel. PAGE 11 Project No. 1516-01-96 Final Drainage and Erosion Control Report V. EROSION CONTROL: A. General Concept (continued) iii The erosion control deposit for Sunstone Townhomes P.U.D. will be $5,800.00. This deposit is refundable. VI. VARIANCE REQUEST: A. Variance from City of Fort Collins Requirements 1. There will be no requests for any variances from the City of Fort Collins Storm Drainage Criteria for Sunstone Townhomes P.U.D. VIL CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort.Collins Storm Drainage Criteria manual and the City of Fort Collins policy. 2. All Erosion Control design complies with the City of Fort Collins Erosion Control Reference manual and generally accepted practices. B. Drainage Concept 1. The drainage design for Sunstone Townhomes P.U.D. is in accordance with the City of Fort Collins requirements and the recommendations of the Master Drainage Report for Timberline Farm P.U.D. 2. There will be no adverse downstream effects due to the development of the site. VIM RETERENCES: 1. Fort Collins Storm Drainage Criteria manual 2. Urban Drainage and Flood Control District Drainage Criteria manual 3. Master Drainage Report for Timberline Farm P.U.D., prepared by Engineering Professionals; Project No. 248.8; Dated November, 1989 APPENDIX I Storm Drainage Calculations FLOW SUMMARY FOR SUNSTONH TOWNHOMRS PAGE 1 DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc I2 I10 I100 Q2 Q10 Q100 DESIGN POINT SUB 2,10 100 BASIN(S) ac. min. min iph iph iph cfe cfe cfe r rrrrrrrrarttattrtrtrrrrrrrtrrrtttt tttttrrrrttttttrttttr•rrtttttttttrrrtttttttttr»rrttttrtt tttrttttrr HISTORIC CONDITIONS Ah EK. BASIN 7.67 0.34 0.34 0.42 14.50 14.50 2.18 3.82 6.17 5.67 9.93 20.04 DEVELOPED CONDITIONS A Ia-If & Irow 8.27 0.55 0.55 0.68 14.50 14.50 2.18 3.82 6.17 9.85 17.26 34.84 RHPONLY B Ib 1.01 0.91 0.91 1.00 5.00 5.00 3.29 5.64 9.30 3.03 5.20 9.39 INLET C Ic 0.74 0.88 0.88 1.00 5.00 5.00 3.29 5.64 9.30 2.14 3.67 6.88 INLET D Id -If 4.20 0.37 0.37 0.47 13.00 13.00 2.30 4.03 6.49 3.61 6.32 12.73 PIPE E Ie-If 4.02 0.38 0.38 0.47 12.50 12.50 2.34 4.10 6.60 3.57 6.25 12.59 SWCUL G Ig 0.62 0.53 0.53 0.66 13.50 13.00 2.26 3.96 6.49 0.74 1.29 2.65 STREET B* Ib-If 5.95 0.53 0.53 0.66 13.50 13.50 2.26 3.96 6.38 7.10 12.44 25.07 PIPE C. Ic-If 4.94 0.45 0.45 0.56 13.00 13.00 2.30 4.03 6.49 5.10 8.94 18.01 PIPE H Irow 0.93 0.70 0.70 0.88 14.00 14.00 2.22 3.89 6.28 1.45 2.53 5.11 STREET ABBREVIATIONS NOTES: I/P =INLET AND PIPE B* - TOTAL FLOW TO INLET N "B" VIA STREET AND ALREADY IN PIPE .- SW =SWALE C* - TOTAL FLOW TO INLET W "C" VIA STREET AND ALREADY IN PIPE - - SWCUL =SIDEWALK CULVERT H - PLOW TO BE DIVERTED INTO POND FROM TIMBERLINE ROAD REFONLY =FOR REFERENCE ONLY VIA SIDEWALK CULVERT SHEAR BNGINBBRING CORPORATION SUBBASIN BREAKDOWN PAGE 2 PROJECT: SUNSTONE TOWNHOMES DATE 05/09/96 LOCATION:FORT COLLINS BY MHO PROJ. NO.SUNRAT TOTAL SITE AREA = 5.95 TOTAL BASIN AREA = 7.67 SUB BASINS Ia Ib Ic Id Is If Ig Historic Irow ASPHALT 0.00 0.20 0.19 0.00 0.45 0.00 0.06 0.70 0.61 CONCRETE 0.18 0.33 0.21 0.01 0.29 0.00 0.04 0.40 0.01 GRAVEL 0.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ROOFS 0.17 0.43 0.27 0.00 0.34 0.13 0.16 0.32 0.00 LAWNS,SANDY SOIL FLAT < 21, 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 AVERAGE 2 TO 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 STEEP > 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 LAWNS, HEAVY SOIL: FLAT < 2, 1.97 0.05 0.07 0.17 0.75 1.13 0.21 6.25 0.31 AVERAGE 2 TO 7% 0.00 0.00 0.00 0.00 0.00 0.00 0.15 0.00 0.00 STEEP > 7% 0.00 0.00. 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00 TOTAL 2.32 1.01 0.74 0.18 1.83 1.26 0.62 7.67 0.93 RUNOFF COEFFICIENT SUB BASINS AND / OR BASINS Ia -Ib Ic Id Ie If Ig Historic Irow C2-C10 0.31• 0.91 0.88 0.24 0.64 0.28 0.53 0.34 0.70 C100 = 1.25*C2 0.39 1.00 1.00 0.30 0.80 0.35 0.66 0.42 0.88 AREA (acres) = 2.32 1.01 0.74 0.18 1.83 1.26 0.62 7.67 0.93 C100 IS NEVER GREATER THAN 1.0 OVERALL DESIGN CONTRIBUTING TOTAL POINT SUB BASINS DESIGN AREA C2-C10 C100 A Ia-If DET POND 8.27 0.55 0.68 B Ib INLET 1.01 0.91 1.00 C Ic INLET 0.74 0.88 1.00 D Id -I£ PIPE 4.2 0.37 0.47 E Ie-If SWCUL 4.02 0.38 0.47 F If SW/SWCUL 1.26 0.28 0.35 B* Ib-If PIPE 5.95 0.53 0.66 C. Ic-If PIPE 4.94 0.45 0.56 Ah Historic RBLRATE 7.67 0.34 0.42 G Ig OFFSITE 0.62 0.53 0.66 H Irow OFFSITE 0.93 0.70 0.88 SHEAR ENGINEERING CORPORATION PAGE 3 FLOW TO CONCENTRATION POINT Ah FROM EXISTING CONTRIBUTING AREA PROJECT: SUNSTONE TOWNHOMES DATE 05/10/96 LOCATION:FORT COLLINS PROD. NO.1516-01-96 FILE: SUNRAT BY MHO AREA (A)= 7.670 ACRES RUNOFF COBF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.34 0.34 0.42 SHE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (TO LENGTH = 110 FEET SLOPE = 2.00 i 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 14.04 14.04 13.26 TRAVEL TIME (It) =L/(60-V) PLOW TYPE L (ft) = 363 S (t) = 0.50 GUTTER V (fps) = 1.50 Tt(min)= 4.03 L (ft) = 310 S (i) = 1.00 FALLOW V (fps) = 0.46 Tt(min)= 11.23 L (ft) = S (4) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 L (ft) = S (6) = V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (i) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 15.27 TOTAL LENGTH = 783 L/180+10= 14.35 < 28.53 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 14.35 14.35 14.35 USE Tc - 14.5 14.5 14.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.18 3.82 6.17 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 5.67 9.93 20.04 CONCLUDE:COMPARE 2 YEAR PEAK PLOW WITH INFORMATION FROM SWMM MODEL AND SWMM MODEL RELEASE RATE = 6.00 CPS MINOR DIFFERENCE USE 6.0 FOR REFERENCE ONLY SHEAR ENGINEERING CORPORATION PAGE 4 FLOW TO CONCENTRATION POINT A FROM SUBBASIN(S) Ia-If & IMW PROJECT: SUNSTONE TOWNHOMES DATE 05/10/96 LOCATION:FORT COLLINS PROJ. NO.1516-01-96 FILE: SUNRAT BY MHO AREA (A)= 8.270 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.55 0.55 0.68 SHE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 110 FEET SLOPE = 2.00 4 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 14.04 14.04 13.26 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) = 363 S (6) = 0.50 GUTTER V (fps) = 1.50 Tt(min)= 4.03 - L (ft) = 87 S (4) = 3.00 SWALE V (fps) = 2.61 Tt(min)= 0.56 L (ft) = 72 S (}) = 1.00 PIPE V (fps) = 5.90 Tt(min)= 0.20 L (ft) = 206 S 00 = 0.50 GUTTER V (fps) = 1.50 Tt(min)= 2.29 L (ft) = S (i) = V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S C0 = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 7.08 TOTAL LENGTH = 838 L/180+10= 14.66 < 20.34 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 14.66 14.66 14.66 USE Tc = 14.5 14.5 14.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.18 3.82 6.17 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfa) 2 YEAR 10 YEAR 100 YEAR Q = 9.85 17.26 34.84 CONCLUDE:FOR REFERENCE ONLY SHEAR ENGINEERING CORPORATION PAGE 5 FLOW TO CONCENTRATION POINT B PROM SUBBASIN(S) Ib PROJECT: SUNSTONH TOWNHOMES DATE 05/10/96 LOCATION:FORT COLLINS PROD. NO.1516-01-96 FILE: SUNRAT BY MEO AREA (A)= 1.010 ACRES RUNOFF COBF. (C) 2 YEAR 10 YEAR 100 YEAR C 0.91 0.91 1.00 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) -- - LENGTH =NA FEET SLOPE =NA 2 YEAR 10 YEAR 100 YEAR C =NA NA 0.00 Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (TO=L/(60-V) PLOW TYPE L (ft) = 484 S (}) = 2.00 GUTTER V (fps) = 2.83 Tt(min)= 2.85 L (ft) = 87 S (k) = 0.70 GUTTER V (fps) = 1.72 Tt(min)= 0.84 L (ft) = S ($) = V (fps) = Tt(min)= 0.00 L (£t) = S 00 = V (fps) = Tt(min)= 0.00 L (ft) = S M = V (fps) = Tt(min)= 0.00 L (ft) = S M = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN PROM PIGURE 3-2 TOTAL TRAVEL TIME (min) = 3.69 TOTAL LENGTH = 571 L/180+10= 13.17 > 3.69 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 3.69 3.69 3.69 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (Cfe) 2 YEAR 10 YEAR 100 YEAR Q = 3.03 5.20 9.39 CONCLUDE:CHECK CAPACITY OF TYPE 'R' INLET IN SUMP SEE PAGE 6A SHBAR ENGINEERING CORPORATION PAGE 6 FLOW TO CONCENTRATION POINT C FROM SUBBASIN(S) Ic PROJECT: SUNSTONE TOWNHOMES DATE OS/10/96 LOCATION:FORT COLLINS PROJ. NO.1516-01-96 FILE: SUNRAT BY HBO AREA (A)= 0.740 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.88 0.88 1.00 SEE SPREAD SHEET ATTACHBD ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH =NA FEET SLOPE =NA $ 2 YEAR 10 YEAR 100 YEAR a C =NA NA 0.00 Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (It)=L/(60*V) FLOW TYPE L (ft) = 484 S (%) = 2.00 GUTTER V (fps) = 2.83 Tt(min)= 2.85 L (ft) = 17 S M = 2.00 GUTTER V (fps) = 2.83 Tt(min)= 0.10 L (ft) = 15 S (6) = 1.00 GUTTER V (fps) = 2.00 Tt(min)= 0.13 L (ft) = S M = V (fps) = Tt(min)= 0.00 L (ft) = S (i) = V (fps) = Tt(min)= 0.00 L (ft) = S (i) = V (fps) = Tt(min)= 0.00 L (ft) = S 00 = V (fps) - Tt(min)= 0.00 ALL VELOCITIES TAKEN PROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 3.08 TOTAL LENGTH = 516 L/180+10= 12.87 > 3.08 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 3.08 3.08 3.08 USE Tc = 5 5 5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 3.29 5.64 9.30 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 2.14 3.67 6.88 CONCLUDE:CHECK CAPACITY OF TYPE 'R' INLET IN SUMP SEE PAGE 6A PAGE 6A PROJECT: SUNSTONE TOWNHOMES LOCATION:FORT COLLINS PILE: SUNRAT PEAK PLOWS AT "B" 2 YEAR Q = 3.03 PEAK PLOWS AT "C" 2 YEAR Q = 2.14 SHEAR ENGINEERING CORPORATION INLET CAPACITY AT DESIGN POINTS B & C 10 YEAR 5.20 10 YEAR 3.67 HEIGHT OF OPENING OF TYPE 'R' INLET (h)= ALLOWABLE DEPTH OF PLOW IN GUTTER (yo)= yo/h = FROM FIGURE 5-2 CAPACITY PER LINEAR FOOT = THEORETICAL CAPACITY FOR 5 'TYPE "R" INLET CAPACITY = FOR 10 'TYPE "R" INLET CAPACITY = REDUCTION FACTOR FROM TABLE 5-4 = DATE 05/10/96 PROJ. NO.1516-01-96 BY MHO 100 YEAR 9.39 100 YEAR 6.88 6.00 INCHES 10.44 INCHES MAJOR STORM - 6" OVER CROWN 0.87 FEET 0.69 PBBT FROM PLOWLINR TO 1.74 BACK OF WALK 2.00 CPS/PT - 10.00 CPS 20.00 CPS 0.8 ALLOWABLE CAPACITY = 5' INLET 8.00 CPS 10' INLET 16.00 CPS r rrrttxtraarrrr rf r++r+r++rf ttrt+t+r+aaaarr rrrrrrrrr+++xaarrrrrrrr+tttta+rrrrrrrrrtrtaaaara CHECK WITH NO OVERTOPPING SIDEWALK I.B. yo = 0.69 yo/h = 1.38 FROM FIGURE 5-2 CAPACITY PER LINEAR FOOT = 1.55 CPS/PT THEORETICAL CAPACITY FOR 5 'TYPE "R" INLET CAPACITY = 7.75 CPS FOR 10 'TYPE "R" INLET CAPACITY = 15.50 CPS REDUCTION FACTOR FROM TABLE 5-4 = 0.8 ALLOWABLE CAPACITY = 5' INLET 6.20 CPS 10' INLET 12.40 CPS CONCLUDE:USH 5' INLET ON SOUTH SIDE OF THE ROAD (DESIGN POINT "C") USE 10' INLET ON NORTH SIDE OF THE ROAD (DESIGN POINT "B") SHEAR ENGINEERING CORPORATION PAGE 7 PLOW TO CONCENTRATION POINT D FROM SUBBASIN(S) Id -If PROJECT: SUNSTONE TOWNHOMES DATE 05/10/96 LOCATION:FORT COLLINS PROS. NO.1516-01-96 FILE: SUNRAT BY HBO AREA (A)= 4.200 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C 0.37 0.37 0.47 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 110 FEET SLOPE = 2.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 14.04 14.04 13.26 TRAVEL TIME (Tt) =L/(60•V) PLOW TYPE L (ft) = 363 S (t) = 0.50 GUTTER V (fps) = 1.50 Tt(min)= 4.03 L (ft) = 87 S (t) = 3.00 GUTTER V (fps) = 3.40 Tt(min)= 0.43 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) _ S _(t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 4.46 TOTAL LENGTH = S60 L/180+10= 13.11 < 17.72 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 13.11 13.11 13.11 USE Tc = 13 13 13 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.30 4.03 6.49 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 3.61 6.32 12.73 CONCLUDE:24" PIPE UNDER GEMSTONE LANE FLOWING UNDER PRESSURE DURING STORMS WHICH EXCEED THE 100-YEAR STORM 18" ADS N-12 ® 1.25% FROM FES TO INLET W 1.254 Qcap = 12.73 CPS 24" RCP FROM INLET TO INLET AT 1.0% HAS CAPACITY OF 22.62 CPS 24" ADS N-12 FROM INLET TO FES AT 1.04% HAS CAPACITY OF 24.98 CPS SEE OVERALL PEAK FLOWS TO "B" AND "C" IN FLOW SUMMARY ON PAGE 1 REFER TO TABLES 4 & 5 IN APPENDIX IV FOR PIPE CONVEYANCE FACTORS SHEAR ENGINEERING CORPORATION PAGE 8 FLOW TO CONCENTRATION POINT B FROM SUBBASIN(S) Ie-If PROJECT: SUNSTONE TOWNHOMES DATE OS/10/96 LOCATION:FORT COLLINS PROJ. NO.1S16-01-96 FILE: SUNRAT BY MBO AREA (A)= 4.020 ACRES RUNOFF COBF. (C) 2 YEAR 10 YEAR 100 YEAR C 0.38 0.38 0.47 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 110 FEET SLOPE = 2.00 k 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 14.04 14.04 13.26 TRAVEL TIME (TO=L/(60-V) FLOW TYPE L (ft) = 363 S (k) 0.50 GUTTER V (fps) = 1.50 Tt(min)= 4.03 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (}) - V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 4.03 TOTAL LENGTH = 473 L/180+10= 12.63 < 17.30 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR SO YEAR 100 YEAR Tc (min)= 12.63 12.63 12.63 USE Tc = 12.5 12.5 12.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.34 4.10 6.60 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 3.57 6.25 12.59 CONCLUDB:CHECK CAPACITY OF SIDEWALK CULVERT SEE PAGE 9A SHEAR ENGINEERING CORPORATION PAGE 9 PLOW TO CONCENTRATION POINT G FROM SUBBASIN(S) Ig PROJECT: SUNSTONE TOWNHOMES DATE 05/10/96 LOCATION:FORT COLLINS PROJ. NO.1516-01-96 PILE: SUNRAT BY MHO AREA (A)= 0.620 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.53 0.53 0.66 SHE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH = 40 FEET SLOPE = 2.00 k 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 8.47 8.47 8.00 TRAVEL TIME (Tt)=L/(60*V) PLOW TYPE L (ft) = 610 S (k) = 1.00 GUTTER V (fps) = 2.00 Tt(min)= 5.08 L (ft) = S (k) = NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 L (ft) = S (k) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 5.08 TOTAL LENGTH = 650 L/180+10= 13.61 > 13.08 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 13.55 13.55 13.08 USE Tc = 13.5 13.5 13.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.26 3.96 6.49 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.74 1.29 2.65 CONCLUDE:THESE PLOWS PLOW OPPSITE TO THE TIMBERLINE FARMS DETENTION POND # 2 PAGE 9A PROJECT: SUNSTONS TOWNHOMES LOCATION:FORT COLLINS FILE: SUNRAT WIDTH OF CULVERT OPENING = HEIGHT OF OPENING = N = SLOPE (ft/£t) AREA (A) = WETTED PERIMETER (P)= HYDRAULIC RADIUS (R)= R'2/3 - PEAK PLOWS AT "E" 2 YEAR Q = 3.57 SHEAR ENGINEERING CORPORATION SIDEWALK CULVERT CAPACITY 0 E DATE PROJ BY 4.00 FEET 0.40 FEET 0.016 CONCRETE 1.00% 1.60 SF 8.80 FEET 0.1818 FEET 0.3209 10 YEAR 100 YEAR 6.25 12.59 OS/10/96 NO.1516-01-96 MEO 4.76 CPS> 3.57 CPS (Q2) CITY REQUIREMENT OF NO CURB TOPPING ON COLLECTER STREET FOR 2-YEAR STORM IS MET CONCLUDE:4' WIDE SIDEWALK CULVERT IS ADEQUATE AT DESIGN POINT "E" SHEAR ENGINEERING CORPORATION PAGE 10 PLOW TO CONCENTRATION POINT B* PROM SUBBASIN(S) Ib-If PROJECT: SUNSTONE TOWNHOMES DATE O6/10/96 LOCATION:FORT COLLINS PROS. NO.1516-01-96 PILE: SUNRAT BY MEO AREA (A)= 5.950 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.53 0.53 0.66 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 110 FEET SLOPE = 2.00 4 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 14.04 14.04 13.26 TRAVEL TIME (Tt)=L/(60*V) PLOW TYPE L (ft) = 363 S (t) = 0.50 GUTTER V (fps) = 1.50 Tt(min)= 4.03 L (ft) = 87 S (t) - 3.00 SWALE V (fps) = 2.61 Tt(min)= 0.56 L (ft) = 49 S (t) = 1.00 PIPE V (fps) = 5.90 Tt(min)= 0.14 L (ft) = S (t) - V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 4.73 TOTAL LENGTH = 609 L/180+10= 13.38 < 17.99 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 13.38 13.38 13.38 USE Tc = 13.5 13.5 13.5 INTENSITY (I) (iph) 2 YEAR SO YEAR 100 YEAR I = 2.26 3.96 6.38 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 7.10 12.44 25.07 CONCLUDB:INSTALL 24" ADS N-12 @ 1.04% CAPACITY = 24.99 CPS (CONVEYANCE FACTOR * SLOPE"0.5) PIPE WILL BE PLOWING UNDER PRESSURE DURING 100-YEAR STORM REFER TO TABLES 4 & 5 IN APPENDIX IV FOR PIPE CONVEYANCE FACTORS SHEAR ENGINEERING CORPORATION PAGE 11 PLOW TO CONCENTRATION POINT C* FROM SUBBASIN(S) Ic-If PROJECT: SUNSTONB TOWNHOMES DATE 05/10/96 LOCATION:HORT COLLINS PROJ. NO.1516-01-96 PILE: SUNRAT BY MEO AREA (A)= 4.940 ACRES RUNOFF CORP. (C) 2 YEAR 10.YRAR 100 YEAR C = 0.45 0.45 0.56 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH = 110 FEET SLOPE = 2.00 } 2 YEAR SO YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 14.04 14.04 13.26 TRAVEL TIME (Tt)=L/(60*V) PLOW TYPE L (ft) = 363 S (}) = 0.50 GUTTER V (fps) = 1.50 Tt(min)= 4.03 L (ft) = 87 S (}) = 3.00-SWALE V (fps) _ 2.61 Tt(min)= 0.56 L (ft) = 24 S (}) = 1.00 PIPE V (fps) = 5.90 Tt(min)= 0.07 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 L (ft) = S (}) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 4.66 TOTAL LENGTH - 584 L/180+10= 13.24 < 17.92 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min). 13.24 13.24 13.24 USE Tc = 13.0 13.0 13.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.30 4.03 6.49 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q = 5.10 8.94 18.01 CONCLUDE:INSTALL 24" ADS N-12 @ 1.00} CAPACITY = 24.51 CPS (CONVEYANCE FACTOR * SLOPE^0.5) PIPE CAPACITY WILL BE ADEQUATE FOR 100-YEAR STORM REFER TO TABLES 4 & 5 IN APPENDIX IV FOR PIPE CONVEYANCE FACTORS SHEAR ENGINEERING CORPORATION PAGE 12 FLOW TO CONCENTRATION POINT H FROM SUBBASIN(S) Imw PROJECT: SUNSTONE TOWNHOMES DATE 05/10/96 LOCATION:FORT COLLINS PROD. NO.1516-01-96 FILE: SUNRAT BY MHO AREA (A)- 0.930 ACRES RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C 0.70 0.70 0.88 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) LENGTH 65 FEET SLOPE = 2.00 % 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 10.79 10.79 10.19 TRAVEL TIME (Tt)=L/(60-V) FLOW TYPE L (ft) - 700 S (t) = 2.00 GUTTER V (fps) = 2.83 Tt(min)= 4.12 L (ft) _ S (t) = NONE V (fps) = 0.00 Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) _ -- V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 L (ft) = S (t) = V (fps) = Tt(min)= 0.00 ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 4.12 TOTAL LENGTH = 765 L/180+10= 14.25 < 14.32 CHOOSE LESSER Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 14.25 14.25 14.25 USE Tc = 14.0 14.0 14.0 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.22 3.89 6.28 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR Q 1.45 2.53 5.11 CONCLUDE:THESE FLOWS FLOW OFFSITE TO TIMBERLINE ROAD. CONTRIBUTING AREA INCLUDES EAST 1/2 OF TIMBERLINE ROW SHEAR ENGINEERING CORPORATION AVERAGE END AREA METHOD FOR PROPOSED DETENTION POND ' PAGE 13 PROJECT :SUNSTONE TOWNHOMES PUD DATE: 05/10/96 PROD. NO:1516-01-96 BY MBO LOCATION:TIMBERLINR DRIVE PILE: SUNAVG CONSTANT: 64.5 = 1 SQ IN. FIRST EVEN CONTOUR 45 FRET INVERT 44.7 FEET TOP ELEV 49 FRET INCREMENT 1 POOT SCALE: 1" 50 FRET +rrrrr++ r•++rtrr rr•+rr++ rrrrr•++ +t+r rrr+ +:+rrr++ ♦+rrrrr+ •r+rtrr+ rrrrrr+e STAGE RLEV PLANI- AREA AREA VOLUME CUM. CUM. CUM. METER (Al) (A2) (V1) VOLUME VOLUME VOLUME £t ft READING aq in sq ft cf cf cy ac-ft rrrr+rrr r+r++rrr rrrtt+rr trrrr+rr ++rrrrrr +rrrrr++ •rrr+•++ +r+rrr++ r+rrr•rr 0.00 44.70 0 0.00 0 0 0 0 0.00 0.30 45.00 9 0.14 349 52 52 2 0.00 1.30 46.00 276.5 4.29 10717 5533 5585 207 0.13 2.30 47.00 554.5 8.60 21492 16105 21690 - 803 0.50 3.30 48.00 633.5 9.82 24554 23023 44713 1656 1.03 4.30 49.00 730 11.32 28295 26424 71138 2635 1.63 rr+r+err r+r+rr+r +rrrrr+r rr+rrrrr rrrt++rr rr+r+r++ rrr++tr+ rrrrrr+r rrrrr+rr STAGE BLEV PLANI- AREA AREA VOLUME CUM. CUM. CUM. METER (Al) (A2) (V1) VOLUME VOLUME VOLUME ft ft READING aq in aq ft cf cf cy ac-ft FORMULAE:A1= (PLANIMETER READING)/CONSTANT A2= (Al)-SCALS SQUARED VOLUME REQUIRED = 39204 CP = WATER SURFACE ELEVATION REQUIRED = SET W.S.BL. AT VOLUME REQUIRED = 4356 CF = WATER SURFACE ELEVATION REQUIRED = 0.9 AC -PT 100-YEAR STORM 47.76 FEET 48.57 PBBT IN ORDER TO MEET HYDRAULIC HYDRAULIC GRADIENT REQUIREMENTS FOR 42' RCP IN TIMBERLINE 0.1 AC -PT 2-YEAR STORM 45.78 PERT LOWEST PROPOSED TOP OF WALL ELEVATION = 53.11 FEET CONCLUDE:POND WILL BE ADEQUATE THE VOLUMES SHOWN ARE FOR THE PRIMARY PORTION OF THE POND IN TRACT A ADDITIONAL VOLUME IS AVAILABLE IN THE STORM SEWER AND TRACT B SHEAR ENGINEERING CORPORATION PAGE: 14 OUTLET STRUCTURE FOR SUNSTONE TOWNHOMHS PROTECT: SUNSTONE TOWNHOMES DATE: 05/10/96 PROJECT NO 1516-01-96 BY HBO PROJECT LOCATION :FORT COLLINS CARIBOU DRIVE AND TIMBERLINE ROAD FILE NAME: SUNOUT INPUT FOR OUTLET STRUCTURE LOWER ORIFICE DIAM. (ft) = 0.50 WHIR TYPE BROADCRESTED DETERMINE ORIFICE SIZE LOWER ORIFICE INV. (ft) = 44.70 WHIR LENGTH (ft) = 12.00 FOR MAJOR STORM LOWER ORIFICE COEF. (Cl) = 0.65 WHIR INVERT (ft) = 49.50 Q- CA(2gH)^0.5 UPPER ORIFICE DIAM.(ft) = 1.00 WHIR COEF. (Cw) = 2.60 A = Q/(C(2gH)-0.5 UPPER ORIFICE INV. (ft) = 46.00 TOP OF BERM (ft) = 49.00 H (ft) 3.87 UPPER ORIFICE COEF. (Cu) = 0.65 INIT. DELTA (ft) = 0.30 C = 0.65 2 YR. RELEASE PATH (cfe) = 6.00 DELTA HEAD (ft) = 0.50 Q (cfe)= 9.00 10 YR RELEASE RATE (cfe) = na 10 YR WSHL REQUIRED (ft) = na A (of) = 0.88 100 YR RELEASE RATE (cfe)= 9.00 100 YR WSHL REQUIRED (ft)= 48.57 R (£t) = 0.528 OUTLET PIPE DIAM. (ft) = 1.25 OVER FLOW NA D (ft) = 1.057 PIPE SLOPE (t) = 1.00 WHIR TYPE TOP OF BERM /BROADCRBSTED MANNINGS n = 0.013 WHIR LENGTH (ft) = 180.00 DESIGN CONCLUSION: WHIR INVERT (ft) = 49.00 A 12" DIAM ORIFICE IS REQUIRED. WHIR CORP. (CWO) = 2.60 FOR A SINGLE STAGE RISER AND 100-YHA *rrr+*rr t•trr*tr *t*t*r*r *OUTPUT* r++rr+r• r**r**** ttt***rr ***rr**r INSTEAD - - -PIPS AREA (SF) = 1.23 WETTED PERIMETER = 3.93 FEET DESIGN A DUAL ORIFICE TO CONTROL 2 HYD. RAD (PT) = 0.313 FEET R^2/3 = 0.4603 - AND 10 YEAR STORMS ALSO. OUTLET PIPE CAPACITY 6.46 CPS LOWER ORIFICE AREA (A) = 0.1964 SQUARE FEET UPPER ORIFICE AREA (A) = 0.7854 SQUARE FEET rrrtrr* *r*r*r+ r*t*rr* *OUTPUT* rrrtrr* r*tttrt rrr♦rrr r*t*ttt ***rrtr *rrrtrr **rrr*r rtt+rrr OVERFLOW SPILLWAY HEAD HEAD HEAD SUB HEAD ELEV. OVER LOWER OVER UPPER OVER WHIR TOTAL OVER WHIR TOTAL ELEV. LOWER ORIFICE UPPER ORIFICE WHIR FLOW FLOW WHIR FLOW FLOW ORIFICE FLOW ORIFICE FLOW ft ft cfe ft cfe ft cfe cfo ft cfe cfe ft 44.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.70 45.00 0.30 0.56 0.00 0.00 0.00 0.00 0.56 0.00 0.00 0.56 45.00 45.50 0.80 0.92 0.00 0.00 0.00 0.00 0.92 0.00 0.00 0.92 45.50 46.00 1.30 1.17 0.00 0.00 0.00 0.00 1.17 0.00 0.00 1.17 46.00 46.50 1.80 1.37 0.50 2.90 0.00 0.00 4.27 0.00 0.00 4.27 46.50 47.00 2.30 1.55 1.00 4.10 0.00 0.00 5.65 0.00 0.00 5.65 47.00 47.50 2.80 1.71 1.50 5.02 0.00 0.00 6.73 0.00 0.00 6.73 47.50 48.00 3.30 1.86 2.00 5.79 0.00 0.00 7.65 0.00 0.00 7.65 48.00 48.50 3.80 2.00 2.50 6.48 0.00 0.00 8.47 0.00 0.00 8.47 48.50 49.00 4.30 2.12 3.00 7.10 0.50 11.03 20.25 0.00 0.00 20.25 49.00 48.56 3.86 2.01 2.56 6.55 0.06 0.46 9.03 0.00 0.00 9.03 48.56 48.57 3.87 2.01 2.57 6.57 0.07 0.58 9.16 0.00 0.00 9.16 48.57 47.15 2.45 1.60 1.15 4.39 0.00 0.00 6.00 0.00 0.00 6.00 47.15 49.10 4.40 2.15 3.10 7.21 0.60 14.50 23.86 0.10 14.80 38.66 49.10 *trrt*rr r+rrrtrr *r*rr*rr *+rrr+*+ rrrtrr*+ *t*t**tr t*rr***+ rrr+***+ **rr*rrr r*rrr*tr rr**rt** t*rrr**r ORIFICE EQUATION: CA(2gH)^1/2 WEIR FLOW EQTN. : CwLH^3/2 PAGE 15 SHEAR ENGINEERING CORPORATION CHANNEL CAPACITY PROJECT NAME: SUNSTONE TOWNHOMRS DATE: 05/10/96 PROJECT NO. : 1516-01-96 BY : MHO SWALB DESCRIPTION:ALL GRASSED SWALES DEPTHS MAY VARY FILE: SUNCHAN SECTION B-B CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRIANGULAR CHANNEL LINING: GRASS Da Db Dc Sc n W I (ft) (ft) (f t) (t) ----- (ft) _--_ (ft) ---- __-- 4.00 ___- 4.00 __-- 1.00 _-_- 2.00 0.032 3.00 0.25 0.25 = LEFT BANK SLOPE 0.25 = RIGHT BANK SLOPE DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (a.f.) (ft) (S.f.) (ft) (A/P) _______ _______ (cfs) _______ (ft/sec) ------- _______ 1.00 _______ 11.00 _______ 7.00 _______ 11.25 0.73 0.14 33.51 4.79 0.75 9.00 4.50 9.16 0.62 0.14 18.37 4.08 0.50 7.00 2.50 7.12 0.50 0.14 8.17 3.27 0.25 5.00 1.00 5.06 0.34 0.14 2.23 2.23 +r+x+xxwrrr+++x+rrrrr++rw+rrr+rrr+r+r+++xr+rr+++x++++r++++x+rrr+r+wxxxrr DEPTH WIDTH AREA PERIM R 2/3 Sc 1/2 Q V (S.f.) (ft) (S.f.) (ft) (A/P) (cfs) (ft/Sec) CONCLUDE: CHANNEL IS ADEQUATE FOR ANTICIPATED FLOWS PAGE 15A. SHEAR ENGINEERING CORPORATION PEAK FLOWS TO NORTHERNN END OF SWALBS ALONG TIMBERLINE PROJECT NAME: SUNSTONE TOWNHOMBS DATE: 05/10/96 PROJECT NO. : 1516-01-96 FILE: SUNCHAN SECTION B-B BY : MEO EAST SIDE AREA = 0.15 ACRES C = 0.37 C100 = 0.46 Tc = 5.00 MINUTES I2 = 3.29 IPH I10 = 5.64 IPH I100 = 9.30 IPH Q2 = 0.18 CPS Q10 = 0.31 CPS Q100 = 0.65 CPS WEST SIDE 0.09 0.53 0.66 5.00 ASSUMED BECAUSE AREA IS SO SMALL 3.29 5.64 9.30 0.16 0.27 0.55 CONCLUDE:SWALES ARE. ADEQUATE to a 2, s � J v J Q o J to 'rCti, J A � 10 E �. c M .r %r 7' v � ., 3 i u 4 N rr r J O _ N' � 1 10 c LT Q- o Vl W vI1 N N I Q I � �• i I� � �^ f� I VI CL ---__,P..... to Pi O ff I , I =` r 1 1 1 JI O` " d � 111 n N — d II p u J V ., � o o 1� IN ,y <, 1n .i r ` N J 11 <r e Q ¢ I C Q No Text APPENDIX II Erosion Control Calculations Erosion Control Sequencing schedule Erosion Control security deposit estimates RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: S ,,)w T or\) G T o w e'Jt�0aay,-$ p U O STANDARD FORM A COMPLETED BY: PU DATE: 31$ tib DEVELOPED SUBBAgIN ERODIBILITY ZONE Asb (ac) Lsb (ft) Ssb Lb (feet) Sb (%) PS M 7i� rts 6,'( ��� 110 • �.�� CIS ►��� %00. )Oo MARCH 1991 9-14 DESIGN CRITERIA pC,\)-q' 11z EFFECTIVENESS CALCULATIONS PROJECT: SU1�15�oYJ� MOWNHomcs PUn STANDARD FORM B COMPLETED BY: M EO DATE: Erosion Control C-Factor P-Factor Method Value Value Comment $,\kl•CNcc, � U U,i Fk fib.\c i.d r`JZfr` 25 Gr<vp\ �.\fiats 1 •U ° 'b 1, p.0 I,U s S�t\ pals 1.0 s., tee ZA ON 1.0 X 6, i c. MAJOR PS SUB AREA BASIN (t) BASIN (Ac). CALCULATIONS Pc 0•� x I.� = O .`� 0-sx0,v3%A, 100:: 64,0 13a-�•a.�r�' � 0.43�c. ' 0•US .c, �O.o1x0,`.;3)4- C0,93x 1,0) } (0.05X0.01)]'I,01 n�� ag x [o.��.a•a) r I,c,(vA+�-ro �3)J�► ul —6�6SS OFF - 66,�5 Tc o 14 las��./�ervL: 0.4o C= LO.o�x�,0,usto.4u� {- 1v�aa��JlO.i� 5(�Z-7) wI.�b��4s cI` r MARCH 1991 8-15 DESIGN CRITERIA P.,Sz LiZ EFFECTIVENESS CALCULATIONS PROJECT: SU6�15iUb�1E -(dW1J�}�F� STANDARD FORM B COMPLETED BY: Pr�a DATE: 3) ISC 5 Erosion Control C-Factor P-Factor Method Value Value Comment SSEG MAJOR PS SUB AREA BASIN (t) BASIN (Ac) CALCULATIONS 1 fl,X ,73 ' 59 r<. C= UI (OAS) }' .Sg l ea,� crY 1.�3 Sege/` c- 10.15(1u) a 0,50�7 G.iC,a) "I-1111a 0.355 `1 o .6z, 0,1 Asd�1,� ION r C &XII .3L(,G1���0.6Z+ 3iZ3 8,`z MARCH 1991 8-15 DESIGN CRITERIA 0 rnD1000 C; 44toUi1n Un wwwCIO w 0 a% 0 aA ON 0 0 0 0 0 0 o .4v44inu ti txitntn ;r wwwww00wwww 0 w01rn0%ONo1D1(TA rno1o+o1000 . . uil . . . . . . o .4.4.4v.41;.4vdvadnUn (n Coco OD OD wwwwwww O r w w w 01 01 G1 01 01 01 01 01 01 01 01 01 01 01 01 . . . . . . . . . . . . . . N w w w w w w w w w w w w w w w w w w w w 0 oM�r m wwtD1Drr-rrrrrrrnrrwwwwww . . . . . . . . . . . . . . . . O o vd vd v��rvd d �r�d v�rv�rvd d Ord d d v�r p � 0000oDODOpopopoD00cD0oa000ooDowwwwwwwwwww o wNm-ITmi m 0 tD w w 0wr.nrrrnnnrrwww p O CID wwwwwww00C0w0D000DCOwwwwwwwwwww U 0 1DONM-it -RV lninlnlntD10%D1D1D1D1D1D1D1Drrnrrn . . . . . . . . . . . . . . 7. C0000pC0C0C0CpwwOpCO WWMMwwwwwwwwwww H 1-a O TmT-1NMM tr w rvinLntn tntnlnu)mtn%otD%o%otD10r a O r M M d d V d V d d <r V d V d d V d d d V d sr v d V V U coaoDowwwwwwww000Dwc000cowwwwwwwww H O 010wOr1rINNMMMM V d V V C a d y 1f11nlntn1D10 x O W MMM It -W vv V'd'sr-0v V'd'd -'d. -r V * --t v-W d d w co co t000CIO w w w w 00 w DD w w w w w w w w w w w w w w 4.a —0 111NLL1rw0100rl rl riNNNNNMMMMM V'd' V'd' V' to dA . . . . . . . . . . . . . . . . . . . . . Cow "in Nen MM fn M d'v V'vv V'vv V qr qrvvv sr V'a le V' CD C0 00 co co co co co w w CO w CO w CO CO w 00 CO CO w w w CO w w W Cn W 140 041n,acori(nvinU)%D%Drnn00cow00cowrn0%o100000 a' a V' N N M M M M M M M M r4 M PI M M M M M M M r;4;-; 44 [-1 0 C7 w w w w w w CO w w w 00 00 00 CO OD CD CO w w CO CO CO CO w w w 0 1D In CO O rI N M V' -cr Ln Ln to 1D W W 1D 10 n n r r CO w CO o1 (Y1 H. . . . . . . . . . . . . W V' rIN N cnm e1 M M m Cl) M P9 m M M m M M M M M M M M M NI OD 00 00 00 00 00 C0 w 00 00 C0 00 CO 00 00 CO w w w w w w CO w w w W U In r1 rl In r CO O O rl N N M M M d' V d' d' d' to In to tD %D 10 n n M r♦NNNNMf'1MMMMMN1 Mf4MMMMMMMMMMM w w w w CO w CO CO w w w w .w w CO CO w w CO w CO w w w w w O O M N%D w C1 o rl N N M M M v V'V'd' V d In In In Ln W 10%010 r74 . . . . . . . . . . . . . . . . . . . . . . . a, M O rl ri ri rl N N N NN N N N N N N N N N N N N N N NN W 00CD CID 0000OD00000000CDODCID wwwwwwwwwwwww a Ln LC) lnrnNm-WlnlDrrncoco0ornrnrnolalrn000000 a ............... a N C1 0 0 H rl H ri H rl H H H rl H4 4 ri ri rl rI N N N N N N .� r 00000D CO 00 OD C0 Co w 0000 CO 0D 00 w w w w w w w w CO Cow w Z O d'InOM 1Ow CO 4. . . . .r1r-IrINNNNMMMMMM N wC11 0000000H HrI r-IH Hr HHr-1 rI r-IHr-IHH H n r w w w w w w 0 0 w w w w w w w w w w w w w w w In ODNODH V rnOD010 00rIHHHrlNNNMMMMM . . . . . . . . . . . . . . . . . . . . . . . . . . rl 10ww01 C10101010101000000000000000 rrrr nrrrrrCOODCOCOCO wwwwwww 0 M1D 0n. Vro10r4 NMM. V VLnnn1n1D1D1DWrr1D%DW r r r CO C0 CO www w C. w w w. w w w. w w w w w w rrrnnrnnrrnrnrnrrrnrrrrnrr Ln 010d'Wr00wrnr1010%01nd'srMMNN01%Dd r♦0110 . . . . . . . . . . . . . . O ONNNNNNNNNNNNNNNNNNNririr 1;88 rnrrnrrrrrrnrrrrrrrrrrrrrn 3Ex+•� 00000000000000000000000000 O U H 00000000000000000000000000 azw rINM V'lnlDrw010rINM V'lnlDrw010tf101nOtf10 H H rl H rl rl rl H H H N N M M V' V In a CONST SEQ M-client/MK-Twain/Erosion/CONSTSEQ CONSTRUCTION SEQUENCE Project No: 1516-01-96 Date: 2/26/96 Revised: 2/28/96 PROJECT: Sunstone Townhomes P.U.D. STANDARD FORM C SEQUENCE FOR 19 _ONLY COMPLETED BY:MEO/Shear Engineering Corp. Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. Year 196 97 Month J J A S O N D J F M A M OVERLOT GRADING *** WIND EROSION CONTROL * Soil Roughening *** Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin *** *** *** *** *** *** *** *** *** Inlet Filters' *** *** *** *** *** *** *** *** *** Straw Barriers *** *** *** *** *** *** *** *** *** Silt Fence Barriers *** *** *** *** *** *** *** *** *** Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving *** *** Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other STRUCTURES: INSTALLED BY: OWNER MAINTAINED BY: OWNER VEGETATION/MULCHING CONTRACTOR: OWNER DATE PREPARED:3/18/96 DATE SUBMITTED: 3118196 APPROVED BY THE CITY OF FORT COLLINS ON: i March 18, 1996 Project No: 1516-01-96 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Erosion Control Cost Estimate for Sunstone Townhomes P.U.D. Fort Collins, Colorado Dear Basil, Attached is the'erosion control security deposit estimate for Sunstone Townhomes P.U.D. ESTIMATE 1: 900 LF of Silt Fence ® $ 3.00 per LF $ 2,700.00 2 - Gravel Inlet Filter Oa $75.00 each $ 150.00 12 - Haybale barriers Q 75.00 each 900.00 TOTAL ESTIMATED COST: $ 3,750.00 x 1.50 $ 5,625.00 ESTIMATE 2: re -vegetate the disturbed area of 5.95 acres at $650.00 per acre $3,867.50 TOTAL ESTIMATED COST: $ 3,867.50 z 1.50 $ 59801.25 In no instance.shall the amount of the security be less than $1,000.00. Therefore, the total required erosion control security deposit for Sunstone Townhomes P.U.D. will be $5,800.00. If you have any questions, please call at 226-5334. cc: Aletha Langham-Godwin; Mark Twain Homes Inc. Dave Stringer, City of Fort Collins 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.0311 March 18, 1996 Project No: 1516-01-96 Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS: Sunstone Townhomes P.U.D.; Fort Collins, Colorado A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C:' SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. i The cost to install the proposed erosion control measures is approximately $3,750.00. Refer to the cost estimate attached in Appendix I. 1.5 times the cost to install the erosion control measures is $ 5,625.00. ii. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 5.95 acres), we estimate that the cost to re - vegetate the disturbed area will be $3,867.50 ($650.00 per acre x 5.95 acres). 1.5 titnes the cost to re -vegetate the disturbed area is $5,801.25...The $650.00 per acre for re -seeding sites of between 1 and 10 acres was quoted to us by the City of Fort Collins Stormwater Utility personnel. CONCLUSION: The erosion control security deposit amount required for Sunstone Town Homes P.U.D. will be $5,800.00. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282.0311 APPENDIX III Backup Diagrams and Exhibits Table 3-3; Rational Method Runoff Coefficients for Composite Analysis Table 3-4; Rational Method Frequency Adjustment Factors Figure 3-2; Estimate of Average Flow Velocity for Use with the Rational Formula Figure 3-1; City of Ft. Collins Rainfall Intensity Duration Curve Fig 5-2 Nomograph for Capacity of Curb Opening Inlets in Sumps Table 4 Circular Pipe Flow Capacity for Mannings 'n' = 0.012 Table 5 Circular Pipe Flow Capacity for Mannings 'n' = 0.013 R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District —areas containing low density multiple family units or any other use in the R-L District with a minimum lot area of 6,000 square feet for one -family or two-family dwellings and•9,000 square feet for multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District — designates areas planned as unit developments to provide business services while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B Highway Business District — designates an area of automobile -orientated busi- nesses with a minimum lot area equal to 1/2 of the total floor area of the building. B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet. I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. I-G General Industrial District — designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt................................................................................................ 0.95 95 Concrete............................................................................................. 0. Gravel................................................................................................. 0.50 Roofs.......................................................................................................... 0.95 Lawns, Sandy Soil: Flat<2%............................................................................................. 0.15 Average2 to 7%.................................................................................. 0. Steep>7%.......................................................................................... 0.20 Lawns, Heavy Soil: Flat<2%............................................................................................. 0.20 Average2 to 7%...................................................... ..........................:. 0.25 Steep>7%......... :................................................................................ 0.35 3-4 DESIGN CRITERIA 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc=1.87 1.1—CC DV2 S Where Tc = Time of Concentration, minutes S = Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet C, = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration; depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storm Return Period Frequency Factor (years) C, 2 to 10 1.00 11 to25 1.10. 26 to 50 1.20 51 to 100 1.25 Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods, such as SWMM, STORM, and HEC-1 are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = C,CIA Where Q = Flow Quantity, cfs A =Total Area of Basin, acres C, = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) I = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such ana!ysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA 4.2.2.1 Street Encroachment The encroachment of gutter flow on the street for the initial storm runoff shall not ex- ceed the specifications set forth in Table 4-1. A storm drainage system shall begin where the encroachment reaches the limits found in this table. Table 4-1 INITIAL STORM — STREET RUNOFF ENCROACHMENT Street classification Maximum Encroachment Local (includes places, alleys, No curb -topping. t Flow may spread to marginal access) crown of street Collector No curb -topping. t Flow spread must leave at least one lane width free of water Major Arterial No curb -topping. t Flow spread must leave at least one-half (1 /2) of roadway width free of water in each direction t Where no curbing exists, encroachment shall not extend over property lines. 4.2.2.2Theoretical Capacity Once the allowable pavement encroachment has been established, theoretical gutter. capacity shall be computed using the following revised Manning's equation for flow in shallow triangular channels: O = 0.56 Z S"2 y8`s n Where O=Theoretical Gutter Capacity, cfs y = Depth of Flow at Face of Gutter, feet n = Roughness Coefficient S =Channel Slope, feet/feet Z = Reciprocal of Cross Slope, feet/feet A nomograph based on the previous equation has been developed and is included in Figure 4-1. The graph is applicable for all gutter configurations. An 'n" value of 0.016 shall be used for all calculations involving street runoff. 4.2.2.3 Allowable Gutter Flow In order to calculate the actual flow rate allowable, the theoretical capacity shall be multiplied by a reduction factor. These factors are determined by the curve in Figure 4-2 lowable Gutter flow calculated atedthuslyris theo ovalue toFactrs for lbe used n the drainage allowable e system calculations. MAY 1984 4-2 DESIGN CRITERIA 4.2.3 Major Storms The determination of the allowable street flow due to the major storm shall be based on the following criteria: Theoretical capacity based on allowable depth and inundated area. Reduced allowable flow due to velocity conditions. 4.2.3.1 Street Encroachment Table 4-2 sets forth the allowable street inundation for the major storm runoff. Table 4-2 MAJOR STORM — STREET RUNOFF ENCROACHMENT ee.eef Pl aaalf,�afinn Local (includes places, alleys, marginal access & collector) Arterial and Major Arterial 4.2.3.2Theoritical Capacity Maximum Encroachment Residential dwellings, puouc, commercial, and industrial buildings shall not be inundated at the ground line unless buildings are flood proofed. The depth of water over the crown shall not exceed 6 inches. Residential dwellings, public, commercial and industrial buildings shall not be inundated at the ground line unless buildings are flood proofed. Depth of water at the street crown shall not exceed 6 inches to allow operation of emergency vehicles. The depth of water over the gutter flowline shall not exceed 18 inches. In some cases, the 18 inch depth over the gutter flowline is more restrictive than the 6 inch depth over the street crown. For these conditions, the most restrictive of the two criteria shall govern. Manning's equation shall be used to calculate the theoretical runoff -carrying capac- ity based on the allowable street inundation. The equation will be as follows: Q =1.486 Rm S+112 A Where Q = Capacity, cfs n = Roughness Coefficient R = Hydraulic Radius, A/P S = Slope, feet/feet A = Area, feet Appropriate "n" values can be found in Table 4-3. Any values not listed should be located in the Geological Survey Water Supply Paper, 1849. Table 4-3 MANNING'S ROUGHNESS COEFFICIENTS FOR STREET SURFACES Surface Roughness Coefficient Gutter& Street...................................................................... 0.016 DryRubble........................................................................... 0.035 Mowed Kentucky Bluegrass ................................................. 0.035 Rough Stony Field w/Weeds................................................ 0.040 Sidewalk & Driveway............................................................ 0.016 MAY 1984 1 4-5 DESIGN CRITERIA DRAINAGE CRITERIA MANUAL RUNOFF 30 t- 2 0 z w U OC w °' 10 z w a O 5 Cn w ir 3 O U 2 w H 1 5 .1 1pffm I�Firm' r � MEN POEM ■■■■� AMEN ■■■OWINE • I ® 1, r ► �mmmommo� W I �EC::::CI� MFAMIN .2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREOUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE 8 FLOOD CONTROL DISTRICT No Text 1.0 12 5 10 4 .9 11 8 3 10 6 8 ►- u_ 2 o 9 00 4/� .7 8 W 3 z 1.5 a. L- cn 2 O EX°mom eyPr Z1.0 L i. ..---- - =-1.0 z 9 -.. - - ., .5 �6=-_-�rrrpCe_P°rt a_ J z -.8-------- a .8 5.5 a O F- w .6 0 .7 w 5 U U. .4 z w '4 0 .6 z 4.5 z o 3 w a. 5 L " o O 4 v _ .2 F- o F- - z z o w '3 3.5 w w �- 4 a a o: O O I w a a. 0 .08 ►~- .25 3 0 F 10 .06 0 .3 _ = O z co co U- - w w Cr .04 .25 = 2.5 = °- .03 a .2 r a .02 0 a = 2 a ►- v a 0 01 .15 15 l_ a O 0 Y0 c 1.5 --- - - -- .10 °=2h Figure 5-2 NOMOGRPAH FOR CAPACITY OF CURB OPENING INLETS IN SUMPS, DEPRESSION DEPTH 2" Adapted from Bureau of Public Roads Nomograph MAY 1984 5-10 DESIGN CRITERIA Q F O .y to mot' CD M N IT 00CO) T OOO.44 IA to Cl) O tD t- .••t M to Ot O N O O O O N O .qW-tLn NtOcM00OD N OOOOr+ 9r N CO) 1O cq t-.N•1N .•t M M 0M CO CD tO OD tO to 0 to N.+O M(D� CD CD 0 M l'0) M IA to in N .L•+NIm IrOOD t- "14N .+ 00C; C; MIA OI �O 4-i O O N O.� O W 0 0 E- to 0 2°. O lC') O tO Cl) O O N O O O lA O O N O O N IA to a'0 r+t'Mt- �•-i N V' N tD M t- Iti C; C e4 CD t- 00 0 d' 0MOD CD .-�N Q' CO q*' 0000.E CD CD -crt- o o t« rnon ONMtOM U 0 0 0 0 M tAC tD CID tiNNm O M to .. O O O 0 " 00 to -trOtD CD <t CD M N CD N a' QI 000 O O t-- N r+ O :r IONNCDt- O r• N M t- 00000 M N t-N M -RTm Ot-00 0 0 .•• N tO O O O O O O tO tb N a CO CD ri M .•� O O *+ +•+ et' O O O O O .•-� to -' tD M Nd tb MM O O 0N O O O O O e}'MMtDIA r+ N IA OD 00 O O O O •-+ O O O O O t-N co m. IA CD M t-m o) 0 t- 0 0 ON Cl) tot'9 r+ M a'IO to co tO NN CD M 00 N eY t- t CD 0 M OD NMt- 0 M O N MCD co M .O to t- m .+N d' O 00 d' V N " N ql' tD M CO) 0 [-.+ .r . • Cl) Ln N 14 t- N N 0 .+ N ILA pop ILO -' to M M IO 0) O O O d 0 00 N toO M 00 a) N C'M tD ONto ODt-CC tOA t- 0 .r M OD m N L A to er t- M M t- to OD 0 q'coOD to c0 eY N M lA OI d IA ti N 00 Cf) 0) OD tO O N CD w d V' .-� N M IO .+ N 0 n v .•� N M N N m O O C4 14 O .- N cn t- to O N ti N 00 t- .� M.4 tO "4 00000N 0)r+N lO Tr 0 r+M co N t- M CD O t- � to to 0 v M 00 tD OtDm M t- O r+ Omto to It N MtAt- Rr -e co tO OD eF N M IA r+M t- t0 d' •0' .� N M co m 00 OCD 0 m .-t t0 .-� t- It .r "N .-t to to O -W N . y .a N Oet'O IA M .•+ t- 0 W to t0 tO O N N M 0 a' O t- tO d' Ot -W co .4 -'t0O .•4 00 OD at M t- tO co LO Vim'uj 0) T N 0 O 'a tt'I .- a O 'cr to OD . 00 0) .O tD I- htnO M atO tO a' to tO -t (V Cl) -IT N M eY t- O -r tOO OI co N N cnW N N M ti v 0 M .. .+ N MtO M M N OONt- MtDN 0 t-• OOOm to OIN .- M "4 to In tD 0 00 O C N M M to t- m to d'coN P N N d tD 0 .-I .timt- tAMtO to et' N M W. m -W t- t- .+ et N m v t- O M OD Rr N M M 0 N CD .t--t N .� .4 O IO N .••i N N O et' lO "t N IC') tD M 0) Mo .-� - t N t O tD ptO Rw O a7 ef' (M M .+ 0 ti O UP) . et N CD m et M El- to 00 0n V to n r. -e N at o; M cN � co Nmr m ...t 1- et' 0 to N r+ N IM .� M to co I[) coNN NC%l co co r07 et cr d .A. A CO) W N N N .+ r �+ ►+ � W 00N OOJ Al-•00 MNO 00 to CA AW SD rr Q1A W Nr►+ r htJ ,a0 Q1r0 NCn0 of W N NCRCA) r0 Q w O to C tD of 00 cn A CA ►+ • . ll�J a O W ACD 0 O C tDrJ ;a OfO1 tO 000�Cn000 A►+ 00JO NCAA 0 W 1-6 ArrWA "1 ffi]]s OA cocnA W Nr 000 0 000000 0 fCD W N 1'.00 W NNA tD Cn W JJAN r- O rw W 000 OAtO r0►+ rcOtOJN N SOA 00000 NN ACOO W W N r00 0 N r O O O R� rto tO r OCn W �a JN-1 �aN O OpWf NO rJ w W On�ia to cOtha �aa tO OCn -1CA) 0 cn 000000 �! CAPOA ►N- Wto -4 cn W Nr O W O 11 A00 OcOJ rO W OrM 00 J O(n r N N to J to CA r N .a W co N J tO 0 00 O r al A N r r r O 00 00 A ++A CD OD W OJA Nr0 O 00 CTl N r 0 0 Q1 N to 00 W 0 r O J CO A 0Cn 00 A .P to WP CR . N W O w tD w tO Co O r A tT1 O 0 X z7 W M r r 0 0 0 00 N 00 Ul to A 00 W to tr W N �+ O \ Cnto JWNrO W ANCA) W WN 00rW WOr CR CJ, 0CA to JN 00 Jr Nr0 CR NACO) N Cn k a P. A N N r r 0 0 0 0 0 ... OJ -4 to of rJ ANr O r r 00 Cj ;a \ r6 zo ONA CA Cn CR. Ul CD ACA) tT CA cn •+ Moo 00 W JN CA AJACnN O r cn W N rr r0000 tOWCD CnWr CIO Cr Av . . . 0ANr6 J Cn 00 Cn J►+ UlO CD A00 to a) -4 JO Ar M m N to NO co co JtA tD Ul -4 cn 'LJ !D rr Q1A W Nrr r0000 AO a1r0 NCRO CA W N A . W O 00 JOtD tA006 A W •+ 0O-9bCD00 M OC�p Q1 CR ONJ N4Ln0 to to CD 00 r Cn 000 0C* fA fD �.. r J A W N r r 0 000 ON Ul00m NJJ NtoA CCmmNO000oOOttoo Nam• O1 Cn Jmw Ww" N00 CA rJOCA) to Cn0 O 00U1CA) Nrr JN r+OJ -4 JAN r0000 rf9 cn w . . fD M N w J A 00 tD W of A O A N r Ul C* toN toAW PO, r+J raf00 00toNwr 0� r r 00 CA A N N r tow 00A0 cOOw OOAN l•+0000 r O W • NN W . . tO tO tO 666 Cn JCO afJANr J 64 W al 7 W al 0 CA 0 O A al 0 N CA O � �0000w ►W+N� wCR W r0000N. Cl N . . N •r•w W 000 D A rOr J wr cc AA WW-4 O r NCR c0AA00 0cncn 0CRW 0-0000 :4 tQ A OO CD 0 6 NaIA tD 00 to Wr rr of cn -4 vtnr rW al I., to CROA CR WN r cn WN r Alb" toc0O OCRW AJA N►+000 rCN to cn CnAA Ato to JN JAN NO ►+dW wWw AJO 0CA-4w0 O A co N r J CA W N r ►••OW -Oral Wrr00 .0P00 OtNOv !:Q G • cn r tV A N to 00 pIm NN tDvtO ArN W -4 W NJtOOC10 O r a l A N r r O J A N r ►+Oal 00cntO tnNr00 NO NCO 00 W 0 4 ;o 6 00 600 A 6 600 A AtO W 1.6 JalOD w W 0 0rACA0 O a 11 O 0 r W 9�+ rd CA APPENDIX IV Portions of the Master Drainage Report for Timberline Farm P.U.D. 3 MASTER DRAINAGE REPORT FOR TIMBERLINE FARM P.U.D Project No. 248.8 September 1989 Revised November 1989 Prepared For: _ G T Land, Inc. 3555 Stanford Road Fort Collins, CO 80521 Prepared By: Engineering Professionals, Inc. 2000 Vermont Drive Fort Collins, CO 80525 MASTER DRAINAGE REPORT FOR TIMBERLINE FARM P.U.D. 1.0 Location Timberline Farm consists of the west half of the southwest quarter of Section 32, T7N, R68W. The site is bounded by Timberline Road on the west, Harmony Road on the south, Caribou Road on the north and Harmony Village Mobile Home Court on the east. The property is located in reach 2 of the Fox Meadows Drainage Basin. 2.0 Existing Conditions The 80 acre site has historically been used for agricultural purposes. Presently a portion of the tract is being farmed with the remainder uncultivated. Several irrigation laterals cross the property. The property is currently made up of three subbasins - the north and east 2/3 of the site draining toward the north; the west central 10 acres, draining to the west into the "Chandler sump"; and the south 1 /3 draining toward the east. The historical drainage basins and flows for the site are identified on the Master Drainage Plan (back pocket). The property has slopes of 0.5% to 3% with the north portion being the steepest. There is no offsite drainage onto the site, nor is there any designated floodplain located within the site. A swale has been constructed from the northeast corner of the site to the east along the south side of Sunstone Village Filing No. 1 which directs flows to the Harmony Village Mobile Home Court detention pond. This Swale was specifically constructed to handle existing 2 year event runoff from Timberline Farm. 3.0 Proposed Drainage The 80 acre site will be divided into 5 subbasins which will result in a minor modification of the existing Fox Meadows Basin Master Plan. This modification is discussed in detail further in this report. Basin 1 Basin 1 consists of approximately 30 acres located at the south end of the site including parcels E, G, and a portion of Phase B. This basin will drain to the east into a detention pond to be located in the northeast corner of parcel E. The detention pond has been preliminary sized at 3.8 acre-feet. Flows released from the detention pond will be directed along the east property in a pipe and overflow swale into detention pond 2. 1Basini-21 Consisting of approximately 29 acres, basin 2 will drain to the northeast into detention pond 2, sized at 5.0 acre feet. Flows released from this pond, at a maximum rate of 12 cfs, will be directed into the swale along the south end of Sunstone Filing No. 1 into the Harmony Village Mobile Home Park detention pond and ultimately into the Sunstone regional detention pond. Runoff released from detention pond 2 (from basin 1 and 2) will be substantially in accordance with the current Fox Meadows Basin Drainage Master Plan. Basin 3 Basin 3 consists of approximately 8.2 acres located within the area denoted as Phase C on the Master Plan. This basin currently drains to the Chandler sump (see Figure 2). Runoff from this basin will be directed to the west where it will be detained prior to being discharged into the 42' storm sewer being constructed along the east side of Timberline Road. This pipe will convey runoff to the open channel located along the north side of the Sunstone development and into the Sunstone regional detention pond. The maximum release rate and detention pond volume for this basin are 9 cfs and 0.9 acre feet respectively. 'basin `4 Basin 4, consisting of 8.0 acres, is located at the northwest corner of the site and includes most of Phase D and a small portion of Phase A. This basin will drain to the northwest and will be released to the 42" pipe along the west side of the site and to the Sunstone detention pond in the same manner as basin 3. The maximum release rate and detention pond volume for this basin are 9 cfs and 0.9 acre feet respectively. �: Basin 5 Consisting of approximately only 4.7 acres, basin 5 includes the area immediately south of Caribou Drive which will drain directly onto this street. Runoff from this basin will be directed to the Sunstone regional detention pond by Caribou Drive. Street capacities for both the 2 and 100 year storm have been calculated to be adequate with this additional flow (refer to appendix). 4.0 Fox Meadows Basin Master Plan Modifications Drainage master planning for the Fox Meadows Basin was first completed in 1981 with the Fox Meadows Basin Drainage Master Plan. This plan was later revised as presented in Updated Hydrology for the Fox Meadows Basin Master Plan, dated October 21, 1987, both prepared by Resource Consultants, Inc.. The current plan assumes that all runoff from the 80 acre site will be directed to the north east corner of the site, detained, and released at a maximum rate of 11 cfs, well below the 2 year historic runoff rate for the site. Because of the large detention pond volumes and extensive earthwork required to make the site conform to the existing Master Plan, alternatives were investigated. Numerous drainage schemes for the site were evaluated utilizing the SWMM model for the basin. Presented herein is a modification to the Fox Meadows Basin Master Plan which utilizes the capacity of existing and planned facilities while providing a more workable drainage scheme for the site. The 2 and 100 year developed conditions SWMM runs for this modification are located in the appendix. The site is divided into two basins in the current Master Plan, 13 and 14, as identified on the 1987 Update SWMM network schematic (figure 1). For the Timberline Farms Drainage Master Plan the site has been divided into five basins as discussed above. These basins are delineated on the Master Drainage Plan (back pocket) and -` the revised SWMM network schematic (figure 2). Three detention ponds have been added to the model corresponding to ponds 1, 3, and 4 on the Timberline Farms Master Plan. Pond 2 corresponds to the existing pond 306 in the SWMM model. Storage volume versus outflow curves were input into the model for ponds 1 and 2 based on current planning. Storage/discharge curves for ponds 3 and 4 were estimated from a conceptual pond layout (see grading plans in back pocket) 'Should; model' shouI&Vb&t,r"' sed. to. verify `aheir adequacy, ��TFie�folloiiviiig able relates the Timberline Farms Master Plan basins and detention ponds to the subareas and reservoirs incorporated into the revised Fox Meadows Basin SWMM Model. K Timberline Farms Master Plan Basin Designation 1 .2z 3 5 Timberline Farms Master Plan Detention Pond Designation 1 2 3 �, i. Revised Fox Meadows SWMM Subarea designation 14 ,:13a 39 included with 17 Revised Fox Meadows SWMM reservoir designation 310 306 312 A3-,IU The change in 100 year peak flows downstream of the Timberline Farm resulting from the modifications are identified in the following table: Drainage Element 40 --Pipe @ Timberline Road Swale North of Sunstone Sunstone Detention Pond Channel east of Fox Meadows Flow west of CR #9 Peak flow (cfs) SWMM Element No. Master Plan Revised Master Plan - 47 cfs Acf 113 68 cfs 81 cfs 210 29.0 ac-ft 29.1 ac-ft 143+302 86 cfs 93 cfs 116 100 cfs 109 cfs 4 4.1 Impacts of Fox Meadows Basin Master Plan Modifications The capacity of drainage facilities downstream of the site, both existing and proposed, were evaluated to confirm that the their capacities would not be exceeded during the major storm. The following discussion addresses each component of the downstream drainage system which is impacted by the modifications to the basin master plan. 42" Pipe Along Timberline Road The purpose of the 42" pipe along Timberline is to provide an outlet for the Chandler Sump detention pond (SWMM element 108). kg,?jder'- ,assess�the�ffectl, additional flow would have on this ,p!pe�thheshydraulic grade line for the pipe with 56 cfs flow was determined (calculations are in the appendix). 11je calculated hydraulic grade line is below the existing ground level up to the Chandler sumit,fhiq hydraulic grade line at the Chandler sump is of elevation 4951.0 which should allow for construction of this detention facility without excessive berming. Channel North of Sunstone The channel north of Sunstone conveys flows from the 42" pipe along Timberline Road to the Sunstone Village detention pond. The pond has recently been constructed and a review of the design drawings reveals the capacity of the swale to be in excess of 100 cfs. The culvert crossing at Caribou Road will create a maximum headwater of 4934.9 with the Sunstone pond at peak stage. The final grading plan of the area upstream of this culvert shows the adjacent houses to have a floor elevation more than 1 foot above the culvert headwater. The section of this channel between Timberline Road and Sunstone Village has yet to be constructed. This section of channel should be designed for a 100 year flow of 82 cfs as opposed to the current master plan flow of 68 cfs. Sunstone Detention Pond The "as built" volume calculations for this detention facility prepared by Landmark Engineering dated May 26, 1988, indicate that the existing volume of the pond is 29.4 acre feet. This volume is developed at a high water elevation of 4934.5. This calculated volume is adequate to hold the necessary volume of 29.1 acre feet. 7 � '-7•Vu •ate �_ • •d FBI% i r �w i rI 16 I CHANDLER SUMP C\ Q I ,T TIMBERLINE ' 1 FARM 2, 15 HARMONY- RC R68W FIGURE 2 — REVISED FOX MEADOWS BASIN mnczTGCJ AI nNi QIaiMM Cf-UCMn-r T (- a , GiZ ,r� l,� 0 4Z p lvo S�s-�� . CAS. e�.� �4 .� ro d. s 44 U� r + 4. 1� ti G Call"?-tirctt� To �c�C3o� �37 I ci- s1� �C' S,1N3�/NG I � r �� vtn �..�. w.0 W. t/�tC�\�W�_..2,'. �?'Jr_JQ�'i'-•J ;:'C'. •. A W O u' C. 6��Ca_ � ,e-Z cL � a �L.� , �1 1 4--0 CC ::•_ � . vvl- . l N J.G- l o t t e S JUpcl 5 X — . 4-a 1?oSIX(`DoI.C�� p 4.4(S) 5.9(S) 24.5(S) 3.5(S) 3.1($) 28.6(5) .0( ) 7.3(S) .JtS) -,.it I 3. 0. 0. ' .6(S) .O(S) O(S) 7 45. B. 13. 45. 11. 18. 84. 46. 16. 14. 115. ` 4.4(S) 5.9(S) 24.3(S) 3.5(S) 3.4(S) 28.6(S) .O( 1 7.2(S) .4(S) 2.4( ) 3. 0. 0. .6(S) .0(S) .O(S) 7 50. 8. 12. 45. 11. 18. 84. 46. 16. 14. 114. 4.4(S) 5.9(S) 24.1(S) 3.4(S) 3.4(5) 28.5(S) .0( ) 7.1(S) .4(S) 2.4( ) 3. 0. 0. .6(S) .0(S) 0(S) 7 5.5. 8. 12. 45. 10. 18. 83. 45. 16. 14. 114. 4.3(S) 5.8(S) 23.9(S) 3.4(S) 3.3(S) 28.5(S) .0( ) 7.00) .3(S) 2.4( ) 3. 0. 0. .6(S) .0(S) O(S) 8 0. B. 12. 45. 10. 18. 83. 45. 16. 14. 114. 4.3(S) 5.8(S) 23.7(S) 3.3(S) 3.3(S) 28.4(S) .0( 1 6.9(S) .2(S) 2.4( ) S. 0. 0. ;l .5(S) .O(S) O(S) BASIN H ... FOX MEADOWS BASIN ..100 YEAR FULLY DEVELOPED CONDITIONS ... UPDATED AUGUST 1999 FOR ANTICIPATED CONDITIONS ttt PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS ttt CONVEYANCE PEAK STAGE STORAGE TIME ELEMENT (CFS) (FT) (AC -FT) (HR/MIN) 50873. .8 0 40. 120 117. .8 0 40. 309 31. .0 1.2 1 10. 3 160. .9 0 40. 310 12. .0 3.8 1 45. 21 118. .9 0 40. 6 21. 1.9 0 50. 5 155. 3.0 0 50. 4 386. 3.5 0 45. 118 120. 2.3 0 40. 122 176. 3.0 0 40. 11 9. .0 4.7 5 10. 7 212. .0 22.8 1 30. 306 12. .0 5.0 3 15. 303 176. (DIRECT'FLOW) 0 40. .•:) 101 260. 3.1 0 40. 10 102. 3.0 12.5 2 45. 307 72. 1.6 0 40. _) 305 58. (DIRECT FLOW) 0 40. 304 118. (DIRECT FLOW) 0 40. 1 112 9. .0 9 1 0. 311 9. .0 •9 1 0. 117 17 n 9'5 9 In_ SUBAREA GUTTER WIDTH AREA PERCENT SLOPE RESISTANCE FACTOR SURFACE STORAG=(iN) INFILTRATION RATE(IN/HR) GAGE NUMBER OR MANHOLE (FT) (AC) IMPERY. (FT/FT) IMPERY. PERM. IMPERY. PERM. MAXIMUM MINIMUM DECAY RATE NO 1 3 . 500. 10.0 40.0 .0130 .016 .250 .100 .300 .51 .50 .00180 1 1 ! 2 2 2000. 23.0 .0 .0150 .016 .250 .100 .300 .51 .50 .00180 I 3 3 5600. 58.5 41.0 .0070 .016 .250 .100 .300 .51 .50 .00180 1 4 4 6000. 80.1 46.0 .0050 .016 .250 .100 .300 .51 .50 .00180 1 7 5 5 4800. 64.3 69.0 .0030 .016 .250 .100 .300 .51 .50 .00IBO 1 6 9 1800. 12.8 80.0 .0070 .016 .250 .100 .300 .51 .50 .00180 1 7 108 2700. 55.8 40.0 .0110 .016 .250 .100 .300 .51 .50 .00180 1 8 6 1400. 14.5 .0 .0120 .016 .250 .100 .300 .51 .50 .00180 1 9 11 1700. 90.0 2.0 .0070 .016 .250 .100 .300 .51 .50 .00180 1 ':. 10 101 2200. 78.1 48.0 .0090 .016 .250 .100 .300 .51 .50 .00180 1 ' 11 14 5000. 80.2 42.0 .0040 .016 .250 .100 .300 .51 .50 .00180 1 i 12 200 2600. 41.9 40.0 .0020 .016 .250 .100 .300 .51 .50 .00180 1 13 118 2750. 27.2 50.0 .0150 .016 .250 .100 .300 .51 .50 .00180 1 ' 14 120 1080. 30.5 60.0 .0060 .016 .250 .100 .300 .51 .50 .00180 1 15 21 2800. 38.6 40.0 .0070 .016 .250 .100 .300 .51 .50 .00180 1 16 122, 1400. 26.3 40.0 .0080 .016 .250 .100 .300 .51 .50 .00180 1 17 119 2000. 38.1 40.0 .0060 .016 .250 .100 .300 .51 .50 .00180 1 18 124 4800. 103.0 40.0 .0080 .016 .250 .100 .300 .51 .50 .00180 1 19 44 2500. 2J 50.0 .0070 .016 .250 .100 .300 .51 .50 .00180 1 21 125 3200. 66.3 40.0 .0040 .016 .250 .100 .300 .51 .50 .00180 1 - 23 126. 4000. 61.3 40.0 .0070 .016 .250 .100 .300 .51 .50 .00180 1 24 127 2600. 10.6 40.0 .0030 .016 .250 .100 .300 .51 .50 .00180 1 25 46 1500. 17.5 40.0 .0800 .016 .250 .100 .300 .51 .50 .00180 1 ' 26 47 1800. 9.4 20.0 .0100 .016 .250 .100 .300 .51 .50 .00180 1 27 204 600. 14.5 40.0 .0400 .016 .250 .100 .300 .51 .50 .00IBO 1 28 204 1900. 37.1 40.0 .0600 .016 .250 .100 .300 .51 .50 .00180 l 29 131 2900. 37.9 40.0 .0060 .016 .250 .100 .300 .51 .50 .00180 1 ' 30 50 2000. 20.1 40.0 .1100 .016 .250 .100 .300 .51 .50 .00180 1 ti 31 129 5000. B1.9 40.0 .0080 .016 .250 .100 .300 .51 .50 .00180 1 j 32 36 3200. 40.0 40.0 .0750 .016 .250 .100 .300 .51 .50 .00180 1 33 38 3000. 30.4 70.0 .0050 .016 .250 .100 .300 .51 .50 .00180 1 34 41 5600. 95.6 50.0 .0050 .016 .250 .100 .300 .51 .50 .00180 1 35 51 1200: 11.1 20.0 .0800 .016 .250 .100 .300 .51 .50 .00180 1 36 54 400. 8.! 57.0 .0200 .016 .250 .100 .300 .51 .50 .00180 1 37 307 1000. 21.0 40.0 .0090 .016 .250 .100 .300 .51 .50 .00180 1 38 308 700. 35.0 40.0 .0070 .0!6 .250 .!00 .300 .51 50 .00190 1 OTOTAL NUMBER OF SUBCATCHMENTS, 38 OTOTAL TRIBUTARY AREA (ACRES), 1495.30 1 BASIN.H ... FOX MEADOWS BASIN ..100 YEAR FULLY DEVELOPED CONDITIONS ... UPDATED AUGUST 1987 FOR ANTICIPATED CONDITIONS 10 CONTINUITY CHECK FOR SUBCATCHMEMT ROUTING IN UDSWM2-PC MODEL I22 i WATERSHED AREA (ACRES) 1475.300 i i TOTAL RAINFALL (INCHES) 2.890 TOTAL INFILTRATION (INCHES) .551 TOTAL WATERSHED OUTFLOW (INCHES) 2.072 TOTAL SURFACE STORAGE AT END OF STROM (INCHES) .267 ERROR IN CONTINUITY. PERCENTAGE OF RAINFALL .001 .115) 3.2(3) O(S) I(S) 0(S) 2.4(S) .0( l O(S) O(S) .8t 1 0. 0. 0. i 11S1 .015) .0(S) i 7 45. 0. 0. 8. 1. 1. 16. 0. 0. 0. 16. ` .1(S) 3.2(S) .0(S) .115) .0(S) 2.4(S) .0( 1 .O(S) .O(S) .8( ) 0. 0. 0. .I(S) .06) .O(S) 7 50. 0. 0. 5. 1. 1. 16. 0. 0. 0. lb. .I(S) 3.2(S) .0(S) .Its) .O(S) 2.3(S) .Ot ) .o(S) .O(S) .8( ) 0. 0. 0. .I(S) .O(S) .O(S) 7 55. 0. 0. 8. i. 1. 16. 0. 0. 0. lb. .1(S1 3.2(S) .O(S) .1(S) .0(S) 2.3(S) .0( ) ..O(S) .0(51 .8( ) 0. 0. 0. .1t8) .O(S) .O(S) 8 0. 0. 0. 5. 1. 1. 16. 0. 0. 0. lb. .1tS) 3.21S) .O(S) O(S) .o(S) 2.2(S) .0( 1 .O(S) .0(S) .8( ) 0. 0. 0. . .. .1 .1(S) .0(S) O(S) BASIN H ... FOX MEADOWS BASIN .. 2 YEAR FULLY DEVELOPED CONDITIONS ... UPDATED OCIOBER 1987 FOR ANTICIPATE➢ CONDITIONS 222 PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS itt CONVEYANCE PEAK STAGE STORAGE TIME ELEMENT (CFS) (FT) (AC -FT) (HRlMIN) 308 14. .4 0 50. 120 19. .4 0 40. 309 14. .0 0 50. 3 34. .5 0 45. 310 3. .0 .b 1 35. 21 24. .5 0 40. b 0. .2 1 30. 5 30. 1.3 0 55. 4 82. 2.8 0 50. 118 20. 1.8 0 40. 122 35. 2.4 0 45. 11 0. .0 .1 2 15. 7 lb. .0 7.5 2 25. 306 5. .0 .6 1 55. -' 303 35. (DIRECT FLOW) 0 45. 101 55. 2.5 0 40. 10 16. 1.3 2 25. j 307 305 17. 0. .9 (DIRECT FLOW) 0 40. 0 0. 304 312 35. b. (DIRECT FLOW) 0 45. i 311 b. .0 SUBAREA BUTTER WIDTH NUMBER OR MANHOLE (FT) 1 3 500. ' 2 2 2000. 3 3 5600. 4 4 6000. 5 5 4800. b 9 1800. 7 108 2700. �) 8 6 1400. - 9 11 1700. 10 101 2200. 11 14 5000. '. 12 200 2600. 13 118 2750. 14 120 1080. IS 21 2800. 16 122 1400. 17 119 2000. i 18 124 4800. 19 44 2500. 21 125 3200. 23 126 4000. 24 127 2600. 25 46 1500. 26 47 1800. 27 204 600. 1 28 204 1900. 29 131 2800. j 30 50 2000. ' 31 128 5000. j 32 36 3200. 33 38 3000. 34 41 5600. 35 51 1200. 36 54 400. 37 307 1000. AREA (AC) 10.0 23.0 5B.5 80.1 64.3 12.8 55.8 14.5 90.0 79.1 GO.2 41.9 27.2 30.5 38.6 26.3 38.1 103.0 2.4 66.3 61.3 10.6 17.5 9.4 14.5 37.1 37.9 20.1 97.9 40.0 30.4 95.6 11.1 0.1 21.0 PERCENT SLOPE IMPERV. (FT/FT) 40.0 .0130 .0 .0150 41.0 .0070 46.0 .6050 69.0 .0030 20.0 .0070 40.0 .0110 .0 .0120 2.0 .0070 48.0 .0090 42.0 .0040 40.0 .0020 40.0 .0150 40.0 .0060 40.0 .0070 40.0 .0090 40.0 .0060 40.0 .0080 50.0 .0070 40.0 .0040 40.0 .0070 40.0 .0030 40.0 .0800 20.0 .0100 40.0 ;0400 40.0 .0600 40.0 .0060 40.0 .1100 40.0 .0080 40.0 .0750 70.0 .0050 50:0 .0050 20.0 .0800 37.0 .0200 40.0 .0080 RESISTANCE FACTOR SURFACE STORAEE(IN) IMPERV. PERV. IMPERV. PERV. .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .230 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 _ .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .150 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 .016 .250 .100 .300 INFILTRATION RATE(IN/HR) 6AGE MAXIMUM MINIMUM DECAY RATE ND 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 l 3.00 .50 .00190 1 3.00 .50 .00180 1 3.00 .30 .00180 1 3.00 .50 .00160 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00190 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00120 1 5.00 .50 .00180 1 3.00 .50 .00190 1 3.00 .50 .00!80 1 3.00 .50 .00!60 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 3.00 .50 .00180 1 38 309 700. 35.0 40.0 .0070 .016 .250 .100 .300 3.00 .50 .00180 .1 39 UL2 900. 8.0 60.0 .0200 .016 .250 .100 .300 3.00 .50 .00180 1 40 1311 900. 8.2 60.0 .0200 .016 .250 .100 .300 5.00 .50 .00190 1 )TOTAL NUMBER OF SUBCATCHMENTS, 38 OTOTAL TRIBUTARY AREA (ACRES), 1495.30 i BASIH.H ... FOX MEADOWS BASIN .. 2 YEAR FULLY DEVELOPED CONDITIONS ... UPDATED OCTOBER 1997 FOR ANTICIPATED CONDITIONS 1 tti CONTINUITY CHECK FOR SUBCATCHMEMT ROUTING IN UDSWM2-PC•MODEL Itt i WATERSHED AREA (ACRES) TOTAL RAINFALL (INCHES) TOTAL INFILTRATION (INCHES) TOTAL WATERSHED OUTFLOW (INCHES) TOTAL SURFACE STORAGE AT END OF STROM (INCHES) ERROR IN CONTINUITY, PERCENTAGE OF RAINFALL 1495.300 1.060 .483 .406 .171 .001 APPENDIX V Stuffer Envelope Timberline Farm P.U.D. Drainage Exhibit Master Grading Plan Master Drainage and Erosion Control Plan EIiewt AUJORDAUKA LOT Et9vA11ONE Y w.1 NOTE: Ama ALLOWARIJL of XGAT. ARRIVE E TO ROVm613 Raveraw CAE 9aBm M 16'IW{W 111E 1B W ORNpG AM 1R lM M m EYM 01 M RYYY p[RM}1N 10ND. \ 23 30 22 /l 2 �' UF'1 r " /� �. �'f ` f; 11 SINCE: 1i 1. zi t` Tz 12 12 14 .ice w,rmroNE.vRUOe a �, ham_ ta�� am aumma �P.u.O. n 10 � � � I YI � III `� r✓,/�� III \ \��a � 2 R,24 ICI YI ' rTIF III I� _ _ CRo 2 RTONEY CREEK DRIVE 9'fONET MEEK DROVE 1 �G 06 I L _ __ --- - ' - - - A� �iY � � 3 � fi FEE,E � + SIX .4 Y __ f(� ____ — _ __ _ _ ICA CIE Xer y� vvp::y= = a=-aa¢¢¢vvvao�aovva vvvq -_^maNXmli3lhOr- .N - 'IO®ERib� ROAD %_ _ �`Co0•wAwLLr_ 7 __ _ _ _ _ _-.__ _ -_.. ` - `EOGE or Sri are T a +yh Oat/ Y Jr ,a + xu el MAX neu i. mnN w+en AOIOf GpKI CY GI MMO TQFI BE` [ON CLEFE,411C r00 To Rs. C.44 INe r Cri ACE ON ' IMOi.rG.50 µ0P µM¢p.in 4:.M EI. 0 NY1 EYIST.3 Y SfN R pNMaCY EXIS IT .STORM SEWER/ NM°'�E�• rip1 � OUT STRU TURE P OFILE lice prtlx •r nNY: xIr.:o N.r.: it >-..T 0100 0+40 0+80 1+20 IL LOT 0 �- : wtxu —_Am T 05 3s orn c Joel W rJ-!.J_yl� ALAN VIEW It OCTEMION BASIN OOTtET G910CTOpE DETAIL } �\\City 1 RIYENN3 Data ImENCH 1996 Dram CAI oeN SHEAR ENGINEERING CORPORATION TITLE uwTew wwAYLIEw NEww i N N"ip1bn FIX row Pecker BWS MARK TWAIN HOMES INC. b36 S0. COLLEGE AVE, 1DIiE I2, FORT COWNS, LOLORA00 Easzs SUNSTONE TOWNHOMES P.U.D. Rn p Nor M. v...... p.... ii. A. w• MErnr,.n B.W.S. I I PHONE: (970) 238-3334 (130) 236-4451 FAX: (970) xEz-Oln 1 FORT COIr1.Iti5. COLORADO It 10 075 0.25 low i of Fort CGllina Colorado VIDJTY PLAN APPROVAL YTROVFI anamn or exmnmec wR CNF[XFO R' III �� u1ATr un aKcxEt w iaN..,a ux.. w,< utcXER n� Areas xn. ..ml J L._ _I_ _ J I L n°fW/LEl DRAINAGE �47°" f °' \ TRACT 1 Afar '7. `\NONE - ,32 °D LOTSf `OO� 9J D.U./AC `� n SE \ `` Of 1 I Ik Or 1 I I1�\�. I ti: Prow 'b o A `• �_ - `I �� PHASE J I I y , f.r .�,�-----�-- I IyyJyip, ----i I I hI Ii�/ PHASIE I I \ —� J �OTSk J'8 D.U./AC � 1 OF �I 1 I !� PARCEL \ � -- / i IFI .G. of Ale Fr V0OV DRAINAGE I -1- - - [ _-_ - �109 I TRACT 2 PARCEL 1.5 AC.t \ E' \ PARCEL -- I- % BUSINESS � SERVICES z Ac HARMONY RD. TIMBERLINE FARM MASTER DRAINAGE AND UTILITY PLAN 1� v1. AA— 6pfN0 nsnfra ,wnr ,v/r. Of - rafrwf w �n urr �.� ol4ukr 44ry pU4prr