Loading...
HomeMy WebLinkAboutDrainage Reports - 09/04/2013 (2)Plans C4',of`FL CON p ed Approved By NORTHERN i EN.GINEE.RING Drainage Letter Report I Date: March 26, 2013 ADDRESS: PHONE: 970.22L 158 200 S. College Ave. Suite 10 WEBSITE: fort Collins, CO80524 FAX:1970.221.4159 www.northernengineering.com Project: Northside Aztlan Community Center Project No. 207-008 Minor Amendment Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the Northside Aztlan Community Center Minor - Amendment. The site is located within Lot 1 of the Northside Aztlan Community Center. More specifically, the portion of land within Lot 1 located west of the existing Burlington Northern Railroad and Right-of-way. The tract of land currently acts as a regional detention facility for approximately 14.6 acres. The property is bounded by an.Express Lube and Center for Fine Art & Photography to the west, Burlington northern Railroad to the North and East and Willow Street to the South. Through discussion with the City, it was agreed upon that the area routed to the existing detention pond would be modeled. This Hydrologic modeling for the existing detention area was done using the computer program EPA SWMM 5. EPA SWMM 5 is a windows -based version of the Environmental Protection Agency's (EPA) Storm Water Management Model with a graphic user interface. As shown in the Overall SWMM Exhibit provided in the attachments, the existing detention area receives storm runoff from a larger area than simply the proposed parking lot addition. Approximately 14.96 acres extending from LaPorte Avenue to Cherry Street along the west side of College Avenue drain to the existing detention area. This area was identified in the study, "Drainage Study for the North College Avenue Improvements", by Felsburg Holt & Ullevig, dated May 9, 2003. In addition to this area, approximately 4.49 acres encompassing an area between Jefferson Street and the Burlington Northern Railroad Right of Way also drains to the existing detention area. The existing detention area drains to the Cache La Poudre River located just north of the proposed parking lot addition. There is a 9.5-foot diameter manhole with an open top and. custom grate which serves as the primary outlet for the existing detention area. The rim elevation of this manhole is at 4965.67, which allows a very large release rate from the existing detention area. The manhole is connected to a 48-inch storm line draining to the Cache La Poudre River. In addition to this manhole, there is an 18-inch storm line stubbed out of an upstream manhole just south of the 9.5-foot diameter manhole. This storm line currently serves to drain the existing low lying area of the detention area. The proposed plan shows a water quality plate -and headwall being added to the 18-inch line in order to create water quality capture JbRni1 ^nii fi;i .Bl f'� Y!?ic_JJi fi`HRIP,G ,.l hJrV "n-'1" volume. Thus, in the proposed condition, the 9.5-foot diameter manhole will serve as the primary detention outlet. The SWMM model created for this project incorporates the overall basins draining to thle existing detention area. Timing of hydrograph peaks within the existing storm line system are accounted for, resulting in the following results for the existing detention area. POND PEAK PEAK WATER TOTAL 100-YEAR 100-YEAR 100-YEAR QUALITY POND WATER SURFACE STORAGE DISCHARGE CAPTURE VOL. VOLUME ELEVATION (AC -FT) (CFS) (AC -FT) (AC -FT) (FT) Existing Detention Area 0.171 31.8 0.006 0.177 4966.30 Please see the attachments SWMM Exhibit, SWMM Schematic, pond rating curves, and SWMM model output. , The proposed redevelopment will include the construction of 44 parking spaced with associated landscape islands. The proposed parking area will encroach into the western property owned by Superior Lube, Inc. All stormwater from the site will be routed via overland flow and gutter flow and discharged into the existing pond at three curb cut locations. These discharge location have been individually sized and are shown within the attachments. To account for water quality, a drain time of 40 hours was used to establish a Water Quality Capture Volume (WQCV) of 0.006 ac-ft. This WQCV is established at an elevation of 4965.2 feet. A perforated orifice plate is designed to control this water quality volume. In maintaining the existing configuration of the detention pond, the current volume allowed before overtopping is 1.17 acre feet. On the chance that both inlets clog, the stormwater will over top the railroad to the east and enter into a swale that was designed within Northside Aztlan Center and into the same existing storm sewer. An Erosion and Sediment Control Plan (along with associated details) is included with the construction drawings. It should be noted that this Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those shown may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The plan addresses both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices (BMPs) from the UDFCD will be utilized. Among the measures expected are: gutter protection in the adjacent roadways and inlet protection at the existing and proposed storm drains. Vehicle tracking control pads, spill containment and clean-up procedures, and designated concrete washout areas shall also be provided by the Contractor. A ■V NORTHERN ENGINEERING Stormwater Management Plan and Stormwater Discharge Permit will be required prior to construction. The contractor should refer to current state requirements at time of construction. i I I The drainage design proposed with the Northside Aztlan Community Center Minor Amendment project complies with the City of Fort Collins' Stormwater Criteria Manual. The drainage design proposed complies with the City of Fort Collins' Master Drainage Plan.for the Foothills Drainage Basin. There is no FEMA 100-year regulatory floodplain within the site. The drainage plan and stormwater management measures proposed with this project are compliant with all applicable State and Federal regulations governing stormwater discharge. The drainage design proposed the Northside Aztlan Community Center Minor Amendment project will effectively limit any potential damage or erosion associated with its stormwater runoff by providing a water quality pond that will service the proposed parking area and existing facilities located west of the site. The proposed Northside Aztlan Community Center Minor Amendment will not have any impact on the Master Drainage Plan recommendations for the Cache La Poudre River Drainage Basin. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, r Nicholas W. Haws, PE. LEED Project Manager AP Cod Snowdon Project Engineer (D uc) E U � c d � E E E c° o U C (0 N V N 0 0 Z Z� W z 2 W Hz Cw Z W C V 2 N E N d p O O O O O O O O O O O O O O O Q EE 01mmmmmmm oo o,00eoeo c_ 0 U o c M „ A C) N ao N O II W h d � N p >` G C L u oo=cO000 O O O O O O o O O `m (n # T O .E 7 O V VS t V O ZU� oo \ J N u m T rz 0 O NIn O 41 Ln Ol In m N m V m In 00 In CO n 00 0L N o 0000000 OU m !_^ bi F OC O N '^ G N In 0) In 0) In 0) N 01 V Ol In 00 LO 00 n 00 2 w T _ 0000000 O WN N G 0 \ A U C1 U U o E > c_ W O N m O o O W n O N L n N O p y C N 0 O 0 O 0 O 0 O 0 O o O M O V 0 (� c 3 Q C v O O O O O O O O U. v T N 0 IUi L] 'O O O V cw N O O O O O O O O y> V 00000000 Qaa o0000000 Z 0 m Q a E y .m. o 0 o 0 0 0 0 o o p p d' O y 00000 OOOOO P, n cn Ol N l0 W u W O Q0 a O0 N O O O O O O O O O Cf' 0000000 O Z a E — a N r C v O LO t0000010 7C ?� C 01011n LO 0 LO O1 0 V LOa N m N m O V 000 000. 00 V n E ` O m 0 0 0 O 0— -+ N ai y O O O O O ILn 00 Q ix O O O O O O O O W ci 2 0 \ U a O) O ` 000Mn CD CDCc)N Cc) 0 l0 O M 0 0 C m O O O O O 000 W Qv o0000000 U H m O CL 0 m O M n O N M T ` Nv to 000-0� o u7 o 1f1 o LL7 m O N V V' 00 O o QQ o0000000 c.i E Q � W z v Oa (g Q Wto LO at 00, 000 o o 0 o W i o o o N o m Q Q w 0 E � o LL 00 e Q ^ C V N a �n (+) 00 00 M �f1 N NNN lO C\l N m y S u « m LL etc :�- 0 W ~ T v t u , Lp a i v N M N M V F a: O O A m tO q d d d W W W W 0 u�� N Q O¢ U (0 0: 0_ G N U o m �3p A c ¢ ii V) 7 O d m a `m c E m E U v r m EQ E E c_ U � m I T o E E o Q m `o c � w u w c oD o w w a N E o � Z CJ Li r� I C ~ Q QQQ¢¢ M1 c E z�zzzzzz .q i u ' N Q Q Q Q Q Q Q G> Z Z Z Z Z Z Z w y y a ¢ Q Q Q Q Q Q Z Z Z Z Z Z Z No L � y�J J Z O C O p W I O l Q Q Q Q ~ E 0 0 0 O Z Z Z '° tl .-i O r Q Q Z Q Z O ^ O y N N N.+Z 4 d o° o° o 0 0 0 j O i 4 ooNN� C7 0 G N o N N O� 0 Z Z Z lGgy n tl 2 b U C J S N Ot co Ql T J W 2 u O F O p E o 0 0 0 0.-'.-'.. 0 ni Q S o W y N N p 4 °' F ]� C_ W Il O ti M n N O E O O .+N NNM ° a o ° o ti .. Y w y c ~ 00 6 6 WQ y E I'll"ll _ o 0 0 0 o e e W w 2° q 't W _O 'n V OR M a N NONNN LL O O LL c t U 01 N Ol 01 J Z' N J O N O O O O O O 00V0-y O O 0 1010 0 ry (1 uo B o m ornrnmrnrn U ll 0 .+ 00000 W U ^1 e~ t C A Lj -. 0 In O m N m m m 'o s .+ Cl O mm Ot OO � c m U N I� O .. 00000 w w i CT d -IE O N N m L p. C� O O m C r` O O O O O O O cgV I (mow c Z ZZZZZZ `w E = N A w P 0 3 3 m E 3 0 0 W m o a a a w w w W G00 mMW 0 F 3 ° c II w u Fj L x I 00 f 2-0 N N N W >> 0 oa v 0 N 3 l0 lO tO V tO N O ° LL O O O- O m l, c d E co o w m m m n m m m - .2 O O O O O.� N en c O N 06 a cqI o N N N N N a N 00 P., m c C m 00 vo - - 0 0 0 0.. OIn lL Z U i. T r Ny m C Ili Ili In LO C � C C O j 01 m Ol 01 m 01 01 01 m 01 m a o M C ' _ Oi Ir m o rn 0; Oi A C u m V Zl •C o= n 0o n 0o n 0o n 00 n 00 n 00 n 00 C 00 00 00 N 00 00 00 W - N N N N N N N 0 O C O QO Y u K O O O 0CD 0 0 C 0 0 0 0 0 O -0 N N V R Y pKo p R O In m In M Ill 0) N 0) V 0) Ill 00 Ln 00 O a 0 m t) o 0 0 6 6 6 0 CA: 6jp$y U W o 6 00000 I a Op o° 0 •� �NODY {E N a J 2 W "Y �qY Yy m ?l ^e o F •E In ll') M In In In In � O Q N U LL U T C ° - a O In U7 In In Y•1 If'1 In 'y U m O oaD C In In In U) In In In c q N ~ .a. Q = I^ Yi O 0 LO 0 t0 0- V wNO O M I, cg 2 A O 000000 IOi O 5 C U A x U E c N M N M V <L 0_O_w w ww W ^ $ A m ° U Cl! m Y N C C c S d _ b0 E 1O Nm.�NMv ° N •� m a N N N O) m � o 'm o K LL C C V 0 w «- N C N E U -a 'c E =3Q E `o E c O U c m a N Q N N L r O z Z �z W � w Fz O" ZZ w o N to LO LO �T i0 N O m Ql (�J u o O O O O -� N L _ T•C O O O O o O o 6. 0 ~ E In LP ui Ln 4i L6 Ln r� L �• C O O O O O o 0 Q F E Ln Ln In Ln Ln Ln Ln '-I S0 0 0 0 0 0 0 0 0 0 0 0 O 0 G LP LD Ln (N V Ln LL-) 01 Ol 61 61 Ol W W 0 0 0 0 0 0 0 Q W N tD O a N O H L O O o o M h O Q A O O O O O O O Z a a a w w w w m to � n n n w a w a Q W m a_ 0 v 0 a 3/26/2013 Northern Engineering Services, Inc. 207-008 Broad -Crested Weir.xls By: CNS Northside Aztlan Community Center Minor Amendment p1 Curb Cut Project No. 207-008 Broad -Crested Weir: P1 Curb Cut Project: Northside Aztlan Community Center Minor Amendment Design: CNS Project # 207-008 Governing Equations: If the weir is long in the direction of flow so that the flow leaves the weir in essentially a horizontal direction, the weir is a broad - crested weir. Reference 1) "Hydraulic Engineering, Roberson, Cassidy & Chaudhry., John Wiley & Sons, 1995, pg 212)" Q= 0.385CiLV 2g H- • where Q is flow rate in CFS - where C is ratio of actual discharge to theoretical discharge. A value of C can be obtained from Figure 4-36 of Reference 1. " where L is the crest length of the weir (F7) " where H is the height of flow over the crest (F7) " where P is the vertical distance from weir crest to pondlchannel invert (F7) Broad -Crested Weir Coefficient (C) fir+ L V um S H } f BROAD -CRESTED Ow 0 0.2 o.a oa na t WEM HI(H+P) '-------._;----.___. Valid if 0.1<H/L<0.8 Input Parameters: Length (L)= 2.00 FT Crest Elevation = 4970,06 FT Upsteam Invert Elevation= 4970.06 FT Q10 = 1.2 CFS Q10, = 2.7 CFS Depth vs. Flow: Depth Above Elevation Flow CHECK Crest (ft) (ft) H/(H+P) C cfs H/L 0.00 4970.06 NA NA NA NA 0.10 4970.16 1.00 1.31 0.26 INVALID 0.20 4970.26 1.00 1.31 0.72 INVALID 0.30 4970.36 1.00 1.31 1.33 0.150 0.40 4970,46 1.00 1.31 2.05 0.200 0.48 4970.54 1.00 1.31 2.70 4-- Q100 0.240 0.50 4970.56 1.00 1.31 2.86 0.250 0.60 4970.66 1.00 1.31 3.76 0.300 0.70 4970.76 1.00 1.31 4.74 0.350 0.80 4970.86 1.00 1.31 5.79 0.400 0.90 4970.96 1.00 1.31 6.91 0.450 1.00 4971.06 1.00 1.31 8.10 0.500 Page 1 of 3 3/26/2013 Northern Engineering Services, Inc. 207-008 Broad -Crested Weir.xls By: CNS Northside Aztlan Community Center Minor Amendment p2 Curb Cut Project No. 207-008 Broad -Crested Weir: P2 Curb Cut Project: Northside Aztlan Community Center Minor Amendment Design: CNS Project # 207-008 Governing Equations: If the weir is long in the direction of flow so that the flow leaves the weir in essentially a horizontal direction, the weir is a broad - crested weir. Reference 1) "Hydraulic Engineering, Roberson, Cassidy 8 Chaudhry., John Wiley 8 Sons, 1995, pg 212)" Q= o.385 CL� 2g H V2 ' where Q is flow rate in CFS ` where C is ratio of actual discharge to theoretical discharge. A value of C can be obtained from Figure 4-36 of Reference 1. ' where L is the crest length of the weir (FT) ' where H is the height of flow over the crest (FT) ' where P is the vertical distance from weir crest to pondlchannel invert (FT) Broad -Crested Weir Coefficient (C) F L IT 09 ` H 0.a9 0 9.2 04 06 9.e , BROALL-CRESrED H/(H+P) ,.'-WEIR ----..- ---------- ----- Valid if 0.1 <H/L<0.8 Input Parameters: Length (L)= 2.00 FT Crest Elevation = 4970.06 FT Upsteam Invert Elevation= 4970.06 FT Q10 = 1.6 CFS Q100 = 3.7 CFS Depth vs. Flow: Depth Above Elevation Flow CHECK Crest (ft) (ft) H/(H+P) C cfs H/L 0.00 4970.06 NA NA NA NA 0.10 4970.16 1.00 1.31 0.26 INVALID 0.20 4970.26 1.00 1.31 0.72 INVALID 0.30 4970.36 1.00 1.31 1.33 0.150 0.40 4970.46 1.00 1.31 2.05 0.200 0.50 4970.56 1.00 1.31 2.86 0.250 0.59 4970.65 1.00 1.31 3.70 -4- Q1oo 0.297 0.60 4970.66 1.00 1.31 3.76 0.300 0.70 4970.76 1.00 1.31 4.74 0.350 0.80 4970.86 1.00 1.31 5.79 0.400 0.90 4970.96 1.00 1.31 6.91 0.450 1.00 4971.06 1.00 1.31 8.10 0.500 Page 2 of 3 3/26/2013 Northern Engineering Services, Inc. 207-008 Broad -Crested Weir.xls By: CNS Northside Aztlan Community Center Minor Amendment p3 Curb Cut Project No. 207-008 Broad -Crested Weir: P2 Curb Cut Project: Northside Aztlan Community Center Minor Amendment Design: CNS Project # 207-008 Governing Equations: If the weir is long in the direction of flow so that the flow leaves the weir in essentially a horizontal direction, the weir is a broad - crested weir. Reference 1) "Hydraulic Engineering, Roberson, Cassidy & Chaudhry., John Wiley & Sons, 1995, pg 212)" Q= 0,385 CL� 2g H 3/2 ' where Q is flow rate in CFS - where C is ratio of actual discharge to theoretical discharge. A value of C can be obtained from Figure 4-36 of Reference 1. ` where L is the crest length of the weir (FT) ' where H is the height of flow over the crest (FT) • where P is the vertical distance from weir crest to pondlchannel invert (FT) Broad -Crested Weir Coefficient (C) os U 09 N J _ ... P I BROAD -CRESTED �,, n2 04 os "1 t ffls' H/(H+P) ---.t.._i------ -------- -.--- ___�............. .___...... Valid if 0.1<H/L<0.8 Input Parameters: Length (L)= 2.00 FT Crest Elevation = 4970,06 FT Upsteam Invert Elevation= 4970.06 FT Ole = 3.2 CFS 0100 = 7.6 CFS Depth vs. Flow: Depth Above Elevation Flow CHECK Crest (ft) (ft) H/(H+P) C cfs H/L 0.00 4970.06 NA NA NA NA 0.10 4970.16 1.00 1.31 0.26 INVALID 0.20 4970.26 1.00 1.31 0.72 INVALID 0.30 4970.36 1.00 1.31 1.33 0.150 0.40 4970.46 1.00 1.31 2.05 0.200 0.50 4970.56 1.00 1.31 2.86 0.250 0.59 4970.65 1.00 1.31 3.70 0.297 0.60 4970.66 1.00 1.31 3.76 0.300 0.70 4970.76 1.00 1.31 4.74 0.350 0.80 4970.86 1.00 1.31 5.79 0.400 0.90 4970.96 1.00 1.31 6.91 0.450 0.96 4971.02 1.00 1.31 7.60 -- Q100 0.479 1.00 4971.06 1.00 1.31 8.10 0.500 Page 3 of 3 -- SWMM Appendix { Z l �w O> o LU j L� Q � W, o CD 0 m - = N o w U N N � Q Q Q O z ZZQ ® O N XWO-' W CDQ S — Q O m n O m z = u ... c Z J o w Q� �O L) U) U) LLJ > W LJ LLJ o rn O OIQ > - J W 1 44 o N09 O I W LL ( - Ld __ 0 c W m W uj- O U- ' ^ N v zw Z = m>Lf) LLJ ' W J-J Ll 0 g U V ZI— i' cc W S U ($ p O y N O 4 PROJECT OUTFALLS VIA - EXISTING STORM SYSTE TO CACHE LA POUDRE C16 IVER I I C15 J II C14 -GEND SWMM BASIN 1 OVERALL BASIN IDENTI C1 C ND I IN "DRAINAGE STUDY OR THE NORTH COLLEGE �jVE. ENTS, 8Y I P1 ' 11 LSBURG H J1 JUNCTI N UL EVIG, MAY 9, 2 I r� C 1 /C EH RRY ST. L A DETENTION Li I w ( sT IJ � SWM N 2 OVERALL B N MAPLE ST. O LJN EATED U IZING Y 1 U ( \ OF FOR OLLIN 2—FT \ AERIAL TOP AND z ))) VERIFIED BY F L INSPECTION v \ IS" r _ ��, ST LA PORT ST. NOR NORTHERN SWMM SCHEMATIC DRAWN BY: A.CVAR SHEET NO: ENGINEERING 200 South College Avenue. Su 10 HONE: 970.221.4158 FAX: 970.221.4158 SCALE: NTS ISSUED: 2/1/13 Fort Collins, Colorado 80524 www.northemenglnsering.eom SWMM RATING CURVE Existing Detention Area Project: 207-008 Date: 2.7.13 ( ( I By: ATC Required Water Quality Capture Volume: .006 ac-ft (M cu.ft.) of Water Quality Capture Volume Req'd I I I STAGE FT DEPTH FT SURFACE AREA OF CONTOUR SF STORAGE CF STORAGE AC -FT RELEASE CFS 4,963.40 0 0.15 0 0.000 0.00 4,964.00 0.60 10.56 2.13 0.000 0.00 4,965.20 1.80 688.11 289.91 0.007 0.00 4,966.00 2.60 6,131.24 2594.59 0.060 8.50 4,967.00 3.60 29,219.38 19688.73 0.452 66.70 Area Inlet Performance Curve: Manhole ID: Existing Detention Area Outlet (9.5' dia. manhole.with custom grate) Governing Equations: At low flow depths, the inlet will act like a weir governed by the following equation: • where P = 3.1416•Dia.of grate 1 5 • where H corresponds to the depth of water above the flowline IQ 3 • O P H At higher Flow depths, the inlet will act like an orifice governed by the following equation: 1_ O . 67 A Z gH ) 0.5 ' where A equals the open area of the inlet grate where H corresponds to the depth of water above the centroid of the cross -sectional area (A) I The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown. However, what is known, is that the stage -discharge curves of the weir equation and the orifice equation will cross at a certain Flow depth. The two curves can be found below: t Weir Flow t—Orifice Flow If H > 1.792 (Afl, then the grate operates like an orifice; otherwise it operates like a weir. Input Parameters: Type of Grate: PERFORATED MANHOLE COVER Diameter of Grate (ft): 9.5 Open Area of Grate (ftZ): 56.70 Flowline Elevation (ft): 4965.670 Reduction Factor: 50% Depth vs. Flow: Shallow Orifice Actual Elevation Weir Flow Flow Flow Depth Above Inlet (ft) (ft) (cfs) (cfs) (cfs) 0.00 4965.67 0.00 0.00 0.00 0.33 4966.00 8.49 87.52 8.49 0.83 4966.50 33.85 138.81 33.85 1.33 4967.00 68.67 175.71 68.67 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- ++++++++++++xxxxxxxxxxx+++++++x+++++xxxxxxx+++++++++RR+++ NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ++++++++++++++++ Analysis Options Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ APR-22-2011 00:00:00 Ending Date .............. APR-22-2011 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec WARNING 08: elevation drop exceeds length for Conduit 5 WARNING 08: elevation drop exceeds length for Conduit 9 WARNING 02: maximum depth increased for Node 6 WARNING 02: maximum -depth increased for Node 8 ************************** Volume Depth Runoff Quantity Continuity +RxRRRRRR++Y++++++++hRRRRR acre-feet inches Total Precipitation ...... 5.947 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 0.089 0.055 Surface Runoff ........... 5.837 3.601 Final Surface Storage .... 0.059 0.036 Continuity Error (8) ..... -0.627 ************************** Volume Volume Flow Routing Continuity ++++++++++RRRRR+++++++x+++ acre-feet 10^6 gal Dry Weather Inflow ....... --------- 0.000 --------- 0.000 Wet Weather Inflow ....... 5.837 1.902 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 4.829 1.573 Internal Outflow ......... 0.993 0.323 Storage Losses ........... 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.010 0.003 Continuity Error (o) ..... 0.106 Highest Flow Instability Indexes SWMM 5 Page 1 Link 10 (2) Link 9 (1) Link 16 (1) i Routing Time Step Summary i) Minimum Time Step 30.00 sec Average Time Step 30.00 sec Maximum Time Step 30.00 sec Percent in Steady State 0.00 Average Iterations per Step 1.53 Subcatchment Runoff Summary --------------------------------- Total Total Total ------------------------------- Total Total Total Peak - Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS --------------------- 1 3.67 --------------------------------------------------------------------- 0.00 0.00 0.05 3.60 1.46 147.59 0.982 2 3.67 0.00 0.00 .0.05 3.60 0.44 44.30 0.982 Node Depth Summary -------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min ------------------------ 4 JUNCTION --------------------------------- 0.45 1.74 60.49 0 00:34 7 JUNCTION 0.43 1.65 65.85 0 00:33 9 JUNCTION 0.51 2.01 64.41 0 00:33 10 JUNCTION 0.51 2.01 63.12 0 00:34 11 JUNCTION 0.41 1.89 52.06 0 00:46 5 OUTFALL 0.41 1.89 51.23 0 00:40 6 DIVIDER 0.32 1.15 66.64 0 00:22 8 DIVIDER 0.30 1.56 66.56 0 00:32 3 STORAGE 1.78 3.00 12.00 0 00:47 ******************* Node Inflow Summary ******************* Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node ------------------------------------------------------------------------------------- Type CFS CFS days hr:min 10^6 gal 10^6 gal 4 JUNCTION 0.00 73.78 0 00:46 0.000 1.575 7 JUNCTION 0.00 42.05 0 00:33 0.000 1.247 9 JUNCTION 0.00 42.05 0 00:33 0.000 1.247 10 JUNCTION 0.00 42.03 0 00:34 0.000 1.246 11 JUNCTION 0.00 73.78 0 00:46 0.000 1.574 5 OUTFALL 0.00 73.78 0 00:40 0.000 1.573 6 DIVIDER 147.59 147.59 0 00:40 1.463 1.463 8 DIVIDER 44.30 44.30 0 00:40 0.439 0.439 3 STORAGE 0.00 149.89 0 00:40 0.000 0.656 ++++++++++++++++++++++ Node Surcharge Summary SWMM 5 Page 2 No nodes were surcharged. Node Flooding Summary Flooding refers to all water that overflows a node, whether it ponds or not Total Maximum Maximum Time of Max Flood Ponded Hours Rate Occurrence Volume Volume Node Flooded CFS - days hr:min 10^6 gal 1000 ft3 ----------------------------------------- 3 0.21 113.73 0 00:40 ------------- 0.323 0.000 Storage Volume Summary *****«««*««x##x###++++ --------------------------------------------------------------------- Average Avg E&I Maximum Max Time of Max Maximum Volume Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss 1000 ft3 Full days hr:min CFS ------------------------------------------------ 3 0.848 11 0 --------------------------------- 7.450 100 0 00:35 31.78 Outfall Loading Summary ----------------------------------------------------------- FlowAvg. MaxTotal Freq. Flow Flow Volume Outfall Node Pont. CFS CFS 10^6 gal 5 97.64 9.96 73.78 1.573 --- -------------- -------------- System 97.64 9.96 .73.78 1.573 Link Flow Summary Link 5 9 10 11 12 13 14 15 16 2 Type CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT DUMMY Conduit Surcharge Summary «*****************##+++++ Maximum Time of Max IFlowl Occurrence CFS days hr:min -------------------- 123.61 0 00:40 26.27 0 00:40 24.05 0 00:23 18.05 0 00:33 42.05 0 00:33 42.03 0 00:34 42.02 0 00:34 73.78 0 0 0 : 4 6 73.78 0 00:40 31.78 0 0 0 : 4 7 ------------------------ Maximum Max/ Max/ Velocl Full Full ft/sec ------------------------ Flow Depth >50 00 0.00 0.04 >50.00 0.00 0.02 8.25 0.94 0.77 6.87 0.96 0.78 10.53 0.59 0.55 8.39 0.79 0.67 9.91 0.64 0.58 15.64 0.34 0.40 12.63 0.45 0.47 SWMM 5 Page 3 --------- Hours Full -------- Conduit Both Ends Upstream Dnstream ---------------------------------------------------- 10 0.01 ,0.01 0.01 Analysis begun on: Thu Feb 07 15:29:24 2013 Analysis ended on: Thu Feb 07 15:29:24 2013 Total elapsed time: < 1 sec Hours Hours Above Full Capacity Normal Flow Limited 1.18 0.01 SWMM 5 Page 4 Water Quality Appendix Pond ATC a: 2.1.13 IONS :QUIRED STORAGE & OUTLET WORKS: BASIN AREA = 0.190 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <--CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.006 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = 1.800 <-- INPUT from stage -storage table AREA REQUIRED PER ROW, a (in2) = 0.027 <-- CALCULATED from Figure ED13-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/4 <-- INPUT from Figure 5 n = 5.000 <-- INPUT from Figure 5 t (in) = 0.500 <-- INPUT from Figure 5 number of rows = 1.000 <-- CALCULATED from WQ Depth and row spacing DRAWING FILENAME: D:\ProJects\207-008\Dwg\Omg\207-008—DRNG.dwg LAYOUT NAME: C4.00 DATE: Mor.28, 2013 — 6:36om CAD OPERATOR: cody UST OF %REFS [207-007—XEUTIL] [207-007�Exst] [207-007. Site] [207-007�Topo] [207—OO8-,xExst Off —Site] [207-008—xPgrod] [207-008�Site] [207-008�Topo Off —Site] [Newnan—x8order] COLLEGE AVENUE (HWY 14) / • a p fir. a v CIO ' m _0 m = z a. -uOm I� / / •.a ,... fD n m II /I /I I II II II II II I /A 50.003NRR' ESMT./ / / STORu MANHOLE / RIN - 4967.61 / , INV. NE - 4961.11 (36- RCP) INV. SE. 4961'11((162'RCPADS) / STO RIY 4965,57 INV. NE � 4956.75 (W RCP) IHV. 9W - e95R61 (36 RCP) / / / / / / LOT 1 / NORTHSIDEAZTLAN "I 1 111 �\ COMMUNITY CENTER 1 I 1 II I \ 1 I I 1 1 I \ I I I I I I \ 1 III I I \ I I - - VOLUME 489.9/ SO. FT. I I I � II I I I I I I \I ELEVATION 4965.2 I I I 1 I I I I I I I I II I I i I I I I I 1 I 1 1 ( III I \\\ I I I II \\ III III \ \\ III II \ / l/ / /,. I I 1 1 \ / I \r I GRAPHIC SCALE e NORTH 30 0 50 60 90 Feel „ IN FEET ) 1 eN - 30 ft. LEGEND PROPERTY BOUNDARY PROPOSED BASIN UNES — — — — — — EXISTING STOMM SEWER LINE W/ MH TeeNESSEE@ PROPOSED UNDERDRAIN UO EXISTING INLET GRATE ® O PROPOSED CONTOUR 93— EXISTING CONTOUR - - - -5013- - - - PROPOSED VERDCAL CURB k GUTTER PROPOSED OVERLAND ROW OIRFCTMI w� PROPOSED BASIN ONNEAiICN B1 PROPOSED MINOR RUNOFF COFFIdENT PROPOSED O MAJOR RUNOFF CFFICIENT PROPOSED BASIN ACREAGE PROPOSED DESIGN PUNT R NOTES: THE SIZE, TYPE AND LOCATION CF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE 'MIEN SHOWN ON THESE ORAVANGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORN. BEFORE COMMENCING NEW CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTIUTIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES BENCHMARK 1-00: LOCATED ON A CATCH BASIN AT THE SOUTHEAST CORNER OF THE INTERSECTION OF MNE DRIVE AND COLLEGE AVENUE. ELEVATION - 4965,57 (NGYO 29 UNADJ STED) 5-00, LOCATED ON THE TOP OF CURB AT THE SIGNAL POE BASE AT ME NORTHWEST CORNER OF UNOEN STREET AND JEFFERSON STREET. ELEVATION . 4974 B] (NOW 29 UNADJUSTED) FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION cAu uTnNrr NO O R ADON CFNTEB OF caoRADo AKn. Cell b61orsyou 61g. e,Mr.c aW N•9 rass Nunes. City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: Lily ng nccr CHECKED BY: r CHECKED BY:� —Tate— CHECKED BY: Perks k ecreetum �e CHECKED BY: -----TFaIlr)`Tn—eer --Z-a— CHECKED BY: Environmental Planner --Zar�-- c t5 DO U t0 E.6 O LU F— D] Z W }U F :- Z c� G OD U Z F- N F- Q LU W i 0 Z WLn O = Q ¢ O o O Z >o Z f u C4.00 V I �r 1p 1 ll /lI/ IIII I ) II I IIII ( \ I I ( ) I \ III I I \ )1I I I \ IIII ) \ IIII I \ IIII I \ STORM Mill- 1. HIM .4967.e5 .11 W V. N.4962.e0 (36- RCP) I WV. S.4962.70 (56- PCP) .� WV. SW. 4963.85 (IS ' RCP) �PROPOSFD WATER ORIFICE KATEW/ I I I El I m-QTTER i II I_ II I / I w RR W/l .. ( I\ 2' CURB COWgTRf `\ \':: "I. NT %� // i �\ ,;;•'. C7 •/ _ III I \ \ � 1 �%. ��!.•-��\ w `'rJ GRAPHIC SCALE (9 NORTH m 0 SO 60 90 Feel NW FEET ) CN . SO 11 LEGEND PROPERTY BOUNDARY EXISTING STORM SEWER LINE W/ MH EXISTING INLET DRAT: 13 PROPOSED CONTOUR 9S EXISTING CONTOUR ----5015---- PROPOSED INFLOW CURB k GUTTER PROPOSED RIBBON CURB APPROXIMATE UNITS OF DISTURBANCE LCO— WATTLE INLET PROTECTION (p WATTLE O rrsarsa WATTLE SEDIMENI TRAP $T CONCRETE WASHOUT AREA O VEHICLE IRACIONO PAID VT PLANTED RIPRAP RR. NOTES I. THE SIZE, TYPE AM LOCATION OF ALL KNOWN UNDERGROUND UTWTCS ARE APPROXIMATE MEN SHOWN ON THESE DRAWNCS, IT SHALL BE ONE RESPCN9BILI7Y BE ME CONTRACTOR TO WRIFY THE EXISTENCE BE ALL UNDERGROUND UTILITIES IN ME AREA OF ME WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTWTES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES, 2. EROSION CONTROL PRAC110E5. SITE PROTECTION, AND RELSGETATION METHODS SHALL FOLLOW CITY REGULATIONS 3, IT SHOULD BE NOTED THAT ANY EROSION CONTROL PLAN SERVES ONLY AS A GODELINE TO THE CONTRACTOR STAGING AND/M PHASING OF BEST MANAGEMENT PRACTICES (BVP.)IS EXPECTED. ADDITIONAL AND/OR DIFFERENT BMI FROM M04 ORIGINALLY DEPICTED MAY BE NECESSARY DURING CONSTRUCTION DUE TO CHANGING SITE CONDITIONS OR AS REQUIRED BY LCCAL AUTHORITIES, ♦. THIS EROSION CONTROL PLAN IS SCHEMATIC IN NATURE. AS SUCH, GRAPHICAL SYMBOLS MAY NOT BE TO SCALE. NOW ARE THEY NECESSARILY SHOWN IN THEIR EXACT LOCATION. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMNTNG (CITY. STATE DISCHARGE PERMIT, ETC.) AND COMPLIANCE WIN GOVERNING AUTHORITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR (OR PERMIT HOLDER) TO ENSURE EROSION CONTROL MEASURES ARE PROPERLY MAINTAINED AND FOLLOWED, 6. CONTRACTOR SHALL IMPLEMENT THE APPROPRIATE EROSION CONTROL MEASURES ACCORDING ME THE CONSTRUCTION SEQUENCING AND LEAL OF SITE STABtt1ZATCN. ). CONTRACTOR SHALL IMPLEMENT APPROPRIATE INLET PROTECTION FOR ALL STERN DRAINS UNTIL SITE IS FULLY STABIUZED, INLET PROTECTION SHALL BE ADAPTED, AS NECESSARY. TO THE SURROUNDING SURFACE TYPE AND COMMON (i.e.. STATUE-ORIVEN WATTLES FOR BARE SEL SAND BAGS OR GRAVEL SOCKS FOR PAVEMENT. ETC.) B. CONTRACTOR IS RESPONSIBLE FOR STABILIZING ALL SLOPES PARTICULARLY THOSE STEEPEN THAN 6:1, CRIMP MULCHING. HYDRO MULCHING, EROSION MATS. TEMPORARY IRRIGATION. AND ADOTCNAL WATTLES OR SILT FENCING MAY BE NECESSARY TO ESTABLISH VEGETATIVE COVER AND STABUZE THE SLOPE. 9. SCE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON RANTING, RMGETAMBN. HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION METHODS 10. SEE 'GRADING A EROSION CONTROL NOTES' ON SHEET C0.02 BETHE MINOR AMENDMENT PLAN SET FOR THE NOIMMOF AMAN COMMUNITY CENTER PREPARED BY NORTHERN ENENEERWG DATED FEBRUARY 26M. 2013 FOR ADDITIONAL WFCRMAMCN, TABLE OF CONSTRUCTION SEQUENCE AND BMP APPLICATION Pro Am Nomwde ANlan CommOniN Center PRXIEW. Krxue IINIeI heOAt I. —Xi erMlm e.mua w.ulOwlNl,em.• ..a ..le T.11HEKTrMRIR. NeFauMa IPI veruimpcweu Mcl — rpepel.YN,w.m —1MD1 — F AeeeeFe IGAN — Rw..N. N.rwN� bmeNwNgve. Xereeee MRANHANIA F...e.nsn N.ev C6.00 ,,.,raacaroa- •••.•..m scBG,derm CURB INLET PROTECTION NOT TO BGEE •A��ys .. r_m—nsrmMr,�1 man SF —ss— A,, Wi o - o- SILT FENCE (a:) WATTLE INSTALLATION cs.ol NOT To sc4E ce.Dl N01 i0 SGLE r,m,ea.nlnri —� /I PLAN VIEW ® DROP INLET PROTECTION CONCRETE WASHOUT AREA "To ScZ [6.01 rv0i 10 sGLE HE. Y.ICN PRGVXD GrvOE I1 N.) EIRut1CD W NET r� B B YNK. m.NaRoN E.EDNw TLOY I— u.1CX vRCPC40 Q G.oE IMO PLAN VIEW 1•YIN` 4O'CO.apN a uIN. vp.poseo DY4NH.T SECTION A -A ��RGOYO WTIEi aIRYLNRE ,�a pgO"gr FCnp V YIN —GIW 4k SECTION B-B HiN. swuErvl SEDIMENT TRAP NOT TO SC E ,? SECTION A f VTC VEHICLE CONTROL TRACKING PAD C6 NO( TO SCKL C/AL U1lI1V NOTIFlUId CENT Cf C.FEED0 � r K Call befoe you Call before you dig. °i �wGG�wYY«.WLmr.. City of Fort Collins, Colorado UTIWTY PLAN APPROVAL "PROVED: _ Clly ng.neer 6 et CHECKS) BY: Fr-M1rf— —�(— Y CHECKED BY: CHECKED BY: - Perak Recreation �Te CHECKED BY: _—fir-Tile ngl Oate CHECKED BY: Environmental Planner �� F- z W f i O z 0 W a Q z 0 O IL z_ 0 U C6.01