Loading...
HomeMy WebLinkAboutDrainage Reports - 01/04/1994is Final Storm Drainage Report for SILVER OAKS P.U.D., SECOND FILING DECEMBER 1993 STEWART&ASSOCATES Consuldn3 Engineers and Surveyors 103 South. IkZdvm SiAeef F04t Co&&6, Coto4ado 80511 , * 3031482-9331 1i TABLE OF CONTENTS TOPICS - Storm Drainage Report - Erosion Report COVER / LOCATION YELLOW - Erosion Control Design/Estimate PINK - Times Of Concentration Runoff Computations - Hydraulic Design Information - Referenced Attachments • BLUE PURPLE RED GENERAL SITE CONDITIONS • This is the "Final Submittal" for Silver Oaks P.U.D. Second Filing (the Filing), which is being developed by Tri-Trend Inc. of Fort Collins. .The proposed improvements will involve the continuation of single family home sites, in this previously approved Preliminary Overall Drainage Plan for this medium density residential development. Silver Oaks is, on the Northwest corner of the intersection of Horsetooth and Taft Hill Roads. It is situated in the South 1\2 of the Southeast 1\4 of section 28, Township 7, Range 69 West, of the 6th P.M.. The site, 7.98 ac, is at the upstream end of the Spring Creek Drainage Basin near the foothills. Adjacent land uses include Olander Elementary. School and Silver Oaks First Filing to the Southwest, and undeveloped areas to the Northwest of this proposed Filing. On the North side are residential "ranchetts" with lot sizes of approximately 5 acres. These home sites are not within current Fort Collins. City Limits, and remain within Larimer County's jurisdiction. East of this Filing is the newly constructed detention pond and South Taft Hill Road; Rossborough Subdivision is on the other side of South Taft Hill Road. Finally, on the South are Silver Trails Drive and Bronson Street, both part of the First Filing. • / Storm Drainage Report . Silver Oaks P.U.D., Second Page 2 HYDROLOGY A detailed exhibit is included which was developed with the First Filing to show the Overall Drainage Plan (ODP). It shows basin patterns for historic, and conceptual developed conditions. This ODP was approved on March 3, 1993 and outlined the future storm drainage development for the entire Silver Oaks P.U.D. site. All hydraulic and hydrologic design has been established using the ODP concept as a basis, along with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards (SDDCCS). The labeling of all developed basins included on the Second Filing Grading, Erosion and Drainage Plan are consistent with the ODP, along with hydraulic structures and design points pertinent to this Filing. The drainage area of this Filing includes 9.23 ac that consists of five subbasins. The Rational Method was used to establish direct runoff rates from these basins. Times of concentration (TOC) and intensities were established by methods identified in the SDDCCS. A runoff coefficient of C=.50 was used for the developed condition, the same used in the ODP. The results of this analysis are shown on the spread sheets attached. There was a revision made to the subbasin areas from those tabulated on the ODP, due to errors in the ODP. • Storm Drainage Report . Silver Oaks,P.U.D., Second Page 3 A planimeter was used in establishing all basin areas. Planimeter readings were repeated for the subbasins in the area of this Filing, and errors in the areas used in the ODP were discovered. The correct subbasin areas were incorporated into the spreadsheets for this Filing. Although the area that encompasses the Second Filing, basin IA-1 in the ODP, was underestimated in the ODP, most of the basin areas comprising the First Filing were assigned erroneously large areas. The downstream flows used to size drainage structures are therefore approximately correct, and inlets and pipes installed have adequate capacity for the revised flows. TOC's ranged from a low of 5.0 min in basin IA -lc to the high of 20.6 min in basin BL-1, both are the 100 yr. TOC. Total direct runoff is 10.0 cfs for the minor event and 34.1 cfs for the major. Noteworthy, is the fact that the subbasin contributing to the BL-1 pan includes a 1.29 ac area developed in the First Filing, resulting in a contributing area for BL-1 of 1.64 ac. Two basins do not drain to the storm sewer collection system, basins IA -lc and IA -la. Basin IA -lc flows into the backlot swale N-1 toward detention, and IA -lc flows overland/channelized into the existing detention pond. Basins BL-1 and IA -lb are collected and conveyed by the existing storm sewer system. B1-1 releases to inlet IC, while basin IA -lb flows to inlet IA. Confirmation of all hydraulic capacities will be shown in the Hydraulics section of the report. • Storm Drainage Report • Silver Oaks P.U.D., Second Page 4 HYDRAULICS All hydraulic design criteria meet the SDDCCS. Catch basins/inlets pertinent to this Filing are IA and IC as identified in the ODP and shown on this GP. The piped storm drainage conveyance system has been designed and installed as part of the First Filing. Catch basins were sized and located so that subsequent street developments will be easily accommodated. Additionally, back- lot pan BL-1 was constructed as part of the First Filing improvements. All of the aforementioned are indicated on both the ODP and the detailed GP for this Filing. Piping network capacities were established during the First Filing, using software developed for the Urban Drainage and Flood Control District, by University of Colorado, Denver. The title of the package is "UDSEWER." The piped system was designed to carry the 2 yr. design storms while the 100 yr. will be carried by available street capacities. Design flows were established as shown in the "Hydrology" section of the ODP and incorporated into the hydraulic model. Revised hydrology for this Filing is within the capacity established for all streets, collection inlets and pipes (see attached ODP). Inlets of interest include IA and IC as shown on the ODP. Design flows to these inlets calculated in the ODP are 5.8 cfs and 9.7 cfs respectively. Actual capacities are 7.1 cfs and • 9.5 respectfully, and shown in the computational package attached. Storm Drainage Report Silver Oaks P.U.D., Second, Page 5 Flows to these points, based on the Second Filing basin delineations, are 5.9 and 9.8 cfs in minor events. These flows represent the peak flow rates to these specific inlets from their entire tributary areas. Inlet IC is 3 percent over design capacity 0.3 cfs, this overage of capacity does not pose a concern as it will move to the east and be collected in inlet IA. Inlet IA has an available capacity in a 6-ft inlet of 7.1 cfs, following this phase 6.2 cfs will be directed towards it, this inlet is adequate. No subsequent improvements will affect these specific inlet flows. Though flow to inlets IA & IC modestly exceeds the original design flows calculated from the ODP, the 6-ft and 8-ft existing inlets require no modification. The only new construction being undertaken during this Filing will be a backlot swale N-1, which will release directly into the existing detention pond. Geotech fabric as shown on the GP is proposed to protect the pond bank. The swale for N-1 will be 15-ft wide and 1.35-ft deep. Earthen slopes will be at the slopes 4:1 and 5:1 within the easement. The capacity of the pan will retain the major event within the easement section. Under drains will be provided to control nuisance flows in "flatter" areas of the swale. Thus, all SDDCCS hydraulic capacity criteria are met. Additionally, back lot pan BL-1 meets pertinent design standards also. • Storm Drainage Report • Silver Oaks P.U.D. Page 6 DETENTION REQUIREMENTS No specific detention modifications will be required as part this Filing. Detention designed, and constructed in the First filing has been sized in a way that includes the area of the Second Filing. CONCLUSIONS This Second Filing of Silver Oaks P.U.D. will not deviate in concept from the approved Overall Drainage Plan of March 1993. Basin configurations have been refined with the final gradir)g plan, this has direct runoff to the existing inlets IA and IC developed to there final conditions. The facilities constructed as part of the First Filing provide adequate storm drainage conveyance throughout. No modification will be necessitated by the Second Filing. Should any questions arise during your review of this report please do not hesitate in contacting Alex Evonitz or myself at your earliest convenience. Respectfully, •,.P�ou„R(%Ty`., GIsTck-. 5ee r Richard A. Rutherfor , P.E. & L.S. :*1 c O O ` • a O , :o $:\siloaks2.rpt •" F. • EROSION CONTROL REPORT The Second Filing of Silver Oaks P.U.D., ±7.9 ac, is a single family development that falls in the area of high rainfall erodibility and moderate wind erodibility. Following is the construction sequence for which erosion control will be provided. Construction of the detention pond in the First Filing will act as a sedimentation basin. The first scheduled activity will be the installation of gravel curb inlet filters at inlets IA and IC as shown on the Grading Plan. Additionally, straw bale dikes will be placed at the release points of pans BL-1 and the newly constructed N-1. A third straw bale dike will be placed at the outlet of the existing detention facility ensuring an effectiveness above the performance standard. Street rough cuts will be next in the sequence of activities. Those gravel filters will provide the primary method of erosion control during the preliminary earth work and subsurface 'utility installations. All points of direct runoff concentration will be provided with erosion protection. The final earthwork activity will be the overlot grading required for the design grades to be realized. This will expose approximately 5.8 ac to wind and rainfall erosion. Seasonal temporary vegetation will be cultivated to minimize wind and rainfall erosion. Road base and asphalt will be the next scheduled construction. This will aid significantly in reducing the erosion potential. It is at this point that the straw bale dikes in the back lot pans • will begin providing protection for rainfall erosion. Erosion Report • Silver oaks, Second Page 2 The final gravel filter in the detention facility will further enhance system performance. Wind erosion will be addressed by use of furrowed contours in all areas of overlot grading. Surface conditions for both wind and rainfall erosion will see a benefit from this final methodology. The last point is that rainfall erosion will be near the end of its primary season of concern, while the wind erosion controls will be more important. Should questions arise regarding this erosion control plan please do not hesitate in contacting us. J S / CONSTRUCTION SEQUENCE PROJECT: -e5llL�P-I' .Djw-S,� STANDARD FORI1 C SEQUENCE. FOR 19 �Q/� 4 ONLY COMPLETED BY: h"�`c DATE: 12—I 1'`_-> ficate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by, the City Engineer. YEAR MONTH ---- ---- OVERLOT GRADING ' - WIND EROSION CONTROL i Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other .RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers I.• Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other I VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation - Nettings/Mats/Blankets Other STRUCTURES: INSTALLED BY l��yt ra ng7� ------------------------ --- I ----------I MAINTAINED BY Q, VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED IZ - APPROVED BY CITY OF FORT COLLINS ON HOF-C:1989 Effectiveness Calculation . SLandar d Form B rProject: Stewart By: Stewart & Associates Completed: N-0 I 10 S 03 S. Meldrum FortCollins, ort CollColorado 80521 Date: -Control Erosion -Factor P - -Factor 'Comments.. Method Value • Value T-, t L) 1, o Z, I'D 6,A2p,L14?(- rJL I,O -T P"- Z- ,�(e7 �^JCQ- por lip P-6- 0 HDI/SF-B:1989 STEWART&406SOCIATES 103 S. PH 482-93 DRF X F4882 9 COLLINS, CO 80521 ConsultingEngineers and Surveyors • By: �i�� Date: Client: %r //-ter �' Sheet No. _ of �x �r Project: J' Subject: 6 - -5'I X GS / GO�U`�TG'GjIG'�J GISTS � U c A 0; JAN-11-93 NON 13i09 0125 NORTH ANERICAN GREEN FAX NO. 8670247 NORTH AMERICAN GREEN FLEXIBLE CHANNEL LINTERS Developed for extreme slopes, high -discharge channels, and applica- tions requiring semi -permanent to permanent protection and vegetal reinforcement. The coconut and nylon flexible channel liners consist of heavy duty, UV stabilized netting and a uniformly consolidated coconut or nylon fiber matrix for Superior erosion control performance. The C125 flexible channel liner features a 10090 Coconut fiber matrix sewn between two heavy duty, UV stabilized nets. The heavy duty construction and high performance coconut fiber matrix of the C125 provides increased durability, longevity, and effectiveness required for protecting high -discharge chan- nels and other difficult -to -stabilize sites. 3116� Ili S.;n'3.d':T•'Cu6>;w",....,,kiiG;Y"-'v";1v( A composite channel lining consisting of C125/ve elation sideslo es , 9- p ' The P300 was used to establish and telrifeme the gran stands pro - and aconcrete low -Row bottom provides acost-effective, aesthetic tecting the banks of this pemfanenf stream. High -velocity discharges alternative to rtprap. The North American Green Erosion Control Plan '{ will damage esfablished grasses without supplemental root protection Software System was used in designing the composite fining for opti- and ruin ornament provided by the P300, count channel Scour protection. 11 P. 05 The P300 flexible channel liner features a 100% recycled nylon fiber matrix sewn between an extra heavy duty, UV sta. bilized top net and a heavy duty UV stabilized bottom net. The P300 is a non -degradable blanket designed to provide tempo- rary protection of high -discharge channel surfaces until vege- tation establishment, and permanent reinforcement of vegeta- tion after maturity, rue rvutnr Hmarican careen trosron Control Plan Software System pro- vides computer -assisted design of materials for slope erosion protec- lion and channel scour resisfance. The computer programs arc based on laboratory and field research Involving erosion control blanitels, vcgstation, and rtprap, utilizing a ehannei lining selection procedure developed by the Federal Hiyhwaav Administration. The North American Green Scfht'are System ComeS romplete with a comprehensive design Surel_ock� Staple Gun Use of the Sure Lock staple glue makes staple placement quick and simple. The patented, spring -operated design and extended handle of the Sure. Lock staple gun eliminate con- stant bending and stooping involved in staple placement by hand. The SureLock is the most cost-effective method for Installing North American Green blankets, as well as other materi- als and geotextiles that must be anchored to the ground. Distributed By: JAN-11-93 NON 13:08 NORTH ANERICAN GREEN FAX NO. 8670247 P,03 EffeClive 2120189 NORTH AMERICAN GREEN MATERIAL SPECIFICATIONS CATEGORY I P300 Permanent Channel and shore lining shall be a machine -produced mat of 100o/0 recycled nylon fiber. The blanket shall be of consistent thickness with the nylon fiber, evenly distributed over the entire area of lire mat. The blanket shall be Covered on the top with black polypropylene netting having ultraviolet additives to reduce breakdown, approximate 1/2 inch x 1/2 inch mesh size. The bottom net shall also be UV stabilized polypropylene, with a 5/8 inch x 5/8 Inch mesh size. The blanket shall be sewn together with polyester thread. Nylon fiber channel and shore lining shall be P300 as manufactured by North American Green, or equivalent. Nylon fiber channel and shore lining shall have the following properties: Material Content Recycled Nylon Fiber Netting Thread Physical Specifications (Roll) Width Length Weight Area L 100% (.80 Ib/y2) (.436 kg/m2) One side heavyweight UV stabilized (5.0 Ibs/1,000 sq It approx wt) One side heavyweight UV stabilized (3.0 Ibs/1,000 sq it approx wt) 100% Polyester Black 6.5 feet (2m) 83.5 feet (25.4rn) 48 Ibs + 10% (21.8 kg) 60 sq yd (50m2) • i Rainfall Performance Standard Evaluation Project: 5rt- e-z 8n14-Standard Form A By: Stewart & Associates Completed: r� 103 S. Meldrum Fort Collins, Colorado 80521 Date: Developed Subbasin Erodibility Zone Asb acres Lsb feet Ssb % Lb feet Sb %a PS '..L Fi, 7,9A-- 00 L400 HDI/SF—A:1989 L- E -O E o : U (n N o cn O Y E) as O 2 > U) 2 Ir O F- U) o C7 T Z O J N LL fr 0 OZ O U) W m g Z � o 'o O " 6 0 W cd Q D a QN a O� (A m � Y O Q C) O LL Q LL W O� Z /� VJ I A.. 0 W m a �O E J W W u O > W W Q Q O � < O O JE E ~ U .• m O 0 E W �+ o F w o O > m m o o m U O m N O U o 3e c U pN 7 II H II m a U Q p rn a 1.0 .9 .8 .7 .6 .5 0 z_ z .3 w IL 0 2 15 12 II 10. 8 10 6 9 0 u 4 F. i rL 3 8 w i�� z IL / (n 2 i t 7 y t 6�_Example Parf a 1.0 z L _ -- 1-.8 w 5.5 v ---- a. rn . 6 0 w 0 w 5 x z 0 z z .4 f z w x 4.5 z ao _3 Uj _ w U_ = 4 0.2 0 = I- z 0 o 3.5 w w a J o 1 w ILL p .OB F 3 0 � F ~o .06 c� z caILL z w w .04 ¢ 2.5 = w w .0.3 a ?" 3 ILL .02 0 a o a 2 rz a. w 01 0 L w 0 - Yo 0 15 --- -- - -- -- � 5 4' 3 2 1.5 � = 1.0 .9 .8 .6 .5 12 .25 .2 15 I , I I L .0 a=2 h � a ya ,t-i Z -t Z .I 1.2 - Figure 5-2 k�11 -" I S O NOMOGRPAH FOR CAPACITY OF CURB OPENING INLETS IN SUMPS, DEPRESSION DEPTH 2" Adapted from Bureau of Public Roads Nomograph (' I Yo �� MAY 1984 - 5-10 DESIGN CRITERIA CJ 0 STEWART&, ,SSOCIATES 103 S. PH. 482-93 1 Ff X 48z 9 80LLINS, CO 80521 Consulting Engineers and Surveyors By: —At'J— Date: �' 1 C Sheet No. of g "1 `J - 1 � Client: 1 tZ � - �t,.l. Project: C.Jr!> 0�'�-5 /t Subject: Co,--) Fi kz� l ,'(��PT � '-t o F 1-- r.� e a_T If�lrT Io. VIA irsl<,p o o I •�f o �3� C.�, ; i mow Obi f?ea'x� rx Tor bs ezpxntloj � r ' l(,-�TjI,I_i_�.�f�Jtr).�,�2�j,_' '�� � ?-• wTr-cam. Ti7TPc- Roy] ; ��ICIActr�C� i r/ t9 tG �.�• i 8 t t . o ; 1Q4S1. ;KE p,3 cFs wlv,eH �s I� L`raoS� ar- �cslz,,� ChiAcny L..�l t 1, rnov,a_ -TO 1 1->t2� iA F!�'; i' A IN��t.l �� Ro,•� _^.�� r� 1�". ny � c +p0.3cts 1p ii'G'._ -'' O.C�—p wtCt_ ?mac tlD�) rla.,s • Al cu CL W 0 LLAZ— 1� cz L CZ 0 L 0 ca v ) W C: co 00 0) ` c O cz ►� W D� c ZJ O Q /7 (nJ m Uc ErL yy(O 0hcNNO 00 00 co 0)UrTN(7 (D (D OD T co to Z Q L c \ r T T d U Z ) (4 � lq O u) ~ H N CO (h (70 (70No N Or- (D O) N 0 O 1D O (D N� T.NN coca'1.4 o � Ncr V Q N 0) N N J EN N O M(7 N O (n O (D O N O U U CU m O (7 o (7 O f7 O (7 o N O N (DO)Nw O(D ow Nm m a) arl Q N J I aD co 200000 0000 0, a)0Lgq(Do(no(no(no Eniriaivv n D(o(ol:z o c c 3 'o 41 O)N D) - 0't� co rn W c O 0 N(D ro 'It coM(D -. N1n Z (mV Orr cm co V ui O � c T o m 0 W O 0 3 N O N aD co NON co co cm W (n n D) N (D O tt aD (7 C ) N� O O OrTNNN(7 (+i0 CY Q N O o 0 0 0 0 0 o o O NJ O It W N (D O It (D N (D ENNN('9(q'Ivv 0(D U (D o C.) Co 0 co Cl) 0N0 (O D) N (D O to O (D N C) cc rr NN(1) o7'7 It Ncr Q N J 00 0 0 0 0 0 0 0 0 N O N O )D O N O (D 0 N E N(Om v't 0 w 001` L) d o C � 00000 0o00 L N (D I� w In a 00000 d o� \ 0 LL 4 0 u V' Y� yyy� ly �U 2 ( H GUTTER CAPACITY TABLE FOR VAIABLE STREET SLOPES AND CROSS SLOPES 2 YR EVENT WILL BE EXAMINED FOR: SILVER OAKS P,U.D. DEVELOPED BY: TRI-TREND, INC. BY: STEWART AND ASSOCIATES THEORETICAL CAPACITY Q = .56 (Z/ n) (S) ^.5 (y) ^ 8/3 VARIABLES AND DEFINITIONS: Q = THEORETICAL GUTTER CAPACITY (cis) 0.42 = y (DEPTH OF FLOW AT FACE OF GUTTER, feet) 0.016 = n (MANNINGS ROUGHNESS COEFFICIENT) S = SLOPE OF CHANNEL( feet / feet) Z = RECIPROCAL OF CROSS SLOPE, ( 1 / cross slope(ft / it)) Florll Infirm fnm/ ,. n f...... Ql....... n...:_.___ ram_:._ :_ a 1. DESIGN CONSTANTS CHANNEL REDUCTION SLOPES FACTOR 0.0045 0.50 1 /CROSS SLOPE h / ft 50.000� 1 % 0 THEO.GUTTE REDUCED CAPACITY cfs CAPACITY cis 11.580 5.79 .. �.J._v„.r„u u VVIIJ\IVVII 1 /CROSS SLOPE (tt / ft) 40.000 = Z = 1 .025 -1 = THEO.GUTTE REDUCED CAPACITY cis CAPACITY (cfs 9.264 4.63 VII VlQ11UQ1UJ 1 / CROSS SLOPE (ft / it) 33.330 = Z = 1 0: -- _ - --�- THEO.GUTTE REDUCED CAPACITY cfs CAPACITY (cf 7.719 3.8E 0.0050 0.65 12.207 7.93 9.765 6.35 8.137 5.2f 0.0060 0.80 13.372 10.70 10.697 8.56 8.914 7.1, 0.0070 0.80 14.443 11.55 11.555 9.24 9.628 7.7( 0.0080 0.80 15.440 12.35 12.352 9.88 10.293 &Z 0.0090 0.80 16.377 13.10 13.102 10.48 10.917 8.7: 0.0100 0.80 17.263 13.81 13.810 11.05 11.507 9.21 0.0110 0.80 18.105 14AB 14.484 11.59 12.069 9.6E 0.0120 0.80 18_911 15.13 15.128 12.10 12.606 10.0E 0.0130 0.80 19.683 15.75 15.746 12.60 13.121 10.5C 0.0140 0.80 20.426 16.34 16.341 13.07 13.616 10.8E 0.0150 0.80 _ 21.143 16.91 16.914 13.53 14.094 11.27 0.0160 0.80 21.836 17.47 17.469 13.98 14.556 11.64 0.0170 0.80 22.508 18.01 18.006 14.41 15.004 12.00 0.0180 0.80 23.161 18.53 18.528 14.82 15.439 12.35 0.0190 0.80 23.795 19.04 19.036 15.23 15.862 12.69 0.0200 0.80 24.413 19.53 19.531 15.621 16.274 13.02 0.0210 0.78 25.016 19.51 20.013 15.61 16.676 13.01 0.0220 0.77 25.605 19.72 20.484 15.77 17.068 13.14 0.0230 0.76 26.180 19.90 20.944 15.92 15.40 17.452 13.26 0.0240 0.72 26.744 19.26 21.395 17.827 12.84 0.0250 0.68 27.295 18.56 21.836 14.85 18.195 12.37 0.0260 0.66 27.836 18.37 22.268 14.70 18.555 12.25 0.0270 0.64 28.366 18.15 22.693 14.52 18.909 12.10 0.0280 0.61 28.886 17.62 23.109 14.10 19.256 11.75 0.0290 0.58 29.398 17.05 23.518 13.64 19.596 11.37 0.0300 0.54 29.900 16.15 23.920 12.92 19.931 10.76 t[.R,> t 'G Z hehZ L�� 1S (.2SS Taba.J - ��✓I�1' 1�1 `111 `--`Y 1 00 100 — -7IDC�S l>OZS/v CRSc SCD�r 1S/ O 0OS.I Pcc vA— CA>ac r ± 1145 _ C4-, C% �o r V A U� W z STEWART&ASSOCIATES 103 S. PH 82-93 1 FAX FORT COLLINS, CO 80521 Consulting Engineers and Surveyors By: Date: 1— C3 client: '(RI -" kfZEHQ INC- Sheet No. of � • Project: SI l,\CER UNKS PNA5e C)N27 CCNSTRIACfIC>N Subject: IzzRM CDI-L.Fx'gpri MDDsL `�cNEMAT( ens 4!1 y ITT 3C; F j 6-r�,4MwT oZo DII�•= Zy- IN. 70 LBO s��>;rtT Rio 1i2�e�g i, MI4"1 MN1!� 6V4M NT'1 � � NOTES * Catch basins are modeled as single manholes with specific design flows, based on the Rational Method Spread Sheet design points. * A11 design sizing assumes a fully developed Silver Oaks. • * Manhole #5 is a "dummy" used for modeling purposes. * All interconnecting piping is 15" at 1% slopex >:v-i'r ZE 1K * Sewer and manhole numbering correspond to "UDSEWER." ---------- REPORT OF STORM SEWER SYSTEM DESIGN USING UDSEWER-MODEL 10-19-1992 DEVELOPED BY JAMES C.Y. GUO ,PHD, PE DEPARTMENT OF CIVIL ENGINEERING, UNIVERSITY OF COLORADO AT DENVER IN COOPERATION WITH URBAN DRAINAGE AND FLOOD CONTROL DISTRICT DENVER, COLORADO *** EXECUTED BY STEWART AND ASSOCIATES (FT COLLINS-COLORADO)............................ ON DATA 12-02-1993 AT TIME 13:51:04 *** PROJECT TITLE : Silver oaks,Second Filing, Comparing to the original ODP *** RETURN PERIOD OF FLOOD IS 2 YEARS *** SUMMARY OF HYDRAULICS AT MANHOLES ------------------------------------------------------------------------------- MANHOLE CNTRBTING RAINFALL RAINFALL DESIGN GROUND WATER COMMENTS ID NUMBER AREA * C DURATION INTENSITY PEAK FLOW ELEVATION ELEVATION MINUTES INCH/HR CFS FEET FEET ------------------------------------------------------------------------------- 3.00 0.00 0.00 0.00 18.80 26.48 24.30 OK 2.00 0.00 0.00 0.00 28.60 24.05 22.60ZZ.SSOK 1.00 0.00 0.00 0.00 36.60 23.15 21.6421.f30K 5.00 0.00 0.00 0.00 36.60 22.75 21.40 OK OK MEANS WATER ELEVATION IS LOWER THAN GROUND ELEVATION �rciC�iN r� - VA�U�S �Kt�l"1=_'ME _.tiDP---P_iZ'E 51���1N *** SUMMARY OF SEWER HYDRAULICS • NOTE: THE GIVEN FLOW DEPTH -TO -SEWER SIZE RATIO= .9 ------------------------------------------------------------------------------- SEWER MAMHOLE NUMBER SEWER REQUIRED SUGGESTED EXISTING ID NUMBER UPSTREAM DNSTREAM SHAPE DIA(HIGH) DIA(HIGH) DIA(HIGH) WIDTH ------------------------------------------------------------------------------- ID NO. ID NO. (IN) (FT) (IN) (FT) (IN) (FT) (FT) 20.00 3.00 2.00 ROUND 22.84 24.00 0.00 0.00 10.00 2.00 1.00 ROUND 31.12 33.00 0.00 0.00 50.00 1.00 5.00 ROUND 32.74 33.00 0.00 0.00 DIMENSION UNITS FOR ROUND AND ARCH SEWER ARE IN INCHES REQUIRED DIAMETER WAS DETERMINED BY SEWER HYDRAULIC CAPACITY. SUGGESTED DIAMETER WAS DETERMINED BY COMMERCIALLY AVAILABLE SIZE. FOR A NEW SEWER, FLOW WAS ANALYZED BY THE SUGGESTED SEWER SIZE; OTHERWISE, EXISITNG SIZE WAS USED ----------------------------------------------------------------------------- SEWER DESIGN FLOW NORMAL NORAML CRITIC CRITIC FULL FROUDE COMMENT ID FLOW Q FULL Q DEPTH VLCITY DEPTH VLCITY VLCITY NO. NUMBER ------------ CFS CFS FEET FPS FEET FPS FPS 20.0 7----------------------------------------------------------------- 18.8 21.5 1.45 7.72 1.56 7.15 5.98 1.17 V-OK 10.0 28.6 33.5 1.95 6.34 1.77 7.07 4.82 4,1(,0.83 V-OK 50.0 36.6 37.5 2.20 7.19 2.02 7.85 6.16 Gz.x 0.83 V-OK FROUDE NUMBER=O INDICATES THAT A PRESSURED FLOW OCCURS ---------------------------------------------------------------------- SEWER SLOPE INVERT ELEVATION BURIED DEPTH COMMENTS ID NUMBER UPSTREAM DNSTREAM UPSTREAM DNSTREAM --------------------------------------------------------- % (FT) (FT) (FT) (FT) ------------ 20.00 0.90 22.74 20.25 1.74 1.80 OK 10.00 0.40 19.40 18.55 1.90 1.85 OK 50.00 0.50 18.95 18.83 1.45 1.17 OK OK MEANS BURIED DEPTH IS GREATER THAN REQUIRED SOIL COVER OF 1 FEET • *** SUMMARY OF HYDRAULIC GRADIENT LINE ALONG SEWERS --------------------------------------------------- SEWER SEWER SURCHARGED CROWN ELEVATION ID NUMBER LENGTH LENGTH UPSTREAM DNSTREAM FEET FEET FEET FEET --------------------------------------------------- 20.00 277.00 20.90 24.74 22.25 10.00 213.00 152.83 22.15 21.30 50.00 25.00 0.00 21.70 21.58 ---------------------------- WATER ELEVATION FLOW UPSTREAM DNSTREAM CONDITION FEET FEET ---------------------------- 24.30 22.60 JUMP 22.60 2-2.f5b21.64 SUBCR 21.64 Z k,& , 21. 40 SUBCR PRSS'ED=PRESSURED FLOW; JUMP=POSSIBLE HYDRAULIC JUMP; SUBCR=SUBCRITICAL FLOW ***'SUMMARY OF ENERGY GRADIENT LINE ALONG SEWERS ----------------------------- UPST MANHOLE SEWER SEWER MANHOLE ENERGY FRCTION ID NO ID NO. ELEV FT FT ----------------------------- 20.0 3.00 25.23 1.86 10.0 2.00 23.22 0.69 50.0 1.00 22.44 0.90 ---------------------------------------------- JUNCTURE LOSSES DOWNST MANHOLE BEND BEND LATERAL LATERAL MANHOLE ENERGY K COEF LOSS FT K COEF LOSS FT ID FT ---------------------------------------------- 0.25 0.14 0.00 0.00 2.00 Z', b.22 0.25 0.09 0.00 0.00 1.00 22.44 0.25 0.15 0.00 0.00 5.00 21.40 BEND LOSS =BEND K* VHEAD IN SEWER. LATERAL LOSS= OUTFLOW VHEAD-JCT LOSS K*INFLOW VHEAD FRICTION LOSS=O MEANS IT IS NEGLIGIBLE OR POSSIBLE ERROR DUE TO JUMP. FRICTION LOSS INCLUDES SEWER INVERT DROP AT MANHOLE NOTICE: VHEAD DENOTES THE VELOCITY HEAD OF FULL FLOW CONDITION. A MINIMUM JUCTION LOSS OF 0.05 FT WOULD BE INTRODUCED UNLESS LATERAL K=O. FRICTION LOSS WAS ESTIMATED BY BACKWATER CURVE COMPUTATIONS. 0 Final Ap r ved Report Final Storm. Drainage..Report -3 �/IL.3 Silver Oak$.P.U.D. " jY7 February 1993 STEWART&ASSOCATES Consulting Engineers and Surveyors 103 Sotdh RePrl um st,w-et fob Co22inz, Catonado 80521 3031482-9331 EXECUTIVE SUMMARY The following is presented in a bullet list form to aid in your review of the residential project for Tri-Trend,Inc.. - Spring Creek Drainage Basin is our location - 133 single family units and 16 patio home lots - 9.2 cfs is our historic release rate 8.4 cfs historic from 38.16 ac 3.3 cfs directly released Olander school <1.1 cfs> undetained 100yr from 1.03 ac <1.4 cfs> undetained 100yr from .74 ac 9.2 cfs- Total Allowable release rate - Olander School has a release rate of 3.3 cfs - this 3.3 will be carried as street flow into this newly developed detention basin in Silver Oaks - the only offsite contributing area, the Olander Elementary School site,'is controlled - all adjacent properties have been considered as part of our review of the grading plan - no sump areas have been created as a result of our grading - all adjacent parcels have been improved - discharge from the detention area is directed as it has been historically, east under S.Taft Hill Road into Rossboroughs' swale - point discharge will be maintained and unmodified - free board of .8-ft. has been provided with 110 % capacity of required detention, (variance requested) Should additional questions arise that are not answered as part of the text of the detailed report please do not hesitate in calling for clarification of design concepts. TABLE OF CONTENTS TOPICS - Executive Summary - Storm Drainage Report - Erosion Report - Erosion Control Design - Times Of Concentration Runoff Computations - Hydraulic Design Information - Street Gutter Capacity 2 & 100 yr. - Detention Design - Referenced Attachments i� COVER / LOCATION PINK waigreia PURPLE YELLOW GRAY RED GENERAL SITE CONDITIONS This is the "Final Submittal" for Silver Oaks P.U.D., which is being developed by Tri-Trend Inc. of Fort Collins. The proposed improvements will involve single family and patio home sites, resulting in a medium density residential development. Proposed are 133 single-family and 16 patio home lots on the 38.16 acre (ac) property. Silver Oaks is on the Northwest corner of the intersection of Horsetooth and Taft Hill Roads. It is situated in the South 1\2 of the Southeast 1\4 of section 28, Township 7, Range 69 West, of the 6th P.M.. The site is at the upstream end of the Spring Creek Drainage Basin near the foothills. Adjacent land uses include Olander Elementary School to the southwest, and undeveloped area to the northwest. On the north side are residential "ranchetts" with lot sizes of approximately 5 acres. These home sites are not within current Fort Collins City Limits, and remain within ,Larimer County's jurisdiction. East of the site is South Taft Hill Road with Rossborough Subdivision on the other side of the road. Finally, on the South is West Horsetooth Road with Timber Ridge Mobil Home Park on the other side of West Horsetooth. 0 Storm Drainage Report Silver Oaks P.U.D. Page 2 HYDROLOGY Overall Drainage Plan - A detailed set of exhibits have been included for your use in understanding how basins were configured for historic, and developed conditions. The Overall Drainage Plan (ODP) has been developed as part of this submittal to establish how best to integrate phase one with subsequent development activities. In reviewing the developed site conditions bear in mind the ODP. All hydraulic and hydrologic design has been established using the ODP as a basis, along with the City Of Fort Collins Storm Drainage Design Criteria and Construction Standards (SDDCCS). The labeling of all historic and developed basins is included as well as locations of hydraulic structures and design points. Currently, this portion of Spring Creek Basin consists of three historic sub -basins totaling 44.96 ac. This total is the sum of the 38.16 ac of the current Silver Oaks proposal, 5.03 ac of future commercial development and 1.77 ac of undetained runoff area. The Rational. Method yields a total 2 yr initial historic runoff of 8.4 cfs from the developed 38.16 ac. The 5.03 ac future commercial site produces .6 cfs in a 2 yr event while the 1.03 acres developed of Silver Oaks that discharges onto the commercial site yields 1.1 cfs in a major (100yr) storm. Only .74 ac in the • northwest corner of Silver Oaks will truly remai undetained. h� major event on this developed area results in ,,7 cfs of runoff to the northwest, a reduction to current unimproved conditions. Storm Drainage Report Silver Oaks P.U.D. Page 3 These historic undetained runoffs are based on a time of concentration TOC(100 yr) of 44.8 min., from historic basin "C" (Exhibit D). The design TOC's were established for the developed conditions by considering each inlet as a basis of design. This resulted in a total of five individual basin segments as shown on the Grading Plan (GP sheets 6&7). Reiterating, .74 ac. will remain undetained following development,'5.03 ac. of commercial property in the southeast will be required to develop onsite detention for itself and 1.03 ac of undetained Silver -Oaks area that will flow onto the commercial area. Finally, 38.16 ac. will be detained as designed in this report. Further detail on how'discharge rates from the detention area were established will be included in the detention portion of this report. The ODP model includes a series of design points for inlets and cross pans, (refer to exhibit "A", ODP for the locations of these points). Many points in phase one are integrated into the ODP to facilitate a consistent program of storm water management. • 0 Storm Drainage Report Silver Oaks P.U.D. Page 4 Phase Specific Drainage - Phase One of Silver Oaks includes 12.87 ac. of single family residential, with 25.29 ac. remaining in an "as is" condition. The one exception to the "as is", comes in the from of a temporary drainage swale to be constructed on the east end of the first phase of Silver Oaks Drive. This swale will allow for conveyance of 3.4 cfs (2 yr.), and 12.2 cfs (100 yr.) runoff volumes to the developed detention area. These flows are generated from the 4.89 developed acres west of Auntie Stone St. that are part of phase one. Following the completion of subsequent phases of Silver Oaks, these flows will be directed in the future extension of Silver Oaks Drive to inlet IA, located in the north flow line of Bronson St. just West of the proposed detention pond as shown on the ODP. Catch basin IA will be built as part of phase one of the development. During the interim period the swale provides additional capacity to convey cutoff overland flows moving generally in the northeast direction, into the new detention facilities which will be constructed with phase one. • Storm Drainage Report Silver Oaks P.U.D. Page 5 HYDRAULICS Overall Drainage Plan - All hydraulic design criteria are in compliance with the SDDC. Catch basins/inlets are identified as IA...IE and Taft, while street pans are designated as P-1... P-5. The piped storm drainage .conveyance system will be designed and installed as part of phase one. Catch basins are sized and located in such a manner that subsequent street developments will be easily accommodated. Additionally, four back lot pans BL-1... BL-4 will be included as part of the phase one improvements. They are indicated on both the ODP and the detailed GP for phase one. Subsequent phases may require additional site specific details (back lot pans... etc). Piping network capacities were established using software developed for the -Urban Drainage and Flood Control District, by University of Colorado, Denver. The title of the package is "UDSEWER". Included in the output is a detailed listing of design parameters for hydraulic constraints. The piped system was designed to carry the 2 yr. design storm while the 100 yr. will be carried by available street capacities. Design flows were established as indicated in the "Hydrology" section of the report and incorporated into the hydraulic model. Olander Elementary does contribute • 3.3 cfs to inlet IE and has been included in the hydraulic design of the attending structures. Storm Drainage Report Silver Oaks P.U.D. Page 6 Phase Specific Drainage - A series of four, 2-foot surface drainage pans as previously mentioned, will be installed to minimize concerns over areas between lots becoming swamped due to the low slope of back lot drainage. Solid fencing will. be incorporated, but only above the computed high water surface elevation of a specific pan. The locations of these pans are shown on the ODP and details are included as part of the phase one GP. Recall that the entire piped storm water conveyance system is going to be installed in phase one. DETENTION REQUIREMENTS Overall Drainage Plan - The 4.8 ac-ft of required detention will be provided in the northeast portion of the Silver Oaks development. Detention sizing for a developed 38.16 ac. site major event has been provided at this time. A storage volume of 4.8 ac-ft was required with an allowable release rate of 9.2 cfs. The 9.2 cfs was established using appropriate historic TOC and corresponding intensities. This 7.�1?- I@EuAt e- Frm total 2 yr release is made up of 8.4 cfs ('38.16 ac) plus 3.3 cfs (Olander detention release), minus undetained (100yr) total of (1.1 +1.4 cfs), yielding a total allowable release rate of 9.2 cfs. This facility is sized to. accommodate future phases of Silver Oaks • P.U.D.. The area of the detention is approximately 1.6 ac. resulting in a High Water Surface Elevation (HWSE) of 5121.7-ft.. A variance for the .8-ft detention freeboard is requested. Storm Drainage Report Silver Oaks P.U.D. Page 7 The detention pond will outf all to an existing 18-in rc pipe in the northeast corner of the detention area (see GP), which crosses under Taft Hill Road and conveys flows to the 40-ft Rossborough drainage way along the east side of the road. Field data indicates grading that will allow a maximum capacity of 20.0 cfs with the HWSE indicated. Development upstream of this historic release point has eliminated the concern of tail water at our discharge piping. The original Rossborough design was for all undetained flow to overtop Taft Hill and be collected in the swale. This can no longer occur in light of the Taft Hill improvements. This historic point of release will be maintained as our control structure and supplemented with an orifice plate to allow for a maximum allowable release rate. Please reference the "Mass Diagram Table" and graph in the report for details of the required design storage. The commercial area has two possible outlets; first through an existing 15-in. pipe crossing Taft Hill, flowing east, south of Bronson identified in the City's "Taft Hill/Horsetooth Road Intersection" Drainage Report (May 89). The second possibility is to utilize the 18-in exiting the detention area. We are assuming that these release points for'the commercial site will be under scrutiny in the future. This design will not allow storm runoff to enter the detention area from the undeveloped commercial site. Rather, a berm will be constructed at top elevation 5124.0 and direct flows into the catch basin south of Bronson on Taft Hill . Storm Drainage Report Silver Oaks P.U.D. Page 8 Downstream concerns have been addressed by insightful planning in the "Drainage Report Rossborough Subdivision" (April 79), and confirmed in the May 89 "Drainage Report Taft Hill Road/Horsetooth Road Intersection", prepared by the City, Development Services/Engineering. Both referenced bodies of work clearly indicate the ability of the 40-foot "Drainage Way" to handle all major events from the developed tributary area at the up stream end of the Spring Creek Basin (please reference the attached excerpts). The detailed GP shows a 4-foot concrete drainage pan to be built in the detention pond capable of carrying nuisance flow to the 18-inch outlet piping. Grading within the detention pond is being dictated by existing grades for the discharge piping into the Rossborough Swale, and the naturally occurring "flat" topography. The surrounding topography will best be suited with a top of bank elevation 5222.5-ft. as the minimum grade around the detention pond. The construction of the Silver Oaks detention facilities will improve conditions for adjacent property owners by controlling release rates in the northwest quadrant of the Horsetooth and Taft Hill intersection. Storm Drainage facilities in this development, will be maintained by a "Home Owners Association" to be established as part • of a future development agreement with the City. Storm Drainage Report Silver Oaks P.U.D. Page 9 INTERIM STORM DRAINAGE SUMMARY The focus of phase one will be on the south and west portions of the Silver Oaks P.U.D.. Development of the onsite detention will control the storm runoff from the undeveloped 25.29 ac. as well. .as the phase one improvements. The natural topography of this site lends itself to our selection of the current development area. On the north the flows off site will be cut off by the east -west ditch used to direct flows from the east end of Silver Oaks Drive into the detention area, thus resulting in a significant reduction in flows leaving the site in that general direction. Flows moving in a easterly direction toward S.Taft Hill Road will be collected and detained within our newly established detention area. The existing grades adjacent to the south side of Bronson Street will be modified with a low berm (± 1.0-ft.) to a top elevation of 5124.0. This will retain and direct a major storm into the existing curb inlet on the west side of Taft Hill Road, south of Bronson. Further consideration to the 2.1 cfs generated in the 100 yr storm will garner consideration during review of a proposal of development for the 5.03 ac commercial site. Runoff to the south has not been a concern for this site topography. Looking to the west we have a developed basin in the form of Olander Elementary School. Discharge is at a point west of Auntie Stone • Drive at the south flow .line of the newly developed Bronson Drive. 0 Storm Drainage Report Silver Oaks P.U.D. Page 10 The discharge rate as identified by the March 89 Final Drainage Report for Olander Elementary is 3.3 cfs, and has been included in all design considerations for Bronson Street and the detention area. Please reference excerpts from the aforementioned final drainage reports for additional details as required. Should questions arise during your review of this report please do not hesitate in contacting Alex Evonitz or myself for further clarification. lD�-•tom-fi�r�/ ( A Richard A. Rutherford, P.E. & L.S. S n hall", 502 c:\wp51\siloak.rpt EROSION CONTROL REPORT Silver Oaks, First Filing, is a 12.87 acre single-family residential development. During Phase One construction, a total of 17.92 acres will be disturbed due to construction of Phase One lots, temporary swales and the attendant detention facility. The following is the sequence of construction for which erosion must be controlled. The first construction that will take place is the rough cuts for the streets. The lots will not be over lot graded since there are no large cut or fill activities planned for the site. Each lot will be graded after the foundations are completed. This will leave 8.92 acres undisturbed. There are pans planned for back lot drainage. The swales for the pans will be rough cut at the same time the streets are being established. Straw bale barriers will be placed in the swales, and the swales seeded. Those bale barriers will remain in place until any disturbed areas are reseeded and the vegetation established. After the streets are rough cut, the sanitary sewer system, water lines and services will be installed. The aforementioned construction will have disturbed a width of 75-ft along the roadway alignments. The storm drainage system will be completed next. After the pipes are laid and before the curb and gutter inlets are constructed, straw bale barriers will be placed to filter out silt from entering the piping system. The curb, gutter, sidewalks and back lot drain pans will be the next element completed. After the concrete is done, the inlets will be constructed, and rock filters If placed at the inlets will replace the bale barriers. Silver Oaks Erosion Control Page 2 At this point power, phone service, gas, and cable will be installed. This will disturb an area of approximately 1.2 acres. Following the completion of the utilities, the disturbed areas will be reseeded with a temporary mulched crop. The streets will then be based and surfaced as the final construction element. aQ Richard A. Rutherfor P.E.& L.S C I ''niuuWJ flFN RIDnk I -_I a— 3:4t e : soon Ly.Tnh _A-.1 AOR Ppt%G NY N N 15(sor EY � c •y a MI AEx AIK WIiff WHNIN byM GlI NALNED TOOK CIFTIRPN perNx I.xG lt,s££ SHEET all EEWN 111 IFELOW W/NDP of S�GtIDN—AA TDRTxNIL£. SLSKTAIxmnw / NPE 4-IN 8F1OW DESyTN yx/tvE 5WPte V-1 -- 0 Ob I.uE. xnxau.cr, I�IK x CITY .I f f0— SfNIDARDS F/ x �q unccxw.uN wlLL wsn't I 4 4 3t f� p.3 3tD /.9 ' JAb I ' ) D L°) L°� m4NmE In Dclro FlvN Jz .3F% 1 19(t) - �,. L5' SL.S tFp /G�ai is w.i/ t5 "is --- e• ! 30 p 3 #0010t T 4m.wJI FJ. B —r LM1 -Al yt.�28 5° M10 2R M1e ' • V \ E�EpL JIafP4ATeN _ n,.. Ll. x 2s ` o tE wLCHL br �rws .xas) •����� �_, t"t�tM.. I p � ~` L of G:xa.r. �.• seF cH,l� rrns »lyE 3? 33G 3JF 3L.8 38 IW/ GRAPHIC SCALE -FEET � u3J-f�j. .� x Bpi 2 12 3t—j1. yID \ y ,IY 4 94� a� 31p �3�3 9 3��� 3T� nr ,���, t I.13x.9 d1. , •3� j � \� /� \. ° � � ps LS N AIZ--f/ rZy�— N�a T tw / noW bfPJYI RN¢ plNe tb 66 \� tl Ewl T<Nt OY 1 SlliIMLED A#RN1p �� a Z"+M, FC�ann L� oufLCT 4RArnnaxn ,••3S..I..r..y.I.,.,....I I . FC \. 1 to.;nv 3x p -Ie / I Pony Te sE aE+uxnED t'I•• • nyI•u f/..._. A� •� 4 \,� '� Z9% E ,I SAL .0.� A 1b OR4INAL OvIr 10T1 gW _Nby q,ll f.11�el.v r -6,W.1W Tm[A RIw Rat,.. FYtrA 3iinlvbPoR soli WeeI PoN. GrywW bdNl Tblow i:YT.= 1 n0 SECTION VIEW bill Not.. SILT FENCE 110 2S on or III III of porm 2 bounct III blow III son Nor Iry, CITY OF FORT COLLINS. COLORADO NIMIJIM STORM WATER UTILITY .r owWronI -ID sD 28 ..,.,. pTun ye/ TENPDRNC/ V&4ETAi IDry Ib A Y nxzv IN ARFAd OF wEFwt 4x 01 P� nA, WHHH E t.t Fullt V IiG In� YNF V. r u �L `lenE Gf�acH FFnv„ IYYV Lvblc RNn i 0 1vL YK A LIboL�l flA I UNDFh fJANN (E?AIL AL 7rtxn • ur,vEE f5n TIE `1.InT.Ifxy I Hx NDA 11 wool Wood 11 1 'IV. borrow "I IWIM10aml IF , ` \ m 50 il I.MA 11 1zBi \ Na ON ,,..t„ �,�, t0 All_ a .,a•Ab•or I 0.9-4T 2 \ ZA Zd.L 2 NININUM 9FT11119-l1 •••i, \ 1 2�2/'u ,.CBEs MWNTAITW WROIN SA6"Nf 1 6CMCIN-55 in AYI 0" plxE s� D N IWAUOV ♦Es CrcT _ ••• t� s I \ t�9x n9 n 0 � TEMPORARY VEGETATION TABLE FOR epFIpN:DS Quit, as Pi4 I $ I% �� �l\ EROSION CONTROL 09K MNEI _ SPECIES L&S/AC PENCEM MUTEDD LBS/ [glTpxeYIDl1 6MRt+P�'6eb.F' b �[¢� �• • 1 �'1 P3sa ANNUAL 20 To% 14lB5 _ — brims- . n RYEGRASS perto OEMa.cw WINTER tl W% 12 LBS WHEAT -- ��— BRONSON 57R T TOTAL 28 I83lAC RIIPF ZL vxnk i) "FuNPDRARY YE4HAEDN 1a EE TIMbP IN ALL ARERS Dt (TIgRD,THIEl FILTER iO ---RNf (IRAOIN4 WNIHH 6M WEEKS OF4RAOIN4 MINIIYI INEMAM p PLR CITY 5N`LOpryplTlpryy }y�MitlNb i �1°Ot �TMVDArtpS AT £'/JNI HIT _ _ _ OBJECT: Liu. D•t lt`M`I`yL}1d SIUOtM M;NLET by �ny,IS butor .md.my. n �mynoyln "unity" w,m44 t for Npmml by In City slimily. %w.5.... must IF I'r'IP �N�S IZ ��IyIDIVIv ----II� WUI gMIE o) o„^nC fit, owt ,� MT5�41; EARN MTM M1CO - NANVILIY n vI D. u s Won Nn . Now wEm. Soy Corro�I,., Si L F,el I Onto mmt.u.. t:.�i Mrnbun Tor"Is 2'4'•., t, Tyrry 4fy YsNrll/c afQICx AA WERETATINE �ntl,n iou _ ly/WpummIn ._..— — Cowiml If 1. IymNo MM Ml„w,w CURB INLET FILTER OF FORT CO LURE, COLOMOO xmm..nwmm,w e, a,- CItt OFFORFCOWNi COLLIMDO '� iTOR\IV/tT ttu VTILITY e, IMyaln,m $TOgI4VATFR JMW STMMES: IIDINLCO BT O.nvP'.i ni MIx1YNY xT xXIN CONE � :. sumus® Cost namyw.IW yti. I- '�vi0 r FI IUETAT[Vii COTE NnITTN 0 1-v ATImM Its CUT CO FEET Min 0 D-26 D-25 5111' FENCE v RE Irvb(µyEp tER NfIr Nlkyroy S FOIE ME E11flul ISIWIx 6 t4R, SOun0AKY I IMAAUELTNLxR FA ArbEf III TLACE9 TIRE LHT LVU:f $A Sfi shbi AT nEar N15TIN[1 LENxIn4 �) 5N£1 £RN —SItSW,1 iE PA—'+InWR6AI£ fiv 011 — GNNEL ylbftIL�l FILTEP. V,TT — GFUN INAl 1 ZE1: — L' uNDNLFAaH PIfIn4 l Drainage Table eN1 Area 02 tOD N-ta 1.lm at zo cis 7.0c1a a-1D 1 247 z5 9.0 U1-1c 1 0.85 1A 3.7 N:-1 1 z45 2.0 S.1 BL-1 1.54 1.5 5.3 J JOE MUMOIJM .L.X.A 1 6 of 7