DRAINAGE REPORT FOR
VICTORIAN GABLES PATIO HOMES
AT SILVERPLUME P.U.D
PREPARED BY
STEWART & ASSOCIATES, INC.
NOVEMBER 7, 1990
STEWAF<r&AsSOCIATE$
Consulting Engineers and Surveyors
November 7, 1990
Mr. Glen Schlueter
Storm Drainage Utility
City of Fort Collins
P 0 Box 580
Fort Collins, CO 80521
Dear Glen:
This is the storm drainage report for Victorian Gables Patio Homes at
Silverplume P.U.D. The site is at the Southeast corner of Dunbar Avenue
and Swallow Road in Section 27, Township 7 North, Range 69 West of the Sixth
P.M. It is located in the Spring Creek Drainage Basin.
The proposed P.U.D. is a part of The Gables At Silverplume which was designed
in 1983. The original P.U.D. contained 12,.33 acres and 4.81 acres were
developed. The original storm drainage report was submitted by Merrick &
Company and dated March 2, 1983. It divided the site into four sub —basins
and provided three detention ponds. Sub —basin A-1 did not have storm water
detention.
The proposed P.U.D. contains 7.52 acres and has 40 paired housing units in
20 buildings. The original plan had 144 units in 12 buildings. The
impervious area has been decreased by 4%. The four original sub —basins are
generally remaining the same as the original plan. The only significant
change is that original Basin B-2 is being divided into two sub —basins in
the proposed plan and each has a detention pond.
Basin A-1 is the same as approved on the Drainage Plan for The Gables At
Silverplume dated March 17, 1983. Part of the basin flows out the private
driveway along the south boundary to the easterly flow line of Dunbar Avenue.
The stormwater then flows northerly to an existing inlet at the southeast
corner of Dunbar Avenue and Swallow Road. The stormwater is then carried
by a storm sewer to the existing detention pond at the corner of Swallow
Road and Claremont Drive. The other part of the sub —basin flows down the
private drive in the existing Gables At Silverplume to the Dunbar flow line.
There is no onsite detention for Basin A-1, it is detained in the
Swallow/Claremont Pond. The coefficient of runoff is lowered slightly from
0.58 on the existing plan to 0.56 on the new plan. A copy of the old drainage
plan made by Merrick & Company and dated March 7, 1983 showing their drainage
basin is included in this report. Also a copy of the new drainage plan is
included and the basins are denoted the same. This parcel was previously
platted as Cedar Village Fifth Filing. The drainage report for Cedar Village
Fifth Filing was prepard by M & I, Consulting Engineers and is dated July
1979. The M & I report designs the pond on Tract "A" at the corner of Swallow
Road and Claremeont Drive. The Victorian Gables Patio Homes P.U.D. runoff
will decrease due to a lower coefficient of runoff and therefore the pond
on Tract "A" as designed will be adequate.
James H. Stewart
and Associates, Inc.
214 N. Howes Street
P.O. Box 429
Ft. Collins, CO80522
303/482-9331
Victorian Gables Patio Homes Drainage Report
November 7, 1990
Page 2
Basin A-2 is also the same as approved on the Drainage Plan for The Gables
At Silverplume. The rear portion of three paired houses and their rear yards
sheet flow northerly through The Gables At Silverplume to the existing
detention pond at the corner of Swallow Road and Dunbar Avenue. Basins B-1
and B-2 on the old plan have been divided into three basins, B-1, B-2 and
B-3 and each sub -basin has its own detention pond. The discharge from Pond
B-1 flows through Pond B-2.
A smal area shown as Basin B-4 does not have storm water detention.
fZc eta0o is lcsr'IhQ" hisf'otI'G So Dk-
The detention pond volumes were calculated using the Mass.Diagram and detain
the difference between the two year historic runoff and the 100 year developed
runoff. The outflow from the three ponds is metered by using small pipes
out to curb chases.
Erosion control measures are provided at the outlet points of the three ponds
during construction and until the time the seeding of the ponds has been
completed. These measures are shown on the drainage plan. The developer
shall provide for the clean up of any mud or debris on the existing streets
at the end of each work day.
The runoff calculations and mass diagrams are included as a part of this
report. As stated previously, the Merrick & Company report and the M & I
report are attached.
If you have any questions regarding the report or drainage plan, please call.
Sincerely,
Richard A. Rutherford, P.E. & L.S.
President
lkk
enclosures
SUBJECT _.VIC_TJJ_L=16L-�@��-S��_'�'LBY_� Hr`i DATE _ZLzz/so
4-- vz�C-..PJ�v/dr --- -------_ SHEETNO.-- '---- _
-- _- -- PROJECT NO.------_--
Az'E,4 =. .7.5zt 'AP � .k, L. P
Ex�sr N R�A/J :
I /N PEa UL°uJ Ap.�SA 3•.S 4- Ac. 4 7. °� V
0, saq) = O. SB ✓
NE w I- AA)
j�Egv:roui A a A = 4rIZ Ate,
4- %Q,Z x 6,54.8) = U •s(o
Asl A) rq -.l (/)Ew P U. D• onI,O
RossBbg'ova 4 Drke A - 670X 30 _ 0.4G Ac•
Z,70 ,Ac,. C= o, S�.
t
T c_ _ l 6 7 (l, l - O. S6) So o 1�-
or 40 '/s `� = 3 o AA / u.
Fry• 3-L UzegvDe. U= /•5 L= zS0" T n '3 �+/v
3 4-, 6/1/ v
v
L=7SOr
+ 3 M,v. = 3 3 M/,)
DEv, Qzyl� =
O•SG x
/,37x 3•t(,
DF_V.. Qioy2 =
O.SG x
c-•�r,J• v
DEv, Q too ye-
I Z-J x
'O•S6 x
c•F•s.
= 7-3 m14. T 3 A4/A),
D.. 4 0'13
V - Az- rE/J6 c. 'LTr= 3 m ,v.
SUBJECT ,�I�71JL'- ..�1__L2@LtL£.L—:iZ--_.
BY_—����C_'_—. DATE_•'t��/-`��'
s,!
AlE
SHEET NO.-- �----
— — — — — — — — — —
— PROJECT NO._____--__
i
B;As//v A-?--( A)
A 0. 72- Ac. C=
O. S6
Tc= l'87(/./—O.s30//z.
13
%s
4- i
L
Tr /•87(/•1-/,zSx/0/AI
DES• Q 272 = 0.S6 x 2!2, X 0.17Z a
o.89 G.F.S.
DES. !Oy/L= O,.S6 X ¢,$ % 0,7Z=
1•`13 L.F.S. .
/,.ZSx O,SG. x. Z.z x0,72
i.
B AS 1,V 13 _ L (/V Es w -P u b '6 A? � Y�
AREA= /.%/ A,,.
, Ca0,5(0 V=0.7<t�Src
TG ``.. / 87 (� l� O. S&,) Jioo '/I-
=
Z Z M / ,V , -1- Z M /V = z 9-• Al i.v.
L
= Ito M iN• "l-' Z M / eJ B xf
• /ooyz, �3
DE-v, z _. O.SG x h7
Dev, Q /oyg, _, 01S6 A. 2,9 k
/'9/ _ 340 e•FJ.
p6v• �(tuy/e. >-:/'LSX..O..S6 x
SSx hQ/ _
%,35- c,F,1.
i
N u T. Tc. 1_ . / 8:7 /. j o. 'soo
%z_. IZ
31eM14-). + ?-M"J'
.. /,08 !3
✓
0.ZOx /,ZSX
L9/ = 043 c.�S, j
SUBJECT �JLiQ2.�_ELRL_ip Fi'�L.�.j'—�T BY--.j1�A_L__ DATE_ Gs_ /jO
SHEETNO._—_5_----
PROJECT NO._ _
TC. IOo �'� - / g�-('/'/ �, }� t /4 An'IAJ. V : ,
y ; D,Sb x.�/.,9 X Q.qG _ 1,OZc•FJ,c/
i -
• i i I
D 8 v,
D E V;• /ooye c /i 2.$_._0,56 x 6.1 x6•9(-
= L• lO c.r,r,
- i
HT ... T c_ _ il, 87
,
/• i3's1 = 3z M1N,
B AS- A).
ALGA = 1•0( Au. C= O,S6 L= 140 Fr. V=z
' T /Min,
O /3 SOO %z = C3 NJ iV, I l M iN. = Zug MiN,
Tciooya LP�7Cl,i� �sx',s�) soot/i . /i nn,v, t 1 Al iN, _ /8 m/,V
�3 /S
D e�, Q zya = . O. SG x /• .�K 7, 0 6 - a, 98 c.,F Jr,
DES, �ioylz O:SG xl.*'; 013x .1, oG = l•73 c..F.r.
i
�.Jr(eiX•'IT X 1.06 = %�-•Dg•G,F,J'�•
Nur Tc = /• 43.7 (l• I �o•i) $DD �= 38 M/4/ f i M /u,
D•93,/3
Fier, Qzy¢ = 0.20x LZ3X AO(o = v•z� c•Fs.
SUBJECT--VJj, Zp„/ /LAd.Z DATE26)
------- SHEETNO.__L2___--
__----. PROJECT NO.__
AS/.V $- 4-
A IZC-A = 0 18 q,'•V
a
Tc c /h 87 �1.1 -D.$�) 1801/Z-
C= O.s`
7� - l87(ll- lzsx•sc�lgo�L
/oo
13 MIN,
9nlq
OeV. Qzyp_ = 0•J6 x Z•ZS x 0.16 = o.Z3 c.F•f.�
Dc--�
DEV
A 0./g = 0.40 a.F.r.
Qloo�c c 1. 2SX 0,56 x 7. Z
c-, F, J , l/
D67 A)T/0A) Reg,
DETB.VTty7 ) / ,e01>OJED
�VTLE7 r, t
Pou D
B-1
11; 17 8 Cu. Fr, //
3G, Z 3 3 C4.
rr.
0.48 c.r.I.
POND
Z3-Z,
54(1a Cu. 97.
(.3 ¢8 Cu.
FT,
Pou C.
67S(o Ca. fir,
/3,494 Cu.
FT
0.Z4-c,�
PoNa
B—I
Qz 048 C,FS.
1/ = 0.6 z - 0 6
Zx3V 2•z x 4.32 =
/0.03
h - 0.}$ - Z✓/U
/0.03 - G•% In
SE 3
P. V.C,
i�oND
I3-Z
Q: 0.27CC,,c.j.—+0.4g
C,F.S.
V =
A = o.7S
_ J4.67 lit
UI E 4"
P V.C.
7.30
o nJ p
f3
C = O. Z (o
Il = 0, 6 L4.4 x Z 6s
$,1z-
SUBJECT V ISr 2 /iI1J-CG'AG..[S_.t��
BY--6./=1 fez--. DATE_iLCcl' `i [J
f/yf
S�L=1L Lg-=P_C�uJk1 C==_ZFiS1A1_H-I--_
SHEET NO.-- 7
---.-
--
PROJECT NO._-__-_-___
T/MC=
MIA.) Z. CfCq
Q(CFS.)
VOLVAISCF7)3
to
77- 7.zsxo.sbx-i.9�.
9•(0s
S790
Zo
S.z -" h 3.4-
`. 97
B 36 4-
30
4 Z
S&3
io, 134-
40
IZ,5z.g
9a
9
z•ss
/3, 770
iZp
i.4s
i.94-
l3,9�8
I80
7,4-1
rS,z2g
SUBJEC I'�LL>11Jb'.1r41J
©Y_- _,��--_DAIE._._y%7
/
' ��fl1.1LE1�iPi.1l
L'lE��---
SHEETNO_
—_--36$-ldJ
PROJECT
T/me MIN.) `L-
C4 CA
GFs
VOLUME Fri
7•2
/.zsx 0.5a xo.94o.
4 8z
2097
ZU
S.L
= 0.W
3.48
4-17(o
3o
44,Z
Z.81
50s8
40
3..5
Z- 35
5s4,4p
60
Z.ro
'/.7 ¢
GZo4-
90
/.Z7
I Z D
/. 4S
0- 97
G 9 8 4
180
/. 05
0.70
7 SG D
w c 00v
7)
J
O
4000
Z 000
T/M6 (MiN•)
SUBJECT CJ c.. :,�'�7 L,J AIAL—_(_2A_P IL -7L_,AL_.
BYUAI E—�,Lz1/2U
SHEET NO. ---a---^
-------____
PROJECT NO.__----_--_
TIM E
(m)AJ.) Z
C4 GA
C?(c Frr)
VOLUM6�r-r �
l0
7• Z
/• 2sx 0•s&x
J. o&
5.33
3198
zo
5•Z
= 0.74-
3. 05
`f loZ0
3o
4•Z
31 11
5598
40
3•s
Z • 59
G z /6,
(10
IZ
9 0
/• q
4-o
75�0
Zo
�¢s
!'
1, 07
-770�L-
�ao
l•os
O•78
S4Z4-
ry
J
�
O
8 D00
75c 0
L00040o0
r13i
.0.Z000QoLEr
reAfE
Rg1E=o.L�G G.f
owAB� VAL
RcT
QUTL6i
/404'
10 10 z0 30 4-O (10 90 izo is 0
-I-iM e (M,.v.)
SUBJECT 1 IC TLZ C-i A p/BY-LAt'— --_. DATE
lf7lwy------- SHEETNO._1Q-----
PROJECT NO.-----__--_
oNf re CVlzg GUT-r6P— CAf-.4G/T-y F,eoAj
Z ! ,Sp rl = ,0/ 3/zs�
0
-pA j CAPACv7-y
�,.
9 . 44 � 2% I/2_
Q x a.49s x 03107) " ood-) - / 33 G.F.r
DVAI 13A e_. CU2..H-CAP4GiT
Dv,va4e- PA,iENIEnJT.+rV)Aet A2Ej= /0/5X 31 = 0•77_z_Ac.
UAS/N A-% A P-E,4 = 4-12-SAC, BOTH
4' ZS h�... es.s°io
97 Ac� 4./¢ S% C 0MPoi iTE C= /k0.14S) -4 L,56 k0.05S) =0,63
97 Ac.
Tc_ 0.(,3) 500 %L /
c ZoM/W. V
V
C�Zy2 0,63 x i e x 4.97 = 5'4- FT%J6c.
CORZ G A do i ry T r. M Fir.. 4--/
°/° 2EDUG T/oN F = 0.0
z= V - �Z
y " 0.
ACLDW {BCC �? _ IZ, pJ C•Ff. 0 /_
1*
y
(
r w ,
i i=a
� 1 R•4 9
h,1
4 ,3
�•1
1
�
p1 `Y 7•q
�iA
Y e ,
�Si Y
n
yyng
•.
It
cos
�
f
1
L
h(
L{
(
ZtY JSJ.
�
.•i
TAWDON
AVENUE
d�
@t
04,
q1
a
r
INV 7391
^^ ONNECT TO
, \ a \ EI(ISTINL INLET So.
6.oeciGLNdeCBS-
TO
upo
/ 7{
E ON
' LAP,LI7V .. ,.:.,.SGW
nR
i www w..,aecu Rr
\ \
•7T.2
13.
<� JA
I l.fn
Al
\ I.
L J
tr
--- !. r,—_'f I I I I l l l l (LIia . l l l l l l fL1JLL1Lll1llLLL1\,
NOTIS:
1. All Y011 COY 110 SET N[S[ OMAN1.11 TO 1[ 1[AIOIIR'D IN ACCORDANCE
N llx THE CL TI 01 TORT mLLNS ITAAMAOS 00 SI¢an CATIM.
1. IN OR TO CONSTRUCTION. ALL CNTRACTORS SxALL VISIT EXISTING
11[YAT INS.
S. SGCN IANKi -E- CUT ON TN[ NORTH IGNNETT IOLT W EXISTING VTR[
NT0WANT N THE 'MEN Im[ 01 SNULW IUD. EAST 01
IONIC AVENUE. ELEVATION, 5001.03
All
[
-
2.67 A.G.
1
h M
5, 101 p[LIpX Or SYMIILY Xpxp \Mp IONIC IY(XU[ REFER TO CONSTRUCTION
(INY1XOS wX f L, ALONE I.u.0,
VOA n1 pOX OF puxuR AVENUE WIN TO CONSTRUCTION DRAVINGS 101
'Cr DAA nLLAp[ n1T" FILING.
S. TIII AIIIOVAL 01 MIII ORAYIMGI.IE IN[ CITY 01 FORT COLLINS HULL
NOT RELAY[ THE 0111N IN41MIER 01 RSSIONSIIILITE 101 ERRORS
AYOYOR MISSIN$.
C
9N
INV"0I'
K I.,G. iIV� '•T
&ECTION A.L
PLAN
CURB CHASE •DETAIL.•
M GiL -
c.AA.cITV • 12,ISD CU.If.
w w cL . el.D
\
nR..
{°b
I.W%
1
S'.6' .SRIALT
•ROyPY
taNTR0. MN
-
R�
°.
X( ;NI1tIN:: C04TOUR
"
N...IN{ D.11N nOYYDARV LINK
DER,'.., 01 OMAass' 6e
'�'j I '
i
-- RHnTIUG LULveRT
LYLV\RT
�❑1, '
LO;'
I. TM[ TYI[, IEEE. LOCATION AYO xUN1LA O[ ALL A,IDIN WOGNOVMO
VTIL I IIp AA[ A1110AIMEl .NIA SIGN. ON THE NAYOIpS. IT WALL
Ll.'1l4 t`'IIW. IN'[I'{i
I . i•
!E THE 11 011111LITT OF THE CONTRACTOR TO PERM JUE GISTIAC[
ANO IOGiTOA 01 ALL UNDERGROUND UTILITIES, RIGS( COR[xCI NG
CONSTRUCTION.
•"'-
[
0. JENSEN ENTERPRISES
- -
O•
per
SHEET �_
DRAINAGE PLAN
Oop
❑❑❑ �CG(
{D
THE GABLES AT SILVERPLUME
,:+'.•.,
oI
tN Ni
�,r
FicALIN.I.Pp -
O to 90 60 Iva we
/
/
/ •1
/ nm Aqb
I-j'NNAlt4 BAD iN LIIIE74
� 6Ahlh; A-2
bAhIN A -I a � hNpat tLDW
. .. I �f 2YR•0.9q cbi
R IooY%' I.'19
0"B
,. ,»....
T mill
„�... �., III I� •-,. ...... ....... - .,...»...,,. , -
NIT
BA
\4MllwUYEI.• 04.0
I ' NAx •cols . d+I -- ��
NAIH G 1 toNO 6•I
VOW MC-94,2v7
I H.W.L.. bto lHVi,Dwil
A,
L%LINGKioF x SitAW r-PL«.,
]'WIVi O.eu. ' gvYK•l.ev 05r�
,A 011 il, lei ooY%•9. ev Lla/,L/�
m
-� _ �i.5 �•_ ��v '..e• - 9- I m �I / o ' r i7cis L4 'x \- -;T- I �e � "a -I� +
�• a✓-q 'P • �• t '➢ if.• B'1,9 frs 881 .v m � I f�• BB.4 Y • /� ` B'L, fT+ `8,.1 ' u o I � �� "' -u
e"• FRB "�-"' ; �'^". ' �?. � '. � � .\ � � � I Y , ; a � � � M .,
.x •� s)a. ve /N � r , 4 .N 4e 1 it .B: dK %- we aB a .RG •E � 'N .i 1 e- i' a
�-.-
1 3/9�` • r0 .� 4�-.� � ��`l '�l � ' N }L1 LL ..� ICY y4 \.-J' LLrJ C'I Lp v� �. b>� k r -� /
��' �B, a�•_ >r e _____ _ ,. e�6AGi111- ''zed �. �c�es� \ / >z _ _.Y_ Iwd.
eF sY 4L p>c °'e _ � eb�a Ls `c \ � s_-_ r `"• dz
—Key9Avk floe or KW -to Utli DeieNtloN—� m% --
poN DIK4jIKL to D6O 70 •114r. uT , oP b
teAi�7HA -11ME OrL KCIJTI ,o Ny . �A,L,
DIF-i,?mp ApEAc sHPLL P-L 2E�+i.404p
KENtua Y.Y L3 LU e4 FLA" PJ"P, y16 6f mV
C6GEn'O
N OT6h • (GONt )
4. GoIJi KALtoK a.µAµ, COMP YAW P'+ 6000 P4
r06o1DAI.14IL LOMPLG11aN op LONv(RVL}'°t✓ ��•n'L nr.�... :...f r
oY cPLH uNCt.
9. (:%.c7 taxi f.>/•./v.Gvi .r.�
--eo Lr S'rv�-_-0.4'/•
IZ WIPP boll 6. FAIJ—jYILLNAY F 51.0
/ rLn VaVlILK LJLVPKi mol q btKN tmW %l • BLY
YI,
I�gloO YK•Z.e cS., VoµDD•Z
�A08 N.N.L.• e1.0
NW GWrF q�I
6L0NL. rA 11
INV• ,0.66
IB L1 4' r v6
A / -.�VAWAlK LNAba
Q tYK
W LWL6s
q9 i �o e
a.16•' \ rim /yee
�.I
y 151ocWAuc cNA6G
.'� I I 2rO LF ryYa" PVL
LFllcl' HNiL/ WP�tMLLc'e ,0L."IAY
VOWnb
/ /' N'LnµL j'AN Ph•Bi.oi VOI'> CL•B2.B
• IL 4'1+L6. r1+ moll Of beKN
-Q ZYF'. O. EYZ cgs ' N.N L.•BL.60.ea MIN %L•B%.1
�} rY loo YK. 2.90 c5c
11. -1 or B folZo f�opl"e Of
ou'I LL1� 1'IPf-s roK P6frLRTION rONOS
B- , 9-2 AND 15-3.
Z. iµ e co Kt ALiaK�C 4.HALL LLSAO 'Me NUD f9OM
EQuIpMEN LI ECL-.. rizim -to DICIv1N(4 oNTo
tHB PuBI.IL <.1`¢ G- ANY YIND 'TKALKev
oNt0 A'[112, sTFLW tPAAW EF- K:MCveO
GY iH6 6WFf JLLtoF ON A OALY GA4.1e+,
3. 6outwfoK "ALL Not re -move Erl/oi1Ny dirouuD OOV6K
ON AMY. Lot Wit, 4011G1 KNLTION PIA ON'TliAi Loi.
Q 1A0 fK•,.BL LSr bIUNalUtz�: QZ YK•164 AS•
• 4`�` ' 1 L A� f.HOWN o
Us. IOO YR.-y A,11♦; IINDGK•+1CmNW I/D HCKe GY ALLLrr
_ — ___� W•._u Y[y I _ � .A'I- 61RAVING PNV VKPINAy� PLAN. '•
T}I
A'C �LV6{2 PLUM (•
NOMeOWNtKE- A�E.L�IATIoFl
3' 6OHG. !'AN PMAI1,RIP �Z;Al,rcYAIy p��r-k1Es, f K uvcui
Iti WIDe "o L
<,LL
Iq
s..-$
❑❑❑
00o MERRICK
Merrick & Company
P.O. Box 975
Fort Collins, CO 80522
March 2, 1983
Mr. Phil Waite
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
RE: The Gables at Silverplume
Dear Phil:
Based on our discussions and review of the storm drainage analysis for
the above referenced project, we are submitting this updated report.
The major revision to the drainage analysis is the runoff coefficient
used to determine the 2-year historical runoff. The runoff coefficient,
C, is the variable of the Rational Method least susceptible to precise
determination and requires judgement and understanding on the part of the
engineer. Its use in the formula implies a fixed ratio for any given
drainage area. In reality this is not the case. The coefficient repre-
sents the integrated effects of infiltration, detention storage, evapor
ation, retention, flow routing, and interception which all affect the
time distribution and peak rate of runoff. Given this consideration, the
runoff coefficient has been reduced from 0.3 to 0.2. This results in the
following basin characteristics:
Area
Detention Volume
Outflow Rate
Basin
(acres)
(cubic -feet)
(cfs)
A-2
3.45
17,450
0.83
B-1
2.67
13,487
0.68
B-2
1.96
12,185
0.53
Another revision is the combining of detention for basins B-1 and B-2.
This is accomplished by an 8-inch diameter pipe. The 8-inch pipe has a
discharge rate of 0.68, therefore the outflow from detention pond B-2 has
been increased to 1.21 cfs to accommodate the additional inflow.
Should you have comments or questions concerning these amendments, please
contact me.
Very truly yours,
MERRICK
& COMPANY
Lldy'd G.
McLa ghlln
Project
Manag
:jb
Merrick & Company: Engineers & Architects • P.O. Box 22026 0 Denver. Colorado 80222 9 Telephone: 303/751-0741
❑❑a
❑❑ MERRICK SHEET NO.-!!! OF
BY��DATE Z-ZB-$3 SUBJECT-���`lEf+'Ptun'/E.3
—
ENGINEERS d ARCHITECTS CH BY DATE JOB NO. /'¢'5-"��
loi (3.-Sz5) �• O. 8- c,�s
///iNUTE
/UO- i`/P r.F2rOUEI�t�
OUiF<O v✓
fTOF/.11E
�0
9l ZGG
-�9N
8,7Gg
/ r'
Z,Z Or�'St
s9710
/G l08
/ � E370t/3 7r.:af
/p'/JlYcc.�a-��: >// �o C/,i✓. 78 = �S (3��i8,r...^! ?900� /. goax r� �c
_ .3Z, 05
rc✓ =o/cu ol%r�cv�.4�/ry c�Y/7-J�p ��..
7 X Z
❑❑n MGRn'CK BY DATE DATEzzf3 B3
/ SUBJECT -S/G ✓�5'�yME SHEET N0. -Z OFs
ENGINEERS B ARCHITECTS CHK6. 8Y_ DATE JOB NO./'¢5''464.5
.�uf'-Pam/!=✓�✓ ,B-/
Lr.s
r,
.5
-•�-c��
ZO-¢
3, B6 -fl
-go 8
r5
9 oil
'5/6
95�5
oee
14, 864
3Cn7Z
/80
/B
!'on you/' B4 = ,.3�✓5O
cci. 1n�/
y(•7;�69Oos/i000t G900Xii,
)= w-ZO9
i/6-49
/6/ZB
Fo/'
GA�GU/oy�d G4�lJG/7Y OT
/3 �S7 GU.f{.
❑❑o
❑❑rl MERntCK BY.. DATE z Ze 3.:: SUBJECT � �'! y "'r'�%n"%-� SHEET NO. 3 OF=
ENGINEERS B ARCHITECTS CH<D. BY DATE JOB NO.
�uB-.�3A3ii✓ .Cs Z
M,.vyrls
/00-yR fiPE4'uENfJ�
Oc/fFLOr✓
,�fp�5-�/(�
/O
6, 30.6
3i8
S9g8
/o, /0
4o D
%d
/8cl>
Cp 7�avi 7q = Z70O c,, e;�'
Co��ou� 80
�.3�i)�z7ci'� 6i.So > z�opxciso� = 4308
/Z/;�•':5 �:i. ;fit:
❑00
000 MERRICK
P.O. Box 975
Fort Collins, Colorado
Telephone: 482-3639
February 4, 1983
Mr. Dan R. Jensen
d. Jensen Enterprises
P.O. Box 1007
Fort Collins, CO 80522
RE: Amendment to Silverplume P.U.D.
Dear Dan:
This letter report and enclosed drainage plan present drainage informa-
tion and recommended improvements for the amendment to Silverplume P.U.D.
SITE DESCRIPTION
The proposed amended portion of Silverplume P.U.D. is located south of
Swallow Road and east of Dunbar Avenue. It consists of Tracts 'D' and
'E' of Silverplume P.U.D. and Lots 45 thru 64, inclusive, of Cedar
Village, Fifth Filing. For a vicinity location refer to the enclosed
map.
DRAINAGE BASIN DESCRIPTION
The general topography of the site is comprised of gently rolling features.
A moderate ridge line running north and south separates the site into
two principal drainage basins. The basin draining west flows into Dunbar
Avenue, west on Swallow Road and into the Cedar Village, Fifth Filing
detention pond. The basin draining east flows into Swallow Road, thence
to Shields Street.
DESIGN CRITERIA
The amount of stormwater runoff for the individual basins was deter-
mined by the rational method. This procedure equates the design flow ; 3
to the total area, amount of rainfall on that area, and a multiplier <
that is determined by the physical characteristics of the area under,
study.
The bulk of the procedures, methods and numerical constants were obtained
from the City of Fort Collins Storm Drainage Design Criteria, dated -4
January-1980.-
Merrick d Company Engineers d Architects 0 P.O. Boa 22026 • Denver. Colorado 80222 0 Telephone: 303/751-0741
Mr. Dan R. Jensen
Page two
February 4, 1983
DRAINAGE PLAN
Offsite areas have no contributing effect on the drainage plan since the
site is located along a moderate ridge line.
The site is divided into four sub -basins as shown on the enclosed drain-
age plan.
Sub -basin A-1 consists of 4.25 acres. It is ��rcrcCO6�'VIU4,A
to continue to discharge to Dunbar Avenue as Proposed to allow this area k� ��I �;
Collins for Cedar Village, Fifth Filing. The flows eare ythen accumulated
the City of t
in the Cedar Village, Fifth Filing detention pond located at Swallow Road
and Hanover Drive. - _ A _
Sub -basin A-2 consists of 3.45 acres. Stormwater in this basin flows to
a detention pond proposed at the intersection of Swallow Road and Dunbar
Avenue. The pond has a design capacity of 15,466 cu. ft. to a high water
elevation of 5077.I- The discharge is controlled by a 12-inch pipe which
has a capacity of 1.32 cfs= The pipe is connected to the existing storm
sewer which has been designed to accommodate the anticipated flow.
Sub -basin B-1 consists of 2.67 acres. Detention for this basin is located
on the south side of Swallow Road in the vicinity of the proposed tennis
courts. The pond has a capacity of 11,635 cu. ft. to a high water eleva-
tion of 5083.7. The discharge of 1.11 cfs is controlled by an 8-inch pipe
which flows to the Swallow Road curb and gutter through a sidewalk chase.
Sub -basin B-2 consists of 1.96 acres. Detention is located at the south-
west corner of Swallow Road and Bowie Avenue. Pond capacity is 10,663
cu. ft. to a high water elevation of 5080.8. Release is controlled by a
6-inch pipe with a flow rate of 0.86 cfs. The pipe flows to Bowie Avenue
by means of a sidewalk chase.
CONCLUSIONS
This drainage plan will satisfy all hydraulic considerations as well as
al
equitabletmethodofstormwatermanagement
regulations
providing
this
project with both a safe and
Should you or others have comments or questions concerning the drainage
plan for the amendment to Silverplume P.U.D., please contact me.
Very truly yours,
MERRICK & COMPANY
Lloyd G. McLaughlin
Project Manager
Enclosures
cc: :City of Fort Collins, Storm Drainage Utility
ZVFK Architects/Planners
LGM:jb
c r- � a s • c.•r it I r
c
I •' � - e Yam• `'`r � � I
F :r PROJECT
6 U I
a l6 LOCATI Oil
. DRAKE RD.
CI d _ I`lim
D
' .vl �r• � �• �V � .r: e I
15
cc
LL
r ,'� ♦ a I
wFr. U C I
r.n.r or:.. ►<
J � Se M AI. C. IY r.Cl
p:w . c: 0 � � 5 •=C� � . o I
99 J 8 �' • �'_ " e
wl.ud N �1 I
u a
W I
N m nd }
VICINITY MAP
SCALE: 1'■2000'
09% M&I consulting engineers
i
STORM DRAINAGE
FOR
CEDAR
�5 FORT COLLINS COLORADO
. JULY, 1979
jc
:::r m- zo'Y•>•�� ?Y #n�.e_T t S'a o }r.rx}i
ct
iP
yy.-y,
1 � ySf5Y '. �Y Y
#Y:•r. iV .:w h s5 1 e
As Al
' CA
r xw1..i .� xx.V,S i �.: iS• .t., ra'C'7' a e`." r
JY4.+
STUDY
t
'f
•4 �
.�'
Y a. '.
Y Y j nr
1
t'
VILLAGE FIFTH FILING
M&I consulting engineers
4710 South College Ave. Fort Collins, Colorado 80525
Telephone (303) 226-2323
July 25, 1979
Miller Homes, Inc.
P.O. Box 1007
Fort Collins, CO 80522
ATTN: Bruce Miller
Dear Bruce:
Presented herein is a storm drainage report for Cedar Village Filing
No. 5, located in the City of Fort Collins. This report conforms to
both the subdivision regulations of the City of Fort Collins and the
Federal Housing Authority. All calculations pertaining to this report
are available upon request at our office.
Please feel free to contact us with your questions or comments.
Very truly yours,
M S I, INC.
Stan A. Myers
.E.-L.S.
Enclosures
TABLE OF CONTENTS
Page No.
I. Introduction . . . . . . . . . . . . . . . . . . 1
II. Study Area . . . . . . . . . . . . . . . . . . . 1
III. Existing Storm Drainage . . . . . . . . . . . . . 1
IV. Design Criteria and Requirements . . . . . . . . 2-3
V. Drainage Plan. . . . . . . . . . . ... . . . . . 3-4
VI. Conclusions and Recommendations. . . . . . . . . 5
Exhibit. No. 1 "Vicinity Map"
Exhibit No. 2 "Design Flows"
'` F
W
I. INTRODUCTION
WThe purpose of this report is to present the developer with a proposed
series of improvements which will provide for proper management of storm
water runoff from both the Cedar Village Fifth Filing itself and adjacent
contributing basins.
The scope of this report involves an analysis of the storm drainage
characteristics of this property in both its historical and improved
conditions, consisting of the following items:
1) Established rainfall intensity duration curves for the City of Fort
Collins.
2) Storm runoff quantities and their general direction of flow.
3) The size and slope of storm drains required.
4) Size and location of detention ponds and culverts.
II. STUDY AREA
The area on which this study is focused is Cedar Village Filing No. 5 and
its contributary basins. This subdivision is located in the southwest
portion of Fort Collins, just west of Rocky Mountain High School. Exhi—
bit No. 1 displays Cedar Village Filing No. 5's geographic location.
III. EXISTING STORM DRAINAGE FACILITIES
Cedar Village Filing No. 5 is bounded on the north by Cedar Village Fil—
ings No. 3 and No. 4. These subdivisions are fully developed. Drainage
is facilitated in them predominantly by surface flow, however, a 21" RCP
has been .stubbed out at the subdivision boundary in Hanover Drive to pro—
vide for future anticipated flows. The general topography of the area is
comprised of gently rolling features, basically sloping from south to
north.
- 1 —
IV. DESIGN CRITERIA AND REQUIREMENTS
The initial and the major drainage system make up the storm runoff drain-
age system for an urban area. The initial drainage system should be
designed to accommodate the runoff from a 2-year storm by utilizing the
maximum capacity of the streets, overland swales and, if necessary,
underground conduits. The major drainage system must be designed to han-
dle a 100-year storm without extensive property damage or loss of life.
Areas which may be susceptible to flooding must be examined. For pur-
poses of the major storm analysis, it is assumed that the storm sewer has
been blocked and rendered ineffectual. Floor elevations should be set to
allow proper drainage between and around these houses without flooding.
(See Exhibit No. 2).
The City of
Fort Collins requires an improved site to limit its
runoff to
the amount
resulting from a 2-year frequency storm occurring
while the
site is in
to design
its natural state. To accomplish this, it is usally
detention
necessary
a pond with a total storage capacity of the maximum
difference
between the 100-year storm runoff from the developed
area and
the 2-year
historical flow. An outlet structure is designed to
limit the
flow to the
2-year historical runoff value.
The amount of storm water runoff for the area, individual basins and
streets was determined by the rational method. This procedure equates
the design peak flow to the total area, amount of rainfall on that area,
and a multiplier that is determined by the physical characteristics of
the area under study. The rational method is commonly employed in the
design of borrow ditches and storm sewer systems. The bulk of the proce-
dures, methods and numerical constants were obtained from the Urban Storm
Drainage Criteria Manual, published by the Denver Regional Council of
Governments. The rainfall intensity duration curves used in this report
were developed by the City of Fort Collins Engineering Department.
- 2 -
The ponding elevations, capacities of the channels and piping were
determined by Manning's Formula, which equates a constant, a roughness
factor, the area of the channel or pipe, the hydraulic radius and the
slope, to the capacity of the channel or pipe.
IV. DRAINAGE PLAN
The approach taken to develop a drainage plan for Cedar Village Filing
No. 5 was effected considerably by the runoff flowing both to and from
offsite areas. The central system'of the project will consist of a
piping system to be located in West Swallow Road and a detention pond to
be situated in Tract "A" (See Exhibit No. 2). The pipe system was sized
to handle the 2-year developed flows. The storage capacity of the pond
was determined by the "Mass Diagram" procedure. Each of these designs,
however, was modified due to offsite runoff considerations.
One of the offsite considerations, involved the four streets at the north
subdivision boundary, which drain into Cedar Village Filings No. 3 and
No. 4. Although each of these streets drain relatively small areas the
difference between 2-year historic flows and 100-year developed flows
accumlates to a total of 10.8 cfs. This difference, of course, must be
compensated for by reducing the outfall flow allowed from the proposed
detention pond. However, runoff is also flowing into the subdivision
from the west and east ends of Swallow Road also increases the outfall
flow allowed from the proposed pond. In this case the difference between
the 2-year historic flows and 100-year developed flows amounts to 8.67
cfs. This means, of course that the design outfall from the pond needs
to be reduced only by 2.13 cfs. It should be noted that runoff quanti-
ties flowing out of Cedar Village Filing No. 5 from Haywood Place, Yose-
mite Drive and Tawson Avenue have no affect on the above calculations
because they will be contained in another separate drainage system, which
will be developed in the future.
- 3 -
EM
The runoff contributed by Basins 2 and 3 is to be collected entirely by
curb inlets at the intersection of Dunbar Avenue and Swallow Road. This
is proposed in order to avoid valley pans across this principal intersec—
tion. These inlets have also been sized to handle the runoff flowing
into the subdivision from the proposed' Silverplume Development located
immediately east of Cedar Village Filing No. 5. The runoff from Basin 1
will also be collected entirely at the intersection of Dunbar Avenue and
Swallow Road from this point, because of flowline and slope considera—
tions the accumlated runoff will be piped directly to the pond proposed
in tract "A". Another small storm sewer located just south of the pro—
posed pond will facilitate the drainage of the sump area in Swallow Road
into which Basins 4 and 5 drain.
The detention pond in Tract "A" will have a storage capacity of 1.76
acre—feet. This allows for over 1.0 foot of freeboard. The pond will
have an outlet of 4.0 cfs. This figure reflects a reduction of 2.13
cfs., which was discussed earlier. The pond will outlet into the
ifexisting 21" RCP located in Hanover Drive which eventually flows into
Spring Creek. A spillway located in the northwest corner of the pond
ifallows for control of outfall should the pond overtop.
Another major consideration was the runoff generated by the proposed
a� Rossborough Subdivision located just south of Cedar Village Filing No. 5.
Considerable analysis and investigation revealed that due to problems
with invert elevations and minimum slopes as well as cost considerations
no runoff from Rossborough could be handled through the subdivision. It
is recommended that two year and 100 year flows from Rossborough be piped
west into the proposed_by_pass ditch, which will run north along the west
1/16th line of Section 27.
ifDuring a major (100—year frequency) storm, there are only two areas sus—
ceptible to flooding. Exhibit No. 2 illustrates these two points, the
areas covered, and the maximum depth, as measured at the flowline of the
gutter. In all three cases no damage would occur to homes in the imme—
diate area.
— 4 —
VI. CONCLUSIONS AND RECOMMENDATIONS
This drainage design will satisfy all hydraulic considerations as well as
governmental regulations in providing this future community with both a
safe and equitable solution to the problem of handling storm water run-
off.
The following is recommended:
1) Storm water runoff should be routed as shown on Exhibit No. 2.
2) All drainage facilities and detention ponds should be constructed as
shown on Exhibit No. 2.
3) The Federal Housing Administration minimum requirements be maintained
on overlot grading and street design.
- 5 -
�GG�G
OAD
RPLUM OC I-
• _
FUTURE y
^��--G^
W I ' ` y1
- ]SWALLOW
- CEDAR
PR OSED -VILLAGE
SUBDIV SION1 FILING NO.[_
L•
E TOO T.. atlC
VICINITY MAP
NO SCALE
EXHIBIT
. CEDAR VILLAGE FILING N0.5
EXHIBIT NO. 2
DESIGN FLOWS FOR 2 YR. AND 100 YR. FREQUENCY STORMS
5070 W „
} _ _ o „ CEDAR VILLAGE F1L.INGS N4.4 a N43_��
_ w
' w
0
Z u r
� N O u
a:
m'ZI^.-TRACT,�A:� Q�' O 0 00 o
c DETENTION POND ,y0� y0� y0� a o% o �o
__. OUTLET ! 1 CAP. • 1.76 AC.FT. ..'3 '
p ao<f._ .: ....
HIGH WATER I Z
ELEV.-
00 FP fr1 Z i
5082
00 YR. PONDING LEV \�
AX. DEPTH TO E=0. 6'
t o� 9 •B �� \r \ i
8Ati N 5 v
A14=1.89.� yc
BASIN 3
0 p2•/s I �F AREA=0.46 AC. 90
seta y o� 90� P 5078
0
/p0i9, J> �\ OOO
............. PROPOSED
0
SI LVERPLUME
A b:• DEVELOPMENT
T �y ✓ � z
100 YR. PONDING LEVEL
MAX. DEPTH TO IL z 0.42'
R -y
LEGEND
W
5080
DESIGNATES DRAINAGE
BASIN
a
INDICATES DIRECTION a
QUANTITY OF FLOW IN CUBIC
ASI -- ..........FEET PER SECOND-"C.F.S."
I - `'AREA' :60 AC. 0
. 3 5082 c CITY OFFORT COLLINS
STANDARD CATCH BASIN
ENUE _
o CITY OF FORT COLLINS
5084 STANDARD 6' VALLEY PAN
STORM 'SEWER PIPE
I S/„c
y SUBJECT _I�ILLO�JA tL E L_ �S BY__ —a -As— _. DAIE�y_'�'
SHEETNO.___—_--_ —
_��.):—DSr___—_------�__—. PROJECT NO.____—�_—_
AP -EA � 0.50 ,Ac..
q O
a6v. zTc, = / &7(/, /_ $.moo, z4.0 '/L
0.90 Y.s
�a
DEv, /00 ye— Tc. _ / 87C /• — (/•asx 75
0, 9 0 /is
wU 2.LS
x 2TTg, x 0-so Q,_&-T. e -
Q=
cda 7.0 3•��`�S
Dsv, /00 ye 4 = 1, Ls x 4 x x O.So =
Cvm-3 GApAcl-ry
C�ey� Z =�
n"u > /oz s = O
= ,UZS S = 009
FgcO t Fir, 4-1
n = 0-0/1,
PIL
Dep1-1, OF GUafr.- /:, C"I&
q
5 0 U
No Text
10000
9000
8000
7000
6000
4000
3000
1000
900
600 5
700
600
500 a
to
TT
n n AS .... I's c9ErncIExT IM M.«Nlwa
.10
FORMULA APPROPRIATE TO MATERIAL IN
EOTTOM Or CHANNEL
E 13 RECIPROCAL OF CROSS SLOP[
.06
REIEIEMCE: x A. a I[OC[mxss IS..
.07
IAOE ISO. [WATgx II..
06
~
EXAMPLE HEE Ou.1. LINES)
Soo
.OS
c IVEN: ! 1.01 cr)
70
n
a 0.3.23 U
0
LL
2o
FIND: o • 2.0 crs
_----_ to
Z
a '
0 400 W
INSTRUCTIONS Vr
OI
300
Q .o,
I. conx[cr [/n Ro10 WITH xaP[ uI Q .py Z
K161-1
100
90
60
70
60
50
cE
K-1
r
From BP
- 2.0
A.
6o
70
60
[50
W
40
2
v 1.30
-_
R
.NO <OMNECr DISCHARGE l01 AT.
03
.008
D[rrN In, rNE![ rr0 ux[! uusr U
.02
Q
007
INTERSECT AT TUR.;.. LINE FOR
COMPLETE sOLUF10M. Q .01
"
_006
2. r0A !HALLOW
.005
v-IN.rEO cNAwNEL
O
AS SHOWN USE NOYOCIAIx
NET. t Y
.004
W
a
rJ
0
.003
a. TO D[TE..UI(
on .... GE 0, IN
VP
Pw nON or cHAwxu
.AIIIND NO'. .:
DETERMINE DEPTH J FOR TOTAL DISCHARGE 10
.002
ENTIRE SECTION a. THEN USE NOMOGRAPH r0
DETERMINE 0 N SECTION A FOR OEPT.
J.J-(I)
r
•.TO OErER YIw[ DISC NA RG! ♦ J
1w CG.I.S.T1 SEC r10N �- J a
FOLLOW INSTROCIION ) I
e
"
ZA
.001
r0 De'AlA .nc.IIZE "A
SECTOR A AT SS..ED 't.IJ'il
9Err. J; olu1N 0. roA
al9IS RATIO E. ... DEPT. i TUE. 9, . G. 9�
Figure 4-1
NONOGRAPH FOR FLOW IN TRIANGULAR GUTTERS
(From U.S. Dept. of Commerce, Bureau of Public Roads, 1965)
F- .20
F-
_Z
0
a
to .10
W
a .06
W
Q .07
O6
it
0 .05
m
.04
U
.03
Q
~ .02
a
W
O
no
MAY 1984
4-3
DESIGN CRITERIA
owe Aw
too
0 low
00
IOo
y00
/
/ Il\
W,MIIAAeiI; 9aa.IN ullb�
PAyln Ad
P
z
fl
6Ahlf} A•2
OF
' ( Popp 5-I
vow/
N.W. �., 840
Fl.w "I" I °g S�FAW a+I.Eb
y_Iv¢ i ( r 6Ahlli I
mm ,¢ is
i
ys.
88,4
sT
LE6EN0
/. - - BL - CX�y cnnf •s
Z
10'WIo6 GOAL.
mwaWAWc 64)
IF 111.1.
4��
evY 5-4
M1w1 Of nrw WI uwIu i:: WIFAU "I
m lo'WI¢B 6096. fAlil
c���'^�IoeWabK GHfaG
0
vvoowmv 6 Z40 cu i•t.
io•i'ogD� Sl.o
'INV.'19.3d 9I4.04L, rAF
- r- Jv6WALk GNae¢
Jez� Ilea,
°m
'ScNAVI, IF
_ --- _-- ----- ------- 'a f-i� 25 LF 2Y1 PVL
0-Y14MR
J
0,0006, rm KM`eZot 470119 B-el c
VOWN6 • It,494 art.
' N.W. b.• BL.eo
i
a
m
k
Z
Q
IF -
H
�
�
O
p
�
J
d
IF