Loading...
HomeMy WebLinkAboutDrainage Reports - 05/09/1995 (2)April 27, 1995 FILE: 95027 City of Fort Collins Stormwater Drainage Utility Department 235 Mathews Street Fort Collins, CO 80525 RE: Revised Drainage Report and Calculations for the Expansion of the Shepherd of the Hills Lutheran Church ATTENTION: Glen Schleuter Dear Glen: The Shepherd of the Hills Lutheran Church is proposing the expansion of their existing Church facility located at 1200 South Taft Hill Road, Fort Collins, Colorado. This expansion includes two additions to the Church on the west side of the existing facility measuring approximately 4,500 square feet and one expansion on the east side of the Church measuring 450 square feet. A drainage report for the Church property was submitted to the City of Fort Collins in 1987 by John Clark. This report addressed the change in impervious area as a result of the paving of their gravel parking lot. This report addressed the drainage on the east side of the building, which we have revised to show the result of the addition. The parking lot was graded to provide on -site detention for drainage on the east side of the building. We have not deviated from the existing grading on the east side of the building but have increased the percentage of impervious area to the drainage calculations. Please see our addendum to the report done in 1987 for our revised calculations. The additions to the Church on the west side will be constructed within the minimum 25-foot setback from the Taft Hill Road right-of-way. The construction of the additions will not result in the regrading of the grassed area, as the lawn is mature with trees and shrubs which will not require relocation or regrading. Therefore, our historic storm runoff routes have not changed as a result of the additions on the west side of the Church. Runoff from the west side of the Church historically drains to the north, eventually emptying into Clearview Channel in Avery Park. After review of the construction plans for the additions (as previously stated), the developed runoff patterns will not deviate from the historic patterns. The Engineering Co. 2310 East Prospect Ft. Collins, CO 80525 Phone (303) 484-7477 FAX (303) 484-7488 City of Fort Collins Stormwater Drainage Utility Department April 27, 1995 Page Two After discussions with the City of Fort Collins Stormwater Utility Department, we felt the developed runoff from the site would not require on -site detention due to the proximity of the site to Clearview Channel. We felt the runoff peak from the Church site (west side) would pass prior to the peak runoff in Clearview Channel, as modeled by Lidstone & Anderson, Inc. (See enclosed report by Lidstone & Anderson, Inc.) We contacted Lidstone & Anderson, Inc. and obtained information regarding the time to peak of Clearview Channel in the proximity of the Church site. We have enclosed these calculations from Lidstone & Anderson, Inc. in the Technical Appendix of this report. After determining the peak runoff times from the Church site (west side), we found the time of concentration for the peak runoff condition from the Church to be less than the peak runoff time in Clearview Channel. Therefore, we do not propose any additional on -site detention as a result of the addition to the Church. The runoff from the Church site will not impact the peak storm runoff in Clearview Channel. Please see our Technical Appendix for our calculations. In review of the City's Erosion Control Standards concerning wind erosion, we have the following comments. In accordance with Section 8.1.1.1, Exclusions, the additions to the Church will encompass approximately 5,000 square feet of area disturbed by construction. This area may vary depending on the amount of disturbance beyond the actual footing limits. As soon as the area is disturbed, forms will be set to place concrete for footings and eventually the floor slab. As we interpret your exclusions, because the site is less than one acre, because 35% or more of the area will be covered with gravel bedding for the floor slabs, and because the existing building will provide a wind barrier, the additions to the Church would be exempt from the Wind Erosion Control. In review of the City's Erosion Control Standards concerning rainfall erosion, we have the following comments. Construction is scheduled for April through October. We will need to be appreciative of the tendency of rainfall to carry sediment prior to the resodding of disturbed areas. We intend to control sediment loss during construction by structural methods and to control sediment loss after construction by resodding. As the historic drainage pattern for this drainage basin is defined by the existing topography and will not be disturbed during construction, we intend to place straw bale barriers as shown on the enclosed exhibit. Straw bale barriers will be placed at the start of construction on the west side of the existing building. Barriers shall be placed as shown on the enclosed exhibit where the historic drainage pattern flowing to the north concentrates itself into a defined Swale. This location was selected to provide a location where runoff would concentrate and allow the sediment to drop prior to flowing onto the existing asphalt parking lot on its way to Clearview Channel. Maintenance of the barrier will include daily inspection by the contractor (especially after rainstorms) to insure the straw bales have not dislodged or become separated. If either condition occurs, the contractor will replace the disturbed bales. The straw bale barriers will be removed once landscaping provisions (resodding) are in place following construction. City of Fort Collins Stormwater Drainage Utility Department April 27, 1995 Page Three Please review this material on behalf of the Church. They have been delayed in obtaining their building permit until this report has been approved by your department. They are anxiously awaiting your approval to begin construction. If you have any questions regarding this material, please do not hesitate to call. Sincerely //yours , JRick R. Pickard, P.E. The Engineering Co. Technical Appendix Determine the Time of Concentration in the Developed Condition To determine the time of concentration, we will use the Rational Method. To determine the time of concentration for our proposed runoff flow route, we can use either the following equation or the "Overland Time of Flow Curves" enclosed as Figure 3-2. Tc = 1.87 ( 1.1 - CCf) Dos / So.33 where: Tc - time of concentration, minutes S = slope of basin, % C = rational method runoff coefficient D = basin length, feet Cf= frequency adjustment factor As the use of Figure 3-2 is limited to 500 feet, we must determine the length of flow route for our application. Length of flow route, = 450 ft. Slope of flow route = (69.92 - 64.25) / 450 = 1.3 % Composite runoff factor (C) _ ((75 ft. x 0.95 )+ (375 ft. x 0.20)) / 450 = 0.33 Cf= 1.25, from table below Rational Method Frequency Adjustment Factors Storm Return Period Frequency Factor (years) Cf 2 to 10 1.0 I I to 25 1.1 26 to 50 1.2 51 to 100 1.25 Note: The product of C times Cf shall not exceed 1.00 Therefore: The time of concentration for the developed flow path is as follows: Tc = 0.87 x 0.1 - 1.25 x 0.33) x 4500.50) / 1.30.33 = 25.0 minutes n In review of the 100-year hydrology at Clearview Channel at the South Taft Hill crossing (as prepared by Lidstone & Anderson, Inc.), the peak storms pass at conveyance elements 59 and 61 with times higher than the time of concentration for the Church site. Therefore, as the peak runoff from the Church site will pass prior to the peak runoff in Clearview Channel, it is feasible to assume no on -site detention is required due to the proximity of the Church site to Clearview Channel. Review of Detention Volume Requirements for the East Addition to the Church The construction of approximately 450 square feet of additional building will require a check of the detention volume requirements as described by John Clark in his drainage report submitted to the City in 1987. Those calculations are represented by a redlined copy of John Clark's original report and calculations. Please see enclosed sheets. Our calculations indicate adequate storage volume in the parking lot detention pond after construction of the addition on the east. ACT R YOexel RADIO As NOTICEANGRY .,, TgAeS IO w TIME OF tmAe�' :Sm. w;.ea, .wale :tw. xx »..N INDOOR -. M5e5 ROUTT CONCENTRATION :�, TV • AGO n Nm1n SMS Ma_N AS as1U.Yv . mroeexwnY vwV-.....m..'rrMSaae. AN PARANA x FGEXI. Sao, w. x W15Ywm W R 51r,r '0F5tVfINRv v.5w.n .YDee a RwGAR RwNSe. rsx'AM, 43 / / A�xiI. rN NWxxaiw �e RURAL ItS�� x Mm5.5 fwev}�.XRN . .1C STRIP, SwIYr Y6115 STRAW BALE N wa IN ..m r.. GAMIN0 '(MV0 Rw. er BARRIER /. x5m.e .eDW v. ' OT HAS 0 \ .%BlPeS win e5 erz '9"�E�•Fvy �°emer � y �jrfy�F�iP.S�Po N,�.ie „olie'r / .D1a t W RYM•N mea YYbY96 'GOAL %M G? ^9Al✓A x5a..a . e.yyA., NEW AOOIt1011w�•W5 N sav I// FF= 9.94 n94R'IN y Yae, ) % - 1 —i px"' o xa 5Y1F�N41r. PROVIDE WALK WALE j 3,'^N^ e"'>.0 SEE DETAIL THIS SHT 07061, xx+. + "i0'N " e eY,w 1x �. / IMI41NNE"I ot INS If ,,,. R N5x .YmSw IIII w.• . xw.IANeDs>w xww,x st •. w15mva xxv.¢ea RSLaSIR , NEW ADDTI IF=507OC rya FEW ADDITION wo re I EE=Solo a .. roNUR'OyEIE �. n . w. , > PUN" A RAW" R ...... _ XSA*�� Y .,a �. ..mix I�YmeN 0 IN 5059 Y.. i • ' � p LIP, 12 AMR 89 AT LAW mRA. ;; p • HALL er Z'W54BYOz ASaw JA I IAN I N rr o .xe¢v Avew QQy' • APPLAY wm'M nxin - u55Nq MEBA'T — �'m R N W �i Sze 9„ M GLEN 98 sa"aw aVAN u I Two a'. A SLID is wpo5 �qq{ i moT "Tdzn„ Rcn,.. • .wx in wR LSYIW ER �, M9LY9l.YaNYY 1.... - EPAL PHN .__. vsmO55 .x.5. v���a .. vx.f OIL 150MIT3 ."I IN OV117 PINES" RSmuco xa"rRw. SPRINGFIELD a DRIVE STRAW III SI WITH 2 STAKES PER AXGE/PEM7 A MUST SECTION A —A FLOW I '0 e PUN VIEW FLAW RACIER D IIil,- J d �„ . * I PROFILE VIEW GENERAL NOTE=. 1 R�INS[ORRS STILL PULLED PRIOR TO DISTURBANCE OF GRASSED AREAS A IRR EACH Dr v v) E i[Rs MISS R12 uox1NIL S ONSS APPROVAL IS LRAGETOBY fDIVISION FOR LONGER USE iI. e. MI SMALL C CONSTR �TION IS COMPILTE. WHEN A K MIUO D AOR SOODED, D SEDIMENT LOSE IS MID DANGER A CONCERN IXD f STRAW BALE ME CHAriB APPLICATION w+ . EXISTINGLEGEND GRAADDE PRIOR TO CONSTRUCTION EXISTING ASPHALT PARKING LOT PROPOSED BUILDING ADDITION A = -- EXISTING BUILDING FOOTPRINT .a EXISTING CONTOURS Scale I- - 30' FLOW ARROWS — TIME OF CONCENTRATION ROUTE EXISTING UNDSCAPIING db STRAW BALE BARRIER DU" JL DISRUPTED RRP DATE MARCH 1995 REBER 1'=SO' CHRxTl APPRKIM PROJ. NO. 95-027 The Engineering Company FORT COLLINS, COLORADO SHEPHERD OF THE FILLS CHURCH ADDMON DRAINAGE EXHOT 1 I 1 151 OG" •sm5IIIX WI70 bell 1 MGM Raw, vsa.TIYE Of v5os /' / 51x5cc v5ms1a xb.rawua CONCENTRATION ` b e n 5e50 ans ROUTE \Y Hamm Ism m n°'Sf%aeaen / xSaNNu xw.m emno x vnrm Hessen-'+wa.•R - xsmaae Ksms n. nm n 13 - _ xeas� ImzeA .aw.ea—_a°°`% ayy'--.r.OM.Rl�pww-..wew.�ne•.. . / �1 5 IKmlwx soa,52 '0'1Y7MRee ./ .awe.. newnv i wWGI II 5m..,R fwR3l 111 emn,; a{awex5w.o -. xnxn xu�. _'.inio STRAW BALE / xsmr rn WRIER ea>en I. 5w I�wum xii e e0wwa.. .�5man SPI, RSoa.:l ma "/ 16 x x M m .wean x w.ea SON w }mEWxS� }, ,m„ew 5we.n ,ewe«oa6n>" N SNNWI - MEW ADDITMNI s �M v rw FE=SOe: �+^ e PROVIDE WAIL( OHASE „} eee .-S e91 SEE DETAIL THIS TINT _ ofSaleµVNINI i:sw,ov+esh E / n I� snow `�a'Nsirw Remo MK 5e . waaa0 j.SISW wn.,a .IN e, x506e7i ,twru CADDff xSAGI nn,• x awe sn NEW ADDITIONaR=SOJ0.0 seMwl•�LM Rs .ErERIaee.= 'Rnoav501 I I XY4129 .5mea. 1I Remo* F K aoeama a. 'I', I as 01,1 .. ��J stt Swann o +Oa Q IMaew e1�e1 xMCI % x xSBnv . Kx0091 yew.n K swmma gfKRSP+i ee ryry ��fIAf`�x WIN fIy}1r �• i�'r xa spxN�m 5071 W{N eMeY--x.aww vmM 55ValRaA� f iwe.s. IGyy, xKD n �''O�pTyeaw�euq,s'IeaMaM ease" F x Y .x71e5 vs 7057 - a4 UA -e wasce ne 4069 SPRINGFIELD DRIVE 15 D p_ a0 R50,2R fD R 501.0i Scale =}a, WNFR" V STdr i nMP MIN x SIMFS PP POYI! RII 1 Y K xMP YN PaM . R7• a J, 1111111`�—, lur lol'-u m u-III II III��'=1 �RII�INI UII= - amWI L Y M SIWL ME NAKO RP TO DKNIWIDi 0e DM51LD MU3 i. MINECT. KPMA, MO K P I[CCmMY) THE FILTERS Al LAN STORM EVENT. } ALL W8 MUST K KIIMm M2E IS YEMNE UMUX3 MPROYAL M. Y ORANRO BY M OgRRlINO M'9]N RR LLMfOI KIP 9W.1. RE K AFTER WIQOMTNK O WMPUTI "H AAS D@O ME .UN KJR111E M INCOMES. MUMMINT NR IS I fl A COKON. STMW BALE ME R CHANNEL APPL.ICAITON LECBO . 5ma+s EXISTING GRADE PRIOR TO CONSTRUCTION EXISTING ASPHALT PARKING LOT PROPOSED BUILDING ADDITION --- — - EXISTING BUILDING FOOTPRINT EXISTING CONTOURS FLOW ARROWS — - — TIME OF CONCENTRATION ROUTE EXISTING LANDSGPMHG db STIUW BALE BARRIER c D•A•N A DESIGNED RRP III MARCH 1995 CEIwI® SCALE 1"=.10n APPROVED PROI. NO. 95-037 The Engineering Company FORT COLLINS, COLORADO 1 1 1 F �.., ram �1 xs . wxna .1012 JI x wa. .. A Wl ,o •:m• TIME OF -nn I - x/ - FAA ON 0 I '�°r s.a CONCENTRATION +WATT. sorer .Faa,.e XwN,n s I'. ROUTE \ .,ma.n Y s ene m y �r A'tmrs. . mrm L x gp - x,x.nesn _'�MMs os� rr u»e w:�gRsl .+_.wROWNP m.ar xi bes / f1NE IYF/L III swill �Nur x ,04,1,F -� ,>mwawrr' i xAGE,,, m w x AREA, Nw>., ✓ « . R . , w. GREW AGE$ STARTED PER 2 x§1.. N x 50,.M. wife .% s FARES PER WL STRAW BALE �wrnlx' .,mr�E. rs{ RIMPO ` ..w^er R NNIERNINW BARRIEP /. NAA781 .Im E. \ i} • PaRn L . wasN rt?s%swI M.pLs+i. xxa 2e w,e eostoea WMO /"` ,• .telW. IF N =URMe rA xf.Y.mODER". v NR4w,4R. .SwA�W,D )INNER R a�.r - -_ NEW ADDITION • r 1 SECTION •-A s rxRN�99RN n ' eeRu� FF=5999.9t _ OW NAWNw r.m �s ..T..' Iw POP• naw PROVIDE WADI CHASE -.s.ms SEE DETAIL THIGAPER V S SM a Lew ^was1N ,waa wF/aa ANN rt E� .FARE. . eea2%/ w , o 1A x sro„o ' Ei ' a FftleS? saw>.f AGREES In 0 `1 . seesR=XKA7 eT- SE'+wu .wags, D� .o 'ew.n xwn Er TELL..___ IN . �osre Sao,. n NEW ADDITION - Ff=50]0.0 �yy PLAN VI[W RAF HEW ADDITIONFLOW A wEs'E 4 I FF=5O70.0 x �a x ww 1 k sARe . — — ,Y.EqF�� ra gNnry .sae {a^iler LO C2wAertn 44 j,. meum .REF. =eARYN 0 PROFILE VIEW . ARSE Ea RsOlu,2 AL ADDS p IO PR TO ols 0 xF.aV.N 9a v !. i A III CH V BIT AND EVEN,'ACE ie x EiGVRrj ,NERGANEX ARFILTERA aussEO .Rvs E WAGES WASP PLACED ALTER 2 MONTHS UNLESS APPROVAL it wr..w ' 92 A5WAX0 } ommumO XAMA. N 32 ,mien o MYNSD LE Tx: WOA%O FI OnvoN OR GRANGER S C UAL. VV�''' CRETONNE) ARE RENOVEO A OR mxsnUcrD n co T LOSS nxEx O. •w coy mros, Nsawo.e^��r e8—'�-IREW.N - sxD LONGER Ac ARC xN�mD stmEO TIED scNNEx, wss Y' ,Ena<• 81flAW BALE DKE meNw x x �{(A CHN18 AAPPLICATION LF�. NNNssbpwiy ..r m w NFIFwxa ,!U(ttR(� a R��WA.Sw�rJ'�GyeAYpn+'AN X505055 IEwMe .-+++1I�/WBa+:ex)HEPx F N'��TjB,. •FOSS aF .mwsr tR �Ae M Sw9N aa�„ 71 LEGEND. v. r.m .mow .ONE+s EXISTING GRADE PRIOR TO CONSTRUCTION SPRINGFIELDDRIVE ,�,R EXISTING ASPHALT PARKING LOT ,a F w - - N5°60dr PROPOSED BUR -DING ADDITION 1wg9e --- EXISTING BUILDING FOOTPRINT EXISTING CONTOURS AR =wa25i'm 0 Is ME 45 w Stab I = SO' FLOW ARROWS TIME Of CONCENTRATION ROUTE EXISTING IANOSCAPIING db STRAW BYE BARRIER 0. DA TIMMONS SHEETS SHEET DYR I EL DCIVOGNIG) RRP DAT'R WAGON THIS The Engineering Company SHEPHERD OF THE HL.LS EXHI�i BCAid Y.SP ePmm PRa. NO.95-027 FORT COLLINS, COLORADO CHURCH ADDMON , � 1 DRANAGE