HomeMy WebLinkAboutDrainage Reports - 10/07/20131. 1 h I I I I 1 1 1 1 1 [I City of Ft. Collins pprov d Plansroved By Approved By pp Date FINAL DRAINAGE REPORT, STORMWA TER MANAGEMENT PLAN AND EROSION CONTROL PLAN Discovery Fellowship Church Facilities Expansion 6630 Brittany Drive, Fort Collins, Colorado Prepared For: Discovery Fellowship Church 6630 Brittany Drive Fort Collins, CO 80525 970-204-6787 Prepared By: ® OWEN CONSULTING GROUP, INC. 3715 Shallow Pond Drive, Fort Collins, CO 80528 Phone:970-226-0264 Fax:970-226-3760 Revised August 2013 Revised May 2013 November2012 Proj. No.: 12-389 I DISCOVERY FELLOWSHIP CHURCH FACILITIES EXPANSION ' FINAL DRAINAGE REPORT Table of Contents ' ENGINEER'S CERTIFICATION............................................................................................. 1 ' 1. LOCATION AND DESCRIPTION OF PROPERTY AND PROPOSED DEVELOPMENT ...... 2 A. Location............................................................................................................................ 2 B. Description of Property..................................................................................................... 2 ' C. Proposed Development.................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS................................................................................ 3 A. Major Basin Description.................................................................................................... 3 ' B. Sub -Basin Description...................................................................................................... 3 ' III. DRAINAGE DESIGN CRITERIA............................................................................................. A. Regulations 4 .......................................................................................................................4 B. Hydrologic Criteria............................................................................................................ 4 C. Hydraulic Criteria.............................................................................................................. D. Waiver / Variance from Criteria......................................................................................... 5 5 E. Stormwater Quality Considerations.................................................................................. 5 ' IV. WETLAND PRESERVATION AND MITIGATION................................................................... 6 V. DRAINAGE FACILITY DESIGN.............................................................................................. 6 ' A. General Concept............................................................................................................... 6 B. Specific Details....................................................................................................:............ 7 VI. CONCLUSIONS......................................................................................................................9 ' A. Compliance with Standards.............................................................................................. 9 B. Drainage Concept............................................................................................................. 9 ' VII. REFERENCES....................................................................................................................... 9 VIII. ATTACHMENTS ' IX. DRAWINGS I 1 1 F DISCOVERY FELLOWSHIP CHURCH FACILITIES EXPANSION FINAL DRAINAGE REPORT ENGINEER'S CERTIFICATION I hereby attest that this report of the Final Drainage Design for the Discovery Fellowship Church proposed building expansion was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Stormwater Criteria Manual for the responsible parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others. 1 Registered Professional Engineer State of Colorado No. 29871 CG CONS ULTING CONSULTING GROUP, INC. 1 DISCOVERY FELLOWSHIP CHURCH t FACILITIES EXPANSION FINAL DRAINAGE REPORT I. LOCATION AND DESCRIPTION OF PROPERTY AND PROPOSED DEVELOPMENT ' A. LOCATION The church property is located at the southeast corner of the intersection of Trilby Road and Brittany Drive, one block west of Lemay Avenue, in south Fort Collins, Colorado. The site comprises all of the Redeemer Lutheran PUD, and is a part of the Southwest Quarter of the ' Northeast Quarter of Section 13, Township 6 North, Range 69 West of the a Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site is bounded on the west by Brittany Dr. and residential development; on the north by Trilby Rd. another ' church property; on the east by a multi -family residential development; and on the south by single-family residential development. �T�Y�771Mii[i]`►[+I��:T�7���31'1 The site comprises a total area of 5.00 acres, and is developed as a church, with associated ' access driveway, parking, and landscaped open space. There is also a trailer on the site, adjacent to the church building, which has been used as a meeting room for the churches youth activities. In addition to the church property, there is also a small area of the adjacent ' residential development to the south that drains onto the site. This adjacent tributary area comprises approximately 0.61 acres. The native soils underlying the site are Renohill clay loam (77%) in the western and northern regions and Kim loam (23%) along the eastern and perimeter of the site. The extent and distribution of the underlying soils are shown in the attachments to this report. The Renohill clay loam is considered to fall within NRCS Hydrologic Soil Group C, and the Kim loam falls ' within NRCS Hydrologic Soil Group B. For purposes of the drainage analysis presented in this report, both soils are considered to be in Soil Group C, which yields a conservative analysis. ' The existing surface of the developed site slopes from southwest to northeast. The average surface slope is approximately 6.3%, with some areas adjacent to the existing building ' having steeper slopes of approximately 4:1, and other portions of the landscaped areas of the site having slopes in the range of 8:1 or 9:1. Expansion plans for the church will not change the overall grading of the site. Localized slopes adjacent to the building will be ' similar to those currently existing, with those on the north end being shifted further north to accommodate the expanded building. Surface runoff from the western portion of the site currently migrates across the turf areas ' and site pavement, via overland sheet flow and concentrated shallow gutter flow, and into an inlet near the southwest comer of the church building. From there, it is conveyed via piped storm drains to the northeast corner of the site and beneath the driveway to the adjacent multi -family housing complex, to an open channel that carries the storm flow to a 2 C CONSULTING GROUP, INC. 1 I 1 1 u I 1 detention basin at the northeast corner of the multi -family site. Runoff from the north, east and south regions of the site, as well as from the adjacent, off -site residential tributary area, all of which is essentially landscaped area, migrates via overland sheet flow to shallow landscaped swales along the north and east perimeters of the property, which flow to a catchment area at the northeast corner of the property, and then via an RCP culvert, beneath the driveway to the adjacent multi -family complex and into the open channel to the detention area mentioned above. An inspection of the City of Fort Collins mapping for this area indicates that the site is not within any mapped floodplain. C. PROPOSED DEVELOPMENT The proposed development at the site includes the expansion of the existing building to provide a new youth wing, to replace the existing trailer, and an expanded sanctuary to accommodate a growing church membership. Both expansions will consist of two-story additions to the existing building, with the youth wing having a footprint area of approximately 4,500 s.f. and the sanctuary expansion having a footprint area of approximately 3,200 s.f. The current youth trailer, with a footprint area of approximately 840 s.f., will be removed, once the youth wing is complete. The layout of the proposed building expansion is shown on the Grading and Drainage Plan included as an attachment to this Final Drainage Report. Stormwater runoff from the within the church property, as well as from the adjacent, offsite tributary area, will continue to flow along the current drainage pathways, with the exception that runoff from the property and the off -site tributary area will now be captured in an on -site detention basin, located in the northeast comer of the site, prior to being released, at a controlled rate, to the downstream open channel. Further discussion of the proposed stormwater management improvements is presented in subsequent sections of this report, and appropriate graphic details are presented in the project drawings. ' 11. DRAINAGE BASINS AND SUB -BASINS A. MAJOR BASIN DESCRIPTION The tributary area associated with this project comprises a total area of approximately 5.61 acres, of which approximately 1.25 acres will be disturbed during the course of constructing the building expansion and the on -site grading and drainage improvements. The site is located within the Fossil Creek Drainage Basin, as delineated in the City of Fort Collins Drainage Basin Master Plan. The site is well removed, however, from the delineated flood plain, and no specific drainage improvements from the Master Plan are applicable to this ' site, other than provision of on -site detention in accordance with the requirements of the Stormwater Criteria Manual. ' B. SUB -BASIN DESCRIPTION Storm runoff from the property will follow the established overland flow patterns of the ' existing development on the site. Final grading in the vicinity of the proposed building OWEO C CONSULTING 3 GROUP, INC. I ' expansion will cause runoff to flow away from the buildings and across the landscaped areas to a new, on -site detention basin in the northeast comer of the site. ' In addition to the on -site tributary area, there is a small area of the adjacent residential property to the south that will also drain onto the property and be tributary to the on -site ' detention basin. The aggregate of on -site and off -site tributary areas is 5.61 ac. For purposes of this drainage / detention analysis, the entire site, as well as the off -site tributary area, is considered to be a single drainage basin. ' The overall intent of the drainage design is to maximize the on -site management of stormwater runoff emanating from the development. A small portion of the site, along the extreme east perimeter of the property and comprising approximately 0.035 ac., is beyond ' the ridge of the perimeter swale and runoff from this area cannot practicably be captured and directed to the on -site detention basin. Runoff from this area will flow off -site undetained, as it currently does. This undetained flow will, however, be compensated for in the design of the detention basin and outlet controls, such that the net effect will be as if all of the runoff from the entire site, as well as from the off -site tributary area, is being captured and detained. ' This property was the subject of a Final Drainage & Erosion Control Report, at the time that the property was originally developed and the church constructed (Parsons & Associates, ' May 1992). At that time, an allowable discharge rate for the property was determined to be 7.62 cfs. The proposed project constitutes a further development of the currently developed site, with a similar, but expanded use. The nature of both the development and runoff from ' the site will not change as a result of the proposed building expansion. Discharge from the detention basin will be regulated via the Outlet Control Structure and ' discharged via existing piping beneath the driveway to the adjacent multi -family residential complex and into the open channel leading eventually to Fossil Creek. All work will be conducted in a manner designed to avoid or minimize any disruption to the existing improvements on adjacent private properties or within the public right-of-way. III. DRAINAGE DESIGN CRITERIA A. REGULATIONS ' The proposed stormwater management improvements for the Discovery Fellowship Church expansion are designed in compliance with the requirements of the City of Fort Collins ' Stormwater Criteria Manual (Stormwater Utility, Dec. 2011). B. HYDROLOGIC CRITERIA ' As specified in the Criteria Manual, stormwater runoff from the church site is analyzed for storms with 2-year and 100-year return frequencies. ' Due to the relatively small area of the site and the absence of any significant tributary off - site drainage sub -basins, the Rational Method is used in the design of the system. The Rational Method provides that: O CONSULTINGOWEN 4 C GROUP, INC. I Q = CIA, where: ' Q = Design flow in cubic feet per second (cfs) C = Coefficient of runoff for the area under consideration 1 = Rainfall intensity for the design storm duration (in/hr) A = Area of the drainage sub -basin under consideration (ac) ' For purposes of this Final Drainage Report, the entire tributary area (both on -site an off -site) is considered to be a single drainage basin. A composite runoff coefficient and percent imperviousness are calculated for the site, based on the areas of the respective component ' surfaces (roof, pavement, landscaped areas, etc.) within the basin. Rainfall intensities are determined using information presented in the Intensity -Duration -Frequency data in the Criteria Manual. ' C. HYDRAULIC CRITERIA ' Within the project site, runoff will be conveyed primarily on the surface, initially as sheet flow and subsequently as concentrated flow in shallow pans, gutters or landscaped swales. Runoff from the southwest portion of the site, and a portion of the off -site residential area, is collected in an inlet near the southwest comer of the church building, and piped to the detention basin. All accumulated flows will be intercepted and diverted into the proposed detention basin. ' Since expansion of the church building will not result in alteration of the runoff quantities or patterns in the area served by the existing inlet and drain piping, no new stormwater management infrastructure is required in that area, and the sizing of the existing ' infrastructure was not reviewed as part of the analysis covered by this Final Drainage Report. Sizing of piping downstream of the proposed detention basin is addressed in this report. ' As stated earlier, the Parsons & Associates Final Drainage Report established an allowable release rate from the property of 7.62 cfs. That allowable release rate has been preserved ' as the basis for sizing the proposed detention basin and associated outlet control structure for the church property. Current rainfall and runoff criteria, as set out in the Criteria Manual, are applied in the determination of design runoff due to the prescribed storm events. ' D. WAIVER / VARIANCE FROM CRITERIA No waivers or variances are requested in connection with the stormwater management ' design for this project. E. STORM WATER QUALITY CONSIDERATIONS ' Permanent water quality enhancement will be provided through the design of the on -site detention facility and, in particular, the outlet control structure within that facility. All storm ' runoff from the site and the adjacent tributary area will be directed to the on -site detention facility. The detention facility is sized to provide capacity not only to attenuate storm flows, but also to detain the initial runoff flows, those typically carrying the first flush of sediments ' and other possible debris from the active areas of the site, for an extended period of time, to allow adequate time for solids to settle out in the detention basin, rather than being carried OWEO C CONSULTING 5 GROUP, INC. I ' into the downstream drainage improvements and receiving waters. The floor of the detention basin will also be grassed, to provide for further fines removal and possibly some t mitigation of chemical constituents in stormwater. Details of the detention basin design are addressed in subsequent sections of this Final Drainage Report. ' In addition to the permanent water quality enhancement features of the stormwater system design, provision will also be made to enhance storm water quality and erosion control during construction. This will be accomplished through the application of Best Management Practices (BMPs), as recommended in Volume III of the Urban Storm Drainage Criteria Manual (UDFCD, November, 2010). Throughout the course of construction and until such time as permanent drainage surfaces ' and/or vegetation are re-established throughout the site, appropriate measures will be implemented and maintained to minimize erosion and limit the transport and migration of sediment. Silt fencing will be installed along the downstream perimeter of the site (north and ' east) and, as appropriate, around sub -sites or work areas within the site, on an interim basis. The permanent detention basin, which will have capacity to detain runoff flows from the fully -developed site resulting from the 100-year storm event, will be constructed at the ' outset of the project, to serve as a collection point for construction stormwater, and an interim straw -bale sediment trap will be established therein. All runoff from the disturbed portions of the site will be directed to the detention basin, and discharge from the basin will ' be controlled. Material that accumulates in the interim sediment trap will be removed periodically, as necessary, and properly disposed of. ' Temporary drainage swales will be established throughout the site, as necessary and appropriate, to collect and direct storm runoff, and temporary sediment traps (hay bales, wattle barriers, etc.) will be installed at appropriate locations to slow the runoff flows and promote deposition of sediment and other suspended solids. Details of erosion control Best ' Management Practices (BMP's) are shown on the Erosion Control Plan, enclosed with this report. 1 Permanent landscaping will be installed within the developed areas, as soon as practicable and temporary revegetation or mulching will be implemented if areas disturbed by construction activities are not scheduled for immediate implementation of development improvements and final landscaping. IV. WETLAND PRESERVATION AND MITIGATION There are no wetland areas within the church site. V. DRAINAGE FACILITY DESIGN A. GENERAL CONCEPT The design of the drainage system for the Discovery Fellowship Church site is based on the premise that the runoff generated within the site should be managed within the site, to the greatest extent practicable, such that there are no adverse impacts to either the development or adjacent or downstream properties or to downstream drainage facilities and waterways. The grading plan for the site has been designed to promote positive drainage away from the building, and direction of collectable runoff flow to the on -site detention basin. O OWEN CONSULTING 6 GROUP, INC. I 1 1 t P Within the bounds of the site, the proposed drainage patterns will continue to follow the historic patterns of the predevelopment and currently developed site, with minor, localized exceptions to encourage flow away from the building and to the permanent detention basin. Runoff from the site will be captured and conveyed to the detention basin, located at the northeast corner of the site. This facility will receive and attenuate runoff flows and provide water quality enhancement. Discharge of attenuated storm water from the developed site will be at a controlled rate, and at a location consistent with the historic experience. The design worksheet included in the attachments to this report presents details of the hydrologic and hydraulic calculations pertinent to the design of the storm drainage system. A Site Grading & Drainage Improvements plan, showing the proposed site grading and the resultant developed drainage patterns, is included in the map pocket following the attachments. While the primary function of the detention facility will be the attenuation of storm flows and improvement of storm water quality prior to discharge from the site, the area will be graded and landscaped such that it also serves as an attractive component of the site open space. No secondary use of the detention basin will be allowed to impede or impair the primary functions of storm water attenuation and water quality enhancement. B. SPECIFIC DETAILS Following is a summary of the calculated storm rainfall and runoff for the developed church site and adjacent tributary area. The on -site detention basin is sized to accommodate runoff from the entire area (both on -site and off -site), including the small area that is not practicably collectable to the detention basin. SUMMARY RUNOFF TABLE Trib. Site Area ac Composite Runoff Coefficient Design Storm Runoff cfs C2 Cioo Q2 Qioo 5.61 0.40 0.50 4.24 19.39 Determination of the required capacity of the detention basin is based upon the Rational Formula Method for small watersheds, as set out in the Criteria Manual. The Design Worksheet and the Detention Basin Volume Calculation Worksheet included in the attachments to this Final Drainage Report present the calculations of required and provided detention capacities, along with the water surface elevations for the respective detention volumes. The allowable release rate from the detention basin was determined as part of the analysis ' developed in the Parsons & Associates report. That calculated rate of release is 7.62 eft. The detention basin has been sized to provide storage capacity for attenuation of runoff due ' to the 100-yr storm event. The Water Quality Capture Volume (WQCV) provided within the facility is in addition to the 100-yr storm attenuation volume. Further, the perimeter berms forming the detention basin are designed to provide a freeboard allowance of a minimum of OWEN 7 v GROUP,IINC. I 1 1 1 P 1.0 foot above the calculated water surface elevation that would be experienced during the 100-yr storm event. The detention basin will be created by excavating the area in the northeast corner of the site, and constructing retaining berms along portions of the perimeter of the site, to create a closed detention area with sloping grassed walls and floor. The downstream invert of the detention basin will be at an elevation compatible with the existing piping to be adapted to accept discharge from the basin. Discharge piping will extend from the outlet control structure, within the detention basin, to a connection with the existing manhole, from where existing piping will carry the released flow beneath the access driveway to the multi -family complex and into the open channel that currently conveys runoff further downstream. Cobble trickle channels will be constructed within the detention basin at the toes of the perimeter berm slopes, to convey low flows to the outlet control structure at the downstream end of the basin. Orifice plates within the outlet control structure will regulate the rate of release of accumulated runoff from the detention basin. The total available active capacity of the detention basin is calculated to be 0.319 ac-ft, at the overflow elevation of 4928.75 ft. This is equal to the aggregate volume required to accommodate the WQCV (0.086 ac-ft) plus the100-yr stormwater attenuation (0.233 ac-ft). Control of outflow from the detention basin will be via a reinforced concrete outlet control structure at the downstream end of the basin, set into the interior slope of the east perimeter impoundment berm. The outlet control structure will include two orifice plates; one mounted on the upstream wall to regulate the release of the WQCV, and the other mounted on the downstream wall to regulate release of the attenuated 100-yr storm runoff. The invert of the impoundment will be at elevation 4924.15. The required WQCV will be provided at a water surface elevation (WSE) of 4926.20 feet (2.05 ft water depth), and the required volume for attenuation of the 100-yr storm event will be provided at a WSE of 4928.75 feet (2.55 ft incremental water depth). Flows in excess of the 100-yr storm event will be passed through the detention basin and will overflow, via an emergency spillway in the north impoundment berm, onto Trilby Road. The design rate of overflow for the spillway is the 19.39 cfs, which is the peak inflow rate to the detention basin due to the 100-yr storm event. Weir analysis indicates that a crest length of 15 ft will pass the design flow rate, with a surcharge head of 0.52 ft, leaving a freeboard height of 0.73 ft to the crest of the perimeter impoundment berms. The flow velocity over the emergency spillway is calculated to be 2.44 ft/sec, which is not expected to result in any erosion of the adjacent downstream grassed surface. The Design Worksheet included in the attachments to this Final Drainage Report presents hydrologic calculations for the on -site storm drainage system. Details of the detention basin and the outlet control box are shown in the project drawings included with this Final Drainage Report. COWEN CONSULTING I VI. CONCLUSIONS ' A. COMPLIANCE WITH STANDARDS The design for the storm water management improvements to serve the expansion of ' Discovery Fellowship Church is in compliance with the City of Fort Collins Stor mwater Criteria Manual. The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the design of the drainage systems. ' B. DRAINAGE CONCEPT The drainage improvements proposed in conjunction with the expansion of Discovery Fellowship Church, including the detention basin and outlet control works, will effectively protect the church site, as well as downstream properties, from storm runoff, resulting in no adverse impacts from the improvements proposed for this site. Development of the site, as ' proposed, should have a beneficial impact on water quality in downstream drainage facilities and drainage ways due to the inclusion of storm attenuation and water quality enhancement features in the on -site detention facility. VII. REFERENCES ' "City of Fort Collins Stormwater Criteria Manual" (Stormwater Utility, December 2011). "Urban Storm Drainage Criteria Manual Volumes 1 & 2, UDFCD, June 2001 ' "Urban Storm Drainage Criteria Manual". Volume 3. UDFCD, November, 2010 1 1 1 C CONSULTING 9 GROUP, INC. I 1 ATTACHMENTS I I I I I I I I I Hydrologic Soil Group—Larimer County Area, Colorado (Discovery Fellowship Church) 40•29. 40' 40' 29' 32' M pSale:1:1.140 C prinW on Aslze(a.5' x 11y suer. N Meters 0 10 20 40 e0 0 40 90 180 240 (JSDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 10/31/2012 Page 1 of 4 m'2e4 40. 29 4T E � ■ § � ■ 2 \ & � � ! { } \6} ]\ ) ! ; ;§ {)\ { )= A }}{ ' § §!! § f! ) }¥ ) ! |(/ \/ 4® { |�( !f|! | i2 \\ | j�k� ! 2i..! La m 262:! (7 f /I z� a$| �) «! ®`` i; t! ■ ��,r ƒ! ems/kf/f!\!)\\\ ({ q { I Hydrologic Soil Group-Larimer County Area, Colorado 1 ' Hydrologic Soil Group .1 1 LJ 1 Discovery Fellowship Church drologic Soil Group— Summa b Map Unit- Larlmer County Area, Colorado (CO644) tti ryy Map umtsymbol - "Map unit name -." '' Rapng`, Acres in AOI {Percent of AOI� - 54 Km loam, 3 to 5 percent slopes B 1.3 23.1 % 90 Renohill day loam, 3 to 9 percent slopes C 4.3 76.9% Totals for Area of Interest 5.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. ' Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of days that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer ' at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. ' If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. ' Rating Options Aggregation Method., Dominant Condition ' Component Percent Cutoff. None Specified USDA Natural Resources Web Soil Survey 10/31/2012 Conservation Service National Cooperative Soil Survey Page 3 of 4 1 I ' OWEN CCONSULTING GROUP, INC. 1 1 DESIGN WORKSHEET Client: Discovery Fellowship Church Project: Building Expansion Task: Drainage / Detention Analysis Job No.: 12-389 By: LCO Checked: Page: 1 Date: 10/30/12 Date: of: 6 Storm runoff for the existing development of the church property was analyzed by Parsons & Associates in 1992. The anticipated storm runoff from the developed property, as well as the required detention capacity and an allowable rate of release from the property were determined, based upon the Stormwater Design Criteria applicable at the time. Since that time, the City has revised the stormwater design criteria and an expansion of the church facilities on the site is proposed. Thus, it is necessary to reassess the stormwater regime for the site and to design upgrades to the stormwater management improvements to cope with anticipated increased runoff and to comply with current stormwater design criteria. The overall nature of the site will not change as a result of the proposed expansion, however, the total area of impervious surfaces will increase with the building expansion. The area of the site is 5.001 acres. There is also a portion of the adjacent residential properties to the south of the church site, comprising a total of approximately 0.61 acres, that drains onto the site. This off -site tributary area will be included in the catchment area assessed in this analysis. Runoff from areas west of the site (Brittany Drive, and other upstream areas of the Provincetowne development) is intercepted and diverted to the north and around the site in the street gutters or in existing stormwater systems. These upstream areas will not be included in this analysis of the church site. For purposes of this drainage/detention analysis, the entire site, as well as the off -site tributary area, are considered to be a single drainage basin, with a total area of 5.612 ac. A small portion of the site, along the extreme east perimeter of the property, and comprising approximately 0.035 acres, is beyond the ridge of the perimeter swale and cannot practicably be captured and directed to the proposed on -site detention basin. Runoff from this area will flow off the site undetained, as it currently does. This undetained flow, however, will be compensated for in the design of the detention basin and outlet controls, such that the net effect will be as if all of the runoff from the entire site, as well as the off -site tributary area, is being detained. The proposed expansion of the church facilities will likely occur in two or more phases. This ' analysis, however, anticipates the completion of all the proposed expansion components and the stormwater management improvements resulting from this analysis have adequate capacity of accommodate the full extent of the proposed facilities expansion. I ' Client: Discovery Fellowship Church Job No.: 12-389 Project: Building Expansion Date: 10/30/12 ' Task: Drainage / Detention Analysis Page: 2 of 6 Component Surface Areas and Runoff Coefficients The aggregate areas and respective runoff coefficients and percent imperviousness of the various surfaces within the tributary area (church site and adjacent off -site residential area), upon completion of the proposed church expansion program, are presented below. 1 Surface Area ac Runoff Coefficient % Im erviousness Pavement 1.319 0.95 100 Bldg. Roof 0.432 0.95 90 Landscaped Area 3.861 0.15 0 Total / Composite 5.612 0.40 30.43 Time of Concentration The site slopes from southwest to northeast. The average gradient across the site is approximately 6.3%, however, due to development of the site, localized landscaped slopes near the building are as steep as approximately 4:1 and landscaped slopes in other areas of the site are in the range of 8:1 or 9:1. Expansion plans for the church will not change the overall grading of the site. Localized slopes adjacent to the building will be similar to those currently existing, with those on the north end being shifted further north to accommodate the expanded building. All storm runoff will migrate via overland sheet flow and shallow concentrated flow toward the low point of the site, which is in the northeast corner of the property, where an on -site detention basin will be located. The longest flow path to the detention basin is used to determine the effective time of concentration for the overall drainage basin. • Initial overland flow travels approx. 290.0' @ 7.6% avg. slope ' • Ti = 0.395 (1.1 — CfC)(L)o.5 58.33 ' For the Minor Storm (2-yr), Cf = 1.00 • Ti = 0.395 (1.1 — (1.0)(0.40)) (290.0)0 5 = 11.02 mins (0.076) .33 ' For the Major Storm (100-yr), Cf = 1.25 . ' Ti = 0.395 (1.1 — (1.25)(0.40)) (290.0)05 = 9.45 mins (0.076)0 33 ' Subsequent concentrated flow in a shallow grassed swale travels approx. 625' at an average gradient of approximately 3.7%. Flow velocity in a grassed swale at 3.7% is ' approximately 2.9 ft/sec. 1 1 1 1 1 1 1 1 1 1 1 DRAINAGE CRITERIA MANUAL (V. 1) 50 30 r 20 Z W V S W 4 10 W a o b y W Ir 3 0 u 2 WLu F Q 1 .5 4.1 .2 .3 JY1111112 3 5 10 PER SECOND 3 1, FIGURE RO-1 Estimate of Average Overland Flow Velocity for Use With the Rational Formula 0612001 Urban Drainage and FloodControlDistrict RUNOFF ON III I �■■■��i ���� i®���■���� ti���IQ�I�■■IIDm 20 1.14151141 I ' Client: Discovery Fellowship Church Job No.: 12-389 Project: Building Expansion Date: 10/30/12 ' Task: Drainage / Detention Analysis Page: 3 of 6 • Tt = L = 625 = 3.59 mins ' V(60) 2.9(60) Tc=Ti+Tt • For the minor storm Tc = 11.02 + 3.59 =14.61 mins • For the major storm: T. = 9.45 + 3.59 = 13.04 mins. ' Design Storm Runoff Using the Rainfall Intensity -Duration -Frequency information presented in the City of Fort ' Collins Stormwater Criteria Manual (December 2011), the applicable rainfall intensity for a 2- year storm event (12), with a duration of 14.61 minutes is 1.89 in/hr. Applying this rainfall intensity to the Rational Method, the design runoff from a 2-yr storm event impacting the tributary area of the site: • QZ = C ' I ' A = (0.40)(1.89)(5.612) = 4.24 cfs 1 The applicable rainfall intensity for a 100-year storm event (1100) with a duration of 13.04 minutes is 6.91 in/hr. Therefore, the design runoff from the tributary area of the site for the 100- ' year storm event: Q10o = Cf.C. I ' A = (1.25)(0.40)(6.91)(5.612) =19.39 cfs ' Allowable Release Rate from Detention Basin ' The Final Drainage & Erosion Control Report for Redeemer Lutheran Church (now the site of Discovery Fellowship Church), prepared in 1992 by Parsons & Associates, established that the historic 100-yr runoff from the undeveloped church site, and the allowable release rate from ' the then -proposed on -site detention facilities, was 7.62 cfs. The detention basin contemplated in the Parsons report, was apparently never constructed, but it is reported that the conveyance improvements downstream of the site were constructed to accommodate the design runoff and more. An on -site detention basin will be constructed as part of the church expansion addressed in this current analysis, and the historic runoff rate established in the Parsons report will be adopted and used in this current analysis to determine the size of the detention basin required to accommodate the proposed improvements to the church property. ' Required Detention Capacity The detention capacity required to attenuate the 100-yr storm runoff is determined using the ' Modified Rational Method. For purposes of this analysis, the tributary drainage basin is a` gol e} gg ag �'•' r - F kFlat . I Le WPMaw 0 N C Y 11 air 3 GID �a n O N V- C) C) r 0 W, (Jy/ui) Allsua;ul ' (11) Section 4.0 is amended to read as follows: 4.0 Intensity -Duration -Frequency Curves for Rational Method: ' The one -hour rainfall Intensity -Duration -Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins .1 1 1 1 1 1 1 1 Rainfall Intensity -Duration -Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) Duration (min) 5 2-Year Intensity (in/br) 2.85 10-Year Intensity (in/hr) 4.87 100-Year Intensity (in/hr) 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78- 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 63 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 I G 1 LJ I 1 1 1 n Table RA-8 -- City of Fort Collins Rainfall Intensity -Duration -Frequency Table for Use with the Rational Method (31 minutes to 60 minutes) Duration (min) 31 2-Year Intensity (ice) 1.27 10-Year Intensity (ice) 2.16 100-Year Intensity (inftu) 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.0 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.8 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 156 3.18 52 0.9 154 3.14 53 0.89 1.52 3.1 54 0.88 15 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.4 2.86 ' Client: Discovery Fellowship Church Job No.: 12-389 Project: Building Expansion Date: 10/30/12 ' Task: Drainage / Detention Analysis Page: 4 of 6 deemed to include both the entire area of the project site, as well as the adjacent off -site area that is tributary to the site. The attached spreadsheet shows that the attenuation volume ' required is 0.233 ac-ft (10,169 c.f.), which occurs for a 100-yr storm with a duration of at least 20 minutes. ' The design runoff from the site to the detention basin resulting from the 2-yr storm event is less than the allowable release rate from the detention basin A = 4.24 cfs compared to Qall abie = 7.62 cfs). Therefore, it appears unnecessary to provide for detention of the 2-yr storm ' runoff. In addition to attenuation of storm flows, the detention basin is also designed to provide water quality enhancement, particularly of the initial runoff flows. Per the UDFCD criteria, the detention capacity that is required for water quality enhancement (the water quality capture volume or "WQCV") is calculated as follows: ' • WQCV = A"R / 12, where R is a function of the composite % imperviousness of the site. • 1 = 30.43% i = 0.3043 • R =0.91 i3-1.19i2+0.78i ' = 0.153 in • WQCV=5.612.0.153/12 = 0.072 ac-ft (3,113 c.f.) ' • Allowing 20% increase for sedimentation, results in total required volume = 0.086 ac-ft (3,735 c.f.) In summary, the detention capacities required for the respective storm events, as well as WQCV, are as follows: • WQCV 0.086 ac-ft (3,735 c.f.) • WQCV + 100-yr storm runoff attenuation 0.319 ac-ft (13,885 c.f.) ' Available Detention Capacity The on -site detention basin will be created in the northeast corner of the site by excavation ' of native soils and placement, compaction and shaping of the excavated soils in perimeter embankments. The configuration of the detention basin is shown on the Grading & Drainage Plan for the project. ' The attached Detention Basin Depth -Capacity Analysis worksheet shows that the respective detention capacities will be satisfied at water surface elevations (WSE's) as follows: ' WQCV 4,926.24 ft WQCV + 100-yr storm runoff attenuation: 4,928.75 ft ' The top elevation of the perimeter impoundment berms of the detention basin will be 4,930.00 ft, to provide a minimum freeboard height of 1.28 ft above the design WSE for the WQCV + 100-yr storm runoff attenuation. I 1 H 1 1 1 1 1 11 L 1 L m ` N 3 T L c � U (Dc E > W > c E O o o IL mdo m v�� 0 @Ir ocNDmm 0 mtp ci l-:N O m D < O N ty m Q � N C O U 'c c Q 'J =9 %(D - CD ' O m m c p o t m r i m O C m d m a U s Q .O. c U m m_ d O w O W m m @co = 8 m c U N Q d 0 m m m Z•0U > > Q m O 0 Q= d m n o E c m mpoi-� � I- 0 N m m cD cO cD M O 8 m N N M Cl)C') N N N" N CY O O O M O O O o 0 0 0 0 0 3 U U7 m E u � c �(D Cl) cf)mmmr- wm �0)Nm chN 000 CO m m cy .X o o o 0 o 0 0 0 0 0 0 0 V7 m 9 m Co CD �cD OO m cl ONON a0 N�-0 n7 0m 0m V Ih 0 cD cD cD m a) c0 Ih M � c O c 0 V 0 O N N N O j (Do mOOmm wr- cD 0? U c0 ch GD CO c0 m O lh m N Ih ar V cO N w NMoomm cp 3 MO cO cqcD cD ��c+)cD Oa N ?cDcOCDmmmmmmaD E� j N�cD000NR(DGOON V SO— Cl) 0 m 0 ID 1- c0N W QCOO, rnm9CD0))rnrnmmrn CID 3 w 0 0 0 0 0 0 0 0 0 0 0 0 O O �i ImL O I - ONO CO Ohm co 0c0 N cM t � to co c0 rh fh m m 00o000000000 O N N N N N N N N N N N N o� (D c0 c0 (D ID cD c0 CO. CO. CD c0 10 �rt���nr�rr�rr O y m"tcD ch a0 cD w c'. I, NcD n �ccD' (SpOm D ((ppc 2 0)LOM c"p C mmv aO (0 m (N GOO V NCO aO cD N c0 co O N v LD c0 1� CO CO E> C U N N" N N N N N 7 U m�D n � <n�mcDv o cn fh (V � vr�o'no O Oi Oi a0 C� a0 Y m m IL cO NN 000N A ID M c7 c0 mh47c0mcDO1- 0. �N000 Di cl c0 u100 V MPi co c+iN�OiDNNM M� v M U) 00 it 1 1 1 1 1 DETENTION BASIN DEPTH -CAPACITY ANALYSIS Project No.: 12-389 Project Name: Discovery Fellowship Church Basin I.D.: On -site Detention Basin Date: 11/2/12 Contour Plan Depth Volume Cummulative Elevation Area Interval Increment Volume amsl s.f. ft c.f. c.f. ac-ft 4924.15 5 0.00 0.00 0.00 0.000 4925.00 2 036 0.85 607.01 607.01 0.014 4926.00 2 760 1.00 2,389.02 2,996.03 0.069 4927.00 3 584 1.00 3,162.89 6,158.92 0.141 4928.00 4 491 1.00 4,028.80 10 187.71 0.234 4929.00 5 467 1.00 4,971.11 15 158.82 0.348 4930.00 6 531 1.00 5.991.27 21 150.09 0.486 4931.00 a± 4930.00 0 4929.00 4928.00 w 4927.00 '0 4926:00 o 4925.00 4924.00 4923.00 0.000 0.100 0.200 0.300 0.400 0.500 0.600 Detention Volume (ac-ft) -The required aggregate detention volume of 0.319 ac-ft for the 100-yr storm attenuation plus WQCV is satisfied at a water surface eleVn of: - The required detention volume of 0.086 ac-ft for the WQCV is satified at a water surface eleJn of: 4928.76 4926.24 I ' Client: Discovery Fellowship Church Job No.: 12-389 Project: Building Expansion Date: 10/30/12 ' Task: Drainage / Detention Analysis Page: 5 of 6 Outlet Control Structure and Discharge Piping ' An outlet control structure will be constructed within the detention basin to regulate the rate of release of accumulated stormwater runoff from the detention basin. The outlet control structure will be as shown on the Drainage & Detention Details drawing included in the project ' drawing set. The outlet control structure will include two orifice plates; one to control the release of the ' initial flows that enter the detention basin (the WQCV portion of the accumulated runoff), and the other to control the release of the accumulated runoff from the 100-yr storm event. The WQCV orifice plate will include a column of small -diameter holes, and will be installed on the upstream, inner face of the outlet control box to regulate the release of the accumulated runoff at the lowest levels of the basin. The small diameter holes in the WQCV orifice plate will be protected from debris clogging by installation of a filtering trash rack on the outer face of the ' outlet control structure, across the opening immediately upstream of the orifice plate. Details and configuration of the orifice plate and trash rack are shown on the Drainage & Detention Details drawing. t The 100-yr orifice plate will include a larger circular hole, and will be installed on the downstream interior face of the outlet control structure, so that it becomes active as a constriction only after the depth of water in the detention basin exceeds the level of the WQCV ' and spills into the interior of the outlet control structure. Flows in excess of the 100-yr runoff will spill over the emergency spillway, and into the ' adjacent street. WQCV Orifice Sizing ' Required WQCV = 0.086 ac-ft • WQCV water surface elevation = 4926.24 feet ' WQCV depth = 2.20 feet (4926.24 — 4924.15) • UDFCD criteria for circular orifice openings in a WQCV outlet control plate provides the following: • For H = 2.09 ft ' K4o = 0.013Dwo2 + 0.22 Dv4Q — 0.10 = 0.013(2.09)2 +0.22(2.09) — 0.10 = 0.417 • Ao = WQCV / K4o = 0.086 / 0.417 = 0.206 in2 / row • Do = 0.512 inches (-1/2" dia.). ' Specifying Do = 0.512 inches in a single column of 6 holes, will achieve discharge of the WQCV in a period of 40 hours. Specifying an orifice diameter of 0.50" will result in a discharge period of only slightly longer than 40 hours. ' The WQCV outlet control orifice plate will be specified with a single column of 6 holes spaced at 4 inches center to center, and each hole being 0.50 inch diameter. ' 100-vr Storm Outlet Control Orifice Sizing ' Required orifice size is determined from the equation: I 1 1 G 1 L 1 Client: Discovery Fellowship Church Job No.: 12-389 Project: Building Expansion Date: 10/30/12 Task: Drainage / Detention Analysis Page: 6 of 6 Q = Ca(2gh)05 or a = Q C (2gh)o.s • Qalle ble = 7.62 cfs • C = 0.62 • g = 32.2 ft/sec2 • h = 4928.75 — 4925.40 = 3.35 ft (Assumes HGL for 15" dia. discharge pipe flowing full.) • Therefore, required opening area "a" = 7.62 = 0.837 ft2 0.62(2 x 32.2 x 3.35) .5 • Orifice diameter = 1.03 ft = 12.39 in (Recommend 12 318 in diameter) Discharge Pipe Capacity • Maximum design discharge through discharge pipe = 7.62 cfs • Portion of existing pipe that was truncated to divert parking lot runoff into detention basin will be removed, salvaged and a portion relayed to serve as discharge pipe from OCS to existing manhole. • Discharge pipe will be laid at 0.80% to convey allowable discharge without surcharging pipe. • 15" HDPE N-12 pipe at 0.80% slope has a capacity of approx. 7.6 cfs • Therefore, discharge pipe has adequate capacity to convey maximum design flow. Emergency Overflow In order to safely convey storm runoff through the detention basin that may be in excess of the design 100-yr storm flow, an emergency overflow spillway will be constructed in the north berm of the detention basin. The overflow spillway will have a sill elevation of 4928.75 ft., leaving a freeboard allowance of 1.25 ft to the crest of the perimeter berms. The spillway will act as a Cipolletti weir. Analysis of various weir lengths indicates that a crest length of 15.0 feet will pass the peak design inflow rate for the 100-yr storm event (19.39 cis), with a surcharge head of 0.52 ft. (6.24 in.), as shown on the attached worksheet. This leaves a freeboard of 0.73 ft (8.76 in.). Excess flows passing over the emergency spillway will be conveyed down the embankment slope the adjacent street (Trilby Ave.) where it will flow east in the street gutter and ultimately to Fossil Creek. I Discovery Fellowship Church - Emergency Overflow Weir Solve For Headwater Elevation Discharge 19.39 ft-/s Crest Elevation 4928.75 ft ' Tailwater Elevation 4926.00 ft Weir Coefficient 3.40 US t Crest length 15.00 ft _ -7='_ R77 U St Headwater Elevation 4929.27 ft ' - Headwater Height Above Crest - 0.52 ft Taihvater Height Above Crest -2.75 It ' Equal Side Slopes 0.25 Wit(H:V) Flow Area 7.94 ft- Velocity - 2.44 ft/s ' Wetted Perimeter 16.08 ft Top Width 15.26 ft t I ' Bentley Systems, Inc. Haestad Methods SoO7tlafltBeffillinrMaster V61(SELECTseries 1) 106.11.01.07] 11/5/201212:29:47 PM 27 Simms Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 I 1 1 STORMWA TER MANAGEMENT PLAN I I I I I I I I I I I n I I I 1 I I I 1 1 L1 1 I 1 1 1 Discovery Fellowship Church Facilities Expansion Fort Collins, Colorado STORMWA TER MANAGEMENT PLAN and EROSION CONTROL PLAN Prepared For: Discovery Fellowship Church 6630 Brittany Drive Fort Collins, CO 80525 (970)204-6787 Prepared By: 0 OWEN CONSULTING GROUP, INC. 3715 Shallow Pond Dr., Fort Collins, CO 80528 Phone:970-226-0264 Fax: 970-226-3760 larrycowen@comcast.net Revised August 2013 Revised May 2013 November2012 Proj. No.: 12-389 1 I ' DISCOVERY FELLOWSHIP CHURCH FORT COLLINS, COLORADO ' FACILITIES EXPANSION STORM WATER MANAGEMENT PLAN and EROSION CONTROL PLAN ' Site and Project Description ' The project site, which is currently developed with a main church building and an auxiliary trailer, used as a youth meeting facility, comprises approximately 5.00 acres. The site is located on the southeast corner of the intersection of Trilby Road and Brittany Drive in Fort Collins, CO. The site is part of the NE '% of Section 13, Township 6 North, Range 69 West of the 6t" Principal Meridian, City of Fort Collins, Larimer County, Colorado. The site is bounded on the west by Brittany Dr. and residential development; on the north by Trilby Rd., and another church property; on the east by a multi -family residential complex, and on the south by single-family residential development. The expansion of the church facilities will include a two-story youth wing, with a footprint area of ' approximately 4,500 s.f., and a two-story addition to the existing sanctuary, with a footprint area of approximately 3,200 s.f. The current youth trailer, covering approximately 840 s.f. will be removed upon completion of the new youth wing. There will be no changes made to the 1 existing driveway and parking area. Specific construction activities to be completed during the course of development will include some overlot grading; excavation for and construction of the building expansions; construction of the on -site detention basin; final grading; and installation of landscaping materials. The layout of the proposed development is shown on the attached Grading & Drainage Improvements Plan. The surface gradient of the site averages approximately 6.3%, sloping from southwest to northeast. Existing site drainage is almost exclusively via overland flow, with the runoff from the southwest quadrant of the site and the parking area being directed to a curb inlet and piped to the discharge point at the northeast corner of the site. There is currently no on -site detention basin serving the property. Runoff flows from the site, undetained, passes beneath the driveway serving the adjacent multi -family residential complex to the east, and into an open channel that conveys the flow to a detention facility at the northeast corner of the multi -family residential property, and then beneath Lemay Ave and on to Fossil Creek. The native soils underlying the site are Renohill clay loam (77%), in the western and northern regions, and Kim loam (23%) along the eastern perimeter of the site. The Renohill clay loam falls within NRCS Hydrologic Soil Group C"and the Kim loam falls within Group B. The extent and distribution of the underlying soils are shown in the attachments to the Final Drainage Report for the project. At the current state of site build -out, the composite Runoff Coefficient for the site would range between approximately 0.37 and 0.47, depending on storm intensity. Upon completion of the proposed building expansion, the composite 100-yr Runoff Coefficient for the site, "Cloo", is Discovery Fellowship Church 1 11/19/2012 Storm Water Management Plan Revised: 8/05/2013 ' calculated to be 0.50 and the composite Percent Imperviousness of the site is calculated to be 30.43%. ' The general sequence of development activities at the site will include limited overlot grading; construction of the new detention basin; excavation for and construction of building expansions; ' final grading; and landscaping of the open -space areas of the site. During the course of development, at one time or another, approximately 25% of the site will be disturbed. ' The primary source of potential surface water contamination that may result from development of the site is sediment that will be liberated due to construction operations. Other lesser potential sources of contamination may include hydrocarbons from on -site fueling and servicing of construction vehicles and equipment, as well as particulate and trace chemicals from ' concrete and building construction activities. There are no other known or anticipated sources of contamination that may impact the site runoff and downstream receiving waters. ' Runoff from the site will be collected and conveyed to the on -site detention basin, designed to provide storm attenuation and water quality enhancement for the developed site, and constructed as an initial part of the construction program. Site runoff accumulated in the ' detention basin will eventually be discharged from the outlet control structure at the northeast corner of the site to the downstream channel, and from there to Fossil Creek, and ultimately into the Cache !a Poudre River. ' Construction Activities ' As indicated above, approximately 25% of the site (a total of approximately 1.25 acres) will likely be disturbed during the course of building expansion and detention basin construction, due to overlot grading; construction of the building expansions; or final grading and landscaping. There will likely be a surplus of excavated soil from the construction activities, so on -site stockpiling of ' soil will be a temporary necessity, and there will be a subsequent need to haul excavated material off -site to a disposal facility. Stockpile height will be limited to a maximum of ten feet, and stockpiles will be located as far as possible from any interim on -site drainage ways. Any ' concrete removed during demolition activities will either be disposed of in an approved facility or recycled. ' Construction materials will generally be delivered to the site as they are required, and stored in close proximity to the work area or immediately incorporated into the permanent construction. Imported construction materials will, for the most part, be non-polluting (steel, concrete, brick, clean fill or construction aggregate, lumber, finishing materials, etc.). There will not be any dedicated asphalt or concrete batch plants on -site. ' Wherever possible, excavated native soils will be used for backfill, and this material will be stockpiled adjacent to the excavation and reused as quickly as practicable in a tight operation. Precautions will be taken, as described below, to limit erosion and transport of temporarily ' stockpiled material. Best Management Practices (BMPs) for Erosion Control and Stormwater Pollution Prevention ' Erosion and sediment transport from disturbed areas of the site present the most significant potential for contaminant migration during construction activities at the site. Several structural BMPs, common to most construction sites, will be implemented to limit this potential and to ' mitigate impacts, as follows: Discovery Fellowship Church 2 11/192012 ' Storm Water Management Plan Revised: 8/05/2013 I 1 1 1 1 1 • Silt fencing will be installed along the north and east perimeters of the site, prior to initiation of any soil disturbance. The silt fences will be maintained throughout the course of construction activities. • Temporary diversion berms will be constructed along the uphill perimeter of any site areas that are to be disturbed, in order to minimize the inflow of runoff from outside areas to the construction sites. • Within the disturbed areas, the surface of exposed soils will be roughened along an alignment that follows the site contours, to limit the flow path length of runoff water and to promote infiltration of stormwater into the exposed soils. • Where necessary, exposed soils will be stabilized with mulch or other approved methods, to stabilize the exposed surface and limit erosion. • Temporary drainage swales will be established within the site, as necessary, to intercept and divert storm runoff, and temporary sediment traps (silt fence, wattles, or other approved materials) will be installed at regular intervals along the lengths of these temporary swales to slow the velocity of runoff flows and to promote deposition of sediment and other suspended solids. • The permanent stormwater detention basin, which will have capacity to detain the runoff expected from the 100-year storm impacting the entire tributary area of the site and the off - site tributary area, will serve as a construction sediment trap. All runoff from the site will be directed to the detention basin, and discharge from the detention basin will be controlled. A silt -fence sediment trap will be constructed within the detention basin, immediately upstream of the outlet control structure, to intercept sediment and confine it to the detention area. This sediment trap will be regularly maintained and accumulations of sediment generated from the site will be removed and properly disposed of. • Inlet protection will be installed at all storm drain inlets into which runoff from the site might flow. A vehicle tracking control pad will be constructed at the site construction access point (to be determined) to limit transport of mud or soil clods from the site onto the public streets via truck tires. Existing pavement will be swept and/or flushed, as necessary, to remove dirt and/or debris that might be tracked beyond the site by local traffic. In addition to the structural BMPs listed above, several non-structural BMPs will also be implemented as part of the construction program, in order to limit erosion and sediment transport. • The construction activities will be advanced in a manner designed to maintain a compact ' scope of construction activities within the site at any given time. • Construction activities will be kept tight and excavations will be backfilled as promptly as practical, in order to limit the number and extent of exposed temporary soil stockpiles. ' Soil stockpiles and other exposed soils will be wetted, as necessary, to control dust generation. • Where it is necessary to have soil stockpiles or other significant areas of exposed soil on t site for an extended period of time, consideration will be given to applying synthetic covers or durable, membrane -forming surfactants on these surfaces, to limit the potential for erosion or dust generation. ' In addition to soil erosion and sediment transport, a further, but considerably lesser risk of contaminant migration may be presented due to spills or leaks during equipment fueling and ' maintenance, materials handling and storage, or waste disposal. Equipment fueling and Discovery Fellowship Church 3 11/19/2012 Storm Water Management Plan Revised: 8/05/2013 t I maintenance will be ongoing daily activities, throughout the course of construction activities. However: ' On -site storage of bulk fuels, lubricants and solvents will be minimized. • Where practicality and efficiency necessitate having a certain supply of such potential ' contaminants on -site, they will be stored in approved containers and at locations well removed from drainage flow paths. • If bulk fuel is stored on -site, approved secondary containment facilities will be established at ' the storage location. • Fueling and servicing of vehicles and equipment will be conducted in areas that are away from drainage swales and other potential runoff flow paths. ' In the event of a spill or leak during fueling or servicing, contaminated soils will be promptly collected and properly secured or disposed of in an approved facility. In addition, appropriate notification will be given and documentation of the cleanup maintained. Contact numbers for project personnel are provided at the end of this SWMP. 1 Materials and supplies will be delivered to the site on an ongoing basis to support construction activities. Appropriate handling and storage procedures will be implemented to limit any ' potential for contamination of storm water being discharged from the site. • Most materials will be delivered to the site as they are needed, and will be promptly ' incorporated into the permanent works. • There will be very little on -site materials storage, and only a small percentage of those materials that are stored on -site will constitute a potential source of contamination. ' If it becomes necessary to store potentially hazardous or contaminating materials on -site, they will be stored in a secure, protected area to minimize the risk of exposure or migration. As necessary, indoor or covered storage will be provided, and secondary containment will be established. ' Handling and disposal of waste and debris will also be regulated in order to avoid creation of unnecessary sources of potential contamination. • All subcontractors will be required to maintain a neat and tidy operation, regularly cleaning up and removing excess materials, construction spoil and debris. ' Sanitary waste facilities (Porta-Potties) will be located away from drainage channels and will be regularly maintained and serviced. • All subcontractors will be required to dispose of construction waste in approved, covered containers, which will be regularly removed from the site to an approved waste disposal facility. • Clean-up or decontamination of construction equipment, including washout of concrete ' mixers, will be performed in a designated area of the site, well removed from drainage paths and storm water management facilities. • Potential contaminants from such activities will be contained and, if necessary, collected for appropriate disposal. Final Site Stabilization and Long -Term Storm Water Management ' As soon as practicable, after completion of construction activities at the site, permanent landscaping will be installed including trees, shrubs, seeding, sodding, filter fabric, mulch and plant materials, per the approved Landscape Plan. ' Discovery Fellowship Church 4 11/19/2012 tStorm Water Management Plan Revised: 8/05/2013 I 1 1 1 1 Disturbed areas of the site will be prepared and revegetated in accordance with the Revegetation Specification attached to this Stormwater Management and Erosion Control Plan. If climatic conditions, at that time, are not suitable for planting and timely establishment of new vegetation, interim measures will be taken to limit the potential for erosion and sediment transport, and such measures will be maintained until permanent actions can be effectively implemented. Such interim measures may include mulching or application of surfactants, particularly on areas that may be prone to erosion. Inspection and Maintenance of Storm Water Management Facilities All BMPs, and the site in general, will be inspected at least every 14 days, as well as after significant storm events throughout the construction period, in order to assess the condition of storm water management facilities and identify any need for maintenance, repair or replacement of such facilities, to ensure their continued effectiveness. The frequency of regular inspections will be not less than bi-weekly. During such inspections, particular attention will be given to BMPs and other preventative measures where the risk or consequence of a failure is greatest (e.g., in proximity to materials of significant concentration or toxicity, or closest to the site discharge point, etc.). All inspections will be fully documented and records will be maintained on site for reference and confirmation. If a need for maintenance, repair or replacement of BMP's is identified, the nature of the problem will be documented, along with recommended actions and a timeline for completion of the work. A follow-up inspection will be made to ensure that appropriate actions have been taken to ensure the continued adequacy and effectiveness of the storm water management system. The follow-up inspection will also be documented and filed with the original inspection report. Specific inspection and documentation will also be implemented after any extraordinary incident or event, such as a spill or leak, with appropriate follow-up to ensure effective containment and clean-up. The documentation of such an event will also address measures or procedures to be implemented to avoid a recurrence. In addition to inspection and incident reports, storm water management system records will also include: • Documentation of the implementation or removal of BMPs. • Records of communications or correspondence with regulatory personnel • Details of and authorization for modifications to the SWMP • Maintenance and repairs records • Details of preventative maintenance activities • Pertinent photos, sketches and field memos. Contact Information The following individuals will be available for contact in the event of an on -site incident, or to respond to questions regarding the implementation and/or compliance with this SWMP. In the event that these individuals are no longer associated with the project, or when changes or additions are made to the relevant contact information, an addendum to this SWMP will be prepared providing updated information, and that addendum will be incorporated into the original and all copies of the document. Discovery Fellowship Church 5 11/19/2012 Storm Water Management Plan Revised: 8/05/2013 1 1 1 t 1 1 1 1 1 • Owner: Discovery Fellowship Church 6630 Brittany Drive Fort Collins, CO 80525 970-204-6787 Att'n: Craig Crider • Contractor Roche Constructors, Inc. 361 — 71 sc Ave Greeley, CO 80634 (970) 356-3611 Att'n: Bob Lyions — Project Mgr. (970-409-6403) • Civil Engineering Consultant Owen Consulting Group, Inc. 3715 Shallow Pond Drive Fort Collins, CO 80528 970-226-0264 Att'n: Mr. Larry Owen, P.E. In addition to the personnel listed above, the following agencies may/should be contacted in certain situations: • For emergencies, always dial 911 Discovery Fellowship Church Storm Water Management Plan 11/19/2012 Revised: 8/05/2013 I 11 1 L 1 1 1 DISCOVERY FELLOWSHIP CHURCH Fort Collins, Colorado STORM WATER MANAGEMENT PLAN INSPECTION REPORT (Page 1 of 2) Inspections/reports must be completed at least every fourteen (14) days and within 24 hours following any rainfall or snowmelt event that causes erosion. Inspection Type: ❑ Routine (every 14 calendar days) ❑ Pre -Storm ❑ Storm ❑ Post -Storm Date: Week Ending: Weather/Storm Event Information: Storm Start Time: Stonn Duration: Time Elapsed Since Last Storm: Approximate Amount of Rainfall (inches): Based on the results of the inspection, necessary control modifications shall be implemented within _seven (7) calendar days. These reports shall be kept on file as part of the Storm Water Pollution Prevention Plan for at least five (5) years from the date of completion and submission of the Final Stabilization Certification/Termination Checklist and Notice of Termination. A copy of the SWMP shall be kept at the site at all times during construction. Certification Statement: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Name of Inspector: Title of Inspector: ' Qualifications of Inspector. ' Inspector's Signature: Construction phasing/sequencing is consistent with the SWMP and Erosion Control Plans: Yes No ' Compliance Certification I certify that, based on there being no incidents of noncompliance Identified during the Inspection, the site is in compliance with the SWMP and the Construction General Permit ' Name of duty authorized representative (Printed): Signature of duly authorized representative: ' Date: `Note: This Compliance Certification is only to be signed by a duly authorized representative (Project Manager) when ' there are no "unsatisfactory" conditions and the construction phasing/sequencing is consistent with the SWMP, rendering the site in full compliance with the SWMP and the Construction General Permit. ' Discovery Fellowship Church, Fort Collins, CO - PAGE 1 OF 2 11/19/12 1 I I I I I I L I I I I I I I �� y C � � \ Cc WU "IX �. as 0. . • / E � > § - c? CO, . 2 17 kZ; k£e {f-� !r kJ cok� { _ � �■ � �\ 2Aw e{ 3 ¢ }k 5-1 I I 1 REVEGETATION SPECIFICATION Disturbed areas of the site shall be prepared and revegetated in accordance with the following specification. Clearing and Site Preparation Prior to any soil preparation, existing vegetation, which is to remain and which might interfere with the specified soil preparation, shall be mowed, grubbed, raked and the debris removed from the site. Prior to, or during grading or tillage operations, the ground surface shall be cleared of materials that might hinder final operations. Rip all areas to be planted, seeded and/or sodded to a minimum depth of 8 inches in two directions, using an agricultural ripper with tines spaced at no greater than 18 inches. Areas adjacent to walks, structures, curbs, etc., where the use of large mechanical equipment is difficult, shall be worked with smaller equipment or by hand. Soil Preparation Spread compost at an application rate of 3 c.y. / 1,000 s.f. and fertilizer in accordance with manufacturer's recommendations, over all areas to be seeded, sodded and/or planted with trees, shrubs or ground cover. Incorporate compost by disking or rototilling into the top six inches minimum of soil. Obtain a uniform mixture, with no pockets of soil or amendments remaining. Restore the fine grade of all areas to be planted, seeded and/or sodded, with float drag to remove irregularities resulting from tilling operations. Float drag in two directions. Remove any stones over 1 1/2 inches in diameter that have come to the surface. Upon completion of finish grading operations, the Contractor must provide a finished landscape grade that conforms to the grades and elevations shown on the engineering drawings. The Contractor shall ensure that the grade promotes positive drainage in all landscaped areas. Compost Compost shall be a totally organic product that has been aerobically and naturally processed, without the addition of coarse wood chips, to create the following characteristics, measured by dry weight: • Maximum allowable organic matter: 60% • Organic matter to nitrogen ratio: 25:1 to 30:1 • pH 7to8 • pH Salts 2.0 to 3.0 • Inorganic matter: Less than 25% • Soil, dirt or sand maximum particle size: '% in diameter Fertilizer Fertilizer for turf shall be commercial type, of uniform composition, free -flowing, and conforming to applicable State and Federal laws. Contractor shall submit formulated Manufacturer's guaranteed analysis. I Seed ' All seeding shall be completed between April 15 and May 31, or between September 1 and October 15. Seeded turf areas shall be seeded with the following blend, at an application rate ' of 5 Ibs / 1,000 s.f.: • Ward Bluegrass 30% ' Sandberg Bluegrass 25% • Rocky Mountain Fescue 25% Sheep Fescue 25% ' After seeding, the area shall be crimped with straw and provided with permanent irrigation. The Contractor shall monitor the seeded area to ensure that the area is being properly irrigated, t that seed germination and establishment is occurring, and that erosion protection BMP's remain effective. Reseeding shall be implemented, as necessary, to obtain even coverage of grass. 1 1 1 1 1 Mulch Mulch shall be applied at a rate of two tons / acre (4,000 Ibs / ac), and shall be mechanically crimped to a depth of two inches, using a purpose -made crimper. Where mechanical crimping is not possible, mulch shall be hand crimped and covered with a tackifier. All mulch shall be crimped such that the individual pieces of straw or hay form exaggerated V-shapes, protruding out of the ground several inches. rm � k k � jj j | k k/ 0 00 k � ! ! k! E § % ! ! § 5 k . k� 0 ) = � : ) { _\ § \ -\ \{�) �k �)\/ |! t ®:!f It lq,E� l•;�e�§!<! !`6 !!«$sL)0 F !&;im DRAWINGS LEGAL DESCRIPTION ALL REDEEMER LUTHERAN POD OWNER / APPLICANT DISCOVERY FELLOWSHIP CHURCH 0030 BR17AW OR. FORT DOWNS, CO SI (970)2016287E ATPN'. RICK MANIDY ENGINEERING CONSULTANT OMEN CONSULTING GROUP, INC. 3715 SHALLOW POND CHUMS FORT COLLINS, D000525 (970)MH0284 ATTR LARRY OKEN, P.E. GENERAL NOTES 1. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM ORAINAGEFACILITIESLOCATEDONMIIVATEPROPERTY. MAINTENANCECFONSITEDRAINAGE FACILTIES, INCLUDING BUT NOT LIMITED TO THE DETENTION IWATER OWLITV BASIN OUTLET CONTROL STRUCTURE AND APPURTENANCES $HALL BE PRIVATELY OMTED AND MAINTAINED BY THE PROPERTY OMER. THE PROPOSED STORM IMPROVEMENTS IDENTIFIED ON THE PLANS ARE PRIVATE. 2. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL REPORT, PREPARED BY OMEN CONSULTING GROUP, INC.. SHALL BE FO LOWED AND IMPLEMENTED. 3, PRIOR TO FINAL INSPECTION AND ACCEPTANC BY THE CITY OF FORT DOWNS, CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED PROFESSIONAL ENGINEER, SHALL BE SUBMITTED TO AND APPROVED BY THE STCRMNATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER DR U Y DEPARTMENT AT LEAST TVA) M II PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY. DISCOVERY FELLOWSHIP CHURCH REDEEMER LUTHERAN P.U.D. PROPOSED BUILDING EXPANSION SITE GRADING & DRAINAGE IMPROVEMENTS A portion of the Northeast Quarter of Section 13, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado 6630 Brittany Drive, Fort Collins, CO 80525 VICINITY MAP SCALE: NIS vvn Ivry mI BENCHMARK INFORMATION VEIRICAL DATUM: BENCHMARK. CITY OF FORTCOLLIN9 N0. 3481, ff ALLMINUN CAPLOCATEp APpgX. 13W WEST OF NORTHWEST PROPERTY CORNER ALONG TRILBY AND ELEVATION • 5957.50 BENCHMARK. CITY OF FORT COLLINB NO 25W NW CORNER OF TRILBY RED, AND IEMAY AVE. SOUTHEAST EDGE OF OONC. RIM OF ELEC. MANgLE ELEVATION=<P0P8T LOCAL EucF% IRON ROD a CAP MARKED 20372. ELEV•AIM2.1A N.W. PROPER CORNER: N.E. PROPERTY CORNER'. IRON ROD a RED CAP MNMED SON. BUSY .4525.06 &IM PROPERTYCORNER. ROD a CAP MARKED29R, ELEV.-4914.22 S E. PROPERTY CORNER: IRON ROD a DAP MAWED 253T2. ELEV =aWL00 U Z JZ �D wZp 000 Fe PAGEINDEX 1. TITLE SHEET ]. OVERALL DRAINAGE PLAN AND EROSION CONTROL MN 3. SITE GRADING& MANAGE IMPROVEMENTS A. DRAINAGE S DETENTION DETAILS a EROSION CONTROL DETAILS r} a x 0 iC ci 55j A APPROVAL SIGNATURES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF EMT U d V COLUNS STORMWATERCRITERMMANUAL. CITYACCEFTANCESHALLNOT y R: RELIEVE THE DESIGN ENGINEER OF RESPONSIBILITY FOR ERRORS, F OMISSIONS OR DESIGN DEFICIENCIES FORNMICHTHECITYISHELD y IX HARMLESS. fo i City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: OM"Immir Mb O CHECKED BY: y Wa1x6 Wu1wMal11YM DIM 0 CHECKED BY: $1ommvBler Uoilr DM �5 CHECKED BY: C a PwaRecNWm Dm CHECKED BY: e TN11k En01rcer DM CHECKED BY: 99! � Wd LINdVEIMPRO,P. E..NTS TO THE AT REDEEMER LANSFORTHE K URE UCTION PREPARED BY ME, OR AND DIRECT SUPERVISION LUTHERAN PUB P HIP CHURL ME IXI UNDER MY DIRECT BUPERPSION, FO0. TXE DMMER$TgE0.EDF, pI3CDYERY FELLOWSHIP CHURCH V II LARRYOOAEN, RE LATE COLOADDREGISTRATIMMOSSI 1 R=2CM' L-3642' D. e0Do' W s�t &d DISCOVERY FELLOWSHIP CHURCH A portion of the Northeast Quarter of Section 13, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado OVERALL DRAINAGE AND EROSION CONTOL PLAN C iYv F.TRL,C: NOTES VEHICLE TRACKING CCNT IOU PAD (Locic" APPROXIMATE. FINAL wixOt%i TO BE DETERMINED BY CONWACTOR) INSTALL SILT FENCE ALONG DOWNSTREAM Wp1TLf DINES (FY% EAST TRILBY ROAD EA(TTENDINGAAMINIMUMO503PYOND OPSTREMILIMITS OF CONTRUCTION. INSTALL IMET PROTECTION AROUND _ IP EXISTING INLET N WEST F O MOF NEB'IT 2YW .)e(Lp0' LEMAY AVE, IMMEDIATELY SCAUH OF TRILBY--- AMID. (INLET LOCATION IS BEYOND THE -- SCOPE OF THIS DRAWING 10 0 L INSTALL BUT FENCE DIKE ACROSS FULL 1 hB l \ WIDTH OF CHANNEL, UPSTREAM OF EXISTING y 1 DRIVEWAY CULVERT. ANCHOR SILT FENCE _ _ A SECURELY IN FLOOR CE EXISTING DEPR..�BYRASS ..A.... ... FLOW BENEATH SILT TOENSURE INTO URI FLOW BENEATH 81LT FENCE MOCULVEM. SEUMEM TRAP INSTALL SILT PENCE ME UPSTNEAMCF WTLETCOMFKI $TRUCTUflE IOTRAP SEGMENTS. SILT FENCE IN MISN OWED ST 6XPLLST SUPFORTEDONBRACEDSIEELPOSTS,NID FLIERCREENNG FOR SUPPORT ANWIRE MESH SCREENING AN FORRIN OOD CON. MAINTAIN DIKE IN PLACE PMSTRU CONDITION MRWOHCUT IONHASICIION PERM AND UMILVELISHED. REMOVE BEEN SEDIMENTS XED.PERDUE ACCUMULATED SEDIMENTS PERKIDICPLLY, ASNECE&9MY. Y CONCRETE TRKAIE PAN EXISTING PAVED--� \ % 4A 1` PARKING AREA PflCPo8E0 Y I AkIIXP ` i' BOUNDAASMOFREVISEDOFWNAGE W EEMENT. ^ ' RRURE CONCRETE APRp1. I' ``, E%18TN0 OXURCH SANCTUARY .`. �\ \� I BOUNDARY OF EXISTING DRAINAGE fASEAIENT. OFFSITE TRIBM.VIV AREAk(D.et AN x LEGEND N DRAINAGE ROW ARPOW z \ \ W EXISTING CONTOURS BYO V\ PROPOSED CONTOURS ", 1 •� 11 It �SF� SILT FENCE 11 % \, ` , I \ 1\+ 11111, `1\1` ``\ L1I II IL I`t\t` 11, VEHICLE TRACKING CONTROL PAD I I { 191 /%% """`" `I ill I^ INLET PROTECTION III Ile ` -'�6 HIV, WATTLE DIKE It 1 ` l l` j RIPRAP ARMORING yJ .' 1 . (M1I i II. LIMITS OF DRAINAGE BASIN Jj ' W SCALE. 1'= 40'-0" NORTH Knew rvhaPs 6elo% —I-- Call before you trig. 0 20' 40 80' 120' STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOES THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO ANY CONSTRUCTON ON THIS SITE THERE SHALL BE NO EARTH DISTURBING ACTIVITY OUTSIDE WE LIMITS DESIGNATED ON ME ACCEPTED PLANS. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITIES (STOCKPILING. STRIPPING, GRADING, ETC.). ALL OTHER REWIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN WE APPROVED PRWECT SCHEDULE. CONSTRUCTION PLANS. AND EROSION CONTROL REPORT. AT ALL TIMES DURING CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROWNG ON -SITE EROSION INCLUDING KEEPING WE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOM SEDIMENT. WE DEVELOPER SHALL ALSO BE RESPONSIBLE FOR INSTAWNG AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN THEM. PRE -DISTURBANCE VEGETATION SHALL BE PROTECTED AHD RETANED YMEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF METING VEGETATION SHALL BE UNITED TO WE AREAS) REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATION, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING. UTILITY INSTALLATONS, STOCKPIUNC, FILLING. ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL. SMP'S ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS -OF -WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITIES FOR MORE THAN THIRTY (W) DAYS BEFORE REWIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY WE CITY OF FORT COLLINS. IN ORDER TO MINIMIZE EROSION POTENTAL. AIL TEMPORARY (STRUCTURN.) EROSION CONTROL MEASURES SHALL A. BE INSPECTED AT A MINIMUM OF EVERY TWO (2) WEEKS AND AFTER EACH SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER TO ENSURE WE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTON. B. REMAIN IN PLACE UNTIL SUCH TIME AS ALL WE SURROUNDING DISTURBED AREAS ARE SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. C. BE REMOVED AFTER WE STE HAS BEEN SUMCIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSTED MATERIAL IMMEDIATELY AND MAKE SURE STREETS ARE FREE OF ALL MATERIALS BY THE END OF EACH WORKING DAY, ALL RETAINED SEDIMENTS. PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY WATERS OF THE UNITED STATES NO SOIL STOCKPILE SHALL EXCEED TEN (10 FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING. WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED AND MULCHED. THE STONMWAMR VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM SEWER LINES WILL BE CLEANED UPON COMPLETON OF WE PROJECT. OTY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CUPS) REQUIREMENTS MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR CONTAMINATED WATER FROM CONSTRUCTION SIZES. POLLUTANTS INCLUDE, BUT ARE NOT LIMITED TO DISCARDED BUILDINGS MATERIALS. CONCRETE TRUCK WASHOUT. CHEMICALS, OIL AND GAS PRODUCTS. LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. A DESIGNATED AREA SHALL BE PROVIDED ON SIT FOR CONCRETE TRUCK CHUTE WASHOUT. WE AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST RRY (SO) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION, UPON COMPLETION OF CONSTRUCTION ACTIVITIES WE CONCRETE WASHOUT MATERIAL MILL BE REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED. CONDITIONS IN THE REM MAY WARRANT EROE ON Col MEASURES IN ADDITION TO WHAT IS SHOWN GN THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY, AS DIRECTED BY THE CITY OF FORT COLLINS. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED MEN NEEDED FOR CONSTRUCTION EQUIPMENT, INCLUDING BUT NOT LIMITED TO PERSONAL VEHICLES E%I LNG EASING ROADWAYS, NO EARTHEN MATERIALS, I.E. STONE. DIRT, ETC. SHALL BE PLACED IN WE CURB AND GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS, CONSTRUCTION MATERIALS, CONCRETE WASHOUT AREAS, AND/OR BUILDING SIZES. THE CONTRACTOR SHALL ALSO REFER TO THE APPROVED STORMWAMIR MANAGEMENT PLAN AND EROSION CONTROL PLAN FOR ACTONS TO BE TAKEN DURING CONSTRUCTION TO UNIT EROSION AND MINIMIZE WE RISK OF OFF -SITE TRANSPORT OF SEDIMENTS AND OTHER POTENTALLY HARMFUL MATERIALS BMIF SEQUENCING CHART MOMllatlon Ftlm blxYn SiMGmdiM I'VerhalComitl FleBeerbinW. I Landiscatil"111 Demobilization Beg Mane menlPMotlwe SM S1,UCIUmil "IretaIlBMi Silt FIAI Vlncle Tlecki Pea Inlet PMeiVan lAn e,ristinG inlets ay.Ynatltelll NaBe SeaimMR TW / Filter (in MCMicn Bmin) Ses rcb / aps BLVIe Contw Flamts (HIM / DII Ses Emei6n CmlM ReDol WaUle Dkes RIOSPAImaMO •All BMPb ere to Oa mmesi mrtce Cartavive n is compete V e TNnwary SEEKIN / Pumal MUICNrp Swiss/ SM Am time the site Will At dermeN kxXW Nan GO Rye. AM time iDo site Will SitaminMm krGW man 300P/s. PermWm[Smairq/ RMICAI PMaucts I BMIW,%s I MEN)Useen a e10Pes, as IIN-eeu I%NI a steNlaNad. APPROVAL SIGNATURES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ME CITY OF FORT COLLINS STORMWAMRCRRERIAMM'UAL. CITYACCEPTANCESIMLL NOT RELIEVE THE DESIGN ENGINEER OF RESPONSIBILITY FOR ERRORS. OMISSIONS OR DESIGN DEFICIENCIES, FOR WHICH THE CITY IS HELD HARMLESS. LT7SUP(y I CHECKED BY CHECKED BY CHECKED BY CHECKED BY CHECKED BY City of Fort Collins, Colorado UTILITY PLAN APPROVAL CN Ergkeer DaN WI A Wastemov LEMF Gets Slam"ter Ui4ty DNA Pass; B Re mamn Date Traflk EnVlnea DM Z t7 e J? Zia Wz0 OUP 0 N O e o e 0 � a � 0 m U z U � C LT7 p IY d! F D iL FI is � a 0 O P Ia SEEPLANS P12 1,1 ULK,sYW� ^W/ ry 00 D V II 'Il I II IIII \ I If DISCOVERY FELLOWSHIP CHURCH A portion of the Northeast Quarter of Section 13, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larinner, State of Colorado SITE GRADING & DRAINAGE IMPROVEMENTS EXISTING m'pA. XOPENIDRAIN 189.7LF..]LF.®3B3% EAST TRILBY ROAD MISTING STORM RIM RM MA HOLE ELEV-01 INV.II-A5217 IW OUT(EI-49I EXISTING PAVING PLANTING AREA n EXISTING W CIA. HOPE W12 STORM DRAM (LENGTH B GRADIENT UiDEIERMNEO) EMERGENCYSPILLWAYSILL (WE DETAIL) BOUNDARY OF REVISED DRAINAGE EASEMENT D r-v ♦♦�1 y I ♦♦�`♦♦ ♦♦♦ `\� `IIII I \\` \M % HIM l 1 1 1 1 1 1\ j I111 III 111 ,1 I I 11,1 1 1 \ TO Is- -4M5.5 IIII IIIIII 1 CANCREIEI II IIII \1\I1 \8.0 W. M.-49413IN 11 ARw �PATp T.O.W. EL. •491 II B.O.W. EL. •4W.3 'TOW.EU-4939.5 IN; \� IN ```\♦\ NARY ER080N I`\ COMEGUATE SUCK \\ ` `-PROP08EOYWTI WNG ••�```•\REVEGERTHANL1 EXPANSION -. ♦ \I`\. \ITYEa�)THANA:1 �\ \ 11 II _ E%ISTING SANCRW2Y � e__ _ EXISTING CHURCH j OFRCES&NORSEM` FF.E-491e.5N- ^ I I E EXISTINGSTORMMANHOLE RIM EL -MiQ63 INV. IN(AM -4032 INV. OUT (BE)=4923.1 MISEMANHOLEAS NECESSARY TO SUIT NEW DETENTION BASIN EMBANKMENT ELEVATION. EXISTING 24 CIA HOPE N1. 45LF. 03.5% i Know whatis below. Call before you dig. T.O.W. EL. =4900 Z U S.O.W. EL.•49M5 TOW EL.•49A4 J E B.O.W. EL .• AIDES { PLACE TYPE"M" RIPMP ARMORING THROUGHOUT ZN- (1 FULL EXTENT OF EXPOSED SUMP ARM ARMDRING Lill z TO EXTEND UP TO ELEVATION 49H 0 INSTALL INTERLOCKING BLOCK HEADWALL TO RETAIN Q ,�p OVv e ap T.O.W. EL.•A92).0 EMBANKMENT FILL. TOP OF WALL ELEVATION-492T.0 ; 81 B.O.W. BL.-49216 ggg e EXISTING 24" OM. RCP CULVERT W F.ES. f T.O.W E. =492)0 BENEATH APARTMENT COMPLM DRIVEWAY 6666 B.O.W. EL. -49242 DISCHARGING TO OPEN CHANNEL EASTF. RO TO.W. EL.=49A.4 B O.W. EL. • 49250 MISTING 3P DM RCP PIPE BENEATH APARTMENT COMPLEX DRIVEWAY DISCHARGING TO OPEN CHANNEL EAST EXISTING STORM MANHOE �N RIM ELEV.•49P.0 EXPOSE AND SALVAGE EXISTING IS"OIA HOPE STORM IW. INN-4922.0 ? Q r GRAIN BETWEEN EXISTING MANHOLE AND CUT LOCATION ROM IN(S)=4924.0INN, v ATSE CORNER OF DETENTION SASIN. RELAYAFPROX. OUT (E) • 4921E 13 OF EXISTING PIPE 00.80% SLOPE, INCLUDING IEW RAISE MANHOLE LID. RIM AND COVER AFPROX 3.0 FT a I 1VDIP. 90 DEG. BEND, TO SERVE AS DISCHARGE PIK TO SUIT OETENTICN BASIN EMBANKMENT FILL FROM OUTLET CONTROL STRUCTURE, AND RECONNEW TO MISTING MANHOLE INLET. IN 0 PIPE INVERT AT OUTLET CONTROL STRUCTURE -492413 p PIPE INVERT AT MANHOLE = 49240 !2 Q 2 CONCRETE TRICIGE PAN INSTALL TYPE -L-RIPMP ARMORING G50 • B9 IN AREA SHOWN SINGED TO PREVIEW EROSION. RIPRAP SHALL BE BURIED BENEATH B OF TOPSOIL, SEEDED NTH NATIVE GRASSESAND MULCHED TO Z 1` PROTECT SEED UNTIL GERMINATION. C CUT EXISTING IF DIA. HOPE STORM GRAIN AT THE Imo. ROM THAT IT INTERSECTS DETENTION BASIN e SLOPE (APPROX. INV. ELEV. JIM 0) AND INSTALL NEW FEE REMOVE EXISTING DOWNSTREAM Mxi AI PIPING FROM THIS POINT TO THE MANHOLE, AND IIt PIPE INVERT AT OUTLET CONTROL STRUCTURE V 481.13 PIPE INVERT AT MANHOLE :411 !p� O DRAINAGE I DETENTION SUMMARY m U DNlne sBasin Area(Including ofil tributary area ac 5Al2 Composts RunOTI Coef3c'Mnt 0.40 30.43 .Porwntlmpowiomm Design Shan Runoff (Oft) - 2-yr Storm Event (Oil 4.24 100-yr Storm Event (Qm@ 19.39 Allowable Release Rate eh 7.152 Required Detenbon Cape* (ealq • WOCV 0.088 • 100.yr Stone Attenuation 0.233 - Total 0.319 Detention Water Surface Elevation (it) - VII 4928.55 100 yr Storm Attenuation 4 WOCV 4928.96 NIIII %INNNNN FUTURE ONCRAPRON `SLOPEAWY OM ILDIN. GAT t% O i NOMINMLELEVATION=4ws APPROVAL SIGNATUPES VUi EXISTING IV HOPE W,: STORM DRAIN S' O i 1I\ 218.4 LF.®338% ALL CONSTRUCTION SHALL BE IN ACCORDANCE NTH THE CITY OF FORT I COLLINS STORMWATER CRITERIA MANUAL. CITY ACCEPTANCE SHALL I 1\\Vi BOUNDARY OF EXISTING DRAINAGE NOT REUEVE THE DESIGN ENGINEER OF RESPONSIBILITY FOR ERRORS, EASEMENr. OMISVONSORDESIONCEFICIENCIES, FORWHICHTHECITYISHEID HARMLESS. r j, EXISTINGSTORMMANHOM RM EL. -MI City of Fort Collins, Colorado INV. IN (WJ =492t3 UTILITY PLAN APPROVAL 1 INV. OM(N-A9311 EXISTINGIVDM. HDPENI2STBRMDMIN 139.41.F1834% APPROVED: SEC11pNCFMISTINGSIDEWALX(APPROX Ctr EIplrwer Dxe TO BE REMOVED, AND NEWSIOEWALK TO BE CONBTRUCTEO IN CONULMCTION CHECKED BY'. k MATH SANCTUARY EXPANSION Wex4 Walewerer WlRy pMF CHECKED BYStmrweler UII1TY DMF F157) CHECKED BY: tCHECKED BY:iTraMcErOirow DW 1 SCALE: 1'�$Y-0' NORTH 16NOV12 CHECKED BY: �3 0 19 29 40 89 ox. 1I DISCOVERY FELLOWSHIP CHURCH A portion of the Northeast Quarter of Section 13, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado DRAINAGE & DETENTION DETAILS AN OPRGNN CONC6EIE "Iova (m) STEEL CN4iML FORMED I�NDD PAD (FNO of PAD TOwTa N10 @EIE ICRSIDES - BD of MIND MACE) I WTI IlA 3'-6' 6' TRAGN P/CK 3/n151ED NCRJ55 I i/4' PULE, wF1DED 511d1' EU ROUND O To CHNTE MIH T (3P 6 CR05 DHc l l 3/8•A6• THREADED SOLT CT FASTEN CRAZE DOD! \ BARS AT 3' O.C., (IYP. OFF. SIDE)'""�\ &IRS A TO O.C.. " I I \ 2 1/2' BC.) AT I I � 2 1/Y D.C.) M IF I� �nnnnunnnn►�.ae mmnununnm: onnnnunnnn QII nsub,amuununnnu nY WRENN■ oil MAP. � �nunumm�nnE Ynunv-.unmlm n■aIltl■■■■■i■■■■■■■Y nn lnnnn 1 / I `UFAS MEN EN1N L J//CONa OPENING YIEIL SCREEN N0. 93 (FASTEN Y4M J/B'K6' TREADED BOL15) (U.S. RLTFF srNNIES9 A B PLAN D /�3//9.1,5• BOLTS 1z• SIFFL OR ET7UN) / lb HOLD HLIKE IN 1/A• FMW rr l WELL (M ME CITY OF 1/4• PLATE, HDDED TRASH RICK TD CRATE 111111 (NOTE 5) — 3 B48' TNREADIED BOLT FASTEN GRATE DOWN 1 OUTLET 40R3 T SECTION C-C DETAILS 12-316" DR. ORIFICE (IOCII STORM) CUT OUT CENTRAL 1-AT BOTTOM OF ORIFICE TO ALLOW COMPLETE DRAINAGE OF OUTLET STRUCTURE. -,�1•.'- BOTTOM EDGE OF ORIFICE PLATE TO BE SET FLUSH WITH FLOOR OF OUTLET CONTROLBOX 100-YR ORIFICE DETAIL SCALE:NTS DI •lee .l. •le less le se le a el I• 0 •I 'YAW HOLE (RPa• Sli �TABLE `5 EEL FLOW CONIRO PLATE TM STEEL ANCHOR BOLTS OR BODONI POw OF 3• (7yp,) `SINNLESS STEEL wE1D5 ON TOP NO SOB IIOE$ 10 ff AT NICHDR BOLT INAU T OF PLATE WELL SCREEN FLOW CONTROL PLATE SECTION A -A SECTION B-B SECTION D-D +41112• DOW PIPE —i4012' GENERAL NOTES 1. QHCRETE 9111 BE CUSS B. WY BE VST-N-R/CE OR PRSUS. 2. RENFORUNG BIRS PWL B1 EPOV ONTO AND aTgi , MO 9wl W\K A WMA1 Y CIfMNVCE 3 1/2• 3. STEPS SML BE PROVIDED MIN VERIMN OMISSION EACUDS X-6' 3' CUP '� SHRI MIN NYCIDVICE Nm hiw M Isar. K1 I/2• KEY 4. ALL SAW FACKS SHALL BE MDAIID) USING VAN ESC STEEL HAACwAIE MD _ PROVED) WIN IwDED AND LOCRYAL OR BOUT.AFI£ AD ESS PAMIS 5. TFA91 WAS SHALL BE AN1LE55 STEEL AWMNW, OR SKEL STEEL TWSN RACKS LPll SE HOT aP U1V,Wtm ND WY M NIT NAaA PNXIED 21'—% 1.1? O O W16'THICKHOT-DIPPED GALVANVED STEEL PLATE K'a BORE OF 15- CIA. DISCHARGE PIPE BEYOND 12J CIA. ORIFICE (SEE DETAIL BELOW) O\ )V DIA. ANCHOR BOLT HOLE (4 REOD) FORW DH0. EXPANSION BOLT. IRO-YR STORM ATTENUATION ORIFICE PLATE $GALE: NTS LEGEND A A SECT)ON LNE A -A WM SECTION INDREawR ABBREVIATIONS CLA. af/PMlF TYP, iTPKN DML OYIDFN No NOM a' COIDNTE a ETEV. E11WllON VIP w OF RATE NV. NARI NO MNR O MAN. 1MaRIlY V IDlGM m STRUaLBE MIN. MWiIN we 1DM a SMDREE O.C. ON FDnu / NBMER OPP. OPIDNIE a At BEEN. A POND TIN. 4924.33 SUN S 4926.55 M. C 4927.55 SRI M. 4928.96 Dom 12• 111 2.22 V VAT w eu' HOLE BIL 0.5' WO I f OF ROWS 7 Ff R COYHS 1 OEFEMION &151NCRFST (HEV.4930.OR av Zara � A n H -J'CLR (1YP) SILL ELEVATION SCALE:1 =1vY EMERGENCY SPILLWAY SILL SLOPE VARIES p SLOPE VARIES CONCRETE SECTION TRICKLE PAN SCALE: NTS TOP SOL a SURFACE VEGETANON TYPE -L' RIPRAP (TYP) 8 OZ/SY NON-INOWN GEOTEXTR-E FILTER FABRIC REINFORCED CONCRETE SILL (SEE DETAIL THIS SHEET) EMERGENCY SPILLWAY SILL - ENLARGEMENT J SCALE:NTS APPROVAL SIGNATURES ALL CONSTRUCTION SHALL BE IN ACCORDANCE WTH THE CITY OF FORT COWNS STORMWATER CRITERIA MANUAL. CITY ACCEPTANCE SHALL NOT RELIEVE THE DESIGN ENGINEER OF RBSPONSIBIU YFOR Boat iB TOP OF SRLLYMYSLL OMISSIONS OR DESIGN DEFICIENCIES, FOR VMICH THE Clry IS HELD ELEV. 4NNW HARMLESS 3' M B4R CGMIHOUS1g REED ) NDctB'BAR®a-o'G SINGLE OURNN n g• SILL SECTION SCALE: 1--2-P City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED' Cm/Englrwer Dow CHECKED BY: _ vAmavme..wr uWlry Dew CHECKED BY: Srormxwer UYfry Dq4 CHECKED BY: Parke a Rxreetion DFw CHECKED BY'. TrNSC Engineer pM Z O f!! J? Zyn fi WZO 30 OU0 el. U 1 08 � u m I: $GALE: NT$ CHECKED BY: Dare n AVERSION RIDGE REWrREO WRERE GRADE EXCEEDS 1F 2 F OR CRGICR ROADWr AL III FAMRIC SELTON A - A \ Ati>F / Go CO BILE$ SINGGGO sPKLXNr OR espy AVI NEED AR CdIr NrILBERM G TO ONIER APPRISED FIXNVfLENr HCMHr rD CHAS AVOE RONOfF 0eAm+As REWIRED Sheary WIFA r0 WEN wHats IF nrcEssA.w `(x/ _ AGGREGAI 12' Will 23 I � I 0 L_ nBa _1J � rmw MN or 050l TH2x' CI ) �OnERnI+..'ccs , 50'(15m) MN -- -� PUPA NORM' I we EN is"NEF SWLL BE WIMNNED N i COMarOV RAT WILL PRFKM MORN GSEDIMENT Ovrp PUBLIC RIGHT-DF-WAIS. MIS NAY R Ar l TOP TOP ORS0.4EISSINGREPAIR AWDIT LLGM NOOF ANY RGSURES USED szo 2 WHEN NELESGRY, XYIEELS Shl BE CLEWED PRIOR lD EMPANCE ONTO FLul Rup R.GWr-w-WAX TEMPORARY S J. WHEN WASHING lS REWIRED. Ir SIALL M GRAVEL i sSIOME c r D,w"°E"LFrs INTO AENDAroRMED HGO CONSTRUCTION SEXUrNr MAP DR SEDIMEM BASIN. ENTRANCE EXIT O BILK r SrOEWALK BACK OF GARB AKDO $IW Oul BLOCK JSR/C \ L A-LONLRETC BLOCK 314- a DRVN GAS Kt J PLAN VIEW (zol PONDAG NEON, �IEREZON CONCRETE BLOGw CURS Auer. -PARE SCREEN Go EIL IER FASRIL GILN BISIN NO1£S I I I. LSE SLOLK NIP GRAVEL TYPE SEDIMENT BARREN WHEN CURB INLET IS LOCATED /N yEO A - A CENILY SLONNC STREET SESMENT. WHERE Al (AN F9N0 AND ALLOW SEDIMENT TO SEYMRAR'FROM RUNOFF 2. BARRIER ERMI ALLOW FOR OKHFYDW FROM SEVERE STORM EYFM Aa**fin CURB J INSPECT BARRIERS AND REMOIT SFO/MFM SEDIMENT AL/ER EACH Smell EVENT SEDIMENT AND GkIltrt MUST BE FAOM ME RUNLED WAY /MMFD/ llEY IBLOC.E B DISCOVERY FELLOWSHIP CHURCH A portion of the Northeast Quarter of Section 13, Township 6 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado EROSION CONTROL DETAILS TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT Construction Specifications: The aggregate size for constmction of the pad Shall be 2-3 men (51-76 mm) stone. Place the growl to tre specific grade and dimensions shown n the plans, and smooth it. The thickness of the pad shall not be leas than 6 inches (0.2 an). I geotextge fabrics, if necessary, to improve stability of the foundation in locations Subject to seepage or Sign water table. The width of the pad shall not be less than the full width of all points of ingress or egress and in any caw shall not be less than 12 feel (3.6 m) wide. The length of the oo shall be an uired but not Ives than 0 feet fig p required. 5 e Loco ). Locate construction r entrances tine exits to limit sediment leavingthe site and to o f steep m d II A Quid or ma utility D a construction wM1idss. witl provide u Y Y entrances which have steep 9nd<a and entrances at curvesIn public roads. One entrance shall be mprevent in a condition that will prevent tracking Periodic of sediment auto public righter -off -way. easc ions de require.n 9 PY repair and/or lap ma int anh aof crypt sasue tie sed toot a demand, anti epair ntmaid, drops of any measures tracked to trap wdimml. All sediment spilled, dropped, washed or lracketl onto public rights -of -way anal be removed Immediately. Provide drainage to carry water to a wdiment trap se other suitable outlet. WTw ceConto J, public rights -of -way. shallf- all n remove is sediment prior h to entrance onto public rights -with way. Wren washing II required, It Shall be done en an r area stabilized with crushed atone that drains into an approved Sediment sedi hop al sediment basin. All sediment shall be use ofsprevented from entering any atarto emir, then or watercourse shads. uw of vend bags. growl. straw pales, or other approved meth Ma. naintoin and Maintenance: Maintain the gravel pad in a candifoT to prevent ^.ud o• wdiment from leaving the constructionsite. lace Repgrowmaterial l materialal when surface voids Hsbe. After each rainfall, inspect any structure Decoed to tap sediment and dean IImmediately t a9 nwemove public remove al' Remove all s materials posse. washed, or tracked onto public roadways. Remove all sediment cepoaited on paves roodwaya within 24 awn. Place the barriers w gently eloping streets where water can pond. The barriers must allow for overflow from a wevere storm event. Slope runoff shall be allowed to flow over blocks and growl arc not be bypassed over the curb. A spillway shall be constructed with the sandbag structures to allow overflow. The sandbag should be of woven -type geatexille fabric since burlap bogs deteriorate nor ly. The scrol ga shall be filled with 3/4 inch (19 rum) drain rook or inch T6 rum) pec growl. he sandbags shall be placed in a curved row from the top of curb at Twat 3 feet (0.9 m) into the street. The row Should be curved at the ends, painting uphill. Several layers of bags shou d be overlapped and packed tightly. Leave a we-shi gap In the lop row to act as a spillway. For Block and Gravel Type Barriers: Place two concrete blocks on their sides perpendicular to the curb at either end of the inlet opening. Thew will serve as spacer blocks. Place concrete blocks an their sides across the front of the inlet and abutting the spacer blocks. The openings in the blocks should lace outward, not upward. Cut a 2 by 4 inch (51 by 102 mm) stud the length of the cum inlet plus the width of the two spacer blocks. Place the stud lhrOLgh the outer hole of each Spacer block to help keep tre front blocks in place. Place wire mesa over the outside vertical face (open ends) of the concrete blocks to prevent stone from being washed through the blocks. Use chicken wire. hardware cloth wil 1/2 inch (13 rum) opeings, or flew fabric. Place 3/4 -1 1/3 Inch (19-34 mm) growl against he wire to the top of the barrier. Inspection and Mo'ntenonce: and door and remove sediment fromer behindnsandbagfter each structure soften ceveery tstorand Any sediment and growl shall be immediately removed from the traveled way of reads. The removed sedimert Shall be placed where it conrot enter a storm drain, stream, ar be transported off site. If the growl becomes clogged with sediment, it must be carefully removed tram the inlet and either cleared or replaced. EXIRA SIRENCM ik2R FAd NEEDED AN/NOW WAer' MESH 51FFL NOW IBNAfSfTu SPACING W/M b' II= SWINUM SPACING w9R/DUI SWPoRT QhCE �SIEEL OR NODO POST J6- (Im) H/L// MAX 9VOlNC HEIGHT OW(ISO X S0.nn) iAEACN xrm fW TRENCH all INRMIAOXIN WRIWR TREN ice AVAES I. Der LIGNI sil EE HACED ON Stone 0000aphS w NUNIIE RbIWrK. ESNCIENCr. hDI 10 SGLE 2 MSPELr ANP Ali LEA? ArrER DART SIDMI EYEM A,e REMOK SELNMENr MNSN AYLIRSAW 9 2PS. MWIMUV RELO.M D S W M.GHr. m'AM� m'l ever werocknowe F"£O SILT FI SEDIMENT OFF -Sur AND Lw � FERMANSWAr SIAEW.I2ED. SILT FENCE Construction Specifications: The height of a sill fence Shall not eed 36 inches (0.9 m). Storage height and pording height shall news, exceed iB inches (0.5 m). The fence line shall follow the contou as closely as possible. If possible, the filler fabric Shall be C it from a continuous roll to avoid the of pints. When joints a y. filter cloth Shall be spliced only at support Pont, with a minimum 6 In In (0.2 m) overlap and both ends securely festered to the post. Posts sholl be spaced a maximum of 10 feet (3.1 m) apart and driven securely Into the ground minimum o 12 inches a.3 m Wren extra -strength fabric is used without Ma wire Support fence, post spacing shall not exceed s teat fence m). A trench the shell of ex fence u hill. P A trench anal) be excavated o line o let 4 Inches 101 fr voice and 6 PP Y ( m) Man tang rd deep along the line of Dosed, and wire ham the barrier. Wren Do alter lckhe u is used, c f t mean support fence snarl wine fastened tleasto the u. a mm) long. of the posts using rwv securely oelop p 1 9 Y They wiro hall ea it limo tincn (25. rum) long, lie wires or hog rings. The wire shill extend into thetrench a minimum of 2 inches nrum) one shall not extend more than 36 inche (0.9 m) above the original ground surface. The nstrength filter /Dark sh II be stapled or wired to the fence, 6i and 6 inches m) of the fabrics ill extend into the trench. The obnc shin nott extend more than 36 Inches (0.9 m) above the original ground surface. filter fabric shall rod be elapsed existing trees. When extra -strength fabric and loser Post spacing are w6 the wire mash support lance may be he post '�n such a case, the filler fabric is sta'Ire trench c wired dirbe bay to the poste Te trench Shall be backfilletl and ON soil compacted over the toe of the filler fabric. SN fences placed at the toe of a slips shall vo set at least 6 feat (1.8 Slit from me toe in removed to hen is pending volume. Silt fences shall be removed when th+y how pservedermanently their useful yne Pend cr but not before Me ndl the or" hap been permanently n:aDilixed and any sediment stored ainter me Gilt force has been removed. Slit forces and Maintenance: Big fences and filar barriers anal) be inspected hour weekly alter each Do made storm (I inch (25.4 mmJ 24 hour). Any required repairs Shall tie. ishon err. rices Sediment 3 an) a emovetl wow R 400<nea 1/3 height of the fence or 9 Ther move m) maximum. The removed sediment shall conform with the existing grade and be willwillor otherwise atatobilized. WATTLE DIKE NOTES -- A. Single slakes shou at be driven through the middle of the wattle. LeWWWWWWe 2 - 3 inches of the stoke protruding abo the wattle. A heavy sediment load will t ntl to pick the wattle up and could pull off the stakes R they are driven dawn too 110 . It may be necessary to make o hole in the wattle with a pick in order to get the I ake through the straw. Wher strow wattle are used for flat ground applications, drive he slakes straight been; when .retailing watts on slopes, tlrive the stakes perpendicular t the slope. B. Double stokes should be c iven ounces from Such other and on each i do of the wattle. Slowing 4r-6• of slake of, ruding above the watt e. boiling wire or ny n rope should be tied to the stokes across he attle. stakes should then be driven untl the boiling wire or nylon rope is sufficiently snug to the wattle, APPROVAL SIGNATURES ALL CONSTRUCTION ShALL BE IN ACCORDANCE WITH THE CITY OF FORT COW NS STORMWATER CRITERIA WINULL. CITY ACCEPTANCE SHALL NOT RELIEVE THE DESIGN ENGINEER OF RESPONSISIUm' FOR ERRORS, OMISSIONS OR DESIGN DEFICIENCIES, FOR WHICHTHE CITY IS HELD City of Fort Collins, Colorado UTILITY PLAN APPROVAL City Engineer qb Water a wasrewakir ueoy Does Psdua Reurnmon Din BY: _ Tl ENIr r pM I Z , 3 ZU —Z W F— B J - �a Z WZO 3 rc Z. 00c� F6 V Sit one