Loading...
HomeMy WebLinkAboutDrainage Reports - 09/23/1994Fier orf PROPERTY OF COLLINS uTuxrM DRAINAGE AND CONTROL STUDY FOR E BUSINESS PARK ONE, PHASE 2 LLINS, COLORADO --/ 2'lo ';�/ FINAL DRAINAGE AND EROSION CONTROL STUDY FOR OAKRIDGE BUSINESS PARK BLOCK ONE, PHASE 2 FORT COLLINS, COLORADO September 2, 1994 Prepared for: ' Vaught*Frye Architects 1119 Stoney Hill Drive Fort Collins , Colo 80525 ' Prepared by: RED, Inc. Engineering Consultants ' 209 South Meldrum Fort Collins, Colorado 80521 (303) 482-5922 ' RBD Job No. 183-030 1 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 INC. Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 303/482-5922 FAX:303/482-6368 September 2, 1994 Mr. Glen Schluter City of Fort Collins Utility Services Stormwater 235. Mathews Fort Collins, Colorado 80522 RE: Final Drainage and Erosion Control Study for Oakridge Business Park, Block One, Phase 2 Dear Glen: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Study for Oakridge Business Park, Block One, Phase 2. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria and all review comments by Storm Drainage staff have been addressed. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, RBD Inc. Engineering Consultants �►p�''OB Steven C. Birdsall, P.E. Project,Engin Stan A. Myers, P.E. Project Manager Denver303/458-5526 TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 1 A. LOCATION 1 B. DESCRIPTION OF PROPERTY 1 II. DRAINAGE BASINS 1 A. MAJOR BASIN DESCRIPTION 1 III. DRAINAGE DESIGN CRITERIA 1 A. REGULATIONS 1 B. DEVELOPMENT CRITERIA REFERENCE 2 AND CONSTRAINTS C. HYDROLOGICAL CRITERIA 2 D. HYDRAULIC CRITERIA 2 E. VARIANCES FROM CRITERIA 2 IV. DRAINAGE FACILITY DESIGN 3 A. GENERAL CONCEPT 3 V. STORM WATER QUALITY 4 A. GENERAL CONCEPT 4 VI. EROSION CONTROL 4 A. GENERAL CONCEPT 4 VII. CONCLUSIONS 4 A. COMPLIANCE WITH STANDARDS 4 B. DRAINAGE CONCEPT 5 C. STORM WATER QUALITY 5 D. EROSION CONTROL CONCEPT 5 REFERENCES 5 APPENDIX VICINITY MAP SITE HYDROLOGY CALCULATIONS DETENTION POND SIZING AND EMERGENCY OVERFLOW WEIR EROSION CONTROL v r� FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE OAKRIDGE BUSINESS PARK, BLOCK ONE, PHASE 2 FORT COLLINS, COLORADO AND DESCRIPTION I. GENERAL LOCATION ' A. Location The Oakridge Business Park, Block One, Phase 2 project is located in the southeast part of Fort Collins. It is bounded on the north by Harmony Road, on the east by Wheaton Drive, and on the south by Oakridge Drive. The site consists of approximately 4.04 acres of which 2.82 is ' planned for development for a Medical Center. The site will contain parking, one building with the option of an addition, and landscaping. It can further be described as being in the Northwest Quarter of Section 6, Township 6 North, Range 68 West, 6th P.M., City of Fort Collins, Larimer County, Colorado. B. Description of Propert At present the site is largely undeveloped, and consists mostly of native grasses with the north east corner containing extensive landscaping. Site topography is from northwest to southeast at a slope of approximately ' 1.8%. Property to the west and adjacent to the site is currently undeveloped. ' II. DRAINAGE BASINS ' A. Major Basin Description The site is located within the Oakridge Business Park Master Drainage ' Plan, and is also a part of the McClellands/Mail Creek Master Drainage Basin. DRAINAGE DESIGN CRITERIA A. Regulations The City of Fort Collins Storm Drainage Design Criteria is being used for the subject site. The criteria as established by the Master Drainage Study 1 ' for the Oakridge Business Park will also be used for this site. ' B. Development Criteria Reference and Constraints This site historically drains largely from the northwest to the southeast ' to the intersection of Wheaton Drive and Oakridge Drive. Maximum release rates, as established by the Master Drainage Study for the Oakridge Business Park, for this site are 0.2 cfs/acre for the 10 year and ' 0.5 cfs/acre for the 100 year storm events. However, per the Master Drainage Study listed above, the 10 year storm event passes from the site at a rate larger than the 0.2 cfs/acre as the regional detention pond ' for the Oakridge Business park has sufficient capacity to detain and release at the aforementioned rate. In addition, the runoff generated from the streets internal to the Oakridge site - in particular for this study ' Wheaton and Oakridge Drives - has been accounted for in the Master Drainage Study for the Oakridge, Business Park. This will be further ' described later in the. report in the DRAINAGE FACILITY DESIGN on page 3. This site was designated as Basin 340 in the Master Drainage Study for the Oakridge Business Park. In that Study, the maximum release rate for the 100 year event for Basin 340 was set at 2 cfs. The calculations ' included at the end of this report will show the maximum release rate for the 100 year event to be 2.00 cfs placing this design within previously established and accepted release rates. ' C. Hydrological Criteria The rational method was used to determine peak developed runoff from the site. The 10 year and 100 year rainfall criteria, which was obtained from the City of Fort Collins, is the criteria used for this study. ' For design, the F.A.A. method was used to determine the detention requirements for this site. 1 D. Hydraulic Criteria ' All calculations within this study have been prepared in accordance with the City of Fort Collins Storm Drainage Criteria. ' E. Variances from Criteria No variances are anticipated at this time. 1 ' 2 1 ' IV. DRAINAGE FACILITY DESIGN A. General Concept ' The majority of a developed runoff from the site will be conveyed to the sout ester orner of the project by way of curb and gutter and ' open channe . e average slopes across most of the pavements in the site is approximately 2%. Runoff from the site will be collected in curb and gutter in the parking lots and conveyed to a permanent detention ' pond. The majority of the detention for the project will be provided within is pon . Detained release from this pond will be piped to the existing storm drain at the intersection of Wheaton Drive and Oakridge �7" 61 Drive. Other runoff flows will be detained in the ditch along Harmony Road on the north side of the site. Detained release from this ditch will be passed under Wheaton Drive via an existing 5' * 3' elliptical cross pipe to the ' east. The ditch on the east side of Wheaton Drive had been filled at some point in the past. Because of this situation, flows can no longer he" removed from this ditchZalong the north side of the site immediately east ' of Wheaton Drive. Detained flows from this basin are released at 0.51 cfs, or 2 cfs per acre as required for the 100 year storm event in the Master Drainage Plan. ' The combined release rates from these two detention areas will not exceed the previously accepted release rates from this area for the 100 year storm event. As noted in paragraph B on page 2, the maximum release from Basin 340 as described in the Master Drainage Study for Oakridge Business Park is 2 cfs for the 100 year storm event. ' As delineated in the Master Drainage Study referenced above, the runoff created by the 10 year storm event will be released undetained to travel to the regional detention pond. This pond, as described in the Master Drainage Study, has been determined to have enough capacity to release flows for Oakridge Business Park at 0.2 cfs/acre. See attached page ' from the Master Drainage Study at the end of the Site Hydrology Calculations in the Appendix for the criteria established for the 10 year storm events and related detention. ' Likewise, street flows have been accounted for in the Master Drainage Study and onsite detention is not required per that report. Internal ' streets in the Master Drainage Study are included in Basin 110 and 160, 1 3 F I 11 7 1 1 the storm runoff of which is directly carried to the regional detention pond. Therefore, the streets adjacent to this site - namely Wheaton and Oakridge Drives in Basin 160 of the Master Drainage Report - have not been taken into account when sizing the onsite detention. A copy of the Overall Master Drainage Plan has been included in the pocket at the end of this report. V. STORM WATER QUALITY A. General Concept Beginning in October of 1992, water quality of storm water runoff was required to be addressed on all final designs. This site will contain a permanent stormwater detention pond which will serve in the long run as a means of settling out suspended particles while discharging at a rate below the predetermined discharge rate. VI. EROSION CONTROL A. General Concept The Oakridge Business Park lies within the Moderate Rainfall Erodibility Zone and the Moderate wind erodibility Zone per the City of Fort Collins zone maps. Per the City of Fort Collins Erosion Control Reference Manual for construction sites, the erosion control performance standards have calculated.lrajsppropriate measures will be required during and after construction to control erosion. All construction activities must also comply with the State of Colorado permitting process for Stormwater Discharges associated with construction activities. A Colorado Department of Health NPDES permit will be required before any construction grading can occur. VII. CONCLUSIONS A. Compliance with Standards All computations within this report have been completed with the City of Fort Collins Storm Drainage Design Criteria. 9 ' B. Drainage Concept ' The proposed drainage concepts presented in this study and shown on the final grading and drainage plan, adequately provide for the conveyance and detention of developed runoff for this project. The size ' of the detention ponds will enable this site to develop in conformance with the Master Drainage Study for the Oakridge Business Park. The detention ponds for this site will be provided with a minimum of 1' of ' freeboard and emergency overflow outlets in the event the outlet structures and pipes become plugged. ' In the event groundwater is encountered during construction of any portion of the site and dewatering is used to install utilities, a State of Colorado Construction Dewatering Wastewater Discharge permit will be required. ' C. Storm Water Quality This site will contain a permanent stormwater detention pond which will serve in the long run as a means of settling out suspended particles while discharging at a rate below the predetermined discharge rate. ' D. Erosion Control Concept Per the. City of Fort Collins Erosion Control Reference Manual for ' Construction Sites, the erosion control performance standards have been calculated and appropriate measures will be required to control erosion from the site. REFERENCES Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984, revised March 1991. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins, Colorado, January 1991. ' 3. Master Drainage Study for the Oakridge Business Park, by RBD Inc. Engineering Consultants, June 1990. 1 5 APPENDIX 11 VICINITY MAP 7 iL 1 1 1 r-■ CC O O w N O YI a WLU � H 0 �n . � Q Q S d% �0 NOld3� '3Ad Ad 31 'S 0 a DR. o '3Ad 3031100 'S w �g0 a I 11 1 SITE HYDROLOGY CALCULATIONS 1 1 CLIENT ✓ i' JOB NO. INC PROJECT �<<%G�C / _ /�ii/ CALCULATIONS FOR _,s7z 2�n 41 Engineering Consultants MADE BY.5dDATE �EC�ECKEDBY- DATE -SHEET OF /Z_ %e 3—�YLs7�� /F IIII if1 r 1192 ! %3�'S/h�-S II I -•LI (3. 'If i I,I L i I I If - .. f 1�/1 l ��� I� I I I I I I , r JL I , I 1�L T1 I I � , t _ f I I - I _ _ v27/�D'n/ . SiG B 1.. 1 1 �.a2 •-tea 38, 9'YG vw2c_ I iGK/n/� Gr 7i8 _ _ _ _ / ?9s { 6 f .. ' t�C S2 G • 9 a /1/ ( jrs/Nus �.. 1 ym • I:. . f 1 f, I � RMINC Engineering Consultants CLIENT ��JCI' JOB NO. S3-O�t% PROJECT i4 45KIC /'114 CALCULATIONSFOR—,S?VYr-A . MADEBYV& DATEI NECKED BY DATE SHEET 0_OF -Z L I I I t f r ; _ ' ' I %3a Sr�r /A- �r�i2�OI✓l � /3�l/t 1 I I � i � •-� — I }. .-4...-_— I� I j r i L:t:.� .'...3_ .,3 r231 __�.i� I � ; -� -ate•-��-'--: ,c _ I I j I LI 1_ ,Iv%1cc ... Q ^ ' 77 de— i �SSvr+To /4�e7�Y/ 3���Gf L4H.NS J. ` _ T -1 / v�ri3 ' ' I I I �crrt�, , lfk ..- _ _ 1 _ I 1 .. I _ _ / r _ I ' j SS V /'9 t� /vC [��t9 /L S / /1 c.✓/�/_: T , 1 + V I j 'I1F i I ' _ 1 _ < 2/ i - 2 I 1 1 .- / - I2; J. _ I , J. .... .�.:. ".-.... f _ I f 1 1 011SOINC Engineering Consultants 1 1 1. 1 1 1 1 1 1 1 1 1 1 1 1 1� 1 CLIENTy JK- /'- JOB NO. '!!�3 r O� d PROJECT /6G.0 I 12/f;!27 CALCULATIONS FOR S�D2r�1 MADE B K$ DATEi *CHECKED BV DATE SHEET J OF /Z /fir itYz�Nc,. ( (vuSf��c �D.L EC I ✓3 /�✓ LI J ' ".a.as I ' I �rtG vr/ e . c �.z�..✓� c t s'Zvb � ,ro.�. L�a-c � I , L �- ! m v�/i 1 it I � I _ J Q ioo ,? 03 I _ J _ 1 10 �O.f%G2i/JG� QrJls'inle'8 _ loo I .. ----- I � � �S' { , -!.., .. L _. /%]�"TT.E'!2 /:✓! / !�/ [ -. � '. r I ��! Fd..:G 'C"�-G' �. - [Sj�S �i<1/ �/ c9d 7.. i _ ! ._. y I I yyo� I + r L._- /r LL, I I I : e, o I ---------------- I UC � � I RMING Engineering Consultants CLIENT A7-- JOB NO. 1e9_y__0_30 PROJECT Beece CALCULATIONS FOR MADE By DATEM6� -CHECKED BY DATE -SHEET2�_/_ Of 259�0_ 7-/17 T 7 -- ----- ------ L __ 4 T i.7 1 F-i rj T j ...... . ....... -.7 1 ........ - Z7 , - - -- - -- - - - 4- - - 7 ..- p i _7 _4 ...... -- - -------- - - - - - - - - - - I p _T_ I .... ..... . ...... ------ -- -- - ..... _4 ---- - --- - - - ------ i. -A 4 .. .... 111 4 - - - - - - - - - - - - - - - - - - 7- - - - - - - - - - -- 7r­ 4- T:ADNC Engineering Consultants I 11 I I I I I I 11 I I I I I 11 I CLIENT 11,00pe 09-- JOB NO. PROJECT ae-AKE 17, Alre-07 CALCULATIONSFOR MADEBYS4(-DATE-7/zgeln�.,CHECKED By- DATE -SHEET-,..'��DF -Z7, r7-7 4- L --L•- J. 47 -7 -Y4 T j T j L 7- L -1--j- j J' .... .. . r j-1 --- i 4,- _1 . ........... 'Z TT 7 ---------- --- ----- - ---- - - - - - - - - - .... .. .. - ------- ----- j- ..... L- ...... - ------------ - - - - — - - - - - - - - - - - - - - - -- - --- ----- .ems -7 - - -------------- -- -------- ---- ---- .......... -L- L -j - - - - - - - - - - - - 777- 7 00 4 4 . .. ------ - - - - - - - - .- / % ..... -- ---------- yy �f.�//fry � 0,2/, ♦'G C- �b /23 ' , � 1 {.! ' L �' ��, Ir.-� , 4 - .............. . .. . . . . . .. . ... ... -- ---- - - - ------- - - ---------- - oe I I I j I I I I I I I I I I I I I I CLIENT JOB NO. f830 NC PROJECT RZOC-e ~e CALCULATIONSFOR M221t:Cwj Engineering Consultants MADE BYge4 DATE CHECKED BY -DATE -SHEET -/,,-,-OF _4 . ................ ------- --- T­ -- -------- 4. 4� -T .... ... ..... ..... . ..... j.- 77 T - - - - - - - - - - 1-T A : i ........ .... , I .. .... ... . .. ...... .. -- ---- _J i._! L - ...... .... ----- -- ----- .......... - ----------- 4 A L 7 t ---------- ----- ­­ ----------- 4 - - - - - - - - - - - ­ --- - ------- - L 1i ------------ - ZE i L 7R' ............ If 7 - — - - - - - - - - - - - - - - - - - ---- --- ------- 1 .2 - - - - - - - - - - - 4 --- .. ..... ......... q I J- - - - - - - - - - - -- OIL e J- 1 . . . . . . . . . . L . _I J - - - - - - - - - - i 1 RmNG Engineering Consultants 1 1 1 1 1 11 1 1 11 1 1 1 1 1 CLIENT 1` JOB NO.-/B.3 -O�-3 PROJECT '71 C OCk O'CfjN�LIJr, %�/t CALCULATIONS FOR 5222a hn MADE BY�v�,DATE ���1"/ CHECKED BY DATE SHEET Z0F '/�r3`rn , ' I i.�iF . �fo f-o2 �.¢-cam} 1 i3i+`s/•�%,_ K �-f I I 1 � ' '- I IT', � 7 '�-- I I 1 I i i I _ / J I 45 1 _ 120N9+ �AoVF�tL ��/Yy 6T/J� �y G v 2 t �i1 PT7fGIYJ $�y i f rr . J. _41 l � I I I I.-. I , I i 1 , } I ,- itfs ,�o l Q, - D, _17�2.8�) i of 4r787s 1 ... -. ..:. :. ._ ----- { i 3 `I a? /o d 7zi Y 7 7� 13 03 i 1 i_ji3 1------------- //2> CLIENT Af /, ilc JOB NO. OZ� RMINC PROJECT AZLX0'06!e,_ CALCULATIONS FOR -CYd, A%,7 Engineering Consultants MADE BTc1cff_DATE Z�CHECKED BY- DATE SHEET o OF %Z I I I No Text INTERPOLATED VALUES FOR 100 YEAR INTENSITIES Tc Value 6U,/41r-, 5.00 9.0 5.10 9.0 5.20 8.9 5.30 8.9. 5.40 8.9 5. 8.8 �w0 5.6050 8.8 5.70 8.7 5.80 8.7 5.90 8.7 6.00 8.6 6.10 8.6 6.20 8.6 6.30 8.5 6.40 8.5 6.50 8.5. 6.60 8.4 6.70 8.4 6.80 8.4 6.90 8.3 7.00 8.3 7.10 8.2 7.20 8.2 7.30 8.2 7.40 8.1 7.50 8.1 7.60 8.1 7.70 8.0 7.80 8.0 7.90 8.0 8.00 7.9 8.10 7.9 8.20 7.8 8.30 7.8 8.40 7.8 .8.50 7.7 8.60 7.7 8.70 7.7 8.80 7.6 8.90 7.6 9.00 7.6 9.10 7.5 9.20 7.5 9.30 7.5 9.40 7.4 9.50 7.4 9.60 7.3 9.70 7.3 9.80 7.3 9.90 7.2 10.00 7.2 MASTER DRAINAGE STUC w4io FOR Th �� OAKRIDGE BUSINESS PAR I .1 31U YES Offsite from north of Harmony 300 YES Offsite from west to Lemay 290 YES Existing 280 NO Street 270 YES 260 YES 250 YES Existing 240 NO Downstream street capacity.is OK 230 YES 220 YES �. 210 NO From sump in Innovation to channel 200 NO Possible YES; Direct to Pond 120, NO Possible.YES; Includes Comlinear 110 NO Internal street system The 10 year storm model did not include any site specific detention for the Oakridge site. The above results indicate that control at the regional detention pond is adequate to bring the 10 year �- release rate below the allowable 0.2 cfs per acre discharge. This includes offsite Basin 300. 2.2.2 Flow Characteristics STREET SYSTEM FLOW DEPTH xi? Page 8 of Appendix A is a sorted list of all the basins and conveyance elements with their respective flow depths.. The internal Ii street system was City of Fort evaluated according to allowable flow depth. The Collins criteria states that14 both local and collector streets may have the an 18" depth of runoff in the gutter for major (l00 year) storm event and arterial streets are only allowed a depth of 0.5' above the crown. There are no arterial streets internal to the Oakridge site. For comparative purposes only, the above mentioned evaluation is based on the arterial standard. There are only three streets that exceed 0.51in crown depth and are located at the downstream end of the basin (see enclosed Drainage Plan). This exceedance is only 0.04 feet in each case. They are Elements 21 (Innovation Drive), 12 (internal future_ street near Comlinear) and 7 (Wheaton Drive). Innovation Drive and Wheaton Drive have been built. All the internal streets have 100 year water surface levels below the allowed 18" standard and present no hinderance to the passage of emergency vehicles. Element 12 is associated with Basin 120 (Comlinear) and was evaluated at a minimum grade of 0.6% slope. DETENTION POND SIZING AND EMERGENCY OVERFLOW WEIR ---------------------------------------- DETENTION POND SIZING BY FAA METHOD ' DEVELOPED BY JAMES C.Y. GUO, PHD, P.E. DEPARTMENT OF CIVIL ENGINEERING ' EXECUTED ON 07-25-1994 AT TIME 18:56:03 PROJECT TITLE: BLOCK ONE, PHASE II **** DRAINAGE BASIN DESCRIPTION ***** DESIGN RAINFALL STATISTICS BASIN ID NUMBER = BASIN AREA (acre)= RUNOFF COEF = 7 1.01 0.27 DESIGN RETURN PERIOD (YEARS) = 100.00 ' INTENSITY (IN/HR) -DURATION (MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 INTENSITY 9.0 7.3 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1 1 I 180 1 . 0-1-- Liv% F• t . ***** POND OUTFLOW CHARACTERISTICS: C,h) S1 MAXIMUM ALLOWABLE RELEASE RATE = 57 CFS OUTFLOW ADJUSTMENT FACTOR = .89 AVERAGE RELEASE RATE _ .5073 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE ----------------------------------------------------- INCH/HR ACRE -FT ACRE -FT ACRE -FT 0.00 0.00 0.00 0.00 0.00 5.00 9.00 0.02 0.00 0.01 10.00 7.30 0.03 0.01 0.02 15.00 6.25 0.04 0.01 0.03 20.00 5.20 0.04 0.01 0.03 25.00 4.70 0.04 0.02 0.03 30.00 4.20 0.05 0.02 0.03 35.00 3.85 0.05 0.02 0.03 40.00 3.50 0.05 0.03 0.03 45.00 3.25 0.06 0.03 0.02 50.00 3.00 0.06 0.03 0.02 55.00 2.80 0.06 0.04 0.02 ---------------------------- THE REQUIRED POND SIZE =------------------- = 2.703412E-02`�`ACRE-FT m 0•0_ THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 25 MI TES wobwAll�.• ��" ova" p� v I -------------------------------------------------------=---------------------- ------------------------------------------------------------ DETENTION POND SIZING BY FAA METHOD ' DEVELOPED BY JAMES C.Y. GUO, PHD, P.E. DEPARTMENT OF CIVIL ENGINEERING ' EXECUTED ON 07-21-1994 AT TIME 07:42:41 PROJECT TITLE: BLOCK 1, PHASE II **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = BASIN AREA (acre)= 3.03 RUNOFF COEF = 0.72 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 'INTENSITY (IN/HR) -DURATION (MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.0 7.3 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0•o-c,>7 r.t. POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = 1.51 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = 1.51 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT ' 0.00 0.00 0.00 0.00 0.00 5.00 9.00 0.14 0.01 0.13 10.00 7.30 0.22 0.02 0.20 ' 15.00 6.25 0.28 0.03 0.25 20.00 5.20 0.32 0.04 0.27 25.00 4.70 0.36 0.05 0.30 30.00 4.20 0.38 0.06 0.32 35.00 3.85 0.41 0.07 0.34 40.00 3.50 0.42 0.08 0.34 45.00 3.25 0.44 0.09 0.35 ' 50.00 3.00 0.45 0.10 0.35 55.00 2.80 0.47 0.11 0.35 60.00 2.60 0.47 0.12 0.35 ' 65.00 2.47 0.49 0.14 0.35 70.00 2.35 0.50 0.15 0.35 75.00 2.22 0.51 0.16 0.35 ' 80.00 2.10 0.51 0.17 0.34 85.00 2.00 0.52 0.18 0.34 90.00 1.90 0.52 0.19 0.33 95.00 1.80 0.52 0.20 0.32 ' 100.00 --------------------------------- 1.70 0.52 0.21 0.31 THE REQUIRED POND SIZE 3528427 ----------------- CRE-FT 4 ' THE RAINFALL DURATION F E AEUVE POND STORAGE= 70 MINUTES ------------------------------- --------------------------- ------------ DETENTION POND SIZING BY FAA METHOD ' DEVELOPED BY JAMES C.Y. GUO, PHD, P.E. DEPARTMENT OF CIVIL ENGINEERING ' EXECUTED ON 07-25-1994 AT TIME 19:01:24 PROJECT TITLE: BLOCK ONE, PHASE II 2nd ITERATION)]g **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = �B BASIN AREA (acre)= 3.03 RUNOFF COEF = 0.72 DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY (IN/HR) -DURATION (MIN) TABLE IS GIVEN 'DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.0 7.3 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0t Civ7 F.C, t ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = 1.43 CFS OUTFLOW ADJUSTMENT FACTOR = 1 S AVERAGE RELEASE RATE = 1.43 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT ***** COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT ---------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 9.00 0.14 0.01 0.13 10.00 7.30 0.22 0.02 0.20 15.00 6.25 0.28 0.03 0.25 20.00 5.20 0.32 0.04 0.28 25.00 4.70 0.36 0.05 0.31 30.00 4.20 0.38 0.06 0.32 35.00 3.85 0.41 0.07 0.34 40.00 3.50 0.42 0.08 0.35 ' 45.00 50.00 3.25 3.00 0.44 0.45 0.09 0.10 0.35 0.36 55.00 2.80 0.47 0.11 0.36 60.00 2.60 0.47 0.12 0.35 ' 65.00 2.47 0.49 0.13 0.36 70.00 2.35 0.50 0.14 0.36 75.00 2.22 0.51 0.15 0.36 80.00 2.10 0.51 0.16 0.35 ' 85.00 2.00 0.52 0.17 0.35 90.00 1.90 0.52 0.18 0.34 95 00 1 80 0.52 0.19 0.33 '---100_00------1_70----- 0.52 0.20 0.32 ---------------- THE REQUIRED POND SIZE .3605562 CRE-FT e ' THE RAINFALL DURATION OR TH OND STORAGE= 70 MINUTES Yy c (S 0�_ FACTOR. 00 +J c0 O o . o w u 1 ' o^ ..rd !" FF w r C� M y } •- O J i p. N :1 Q. + /-T 0 dab M � b of 0 w N 0 O f.j u C) G. Z o O O .I j- oo d N rn Cd; LD d N. Co a) a) rn CDo oo, oo . o0 00 0 o O CD CD o a o o o I x — .10'.0*ej quaui-4snrpv A4.OIJ0 • o I I 1 BLOCK ONE, PHASE II, OAKRIDGE BUSINESS PARK pDETENTION POND FOR IBASIN A ' RATING CURVE 11 Elev. Area Area Storage Cum. Stor ft. sq.ft. ac. ac.ft. ac.ft. 78 309 0.01 0 79 1143 0.03 0.02 0.02 79.5 1143 0.03 0.01 80 2387 0.05 0.02 0.05 81 3693 0.08 0.07 0.12 IJ 1 1 i 1 1 1 L 1 I .1 11 1 .1 BLOCK ONE, PHASE II, QAKRIDGF RURI ESS PARK --DETENTION POND FOR ASIN B RATING CURVE Elev. Area Area Storage Cum. Stor ft. sq.ft. ac. ac.ft. ac.ft. 73.25 1066 0.02 0 0 74 1805 0.04 0.02 0.02 75 2385 0.05 0.05 0.07 76 4931 0.11 0.08 0 5 77 13213 0.30 0.20 0.36 1 RBD INC. ENGINEERING CONSULTANTS OVERFLOW WEIR SECTION FLOW DATA BLOCK ONE, PHASE II WEIR COEF. 3.400 : `f -- fires+-� il,.i< 7� i3124-c� rL STA ELEV 100.0 78.00 200.0 78.00 207.5 77.00 215.0 78.00 315.0 78.00 ELEVATION DISCHARGE 3iZ (feet) (cfs) Q -eGH 77.00 0.0 77.10 0.1 77.20 0.3 %7 37 77.30 0.9 77.40 1.8 77.50 3.2 77.60 5.0 77.70 7.4 77.80 10.3 77.90 13.9 78.00 18.0 7 7 m o J 11 1 11 h� EROSION CONTROL 1 RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: acock, o^nr� STANDARD FORM A COMPLETED BY: -5 • C. i3 . DATE: rx, c DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SU9BA§IN ZONE (ac) (ft) M (feet) M ($) ...........y %Or. Qlc 49 -e4- +qNT�t-Yf DYij-PCB ' MARCH 1991 B-14 DESIGN CRITERIA f i i r- r I 1 t I J EFFECTIVENESS CALCULATIONS PROJECT: o�K2���r; ,3CoCK e../�, P*Z:r STANDARD FORM B COMPLETED BY: DATE: Erosion Control C-Factor P-Factor Method Value Value Comment fSV-,A/3G/S,"c 0 0,08 4IZA ss /3A 2 r% 2 ov.vo MAJOR PS SUB AREA BASIN BASIN (Ac) CALCULATIONS jg � �. �,y ���ss ,��� = �• 9y ,fc-.. . fc re/L - /• 00 vO C:5 �sj� r � 9.8 • �o /D/ttvrw i iv-f o ' MARCH 1991 8-1S DESIGN CRITERIA RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: 0,,F1rC14 4 4 OC IC STANDARD FORM A COMPLETED BY: C.Q.DATE: DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBA§IN ZONE (ac) (ft) M (feet) M M 70 s. 8 Bo oo - MARCH 1991 8-14 DESIGN CRITERIA I I 7 L EFFECTIVENESS CALCULATIONS PROJECT: 0/.ceo,,p4 e ve ae acit ^+�14 sr -2r STANDARD FORM B COMPLETED BY: DATE: Erosion Control C-Factor P-Factor Method Value Value Cominent. e-12,to,4 0, 5'j- a 0 0.08 -- --- -- =.-4 - -(50 .Sole - MAJOR PS SUB AREA BASIN BASIN (Ac) CALCULATIONS 4.e,f c Ire 5> 7.' &,:7 7 1,6 gg ,Z 0 6r, yg) Ma MARCH 1931, 8-15 DESIGN CRITERIA 3 c CONSTRUCTION SEQUENCE I Mai PROJECT: 4µK erc, G�i3roeii Qivr� P.r�RSe�11 STANDARD 3FORM C SEQUENCE. FOR 19. ONLY COMPLETED BY: ,g,, c. f*sa c L DATE:. o Indicate by use of a bar line or symbols when erosion control measures wiIT.'66,installed. Major modifications to an approved schedule may require submitting a new schedule for ' approval by the City Engineer. ix YEAR MONTHIAIsI_OI�/I r�IJIF.Ir?I�I::Ia=4,:I5' ' -------j----1---= --1: - ------------------------ I----}----} -.{ OVERLOT GRADING I-1 I i I I I I ' I:-' I :. 1 T----� ' WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other ,- RAINFALL EROSION CONTROL ' STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags ' Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving ' Other ' VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting ' Sod Installation Nettings/Mats/Blankets Other I = STRUCTURES: INSTALLED BY ' VEGETATION/MULCHING CONTRACTOR ' DATE SUBMITTED P, DI/SF-C:1989 MAINTAINED BY N0. DeDATE HARMONY ROAD EXISTING 5XT ELLIPTICAL Tt� _ BOB PIPE. FIELD FIT��_� ��'� �� ' a 3/e DEA ORIFICE PLATE. F 81 ., .........._ 19 RETAINING WALL I I 1 , 1 HARMONY MEDICAL CENTER 1 10,000 SQ. F I. 4 16,000 S0� FT. 1 1 EXPANSinN E.F. ELEV.- 4980.Y5 I 1 RETAINING WALL I RE'. ARCH I I I I I I t- - .- _; �-:- I I j RE. ARCH I �1 II } l x 1 I 1 '�— II SIDEWALK CHASE ' nitr I FOR ROOF DRAINS k 0 m 0111, , O ' 7-I 1CURB I I L... 9 II m v1. P rp HIT eRoNF I — WIDE 1 -ON F �tt I FUTURE FUTURE PARKING 4,000 SO.FT. 1 I 18" FLARED PAD ail. END SECTION WEE 5-1/4 ORIFICE v ht Rj PLATE L 1 9 ` EXISTING 'B' RCP V p ! re n RE DMLOCA E STUB. —JT_ / • - D- '•=B <?. 1 FI FO EF NEED ENDS SECTION PIPE ® .TR I / '�°` V >b — FROM CORE INLET OES SIR - - 1- SSR 1 N01 EXTEND AS SHOWNIE 3 ,. a _" __ 15 SHOT _ 15, n - STORM �.. - OVERFLOW OX e_ �_ .... WEIR O ELEV } 9y - OAKRIDGEDRIVE ___�--- ------- --- ;' LOT �F SITE SKIT STATE For Be, pnraap ama Noy If E HOTEL Sa ANSI C" MOOTA a) BE OUR .muRXIAMMm WA X@R1t XkR a/8' AMEX CONTINUE qXR POR9 OUTLET MPM SCE IT AUG,1 1994 E3-030 Nn+ NOTE. OTY SHALL NOT BE RESPONSIBLE FOR VAINRNANCE of D.NSITE STORY DRAINAGE EAZIUNES. NOR ME OFFSHE SNALE(S) SS0*A W. THESE FLANS AS ME DEVELOPER WALL BE RESPONSIBLE ME CITY ALL NOT MAINTAIN IRRIGATION SWAIfS/DITCHES, OR PONDS. DEVELOPED SITE HYDROLOGY LEGEND W III SCALF 1'=30' EXISTING CONTOUR PROPOSED CONTOUR PROPOSED BASIN BOUNDARY ePROPOSED BASIN NUMBER O SAC BASIN AREA IN ACRES CONCENTRATION PT, UIRECTION OF FLUX 9RAW BALE CHECK DAM GRAVEL INLET FILTER L' EXISTING SPOT ELEVATION SHIP— PROPOSED SPOT ELEVATION FF FINISHED FLOOR ELEVATION FLOWLINE SEDIMENT FENCE 11511 SANITARY MANHOLE (EXIST) Ci STORM DNAIN MANHOLE (EXST) City of Fort Colliln'Colorado DRAINAGE Sams. _ UTMR PLAN APPROVAL ON —SITE DFTFNTON u0, A HASIN A APPKo.i _ Dlrectar of EMH^'nng Date SE .1C Ei RF]Nr H C"FrKtC 0 RT Meter N YeateaeteT pNllty Date DETENTION SUN•n <RY Cn EGr,LU US _ BASINS DRAINED: A R 9tunaaeter Duty -Date MAIL RELEASE RATE. O.ht AC 1 43 CHECKEU HT REQUIRED D oX AC 0.35 AD Fr PC Yer6 k AeoeeUon _ Date PROVIDED VOLUME PROVIDED. U.12 0.30 AC Fi. SURFACE PF SO 4C AC CHELHED BY IOC vR WY 497 a9T9 a9P 497 Date CHECKED BY. Engineering Consultants I OAKRIDGE BLOCK ONE P.U.D., SECOND FILING ' - � 1,;42FORT COLLINS, COLORADO -Date— GRADING, DRAINAGE AND EROSION CONTROL PLAN 5 4