HomeMy WebLinkAboutDrainage Reports - 05/06/1996Find cr vsd Reps PROPERTY OF r VVVV a; 15 FORT CODUNs FINAL DRAINAGE REPORT FOR CARRABBA'S ITALIAN GRILL in 2, OAKRIDGE BLOCK ONE, THIRD FILING FORT COLLINS, COLORADO Drexel Barrell M Engineers/Surveyors Incorporated Boulder, Colorado Springs 4840 Pearl East Circle Suite 114 Boulder, Colorado 80301 303 4424338 1 1 1 1 1 1 1 FINAL DRAINAGE REPORT FOR CARRABBA'S ITALIAN GRILL in LOT 2, OAKRIDGE BLOCK ONE, THIRD FILING FORT COLLINS, COLORADO Prepared For: Carrabba's Italian Grill, Inc. 5100 W. Kennedy Blvd. Suite 560 Tampa, Florida 33609 Prepared By: Drexel Barrell 4840 Pearl East Circle, Suite 114 Boulder, Colorado 80301 Date Prepared: January 19, 1996 Job No. E-4719 1 Drexel Barrell �T\ 1 tEngineers/Surveyors March 6, 1996 Incorporated 'Boulder, Matthew Fater Colorado Springs Stormwater Utilities Department Pearl East Circle P.O. Box 580 '4840 suite 114 Fort Collins, Colorado 80522 Boulder, Colorado 80301-2475. Dear Mr. Fater, ' 303 4424338 We are pleased to submit the following Final Drainage and Erosion Control Report for your review. The proposed site is the Carrabba's Italian Grill located in Lot 2, Oakridge Block One, Filing No. Three. The following report addresses the proposed development and resulting drainage and erosion control measures. All drainage concepts and calculations comply with the City of Fort Collins Standard Criteria. ' Thank you for your time and consideration. ' Sincerely, 65� 0Q06 Debbie Klisis vi wed,by, �. I 1 � Vl I Ar 11 1 r 1 1 1 1 1 PROJECT LOCATION 1 EXISTING SITE CONDITIONS I DRAINAGE CRITERIA 1 PROPOSED DEVELOPMENT AND DRAINAGE I EROSION CONTROL 2 CONCLUSION 3 REFERENCES 4 APPENDIX 5-11 Vicinity Map 5 Developed Runoff Calculations 6 Erosion Control Calculations , 11 u FINAL DRAINAGE REPORT FOR CARRABBA'S ITALIAN GRILL in LOT 2, OAKRIDGE BLOCK ONE, THIRD FILING FORT COLLINS, COLORADO ' PROJECT LOCATION ` The proposed development is located west of Wheaton Drive between Harmony Road and Oakridge Drive. Access to the site is through a joint entrance with the Harmony Medical Center, ' approximately 300 feet west of Wheaton Drive on Oakridge Drive. The parcel is located in the NW 1/4 of Section 6, T6N, R68W of the 6th P.M. ' EXISTING SITE CONDITIONS ' The existing site is grass covered land, which was previously graded, with a slope of 1 % to 2% to the southeast. Offsite runoff from the north is cut off by Harmony Road. Runoff from the site historically flows southeast to McClellands-Mail Creek Drainageway. Drainage then continues east, eventually reaching the Cache Le Poudre River. ' No springs or irrigation ditches are located on the site. The proposed development lies within the moderate rainfall erodibility zone and the moderate wind erodibility zone per the City of Fort Collins Zone Maps. The site does not lie within the 100-year floodplain. DRAINAGE CRITERIA Runoff was calculated using the Rational Method for the 10- and 100-year storms. The plan and report are designed in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards". 1 PROPOSED DEVELOPMENT AND DRAINAGE The proposed development consists of a sit-down restaurant and associated parking lot and landscape improvements. The site is planned to fit on the lot without, disturbing existing conditions at the site boundaries. ' The overall site drainage patterns were previously determined by drainage studies for Oakridge Block One P.U.D., Filings 2 & 3. See references following the report. These drainage patterns are closely maintained in the proposed development. The site uses existing detention ponding which was constructed with the adjacent lot developments. For purposes of this study, the site is divided into four drainage basins, "A" through "D". Basins "A" and "B" constitute the primary developed portions of the site.. Runoff is designed to flow on the surface, in swales and in curb and gutter, to offsite detention provided by the overall development.. The western 0.38 acres of the site, Basin "A", drains across the western boundary into Oakridge Block One, Third Filing, which is the Marriot Hotel development, where detention ponding is ' provided for this basin. Basin "A" includes a minor change in the basin boundary from the previous drainage study, which slightly increases the area of Basin "A" and decreases the area of Basin "B". See the calculations in the appendix for further detail. Basin A includes two sub -basins, "Al" and ' A21f, which are created by a high point in Basin "A". Basin "Al" drains to the north around the Marriot Hotel and Basin "AT' drains to the south around the hotel. Flows from both sub -basins . combine at the existing detention pond. The eastern 0.66 acres of the site, Basin "B", drains across the east boundary into Oakridge Block One, Second Filing, which is the Harmony Medical Center development, where detention ponding is also provided for this basin. ' Basin "C" consists of a small, 0.04 acre, landscaped area on the south end of the project along Oakridge Drive. This basin will drain over the curb into Oakridge Drive and flow east along the curb flowline to a curb inlet at Wheaton Drive. ' Basin "D" is a 0.33 acre landscaped buffer along Harmony Road on the north end of the project. This area will drain in a broad grass lined swale east across the eastern property line to a detention pond in Oakridge Block One, Second Filing. To determine detention requirements, the runoff coefficients, or "C" values, for the site were ' calculated and compared to the values calculated in the adjacent site drainage studies. The values for the proposed development are generally similar to the previously calculated values. The difference in "C" values for Basin "A" is negligible. Basin "B" shows a difference in "C" value of 0.72 to 0.86. This results in a slight increase in detention ponding on the Harmony Medical Center site due to the change in "C" values. The additional ponding amounts to 580 cubic feet, which is ' equivalent to a 1/2" rise in the 100-year water surface elevation of the pond. The site lies within the moderate rainfall erodibility zone and the moderate wind erodibility zone. Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites, the erosion control standards have been calculated. Based on existing slopes of 1.5%, the performance standard was calculated to be 78.8%. With erosion control practices in place during construction, the net effectiveness is 93.2%, which is more than existing conditions. Therefore, the erosion control plan will meet the City of Fort Collins requirements. ' In order to adequately reduce the amount of erosion during construction, several measures are proposed based on the erosion control calculations found in the appendix. A silt fence will be constructed at the site perimeter, Basins "A", "B" and "C", to contain soil erosion and wind erosion. 1 • - �. v :�:.:... �.4 - ;... ... ,._.:"., i;.✓�.-_.-:5.: .. � �. �, - .. .. �... - .., sip:... NK -, I 1 1] 1 1 1 1 ill 1 1 1 1 I 1 1 All disturbed areas to be paved, will be roughened after overlot grading. All landscape areas will be planted with sod after final grading has occurred. These practices ensure control of both wind and rainfall erosion to disturbed areas.'- With these erosion control practices, the proposed construction area will not exceed historic erosion rates while the ground is disturbed. Once the grass is established in the landscape areas and all paving is complete, the silt fence can be removed from the site perimeter. CONCLUSION The design and all calculations conform to the City of Fort Collins Criteria. No downstream sites will be adversely impacted by this development and historic drainage patterns will be maintained. The development closely follows intended use and drainage pattterns as previously approved with adjacent properties. Runoff from all disturbed areas will be controlled with adequate erosion control practices during construction until the disturbed areas are either paved or have established vegetative cover. Written by: Reviewed by: 7>jok%� 4 4 06W Debbie Klisis, E.I.T. (4719fdr.wpd) John Common. P.E. 1 1. City of Fort Collins Storm Drainage Design Criteria and Construction Standards. 2. "Final Drainage and Erosion Control Study for Oakridge Business Park, Block One, Filing 2, Fort Collins, Colorado", dated September 2, 1994, prepared by RBD, Inc. Engineering Consultants. 3. "Final Drainage and Erosion Control Study, Oakridge Block One P.U.D., Third Filing, City of Fort Collins", dated December 9, 1994, prepared by RBD, Inc. Engineering Consultants. APPENDIX w Q w 0 w J J 0 U c/i HORSETOOTH RD. PROPOSED CARRABBA'S ITALIAN GRILL SITE -1,,, HARMONY ROAD t,_i OAKRIDGE DR a w J i VICINITY MAP N.T.S. s- z 0 a w V Developed Runoff Project: Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 3/6/96 Basin: A Area (Ac. 0.38) Basin: Al Area (Ac. 0.17) Runoff Coefficient. Runoff C Surface Area (Ac.) %Area 10yr. 100Yr. 10Yr. 100yr, Roof 0 0 0 0 Pavement 0.11 64.7 0.95 1.00 0.61 0.65 Landscape 0.06 1 35.3 0.20 0.25 0.07 0.09 Basin: A2 Runoff Coefficient. Composite C. 0.69 U.14 Area (Ac. 0.21 Runoff o/)' C I Surface Area (Ac.) %Area IOYr. 100yr. I Joyr. 100Yr. Roof 0 0 0 0 Pavement 0.27 128.6 0.95 1.00 1.22 1.29 Landscape 0.11 52.4 0.20 0.25 0.10 0.13 Time of Concentration: Assume 5 min. Intensity: From: FIGURE 3-1 I10Yr I100yr 5.65 8.00 Rainfall. Q=((CI *Al)+(C2*A2)) *I Q1o= 2.23 Qloo= 3.38 Composite C. 1.33 1.42 Drexel Barrell and Company 4719RO.XLS 1 1 1 1 Storm Water Detention CITY OF FORT COLLINS 100 Year Storm FAA Method' Project: Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 1 /12/96 AREA (AC.) 0. 100 YR C 0.72 Q OUT (CFS) 32 VOLUME VOLUME REQUIRED TIME INTENSITY IN OUT STORAGE (MIN) (INIMR) (CF) (CF) (CF) 5 9.00 1,283 396 887 10 7.20 2,053 792 1,261 15 6.00 2,566 1,188 1,378 20 5.20 2,965 1,584 1,381" 25 4.60 3,279 1,980 1,299 30 4.15 3,550 2,376 1,174 40 3.50 3,992 3,168 824 50 3.00 4,277 3,960 317 60 2.60 4,448 4,752 (304) 70 2.30 4,590 5,544 (954) 80 2.05 4,676 6,336 (1,660) 90 1.85 4,747 7,128 (2,381) 100 1.70 4,847 7,920 (3,073) 110 1.56 4,893 8,712 (3,819) 120 1.44 4,927 9,504 (4,577) 130 1.32 4,893 10,296 (5,403) Drexel Barrell and Company 4719FAA.XLS 1 /12/96 1 1 1 1 1 1 1 Developed Runoff Project: Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 3/6/96 Basin: C Area (Ac.): 0.04 Runoff Coefficient: Runoff C Surface Area (An) %Area 10Yr. 100Yr. 10Yr. 100Yr. Roof 0.00 0.0 0.00 0.00 Pavement 0.00 0.0 0.00 0.00 Landscape 0.04 100.0 0.20 0.25 0.20 0.25 Time of Concentration: Assume 5 min. Intensity: From: FIGURE 3-1 IIOYr I100Yr 5.65 8.00 Rainfall., Q=C*I*A WS) Q10= 0.05 Q100= 0.08 Composite C. 0.20 0.25 Drexel Barrell and Company 4719RO.XLS Developed Runoff Project: Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 3/6196 Basin: D Area (Ac.): 0.33 Runoff Coefficient. Runoff C Surface Area(Ac.) %Area Joyr. 100yr. IOYr. 100Yr. Roof 0 0 0 0 Pavement 0.03 9.1 0.95 1.00 0.09 0.09 Landscape 0.30 90.9 0.20 0.25 0.18 0.23 Composite C: U.Z 1 IU.3[ Time of Concentration: Assume 5 min. Intensity: From: FIGURE 3-1 I10Yr I100yr 5.65 8.00 Rainfall: Q--C*I*A (cfs) Q1o= 0.50 Q1oo= 0.84 Drexel'Barrell and Company 4719RO.XLS RUNOFF SUMMARY Project. Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 3/6/96 BASIN AREA C l0yr C 100yr Q 10yr Q 100yr A 0.38 0.73 0.78 1.57 2.38 B 0.66 0.81 0.86 3.03 4.56 C. 0.04 0.20 0.25 0.05 0.08 D 0.33 0.27 0.32 0.50 0.84 Time of Concentration: Drexel Barrell and Company .. 4719RO.XLS Composite C: Storm Water Detention CITY OF FORT COLLINS 100 Year Storm FAA Method Project: Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 1 /12/96 AREA (AC.) 100 YR C 086 Q OUT (CFS) VOL UME , TIME INTENSITY IN (MIN) (INIHR) (CF) 5 9.00 1,533 10 7.20 2,452 15 6.00 3 065 ' 20 5.20 3,542 25 4.60 3,916 ' 30 40 4.15 3.50 4,240 4,768 50 3.00 5,108 60 2.60 5,313 70 2.30 5,483 80 2.05 5,585 90 1.85 5,670 ' 100 1.70 5,790 110 1.56 5,844 120 1.44 5,885 130 1.32 5,844 Drexel Barrell and Company 4719FAA.XLS VOLUME REQUIRED OUT STORAGE (CF) (CF) 396 1,137 792 1,660 1,188 1,877 1,584 1,958- 1,980 1,936 2,376 1,864 3,168 1,600 3,960 1,148 4,752 561 5,544 (61) 6,336 (751) 7,128 (1,458) 7,920 (2,130) 8,712 (2,868) 9,504 (3,619) 10,296 (4,452) 1 /12/96 1 1 1 1 1 1 Developed Runoff Project., Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 3/6/96 Basin: B Area (Ac.): 0.66 Runoff Coefficient: Runoff C Surface Area (Ac.) %Area Joyr. 100Yr. IOYr. 100yr. Roof 0.14 21.2 0.95 1.00 0.20 0.21 Pavement 0.40 60.6 0.95 1.00 0.58 0.61 Landscape 0.12 18.2 0.20 0.25 0.04 0.05 Time of Concentration: Assume 5 min. Intensity: From: FIGURE 3-1 Iloyr I100Yr 5.65 8.00 Rainfall. Q=C*I*A (cfs) Q10= 3.03 Q1oo= 4.56 Composite C. 0.81 0.86 Drexel Barrell and Company 4719RO.XLS Historic Runoff Project., Lot 2 Oakridge Block One PUD, Third Filing Job #: E4719 Date: 1/11/96 Basin: B Area (Ac.): 0.66 Runoff Coefficient: Surface Area (Ae) %Area 10Yr. 100Yr. 10yr. 100Yr. Roof 0.00 0.0 0.95 1.00 0.00 0.00 Pavement 0.00 0.0 0.95 1.00 0.00 0.00 Landscape 0.66 100.0 0.20 0.25 0.20 0.25 Time of Consentration: Assume 5 min. Intensity: From: IIOYr 1100Yr 5.65 8.00 Rainfall. Q=C*I*A (cfs) Q10= 0.75 Q1oo= 1.32 Composit C. 0.20 0.25 Drexel Barrell and Company 4719HRO.XLS 1/12/96 RAINFALL PERFORMANCE STANDARD EVALUATION I MARCH1991 B-14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: 6loca• G-4-1)g STANDARD FORM B COMPLETED BY: DATE: I�11�`1(c Erosion Control C-Factor P-Factor Method Value Value Comment Gr�,�,12ed.s�'a N1vlcL (;,D10 1, oO !°% Fv5`/, snafu. QovS l-.a rigid ,Sur . c2. 1.00 D , 90 ,so-2 Crass 0.01 1 • 00 Sfra.V-) kjar(i1.00 —._D, S0 C4Ccrs'v�c'Z�. �ni�-avCe LC4s,J r1r 1,00 O•SO P 5 Y Pa Je w�c v�r p. O 1 1.00 _"- a I; 4v G+ass �, c I ol° a"l a .;n (c7,'n 8A MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS s1� �g• v �•3 V �^6lSCa C :?rfc 0.11 U So L0.0lti`..If 4 D.01a Pf'QLTCr = ( I,00 (0.2-7 } 1.0 0.39 KO.SD EFF 059)Yloo= 97.511- g d•io� (� ASCc �cre4= O.IZ>� �CaJCv Ev.T= G 40°� FG(�p�=-t.0,01 [ 0, )7- .0 0.4 -4 1,0 D,14� "�• Ic(o = 0 , 25 P.Fa� r=(1,DO"040 1.0,�0.1Z.)'D•5Z 0.So o.SO) 11;co = g-1.5/° C, 0.04 (.'� ci5[� �r��s O.CL F�.c;So{ (c oq 1 p.o1 )7D.o4 o of g0 0 D 0. S .3 c r.-ems - O.3o EX. Po `1�w: = 0.c3 (y.Y ct . p r Fid. ?r+Fa = o. CCo « Sod Ce=o.o1 a=I. c'✓4 C. c=l e�-r e.55 - D, Z�ar. �-7:j'l4 of ba (1• 03 0. 24 + P. 0 I K C. G + O •o lx o.03�= 0. 3 P Face i l .O x 0, LQ, 4 1.O 1 0 CV - 6.z0 � 0. _O 0. ' MARCH 1991 B•15 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: '� STANDARD FORM B ,, r aLiaba S F+ Co (( , v: g - E 41(9 COMPLETED BYO DATE: 1 11'7 / 9 (., Erosion -Control C-Factor P-Factor Method Value Value Comment r� MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS °Vo 9 9. r 0. 04 ��o Q r7?.f ��r..-.s �. ✓O r 7 6. U J MARCH 1991 8.15 DESIGN CRITERIA CONSTRUCTION SEQUENCE 1 PROJECT: rfA 17� r S - t--{ I,.�S E' g, I I STANDARD FORM C SEQUENCE FOR 19 9 ONLY COMPLETED BY: D DATE: IIn Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule approval by the City Engineer. may require submitting a new schedule for YEAR r MONTH OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other ,RAINFALL EROSION CONTROL STRUCTURAL; Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation ' Contour Furrows Terracing Asphalt/Concrete Paving ' Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant . Temporary Seed Planting Sod Installation Nettings/Hats/Blankets Other RUCTURES: INSTALLED BY GETATION/MULCHING CONTRACTOR �TE SUBMITTED 1 MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON IMARCH1991 8.16 DESIGN CRfTERIA 1 Erosion Control Cost Estimate ' for Carrabba's Italian Grill ' Ft. Collins, Colorado March 5, 1996 Unit ' Description Unit Quantity cost Amoun ' Method 1: revegetate site Native Grasses Acre 1.07 $ 650.00 $ 695.50 ' + Contingency (50%) $347.75 ' TOTAL $12043.25 ' Method 2: Temporary Erosion Control Overlot Grading CY 870 $ 2.50 $ 2,175.00 ' Soil Roughening SY 1245 $ 0.25 $ 311.25 - Proposed Landscape Areas ' Crimped Straw Mulch SY 3153 $ 0.10 $ 315.30 - Proposed Paved Areas Silt Fence LF 945 $ 2.00 $ 1,890.00 ' Vehicle Tracking Control EA 1 $1,000.00 $ 1,000.00 Sediment Trap EA 2 $ 400.00 $ 800.00 ' Subtotal $ 6,491.55 + Contingency (50%) $3,245.78 ' TOTAL $ 9,7 3 T3-3-1 USE ' (I:IPROJIENGIE4719ICOSTS14719COST.XLS) 1