Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDrainage Reports - 08/23/2000PROPERTY OF
FORT COLLINS UTILITIES
FINAL DRAINAGE AND EROSION
CONTROL STUDY
OAKRIDGE BUSINESS PARK,
TENTH FILING, LOT 2
�«� Report,
FINAL DRAINAGE AND EROSION
CONTROL STUDY
OAKRIDGE BUSINESS PARK,
TENTH FILING, LOT 2
Prepared for:
THE EVERITT COMPANIES
3030 S. College Ave
Fort Collins, CO 80526
Prepared by:
North Star Design, Inc.
1200 Carousel Drive, Suite 201
Windsor, Colorado 80550
(970) 686-6939
August 23, 2000
Job Number 102-07
t North Star
'AlAaa, design _
I
'
August 23, 2000
'
Basil Hamdan
City of Fort Collins Stormwater
'
700 Wood Street
Fort Collins, CO 80522-0580
IRE: Final Drainage and Erosion Control Study for Oakridge Business Park,
Tenth Filing, Lot 2
Dear Basil,
I am pleased to submit for your review and approval, this Final Drainage and Erosion Control
' Study for Oakridge Business Park, Tenth Filing Lot 2 with revisions to address your comments
dated February 16th. This drainage report is an update to the Final Drainage Report for
Oakridge Business Park, Tenth Filing prepared by RBD, Inc. Engineering Consultants. I certify
' that this report for the drainage design of Oakridge Business Park, Tenth Filing Lot 2 was
prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual.
I appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions. --1
QP� o K G/S
Sincerely,
31306
.Q
' Patricia Kroetch, P.E. AI. E�
I
North Star Design, Iric.
1
ii
1194 W. Ash Street, Suite B Windsor, Colorado 80550
970-686-6939 Phone • 970-686-1188 Fax
I
' TABLE OF CONTENTS
'
TABLE OF CONTENTS...............................................................................................................
iii
1. GENERAL LOCATION AND DESCRIPTION
1.1 Location...................................................................................................................1
1.2 Description of Property ............................................................................................I
'
2. DRAINAGE BASINS AND SUB -BASINS
2.1 Major Basin Description..........................................................................................I
'
2.2 Sub -Basin Description.............................................................................................2
3. DRAINAGE DESIGN CRITERIA
'
3.1 Regulations..............................................................................................................2
3.2 Development Criteria Reference and Constraints...................................................2
3.3 Hydrologic Criteria..................................................................................................2
4. DRAINAGE FACILITY DESIGN
4.1 General Concept......................................................................................................3
'
4.2 Specific Flow Routing.............................................................................................3
4.3 Drainage Summary ..................................................................................................4
'
5. EROSION CONTROL
5.1 General Concept.....................................................................................................4
5.2 Specific Details........................................................................................................4
6. CONCLUSIONS
6.1 Compliance with Standards....................................................................................5
'
6.2 Drainage Concept....................................................................................................5
7. REFERENCES....................................................................................................................6
APPENDICES
A Vicinity Map
B Hydrologic & Hydraulic Computations
C Erosion Control Calculations
D Figures and Tables
E Excerpts from Previous Reports
iii
'
2.
GENERAL LOCATION AND DESCRIPTION
1.1 Location
This site is located in the Oakridge Business Park, P.U.D. This project is located in the
Northwest Quarter of Section 6, Township 6 North, Range 68 West of the Sixth Principal
Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in
Appendix A.
The project is located in the southwest corner of the intersection of Wheaton Drive and
Oakridge Drive. The project is bounded on the north by Oakridge Drive, on the east by
Wheaton Drive, on the west and south by parking and Oakridge Business Park, Tenth
Filing, Lot 1.
1.2 Description of Property
Lot 2 consists of approximately 1.7 acres of land. The land is currently undeveloped and
covered in grasses. Half of the site slopes to the northeast at approximately 2% and half
of the site slopes to the southwest at approximately 2%. The site currently drains into the
existing parking lot on the southeast and into the existing streets on the north and west.
The project will consist of a single building of approximately 7600 square feet. All of
the parking for this building is existing and no additional parking will be added. The
original drainage report for the Tenth Filing accounted for a future a building in this area
of approximately 9300 square feet.
DRAINAGE BASINS AND SUB -BASINS
2.1 Major Basin Description
The proposed development lies within the McClellands Drainage Basin. The site is a
portion of Basin 260 of the Oakridge Business Park Master Drainage Plan, as prepared
by RBD Inc., dated June 22, 1990 and updated April 1, 1996. More specifically, the site
is a portion of Basin 5 as described in the Final Drainage Report for Oakridge Business
Park, Tenth Filing prepared by RBD, Inc. Engineering Consultants, dated November 10,
1987. An excerpt of the drainage schematic is shown in the Appendix.
' 2.2 Sub -basin Description
' Basin 260 of the Oakridge Master Drainage Plan drains to a detention pond which
releases into a storm sewer system beneath Oakridge Drive during the minor storm
' events. This storm sewer system eventually outfalls into the Regional Detention Pond #2
at the end of Keenland Drive.
' Per the Master Drainage Plan, developed flows from Basin 260 should be detained in the
existing detention pond. Portions of the Oakridge Business Park Master Drainage Plan
and the subsequent update are included in appendix E.
' 3. DRAINAGE DESIGN CRITERIA
3.1 Regulations
This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage
' Design Criteria Manual' specifications. Where applicable, the criteria established in the
"Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver
' Regional Council of Governments, has been used.
3.2 Development Criteria Reference and Constraints
' The runoff from this site has been routed to conform to previous calculations completed
with the Master Drainage Plan for the Oakridge Business Park, P.U.D. by RBD
Engineering Consultants dated June 22, 1990 and updated April 1, 1996. The detention
' for this site is provided in the existing detention pond as noted in the above -mentioned
report.
1
3.3 Hydrologic Criteria
Runoff computations were prepared for the 10-year minor and 100-year major storm
frequency utilizing the rational method.
All hydrologic calculations associated with the basins are included in Appendix B of this
report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub -
basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub -
basins and Design Points associated with this site.
2
4. DRAINAGE FACILITY DESIGN
4.1 General Concept
' A majority of the runoff from this site will flow to the existing detention pond south of
the site and be released at a controlled rate into the existing storm system. A small
' portion of the site will drain to streets in the northeast corner of the site and be collected
in the existing inlet in Wheaton Drive.
4.2 Specific Flow.Routing
' In the Final Drainage Report for Oakridge Business Park, Tenth Filing, Basin 5
encompasses the east half of Oakridge Business Park, Tenth Filing including all of Lott.
This Basin is shown to flow to the lower pond (Pond 4) where it is to be detained. In
' order to reflect the actual developed conditions in Basin 5, the Basin was divided into
two subbasins. A summary of the drainage patterns within each subbasin is provided in
the following paragraphs.
Subbasin 5-1 contains the northeast portion of Lot 2, including the north half of the
proposed building and landscaped area. Runoff from this basin flows into Oakridge
' Drive and Wheaton Drive and flows south on Wheaton to the existing 7' type R inlet near
the existing detention area. All of the flows from Basin 5 were calculated to flow to the
existing detention pond on the south boundary of Basin 5 but the grading completed with
Lot 1 of the Tenth Filing prohibits these flow patterns. The maximum flow from this
Subbasin and into the existing inlet in a 100 year storm is 1.75 cfs.
Calculations are included in Appendix B that show the effect of the additional flow on
' the street capacity and the inlet capacity. An exhibit also shows flows from the south
which are accounted for in the inlet calculations.
Subbasin 5-2 contains the southwest half of Lot 2 and the east half of Lot 1, including
the south half of the proposed building, the east half of the existing building and a
' majority of the parking lot. Runoff from this subbasin flows south through the parking
lot to the existing sidewalk culverts at the southeast corner of the parking lot and into the
existing detention pond on the south boundary of Basin 5. This flow pattern conforms to
Basin 5 runoff as described in the Final Drainage Report for Oakridge Business Park,
Tenth Filing prepared by RBD, Inc. Engineering Consultants but the runoff is slightly
' 3
' more. The required detention volume (in the lower pond 4) was recalculated using the
higher runoff and the detention required increased from 1.76 acre feet to 1.80 acre feet.
The existing lower pond was designed with a volume of 1.8lacre feet so the additional
runoff can be accommodated.
The existing detention pond has a permanent pool that will address the desired water
' quality enhancement prior to release downstream.
' 4.3 Drainage Summary
The City of Fort Collins will be responsible for maintenance of the existing storm
drainage facilities located within the right-of-way. No structures or pipes are proposed
with this development. Any existing drainage facilities located on this site will continue
to be maintained by the owners of the site.
5. EROSION CONTROL
' 5.1 General Concept
This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort
' Collins Zone Maps. The potential exists for silt movement from the site and into the
existing storm system during construction. Potential also exists for tracking of mud onto
' existing streets which could then wash into existing storm systems.
Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites and
' related calculations in Appendix D, the erosion control performance standard for the
subject site is 80.1%. The erosion control plan gives a performance standard of 82.3%.
' The erosion control escrow amount is $1600.
' 5.2 Specific Details
To limit the amount of silt leaving the site several erosion control measures shall be
' implemented during construction. All boundaries of the disturbed area shall have silt
fence installed. Because all of the parking lot is existing, vehicle tracking pads to control
the mud being tracked onto the existing public streets are not feasible. Any mud tracked
onto the public streets shall be cleaned as required.
' 4
' A portion of this site will discharge into the existing detention area south of this site. The
' existing detention area has a permanent pool and, after construction, the existing
detention area will be utilized as water quality. The permanent pool will allow
particulants to settle out of the water released from the site prior to releasing the water
' downstream.
6. CONCLUSIONS
' 6.1 Compliance with Standards
All computations that have been completed within this report are in compliance with the
City of Fort Collins Erosion Control Reference Manual for Construction Sites and the
Storm Drainage Design Criteria Manual.
' 6.2 Drainage Concept
C
1
r Jl
The proposed drainage concepts presented in this report and on the construction plans
adequately provide for the detention and transmission of developed on -site runoff to the
existing storm system. The onsite and off site storm drain system will provide for the 10-
year and the 100- year developed flows to reach the existing onsite detention facility and
ultimately, the Regional Detention Pond downstream. The existing downstream
detention facility has been sized to accommodate developed runoff from this site after it
is detained in the on -site pond.
If, at the time of construction, groundwater is encountered, a Colorado Department of
Health Construction Dewatering Permit would be required.
5
1
1
1
1
1
7. REFERENCES
1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March,
1986.
\,-2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria
Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September,
� 1992.
\I
3. McClellands Basin 100 Year Master Plan Update by RBD, Inc. Engineering
Consultants dated April 1, 1996.
4. Master Drainage Plan for the Oakridge Business Park, P.U.D. by RBD
Engineering Consultants dated June 22, 1990 and updated April 1, 1996.
5. Final Drainage Report for Oakridge Business Park, Tenth Filing prepared by
RBD, Inc. Engineering Consultants, dated November 10, 1987.
6
t
�I
L
APPENDIX A
VICINITY MAP
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
HORSET06 TH ROAD
JSITJE
HARMONY ROAD
OAKS �
3
Q �
Q
CITY LIMITS
mCOUNTY ROAD 36
YYL _
VICINITY MAP
APPROXIMATE SCALE: 1" = 2000'
ri1
APPENDIX B
HYDROLOGIC & HYDRAULIC
COMPUTATIONS
^,
!L
1
I
11
1
1
1
1
1
1
1
1
1
1
1
)NY ROAD I
2(
ri
� 1
V / C
Oo
i RULE DRIVE
�o
mom
'--OAKRIDGELk
\ `\
j \ �� , Z OAKRIDGE
;
ow BUSINESS PARK
7' TYPE W INLET
% North Star
design
1194 W. Ash Street, Suite B
Windsor, Colorado 80550
Phone: 970-686-6939
Fax: 970-686-1188
OAKRIDGE BUSINESS PARK
y TENTH FILING, LOT 2
SHEET 1 OF 1
CT NO. 102-07
1
�
k
�
�-
B
0 2
�
co\,
LL
§ \
��
L /
��
o
\§
°
)
R§
z \
/\
2 \+�§
fE
Q
3)EQ
0
(
\E
)
J@
2(k
(\}&
■■
\/0
))
@L
/§Eo
2
*)
@/om22M
7
c =
{
,\
E
0
q
§§�
Ci
2
|:
\5{
]
a!a
�
/)a
=E
##
©7
!«!
R«
0 0
kaa
g
m§
Goa
§
2�
))k
§§
!
[§
;!
GG
k
�
a\«]
L>
r
.«
(242
�
)k��
§{.6
.k
o`m`
E Z
�..
it
)\
\\
\
@
j (
}
\
B
,)
§�
.
§z
§S
§b
LU
»
/
\
]
3/eQ
.
/
\
dj
d/�
E
�
()E&
uolw
k
S�E0
#
LU
LU
19
_
z
ru
L
a��
/!
«
B
22�FN
§§/
/§
§§
fno
,{(
!!¥
7
§
(
:
OF —
w
ro —
§coo
aN
�
a
a
;
f/g
_
§
}._
/w°
E
■
3
S
§«G\
k`
§ §
\
\
k
\
\
\
' {
Lu
_
\
)
k
�
B
2k
� Z
§S
§b
�2
e
§
/
b
LU
LU
_$\J
§\��
§na
G
m¥
q
wlfp
19
!!¥
,
I
lcic�
$
2
00
f�
£�
CR
^
kaq
�~
�
fZ®~�
§§(
7]
G§
\
$«E
§«�
-
f¥2
9
■
a
§
\
§■
o
!ka
§
|
k
_
3
;
�
§
)
k
§
§
�
�
«
CL
�
c�
2
UJ
\
■
-
z
o
/
)
/
32E4
/
/
CO)
\
2\�
oee
)\6&
uC)
uc
\
\
\
2
@
&
)
d
N {
!
k
5
!
�
`
vi
§
0 \
§
�§ƒ:
a {
##
K
#
a
,
- {
§)
§
2
/
< \
2
§
§
[
§
ƒ$f
Q;
c
3
G
`
k
im
0
©
!
iL
I
§
)
§
§
�
ILE
0\
]
k
q
§
§
)co
]
/�L
§
3\e#
/
(
\
/
y� $
§2{..
\/\\
{
{
a
.9
\
\
2
0
&
~
^
a
\
/
!o
�§»!
(L
/ \
(
® {
§
n
« \
2§
§
[
§
%
k
!
§f)
;�
3
3
�
k
u
! 0
§
C%
.
\
I
DETENTION POND SIZING
BY FAA METHOD
Developed by
Civil Eng. Dept.,
U. of Colorado
'
Supported by Denver Metro Cities/Counties
Pool Fund Study
Denver Urban Drainage and Flood Control District, Colorado
'
PROJECT TITLE: Oakridge Business
**** DRAINAGE BASIN DESCRIPTION
--------------------------------------
Park, Tenth
filing, Lot 2
BASIN ID NUMBER
5-2
(o)
+3.2-4 (B0.51Y1 S-Z.)
BASIN AREA (acre)=
11.76
RUNOFF COEF =
0.76
'
'C-
Foe- laks1nl 6 �,
T3aS1v, S-Z
***** DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS)
= 100.00
INTENSITY (IN/HR) -DURATION (MIN)
TABLE IS GIVEN
DURATION 5 10 20 30
40 50
60 80 100 120
150 180
INTENSITY 9.0 7.2 5.2 4.2
3.5 3.0
2.6 2.1 1.7 1.5
1.2 1.0
POND OUTFLOW CHARACTERISTICS:
MAXIMUM ALLOWABLE RELEASE
RATE =
2.49 CFS = 4.45- lAoicFS
OUTFLOW ADJUSTMENT FACTOR
=
1
FCoW t4rowbi-%
'
AVERAGE RELEASE RATE
=
2.49 CFS
upper Qo A 3
AVERAGE RELEASE RATE = MAXIMUM RELEASE
RATE * ADJUSTMENT FACTOR.
***** COMPUTATION OF POND SIZE
RAINFALL RAINFALL INFLOW
OUTFLOW
REQUIRED
DURATION INTENSITY VOLUME
VOLUME
STORAGE
MINUTE INCH/HR ACRE -FT
ACRE -FT
ACRE -FT
'
0 00 0 00 0.00
0 00
0.00
5.00 9.00 0.56
0.02
0.54
10.00 7.20 0.90
0.03
0.86
'
15.00 6.19 1.16
0.05
1.11
20.00 5.18 1.29
0.07
1.22
25.00 4.68 1.46
0.09
1.37
30.00 4.17 1.56
0.10
1.46
35.00 3.84 1.67
0.12
1.55
40.00 3.50 1.75
0.14
1.61
'
45.00 3.25 1.83
50.00 3.00 1.87
0.15
0.17
1.67
1.70
55.00 2.80 1.93
0.19
1.74
60.00 2.61 1.95
0.21
1.75
65.00 2.47 2.01
0.22
1.78
'
70.00 2.34 2.04
0.24
1.80
75.00 2.20 2.06
0.26
1.80
80.00 2.06 2.06
0.27
1.78
'
85.00 1.97 2.09
0.29
1.80
90.00 1.88 2.11
0.31
1.80
95.00 1.79 2.12
0.33
1.80
100.00 1.70 2.12
0.34
1.78
'
105.00 1.64 2.15
0.36
1.79
110.00 1.58 2.16
0.38
1.78
115.00 1.51 2.17
0.39
1.78
'
--120.00------1-45--------17------0-41------1-76-----
THE REQUIRED POND SIZE = 1.802713 ACRE -FT
THE RAINFALL DURATION FOR THE ABOVE POND
STORAGE= 90 MINUTES
1
4/27/00
LOCATION: Oakridge Tenth Filing, Lot 2
ITEM: Wheaton Drive
COMPUTATIONS BY: ppk
SUBMITTED BY: North Star Design
2-year design storm
Design in accordance to "Stone Drainage Design Criteria and Construction Standards"
City of Fort Collins, May 1984.
Street with 25' half street width, vertical curb and gutter
no curb topping, Flow may spread to crown of street
Theoretical Capacity., use revised Mannings eq. Allowable Gutter Flow.,
Q=0.56'ZJn'S'a-ysa Qall=F -Q
where Q = theoretical gutter capacity (cfs) F = reduction factor (Fig. 4.2)
Z = reciprocal of cross slope (ft/ft) Call = allowable gutter capacity (cfs)
n = roughness coeff.
S = channel slope (ft/ft) Q = Qa - Qb + Qc
y = depth of Flow at face of gutter (ft)
sec. A FL
Z n y. S I Q.
12
0.013
0.5
0.40%
5.15
12
0.013
0.5
0.50%
5.76
12
0,013
0.5
0,60%
6.31
12
0.013
0.5
0.80%
7.28
12
0.013
0.5
1.00%
8.14
12
0.013
0.5
1.50%
9.97
12
0.013
0.5
2.00%
11.51
12
0.013
0.5
3.00%
14.10
12
0.013
0.5
4.00%
16.28
12
0.013
0.5
5.00%
18.20
12
0.013
0.5
6.00%
19.94
12
0.013
0.5
7.009/6
21.54
Z
n
y,
S
Qb
12
0.013
0.33
0.40%
1.70
12
0.013
0.33
0.50%
1.90
12
0.013
0.33
0.60%
2.08
12
0.013
0.33
0.80%
2.40
12
0.013
0.33
1.00%
2.69
12
0.013
0.33
1.50%
3.29
12
0.013
0.33
2.00%
3.80
12
0.013
0.33
3.00%
4.66
12
0.013
0.33
4.00%
5.38
12
0.013
0.33
5.00%
6.01
12
0.013
0.33
6.00%
6.59
12
1 0.013
1 0.33
7.00%
7.11
B
A
D
�--- ye = y° = 0.3311
y. = 0.5 ft
Z. =
24"/2" =
12
Z° =
24'/2" =
12
Z° =
1 /0.02 =
50
n _ n. nw � n- k�lf.1-t
--Z -
n
Y.
S
Q
F
0,11
50
0.016
0.33
0.40%
5.76
9.20
0.50
4.60
50
0.016
0.33
0.50%
6.44
10.29
0.65
6.69
50
0.016
0.33
0.60%
7.05
11.27
0.80
9.02
50
0.016
0.33
0.80%
8.14
13.02
0.80
10.41
50
0.016
0.33
1.00%
9.10
14.55
0.80
11.64
50
0.016
0.33
1.50%
11.15
17.83
0.80
14.26
50
0.016
0.33
2.00%
12.87
20.58
0.80
16.47
50
0.016
0.33
3.00%
15.76
25.21
0.72
18.15
50
0.016
0.33
4.00%
18.20
29.11
0.60
17.47
50
0.016
0.33
5.00%
20.35
32.54
0.48
15.62
50
0.016
0.33
6.00%
22.29
36.72
0.40
14.69
50
1 0.016
1 0.33
7.00%
24.08
1 1 38.51
1 0.34
1 13.09
13AS11`4 5-1 + 0-1
10 year stone runoff to west side of Wheaton Drive north of inlet = 0.84 cfs+3.37 cfs = 4.21 cfs
Street slope = 0.8% to 2.0%
Street capacity:
at 0.8% = 10.41 cfs
at 2.0%= 16.47 cfs
StncapAs
1 of
4/27/00
d
0
1
LOCATION: Oakridge Tenth Filing, Lot 2
ITEM: Wheaton Drive
COMPUTATIONS BY: ppk
SUBMITTED BY: North Star Design
100-year design storm
Design in accordance to "Storm Drainage Design Criteria and Construction Standards"
City of Fort Collins, May 1984.
Street with 25' half street width, vertical curb and gutter
depth of water over crown not to exceed 6", buildings shall not be inundated at the ground line
Theoretical Capacity: use Mannings eq.
Allowable Gutter Flow:
Q=1.486/n-Rv3-S112-A
Qall=F"Q
where Q = theoretical gutter capacity (cfs)
F = reduction factor (Fig. 4-2)
n = roughness coeff.
Qall = allowable gutter capacity (cfs)
R= A/P
A = cross sectional area (ft)
Q = Qa + Qb
P = wetted perimeter (ft)
S = channel slope
sec. A sec. B
A = 9.83 A = 1.96
P = 25.93 P = 14.28
R= 0.38 R= 0.14
n = 0.016 n = 0.035
half street
S
Qa
S
` b
o' tot
F
Qall
0.40%
30.33
0.40%
1.40
31.73
0.50
15.87
0.50%
33.91
0.50%
1.57
35.48
0.65
23.06
0.60%
37.14
0.60%
1.72
38.86
0.80
31.09
0.80%
42.89
0.80%
1.99
44.87
0.80
35.90
1.00%
47.95
1.00%
2.22
50.17
0.80
40.14
1.50%
58.73
1.50%
2.72
61.45
0.80
49.16
2.00%
67.81
2.00%
3.14
70.95
0.80
56.76
3.00%
83.05
3.00%
3.85
86.90
0.72
62.57
4.00%
95.90
4.00%
4.44
100.34
0.60
60.20
5.00%
107.22
5.00%
4.96
112.18
0.48
53.85
6.00%
117.45
6.00%
5.44
122.89
0.40
49.16
7.00%
126.86
7.00%1
5.87
132.74
0.34
45.13
F C
0.15'
0.46'
0.17'
Area A = (0.15')(23') + (2"/12)"(2')"(1/2) + (5.52"/12)'(2') + (5.52"/12)"(23')"(1/2) = 9.83 sq. ft.
Area B = (14')'(3.36/12)"(1/2) = 1.96 sq. ft.
$A 64 5-I + O-t
100 year storm runoff to west side of Wheaton Drive north of inlet = 1.75 cfs+6.21 cfs = 7.96 cfs
Street slope = 0.8% to 2.0%
Street capacity:
at 0.8% = 35.90 cfs
at 2.0%= 56.76 ofs
' Strtcap.xls 1 of 1
1--------------------------------------------------------------------
----------
UDINLET: INLET HYDARULICS AND SIZING
' DEVELOPED BY
CIVIL ENG DEPT. U OF COLORADO AT DENVER
SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD
,USER JR ENGINEERS-DENVER CO .. ..... .... .. .... ... ... ..... ....
ON DATE 04-27-2000 AT TIME 11:13:21
'*** PROJECT TITLE: Inlet in Wheaton (R VZOFF F9_0M BNSINS 0-1 1�0-Z onvL4)
*** CURB OPENING INLET HYDRAULICS AND SIZING:
'
INLET ID NUMBER: 1 CEy 1'!>T1 J(I 7'
114PE 12 1NLC--r)
'
INLET HYDRAULICS: IN A SUMP.
GIVEN INLET DESIGN INFORMATION:
GIVEN CURB OPENING LENGTH (ft)=
7.00
HEIGHT OF CURB OPENING (in)=
6.00
INCLINED THROAT ANGLE (degree)=
45.00
'
LATERAL WIDTH OF DEPRESSION (ft)=
2.00
SUMP DEPTH (ft)=
0.35
Note: The sump depth is additional depth to flow depth.
'
STREET GEOMETRIES:
STREET LONGITUDINAL SLOPE (s) =
0.80
'
STREET CROSS SLOPE W =
2.00
STREET MANNING N =
0.016
GUTTER DEPRESSION (inch)=
2.00
'
GUTTER WIDTH (ft) =
2.00
STREET FLOW HYDRAULICS:
WATER SPREAD ON STREET (ft) = 18.81
GUTTER FLOW DEPTH (ft) = 0.54
FLOW VELOCITY ON STREET (fps)= 3.46
FLOW CROSS SECTION AREA (sq ft)= 3.71
GRATE CLOGGING FACTOR (°s)= 50.00
CURB OPENNING CLOGGING FACTOR(%)= 20.00
INLET INTERCEPTION CAPACITY:
IDEAL INTERCEPTION CAPACITY (cfs)=
BY FAA HEC-12 METHOD: DESIGN FLOW
FLOW INTERCEPTED
CARRY-OVER FLOW
BY DENVER UDFCD METHOD: DESIGN FLOW
FLOW INTERCEPTED
CARRY-OVER FLOW
15.93
BASs -ts 0-1 + 0-Z z
(cfs) =
12.70 = bzl +6,49ds
(cfs) =
12.70
(cfs) =
0.00
(cfs) =
12.70
(cfs)=
12.70
(cfs) =
0.00
11
'------------------------------------------------------------------------------
UDINLET: INLET HYDARULICS AND SIZING
' DEVELOPED BY
CIVIL ENG DEPT. U OF COLORADO AT DENVER
SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD
'USER:JR ENGINEERS-DENVER CO. .. ..... ..... ..... ... ...... ..
ON DATE 04-27-2000 AT TIME 11:14:25
'*** PROJECT TITLE: Inlet in Wheaton(Q_AWOFF F2.om (3A56SjNS 15 -11d-I £D-2)
*** CURB OPENING INLET HYDRAULICS AND SIZING:
'
INLET ID NUMBER: 1 (6;XISTIh1Zx
7� T1jp�R Jt.'T�
INLET HYDRAULICS: IN A SUMP.
GIVEN INLET DESIGN INFORMATION:
GIVEN CURB OPENING LENGTH
(ft)=
7.00
HEIGHT OF CURB OPENING
(in)=
6.00
INCLINED THROAT ANGLE (degree)=
45.00
'
LATERAL WIDTH OF DEPRESSION
(ft)=
2.00
SUMP DEPTH
(ft)=
0.55
'
Note: The sump depth is additional
depth to flow depth.
STREET GEOMETRIES:
' STREET LONGITUDINAL SLOPE (%) = 0.80
STREET CROSS SLOPE M = 2.00
STREET MANNING N = 0.016
' GUTTER DEPRESSION (inch)= 2.00
GUTTER WIDTH (ft) = 2.00
'
STREET FLOW HYDRAULICS:
WATER SPREAD ON STREET
(ft) =
19.75
GUTTER FLOW DEPTH
(ft) =
0.56
'
FLOW VELOCITY ON STREET
(fps)=
3.55
FLOW CROSS SECTION AREA
(sq ft)=
4.07
GRATE CLOGGING FACTOR
('c)=
50.00
'
CURB OPENNING CLOGGING
FACTOR(%)=
20.00
INLET INTERCEPTION CAPACITY:
IDEAL INTERCEPTION CAPACITY (cfs)=
18.20
'
BY FAA HEC-12 METHOD:
DESIGN FLOW
(cfs)=
FLOW INTERCEPTED
(cfs)=
CARRY-OVER
FLOW (cfs)=
BY DENVER UDFCD METHOD:
DESIGN FLOW
(cfs)=
'
FLOW INTERCEPTED
(cfs)=
CARRY-OVER
FLOW (cfs)=
1
1
B^sw S-I + 0.1 -r0-2 =
14.45= 1.7fi+(o•2-1+(0AC3
14.45
0.00
14.45
14.45
0.00
1
I
1
1
1
I
H
APPENDIX C
EROSION CONTROL CALCULATIONS
C
0
I
I
I
I
I
I
I
I
I
�
�
I
@
I
I
�
\
j
k
!00
�2�
�
))2
�
0
a
\
w
k
k
U)
u
3
■
�
0
w
�
K
LU
k
<
\
/&
-
[\
S (
(
2
■
«!
±
\
�
A
! \
®�
�
7
!\
=r
\
§
2
§
2
§�
§
\)
`
oa
�
§\
j}
LbLo
)
$\
§§
ow
\)>
e)\
\c.
«\ƒ
/C*
�\\
�§\
�/_
to
\
c
\/0
E
§,
>
C4
_
/
�\\
k
k
;ano. ME,
§E\
%$g!(
e7=
}))§§
°\
:3
§ "al
.2
/\\<®
i.
ate.
)j\]«
a2<
LU
North Star Design
1200 Carousel Drive, Suite 201
Windsor, CO 80550
EFFECTIVENESS CALCULATIONS
PROJECT:
OAKRIDGE BUSINESS PARK, Tenth Filing, Lot 2
STANDARD FORM B
COMPLETED BY:
PPK
DATE: 13-Jan-00
EROSION CONTROL
C-FACTOR
P-FACTOR
METHOD
VALUE
VALUE
COMMENT
BARE SOIL
1.00
1.00
SMOOTH CONDITION
ROUGHENED GROUND
1.00
0.90
ROADS/WALKS
0.01
1.00
GRAVEL FILTERS
1.00
0.80
PLACED AT INLETS
SILT FENCE
1.00
0.50
STRAW MULCH
0.06
1.00
ESTABLISHED GRASS
0.08
1.00
FROM FIGURE 8-A
STRAW BARRIERS
1.00
0.80
EFF = (I-C*P)* 100
MAJOR
SUB
BASIN AREA
EROSION CONTROL METHODS
BASIN
BASIN
(Ac)
5-1
0.67
ROADS/WALKS
0.00 Ac.
ESTABLISHED GRASS
0.30 Ac.
SILT FENCE
I 0.37
STRAW MULCH
0.00 Ac.
NET C-FACTOR
0.59
NET P-FACTOR
0.72
EFF = (I -C*P)* 100 =
57.4%
5-2
3.24
ROADS/WALKS
2.02 Ac.
ESTABLISHED GRASS
0.90 Ac.
ROUGHENED GROUN4 0.32 Ac.
STRAW/MULCH
0.00
NET C-FACTOR
0.13
NET P-FACTOR
0.99
EFF = (I-C*P)* 100 =
87.4%
TOTAL AREA = 3.91 ac
TOTAL EFF = 82.3% _ (94.0%*29.77 ac. +...+99.6%*0.40 ac)/I. 14 ac
REQUIRED PS = 80.1%
Since 82.3% < 80.1 %, the proposed plan is o.k.
Erosion2.xls
1of1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
1
North Star Design
1200 Carousel Drive, Suite 201
Windsor, CO 80550
CONSTRUCTION SEQUENCE
STANDARD FORM C
PROJECT: OAKRIDGE BUSINESS PARK, Tenth Filing, Lot 2
SEQUENCE FOR 2000 ONLY COMPLETED BY: PPK DATE: 26-Apr-00
Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an
approved schedule may require submitting a new schedule for approval by the City Engineer.
2000
2001
MONTH
A
M
J
J
A
S
O
N
D
JI
F
M
Demolition
Grading
Wind Erosion Control:
Soil Roughing
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
Rainfall Erosion Control
Structural:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
Vegetative:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/M ats/Blankets
Other
BUILDING CONSTRUCTION
STRUCTURES: INSTALLED BY: CONTRACTOR MAINTAINED BY: DEVELOPER
VEGETATION/MULCHING CONTRACTOR: TO BE DETERMINED BY BID
DATE SUBMITTED: APPROVED BY CITY OF FORT COLLINS ON:
Page 1
Cost Est
I
1
1
11
I
1
1
I
I
EROSION CONTROL COST ESTIMATE
Project: OAKRIDGE BUSINESS PARK, Tenth Filing, Lot 2
Prepared by: PPK
ITEM
QUANTITY
JUNIT
COST/UNIT
ITOTAL COST
Silt Fence
607
LF
$3
$1,821
Straw Bale Barrier
0
EA
$150
$0
Gravel Inlet Filter
0
EA
$150
$0
Construction Entrance
0
EA
$550
$0
Subtotal
Contingency (50%)
Total
$1,821
$911
$2,732
CITY RESEEDING COST
Reseed/Mulch
1.5
ACRE
1 $650
$975
Subtotal
Contingency (50%)
Total
$975
$488
$1,463
EROSION CONTROL ESCROW AMOUNT $2,732
Page 1
'LI
1
I
1
". 9 9 B1►11] ►.ilk
FIGURES AND TABLES
F
No Text
00
i
o
41
m
D
.
w
D
�
O
144
n
4J
j
ro
..�
w
41
a.)
\_
�rai
PCs
=
O
41
Of
0
, )
.....
�
N
�
0
O
w --
0
O
00 (D - t N o) oo Lo v- t. N
00 0o 00 00
O O O O O O O O
x —-10-40-Od lxxavu-4sn. MoLJ1110
I
I
' 0
A
' o
a
0
U
z
z
H
a
a
o
U
a
o
w
11 0
CO 44
EA zA
to
W
1
3
c
k
MARCH 1991
0 atrno00
o vvinuiut
In COwwww
p mmmm000000
o ;444in* LLlinnoIn* n
v wcocawwcowwww
o wmototrnatrnotmrna%a%oo0
. 44
4444 . . . . . .
cl)
wwwwwwwwwwww�w�wowo
o �comcoo�rna�o�rna�a+a,o�a�a�rnma+rnm
. . . . . . . . . . . . . . . . . . .
o vvv-Kr vavvvvvvvvvvvvvv
N w w w w w w w w co CIO w w w co w w CO w OD co
O Ot'1d'In00t0Wrt r.I,I�I.I-I-I-I-1.1-I�wwwwww
. . . . . . . . . . . . . . . . . . . . . . .
r4 cocococowvcococoovwvcocoococococowvcocwvcococoavococcoococovwvcowwww
wNclvululLcl%D��o�D��Drrrrrr-r-r-`r-mcoco
o
. . . . . . . . . . . . . . . . . . . . . . . .
at cococococococcoovwvwvcovwvww�cocococococoCIO cocoo00cocowwww
p tDONc'1C' wul1nInu1t0%Dtoto%o %otoowtDI-1-I-I-I-I-
. . . . . . . . . . . . . . . . . . . .
w co�cococo00cocDvcovcococovcovwccoococococowvcoovowwovovcoovowwwww
O V' ON ri N c'1 r, V' V' V' V' In In In In In Lo In In to to to t0 o tD to r
....... ...............
`cocowwwwwwwwwwwwwwwwwwwwwwww
O 0%D%0
Otpa00ririNNc'lc"1f`�c'tvv V'If'1LL111'I
comcowwwwwwwwwwwwwww0wwwwwww
O In N In I- w Ot O O H ri .-1 N N N N N N cn m c'1 m v v v v v
p . . . . . . . . . . . . . . . . . . . . . . .
�U) co co co cococ000c000cowcowcowcocococococowwwww
4�,�w,��vinlntotDt`I•nmcowwwwmrnrno0000
. . . . . . . . . . . . . . . . . . . . . . . . .
jd N N C1 m m C1 m M M rl M M m M (n[7 C't cl VI m m d Cd'vv
q cowwcococacococococococococococococococowwwww
O tD In w O ri N m q ;r u) In LLl t0 t0 t0 t0 tD I� 1- I. 1- w w w at at
. . . . . . . . . . . . . . . .
w co w w w w co w w w w w co co co w w w w w w w w w w w
U'1 rir4InI-w00.-INNclmMV' V'vd'C'InInIntOtot01-1-
. . . . . . . . . . . . .
`� wcoNwcooco`wcw�w�ccoocoocacoCo. �wwwcocwcwcoccoocoococwco
O clNto00 ONO riNr4mmclIq.1v 10vvLntnlnln%0to%DtD
. . . . . . . . . . . . . . . . . . . . . . . . . . .
co co 00 co co co co co co co co co co co co a3 CO 00 00 CIO CIO 00 CIO CO CO cO
In InIc101Nc1vIntor-r ,cococoatata%Olatat000000
........................
N Ot00 r4r-4Hr4ririririr4riririHHHrir4NNNNN04
I- co cG co w w w w w w w www w co co co co co co w w w w w
O •V In0c'1lntDwwa%000ririrlrlNNNNCncl cnc)c1M
. . . . . . . . . . . . . . . . . . . .
N (��wwwwwwwwwwap ap aawwwapwwwwwww
In co w ri Vlnrr w Ol m O O H ri H ri ri N N N m cl M M(n
. . . . . . . . . . . . . . . . . . . . . . . . .
ri �rwr����mnm m. . opoo0oo0o0mopo0a0000o0 0pwo0o�0w
p tD Cl O d' [� at O r-i N C1 c'1 'c!' 'd' 1f1 111 In if1 t0 w tD w V� 1— t0we t0 tp
I` l l` r- we
r r` I` I` � I` r- I` r-
In a%o --w%D r w w r- r- tD tO tD In v"T m c') N N 01 tD'w H at tD
I- I- I` r- 1� O O
x
E.,,-, 00000000000000000000000000
OP 00000000000000000000000000
W k+ r♦Nc'1 C'In tD t�wOt 0 H H ri H H H H H ri N N m my q.0
av
W35
DESIGN CRITERIA
11
APPENDIX E
EXCERPTS FROM PREVIOUS REPORTS
1
lI
11
E
1
I
1
1
1
n
1
I
FINAL DRAINAGE REPORT
FOR
OAKRIDGE BUSINESS PARK
TENTH FILING
PREPARED FOR:
EVERITT COMPANIES INC.
3000 S. COLLEGE AVENUE
FORT COLLINS, COLORADO 80524
PREPARED BY:
RBD, INC. ENGINEERING CONSULTANTS
2900 SOUTH COLLEGE AVENUE
FORT COLLINS, COLORADO 80525
INTRODUCTION
1
C
I
LOCATION
Oakridge Business Park Tenth Filing is located within the Oak -
ridge Business Park on the southwest corner of Oakridge Drive and
Wheaton Drive. The legal description of the development falls
within the Northwest Quarter of Section 6 of Township 6 North,
Range 69 West of the 6th Principal Meridian.
EXISTING CONDITIONS
The site currently is being utilized as farmland and is covered
with field stubble and native grasses. The property slopes to
the south at a 2% grade and drains into an existing drainage
channel. This drainage channel runs along the south edge of the
property and flows from west to east. Offsite flows enter the
site in this channel through three 36 inch RCP's under Oakridge
Drive. Drainage flows leave the site through two 42 inch RCP's
which lie under Wheaton Drive. Offsite Street Flows tributary to
the site along Wheaton Drive and South Lemay'Avenue are collected
in an existing catch basin and enter the site just downstream of
the 3-36" RCP's through a 15" RCP. The site is roughly trian-
gular in shape with improved streets along the north and east
sides (ie. Oakridge Drive on the North and Wheaton Drive on the
East.) The property south of this site is largely undeveloped at
this time with the exception of two previously platted filings of
the Oakridge Business Park (see Exhibit One). Construction is
currently underway on the Eighth Filing. Storm drainage for
these filings is being facilitated by a recently installed 15
inch RCP which is being relaid as a part of this project and will
outfall into an existing catch basin on the Southeast corner of
the site. Calculations for the capacity of this pipe and grated
inlet are included in the Appendix.
PROPOSED CONDITIONS
When fully developed,the Filing 10 site (areas 3 & 5 of Exhibit
One) will consist of two office buildings, a parking area and two
large landscaped ponds The storm ra na a es n nc uded
erein is for the ent re subbasin dent f ed as areas 3 through
and the tributary street flow area shown on Exhibit On . The
design incorporates four separate facilities to provide suffi-
cient detention volume to limit the localized flows from the
above described subbasin to .2 cfs/acre while passing the
upstream developed flows. Our modeling used an off -site flow of
68.12 cfs. The 68.12 cfs is a combination of the attenuated 100
year peak storm flow of 65 cfs at South Lemay Avenue and Harmony
Drive and the addition of 3.12 cfs from the area just upstream of
the site. (15.6 acres x .2 cfs/acre) This flow either needs to
be routed through the designed ponds or bypassed around the
ponds. Due to the large ponds required to route the storm
through the ponds, it was decided to route the 68.12 cfs around
the site.
65 cts : HARMONY ROAD
REA 2
C � �
FUTURE POND
OAKRIDGE DRIVE
POND 2:
r
AREA 1 %\P I
` `. E
�a\et1�P'A UPER POND r'
NO 3
AREA 4
0961 F
11
RULE DRIVE
POND'4
AREA 6 _
OAKRIDGE
BUSINESS
PARK.
10th FILING
Z
tie
4th FILING
"8th FILWGI \
EXHIBIT ONE
These "C" factors were then applied to the rational formula
(utilizing a Cf = 1.25) in conjunction with Figure 3-2 of the
City of Fort Collins Storm Drainage Criteria to obtain the Peak
flow rate for the given time of concentration. The maximum dif-
ference between the cumulative volume plotted against time and
the maximum allowable release rate of .2 cfs/acre would then be
the required pond volume. This was done for the upstream pond
using a maximum release rate of 1.99 cfs.
The required volume of the downstream pond was calculated by ad-
ding the cumulative volume corresponding to a peak outflow rate
of 1.99 cfs from the upstream pond to all of the cumulative
runoff volumes calculated by the Rational Formula for areas 5 &
6. This cumulative volume plotted against the maximum release
rate of 1.99 cfs from the upstream pond and 2.49 cfs from the
downstream basin (4.48 cfs total) would then be the required pond
volume.
These calculations indicate pond volumes of 1.66 ac-ft, and 1.76
ac-ft. for the upper and lower ponds, respectively. Computer
printouts of these calculations are included in the Appendix,
labeled as Mass Diagram Method. Volumes of the detention ponds
are approximately 1.84 ac-ft and 1.81 ac-ft for the upper* and
lower ponds, respectively.
The peak outfall rates of 1.99 cfs and 4.5 cfs were maintained by
selecting an appropriately sized orifice. Tables of discharge
versus head are also included in the Appendix.
To maintain the different working water elevations between the
upstream and downstream ponds a retaining wall with the orifice
cast -in -place was required. A stability analysis of the retain-
ing wall is included in the Appendix. In the event the orifice
plate on the upstream pond should plug, the crest of the retain-
ing wall is depressed 4" for a length of 3� This will act as a
broadcrested weir and limit the flows to the downstream pond to
less than 2 cfs. Given the same scenario for the downstream
pond, water will overflow the ponds and enter a grated inlet on
the top of the junction manhole. These emergency bypass struc-
tures assure passage of storm flows through the site.
1
1
i
NG
Engineering Consultants
t JOBNO.
CLIENT F- ^J�
PROJECT CALCULATIONS FOR
Iii M DATE _i CHECKED BY -DATE _BHEET 1 OF
T"
T
4.
-A-
4--i
I
T
4
4
i
L L
0 il.ln
ts
L
_J A.
f-4
L
z -1 - -
Al A... L_
It1A_i
X!
_-I.-
i-l-,
7
1 tit
>( J�Lg
6
J L
4
A
4 4
L. _Li, i..i L
A 1-j 'i
r
r 4- �_i_
: 7 1
A;33
_T,
7
+
i-A'- 7rd
iW
1isl
jh i-Aralrr
It
c
N.
P_J
.:CAI
M, -A_
:c�
-
TLC-
T
IS
; I
I I
f-
'4
-A
I
61
4
T L
4-1
J,
4-
t
I m
I—A
MASS DIAGRAM METHOD
f or
DETENTION VOLUMES
PROJECT: OAKRIDGE ESTATES
COMMENTS: 10o YEAR STORM
MAXIMUM ALLOWABLE RELEASE
FILING 10,LOWER POND
(CFS) _
RATIONAL EQUATION: 0 = CIA
C = 0.713 A(area) _
4.48 ,INCLUDES ADDITION
FROM UPSTREAM POND
12.43
TIME OF CONCENTRATION = 15.96
TIME CA I INFLOW OUTFLOW STORAGE
cu
cu
CU
---- ---------------(----- ) - ---f t) --(---- t) -- ------ - t af - -
5 8.96259
10 S.86259
15 8.86259
20 8.86259
25 8,86259
3o 8.96259
35 8.86259
40 8.86259
45 8.86259
50 8.86259
55 8.86259
60
8.86259
7i �
8.86259
80
8.86259
90
8,86259
100
8.86259
110
9.86259
120
8.86259
360 8.86259
1440 8.86259
1
1
1
1
9.4
25589.80
1344
24245.80
0.556607
7.29
39959.56
2688
37271.56
0.855637
6.16
5o926.09
4032
46894.09
1.076540
5.2
57691.76
5376
52315.76
1.201004
4.6
64138.37
6720
57418.37
1.318144
4.17
70106.40
8064
62042.40
1.424297
3.8
74904.56
94i)8
65496.56
1.503594
3.5
79224.15
10752
68472.15
1.571904
3.25
83144.92
12096
71048.92
1.631058
3
85736.31
13440
72296.31
1.659694
2.8
88460.63
14784
73676.63
1.691382
2.6
90121.44
16128
73993.44
1.698655
2.3
93974.81
18816
75158.81
1.725409
2.05
96764.68
21504
75260.68
1.727747
1.88
lo0724.4
24192
76532.41
1.756942 �--
1.7
102344.4
26880
75464.41
1.732424
1.56
104389.8
29568
74821.92
1.717672
1.43
105584.4
32256
73328.42
1.683389
0.625
162650.5
96768
65882.56
1.512455
0.192
31904j.1
387072
-68029.8
-1.56175
CLIENT C/�'�`� c� - ,y OB NO. UIS- o414
J
NC PROJECT U i A ,e pal,`.9 CALCULATIONSFOR Pn, a
Engineering Consultants MADEBY DATE IU HECKEDBY DAT! SHEET ` OF
F ,..
--.---
1 ,
A-, I I I ,. .
tf r
L1..,
1 I
1. — 1 ....
4 1 , —
i II 1
Ems,. � �. � -; � ` � I1
I I I 1�-►-
,
I i
•- III ,: � ,
1.
-� Z - -- - ' -- - - - ----` —
31 col 3
I
y
I. . TI uV.
s
n '1
I
I , t I i I
I 1
j.
t
I
I_
I ,
J
I p h
. i. :. � .,. :. �. � --i '-I ' :..:. �. 1..r... . i I' "1' ,� , '` : � I , r. I_I 1 ! �. 1• I : I J �.. '..:
is ..I J I ! i..
ur�~11
►. ; to
I , I
rT
43a .;. 3
lO,.jI
1}r
4,4-
i�_{ I.., 'T
.. 1.,
t L ' l—
k i LI f
,
J.
.t V.
1.T. �.
. �. a i.l i.. }. 1.., ,., .{ I t-I t 1 i.I j L.+ I I. t�.i
I �r� y.
-i 1 1 1
y I
LOWER POND DISCHARGE CONTROL
Discharge is controlled by a:10.75" ,6t Orifice Plate with bottom
set @ 69.5%
Elev. 0 (cfs)
69.5 0 Q= CD 2 h A
71 3.165 cfs = .61 �2gFi � D2/4
72 4.42 cfs
Use 12" Schedule 120 Steel Pipe I.D. = 10.75"
UPPER POND DISCHARGE CONTROL
Discharge is controlled by a orifice plate with bottom set at
71. 5. \ Plate is 7" ,Pl.
Elev. cfs
71.5
0
71.79
.579
72.08
.71
72.5
1.1
73
1.439
73.5
1.711
74
1.944
Use 8" Schedule 140 Steel Pipe I.D. = 7.001"
1
1
1
1
EXCERET
McCLELLANDS BASIN 100-YEAR MASTER PLAN UPDATE
(COUNTY ROAD 9 to FAIRWAY ESTATES)
FOR PROPOSED MODIFICATIONS TO
THE OAKRIDGE VILLAGE REGIONAL DETENTION POND
FORT COLLINS, COLORADO
April 1, 1996
Prepared for:
City of Fort Collins
Stormwater Utility
235 Mathews Street
Fort Collins, Colorado 80522
Prepared by:
RBD, Inc. Engineering Consultants
209 South Meldrum
Fort Collins, Colorado 80521
(970) 482-5922
RBD Job No. 395-003
�Ell NO. ]CANAL 510
NOTE: 0.11N j10 I u'w.sr
1h woft7N (W v y� • .M.
NUIMONT PD4D ' / I p ,•' _ w•y.cr—_ - _ / /01
I I
ul ^ N
i I • I70 :nrn. .cam �! ♦ 16 \
11.75
EVANGELICAL
COVENANT CHURCH / O
Q\� 240 \yt�•e...,�
C
I OAK 21is .. i
t , OAKRIDGE� / -e�M w. v.•`'�_ ��'
BUSINESS
1J LOTH F INO�.;�",,,.�
�OAKRIDGE k,JINESS
:PARK [TH FILING,
11
OAKRIDGE
BUSI`IESS PARK
STH FILING._.-. - �. <t
P
240 3r�fr- OAK(11DOE O
m m, �Almm
LEGEND
Poda a
10 YEAR
I STORM
Perrd 1
E/enddl !
HEALTHCARE 50
INTERNATIONAL 5y1
.M1 Yw r.� !•I. OY
.
„ 500
25e
e� PoM E
EGEND I 100 YEAR
STORM
Pond r
f/errdnr J
;CHEMATICS
■
■
V
7.00 I SUSiNESS PARK 120 y�1•
•' ^•r�r 1ND FlUNG 1L
17.79
. ICOMIIHEAg1 , -
I
a F174
T-\ -
. j
wcr
O
o
I�nertw .o-
pAA01A0[ CNANK[L \
I 2NDNO \ ♦�
r i
SOUTHRIDGE GREENS GOLF COURSE
jet— sc
....— Oe.«+orus,to c.[c<ro '.c Engirwerirlq Consunanls OAKF
......... _ _ e- a -es o»_o�y_ nee ........« ...... ne.. •....-. e... t... ne rut...«�......�. t... /st MAS
UI YNn•iulN- ii.-Iru.[u o.'t �Roltcf.0. ••`au.-. r.r... ec•n o...n t«.•.<.+.... ww. .. c...... or.•
w w;t-.Itt ,e uc.-net nv. v-uu
■
T�'CNI� = �ct�r� 0�42_ DyS�r�C.sS
d � W N O� W _
W
O
W O O W 00
N '
y m O N
cEn03 r10
Uw=t-i& as lv
mj
N b�
n
N
O O
O ch O
co
co
N
0
O m ...
U
C
O �.
>1c
rR m m
v c
m 02
W 0 Ow
c
C: 4A
ma�
O co
m m
Q O m
u�Uw
y a)
d
o U
C
L O
O.
COC m m c.
CD 0 Q m .
0C O� a)
L Q
0 >LO
i ce. (ID
�c m
om �00)
C m `O m
_ '0m
Tm
:) _ cc:
a 51 YriC szS-
■
0
.�
LZ
OA'RIDGE DRIVE 20 �
so
■ F
1\one
\Nr
\ \
\ 24 .]1xx
4
\�
xxx
1
EXISTING BUILDING
\NN_
/7
l \
1% \
�,
.�
`\\ \
/
/
/
/
/
4,
G
%/ Vt I
IIIIIIIIIINrlif lllllik,
unnll ll II I I I I I I I it l '�.
1rr1yu11]yBroro111119113 1N`. I
j - -"-
IIIR.�I,LIIIIIIIIIIIII,l—
j'IAr■`7w11 ,{
I D
,' Z
l� o
jle
(�
Z SF
ff
" � 1
lEasaRa ADr _
WLKR
,ere_. (((���sss+++••
EXISTING DETEN N /
POND 4-
/ / a/
M
II
<'p
111
Ij
tf9
STANDARD EROSION CONTROL CONSTRUCPOIN PI AN NOTTS
July. 1996
The City of Fort Collins Stormwater Utility erosion control inspector must be notNled at
lease 24 hours prior to any construction this te.
All rewired perimeter silt pending span be nstmled prior to any land disturbing activity
(stockpiling, strippin, grading, etc.). An other required erosion control measures anal
be Installed of the appropriate time in the construction segue indictd ithe
approved projeet schedule. construction plans and erasion coned eport.
Pre —disturbance vegetation shall be protected and retained wherever possible. Removal
or disturbance or existing vegetation shall be limited to the area required for immediate
construction Operations and for the shorterst practical period of time.
30 15 0 30 60
All wild exposed during land disturbing activity (tipping grotlng, ullty Instolations,
abckpTMq filing etc.) shall be kept'In o roughened condition by tipping or dicing along
SCALE, P 30' land emlwrs LOU mulch yegetat On Or otherpermanent erosion control is installed. No
soft in areas outsideproject t t rights of way sholl remain exposed by land disturbing
activity I ore tho thirty (30) dark before a 1 w temporary or perm t erosion
Contra! (e sew/ IChlandscaping,t .) Is --installed.to approved by the
Storminater Utility
The property tall be watered and maintained at all times during construction activities
aas t prevent wins w son. All d Perturbing activities shall b immediately
scontinued when Fugitive dust impacts adjacent properties, s determined by the sty of
Fort Collins Engineerng Deportment.
All tremporary (structural) erosion control measures shall be -inspected and repaired or
wise, necessary roter each ru,o fevert order to sew.. hued
polarmance'ofkrr� albs~!y�e1� ua etakud eeeBswlt� Iitbe RAN
paved roodway, air . shall 6e ..movsa na Ospaeea n IN a mmnnw Iron location so as
not to cause thew release into Cry sholnogeway.
No fuld stol shall exceed 1 (10) feet in height. All soil stockpiles shall be
protected from sed,ment t p t by surface roughening watering a perimeter silt
fen Mg Any T at _ pl remaining after 30 ran shall be seeded and mulched.
City Orsini arohbl the tracking, aroppmg or depositing of soils or any other
material onto City streets by or ham any vehicle. Any inadvertent deposited material
shall be cleaned mmedotely by the contractor
CONSTRUCTION SFO 1 N F
...
Ma r � aa. courturris By w, Pin YI
ANN
— m' �I
Del
Press
Our
Ovi
wwww"v.
As NI
Devi
Nla 1vill
, ..i
Al
Cal hini
left ved
�
six �:��
M
MT. e. e nTe ee
AMTa. sae
Re a�mByal, mFIAT �as
DRAINAGE SUMMARY TABLE
DESIGN
POINT
AREA
DESIG.
AREA
ACRES
CIO
pO0
TO (10)
MIN
4 (100)
MIN
0 (10)
CPS
0 (100)
CGS
51
5-1
D.6]
0.32
040
1 L_'
123
O.R4
iJ5
52
1 5-2
3.21
D.]1
O.8B
9.4
6.0
1 10.4
1 24.91
51
1 0-1
1 0.]9
1 0.93
1.00
1 9.1
6.5
1 7
6.2t
LEGEND
4(
BASIN CRITERIA
RUNOONOEF COEFFICIENT
17 j
AREA IN ACRES
I<
—
FLOW DIRECTION
till
mmmm
BASIN BOUNDARY
y-I
o
0 o
EXISTING STORM SEWER
(F�EEXSON Y TYRE
®
PROPOSED PIPE
�]
,
FLARED END SEC00N
EXISTING CONTOURS
-- -- 49'----------
EXISTING INDEX CONTOURS
PROPOSED CONTOURS
4905
PROPOSED INDEX CONTOURS
O
v
SILT FENCE
OI
A
EROSION SALES
CALL UTILITY NOTIFICATION
[ENTER OF COLORADO
1=800AA922er1987
M534er6700
QAI 2-BUSINESS DAYS IN ADVANCE
KF YW DIG, MADE, M ERCAVATE
M TIE NMNINL 6 L MRM D
I MR UTILITIES
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPROKD. _
City Pe,w
CHECKED BY: _
woes a wine voter Utility
CHECKED BY: —
seo,mfater utody
CHECKED BY: _
Ppb a Reveal
CHECKED BY: _
Twmc transfer