Loading...
HomeMy WebLinkAboutDrainage Reports - 08/20/1992Final Approved Report �Ia► 44� 1 FINAL DRAINAGE AND EROSION CONTROL REPORT for CHILPS GRILL & BAR AT THE SQUARE (LOT 1, STRACHAN SUBDIVISION FOURTH FILING) FT. COLLINS, COLORADO PREPARED FOR: BRINKER INTERNATIONAL 6820 LBJ FREEWAY DALLAS ,TEXAS 75240 Shear Engineering Corporation Project No: 1270-02-92 Date: July, 1992 4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334 n u VICINITY MAP C • PAGE 1 Chili's at the Square Project No: 1270-02-92. INTRODUCTION: This report presents the pertinent data, methods, assumptions and calculations used in analyzing and preparing the grading, drainage, and erosion control plans for Chili's Grill and Bar at "the Square". L GENERAL LOCATION AND DESCRIPTION: A. Location: 1.) The 1.71 ac. site is located in the Southwest Quarter of Section 25, Township 7 North, Range 69 West of the sixth Principle Meridian in the City of Fort Collins, Latimer County, State of Colorado. More specifically, it is located at the Northeast corner of the intersection of Horsetooth Road and South College Ave. It is the final remaining undeveloped pad site at the Southwest corner of "the Square" property. "The Square" will be replatted as Strachan Fourth Filing. B. Description of Property: 1.) The existing site consists of a maintained grassed area which is a defined building pad site. The building pad site is bounded on the east and the north by paved parking • which is common parking for all of "the Square". 2.) The proposed development of the site will include: a restaurant, additional sidewalk, the necessary utility tie ins to existing utilities located on or near the site, landscaping, and minor changes to the existing parking lot to facilitate the proposed restaurant service area. The grading of the developed site will not change historic drainage patterns and will not affect the existing drainage patterns of "the Square". II. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description: 1.) The site is contained within the Foothills Drainage Basin. Further major basin description for the Foothills Drainage Basinmay be found in the Foothills Basin (Basin G) Drainage Master Plan on file with the City of Fort Collins Storm Drainage Utility. B. Sub Basin Description: 1.) The site is located within a 172 acre watershed which has a point of concentration at Horsetooth Road and the Northwest corner of Warren Lake where storm sewer facilities convey runoff into Warren Lake (refer to Drainage report for Foothills Square prepared by lames H. Stewart and Associates., 1977). This watershed, being a part of Foothills Drainage Basin, is almost completely developed with a combination of residential and commercial properties. 0 • PAGE Chili's at the Square Project No: 1270-02-92 B. Sub Basin Description (continued): 2.) The proposed Chili's ' site is on the Southwest corner of the overall Strachan subdivision sub -basin as defined in earlier drainage reports. Runoff from the immediate Chili's site flows in a Northeasterly direction across the existing parking lot, thence due easterly in the drive immediately south of the main building of "the Square" to the eastern end of "the Square" to J.F.K. Parkway. At this point the runoff is intercepted by an inlet located in the parking lot, and directed to the Warren Lake Reservoir (located Southeast of the property) via an existing storm sewer system which directs stormwater easterly and southeasterly through the Strachan Subdivision Third Filing property, under Horsetooth Road and to Warren Lake. The proposed development was considered in the planning of "the Square" and detention requirements were satisfied for the entire site via an agreement with Warren Lake Reservoir (See Appendix Q. M. DRAINAGE DESIGN CRITERIA: A. Regulations: 1.) City of Fort Collins Storm Drainage Criteria and Erosion Control Criteria were used. • B. Development Criteria Reference and Constraints: 1.) Previous studies which were considered include: a.) The Foothills Basin Drainage Master Plan study b.) Drainage Report for the Foothills Square, Prepared by James H. Stewart & Associates, August 1977 c.) Drainage Report for the Marriott At Fort Collins, prepared by Simons Li & Associates, February, 1983 2.) The surrounding area is fully developed with curb, streets and parking lot area that service "the Square". The existing grades are the primary grading constraint. All grading and facility design must accommodate the existing grades. No modifications to South College Avenue or East Horsetooth Road are proposed. There will be minor modifications to the existing curb directly adjacent to the building pad site to facilitate the service area on the east side of the building. Existing pavement grades will be matched. C. Hydrological Criteria: 1.) The Rational method (Q= CIA) was used to determine the pre -developed and post - development peak flows for the 10 and 100 year storm events (commercial requirements). 2.) Upstream flows were not considered. Assumptions made in previous reports were • followed. The main assumption is that the man made barriers of South College Avenue and Horsetooth Road would intercept and divert all flows from the upstream areas around the project site (See Drainage Report for the Foothills Square, Prepared by James H. Stewart & Associates, August 1977). • PAGE Chili's at the Square Project No: 1270-02-92 C. Hydrological Criteria (continued): 3.) On -site detention was not considered as an agreement exists whereby the Warren Lake Reservoir Company would accept any increase in runoff due to the development of the Strachan subdivision, which includes the proposed site for Chili's (See Appendix Q. D. Hydraulic Criteria: 1.) Grass lined swales will provide the main conveyance for storm runoff through the site to the parking lot. 2.) Mannings equation for open channel flow was used in the design of the swales. IV. DRAINAGE FACILITY DESIGN: A. General Concept: 1.) The on -site drainage facilities are limited to the swales that carry water away from, and around, the building. Sidewalk culverts will convey water under the sidewalks. No off -site drainage facilities were considered. • 2.) Erosion control will be provided. Details are included with the Utility Plans. B. Specific Details: 1.) These swales are sized for the100 year storm. Concrete sidewalk culverts have been placed under the sidewalks at points where the Swale intersects the sidewalk. These culverts will carry the runoff under the sidewalk(s) and minimize any icing problems in the winter. All roof drains are being placed so as to minimize the distance to the swales or the parking lot and the outfalls are to be constructed so as to reduce erosion. 2.) Haybales will be placed in the swale flowlines in locations which comply with the installation details for erosion control bales provided on the Utility Plans. 3.) Silt fencing will be placed on a majority of the northernmost and easternmost sides of the project according to the silt fencing details provided on the Utility Plans. V. CONCLUSIONS: A. Compliance with Standards: 1.) All drainage calculations comply with the requirements of the City of Fort Collins Storm Drainage Criteria Manual and City of Fort Collins policy except as noted. 2.) Detention will not be provided as typically required by City of Fort Collins policy. An agreement was made between the Warren Lake Reservoir Company and the • developer of "the Square" which considers all detention requirements for the entire "Square" property. A copy of the agreement is included in Appendix "C" for reference. • PAGE 4 Chili's at the Square Project No: 1270-02-92 A. Compliance with Standards (continued): 3.) All Erosion Control design complies with the City of Fort Collins Erosion Control Manual. B. Drainage Concept: 1.) As previously mentioned, the development of proposed Chili's site has been considered in the drainage reports and detention calculations for the Strachan subdivision (the Square Shopping Center) and the Marriott prepared by James H. Stewart and Associates and Simons Li respectively. Both reports state that all detention requirements were to be satisfied by an agreement between the developers of "the Square' and the Warren Lake Reservoir company (See Appendix "C"). Therefore, no detention is proposed for the site. Calculations for the amount of runoff to be expected from the existing and developed site are attached (Appendix A). Along with this, the design calculations for the proposed swales on the north and south side of the building as shown on the grading plan are attached. VI. REFERENCES: 1.) Fort Collins Storm Drainage Design Criteria Manual • 2.) Drainage Report for the Foothills Square, Prepared by James H. Stewart & Associates, August 1977 3.) Drainage Report for the Marion At Fort Collins, prepared by Simons Li & Associates, February, 1983 4.) Letter from Brian W. Shear to City of Fort Collins Storm Water Utility re. Chili's at the Square, June 1 , 1992 S.) Foothills Basin ( Basin G) Drainage Master Plan additional 0 APPENDIX A Drainage Calculations Supporting drainage Figures and Tables 0 i 1 PAGES T PAOE+ � '' , vl�h\\ ._ `-, h rMr PREPARED .. c I1 { r� i > t Y {: .a }� Y+J .S G.;K a t �. ... y s Q .. .ter 2!' "DATE`✓ �- z �'v- >w, v\S-1��,7'.1J.rti\ wit", •� I IZ �. i • i IILI U • of , r � �'' � ily { 'SV� C°y,v y 1 ,x2 ,3Y f v � ,f i�aI^,.y�y q r �t >r u''.11 r r� s< a.r � (�AFyf •_. Y1 •. 4, S„'`.. � .. • � � �iii F IIL.hhl�^ YC.L� � ) '��5,1� �Y. '.i O. �.��� � 1I�.�`��.V,'v4♦ ,. 5._ .4.4 {..h �•EfU\0-\.i .� .•�; ..l S. { •y_ , 7A �f �� �` f g.. l ' •..1' f.pk.L-,U N�'�J�.: ) � ' 5 J'�j \ V Yv"o \� & C-F-�•.i•�Ci cl)� e 1 1 � .A �.t ` e _..'n„^ .K; Yam' w � .-. s _ , . 7 .r • C �,W u 'h<�v s�,\_ . .,,ZT� 17 va a Y a` :x r t �4':_e.t-`+O�.\ ti-le 0� �t,�'.x• �.��`�". xao P i'4+Y • �'z`4„11 v\ 1 \J r '•' e ' 3..,-12} ',Z.�. � '�. r '. a .._� , k X j G.� { t ,, >{' , � =.• . ,.`: `� ...!VIMtD7l.}-.� t:... 2. n i _ . t. ,,,r, I n 14 '.��ra���;±01' ' -` H�,�,o,cv C,erl��nr �.��,uiJ ���G•-. :, ' FI 'x'. ..h., :;,1'�� ..t a N"''n" w} f J: � G.Z �' S U 1713�ti '.4 ♦�' fi ...� a'f Fy, 1 1, d'n 6 Y' �' �k� 1 ' a _:,! 18 r• � -i o'„�i^�(1. �225J)h �� " �'x l� .!)l66 '`225 Jf'2 -1 S 1:�5� ll O,gZI •: .rvn �..^ f«., n"'r .. '. !T.-.4w..+w ., 1w3.�"- f 6:...3'.�.u. w_' .. ..- w'- lu9rf 1':'.'.. .'. {R.• :I.53��re,,,v.u�cs.k '• � �' � .:'. .. _ k. _�79 re�,,v . ::, tt .... _ - A' � ���1`.b - VTI�Cr• Z..S4V 'I:Z`%U. '� �i_ `•Zl ,.,i1 Q7.. 2,.M10 ,y '. 3+.,. 22 n r ...� �, 7Y > *� " t _ 1Ay CC}•'S•t"y. 23 USe 11 i 25 f ' h ... S J ! 1 Yv i ,T _ 16 S ,rv� L i1�. • a � _ . zCr . � r. i27 x c (c executive" 28 2 p rnrrmn;u uv /•7�ii oia C -14-tiz • J 1 Rl O- a �I 3 J 7 Io S „ = d ,-7 L C C 13 n, Is L� �-�� �t " Lc -��.�� '!z 17 �'13 , 20 5z-4 '13 5 4'13 21 22 2., 24 la 25 28 0y, IO rhINUfes'gp.-b 2% u - c,1cculiuc 28 �f` ,. _ 4,-- n+, C,\\\YSlfeb ° PREPARED PAGE •, F- T NO"�L, DATE Y`t G, < 1;L; 1 •.' J M1'! Y .. '. _. 5x 1 ya�' 1�' w '� ' ` • � �5eS f _ ,. c. 25 � f < S: + 7 ' ^ Y •. hI II y,Vn, F. t ., l 13 6It SI � .A is a., St:_ 4 `r• r } - '.6. `*: '.f 't' i. . � � S. _ P •�.t 'OL�.S` � jfir�.r h :_'T ,v i-.. ,.�« rota :t �i; �� f,Yz a. 2' dr �.•.. -• ; 1 'e �`.. e��� s'• �� � � � , �fi is r T 3,:.' e{ u k- ol is .rf Uvf Yl cl r �r77Y 'q F`� Yard 4 .� '• ti s -+r,3u .'' c �� x.p- v rf' 7 . _. ,, i -. , ' } `'fi J� � �,•LL " - � -,+ill l� :l`L�h'�•i ;'��I+ 1 W nIL L M. f, t C.. 1 � �• �• ..16_ '1}' -'�{{ YI {J' 4" �. 1 l� a 1 l: '- Y , ., Pt '���.,:, .. �;Y� ..�� �� '' S3� �'-,_��. Ass` 11,; n c 1ti�� re,..���• 17- �Z:.. ��+� �" �� i'". ' �L ••". h�'l�.c.+fl <<.�U 2Y+\Z.cJ�' .ST, _�. A11 » M; �.1 ',- :n, ,i BJ ,a a "� v"'} �. t,? -°- , r„ to m ,a r r. -.•- ;{ - 4 CI }f A 20. 'y" 'i,•Y}�`c;sa 3 any r a: -. �j ,'may i t14� 1 X3 +c tx rr"' 21 - a-. A 5 s c. -",. PsY ,aJ ,• ,y t . ;. ,, i.'1-r:4k Y l� vl. r. b a rl' e ••p a `wnl F ,ycr q S• ,, r,x �,� G'C �i,J+ tII7� to 1 , I r x;• `a `.,, i ,-'..«->a'.r n:_ __ ..+-a.'. ._ rYQ F.;� f a 4_ ^ s '•,7• � " +, .'.� f ;; a. �' : f• 2nV.14,.at- kr w e:, �* ! ':.r t. � _L })}t +r 7 q - 2f1' r' x •� J t' �.��Ya+ f 1.'t.y�'•{ t > jy S^l. ,w aJ �,y 'I 1^e j., t �, , - •` 1 F•. � ` k.. �. . o-:� .vim. r 8 �4ti. !• ri_a_.. ..Y , i G !R �»�t }4� l� 25-1 ! F .. u.-: .'ry '. •.. x 'fir :. ;.. .. - ..,i i 1f s.-',•- ¢xecu Eive 28 '� [j PAGE (kS PFEPARED BY. .��\\\•S7 -,', ` •�4 4Nx r b S` e NOW 1 •' t. -F_ F a j � Q�OT r� WI y 5 •, - .., t 3 t.'.- 1 4° { l •ly rX`.• --. ...: rdy v :i� 0 On Lf,WN.•�c,re5 _ r _ _ .;i .\1^� t.r,_.�.ZS' - Uy2�.. G,1i1' 0..\€ p1 1 .r. YT-� y - ♦ 3 {A G RW aY S r l�' :h VAT not ^ h H Ylj �.!`C r� { C1;OhL°a rr 0.112:Y' t�rX32 - S� 01\>TuAl.:.•.:. y' 4 }0,. :{\iyr� "¢` S':\i1C aS��G.ti;e y 9X-1U +,1S�B�i 1�Orb i ;xb� t SX� �.09'[l •� 7. s ISSB G,' L4: 12; 1s;' K ; x. .G=x.6,�I�� C; ,ItZS�O �(, �,• � 1�� �t)1!. ,,. 1,3cJ�stlA4 it c'6fVe�uNC O,E5\ 0� Lre,` 1V J\ ra ��, .Q\00; yy :i i ^.; vy +�gt J r 1 a:...t , �„'1�� �Ys,'t`.��+' � ^.{>, < yy -... x ,� 29.-2_ \•05 .an ��. �- �J. f�i rt Y. � ' • i § ai O : - i � J1.J..sl. �.i•� . §..... _ ... s/ n. :iJ w • A.. d 0 1 14 X [ i S ..Y �' �.: p�• i 1• 1 N �^ 1 1 S Jr i ,yN n. e x- Y. uc _ <Cos3 ,10 v _ _ ..-k7l g - v.-?'r 4 von `•r E > xi Mr '�^'•n✓�,f�j" -r Y} T •r �� !,x +'srit'}: { t •. i-.. 1 a.. , Jw r!� J 4 .r J 'Ip-•, ��f24r Hf Ikt r y4 adz Yt y��Jy drY'tVk "IA Y".i?�{e 1J-'.Vii WSJ ".z-Yel'1}R �i y� V . ..�_J'a � iJA t: � / '_. i. Y •r .5 ✓ a.�Y� �r.Yl t'.'p'_ _.'4 v:'.` ..I L1G1'uY _V,ve ram. `{"�'i � -. -1d .. ,., f�-{•..,. ,] r'F... y � � � F �� i r+J l �N. }i4•'+S..rA L����4... i _.X• .'S,•`i•+JC ..rn ri4hf-�., _'4 ..1..—\ SM�i 2i' r - • Project No: 1270-02-92 Chiii's at the Square Strachan Subdivision Fourth Filing ---Swale -#1 (north -swale)-Depth / Flow relationship CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRIANGULAR CHANNEL LINING: GRASS Da (ft) Db (ft) Dc (ft) Sc - M n _ W (ft) I (ft) 2.50 2.50 0.50 4.00 0.060 0.00 0.02 0.2 = LEFT BANK SLOPE 0.2 = RIGHT BANK SLOPE DEPTH WIDTH AREA PERIM R 2//3 Sc 1/2 g v -(s_f_) --(ft)- -(s_f_) --(ft) - (A/P) ------- (cOs) (ft/sec 0.485 4.85 1.18 4.95 ------- 0.38 0.20 ------- 2.24 ------� 1.90 0.47 0.46 4.70 4.55 1.10 1.04 4.79 4.64 0.38 0.37 0.20 2.06 1.86 0.44 4.40 0.97 4.49 0.36 0.20 0.20 1.89 1.72 1.82 1.78 0.41 4.10 0.84 4.18 0.34 0.20 1.43 1.70 • 0.38 3.80 0.72 3.88 0.33 0.20 0.36 3.65 0.67 3.72 0.32 0.20 1.17 1.05 1.62 1.57 0.35 0.33 3.50 3.35 0.61 0.56 3.57 3.42 0.31 0.30 020 0..20 0.94 0.83 1.53 0.32 0.30 3.20 3.05 0.51 0.47 3.26 3.11 0.29 0.28 0.20 0.20 0.74 1.49 1.44 0.27 2.75 0.38 2.80 0.26 0.65 0 49 1.40 0.24 2.45 60 0.30 2.50 0.24 0.20 0.0 1.30 30 0.23 0.20 0.36 1.21 0.21 2.15 2.19 0.22 0.20 0.26 1.11 0.18 1.85 0.177 1.89 0.20 0.20 0.17 1.00 E SWALE # 1 • T=s n' SECTION C-C SCALE: 1/2"= I' • J PAGE 1 1� IIEPARED BY GATE 2 �1uw rsro �e 3 mac- 4 5 VNo 7 �02 T\C.\2n1� 'lz g\ - o,oU2 h� $ 4) + i$ox4 }C3x6) + sort = o,oz�iZ 9 , Zn. cam.. - o.ob-(.+o,ot5z. = 6•0� o, ti 10 OA 11 C 0 .11� ,Z i 0,1 0 ,h5 6 • �\ 12 6,26 13 14 15 76 17 18 Coavo,� o ' 79 25 •b`1 —z-,— ouz' 20 To> 1,,,,d\�}� 8,00 !. i• 21 4. 22 F = a.48S 23 Q ; 1,A4b �j•o� L6,44Sr'(o,00$q'Iz s.ml cis > I,Z 24 25 �roT Qnn�oc o.45 26 27 IIe��. m.recafiue 29 • u 0 Pro ect No: 1270-02-92 Chiii's at the Square Strachan Subdivision Fourth Filing Swale #2 (south swale) Depth / Flow Relationship 'CAPACITY OF TRIANGULAR OR TRAPEZOIDAL CHANNEL CHANNEL CONFIGURATION: TRIANGULAR CHANNEL LINING: GRASS Da b Dc Sc(ft) n I (Dt) (ft) _ M (ft) 4.00 4.00 1.00 0.84 0.060 0.00 0.05 0.25 = LEFT BANK SLOPE 0.25 = RIGHT BANK SLOPE DEPTH (s.f.) WIDTH AREA PERIM R 2/3 Sc 1/2 V (ft) ------- -(s_f.) -- (ft) ------- (A/P)------- ------- (c?s) (ft/sec) 1.00 8.00 4.00 8.25 0.62 0.09 ------- 5.61 ------- 1.40 0.95 7.60 3.61 7.83 0.60 0.09 4.89 1.35 0.90 7.20 3.24 7.42 0.58 0.09 4.23 1.31 0.85 6.80 2.89 7.01 0.55 0.09 3.63 1.26 0.80 6.40 2.56 6.60 0.53 0.09 3.09 1.21 0.75 0.70 6.00 5.60 2.25 1.96 6.18 5.77 0.51 0.49 0.09 0.09 2.60 2.17 1.16 1.10 0.65 0.60 5.20 4.80 1.69 1.44 5.36 4.95 0.46 0.44 0.09 0.09 1.78 1.44 1.05 1.00 0.55 4.40 1.21 4.54 0.41 0.09 1.14 0.94 0.50 4.00 1.00 4.12 0.39 0.09 0.88 0.88 0.45 3.60 0.81 3.71 0.36 0.09 0.67 0.82 0.40 3.20 0.64 3.30 0.34 0.09 0.49 0.76 0.35 0.30 2.80 2.40 0.49 0.36 2.89. 2.47 0.31 0.28 0.09 0.09 0.34 0.23 0.70 0.63 0.25 0.20 2.00 1.60 0.25 0.16 2.06 1.65 0.24 0.21 0.09 0.09 0.14 0.08 0.56 0.48 0.15 1.20 0.09 1.24 0.17 0.09 0.04 0.40 0.10 0.80 0.04 0.82 0.13 0.09 0.01 0.30 0.05 0.40 0.01 0.41 0.08 0.09 0.00 0.19 0.00 0.00 0.00 0.00 0.00 0.09 0.00 0.00 -0.05 -0.40 0.01 0.41 0.08 0.09 0.00 0.19 SWALE #2 • T=8.0' I/2T=4.0' 1/2T=4.0' n=0.06(6RASS) SLOPE= 0.84% 010=0.6cfs DIO=0.45' 0100=1.2cts D100=0.60' SECTION D-D SCALE; C=2' • 0 No Text LOVELAND I FIGURE 602 I STORM DRAINAGE CRITERIA MANUAL • 7 • TRAVEL TIME VELOCITY FOR RATIONAL METHOD 50 30 t- 20 z w 0 cc tit 90L 10 z W a 0 5 y w cc 3 0 U 2 r W H Q i 1 A MINE 1 FAFA����• 011 Milli milli milli �������■■� Nw •MM!lAMWANwffm II�i -f-_M■-.■YA■_AWAM __MEM■■- �,�II ■■II ■I.�■/III �®���■■■■� �I III ■�'I �%��I-��B��■■■■�� .2 .3 ,5 1• 2 3 5 10 20 VELOCITY IN FEET PER SECOND I WRC. EN& IREFERENCE: 'Urban Hydrology. For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. Table 7-3 PERMISSIBLE VELOCITIES FOR CHANNELS LINED WITH VEGETATION . (USDA, SCS-TP-61, 1954) These values apply to average uniform standards of each type of cover. Permissible Velocity(') 7.3 Slope ranger" Erosion resistant soils Easily eroded soils Grass Cover (Percent) (Flpersec) (Ftpersec) Buffalograss Kentucky bluegrass 0-5 7 5 Smooth brome ............................... 5-10 6 4 Blue grama over-10 5 3 Native grass mix Grass mixture ......... (2)0-5 5-10 (')Use velocities exceeding, 5 feet per second only where good covers and proper maintenance can be obtained. IZIDo not use on slopes steeper than 10 percent except for side slopes in a combination channel. A water surface profile shall be computed for all channels and shall be shown in the drainage report. The hydraulic computations shall be complete, detailing all hydraulic parameters located along the channel reach. The minimum roughness coefficients to be used for unlined channels are as follows: Table 7-4 MINIMUM ROUGHNESS COEFFICIENTS FOR UNLINED CHANNELS Type of Channel Coefficient Earthen, straight and uniform, no brush or debris a. Grasses (1) Depth of flow <2.0 ft..................... (2) Depth of flow >2.0 It ..................... b. Earth bottom with riprap on sides ....... Irrigation Ditches ................ 0.060 ................ 0.035 ................ 0.040 Irrigation ditches shall not be used as outfall points for initial or major drainage systems unless such use is shown to be without unreasonable hazard or excessive future maintenance costs substantiated by thorough hydraulic engineering analysis. Neither the concept of the irrigation ditches' acceptance of "historical runoff" or the approval by the particular ditch company or authority of a drainage outfall point into the irrigation system shall be considered sufficient justification to waive the requirement of a thorough hydraulic analysis. Required ditch flows shall be determined by existing water rights below the design points and documentation of the water rights flowing across and below the property shall be submitted with the hydraulic analysis for approval. Such hydraulic analyses must obtain written acceptance by both the City Engineer and the appropriate ditch authority prior to the approval of utility plans incorporating an irrigation ditch into the storm drain- age system. Any information that is part of the permanent records in the City Engineer's office pertaining to previous analysis or studies of the irrigation ditches may be obtained upon request by any interested party. MAY 1984 7-3 DESIGN CRITERIA APPENDIX B Erosion Control Report and Calculations 0 MOM_•\ •\_L•_ Description: The site is the remaining undeveloped building pad at the commercial site known as "the Square'. This site was included in the original Strachan Subdivision and development plan as a commercial property. The existing site consists of said building pad (approximately 0.60 acres) which is currently covered with native maintained vegetation, and a paved parking area to the North and East of the building pad. The proposed development of the site includes: a restaurant, additional sidewalk, the necessary utility tie-ins to existing utilities located on or near the site, landscaping, and minor changes to the existing parking lot. The grading of the developed site will not change the existing flow patterns of the property. The site is located in a moderate erosion zone (see Fort Collins map attached). The building pad is divided into 2 sub-basions from which runoff / sediment flows in a Northeasterly direction, eventually reaching a low point at the Northeast corner of the building site. Flows continue easterly to the east end of "the Square" site. Erosion Control Measures: Erosion control measures will be erected in order to minimize the loss of sediment from • the site during the period of construction. These measures are outlined on the Erosion Control Plan and consist of the following: 1.) Silt fence to be constructed around the downstream side of the work site. 2.) Hay bale barriers to be placed in the swales on the northern and southern sides of the building. 3.) Topsoil stockpile to be temporarily seeded and hayed for the period of construction until it is needed for final grading and placement of sod. 4.) Parking lot to be cleaned on a regular basis. 5.) Sod to be placed after completion of the sidewalks and the frame of the building. 6.) Existing vegetation outside of the limit of disturbance will remain undisturbed until the building frame and roof are completed and the concrete sidewalks are in. At this time the existing vegetation will be replaced with sod or landscaping as shown on the Landscaping Plan. Conclusions: 1.) Wind erosion was not considered since the actual disturbed area is less than 1.0 acre. 2.) Based on the attached erosion control calculations for performance standards and effectiveness, the erosion control measures as presented on the erosion control plan • for Chili's at the Square comply with the requirements and standards of the City of Fort Collins. The scheduling of the project calls for the construction to be completed in a 2-3 month period. • Conclusions (continued): 3.) Based on an estimated cost for reseeding the entire site, which was provided by the City of Fort Collins Storm Drainage Utility, a security deposit requirement of $1,688.65 was determined. This amount has been deposited with the City of Fort Collins Storm Drainage Utility. Security deposits for Erosion Control is discussed in Section 2 of the Erosion Control Reference Manual for construction sites. References: 1) Fort Collins Storm Drainage and Soil Erosion Design Criteria. • 0 ;• - .o-.. . } A .. 11 �`, � '� r,y \., . .. el . c..w t `S r^•" e..�-..�. ,'. i �•.. 1 Icy., 1 a.�.�. u .I -- ..,r.. • r� �,.., ! i I r i .. l" l r •.,, 4 e � c. �. I `• I j t� � 4a I .� I I`+I � . + -µ� � fig � i ,.•,,� ,� : ,' 1 n .. • �{ i J1 ', � , .C. } �•,. ice. `�` � —' � ' .. I I ,�.�-i.° .♦�wi"�-:�;r�`! � I I 11\I IW-�/ �i � `.` �.�� ' ram' ''r. r',.. •.r.tt EFFECTIVENESS CALCULATIONS • PROJECT:2- r1L STANDARD FORM B COMPLETED BY: _ M66r5,0EN2 DATE: -Iq S2 °y Erosion Control C-Factor P-Factor Method La value Value Comment I,U 0,70 �T SU 1lS JIV\ x , . x -. S .``n' L 0 U, S f3 oil sdh ,. `h a0z i °f lFeNc� r,ss4 1. L6°� ca Ud„ - E. b.. sod) U.2'7 I UU (1ntA s+wh Arc x x SU90 X o .A Os.np1.1, 0•U1 LGO co�c4°,f001 0,95 N rd .T ,00 1,00 =A„I� MAJOR PS SUB AREA a, RY s1 Trr. ,,1,i or,n c°NS BASIN (�) BASIN (Ac) CALCULATIONS I .' �,.re. �lloUrvU1 = 0,56(,,3-1) = . G ,3S • i G.GQ',e 9,aA = 509o,(•31) c - C,,,— C6.14gx I,UL) ♦ (, 1$Sx U,01) +(O, Uqx 0,2�)a(0,4SX.JJI) 0.37 = 0.6 ,c 0.3Z EFF=4-cxr)x100cL—`93x,3k)]k100 _ $2•g �'ai o,3q Es+�6�,z�e,\ y�..//ss. �o.b)�o.1) = O,U6 ne YS Nr�,r°`d,N1� 0,3q-10,1'116,06) G.m) + w 0.39 o.3q = G,38�I • — 0,11 J �19 , 56 > 82,`6 0k J P,J, MARCH 1991 8 15 DESIGN CRITERIA • RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: 127U -0%-9Z STANDARD FORM A COMPLETED BY: DATE: DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) (feet) ($) M I R ffioaera�� 0,3-7 2S3 JTu%0 -1.-13 rm0�)er�}� p,34 39S 3,3% (ux.3,5%u� iS2, sti 56 13,�z,cls MARCH 1991 B•14 DESIGN CRITERIA CONSTRUCTION SEQUENCE PROJECT: CHILI'S (1270-02-92) • SEQUENCE FOR 19 92-93 ONLY COMPLETED BY: MEO/SHEAR ENG. STANDARD FORM C DATE: 8/27/92 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 92 93 MONTH I S 1 O 1 N I D I'J I F( M I A I M I J I J I A OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods . Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters • Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other • VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mate/Blankets Other STRUCTURES: INSTALLED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON' MARCH 1991 8.16 DESIGN CRITERIA APPENDIX C • Agreement regarding detention requirements for "the Square" 0 RCPTN 9 85034305 07/16/85 11:21.45 1 OF PAGES - 4 FEE - '=2.)11 $.00 J. ULVANG, RECORDER - LARIMER COUNTY, CO. DOC. FEE- • A G R E E M E N T ' THIS AGREEMENT made and entered into this ;S day of January, 1?7:, by and between HCI, I!:C., a Colorado corporation, 6 'hereinafter designated as the "applicant", and THE WARREN LAKE RESERVOIR COMPANY, a Colorado mutual irrigation corporation, hereinafter designated as "reservoir company". PROJECT: Construction of a shopping center development located east of College Avenue and south of East Monroe Drive and north of Hcrsetooth Road, in the City of Fort Collins, County of Larimer, State of Colorado. • - WITNESSETH: I WHEREAS, reservoir company is the owner of a reservoir known as Warren Lake, and such, company is presently being required b': the office of the State Engineer of the State of Colorado to a%a'certain changes and improvements, including but not limited _c the erection of a spillway, to comply with State law and the r_c,-Iations of the office of the State Engineer; and W-EREAS, the shopping center being developed by applicant will increase the volume of: flow of water within a given period of time into this reservoir, thereby requiring additional expenses tc the reservoir in meeting the requirements of the State Engineer's Off:ce; and WFHEPZAS, the parties hereto deem it mutually advantageous _c`.ave applicant assist reservoir company in the expense of the above referred to improvements rather than the erection of detention cr retention ponds for the orderly discharge of waters from such • development. NOW, THER.E?ORJ, in consideration of the premises and the . �i/ CL ... n� • --t_a! benefit to the parties herein, it is agreed as follo•.,s:- 1. Reservoir company shall accept the quantity and volt:-e of water to be discharged from the shopping center area and the :an:!s to the east thereof, presently owned by ELMER L. BRUNE and J. BRUNE, (the lands of applicant and the Brunes involve:: n _rn consisting of twenty-five (25) acres, more or less), develciec! __ to be developed by applicant and others, through natural channels no- existing without intervention of detention or retention ponds or other retardent procedures. 2: Applicant agrees to pay to reservoir company not less than Six Thousand and No/100 ($6,000.00) Dollars nor more than :1.•elve Thousand One Hundred Fifty and No/100 ($12,150.00) Dollars upon the following terms and conditions: (a) Applicant shall pay the sum of Four Thousand and No/100 ($4,000.00) Dollars to reservoir company at the time of the execution of this agreement and a minimum of Two Thousand and No/100 ($2,000.0o) Dollars more after the' cost of the spillway contemplated above is • determined by reservoir company. The basis Of payment to reservoir ' company by applicant shall be 8.11 of the total cost of said spillway tc reservoir company up to a total spillway cost of One Hundred Fifty T.`. c•_sznd and No/100 ($150,000.00) Dollars, with a minimum pay-.e..: c_ sox Thousand and No/100 ($6,000.00) Dollars. Applicant's total cash obligation shall not exceed Twelve Thousand One Hundred Fifty and `:c/'-00 ($12,150.00) Dollars. J. It is understood and agreed that there is a possibility _n the future of governmental bodies, either City, County, State or Federal, imposing quality controls on water discharge; and it is spec!`ically understood and agreed that this agreement does not re: -:eve either party hereto nor determine the responsibility for water Cuallty now or in the future. Reservoir company does not ass,_-.e'ary obligations for the quality of water being accepted -rider the terms of this agreement and reserves the right to pass' or to applicant, its successors or assigns, any water quality • _:andards which may later be _-..posed upon the water be!^- - r.- .. �'j � �./•��yr�i��FA4 �... h . 7 • THIS AGREEMENT shall extend to and be binding upon the successors and assigns of the respective parties hereto. IN WITNESS WHEREOF, the parties hereto have caused this aereement to be. signed the day and year first hereinabove written. (SEAL) ATTEST: T 1. Secretary (SEAL) ATTEST: wjIllam C. tovet, Secretary HCI, INC., a Col ono corporatio Eugen r 6. Mitchell, PresiCent THE WARREDI LAKE RESERVOIR COMPANY, a ColorpAo mutual irrigation corporat By Glen A. J011KS011, Presi e7cennt STATE OF COLORADO ) ) ss. County of Larimer ) The above and foregoing instrument was. acknowledged before • c.e this 45ti'day of January, 1978, by EUGENE E. MITCHELL, as Presided, and attestec to by JACK A. SHIREY , as ' Secretary " ' , of HCI, 1,N a Colorado corporation. Witness my hand and official seal. My Commission Expires: 'August' 5; 1979. (SS A.L) d Notary Public STATE OF COLORADO ) ) ss. County of Larimer ) The above and foregoing instrument was acknowledged before me this .'."/"day of January, 1978, by GLEN A.'JOHNSON,. as President, and attester to by WI LLIAM C. STOVER, as Secretary, of THE WARREN LAKE 'RESERVOIR COMPANY, a Colorado mutual irrigation corporation. Witness my hand and official seal. My Commission Expires • 14y Commission Expires September 28, 1980 Notary Public • WGA:, • 25, 1978 Agreement: A P.dr���t--1..,_ Pa�celfor January F Strachin,Subdi-vision,,_Second Filingort Collins, Larimer,_ on the North line t+' County, Colorado which begins at a point N 89° 45' 3D" E 111.80 of East'Horsetooth Road which .bears 15" W 31.62 feet and again 'N 45° 0feet•st aggain N 00° 27' fee feet from the Southwest corner of Section Tan W 26.14 34'25, Township 7 Narth, Range 69 West of the 6th P.N. and thence N 00° 24' run thence H 45'.34' 15" W '14.78 feet; S 89° 02' E 749.75 feet to a .`j: 45" W 518.67.feet; thence line of said Lot 1; thence along the point on.the East said East line along the arc of a 554.77 foot radius curve long chard of. . to the left a distance of 123.04,feet, the "28" E 122.78•feet and again S 23'. which bears S 160 44 05' 40" E 114.42'feet and again along the arc of a 400.00 feet, eet of 159.54 f, foot radius curve to the right a distance S 11° 40' 05" E 158.49 feet ktt- ' the long chord of which bears 5.00' 14'• 30" E 140.83 feet; thence along the '•'': and again of a 15.00 foot radius curve to the right a distance of S 44° 45' 30" W arc 23.56 feet; the long chord of which bears 30" W 811.90 feet to the point 21.21'feet. thence S 89°.45' AND ALSO a part of Lot 3,Strachan Subdivision, ' of beginning Third Filing, Fort COTlins Larimer ounty,Co ora o w is 2, Strachan Subdivision, ♦ 3 eglns.a a outhwest corner of Lot N 85° 19' E 58.78 feet; thence r" Third'Filing and run thence E 192.00 feet; thence N 440 45' 30" E 312.00 y g9° 45' 3o" S 89' 21' 50" E 203.60 feat; thence N 89' feet; thence 45' 30" E •153.64 feet; thence S 45' 14' 30" E 215..feet; 00' E thence 11 89' 45' 30" E 83.00 feet; thence 5 of radius arc of a 298.80 foot radius 233.05 feet; thence along the distance of 198.17 feet, the long chord curvg'to the right a 18° 45' 30" W 194.56 feet;.thence along . • 1 ' of which bears'S 376.80 foot radius curve to the left•a distance of AS' 30" W the are .a of 249.90 feet, the long chord of which bears 5 180 a 15.00 foot radius 4: 245.35 feet; thence along the arc of curve to the right a distance of 23.56 feet, the long chord_. _ of whichs S 0 45' ah15�00Sfoot radius along2thelarcxof 23.56 feet, the long chord I curve to the right a distance of 45' 14' 30".H 21.21 feet; thence tl 00' 14' 30" W of which bears N 14033 feet; thence along the arc of a 348.61 foot radius 139.05 feet, the long chord curve to the left a distance of 1 W thence whIcfeet rthence°alongOtheWarc8of3af488.77foot radius0curve of which ;'of distancd*ofbeginning. containingeors lto the point gov`heSy�9hen"a15r.,24feet fq'vl r� %4 M!/MS I/iIt M1M rt'/.. M • j n S/L REVISIONS - —W- -Na h— o.eta I_II I II j1 I'll I I I'll II 1 1 1 II 1 a I II [ I II I II 1 1 1 1 I Il I 9 irP IS1 011 i j �ii I L11'. I t I I I I I I Is L tl I I 1 I I I I I I I I I i I tl I JJte_ JUKE 1992 2Q- 0 z � n l II I ENCE R1 ryWY BALES,TYR IONSTE WALIt. 1 I 1 i .I 1 I 1 I I- I 1 1 1- I .I 1 1 1 I 1 I 1 9 1 1 0 1 1 I I d 0 1 1 __ za IRLOSION COMICAL MEASUREEI r. Wfvucny iliWl b:irovllrtl brand rb= clime length aof ilk, "in me ei Au r � nF andag=uv ad tic cost -racy curb and inalcr mrnW iaaely cent f hea 1 he JI. I b W p 1 asidewalk fa budding ba d S. V Jnl J 4 ! J 0i War Otto ' v' iit a n m g b end , re Sa rtynv at he end nda e - -p , uM 1 III I At Ilened OR J &Lly un 15 All a g.r m r r y fn.en am afore car t curt wn uas s t findsoobeym Calla Herb Ind a d r ng irs ■.,'�'tl'I1I1 ALL sorkrudi (r an, off of Lark H l, FundL END Date argark to be da DO cube Dwar or tre advidern i WO,armdirsor Jr bill B .— —�9 JinpoWl udeblui, L. W 1 OAl11Y Wround cdli IN fn rbeprot ad odrestat ' SCNO 1'=IY rl DOb undrel ner III Visual;a a plancriDdIt nuked, 10 Red whNI d Ron, ",piaN, ,k Red take far ch. Dealing 1 11. Eaining sq'i ,It&or be Alml of J1111di Wll mand. cndLAIrk anril use baild'nr Ak ii,i Ii an co,pMed ad the e,n,k si,ki am ItNor arc ahrunm5 rcgutim will be replxed an m1 Or l'nuil ing as I., Art JU LnMpiry Hung I I I I I I J_ L' - —J L -- '- --_- s. ___�O-C_— -- - — -- _--- veNRISU.— an.e-- gi eiwexnrwe is sA l NEW, in" w WIN sY =e=rRan rMaHasc avpe `8 ILM M \ ps We ♦ O=IrJr O gY.♦l Ys J`J - -- � �YT .LLK 9 OitLlf'I 368.873 �e Cis— Ihl �I ORION*asks — ,kill Acksolk II II' - —III IIIL-1II — III III VI M Oris walk `M k WIND ot N RI ,.b y:fe..ae,aaa IOftnea. at 1 IF II III ^ rare .aM. haveng I wig I m at I"i n ul a ,earn I 11 in II 11 v II II b aa...a..ar.m Lml.. n n vi L..,mafmm.r II 11 Vi MIR ,a.r aa.e...rRare We age muLWv_... N tll II RI u m u RI u Ir. c 0 u n u u I 1 JIL 1 III II — tll I tll o tll MAIN ENTRANCE TO I THE SQUARE a EAST HORSETOOTH ROAD Ork °A°'r°' SHEAR ENGINEERING CORPORATION CNn+M B WS CHMITS, INC. MSY SO. COLLEGE AVE. SUITE 12, FORT COWNS, COLORADO W525 ESOSI H PROTECTION PLAN ,HILT S GRILL & BAR FORT OLLINS, COLORADO CIO a FORT COLLINS. COLORADO N UTILITY PLAN APPROVAL 1NROVED �l e a o+a»<..aw rand a[cKm cur HIM n Ilk I I,,, aml. �. NECKED Sf nr Hoot aaWux unun ue CHECKED RY eers wo •sOW'^-♦'wER W PROJECT NO. NO. r \ l27o—w—B2 6. 7 N W W O D oll Del MHN2 0 15 S/L LEGEND MAJOR BASIN BOUNDARY MINOR BASIN BOUNDARY I BASIN DESIGNATION OCONCENTRATION POINT ROOF DRAIN 1 I 1 1 II I I I 1 I 1 I I I I Y I I I I I r n I I I II II II I I r u u� p I I I � I I y F.ic 1\\. I Q. 5.9 f. " Q. 119,E 103 d. I i 1 .I z 1x 4.2 1 S« k D as T A A p A 1 1 1 os 5.1 sa am 125 3.1 0.24 I. 1 z 1.0 0-.1 so D aD ers oa 1 .I Hd.. mn...,N.Iu...wn3wvwP, J ' r,,'(111.111 I'I 1 1 1 I suu: raR I I I I I I L _ I I _ __ J L -- I - I t _ _ TO INLET AT EAST ENO WTHE SQUARE" B a E11 we Q SEE SECTION SNT-S DETAIL ON S3 OF T IS C, Ram max _ n IEEE SEC, R`YILM. ]OF � 1-AQ— e JUNE 1992 'nn., CADNON OUR a check I CFM•S, INC. �9®1 1 I 1 I 1 1 I 1 I 1 I 1 �q 1 I 1 1 I 0 27'WALK IN UTILITY MAIN ENTRANCE TO I THE SWORE" EAST HORSETOOTH ROAD SHEAR ENGINEERING CORPORATION M36 SO. COLLEGE AVE, SUITE 12, FORT COWNS, COLORADO W525 M Or Im twlNs, COUpuro UTILITY PLAN APPROVAL n J➢PPoVED m1u a uclNuw un CYLC[UO SO ABM NON � CHECKED 9Y \ WAS N OWED) 9 \ ,• w.rcw .aE .� PROJECT NO. SKEET No. AN 0 GN E - - M- _ GRILL & BAR I 1270-02-92 5 7 �LINS, CO RADO