HomeMy WebLinkAboutDrainage Reports - 09/16/1997r Fl;r;i'� ," ' Repor# PROPMTT OF a !o ' FORT COLUNS UTUXr=,, FINAL DRAINAGE REPORT FOR SAN CRISTO P.U.D., SECOND FILING LOCATED IN THE CACHE LA POUDRE BASIN 1 1 ' PREPARED FOR ' FORT COLLINS HOUSING AUTHORITY AND DAVERN INC. ' JULY 21,1997 1 PREPARED BY ' STEWART & ASSOCIATES, INC. 103 SOUTH MELDRUM STREET ' FORT COLLINS, COLORADO 80521 970/482-9331 1MI6 = 6 1991 V I 1 I I Table of Contents 1-2 Text 3 Vicinity Map 4 Poudre Basin Map ' 5-15 1988 San Cristo Drainage Report 16-18 Basin calculations ' 19 Concentration Point quantities ' 20 Detention Pond Outlet Pipe Calculations 21 Backyard swale along east boundary and pond spillway ' 22 Allowable Street Flow -2 Year Storm 23 Allowable Street Flow - 100 Year Storm ' 24 Erosion Control Rainfall Performance Standard 25 Erosion Control Effectiveness Calculations 26 Erosion Control Construction Sequence 27 Erosion Control Collateral Required Pocket 2 sheets Grading Drainage and Erosion Control Plan Drainage and Grading Design Plan 11 1 1 ' July 21, 1997 1 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil, $TEWART&ASSOCIATE$ Consulting Engineers and Surveyors The following is the final drainage report for San Cristo P.U.D., Second Filing which is ' located in the Northwest r/4 of Section 7, Township 7 North, Range 68 West of the 6th P.M., City of Fort Collins, Colorado. The P.U.D. is a portion of Anderson Place which is being replatted. San Cristo P.U.D., First Filing was platted in 1988 and has been partially developed. Houses have been constructed on 13 lots in the First Filing. ' The Second Filing is bounded on the West by existing Tenth Street, on the North by the Burlington Railroad, on the East by the future Lemay Avenue bypass and on the South by the First Filing. The site is in the Dry Creek Drainage Basin. The site slopes from Northwest to ' Southeast at an approximate grade of 0.6%. The Second Filing contains 6.26 acres. The total area of the combined First and Second Filings is 10.1 acres. ' . The detention pond was designed with the First Filing to provide detention for the entire two Slings. The required detention was 52,154 cubic feet and the pond as designed has a volume ' of 67,861 cubic feet. A copy of the drainage report and calculations prepared February, 1988 for the total San Cristo area is included in this report. This 1988 report calculated the offsite flows from Anderson Place and also the 2 year and 100 year developed runoff at concentration points. ' Also the required detention, the allowable release rate, and the volume of the proposed detention pond is calculated by this 1988 report. Only a part of the pond was constructed in 1988 to accommodate the runoff from a portion of the First Filing. Since the outfall pipe and swale from the pond had not been constructed, the amount of detention volume for the 13 lots was doubled and the pond has functioned as a retention pond. The street and lot layout for the proposed Second Filing has been revised from the original layout shown on the 1988 plan. A new overall plan has been prepared which shows the proposed new lot layout and which shows the sub basins per the new layout. New calculations are being provided for these revised sub basins and a copy of the revised grading and drainage design plan is included in the pocket of this report. ' The remainder of the pond will be constructed with the Second Filing and the outfall pipe ' and swale will also be constructed. The allowable discharge from the pond is 2.02 cubic feet per second from the First and Second Filings. This 2.02 cfs is the 2-year historic runoff from the combined First and Second Filings. The runoff from the offsite area will be passed through the pond and the total discharge will be 6.02 cubic feet per second. These release quantities were calculated by the 1988 report. ' James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 970/482-9331 Fax 970/482-9382 Final Drainage Report San Cristo P.U.D. Second Filing Page 2 The discharge will be through approximately 1400 feet of 30 inch storm drain pipe which will be constructed from the detention pond outlet to the existing large swale which runs to the east along the north side of East Lincoln Avenue. The Lincoln Avenue swale flows Easterly to Dry Creek in the street right-of-way. An overflow box is planned at the outlet of the detention pond. This box will let the allowable release rate of 6.02 cfs pass through the lower opening on the box, and will allow the offshe flows from Anderson Place to enter the top of the box at the high water line elevation. Calculations of this box and the flows are shown in the 1988 report. All flows will be carried from the box in the proposed 30 inch pipe. Erosion will be controlled with a sediment trap in the detention pond as soon as the outlet structure is constructed. Straw bales will be used temporarily at the entrance to the pond before the streets are paved. It is anticipated that it will take more than one year to construct the houses. The lots will not be graded or disturbed until the house is under construction. This report and the approved First Filing report were made in substantial compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. The grading and drainage plans are included as a part of this report. If you have any questions regarding this project, please call. Sincerely, Phillip I. Robinson, P.E. & L.S. rrc enclosures m yl main, 3 .. Canol � N u ° E. Vine Drive '! /pop= '.Truj. I — — �m� — — — Men. R o ez cT. Linden San c i -SAN _.CRI-$TO CD ter r -- - -- ,4,, - --- — — ---- --- Rom to t Buckiln ham St o ~ J Sr N y ro W 4f .. Lo nAv ■'1 J o , \ y ~ r 12 E. Lincoln Ave. ' 1, f or \\\ 4f Poll Pkwy 4o \� ain Ave. \ � si E Do St. \ E o t E. Olive v C t Dli St. �\ \\ Polval o \ � I olio St.' e \ \ M� T olio SI. Llnk Lane Ct G o N err dyrtle St \ ive on a \ ^�'4 el St. w 'lu St. EcIl le o D r \ Laurel Si , \ c o e \\ \\ o t. St. KCT'a — J Pennock Place c Qi Ric \Gp lizabeth H R a Id St. a gg \ a > Car St, o dw ds St. c h y� _ a Doctor's Ln to y SI E E y J o t ik 3 St. of W fds'rtl8\. J E w a Bucke eSt ; Bucke a c't E. it i Buc �. St. Nrl- '^tti it 5 EWART SOCIATE ST 8�s S Consulting Engineers and Surveyors STORM DRAINAGE REPORT SAN CRISTO P.U.D. ' San Cristo P.U.D. is a ten acre site lying just east of Anderson Place, and south of the Burlington Northern Railroad. The future Lemay Avenue by—pass will lie along the easterly side of San Cristo P.U.D. Tenth Street, which runs along the east side of Anderson Place, will be the west street of the San Cristo P.U.D. Tenth street is presently paved to ahalf width, and the pavement has a straight slope to the east. ' There are 'no .curbs in Anderson Place, .and, the east —west streets have inverted crowns which drain to the east. It appears that most of the Anderson Place development will drain to the east side of Tenth Street. This water presently drains south along the east edge of the existing_ pavement, although the slope along this east edge is approximately 0.2 percent so the run—off is very slow and there are puddles. When the ' east half of Tenth Street is paved, and the east curb is constructed, this off —site run—off from Anderson Place will drain through the proposed ' San Cristo P.U.D. into the new detention pond. The attached map shows the proposed drainage patterns and flow quantities at critical locations. There will be no off —site drainage from the north because of the railroad embankment. We propose to provide detention for.the San Cristo P.U.D. in the normal manner of detaining the difference between the 2 year historical run— ' off and the 100 year developed volume, 'as calculated on page 4. of this report. Since the Anderson Place development is draining into the ' detention pdnd, we plan to increase —the out —flow quantity by the amount of the 2 year flow from Anderson Place. These calculations are shown on page 5 of this report. James H. Stewan and Associates, Inc. 214 N. Howes Street ' P.O. Box 429 Ft. Collins, CO 80522 3031482-9331 0 The 100 year flow from Anderson Place shall be routed through San Cristo in the streets, and will enter the detention pond. These flow quantities are shown on the map on sheet 11. ' The calculated composite C factor for this site is 0.5 as shown on sheet 3 of this report. The required detention quantity for the San Cristo development is 52154 cubic feet as is calculated volume of the proposed detention pond is 67861 cubic feet volume. There will be an outlet structure to let the allowable outflow of 6.02 c.f.s. out from the bottom ' of the pond and to let the overflow through a grated opening when the pond has been filled to a depth of 3.7 feet. Sheet 6 is a mass diagram of the combined areas of San Cristo and Anderson I Place, and it shows both the 10 year and 100 year volumes. From this mass diagram, we see that the pond will hold the 10 year flow, and will activate the overflow after 20 minutes of the 100 year storm. The pond ' will not overflow the 0.8 foot freeboard during the 100 year storm. The 6.02 c.f.s. outflow and a maximum overflow volume of 15.8 c.f.s., ' as calculated on sheet 7, will be carried under future Lemay Avenue in a 24 inch R.C.P. After leaving the pipe, the 21.82 c.f.s. will be carried in an open ditch to the drainage way along Lincoln Avenue. This ditch will be temporary until such time the property it crosses is developed. ' There shall be a twenty foot wide easement provided for this ditch and flow calculations are shown on sheet 11. 1 Phillip I. Robinson, P.E. & L.S. _* 4502 A g, 7F CV1%) 1 1 1 1 _ - STEWART&ASSOCIATES COMPUTATIONS:- consulting En3irieers and surveyors ' 214 N. Howes St. Ft. Collins, CO 80521 (363) 482-9331 By: D i R Date Z 2-s Client: _ /fit ✓e5 —. SV r1 S Gr< Sheet No.37of 'hkd By: Date Project: -50 R C1-1 S-1-0 P. (J. _2. Job No Subject --+Orm ...Drcirna�P — Ca1cola-klrh �� "G--'x run-vfF STEWART&A SSOCIATES iCOMPUTATIONS Consu)tird EnSlneers and Surveyors 214 N. Howes St Ft Collins, CO 80521 (303) 482.9331 P/R Date 12L 1&Z Client: -'Fr- .Svrisei Sheet No. 8 of Sd By: Date Project: San Gri s+y P. (J. D. Job No. ect r-1'�•Uh Gr'!1<l CQ G a44On b. I ' U 073 I z) i l 30 1 I _ z 7i151� J 153,0 I i 1540 5- Cf i bo .. r, r . I Iri 7 I lu I. — -- — Z o -- -- — UJ W- I -- TL tica R zlo!i0 IB .tip STEWART&ASSOCIATtS COMPUTATIONS Consulting Engineers and Surveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 .By: PIEN Date --hi;J'90 Client: I —Sheet No. 9 of 1hkd By: Date Project: Job No. a n C� a 11 OL%/ L IET_e� 149 Ick r ef TC_ 4 IJ j.00 4.21 to Div ! _.l.Gt =._.�� .y� l.i4-)IC v�! � 7.��f.. L. I— -- � - —�---I Z in+5 e T_7 RL r7a ileII% 4c�_ CAI) 0%./, c;t 9 PIC 0 C 0 0­" r I Jef -cr cif;'J e_ El/ _V_ ell, lb)r� I LA A 4, 0 Vi IA/ _ C_ i X/T , , rv7 oi J, 47- 0.� 0 0- d 7- COMPUTATIONS STEWART&ASSOCIATES rr� EMineers aril Surveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 By: P J Fz Date 2 2G 8 Client: /4% W eS — Su as e f Sheet No.10of tkd By: Date Project: Job No. object O k-1 a' a - D r 'on Pon _ 0�r- run- o T4- av ,- 1 ' ` • / I . Q _..1.. tI p. y�iihp T s( I 1 I � ( wl I os zo..► s�.) 2 s I Zo_3. z 56.1 _IIa s GOT_�y.73 . ' .. ' 9 (� ZI � I,B01 I — I I� li _ f I I 1-- I i I ILLI 1L. • I U a U s 00 IP nr is >rllied b' re -I I I j I I i Iw I L L... . ._1 - ._. ._... _ .. i. _. 7 Q I I 4 I 'SoO��-- I I I j ' _ _ 1 - I I f I j � ' w � � I i' •� - I�I I I I II 1 I 1 I 1 I 1 .. I ' zsoov.. gee I I ¢ 0 i i ! 1 I I I Ti'.me 'lM 'loinuel i o z s 4U 60 ' 70 IZU 18U STEWART&ASSOCIATES COM, PUTAT IONS GonsultitEngineers and Surveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 By: PIS Date Z508 Client: PcG-e5 - -Sunse4- Sheet No. of kd By: — Date— Project: -501r) Cr-its-4-0 Pup Job No. Subject S+07-`l Dr-c;(r) aGe 0 6) �(O L,/ 7 0 0 C 10 0 4v -ck -r-L—L —1--i 1 A -1-1- --i I -A f- -34 i�ilili:t7r J. J J - /- ... lVV _J —1 J ?0 (p - - - -- :,"-, 3. 153 :51�- J TH 100 )> o -fs i �e-! �O� I C! por'd, �P-O;zd e ion OV -C -'T rr elk Xq[ C/ 0. -�-s 0- aS5U�,Ae-d :6tyley aAe; o fr ZOO er)(n 1 I; I i I �_I I I i . .. 4 ...... 7—A'1, V 1'4i4.!4 T-� ell,4 J��IS jG box 4i j'q�� e �y �Q17_.j .,.. I_._.. ' i j _ �i �she,e>L �1/' ) - ----- ---- Te e-4 fh!_:..F i I� -leiV 310 4-1 0 pe�t 0 JW Oi 105� C STEWART&ASSOCIATtS COMPUTATIONS consulting Engineers and Surveyors 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 BY: Dbte-"/&& Client: HQ_ weK- �Ur-)_ge+ Sheet No. JZ of 1hkd By: —Date Project; S52m (friliQ Job No. Subject r7,.-:- 4-?� r-i o 4 and k1olum 61 e-(=JrU1c;t-�Jov) and 0()4--P(jV/ C rA :Ob+e Le-) kja'!-kop? I =1 5L2317'0 I J e 'A ---- -- ----- -- III i A 1+1 o ei J _J_ .39 0! ZL 14" 0-7 1 01 t'e'flaw 4-0. 1_6 z jreeboard -- ----- ------- ---- A F FF-t I a WHI Old i.(� JiJ V !f(Jslh v In! --- II v 1^/1 .... .. . 0 leur5 .1 T­ 11 V=- M '9 4�1 �./4! V! 1 J ---- -- o. 5 C4-- 1 04 r'q( PCX I - c 10 u(!k4J&W' I VAII) rir e f4 ;-I Pv Ae 6, 78C I J vo.. _J 10p__ Ckg'3r k Qf_16 �eorv. 1-5 'J Q 00 v 0118 NIA Ix :F J W � p t .w `'� O N `'� o � 4�3 o N o o V H O O O O O Q O v � rV u�•. Jam- M OrJ t co V- V a S ^! eT- 5 N e � 4' h t J * < 6 +o y r U ,� U e L �1 t v +.Q p� V1 v uo v +e h o 1, 0 r o h V W V1jw h4 J o a t 2 L 4War Vlv 6LL� ly C� �� �� w "1�— 05 Ll 4� Q 41 c9 �j a ;F J W O � o to O O l`j 1n lJ- 1Mr rl\rl — M to , I' so M a m - T u V p Y � _ I� M O pj Mrlj M N N + M + + O + N Vv Z1� vac y oHF o�� Jr�j 0 �s �3 p { LLJ dtc 0.1 H] f VV v V C O. Ij� r^p' �V1 c K W �Ql ) D c V-�ofF h�.c hI� ^0� O O a a iQl°� �•1 i od i1 W �@1'A �—@� 1 <� .0 1 v� l Ill�cy I�• o 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 1 . IS 1 D.PROM p i-IILI3Gr.x b n^ t a'•a 6ALWA.IE; 'a�i ANWH - T.I olnN � `T\ TO G- 3- LON6-1"w3'•fl • 1 ^ — PN6�[3 ]V OG' ODI-]a � 1pF [ILV K.]9 � I•�. sa�E ] bJ•el�s>®tIl nY _ C�O'Uf IImiUIullr 1RIN �, . L LJg J Juts r SNOWS mum NIL L41 I WE a Lu�l w 60 01 r .Ll NT1i. _._STR C.7 t T A. 1II i io zJIS swr i , gal I1 � Q DP G 'AI R 'p IQ I I u �2.7e A.i II Z I v I _ _ •t*.e r�� n• SEcTI ON q-A - e' . I _ b A[[[ro nI[ Z O I, � W 6 a' 6 O.. G.02 ail t[ J �1 •• N •� 034� D - � : O OP [ z — A I O � p.. y� . _ SICTIGN o- o ♦ IN MS'LA OF I CM spa I N OF . o.rAl dlpiA FViURe:, I . L.AL[ Y M9.19M *" '. ... ,t[G p[AY AteVI s G O V j o 0 i T -qq" z t . JA6G 7.4OLE z Pde • 0.5 n �b/r I}Ir+ irsA n... d../NIp....l• zai.h J C d.1en}jen. cu. H. idd 47061 W ei pond b werVf/.e v c oo ra � o.e fi- Q aZ t; w Q i n rc � o W U � 3 � a53Z I I 0 STEWART&eiSSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: F/ R Date: 8J 2 I f Client: Ft C_ollms 14ous/„f Sheet No. Hof_ Project: S q n C r is fo P. l/ . D. Subject: I3asi ti Ca CV1i .-,<-Pon! T� = =1 0. I L.cra -q_�r�sa�4 i C-t-- g l o —117 _ t _ I _ I �TG r=z �a��r t_ !30' loverla„1 I 1,49ILI T i I7-FF-F I i +!� 1 ra—,_Z{zv�_�a�_�,1/-¢.,.wave I Zy3—! —% H �9.� �S_2) �- � ,.S���s d I l.lzk0.(��T, �((R _ [ £s I j I I I �. 0 I 1 I 1 I 1 I I I I STEWAU&O SSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: pig Date: s' 2 Client: Ff ColtinS Sheet No. 1of_ Project: cSan CiI 2(%5> Subject: j3QSin 6cxtcv1 a,4-i ont a 1,1MC %W.�g=MJhI 2r �G'i�_((,{ � z s� 19 �.3_—< AIN T i II �Jr.d�e'r + Ilill 0. I''I Iilii!11 n'- I .1�7 I ill uv - l t .3��--;;IC�I i .i _L_i__ • !__ i__1—co i• + }— — -- I — I —}- ! � ! i I _ �-44 I-���_� _ I�O!S.� f -r-- . I !! I I I I I FFI i 1 1 I 65i' 1 I I j �j Z_�1f -----r- 'e-ra F jJ_p ltTyO t Iv)' overly S-C ' tI-L: > —�•-I i � U-5 E_(U I M 1 r� _.—, U. s) ��i � f - I I I I I 1 STEWART&ASSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: P i K Date: �- Z 9 Client: r-f 6-o1/i n t 14OUT Inc Sheet No. of _ Project: an Gris4--v pU Subject:_ sasjr, C0Lrec'/0Jipn( TT o !er I ! _I G :0-O: [OIL [OIL III i��if�c i i z. _ I -- i ! i as/N I LJi I I ZIy�_ i Too i i i l Tl _L E YT- �f_ !-I J I3AS1 XIICI reoa /1-f�4—c I !I- c✓i.611 _1 ! L2V31_�iaxlri 6(.!'Gk_�—.. �.LQ. 2i iI 0• )- �)!� -_ .I zt 01. fI I }I l I I! I I I I I I I ! 1 i I III I ! ! I! STEWART&ASSOCIATES 103 S. PH 482-9331 FM , FORT COLLINS, CO 80527 Consulting Engineers and Surveyors By: P1rz Date: S Client: A%W101C Sheet No. of ' Project: Sot n Kr r t 4a (�. 1 Subject: Conc-e-4rat,4 on pO?'7-I I I 11 I I I I I I I I 1 I I I I I I.. CZ Sir 7-1 G Q�.LS ' l.� L i,lg�I } �4-.?)�5 E�t C�iUI(/ i 4tor =r��U� ci SS fr + 10_.i2 I I I _i- f [6_.SO i i k-- I i �--r-;--I i ; I i� 1_—i—' I- ---- • (� Z..S_� colRR! G2Lzl-13 z G%..i.YU-Z__Cctrf!i QH/ � + .3 1 I ,i¢_LI � i t_lTtG I t I_l*L,$b-: ti 4-1'SL� Ijt-= i2,g7 -�ss-t �� -T� mil I � II iI ! f TB C I fZ I I_ L 4 . I I i Qloo -- 9. eZ + 4;.3q + ,o. s- = Z6.71 c-Fr I 1 i 1 1 1 1 i 1 1 1 1 1 1 1 1 1 11 1 STEWART&ALSSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: P/R Dater Client: Fi- 6olliej (io✓ri^c Sheet No. ZO of Project: San ��riS�O �w ri. Subject: Deejo, Pot L O✓f-le> pipe CAll,- Plm Cavaai�v �= rae�ini9* I I' �LoU�A'l7_S_ I LZ 0 `_, } U 4�Df l t o10Z i ����. I�If 0�4 V_I ' .L' 1 ✓ oar V_; I i—!-J _ — F - I I I IT j a: � � 13 V� I I H I _' !` i - C0_i; a,Jz � _�' t i I z-s�4.q I I f t�s--cs 4 I I I I ``�VL I I I I I l l ' _. xi,- I I I I I II I I III I I I I 1 I 1 11 1 1 1 IL I I I I 1 1 I STEWARF&ASSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: }' 1 R Date: ��_ Client:FI Co 11 i ns iig es r r Sheet No. Z 11 of Project: Sa h P U D Subject: I3a r1c tz.. _._. G�,w13(• d i G oG = 061cf_— �... _ I I I I 115r EfMT I I I I I I IL44 ' Igl'f0 I I i I� I I I ''�:_ ' .�r�ta• � � � ! s -{' �,PPPP�=_ �"4 % 1 /.�a-q3� �3 : 004 � s��,.�L1.�:3_i T 11.33 1C1 Inl I ' ►� =' as �l! I I 7 1 ,u000 i'- ,6.3_ � L•331j - I I g,g=� ' s " I ! w Il c: y I /33._ p� I 1001�1- !� I 1 _!�It� I Is1�0i �� _ � � j7ercGn _I _ _ /10_ -- III7 I!I I 1 I I I! h i l l l� i l l !� 1 1 I II p,'S I� I I ( I ( I! I I ! I I I i! I I i �.__L__! J_._- �_. I I i 1 LL�.✓.4Y_,___Ei E_l/ 4_i. U I ! H.4—! � �O.�hee• 1. �2 ILA IlLV cirYrv� i '✓fs�-f�C-�V�ri .TJa✓ �ticerso_ O-�}-�i-1,e, q� rOpo� lv✓ ;ro.r o San _e ' i2�I— � i c I O_XGc�paGr' Grl i 1p- - 4 ax'.�.✓�.I I a f,�_O *f a��rl(ow i I s r Q I I i I 1 1 1I —I USA 7- r-Id' e_il.,! o 'r _a — 1= 0.. z 'T_I- 3�z ifJr*l(iN ai Sp rrwe C _0.TdGrE1/oT� I Tv' I I I Early _ I I II I 1 !, 1 11 1 1 1! l 1 ' COMPUTATIONS _ Stewart & Associates, Inc. 103 S. MELDRUM st Ft. Collins, CO 80521 (303) 482-9331 Date Client Sheet No. 7_ of Jkd By: Date Project: Subject i-)LL06/.4B GUTTER' F1 ow LOCAL_ STK FT / IT/AL STORM LZ Y I�ZF.�a.. �1.�.. L -. s 4vbi height! �dtw4 duet) ; L I_J -f i So01 I I' i I r. I ' I i I 1 -SLOPE; . Q!7fteore�lcG,l 1�� ¢:Lrlon �U. 0.7� I4.g• � I i ;vJ7T U. `r X. 13 1 I I �B 2. 3.o X q.12! 34-14 S.O 39;5 i I O.g!8 04 7 0 r ¢Sr5 ! 33 ; .zh I... I : f � COMPUTATIONS ' Stewart & Associates, Inc. By:Date Client:_ ... 103 s. MELDnu sr Ft. Collins, C0 80521 (303)482-9331 No. 2 3 of Chkd By: Date Project: - — - - Subject ALLOVIa)FLE PLOW /N LOCAL S7FEETS - IOC) YR S70ZM i SLO�� � �Q' TiiPore�-cGl L._I.. �eclv��i U G 121': ! ! I 0.0 0.:9' 'Zo : ' l '9-8, 9 - I - I•� 7o. I ! 199.E I i 4 T ! z1o. a - 2,a 7 ' 2Z2.GI 351.Q 6"0� 38�•C '.. 7. 80% Oi off. i- vi B'. i - -1 '72, _J ..4-0 o 0.33; =0.0 Z: /iLLCNIAB C E 77.,0. c�1 112,3 'c �f /ZSG GTr 156.9 cif�f 168.5 cTS 177, 6 c;- f 186 2 C- Ts I9,1-8 �sJ l(33. l c�1 /G8.•S cf /53.8 c" /3 7.0 c=s I ZZ.0 c 5 I u IN RAINFALL PERFORMANCE STANDARD EVALUATION --------------------------------------------------------------------- PROJECT: ,S'AM Creilro P. U, D., Xeco.vo Fiii,v& STANDARD FORM A COMPLETED BY: IZ .44 - -- - DATE:_ FEa.2od9� DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBASIN ZONE ac) (ft)• (%) (feet) (%) 0 ) SE GOUD MCDEZATE L.ZIAc. /OZO 0.44 /0?0 O-¢D% 0 1 1 1 1 Z5 EFFECTIVENESS CALCULATIONS PROJECT: SAwCew'>o PV.D., f6 vivo, Fu./,1lc STANDARD FORM B COMPLETED BYA, DATE: Fen 74/49i Erosion Control C-Factor P-Factor Method Value Value Comment BARS Gew/v�> I,00 1,00 3.17AC. x E,sT/N6 la.2Arr 0.07 1,00 3,12.Ac. SeD/ME 'r 84r,,v h o o 6. so SrZA ,v 13 A C ES /. Oro G, Q a 'SILT /ceuce! /r00 0.50 RG-SeEC BASIN ($) BASIN (Ac) CALCULATIONS FIL/qL WTo C = (/�o-vx 3•/7) t(b•0�x-3.1L� 6,z9 W7D P. = O•SO x0.80 = 0,¢-6 FF = E /-- (O, 539 X 0,4-0)] X /00 OK �>7z.'7 1 MARCH 1991 8.15 DESIGN CRITERIA ' z� CONSTRUCTION SEQUENCE IOJECT: Sqh Cr-fs -o P.U. D. STANDARD FORM C I UENCE FOR 19 ONLY COMPLETED BY: DATE: Aprd ITT7- icate by use -of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for 1roval by the City Engineer. YEAR 97 MONTH S f S l X� S 1.0 I I D l s F OVERLOT GRADING - UD EROSION CONTROL Soil Roughening Perimeter Barrier Sill• Fe.rr ' Additional Barriers , Vegetative Methods Soil Sealant ' Other ' I NFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin 'Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing 'Asphalt/Concrete Paving Other 'VEGETATIVE: Permanent Seed Planting 'Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mate/Blankets ' Other ST`ICTURES: INSTALLED BY MAINTAINED BY VF■■ TATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON 1 MARCH 1991 9-16 DESIGN CRITERIA I 1 1 I 1 1 I 1 1 1 STEWART&ASSOCIATES Consulting Engineers and Surveyors 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 By: ;DJ R Date: 8' � G Client: Pf Cofi nJ d ollsihc Sheet No. 2 7 of _ Project: -Sa r, Gris%u P - U . D. Subject: C—rosi o n zfo n lro / �Ul�a eTa. c{, anL I �;_e _f 2__ptr�75��� _(_� J� i�� !CUs� I1 I ! I TSecoh�_i itte�_ ��-I-'set IG!.Z9 Fi i III I 0.�rc� T j I iit _MOLL L}iL j—IZECZUlTZE.D —;—;_T..,�. =! �...5 X—�t -- I ! i I I -- I I! I I -FT- # 1 1 l I( I I I I J I! I r-