Loading...
HomeMy WebLinkAboutDrainage Reports - 07/13/2005ail nI-11f � AMENDED FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HARMONY SCHOOL SHOPS 3RD FILING LOT 1 J J R ENGINEERING 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 AMENDED FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HARMONY SCHOOL SHOPS 3RD FILING LOT 1 Prepared by JR ENGINEERING 2620 East Prospect Road, Suite 190 Fort Collins, Colorado 80525 (970) 491-9888 Prepared for Capital West National Bank 2850 McClelland Drive, Suite 2400 Fort Collins, Colorado 80525 June 3, 2005 Job Number 39445.00 ' June 3, 2005 1 1 1 1 1 Mr. Basil Harridan CITY OF FORT COLLINS Stormwater Utility 700 Wood Street Fort Collins, CO 80521 J-R ENGINEERING A Westrian company RE: Amended Final Drainage and Erosion Control Report for Harmony School Shops Third Filing Lot l Dear Basil, We are pleased to submit to you for your approval a revised Amended Final Drainage and Erosion Control Repoli for the proposed Bank on Lot 1 of the Harmony School Shops Third Filing. This report has been revised to satisfy your comments dated May 9, 2005. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria dated May 1984, revised April 1997, and the Urban Storm Drainage Criteria Manual dated September 1999. We greatly appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, JR ENGINEERING, LLC Pre/s/ep pared by, C. S arone PEngineer ' /attachments Reviewed by, Lee Watkins, P.E. Project Manager ' 2620 East Prospect Road, Suite 190, Fort Collins, CO 80525 970-491-9888 • Fax: 970491-9984 • wJrengineenng.com ' TABLE OF CONTENTS PAGE ' TABLE OF CONTENTS................................................................................................................i ' 1. INTRODUCTION................................................................................................................ l 1.1 Project Description.........................................................................................:...........1 1.2 Purpose and Scope of Report ...................................................................................... I ' 1.3 Design Criteria & Methods.........................................................................................2 2. LOCAL HYDRAULIC ANALYSIS FOR DEVELOPED CONDITIONS ..........................2 ' 2.1 Proposed Sub -basin Descriptions...............................................................................2 2.2 Hydrologic Analysis of the Proposed Drainage Conditions.......................................3 3. STORM WATER FACILITY DESIGN...............................................................................5 3.1 Pond Description........................................................................................................5 3.2 Water Quality..............................................................................................................5 t4. EROSION CONTROL.........................................................................................................6 4.1 Erosion and Sediment Control Measures...................................................................6 ' 4.2 Dust Abatement..........................................................................................................6 4.3 Tracking Mud on City Streets.....................................................................................6 4.4 Maintenance................................................................................................................6 ' 4.5 Permanent Stabilization..............................................................................................7 5. CONCLUSION.....................................................................................................................7 ' 6. REFERENCES.....................................................................................................................8 APPENDIX A MAPS AND FIGURES APPENDIX B HYDROLOGIC CALCULATIONS APPENDIX C DETENTION POND APPENDIX D EROSION CONTROL CALCULATIONS 1 1 1 ' Amended Final Drainage and Erosion Control Report Page i Harmony School Shops Third Filing Lot 1 June 2005 ' 1. INTRODUCTION 1.1 Project Description 1 The proposed Capital West National Bank facility is a 1.16-acre commercial development located at Harmony School Shops, Third Filing, Lot 1 in a portion of Section 32, Township 7 North, Range 68 West of the Sixth Principal Meridian, in the City of Ft. ' Collins, Larimer County, Colorado. The development area is bounded by the existing Sunstone Village Subdivision to the north, Timberline Road to the west, an office ' building complex that is currently under construction to the east, and Milestone Drive to the south. A vicinity map is included in Appendix A. 1 1.2 Purpose and Scope of Report ' The purpose of this study is to amend the Final Drainage and Erosion Control Study ' prepared for Harmony School Shops Third Filing by the Farnsworth Group dated February 15, 2001, last revised July 31, 2001 and analyze the stormwater drainage ' conditions that will occur as a result of construction of the proposed bank facility and associated parking and landscape areas. The scope of this study includes the analysis of ' the stormwater drainage design for a drainage area of approximately 1.16-acres. The following items shall be addressed in this report: ' • Narrative of previously approved and proposed conditions with calculations to ' substantiate derived runoff curve numbers. • Calculations of the previously approved and proposed peak runoff rates for the ' 100-year design storm. • Complete design of detention pond and concrete weir to maintain the previously ' approved release rates. ' The primary design constraint for this project is that the proposed drainage design serves to maintain the previously approved stormwater runoff rates. ' Amended Final Drainage and Erosion Control Report Page 1 Harmony School Shops Third Filing Lot 1 June 2005 r-. Lei 1 I 1 I 1.3 Design Criteria & Methods This report and associated calculations were prepared to meet requirements established in the "City of Fort Collins Storm Drainage Design Criteria and Construction Standards" (SDDCCS), dated May 1984 and updated April 1997. The new rainfall criteria as amended by Ordinance 42.199 were used for the 100-year design storm. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), developed by the Denver Regional Council of Governments, were also used. As previously mentioned, the primary design constraint for this project is that the proposed drainage design serve to maintain the previously approved stormwater runoff rates. More specifically, the development area has been divided into three (3) sub -basins under the previously approved and proposed conditions. Stormwater runoff generated by the first sub -basin flows to a trickle pan located along the northerly property line and ultimately to an existing regional detention pond located to the east of Milestone Drive, the second flows to Milestone Drive and the third to Timberline Road. The intent of the proposed drainage design is to maintain post -development stormwater runoff rates at or below the previously approved rates for each of the three (3) sub -basins. No additional improvements to downstream stormwater management systems, including the existing regional detention pond, are required since the design serves to maintain the previously approved flows. Further, the regional detention pond was previously improved under the original Harmony School Shops Third Filing design to provide the required water quality volume for the subject site; therefore no on -site water quality measures have been proposed. 2. LOCAL HYDRAULIC ANALYSIS FOR DEVELOPED CONDITIONS 2.1 Proposed Sub -basin Descriptions The development area has been divided into three (3) primary sub -basins. These sub - basins have been designed to flow in a manner that is consistent with the previously Amended Final Drainage and Erosion Control Report Page 2 Harmony School Shops Third Filing Lot 1 June 2005 �I ' approved drainage patterns. These previously approved and proposed sub -basins have ' been depicted on the "Drainage and Erosion Control Plan" which is included within Appendix A of this report. The proposed sub -basins are further described as follows: Sub -basin la is located in the northeast portion of the site and includes runoff ' generated by the majority of the parking area, the building roof and the drive-thru teller area. The runoff generated from this area will travel via overland flow in a north -northeasterly direction and will be collected by the proposed curb and gutter and discharged to the proposed pond via two curb cuts. Sub -basin 1 a has been ' designed to maintain the approved flows to the trickle pan along the northerly property boundary and ultimately the regional detention pond. ' Sub -basin 2a is located in the southeast portion of the site and includes runoff generated by the landscape area along Milestone Drive. The runoff generated from this area will travel via gutter flow along Milestone Drive, will be collected by an existing inlet east of the subject site and ultimately conveyed to the regional detention pond. Sub -basin 2a has been designed to maintain or reduce the previously approved flows to Milestone Drive. ' Sub -basins 5a is located along the westerly portion of the subject site and ' includes runoff generated by the landscape area along Timberline Road. The runoff generated from this area will travel via gutter flow along Timberline Road and will be collected by an existing inlet north of the subject site. Sub -basin 5a has been designed to maintain or reduce the previously approved flows to ' Timberline Road. ' 2.2 Hydrologic Analysis of the Proposed Drainage Conditions ' The Rational Method was used to determine the 100-year peak runoff values for each sub -basin. Runoff coefficients were assigned using Table 3-2 of the SDDCCS Manual. ' The Rational Method is given by: Amended Final Drainage and Erosion Control Report Page 3 Harmony School Shops Third Filing Lot 1 June 2005 n LI' 1 L� 1 F 1 Q = C,CIA (1) where Q is the maximum rate of runoff in cfs, A is the total area of the basin in acres, Cf is the storm frequency adjustment factor, C is the runoff coefficient, and I is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration. The frequency adjustment factor, Cf, is 1.25 for the major 100-year storm. The runoff coefficient is dependent on land use or surface characteristics. The rainfall intensity is selected from Rainfall Intensity Duration Curves for the City of Fort Collins (Figure 3.1 of SDDCCS). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration t� = ti + tt (2) where t, is the time of concentration in minutes, ti is the initial or overland flow time in minutes, and tt is the conveyance travel time in minutes. The initial or overland flow time is calculated with the SDDCCS Manual equation: ti = [1.87(l.1 - CCf)L0.5]/(S)0.33 (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cf are as defined previously. All hydrologic calculations associated with the sub -basins shown on the attached drainage plan are included in Appendix B of this report. In addition the following table summarizes the results: ' Amended Final Drainage and Erosion Control Report Page 4 Harmony School Shops Third Filing Lot 1 June 2005 [1 1 [1 Design Storm Previously Approved Proposed Difference Release Rate (cfs) Release Rate (cfs) (cfs) 100-year Sub -Basin EX la: 5.4 Sub -Basin la: 5.4 0.0 Sub -Basin EX 2a: 0.7 Sub -Basin 2a: 0.1 -0.6 Sub -Basin EX 5a: 0.4 Sub -Basin 5a: 0.3 -0.1 3. STORM WATER FACILITY DESIGN 3.1 Pond Description The pond design was completed utilizing the Rational Volumetric (FAA) Method. As depicted on the associated design drawings, one permanent pond, Pond 1, has been proposed to mitigate the increase in runoff that will be generated by the proposed improvements. This pond has been designed to detain and release storm water runoff generated by the proposed improvements during the 100-yr storm event at the previously approved rate. Pond 1 has approximately 1,998 cu-ft of detention volume. The outlet structure of Pond 1 is a concrete weir with a 20" opening. The pond has been designed to detain the additional flows created by this revised site plan and ultimately release the 100-year event at or below the previously approved rate of 5.4 cfs creating a 100-year water surface elevation of approximately 4959.08 feet. 3.2 Water Quality As previously mentioned, the existing regional detention pond was previously improved to provide the required water quality volume for the subject site. Since the proposed design serves to maintain the previously approved flows, it is anticipated that the existing regional pond will function as previously designed. ' Amended Final Drainage and Erosion Control Report Page 5 Harmony School Shops Third Filing Lot 1 June 2005 [1 I7 F 1 1 it 1 4. EROSION CONTROL 4.1 Erosion and Sediment Control Measures Erosion and sedimentation will be controlled on -site by use of silt fences and a gravel construction entrance. These measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. 4.2 Dust Abatement During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance, which has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing nuisance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. 4.3 Tracking Mud on City Streets It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights -of -way unless so ordered by the Director of Engineering in writing. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required per the detail shown in the Erosion Control details, with base material consisting of 6" coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. 4.4 Maintenance Temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt ' Amended Final Drainage and Erosion Control Report Page 6 Harmony School Shops Third Filing Lot 1 June 2005 ' fences will require periodic replacement. Maintenance is the responsibility of the ' developer. ' 4.5 Permanent Stabilization ' All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation or other permanent erosion control is installed. No soils in areas outside project street rights of way shall remain exposed by ' land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/ mulch, landscaping, etc.) is installed, unless ' otherwise approved by the Stormwater Utility. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature and stable enough to control soil erosion as specified in paragraph 11.3.10 of the City of Fort Collins Storm Drainage Construction Standards. 5. CONCLUSION The proposed improvements have been designed with provisions for safe and efficient control of stormwater runoff in a manner that will not adversely affect adjacent roadways ' or parcels. Due to that fact that the proposed development will maintain or reduce the previously approved peak runoff rate for the 100-year design storm frequency for all the ' sub -basins, it is evident that the proposed development will have a positive negligible ' impact on the existing stormwater management systems in the vicinity of the subject parcel. I 1 Amended Final Drainage and Erosion Control Report Page 7 Harmony School Shops Third Filing Lot 1 June 2005 6. REFERENCES 1. "Storm Drainage Design Criteria and Construction Standards (SDDCCS)", May 1984, City of Fort Collins. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated June 2001, and Volume 3, dated September 1992. 3. "Final Drainage and Erosion Control Study Harmony School Shops Third Filing", February 15, 2001, last revised July 31, 2001, Farnsworth Group. Amended Final Drainage and Erosion Control Report Harmony School Shops Third Filing Lot 1 Page 8 June 2005 'J 1 r-. ICI I� I L 11 1 I.1» Diet 11►:I.1 MAPS AND FIGURES Amended Final Drainage and Erosion Control Report Harmony School Shops Third Filing Lott Appendix June 2005 J 1 1 1 i i 1 i i 1 VICINITY MAP VICINTY MAP HARMONY SCHOOL SHOPS THIRD FILING LOT 1 JOB NO. 39445.00 J•R ENGINEERING A w.sWw company 2620 Fast Rasped Arad SL1e 19D • Fat Cain, 00 fiC525 97D-49H9 • Fa Q -49H- 4. wwwn,rirw:r,,,,n I� i r APPENDIX B HYDROLOGIC CALCULATIONS Amended Final Drainage and Erosion Control Report Harmony School Shops Third Filing Lott Appendix June 2005 RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Harmony School Shops 31•d Filing Lot / PROJECT NO: 39445.00 COMPUTATIONS BY: JCS DATE: 412012005 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual Streets, parking lots (asphalt) Sidewalks (concrete) Roofs Lawns (flat <2%, sandy soil) Runoff % coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.10 0 JR Engineering 2620 E. Prospect Rd., Ste. 190 Fort Collins, CO 8525 SUBBASIN DESIGNATION TOTAL AREA (ac.) TOTAL AREA (sq.ft) ROOF AREA (sq.ft) PAVED AREA (sq.fl) SIDEWALK AREA (sq.ft) LANDSCAPE AREA (sq.ft) RUNOFF COEFF. (C) % Impervious Ex1A 0.95 41,227 0 22,977 0 18,250 0.57 56 Ex2A 0.08 3,546 0 Z425 0 1,121 0.68 68 Ex5A 0.14 5.915 1 0 1 846 1 0 5,069 0.22 1 14 Prop1A 1.03 44,868 0 35,750 0 9,118 0.78 80 Prop2A 0.04 1,917 0 377 0 1,540 0.27 20 Prop5A 0.09 3,904 0 643 0 3,261 0.24 16 Equations - Calculated C coefficients & % Impervious are area weighted C = i (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai s 39445=Iow.xls } 0 0 z _O N N z :Ez W Ir wZ 00 ci 0 U. FO N W (0 C C fC 2 C O) .y N 0 N C .O U 0 0 LL 0 0 2.^ U `o c� rn LL O e _U 0 J U U z Q+ccqq D = v Q II II II w c) a = Ol x O Co )o IT O) m 1 JR Engineering 2620 E. Prospect Rd.. Ste. 190 Fort Collins, CO 80525 RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 100-Yr Storm) LOCATION: Hamlony School Shops 3rd Filing Lot 1 PROJECT NO: 39445.00 COMPUTATIONS BY: JCS DATE: 4/20/2005 100 yr storm, Cf = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Point Area Design. A (ac) C Cf tc (min) i (in/hr) Q (100) (cfs) from Design Point Q If 00) (cfs) Q(1 o0)tot (cfs) 1 Ex1A 0.95 0.72 9.2 8.02 5.4 5.4 2 Ex2A 0.08 0.85 5.0 9.95 0.7 0.7 3 Ex5A 0.14 0.28 5.0 9.95 0.4 0.4 4 Prop1A 1.03 0.97 5.0 9.95 10.0 10.0 5 Prop2A 0.04 0.30 5.0 9.95 0.1 0.1 6 Prop5A 0.09 0.33 1 5.0 1 9.95 0.3 0.3 Q = C iA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 84.682 / (10+ tc) ° "" t3944500flow.x15 J APPENDIX C DETENTION POND Amended Final Drainage and Erosion Control Report Harmony School Shops Third Filing Lott Appendix June 2005 1 1 1 1 1 1 1 1 1 1 1 1 i 1 i I 1 1 1 DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: Harmony School Shops 3rd Filing Lotl PROJECT NO: 39445.00 COMPUTATIONS BY: JCS DATE: 4/2012005 Equations: Area trib. to pond = 1.03 Developed flow = Qp = CIA C (100) = 0.97 Vol. In = Vi = T C I A = T Qo Developed C A = 1.0 Vol. Out = Vo =K QPo T Release rate, QPo = 5.4 storage = S = Vi - Vo K = 0.84 Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67) rainfall JR Engineering acre` acre cis (from fig 2.1) Storm Duration, T (min) Rainfall Intensity, I (in/hr) Qp (cfs) Vol. In Vi W) Vol. Out Vo W) Storage S W) Storage S (ac-ft) 5 9.95 9.9 2982 1361 1622 0.04 10 7.77 7.8 4656 2722 1934 0.04 15 1 6.50 6.5 1 5845 1 4082 1 1763 1 0.04 20 5.62 5.6 6739 5443 1296 0.03 25 4.97 5.0 7449 6804 645 0.01 Required Storage Volume: 1934 ft 0.04 acre-ft' 3944500FAApond.xl s, FAA- 100yr 1 ' DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 1 100-Year Event LOCATION: Harmony School Shops 3rd Filing Lotl ' PROJECT NO: 39445 COMPUTATIONS BY: JCS DATE: 4/20/2005 1 1 i I 1 1 1 3944500FAApond.x1s,FAA-100yr JR Engineering JR Engineering DETENTION VOLUME CALCULATIONS Rational Volumetric (FAA) Method 100-Year Event LOCATION: Harmony School Shops 3rd Filing Lotl PROJECT NO: 39445 COMPUTATIONS BY: JCS DATE: 4/20/2005 2000 1500 E 1000 500 re 5 10 15 20 25 30 Storm Duration (min) --+— Storage--- Volume 3944500FAApond.x1s,FAA-100yr Project No.: 39445.00 By: JCS Project Name: Harmony School Shops 3rd Filing Lot 1 Date: 4/20/2005 Detention Pond 1 Contour Surface Incremental Cumulative Cumulative Elevation Area Volume Volume Volume ft. (sq. ft.) (cu. ft.) cu. ft. (ac-ft 58.13 0 0 0 0 58.40 1775 159.7 159.7 0.00 58.60 2445 420.2 580.0 0.01 58.80 2870 530.9 1110.9 0.03 59.10 3045 887.1 1998.0 0.05 Required Volume (100 YR) = Volume Provided (100 YR) = 1934.00 cu-ft 1998.00 cu-ft @ 59.10 3944500Basin.xis 3 7. 3 .Y 3 n II 11 C U U Z Y �i LL L y T � � h O a � ` o = L N X v U U rt X o Z� d XX a O E m v 9 U U � C II II _ d 0' V Y I 1 C 1 1 APPENDIX D EROSION COTNROL CALCULATIONS Amended Final Drainage and Erosion Control Report Appendix Harmony School Shops Third Filing Lott June 2005 I I I I I I @ [I I I I I I I I < ) �� K r /d )( me S( E ) waa w } !\ bee 2 7 j � ( �r L;- - / \ � ■ � 2 §[ «04 «a - §\ �� ;f =ƒa 32 �- 2§ \\\ kk\ &7g \]\ / § \ �\( \\\ 7 24) ® \cn \\\ ( b=a J\\ ( k �\\�� §§§ 222mto \; \k.6 rr~ CO) 3>>-9 {{ \\/ 2)$S« 2p] } \ w O O a 0 U z H a 0 U a 0 w ax cow W rA 00 xc F4 0 H In W V 0 0,0N 000 o vvin* lnin In mmmmm O o+rnONrnooa000 o avvvULi Li Ur tiLi v wwwwwwWWWW o WrnrnC rnl1 me Ornc�o,a+000 o VVvvvvvvvvvsrinlnln � mWWmmmWWWWWWWmm 0 Ir m m W o+ a+ o, c� c1 o� o� 0! m rn rn rn o� . . . . . . O. . . . o VvvvvvvvvvvvvvVVvvvv N m m m W W W m m m W m m m m m m W W m m Omvowow wrrrrrrrrrrrrCoco mmmW . . . . . . . . . . . . . . . . . . vvVvvvvVV1;41; VVVVVVvvvvV m W W m m m W W m m m W W m W m m W W W W W m m m m mNMVInInlnwwwwwwrrrrrrrrrrWmm . . . . . . . . . . . . . . . . . . . . . . . . . M� v v v v v v v v v v v v v v V V v v v V• v v v v cold co co commWm co co mmmmmmmm co Wmm woNMvvinInInInw0wwwwwwwwrrrrrr 94444 V 44 V of 44 44 V Vvvvvv 4 4 ; 4 ve m co m co m m m m co m m m m co W co co co co m m co m W m m vON riNMMV' V' V'vLnInlnIntnlnInInlnwwwwwwr . . . . . . . . . . . . . . . . M M v v V' V -W%' -W -Wv v v V' V' V' V' V' V' V' V' V' V' V' V' tT W m m m W W m m m m W W m m m m W m m m W W W W m m Ow m0."IriNNMnmmvvvvv V'd'V'111111LnInww . . . . . . . . . . . . . . . . . . . . . . . . . . W CO W m m W m m m m W W m m m m m m W m m m W W W m InNor- w0100HHr-iNNNNNMMMM. M. s7 d d V V . . . . . . . . . . . . . . . . . . . . . N M M M M M v V' V V 'tP v V' V' V V V v v V V v V' V V V m CO m m W W m CO CO CO CO CO CO CO CO CO W CO CO CO CO CO CO CO CO CO rimriMVlnlnwwrrrWWmmWmmrnrno0000 . . . . . . . . . . . . . . . . . . . . . . . . . . N NMMMMMMMMMMMMMMMMMMM V' V• V' V' V' OO W m m m CO W m W W m m W W W m m m m m m m m W W m w0 W Ori NMvv0In In ww ww to r rr W m m 0%M rI N N 9 M 9 M M M 999 99 M M M M M M M M M M M M CO CO W CO CO m CO CO W CO CO m W W CO W m m m CO m m CO CO CO m In Ir1.-Ilnrm00r4NNMMMV' V'-o V' V'InInInwwwrr W W CO CO Oo m W m m m m m W m W W m m m m m m m W W m O MNwm0lOriNNMMMVV'v V'V'vinlnlnlnwwww M C;. . . . . . . . . . . 1; 1; 1; r•1 N N N N N N N N N N N N N N N NN N N NN W W W W W W W CO CO CO CO W W CO CO W W CO W CO W CO CO m m CO to In to c% N M v In w r r r m m m 4. 0101010101 O O O o 00 . . ...... .. ... .. ... N 0% O O .� ri rl H .-1 ri r•1 r-i ri e-1 .-I ri ri H ri rl rl N N N N N N rCOCOCO0OWCocammWmW WComccmW W W WmmmW O V' In o M In w m m oN 00 ori rq NNNNMM M M en . . . . . . . . . . . . N co c1 o O. O OOO Ori 144 r4444 rrcoaomcoWmcommWmmWWWmmmmWWmmm In mNm rA -W In rr W 010 00r4 r4ri.-I r4NNNMMMMM . . . . . . . . . . . . . . . . . . . . . . . . . . . r•I w m m 01 0: c� c 1 0; c1 0; 01 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 rrrrrrrrrrrmWWWWaoCID mmmmWWWm O wMOV'r01orgNMMv V'InInIninwwwwrrwww . . . . . . Q. . . . . . . . . . . . . . . . . . . . ri wrrr9WWmmWmWWWmmWmaoWWWmmmrrrrrrrrrrrrrrrrrrrrrrrrrN N N N N N N N N N N N N N N N N N rl ri ri H 0o I'v rrrrrrrrrrrrrrrrrrrrrrrrr 3 p 00000000000000000000000000 OC9E4 00000000000000000000000000 azw.-Irocrlvinwrmrno.-INMVInwrmrnolnolnolno way- ririririrlririririrlNNMMVQIn ' MARCH 1991 DESIGN CRITERIA JR Engineering 2620 E. Prospect Rd., Ste. 190 Fort Collins, CO 80525 EFFECTIVENESS CALCULATIONS PROJECT: Harmony School Shops 3rd Filing Lot 1 STANDARD FORM B COMPLETED BY: es DATE: 03-Jun-05 EROSION CONTROL C-FACTOR P-FACTOR METHOD VALUE VALUE COMMENT BARE SOIL 1.00 1.00 SMOOTH CONDITION ROUGHENED GROUND 1.00 0.90 ROADS/WALKS 0.01 1.00 GRAVEL FILTERS 1.00 0.80 PLACED AT INLETS SILT FENCE 1.00 0.50 SEDIMENT TRAP 1.00 0.50 STRAW MULCH (S = 1-5%) 0.06 1.00 FROM TABLE 8B STRAW BARRIERS 1.00 0.80 EFF = (I-C'P)' 100 MAJOR SUB BASIN AREA EROSION CONTROL METHODS BASIN BASIN (Ac) Prop 1A 1.03 ROADS/WALKS 0.82 Ac. ROUGHENED GR. 0.10 Ac. STRAW/MULCH 0.10 Ac. GRAVEL FILTER NET C-FACTOR 0.12 NET P-FACTOR 0.79 EFF = (1-C*P)* 100 = 90.8% Prop2A 0.04 ROADS/WALKS 0.01 Ac. ROUGHENED GR. 0.02 Ac. STRAW/MULCH 0.02 Ac. GRAVEL FILTER NET C-FACTOR 0.43 NET P-FACTOR 0.77 EFF = (I-C*P)* 100 = 67.2% Prop5A 0.09 ROADS/WALKS 0.01 Ac. ROUGHENED GR. 0.04 Ac. STRAW/MULCH 0.04 Ac. GRAVEL FILTER NET C-FACTOR 0.44 NET P-FACTOR 0.77 EFF = (I -C*P)* 100 = 65.9% TOTAL AREA = 1.16 ac TOTAL EFF = 88.0% (£ (basin area * eft) / total area REQUIRED PS = 78.2% Since 88.0% > 78.2%, the proposed plan is o.k. 3944500erosion.XLS 1 1 1 i 1 1 i 1 1 1 1 1 1 1 1 1 i 1 I I i Harmony School Shops 3rd Filing Lot 1 EROSION CONTROL COST ESTIMATE JOB NO. 39445.00 DATE: 6/3/2005 FROSION CONTROL MFASI IRFS COMPLETED BY: ES ITEM DESCRIPTION UNITS I UNIT COST IQUANTITY I TOTAL COST 1 TEMPORARY SEED & MULCH ACRE $ 775.00 1.2 $ 901.84 2 SILT FENCE LF $ 3.00 605 $ 1,815.00 3 GRAVEL CONSTRUCTION ENTRANCE EACH $ 500.00 1 $ 500.00 4 INLET PROTECTION EACH $ 250.00 0 $ - 5 STRAW BALES EACH $ 3.25 0 S 6 SEDIMENT TRAP/BASIN EACH $ 500.00 0 $ COST $ 3,216.84 CITY RFSFFI]ING COST FOR TOTAL SITE ARFA ITEM DESCRIPTION UNITS I UNIT COST IQUANTITY I TOTAL COST 1 RESEED/MULCH (ALL disturbed area on and off site) ACRE S 775.00 1.2 $ 901.84 COST $ 901.84 SECURITY DEPOSIT $ 3,216.84 REQUIRED EROSION CONTROL SECURITY DEPOSIT WITH FACTOR OF 150% $ 4.825.26 0payky Q6w$ZK�3 S(f�KW—R F im���♦=mF �I, W �N ZU 1.5 RTYP. F0aw ergo 80.0, B• z M13-�0 3�0'y ELI 4959.08 Y 1[ M. SLOPE 1 Y aN ELEV 4 13 _ _ _ _ _ NIN' m > N jN o m K o pop BEIR FINISHED N HORIZ. (2 TYP.) a< J N U GRAVE Z AIR ENIHAMEO CLNC. Q J k1 Z 4,000 PS O 28 DAYS d U J Of N O D CONCRETE WEIR p WDC NTE aN O z w 20 10 0 30 40 Z `g SCALE: I- _ 20' LEGEND —9 ® SE SE— SILT FENCE W WK IP INLET PROTECM)N O ®O CGNSTRUCM)N ENTRANCE LL POND 1 NTN VEHICLE TRACKING CONTROL Fy 100-YR WATER BURPACE UUUv. tril SYSY.OB - 1934 ® SEDIMENT TRAP MA, mom PROYIII)ED (W—IFE) a I 1999 PROPOSED RIPRAP 6 LI ADESIGN POINT ' lot 1Di BASIN IDENTIFICATION 1O RUNOFF COEFFICIENT AREA IN ACRES y FLOW DIRECTION •u•uNN� DRAINAGE SUB BASIN uuuu� DRAINAGE SUB BASIN DEUNEATED BY PREMOUS DRAINAGE REPORT LAST REV JULY 31, 2001 PREPARED BY THE FARNSWORTH GROUP + i 100-M INUNDATION AREA s 04-3L.)3' NWN'E MILESTONE DRIVE `-- `-� -- PREPARED UNDER ME DRECT SUPFRNSIW OF O N Q VI ,j 0 A[415j II 2 (D W $� U oP: Wit[ Wijy� !y 8 AtED IV an 0 UVE Z CP 6 V oESTIOHAI•E�G � � A an 0 W. tFf WAMINS DALE ]RIES Z Pp1 NO OF edNF 6 A ENMI♦DWq Q H V) Cityof Port Collins, Colorado ~ O O Z UTILITY PLAN APPROVAL W J APPROVED: U 0_ City Engine. Dote ( Z Q O CHECKED BY: m W Wetw k Ybelwetw utility Dote U Z CHECKED BY: seoaa.. .mUnity Q' Q O ty � Z U CHECKED BY: 0! LNnt > Po.. Utility Dote p CHECKED BY: Pane A Re tlan Vale CHECKED BY: T aft Date SHEET 5 GE 10 CHECKED BY: mee JOB NG. 39445.00