HomeMy WebLinkAboutDrainage Reports - 08/24/1990-r�F,�fla. y� B/zy/90
STORM DRAINAGE REPORT
FOR
ONE PROSPECT P.U.D.
INCLUDING HEC-2 ANALYSIS
BY NORTHERN ENGINEERING SERVICES. INC.
l
PREPARED FOR
W.W. REYNOLDS COMPANIES
AS R991811 AUGUST 16, 1990
PREPARED BY
STEWART & ASSOCIATES. INC.
STORM DRAINAGE REPORT'..
ONE PROSPECT P.U.D.
SITE LOCATION
One Prospect P.U.D. is a replat of Lots 1, 2, 13, 14, 15 and 16 of
Prospect Park East P.U.D. It is located in the Northwest I of Section
20, Township 7 North, Range 68 West of the Sixth P.M., City of Fort
Collins, County of Larimer, State of Colorado, and is bounded by East
Prospect Road on the north, Midpoint Drive on the south, Specht Point
Road on the west, and Prospect Parkway on the east. The site is located
in the Spring Creek drainage basin. According to the FEMA map, which
indicates conditions before the Spring Creek channel was constructed,
Lots 2 and 3 of One Prospect P.U.D. are within the 100 year floodway.
The construction of the Spring Creek channel has moved the floodway into
the Spring Creek channel and off of Lots 2 and 3, but until such time
that the FEMA map is officially revised, we are required to design as
though the floodway was across Lot 2 and 3.
The attached sketch at page 4 of this report shows the One Prospect P.U.D.
site and also shows the surrounding streets and tracts. The Spring Creek
floodway, according to the FEMA map, is shown on the sketch.
EXISTING SITE CONDITIONS
The existing site is covered with sparse vegetation, and the surrounding
streets are all paved and have curb and gutter. There is an existing
drain Swale running west to east through the site. Concrete drain pans
are existing across Specht Point Drive on the west and across Prospect
Parkway on the east, which channel runoff water into and out of the
existing swale. The entire One Prospect P.U.D. site drains to this swale.
There is no storm water detention provided on developed sites or proposed
on new sites in the Prospect Park East P.U.D. development. This is
because the development is adjacent to the Cache La Poudre River, and
drainage swales have been provided to carry runoff to the river.
OFFSITE DRAINAGE ONTO THE SITE
Tract "A" of Centerpoint Park, which is presently undeveloped, but which
will be developed in the future under HB zoning, drains through the swale
across the One Prospect P.U.D. site. The area of Tract "A", plus the
surrounding streets which will contribute runoff, is 13.4 acres. 3.7
acres of this total will.drain directly into Spring Creek, leaving a
total of 9.7 acres to drain through the One Prospect P.U.D. swale.
According to Engineering Professionals' March 1988, Spring Creek drainage
study, the 100.year existing condition storm will cause a 75 c.f.s.
overflow of Timberline Road. This overflow will occur at Midpoint Drive,
which is the low point at Timerline Road. The included map at page 4
of this report shows the existing elevations along Timberline Road and
along the railroad. According to Master. Plan design, the 75.c.f.s.
overflow of Timerline Road will be eliminated by future improvements.
One Prospect P.U.D. Storm Drainage Report
August 13, 1990
Page 2
The 75 c.f.s. overflow will drain east a -long Midpoint Drive and that,
combined with the 100 year run—off from the Midpoint Drive right—of-way,
will cause an overflow spill into Specht Point Road of 33 c.f.s. This
33 c.f.s. will then be channeled throught the One Prospect P.U.D. site.
Calculation sheet 7 of this report shows how.we arrived at this quantity
of 33 c.f.s.
According to the Northern Engineering Services, Inc. analysis of the
Spring Creek flood flows, the overflow of Timberline Road will occur
more than 2 hours after the beginning of the storm, therefore this .
overflow quantity will not be combined'with the offsite flows from
Tract "A".
DEVELOPMENT OF SITE
This site will be developed as buildings and paved parking lots as shown
on the plan at sheet 12 of this report. The site has three drainage
sub —basins. The west basin plds the offsite flow must.be carried between
the west buildings in a drainage channel. The volume of flow between
the west buildings is calculated on sheet 9 of this report, and also
shown is a cross—section between the buildings. .
The central basin runoff consists of the west buildings roof drainage,
the central parking lot and the east buildings roof drainage. The central
basin plus the west basin and the offsite flow must pass through the
drainage channel between the east buildings. The volume of flow between
the east buildings is calculated on sheet 10 of this report, and also
shown is a cross—section between the buildings.
The third basin is the north parking areas and east parking areas. This
runoff will be added to the offsite from the west along with the runoff
from the west and central basin to produce the total flow across Prospect
Parkway. This calculation is shown on sheet 8 of this report.
Included with this report is a HEC-2 analysis of the flows through the
site. This analysis was prepared by Mike Jones of Northern Engineering
Services, Inc. Mr. Jones' report indicates that the flows will pass
through the parking lots and swales between the buildings with a minimim
of 1 foot from the water surface to floor elevation. Also, it shows
that the flow depth across Specht Point Road and Prospect Parkway will
be a maximum of 1.5 feet.
2
One Prospect P.U.D. Storm Drainage Report
August 13, 1990
Page 3 .
The drainage downstream from One Prospect P.U.D. will be carried through
a previously constructed drain pan, and the maximum flows will overflow
into parking lots adjoining this pan. The floor elevations of existing
downstream buildings are constructed above the maximum 100 year high
water level. The previous drainage calculations prepared for the
downstream sites used criteria which resulted in smaller 100 year flows
than we are now using. These larger flows will cause added depth to
the flow across streets and through the drain pan and parking lots, but
will not endanger any buildings.
Lots 2 and 3 of One Prospect P.M. are within the Spring Creek overflow
floodway per the FEMA map. Lot 1 is not in a floodway or flood plain.
The FEMA maps do not reflect the revision made to the. Spring Creek
channel, which physically eliminated the floodway from the One Prospect
P.U.D. The FEMA map must be revised to show the floodway elimination
from Lots 2 and 3 before any buildings can be constructed on Lots 2 and
3. We propose to construct the'two buildings on Lot 1 and pursue the
revision of the FEMA map so that buildings can be constructed on Lots
2 and 3 in the near future.
We hereby request that a variance be granted from the Storm -Drainage
Criteria maximum depth of cross flow, in Specht Point.Road and in Prospect
Parkway. The calculated 100 year cross flow in Specht Point Road .is
1.5 feet and in Prospect Parkway is 0.6 feet. We believe the variance
is warranted due to the facts that the streets, including curb, pavement,
and cross -pans are already existing, also the cross flow velocities are
very low (3 f.p.s. across Prospect Parkway and 0.3 f.p.s. across Specht
Point Road), also both streets.are only one block long and will have
access for emergency vehicles from each end.
Phillip . Robinson, P.E. & L.S.
*; 4502
�� J!•. o F & �.5
OF CO Z,
�nnnn��
3
►1
all
1
w C
0
CREEK"
�e�
C,o,s-r P os-PFc.
0 1�o�D
Q
LOT l_ r CE7J7cpalNT
LOT Z LOT3' 0.ul
M lS7P0/NT c'7v
_ nEtz CURRENT FEMA MAp
" 4¢
CS v
I
i
I
%L
N�
0,�o-s
4
Q
z
of
w
e
.Q