Loading...
HomeMy WebLinkAboutDrainage Reports - 07/07/1995June 6, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil: STEWART&vSS0CWES Consulting Engineers and Surveyors M Wr �`Jijf Re: Erosion control procedures proposed for the construction of two building pads on Lots 2 and 3 of One Prospect P.U.D. at Prospect East. The W.W. Reynolds Companies desires to construct two building pads for buildings to be constructed in the future. These pads are located on the north side of Midpoint Drive between Specht Point Road and Prospect Parkway. The area is in a high rainfall erodibility zone and in a moderate wind erodibility zone. The pads will be constructed with structural fill, and the pads will be left in a roughened state. An existing low area in the northeast comer of the site will be filled with dirt, and this bare dirt will be straw mulched. The erosion control calculations of the performance standard and of the effectiveness are shown on the attached forms. The erosion control collateral is calculated to be 1989.00 dollars. The pad construction and the erosion control procedures are shown on the attached grading and drainage plan which was prepared in 1990. - Please call if you need more information. R%. wy Sincerely, 01. R 61�,✓ _ /§Q •.••••• Phillip I. Robinson, P.E. & L.S. 45 O 2 Vice President rsc enclosures James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 RAINFALL PERFORMANCE STANDARD EVALUATION ------------------ ------------------------------------------------- PROJECT:. LoT3 .2 3 of ONE PROSPECT P.V O STANDARD FORM A COMPLETEDAY: DATE: ---------------- DEVELOPEU ---------------------------------------------— ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBASIN ZONE (ac) (ft). L o-rs z 1-3Nth 31zG -- 0 7 ------- 5CO 1.0. ------- 77.8 ------------------------ --------------------------------------------- nriw.A. q EFFECTIVENESS CALCULATIONS -------- ------------;------------------------------------------------- PROJECT: LOTS Z 3 or- 0A/E Pup STANDARD FORM B COMPLETED BY: DATE: I Erosion Control C-Factor P-Factor Method Value Value Comment ----------------------- Exis� Je�� a�i:c�... ------------------------ 0.04— I.OG 70 c0ve, e0wy.ele� s}r, F111 0-50 1,00 bare 570 i.l 1.00 - 1•00 pavcl�-e- 4- 0,0( I_ c.0 en sf. drrv�w -511 - .-'e^cc /1 00 0,s0 M U cf:LSO i I (Af0,fec4 4.O G I oG ----------------------------------------------------------------------I MAJOR PS SUB AREA BASIN (q) BASIN (Ac) CALCULATIONS 77.(5 --- ------ .2�0 ----------------------------------------- C - xis OIeSe�Q�io�I 1,oSA _; Gow.paGt'e� SfrVGNr n� i-1�� O.Pi` �iG bare sod 0,95 Ac pa V(?-m C Ai 0.17/ e mulctINd 0,Z3 Ac �0.7-3��O.�G FE r F 0 0,,4.4-x. S) x 10U = 787 6 E ---------------------------------------------------------------------� I/SF-B:1989 CONSTRUCTION SEQUENCE PROJECT: LOTS Z � 3 OF ONE PROSPECT i()P STANDARD FORM C SEQUENCE. FOR 19 9 S ONLY COMPLETED BY: DATE: 6 S Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR. --MONTH ------------------=- ----- OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other /MV%c,� RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other Mold VEGETATIVE: Permanent Seed Planting Mulching/Sealant.-, Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other STRUCTURES: INSTALLED BY ys .. �' is IRIS Id IA,)19 I VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HDI/SF-C:1989 APPROVED BY CITY OF FORT COLLINS ON ------------- I I I I I I I I I I I' I I I JANUA Y 1991 8-20 DESIGN CRITERIA STEWARZ$ SSO OATES 103 PH. S. MEL9331 DRUM, FORT COLLINS, CO 80521 482-FAX 482-9382 Consulting Engineers and Surveyors By: FJ F — Date: Client: VJ IAI Re-yrlald5 Sheet No. of Project: 'L oL Z cm on e- Pr qs� e / r- Subject: Eros io P) C-or?4fvi -)/r �z - ::;t i d k7 0 ' 2 7 x1e, L A M-1 I i le0o 0 0 E. hRO5PECT ROAD Np0 F100�4905 O 1z � 0 v 0. J ILL 03 Af B✓rsDu+° MIDPOINT DRIVE 0 73 —7 3LOT 3 FLOOR•49a3. <_ J J 4 U J t Ai Bmap/.y'.J III II III II ICI �li SCALES I°=40 lu1 i I,I I.I 1 f ip ER 051 ON CON TRL PLAN FOR PH/g5L THRF_F — li L3U/ Lo/NC- PA CONS TIC J cT1 uN. sUNE c, 1995 1 �I II ��I I iY �I:II GEI � I L NE / I 3 IE $OUN ORR✓ OF GONSTRUCT)ON PTS 2 It3) 5 E cR055 HATCHED ARA 1EXISTING AI 4 CROSS PANS BVILO) ME pEMENT SODDED ARCfC. 11 SILT PENCE .�I � III %U _ _33p�-- fHiSTING cO,vTUVRf / ' ^ II � � � Z ?RO POSED FUTURE CONTOURS I yuj, i� m ot NON PAN a 50• SILT FCNCE y ev Alll 5� 6.9CK OF GVR6 Tiu S k �R i III .. -- _IIIyS,> 11p^ u EROSIO - c6 ✓�LTaOL PROC_FDURES. o OF p 4 f /. THE co TRAOTOR S)4A11 CLEAN OFF RAIL✓ ALL III F x MUD AND DE6R/3 TRACTEO ONTO .PAVED 5TREE7S. 8 III I J R: 3 Z. /NSLALL 0.50 LF 31LT FENCE / LONG THE SOUTH CD6E III y ' Nii F y JC TNC >tISNNG CONCR[TC DRAIN VAN, 1J!{5j 3. INSTALL O LF SILT FENCE aLONa THE JSgciC OF -/HE III I L' W [3T CVR ON VROf P[CT IRmwWA✓ IMMEDIATELY E I S Q 30VTH OF THH cor eaE - PA1AI. MJLC04 JNE 3AW. SOIL AREA (AFPROH O.Z3 ACRES AT THE rjomTHFfaST CC. MPR OF THE SITP1 WITH CRIMPED III I" W` nT rts+w PER ktTHE RATE OF 2 TONS CRE a III �h S. LfAVE Te TOP OF T'C PAD5 IN A ROVONENED coNDITION. ® I lli� Ih I OIS ly a I ua. 0 'd � /�Y/ V i = W a (] UO UO UIN)0 C S Q � It a 6R ti� SW NG Q� Wp �m u ILLI p Q C Z I11 0o Z h� pe e Dtc 4 o Y• ZN U Q WW Go 0 3Q p° o zW a =a b .O p LD