Loading...
HomeMy WebLinkAboutDrainage Reports - 02/12/2014City nf Ft. Collin prov Plans Appiuved By. January 16, 2014 Mr. Wes Lamarque City of Fort Collins Stormwater Department 700 Wood Street Fort Collins, CO 80521 RE: Drainage Memorandum — Harmony Technology Park Third Filing, Second Replat Dear Wes: The purpose of this drainage memorandum is to summarize the proposed drainage design and provide calculations for the additional impervious area runoff being added by the 23 parking stalls, which will be located along the south side of the existing Custom Blending Building. The stalls will add approximately 3,870 square feet of additional impervious area to the site and will replace a portion of the existing grass median island, located along the south side of building. Aspen is providing the following analysis and supporting calculations to demonstrate the added parking stall area (additional impervious area) has very little effect on the overall site runoff and masterplan drainage area (HTP Masterplan Area). Please refer to the attached Drainage Exhibit and accompanying rational method calculations for details. The proposed 3,870 square foot parking stall area will tie directly to the southern drive aisle (at the south end of the stalls), with the north side of the stalls fronting the existing green space, located south of the existing building. The additional 3,870 square foot impervious area will increase the `c' value for Basin 2 from 0.53 to 0.67, which also provides for a slight increase in the overall site `c' value from 0.68 to 0.69 (overall site impervious ratio increases from 65% to 671/6). It's important to note that the existing site, including the added impervious area, continues to fall below the allowable `c' value of 0.80, thereby, continuing to meet the intent of the HTP Drainage Masterplan. The calculated 2-year time -of -concentration for Basin 2 is 7.3 minutes, versus the previous 8.8 minutes. The 2-year rational method flow for Basin 2 will increase from 0.52 cfs to 0.70 cfs. The calculated 100-year time -of -concentration for Basin 2 is 5.4 minutes, versus the previous 7.3 minutes, while the 100-year rational method flow for Basin will increase from 2.43 cfs to 3.40 cfs. The decrease in time of concentrations (faster travel times) and slight increase in the 2-year and 100- year runoff rates appear to be negligible and have very little effect on the drainage patterns or runoff for the Custom Blending site, and in relation to the HTP Masterplan basin. Stormwater runoff from Basin 2 will continue to follow the historic drainage path to the south and will be routed through the LID basin(s), prior to flows spilling south and into the existing water quality and detention pond. It's important to note that Aspen met with the City of Fort Collins Stormwater and Stormwater Quality Departments, in which it was determined that additional LID measures are not required for the increase in impervious area, as the LID measures proposed in the HTP Third Filing, Second Replat Utility plans provide the necessary LID measures, all of which are in addition to the existing water quality/detention pond, which provides all of the required water quality and detention for the entire Custom Blending site. In summary, the proposed 3,870 square feet of additional parking stall area on the south side of the existing Custom Blending Building meets the intent of the "Final Drainage and Erosion Control Report for Harmony Technology Park Third Filing, Second Replat", dated August 16, 2013, by Aspen Engineering, and also the "Final Drainage and Erosion Control Report, Harmony Technology Site Master Plan, by Stantec Consulting, dated May 19, 2008. The proposed improvements appear to have little effect on the existing drainage system and existing facilities and meet the intent of approved plans and drainage reports for the HTP Third Filing, Second Replat, and the HTP Masterplan plans. Should you have any questions or concerns, please contact me. Sincerely, John Gooch, P.E. Aspen Engineering • 'I` Developed Weighted Runoff Coefficients Custom Blenomg 101-001 Basin PoofArea(sqfl) Asphalt Area (sqft) COncmtaAte,(sqft) Gravel Area (sqft) LawnAreo(sqft) ToralAroa composite 2 0 7.315 3,870 0 7.141 18.326 0.67 3 0 33,788 0 0 2.540 36,328 0.90 4 0 21.240 0 0 936 22.178 0.92 5 0 19,151 0 0 769 19,930 0.92 6 0 0 12.265 0 739 13.004 0.86 7 0 862 690 0 4,125 5,677 0.44 8 0 0 0 0 45,120 45,120 025 131 0 9,200 0 0 1,255 10.454 0.87 132 0 29255 0 0 10,820 40.075 076 Total SITE _ 12Z= 16,825 0 78.218 217,883 0 69 Total Acreage 0.00 2.82 0.39 0.00 1.80 5.00 Impervious Ratio 4. C = D, 53 (PA"un•5 ) s C = C. l,r, ( Mil 1GAS ) 1 0 2019, 0 0 4,771 6,790 33% 2 0 7.315 3.870 0 7.141 18,326 63% 3 0 33,738 0 0 2,540 36,328 93% 4 0 21.240 0 0 938 22,178 96% 5 0 19,161 0 0 769 19,930 96% 6 0 0 12.265 0 739 13,004 95% 7 0 862 690 0 4,125 5.677 31% 8 0 0 0 0 45.120 45,120 Total SITE 0 84,385 18,825 0 68,143 187,353 67% Total Acreage 0.00 1.94 0.39 0.00 1.52 3.84 C C C 1 C Aaao4OeaINmMR Land Use or such. Caarac Wfts Pemla alyerr4wuwss Buahwss: Cammeroial areas 95 Neqihto,llaaf areas 85 ResiMntial: S�le-ftinnlly Mulaura detached 60 Mulaure eaached 75 Haff-acre la orl a,partareals 80 YMustrbL M areas 80 arms 90 Parks,c.lrwbaea: 5 Pb rounds 10 schools: 50 Railroad ard.r..a: 15 ems: Higarkal Flow AnalArtalyss 2 G..w1s,'riculwral Off,ale flow analyse whm Ian w not defined 45 steels: Paved 100 Grave 40 Ork�and sid.waals: 90 Rs 90 Laws, sarvlysal 0 tawre, ciasal 0 -Mara,'. rlgllftl5 RUJ elloug. RV -urn r, a M Mjv W L.,S 1C. ( Ft-6v1OAS 9:09AM tn5l2014 + O _ O II II � t` I I Z O Q E � o c z E a w a Q) o U Lnm� N O-o EO U o U. N j O TU w N H Y < M A w J Q u .0 N o� M aD Lb O O r 0 u� Z " E r r Ih Lo (O LO LO Lo 1� C J r LO OJ LO V Cl) r U) r Ln E O N O O O O O r 0 N Or r M M O N N W V V 1� M I� (� r Or M V O J N N N N CO N W W 2E F w J O- O m w O O CD 1l- Lo (D w J O 1 N N N LO � n 0 Q U) J W (D Zw QQ¢QQ���QQ Q}°Daawaa���aa C� x (~� D O w (D O(D O V' 1- M M r ZSI-IN r W J r� co U) r M O C N O O E v M co Ln W I— Z Q J W' W W n- O o Lr) O c• 0 0 0 0 V to O J N r r M r M r N J � Q Z H Z M O 0)^ m w N M r r J (D 1— O N N (D It LC) 1— M (� a (D mmmM V NMr— Q Z� N N (D � N �{ r(D OM IT W AT Cl)N M LO r O N Q) O O O O O O r 0 0 m Z m (%% O r r N M IT to 0 f` w M (`m Q Z r r CO m 2 W W 2 C� W W rL Q + � N w � M � t` 00 ^II ti Z O Z c w •°1aCio U �pp0 0 U mp O a- LL >. V) OoU w O H m Y ir M Q C C� W w J Q , C N g 0 0 0 0 m` 0 0 Z lL � C_ lD M In rf M r In r lD N O O O O O r O N O r r-, O M M V CD V J N N M N r r W W 2 w J a v w C) 000000 W p (n � 0 0 0 0 I� LO (D > J O r N N N (D r 0 0 H J W (0 a0° aaaaoC�ooaa Q C7 (� 2 U (� I` O 00 (D V O M O I` Z O V' n M M M r N W J _ C (3) f� 'V V V 1� N N N (`') N r r- r N w H O Z w w W (L OCDOOOOOOOO > O o mn Cl) 0000(o V (nO pJ - D7 V r r r N r M r N J Q Z C) N� V M W �^. Z M 0)N N M r O a) r 0 w M r r r J Q (D h 0 N N W V' N I` (D Q CD 0 0 0 0 0 0 0 0 0 0 Z W U N (D N V CO r (D O M V ITN M () It M r O N O QQ O O O O O O O r 0 0 m Zm Q .- NM�tUn mDrmmm Z.- r r T N N v N Vl V) N c 00 C>u 7 U0 f0 U ul Y C U O J > 06 O am a N II C J C a (0 U � d) (gyp d) n °a oU Z (o a0 O to rn I• I( r K La _ V `W W � G L W � @o s O LL C p � • fO G u � n G a L 6 • W � C W � v LL N C m v • O • o � rn cV1 o � O T u vi N n Tri U v r o a N o n N N p a o n m 00 m oosssssso 0o ss o Oc O O O O O O O O O O O O O O O M p C n O N N n n n n N Q n n m O N__ n0 N 0 0 m O O W V W N O M fp O t7 p O N m n 'MO N m m n O Ol O !� m. O O O O O O 0 0- 0 0 .0 0 0 n 0 O F n N - n n^ O 1 m n m m m O m O n O N n Vl m n O O v N N N N N N N N N N N N N N n O N N m O n Or N N m Cl m (J m 0 a m m< N wl 0 0 0 0 2000 Or 0 00 m n 00 m 0 'Y E r nln ro �vi��vin �n vi vir m > c > Cc 000000000 O W O t7 O .YL- E o00000000 00 oN o • O � v LL • p O m O O N o 0 J N MWm 0o `0. o0 0o ^ 'Y E n ui m C,2 � "m - N n amm�mnn na low N (7 f � m S. a rvn vu�mnme7n p :5Ine mn m o § J O � O 2 ) 77; |f � :! 2 g° �#\ §« S8888888 !! §! \ ■� ;, : | !£ !;■;,,,, \ 8888A;;8 !) !B § , ■!- EA §( � u P .P w LEGEND 4PCPo,FDmWT,..WpY � , YR W WrFA WPFMEElFI. ____ PPdM®E VMxE ' 10 ,Ew xfFS CCMWR, -- MviM PO ELIWM'NiIN W'JxMFY IIxE IFRGI m.MEmM E a a e. 80 aFeaMP -i. HEAL EXi6Nrq„MIFR ® �r„poe.N.,EaE,laxPax.11xoM xaI EMISSIONS IPrroPD,ED ErwIIaDEslelx eDuxoaRY WINIO ®. - MTE9 �Y:VALUE C i Q PPMXEapWNiOEIE&GHPoIM =: THE DATA BELOW IS AN EXCERPT FROM THE IONY TECHNOLOGY PARK, THIRD FILING 4AGE EXHIBIT AND IS SHOWN FOR ZMATIONAL PURPOSES ONLY. )LOGY SUMMARY (HTP THIRD FILING PROJECT) on lad Is Ltllsodu ) A1Ws (2010) Composlb Cr" 010(ds) Ow(Eb) 110 110 4.55 On 3.71 p.n 12D 120 4.92 0.81 13.19 40.87 130 ISO O87 1 057 1.52 4.35 1311 131 01 0.87 1.00 2.36 13Z In am on 2n 8.52 1 M 133 0.87 1 0.78 3.12 8.42 1 140 2.00 1 0.81 8.72 19.92 1 ISO 1.93 0.81 634 19.19 1 180 -T56 0.78 2.85 7.72 1] 170 0.71 0.61 2.02 5.40 1 180 12.04 0.32 8.45 1737 1 1 IN 328 DW 537 1431 501 501 15.85 0.32 9.41 25A] 6D2 502 0.84 0.81 2.08 5.78 503 0.84 0.81 2.09 5.79 OS- 0s-1 1.82 Dw 532 13.56 OS 032 0.851 01 2.83 720 SUMMARY (HTP THIRD FILING PROJECT) VOLUME VIXME P DESCmYR WSFL PRWIDED REWIRED its DEIBRKIN PDEO .27 7.0E 1.w } PROPOSED DRAINAGE BASIN SUMMARY TABLE: DRAINAGE BASIN DESIGN PONT DRAINAGE BTSININ AREA (eves) C' VALUE @tRe) Gm IN) 1 D.tE D. 0 T 0. 2 2 0.42 H o.B7 9 &m #N 3.40 ON 2.04 e.m 4 4 0,51 an 1m 5,07 5 5 a." On 1.M 4.55 5 E D30 O.m On 012 ZIP T T 0.13 0M 0.61 5 E 1w ax ORz55 131 131 0.24 1 0." 0.0 z39 rz Oo2 0. 1SI SITE PD10110 5.00 9MSwi 894051 II_R 9ermosom , 'CEDBY- !0-KL DNEDBY. +Gxd NNBY'. OWaW z Z J LL • L FIIII0 m Jo w W 0 Z 11111. it LL U V) U) M Z J LU O O Z U :Wo 1 MID p City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPRUYED: Dole O City Engineer CHECKED Bf. ¢ c Woter k Waatex0ter Utility Dole Vju ELyN CHECKED BY. YE Stormemer Utility Dote F La CHECKED BY: IM Pone k Recreolin Gate CHECKED BY: TM! Lgimer Dote CHECKED BY: Environm ental Planner DoteApD0 eLL E��s ENTRY o"av Uo„'C¢rngm THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL -'-4 EHY FOR CONCEPT ONLY. THE RENEW WES NOT ; 'e A41451 e- IMPLY RESPONSIBILITY BY THE REVIEWING f DEPARTMEM, THE LOCAL ENTITY ENGINEER, OR THE PO /'?AR LOCAL ENTTY FOR ACCURACY AND CORRECTNESS OF ns„pNAi THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS IRE THE FINAL QUANTITIES REQUIRED. THE RENEW rNyevxo: SH4L NOT BE CONSTRUED IN ANY REASON AS m1L01 O014001 ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHEET No: "08 SHOWN THAT AIRY BE REQUIRED DURING THE CONSTRUCTION PHASE. 8 OF 12