January 16, 2014
Mr. Wes Lamarque
City of Fort Collins Stormwater Department
700 Wood Street
Fort Collins, CO 80521
RE: Drainage Memorandum — Harmony Technology Park Third Filing, Second Replat
Dear Wes:
The purpose of this drainage memorandum is to summarize the proposed drainage design and
provide calculations for the additional impervious area runoff being added by the 23 parking stalls,
which will be located along the south side of the existing Custom Blending Building. The stalls will
add approximately 3,870 square feet of additional impervious area to the site and will replace a
portion of the existing grass median island, located along the south side of building. Aspen is
providing the following analysis and supporting calculations to demonstrate the added parking stall
area (additional impervious area) has very little effect on the overall site runoff and masterplan
drainage area (HTP Masterplan Area). Please refer to the attached Drainage Exhibit and
accompanying rational method calculations for details.
The proposed 3,870 square foot parking stall area will tie directly to the southern drive aisle (at the
south end of the stalls), with the north side of the stalls fronting the existing green space, located
south of the existing building. The additional 3,870 square foot impervious area will increase the `c'
value for Basin 2 from 0.53 to 0.67, which also provides for a slight increase in the overall site `c'
value from 0.68 to 0.69 (overall site impervious ratio increases from 65% to 671/6). It's important to
note that the existing site, including the added impervious area, continues to fall below the allowable
`c' value of 0.80, thereby, continuing to meet the intent of the HTP Drainage Masterplan.
The calculated 2-year time -of -concentration for Basin 2 is 7.3 minutes, versus the previous 8.8
minutes. The 2-year rational method flow for Basin 2 will increase from 0.52 cfs to 0.70 cfs. The
calculated 100-year time -of -concentration for Basin 2 is 5.4 minutes, versus the previous 7.3
minutes, while the 100-year rational method flow for Basin will increase from 2.43 cfs to 3.40 cfs.
The decrease in time of concentrations (faster travel times) and slight increase in the 2-year and 100-
year runoff rates appear to be negligible and have very little effect on the drainage patterns or runoff
for the Custom Blending site, and in relation to the HTP Masterplan basin.
Stormwater runoff from Basin 2 will continue to follow the historic drainage path to the south and
will be routed through the LID basin(s), prior to flows spilling south and into the existing water
quality and detention pond. It's important to note that Aspen met with the City of Fort Collins
Stormwater and Stormwater Quality Departments, in which it was determined that additional LID
measures are not required for the increase in impervious area, as the LID measures proposed in the
HTP Third Filing, Second Replat Utility plans provide the necessary LID measures, all of which are
in addition to the existing water quality/detention pond, which provides all of the required water
quality and detention for the entire Custom Blending site.
In summary, the proposed 3,870 square feet of additional parking stall area on the south side of the
existing Custom Blending Building meets the intent of the "Final Drainage and Erosion Control
Report for Harmony Technology Park Third Filing, Second Replat", dated August 16, 2013, by
Aspen Engineering, and also the "Final Drainage and Erosion Control Report, Harmony Technology
Site Master Plan, by Stantec Consulting, dated May 19, 2008. The proposed improvements appear
to have little effect on the existing drainage system and existing facilities and meet the intent of
approved plans and drainage reports for the HTP Third Filing, Second Replat, and the HTP
Masterplan plans.
Should you have any questions or concerns, please contact me.
Sincerely,
John Gooch, P.E.
Aspen Engineering
•
'I`
Developed Weighted Runoff Coefficients
Custom Blenomg
101-001
Basin PoofArea(sqfl)
Asphalt Area (sqft)
COncmtaAte,(sqft)
Gravel Area (sqft)
LawnAreo(sqft)
ToralAroa
composite
2
0
7.315
3,870
0
7.141
18.326
0.67
3
0
33,788
0
0
2.540
36,328
0.90
4
0
21.240
0
0
936
22.178
0.92
5
0
19,151
0
0
769
19,930
0.92
6
0
0
12.265
0
739
13.004
0.86
7
0
862
690
0
4,125
5,677
0.44
8
0
0
0
0
45,120
45,120
025
131
0
9,200
0
0
1,255
10.454
0.87
132
0
29255
0
0
10,820
40.075
076
Total SITE
_
12Z=
16,825
0
78.218
217,883
0 69
Total Acreage
0.00
2.82
0.39
0.00
1.80
5.00
Impervious Ratio
4. C = D, 53 (PA"un•5 )
s C = C. l,r, ( Mil 1GAS )
1
0
2019,
0
0
4,771
6,790
33%
2
0
7.315
3.870
0
7.141
18,326
63%
3
0
33,738
0
0
2,540
36,328
93%
4
0
21.240
0
0
938
22,178
96%
5
0
19,161
0
0
769
19,930
96%
6
0
0
12.265
0
739
13,004
95%
7
0
862
690
0
4,125
5.677
31%
8
0
0
0
0
45.120
45,120
Total SITE
0
84,385
18,825
0
68,143
187,353
67%
Total Acreage
0.00
1.94
0.39
0.00
1.52
3.84
C
C
C
1
C
Aaao4OeaINmMR
Land Use or such. Caarac Wfts
Pemla alyerr4wuwss
Buahwss:
Cammeroial areas
95
Neqihto,llaaf areas
85
ResiMntial:
S�le-ftinnlly
Mulaura detached
60
Mulaure eaached
75
Haff-acre la orl
a,partareals
80
YMustrbL
M areas
80
arms
90
Parks,c.lrwbaea:
5
Pb rounds
10
schools:
50
Railroad ard.r..a:
15
ems:
Higarkal Flow AnalArtalyss
2
G..w1s,'riculwral
Off,ale flow analyse
whm Ian w not defined
45
steels:
Paved
100
Grave
40
Ork�and sid.waals:
90
Rs
90
Laws, sarvlysal
0
tawre, ciasal
0
-Mara,'. rlgllftl5 RUJ elloug. RV -urn r, a M Mjv W
L.,S 1C. ( Ft-6v1OAS
9:09AM
tn5l2014
+
O
_
O
II
II
�
t`
I
I
Z
O
Q E
� o c
z E a
w a Q) o
U Lnm�
N
O-o EO
U o
U. N j
O TU
w N
H
Y
<
M
A
w
J
Q
u .0 N
o�
M
aD Lb O O r 0 u�
Z
" E r
r
Ih
Lo (O LO LO Lo 1�
C
J
r
LO
OJ LO V Cl) r U) r Ln
E
O
N
O O O O O r 0 N
Or
r
M
M
O N N W V V 1�
M I� (� r Or M V
O
J
N N N N CO N
W
W
2E
F
w
J
O-
O
m
w O O CD 1l- Lo (D
w
J
O
1 N N N LO � n 0
Q
U)
J
W (D
Zw
QQ¢QQ���QQ
Q}°Daawaa���aa
C�
x
(~�
D
O w (D O(D O
V' 1- M M r
ZSI-IN
r
W
J
r�
co
U) r M O C N O O
E
v
M co Ln
W
I—
Z
Q
J
W'
W
W
n-
O o Lr)
O
c•
0 0 0 0 V to O
J
N
r r M r M r N
J
�
Q
Z
H
Z
M
O
0)^ m
w
N M r r
J
(D
1—
O N N (D It LC) 1— M
(�
a
(D
mmmM V NMr—
Q
Z�
N N
(D
�
N
�{
r(D OM IT
W AT Cl)N
M LO r O N Q)
O
O O O O O r 0 0
m
Z
m
(%% O r
r
N
M IT to 0 f` w M (`m
Q Z
r r
CO
m
2
W
W
2
C�
W
W
rL
Q
+
�
N
w
�
M
�
t`
00
^II
ti
Z
O
Z c
w •°1aCio
U �pp0
0
U mp O a-
LL >. V)
OoU
w O
H
m
Y
ir
M
Q
C
C�
W
w
J
Q
, C N
g
0 0 0 0 m` 0 0
Z
lL
� C_
lD
M In rf M r In r lD
N
O O O O O r O N
O
r r-,
O
M
M V CD V
J
N N M N r r
W
W
2
w
J
a
v
w C) 000000
W
p
(n
� 0 0 0 0 I� LO (D
>
J
O
r N N N (D r 0 0
H
J
W (0
a0°
aaaaoC�ooaa
Q
C7 (�
2
U
(�
I`
O 00 (D V O M O I`
Z
O
V' n M M M r N
W
J
_ C
(3)
f� 'V V V 1� N
N
N (`') N r r- r N
w
H
O
Z
w
w
W
(L
OCDOOOOOOOO
>
O o mn
Cl)
0000(o V (nO
pJ
-
D7
V
r r r N r M r N
J
Q
Z
C)
N�
V M W
�^.
Z
M
0)N
N M r O
a) r 0
w
M r r r
J
Q
(D
h
0 N N W V' N I` (D
Q
CD
0
0 0 0 0 0 0 0 0
0
Z
W U N
(D
N
V
CO r (D O M V ITN
M () It M r O N O
QQ
O
O
O O O O O r 0 0
m
Zm
Q
.-
NM�tUn
mDrmmm
Z.-
r r
T
N
N
v
N
Vl
V) N
c
00
C>u
7
U0
f0
U ul
Y C
U
O J
> 06
O
am
a
N II
C J
C a
(0
U �
d) (gyp
d) n
°a
oU
Z (o
a0
O to
rn
I•
I(
r
K
La _
V `W
W � G
L
W �
@o s
O
LL
C
p � •
fO G
u �
n G
a
L
6
•
W � C
W � v
LL
N C
m v
•
O
•
o �
rn
cV1
o �
O
T
u
vi
N
n Tri
U v
r o
a N o n N N p a
o
n m
00
m
oosssssso
0o
ss
o
Oc
O
O O O O O O O O
O O
O O
O
O
M p
C
n
O N N n n n n
N Q
n n
m
O
N__ n0
N
0 0
m
O
O
W V
W
N
O
M fp O t7 p O N
m n 'MO N m
m n
O Ol
O !�
m.
O
O
O
O O O 0 0- 0 0
.0
0 0
n
0
O F
n
N - n n^ O 1 m
n m m m O m O
n O
N n
Vl
m n
O
O
v
N
N N N N N N N N
N N
N N
N
n
O N N m O n
Or
N N
m Cl
m
(J
m
0
a m m< N wl
0 0 0 0 2000
Or 0
00
m n
00
m
0
'Y E
r nln
ro �vi��vin
�n vi
vir
m
> c
> Cc
000000000
O W
O t7
O
.YL-
E
o00000000
00
oN
o
•
O
� v
LL
•
p
O
m
O
O
N
o
0
J
N
MWm
0o `0.
o0
0o
^
'Y E
n
ui m C,2
�
"m
-
N
n amm�mnn
na
low
N
(7
f
�
m
S.
a
rvn
vu�mnme7n
p
:5Ine
mn
m
o §
J
O
�
O
2
)
77;
|f �
:! 2
g°
�#\
§«
S8888888
!!
§!
\
■�
;,
:
|
!£
!;■;,,,,
\
8888A;;8
!)
!B
§
,
■!-
EA
§(
�
u
P
.P w
LEGEND
4PCPo,FDmWT,..WpY
�
, YR W WrFA WPFMEElFI.
____
PPdM®E VMxE '
10
,Ew xfFS CCMWR,
--
MviM PO ELIWM'NiIN W'JxMFY IIxE
IFRGI
m.MEmM E a a e.
80
aFeaMP
-i.
HEAL
EXi6Nrq„MIFR
®
�r„poe.N.,EaE,laxPax.11xoM
xaI
EMISSIONS IPrroPD,ED
ErwIIaDEslelx eDuxoaRY
WINIO
®.
- MTE9 �Y:VALUE
C
i
Q
PPMXEapWNiOEIE&GHPoIM
=: THE DATA BELOW IS AN EXCERPT FROM THE
IONY TECHNOLOGY PARK, THIRD FILING
4AGE EXHIBIT AND IS SHOWN FOR
ZMATIONAL PURPOSES ONLY.
)LOGY SUMMARY (HTP THIRD FILING PROJECT)
on
lad
Is
Ltllsodu
)
A1Ws
(2010)
Composlb
Cr"
010(ds)
Ow(Eb)
110
110
4.55
On
3.71
p.n
12D
120
4.92
0.81
13.19
40.87
130
ISO
O87
1 057
1.52
4.35
1311
131
01
0.87
1.00
2.36
13Z
In
am
on
2n
8.52
1
M
133
0.87
1 0.78
3.12
8.42
1
140
2.00
1 0.81
8.72
19.92
1
ISO
1.93
0.81
634
19.19
1
180
-T56
0.78
2.85
7.72
1]
170
0.71
0.61
2.02
5.40
1
180
12.04
0.32
8.45
1737
1
1 IN
328
DW
537
1431
501
501
15.85
0.32
9.41
25A]
6D2
502
0.84
0.81
2.08
5.78
503
0.84
0.81
2.09
5.79
OS-
0s-1
1.82
Dw
532
13.56
OS
032
0.851
01
2.83
720
SUMMARY (HTP THIRD FILING PROJECT)
VOLUME
VIXME
P
DESCmYR
WSFL
PRWIDED
REWIRED
its
DEIBRKIN PDEO
.27
7.0E
1.w
}
PROPOSED DRAINAGE BASIN SUMMARY TABLE:
DRAINAGE
BASIN
DESIGN
PONT
DRAINAGE
BTSININ
AREA
(eves)
C'
VALUE
@tRe)
Gm IN)
1
D.tE
D.
0 T
0.
2
2
0.42
H o.B7
9 &m
#N 3.40
ON
2.04
e.m
4
4
0,51
an
1m
5,07
5
5
a."
On
1.M
4.55
5
E
D30
O.m
On
012
ZIP
T
T
0.13
0M
0.61
5
E
1w
ax
ORz55
131
131
0.24
1 0."
0.0
z39
rz
Oo2
0.
1SI
SITE
PD10110
5.00
9MSwi
894051
II_R
9ermosom
,
'CEDBY- !0-KL
DNEDBY. +Gxd
NNBY'. OWaW
z
Z
J
LL
•
L
FIIII0
m
Jo
w
W
0
Z
11111.
it
LL
U
V)
U)
M
Z
J
LU
O
O
Z
U
:Wo
1 MID
p
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPRUYED: Dole
O
City Engineer
CHECKED Bf. ¢ c
Woter k Waatex0ter Utility Dole Vju ELyN
CHECKED BY. YE
Stormemer Utility Dote F La
CHECKED BY: IM
Pone k Recreolin Gate
CHECKED BY:
TM! Lgimer Dote
CHECKED BY: Environm
ental Planner DoteApD0 eLL E��s
ENTRY o"av
Uo„'C¢rngm
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL -'-4
EHY FOR CONCEPT ONLY. THE RENEW WES NOT ; 'e A41451 e-
IMPLY RESPONSIBILITY BY THE REVIEWING f
DEPARTMEM, THE LOCAL ENTITY ENGINEER, OR THE PO /'?AR
LOCAL ENTTY FOR ACCURACY AND CORRECTNESS OF ns„pNAi
THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES
NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS
IRE THE FINAL QUANTITIES REQUIRED. THE RENEW rNyevxo:
SH4L NOT BE CONSTRUED IN ANY REASON AS m1L01 O014001
ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE
LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHEET No: "08
SHOWN THAT AIRY BE REQUIRED DURING THE
CONSTRUCTION PHASE. 8 OF 12