Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDrainage Reports - 02/04/2010gTrIEW.
r-Lr- ASSOCIATES
PRELIMINARY DRAINAGE STUDY
FOR
JP MORGAN CHASE BANK
AT
RIGDEN FARMS TRACT A, LOT 1
CITY OF FORT COLLINS, COLORADO
fl
1
u
L
RAINAGE STUDY
'
FOR
JP MORGAN CHASE BANK
'
AT
RIGDEN FARMS TRACT A, LOT 1
CITY OF FORT COLLINS, COLORADO
July 17, 2009
Prepared for:
JP Morgan Chase Bank, N.A.
Mail Code C01-9504
1125 17th Street, Floor 2
Denver, CO 80202
Prepared by:
CLC Associates, Inc.
8480 E. Orchard Road, Ste. 2000
Greenwood Village, CO 80111
Phone: 303.770.5600
CLC Job No. 09-0222
FA2009\09-0222 Chase Retail Timberline and Custer - Fort Collins\4.0 Constuction Documents\h - Reports\09-0222 Prelim
Drainage Report.doc
A
ENGINEER'S STATEMENT
This report for the final design of JP Morgan Chase Bank at Rigden Farms Tract A, Lot 1, was
prepared by me or under my direct supervision in accordance with the provisions of the City of
Fort Collin's Storm Drainage Design Criteria and Construction Standards. I understand that the
City of Fort Collins and its designated town authority do not and will not assume liability for
drainage facilities designed by others.
State of Colorado
Date 1112 Z 00
' TABLE OF CONTENTS
' GENERAL LOCATION AND DESCRIPTION ................1
............................
' Site Location...........................................................................................................................1
SiteDescription.......................................................................................................................1
Proposed Project Description..................................................................................................1
DRAINAGE BASINS AND SUB-BASINS..................................................1
MajorBasin Description..........................................................................................................1
' Site Sub -Basin Description.....................................................................................................1
DRAINAGE DESIGN CRITERIA................................................................ 2
' Hydrology Criteria..........................................................................................:........................2
HydraulicCriteria ....... ................................................................. 2
DRAINAGE FACILITY DESIGN................................................................. 3
GeneralConcept.....................................................................................................................3
' Specific Details..............................................:........................................................................3
WaterQuality and Detention...................................................................................................4
ENVIRONMENTAL PROTECTION CRITERIA........:.................................4
General................................................................................................................................... 4
Sedimentation and Erosion Control Measures........................................................................4
1
CONCLUSION......................................... ............... .................................... 5
Compliance with Standards............................................................................................:.......5
DrainageConcept ................................................ ..... ...... :....................................................... 5
Sediment and Erosion Control Concept..................................................................................5
REFERENCES.......................................................................................... 6
® Page I .
Index of Figures
All figures are presented in the appendices
Appendix A
Vicinity Map
City of Fort Collins Floodplain Map
Soils Map
City of Fort Collins Rainfall Intensity -Duration -Frequency Table (Rational Method)
Appendix B
Weighted C Coefficient
Standard SF-2 Form (Time of Concentration Calculations)
Standard SF-3 Form (Rational Method Calculations)
Appendix C
A portion of the Drainage Map and Drainage Summary Table from "Rigden Farms Filing One
Drainage Plan" prepared by JR Engineering, Inc.
I
Page II
' GENERAL LOCATION AND DESCRIPTION
This report presents the JP Morgan Chase Bank at Rigden Farms Tract A, Lot 1 preliminary
' drainage study. The design and analysis of this site has been performed in accordance with the
City of Fort Collins Storm Drainage Design Criteria and Construction Standards. Drawings,
tables, and design calculations are included. in the appendix of this report.
Site Location
The site is a portion of Tract A, Rigden Farms Filing Number One, located in Northwest Quarter
' of Section 29, Township 7 North, Range 68 West .of the 6"' Principal Meridian, City of Fort
Collins, County of Larimer, State of Colorado. More specifically it is located south of Custer
Drive; west of Timberline Road and east of Illinois Drive.
' Adjacent developments include a commercial shopping center to the north, undeveloped lots to
the east, a church to the south and a residential subdivision to the west.
' Site Description
The site is approximately 0.885 acres in size. The topography for the site generally slopes
southeasterly at slopes ranging from 0.5% to 2.0%. The soils within the site are Nunn clay loam
' and fall into Hydrologic soils group Type C. The vegetation is native grasses and weeds.
Proposed Project Description
The project is a proposed commercial development. The proposed site will consist of one
commercial building (a bank), an automated teller machines, drive-thru banking lanes, parking
spaces, drive aisles and landscaped areas.
' DRAINAGE BASINS AND SUB -BASINS
Major Basin Description
The site is located within the limits of the "Rigden Farm, Filing One Drainage Report" (Master),
October 1999 prepared by JR Engineering, shown as Basins 108a, 108e and 108b1. Drainage
patterns for the site established in the Master report are maintained. The site is divided into two
major basins, which drain to the existing Water Quality Pond #2. Flows from this pond are
routed to the Foothills Regional Channel then to the Fossil Creek Reservoir Channel and
outfalling to the Fossil Creek Reservoir.
The site is assumed to be located outside the 100-yr floodplain. The Flood Insurance Rate Map
Community -Panel Number 08069C1000 F, unknown date, for Larimer County, Colorado is no
longer available. The map has been revised but has yet to be released by FEMA. A copy of the
Fort Collins' Floodplain Map is shown in Appendix A.
Site Sub -Basin Description
In order to maintain the overall drainage patterns from the Master Report, Lot 1 was divided into
two basins. The northeasterly corner of the site, Basin B, will drain to the existing inlets at the
northeasterly corner of the property.
® Page 1
' The Basin A will drain to the existing drainage swale along the southern property boundary. The
' basins were sized anticipating final build -out in which the flows entering the swale or the inlets
would be less than or equal to the 2-yr and 100-yr flows as given in the Master Report.
Offsite flows from the adjacent western property will be routed through Lot 1 to outfall to the
' existing drainage Swale along the south side of the site. A small portion of this western property
will sheetflow to Basin B.
DRAINAGE DESIGN CRITERIA
Hydrology Criteria
' City of Fort Collins Storm Drainage Design Criteria and Construction Standards (STANDARDS).
The following criteria were utilized in developing the proposed drainage system.
• The proposed drainage system is designed to match, as best as possible, the historic
drainage patterns occurring at the site.
' . The proposed drainage system attempts to limit the diversion of storm runoff from one
basin to another (basin transfer).
Runoff generated from drainage sub -basins is conveyed either directly or via storm
' sewer systems or channels to outfall locations into a regional water quality pond then to
the regional detention pond.
' Design Rainfall: City of Fort Collins rainfall data is used to determine peak runoff values. The
2-year and 100-year frequency storms are used as the initial and major design storms
respectively.
' Runoff Calculation: Peak storm runoff is determined using the rational formula,
Q = CIA:
Q = storm runoff in CFS;
' C = runoff coefficient based on surface impermeability;
I = rainfall intensity in inches per hour; and
A = drainage basin area in acres.
' City. of Fort Collins runoff coefficients for composite analysis (Table 3-3) are used to develop
basin runoff coefficients. The runoff coefficients are weighted for each applicable sub -basin to
' more accurately reflect the runoff characteristics of the site.
Time of Concentration is determined using STANDARDS in Sections 3.1.7.
Rainfall intensities are determined using STANDARDS Point Rainfall data and Intensity -
Duration curves.
The recurrence intervals used for this study were based on a commercial land use. The minor
' drainage system is designed for a 2-year recurrence interval and the major drainage system is
designed for a 100-year recurrence interval.
Hydraulic Criteria
' The following criteria were utilized in determining allowable street flow.
Initial Storm
' Local Street- No curb overtopping and flow may spread to crown of street.
® Page 2
' Major Storm (100-yr)
' Local Street — Buildings shall not be inundated at the ground line unless flood
proofed. The depth of water over the crown shall not exceed 6-inches.
Street capacities were determined using STANDARDS Table 4-1 for Initial Storm -- Street
' Runoff Encroachment and STANDARDS Table 4-2 for Major Storm — Street Runoff
Encroachment.
DRAINAGE FACILITY DESIGN
General Concept
' A small portion of the runoff from the site will be conveyed to either the existing inlet at the
northeast corner of the property via curb and gutter with the majority of the runoff from the site
' outfalling to the drainage Swale along the southern property boundary. Runoff is directed to
Water Quality Pond #2. The drainage patterns outlined in the "Rigden Farm, Filing One,
Drainage Report" October 1999 prepared by JR Engineering are maintained. Rational
calculations are included in Appendix B.
' Specific Details
' The proposed development has been divided into two basins: Basin A and Basin B. A drainage
map, presenting the drainage basin delineations as well as existing and proposed drainage
facilities, can be found in the back of this report.
' The following text generally describes basin conveyance to design points. Hydrologic
calculations for each sub -basin are presented in the rational method SF-3 forms in Appendix B
of this report.
' Basin A, 1.04 acres, includes the off -site area to the west and the majority of the lot that
comprises the building, drive aisles, parking lot, and landscape areas. This basin will sheefflow
to a curb cut that will direct runoff into the existing drainage swale that parallels the southern
' boundary. Design Point 1 indicates curb cut location. (Q2=1.6 CFS and Q100=5.9 CFS).
Basin B, 0.12 acres, is located along the north and east portion of the site and is comprised of a
drive aisle and landscaped area. The basin flow is to be directed to the existing inlet, Design
' Point 2, located at the southwest corner of the intersection of Custer Drive and Illinois Drive.
(Q2=0.2 CFS and Q100=0.6 CFS).
' In order to compare this proposed site's drainage with the Master Report some assumptions
were made. First that Basin A is a portion of the Basin 108e while Basin B is Basin 108a then
using the same time of concentrations, C-coefficients and intensities with the proposed acreage.
For Basin A the existing flow would be Q2=3.69 CFS and Q,00=5.65 CFS. For Basin B the
' existing flow would be Q2=0.28 CFS and Q,00=1.06 CFS. While Basin A is slightly higher than
the Master for the 100-year storm Basin B is lower. The overall flow for the proposed site is less
than the Master Report and this is reflected in the reduced C-coefficients.
' Flows from the existing inlet and the existing drainage swale are then routed to the existing
Water Quality Pond #2. The runoff is then directed from the water quality pond to the Foothills
Regional Channel to the Fossil Creek Reservoir ditch to finally outfall to the Fossil Creek
Reservoir.
t® Page 3
Water Quality and Detention
' Water Quality is being provided by the existing Water Quality Pond #2 as provided for in the
Master Report. Runoff from the proposed site will be detained by the existing Fossil Creek
Reservoir as directed by the Master Report.
' ENVIRONMENTAL PROTECTION CRITERIA
' General
There are no wetland areas on the site nor are there any threatened or endangered species.
' Sedimentation and Erosion Control Measures
During construction, silt fence, inlet/outlet protection and vehicle tracking pads will be utilized to
' prevent sediment entering the storm sewer system or sediment leaving the site. The lots will be
seeded to prevent soil erosion. Temporary sediment basins will be utilized to offer initial water
quality. Calculations for the temporary sediment basins can be found in Appendix C. As the lots
are developed any and all open space areas will be landscaped. The erosion control plan is part
of the Final Construction Plans. All erosion and sediment control methods shall be maintained
and repaired by the owner during construction and shall be inspected after each heavy
precipitation event.
Xc
Page 4
' CONCLUSION
Compliance with Standards
' The proposed drainage system for JP Morgan Chase Bank at Rigden Farms Tract A, Lot 1 was
designed to meet the City of Fort Collins Storm Drainage Design Criteria and Construction
Standards. The site does not include any F.E.M.A. mapped floodplains. The existing Flood
Insurance Rate Map (F.I.R.M) is not presented in Appendix A as the new map has not been
released by F.E.M.A. and shows no portion of the site to be in a flood hazard area. Therefore,
no map revisions are required as part of this development.
' Drainage Concept
The drainage system for JP Morgan Chase Bank at Rigden Farms Tract A, Lot 1 was designed
to allow storm water to be safely conveyed through and away from the site without negatively
impacting downstream or upstream properties (regionally) beyond that imposed by the historic
condition. The drainage concepts proposed for this site are in accordance with those presented
' in previous reports.
Sediment and Erosion Control Concept
' The construction BMP's proposed for this site follow the requirements of the City of Fort Collins.
Attention to proper installation and maintenance are essential for the sediment and erosion
control practices to function properly.
n
IL
' ® Page 5
REFERENCES
1. City of Fort Collins Storm Drainage Design Criteria and Construction Standards, May
1984.
2. Rigden Farms Filing One Drainage Report, by JR Engineering, dated October 1999.
3. Web Soil Survey 2.0, National Cooperative Soil Survey, Natural Resources
Conservation Service.
J
a
® Page 6
APPENDIX A
• VICINITY MAP
• CITY OF FORT COLLIN'S FLOODPLAIN MAP
• SOILS MAP
• CITY OF FORT COLLIN'S RAINFALL
INTENSITY -DURATION -FREQUENCY TABLE
(RATIONAL METHOD)
u
ItaS a U1p �EPros t3Rd
t. . Ape�_W i P� t �Fpy
i(.St E fy ..J i N r
Ave A
�m n
1 Ch©ye^e
, CkrtrnouthTrls ` •
SiUtrER 7 1 d
- 3i 14rkw^Q` O+�TM•
fotumbia Rd c cpj.
ck Ar it
p a
BrowaAve`
brit a it7?'zj
,i,, E DrAWRd r—
Cr ked
I ^ �Q;�r•' '� � LAKE SFi EI7,N,OL'Q�C
-paw « "�'"�.•�=. � �^ . !� u� ``
s �
s ° Ilow R r
d ,cc
_. ESNe 1 d d6S ` - IvYSt
} - lO`-•M p�tenrv�� Bi
kO
i,-'' is v MBr:Sfjefd ,..J .ti
t r ^
Tree@t^
P ram,;
Ki • T
kk_ EN_ rcerr—Dri ,Dri�y�-...�--„'— E,►ia se tool
17
E"•' i � t �T,eT r
y
` l:
s i
.'�1salhl
L�'LO der
ATE: 07. 1 7.09
EPr�sC�t L r d C \
CP,
I
INif hff• y
I' 4• 34 - 5 +Y .t, t A a d'51
,
�`
I ..i• Nasty
0 p441�r ayAv@
y ;
TE
r•,.wb .�: ^ i .Or W tT,.110
ter
6 e ✓""`z* i tYtik• ey.
If 't` F-•.••,;.fir yf; •'Y �O �� t��}� " `�
to 'l
r
$E ° t s nelKe �a z
r� 5 -,Can'
O
N'Ra'b
zIf
taB`04 d :c. YO ff_j?•e„•4: cif
j a C.
,. c;,��` , ,eft ;• {�
—UE'
y tc Ante�otpe a
N1
Y F F
1
10
lie
'•
It
j � �� Q€t �`f °f07t5T0 '� * pnC �o..'""".'"""'•—„' �;�, �� ;.�,.•�O�rd
_ Rd
r �S •1' , � =n
T
NORTH
RIGOEN FARM FILING ONE
CLC ASSOCIATES
TRACT A LOT
(
0900E.TE200DRO.
SUITE D VILLAGE
GREENW ODO VILLAGE
CHASE BANK
'
P 5600 DDL0RADO 77303 0 9600
F 303 'l •)02349
FORT COLLINS, COLORADO
CLCA880 C.COM.COM
ARCHITECTURE
ENGINEERING PLANNING
LANDSCAPE
ARCHITECTURE
LAND SURVEYING
VICINITY MAP
LL
OV //C ) �
3AV
NO
lNn64
C
J
$
�4
Qa, S
'fSi 9
x
N
F.
gg
$a.c 4 sc a
W €'oo aW
0
m
$ Mlj! W g
14
-S
c� 0
aeb'�
a# t: e
Wa 0 8
u
c�,Do a
w
�t'o E�
gr;�T$"—�,gE4
u Q Mille
p
Cd QQQQLK$'� e W g aC W Y a '
W W LSXL c no
y�
-�
W
E
O C$ W
L IgL ?
(01 a q$
Q
c,g< aaaWaa#�
S
0
—in
N
0
N Y�I
2`1 tV
� N
9 e
LL .2 .SOL
8
8
my
ow
00
Q1
N
OI
N
a
o
[Y
N
zQ
ZU
o2.z soy
I
I
I
I
I
I
0
§
<
{
■
I
I
I
.I
I
I
z
0
6-
0
LL
IL
«
�
O
z
w
0
w
a
«
■
}
m
•
s 0
3:
\
§
�4
§a)
!
��
�
0
\2|
a
2
!
§
;20
(
�
!
7;-
S
a
�72
|
&
.
ZW
3§
@
■
)\)
k
ƒ\
2
)\�
3
`
S
]
7
§] ,
(
�$` a
`
,-
�/�
/��ƒ
Lsm
\
\
)
\u�
kk
/�
k
}}\\
ID
'-
0
\
/
k
/�
\)
§
r§
ƒ§§
)
2+2
)
k
_;;
,
ke
��
/Jƒ\
IX
]
k)$
2
J
}§
/kJ
//
\)
\
k(/\
f (
) )
Ik
;
« $ m g o a c j
■)
]
§)
)
§ k
!OM
�.!/(
r-Iq / 2/)oa
m
!
-
\i2
Nq
k
!
!
.
\\
z
■k
0
�f
zU
k
I
Soil Map-Larimer County Area, Colorado
' Map Unit Legend
Larimer County Area, Colorado (C0644)"'
Map Unit Symbol
.. Map Unk Name
"Acres In AOI ,
;;' Peicent of,A01 ;
73
Nunn clay loam, 0 to 1 percent slope
1.6
48.7%
74
Nunn clay loam, 1 to 3 percent
slopes
1.7
51.3%
Totals for Area of Interest
3.3
160.0%
J
USDA Natural Resources Web Soil Survey 2.1 1/22/2009
' Conservation Service National Cooperative Soil Survey Page 3 of 3
D
Hydrologic Soil Group—Larimer County Area, Colorado
11
1
1
Hydrologic Soil Group
Hydrologlc,Sol1 Group—Surnmary by Map Unit Larlmer:County Area'Colorado � T " f
Map unit symbol. '
Map unit name
Rating
Acres In AOh
`.Percent "of AOI,
73
Nunn clay loam, 0 to 1
percent slope
C
1.6
48.7%
74
Nunn clay loam, 1 to 3
percent slopes
C
1.7
51.3%
Totals for Area of Interest
3.3
100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
'
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive precipitation
from long -duration storms.
'
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly
wet. These consist mainly of deep, well drained to excessively drained sands or
gravelly sands. These soils have a high rate of water transmission.
'
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained orwell drained
soils that have moderately fine texture to moderately coarse texture. These soils
'
have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
'
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of water
transmission.
'
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink -swell
potential, soils that have a high water table, soils that have a claypan or clay layer
at or near the surface, and soils that are shallow over nearly impervious material.
These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in their
natural condition are in group D are assigned to dual classes.
' Rating Options
Aggregation Method.' Dominant Condition
USDA Natural Resources Web Soil Survey 2.1 1/22/2009
'� Conservation Service National Cooperative Soil Survey Page 3 of 4
I
1
11
City of Fort Collins
Rainfall Intensity -Duration -Frequency Table
for using the Rational Method
(5 minutes - 30 minutes)
Figure 3-1 a
Duration
(minutes)
2-year
Intensity
in/hr
10-year
Intensity
in/hr
100-year
Intensity
in/hr
5.00
2.85
4.87
9.95
6.00
2.67
4.56
9.31
7.00
2.52
4.31
8.80
8.00
2.40
4.10
8.38
9.00
2.30
3.93
8.03
10.00
2.21
3.78
7.72
11.00
2.13
3.63
7.42
12.00
2.05
3.50
7.16
13.00
1.98
3.39
6.92
14.00
1.92
3.29
6.71
15.00
1.87
3.19
6.52
16.00
1.81
3.08
6.30
17.00
1.75
2.99
6.10
18.00
1.70
2.90
5.92
19.00
1.65
2.82
5.75
20.00
1.61
2.74
5.60
21.00
1.56
2.67
5.46
22.00
1.53
2.61
5.32
23.00
1.49
2.55
5.20
24.00
1.46
2.49
5.09
25.00
1.43
2.44
4.98
26.00
1.40
2.39
4.87
27.00
1.37
2.34
4.78
28.00
1.34
2.29
4.69
29.00
1.32
2.25
4.60
30.00
1.30
2.21
4.52-
DRAINAGE CRITERIA MANUAL (V. 1)
RUNOFF
5C
3C
t— 2 C
2
W
V
Q
W
d 10
W
a
0 5
W
¢ 3
0
co 2
W
I--
3
1
- ►n
/ I -
n���
nrr■■�■
•I
�n♦�I�I/�I,if�I/n�����■■��
5'
.1
2 .3 .5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE RO-1
Estimate of Average Overland Flow Velocity for Use With the Rational Formula
O6/2001
Urban Drainage and Flood Control District
RO-13
APPENDIX B
• WEIGHTED C COEFFICIENT
• STANDARD SF-2 FORM
(TIME OF CONCENTRATION CALCULATIONS)
• STANDARD SF-3 FORM
(RATIONAL METHOD CALCULATIONS)
w
PROICf: CWWSE BANK At 06MN FARM
PRO. NO. 09.0222
M516N BY: 6. [�. GRAVE5
REV. DY: D.J. Wk A
AiZNCY: CITY OF FORECaLIN5
PM: 711712009
C-VALUES
BASIN
AREA
C2
CIO
C100
I %IMPERV
LANDSCAPING
0.47
0.20
0.20
0.25
5
ROOF
0.12
0.95
0.95
1.00
90
CONCRETE
0.12
0.95
0.95
1.00
90 _.
PAVEMENT
0.33
0.95
0.95
1.00
90
C2= 0.61
CIO= 0.61
CI00= 0.66
Total Basin Area
1.04 ac
Basin Impervious
51%
BASIN B
AREA
C2
CIO
C100
% IMPERV
LANDSCAPING
0.06
0.20
0.20
0.25
5
ROOF
0.00
0.95
0.95
1.00
90
CONCRETE
0.03
0.95
0.95
1.00
90
PAVEMENT
0.03
0.93
0.95
1.00
90
C2= 0.58
C10= 0.58
C I00= 0.63
Total Basin Area
0.12 ac
Basin Impervious
48%
I
I-
7
I
W
Q
�g
C N
a�
LL �
w r
O
U
� H
Z
N O Q o
vaz
¢�m
oww
U Q
Q�U
ZOO
U)w5C7
mg5m
'
P:o�
� CO
mw
w
g
J
'
U
I
I
I
I
■�iiinuui�nui
ui
■9NIIIIIIINIIIIINN
�@�IIIIIIIIIIIIIIIIN
11
■��IIINIIIIIIIHIIIa
NI
■�
IIIIIINIIIIINI��
�8��111111111111111111111
■�91NIIIIIIIIIIdI
pIYI
■o011N111111111111�111�1
I
I
I
I
I
Z W 2
H
3 CC U)
a(9
Fn
w
0
I¢
21
a�
mn
'
T
}
�nm
� Y
'
Q Q S
000
0
t0
MOM
I
1
I
11
I
C
I
1
7
I
APPENDIX C
• A PORTION OF THE DRAINAGE MAP AND
DRAINAGE SUMMARY TABLE FROM MASTER
REPORT
f
C
9
N
-13
avow 3NllH38V4l1
7=4
0nlan
Ia9e
Tith"
su0.00t41
AM
I Hole
c(lo)
j.7 - uralna
c(lo0)
a u
600410)
�
Mary
I11000)
Table
0(2)w
a(10)lal
01100"
�
strYehn
camnld
1
101
10.52
an
0.97
too
12.3
15,09
211,79.
72.6
10
lots
114
Q87
1.00
a4
as
oat
11.12
21IL4
'
to
tOtt
1.37
M03
1.00
5.0
so
1a3
0,21
Me
to
1010
324
ass
0.80
at
0.0
&XI
9,2D
27A
Id
told
140
0.91
I.W
7.0
5.8
7.84
13.40
31.9
4
11 102
4.10
0.77
0.07
10.7
7.1
6.06
it as
353
22
1021
195
0.73
0.91
13.1
10.8
5.70
0.74
27.2
2b
lost
257
a71
0.06
9.7
7.3
4.00
6.90
10.7
T tandmlm He+
3
103
2.71
Q75
0.04
as
a
4.61
8.114
2"
Iff-TypoRWA
4
104
1.36
0.78
0.9s
to
a0
2.91
6.33
15.4
t6' Type abed
46
1048
1.37
0.79
0.90
5.4
6.4
199
5.11
+10
re4b cmftndm Hal
105
4.43
Q46
Q57
11.8
11.5
422
720
18.4
5
105.104.1040
109.102t0t1.112
last,
0.97
0.84
to.2
19.2 -
20.75
35.43
90.5
50"Pond 218
e
105
2.47
0.10
0.13
10.4
10.4
1 0,54
Q02
2A
Pand 0+7
7
107
5.33
am
IA0
7.5
so
1 12.03
2Q54
4a$
79
1074
2.64
ally
1.00
6.0
7.6
1 a43
928
22.8
T cantlnN4t1 w41
71)
loll
1.81
0.87
t.00
7.9
6.0
1 190
0.34
24.4
oatntlnslmwsl
7c
107C
.2.16
0.79
0.00
1 at
7.1
1 102
7.99
211.0
1' amebtdmwe
7d
told
3.42
Q75
M94
1 its
10.3
1 tat
9.30
34.1
ouraumon Hal
7e
1070
2.10
0.79
0.0
114
so
144
7.20
29.6
19 Rw14
6
10e
1.01
am
I.00
9.2
0.2
2.1a
170
let
III Rwet
ft
toft
am
0.70
020
0.7
5.0
4A0
WA
tall
T 0Ia1E1talen we
least
0.71
Q73
041
as
8.0
2.50
WA
11.1
at
108t
Us
0.N
1.W
as
510
11a
WA
10.3
T Om"mom 04s1
loat1
0.02
0.70
0.06
5.0
5.0
1.53
WA
I1A
an
1090
1.30
0.70
0.09
11.7
53
E48
WA
17.1
T CMbkt tlmwel
ad
load
0.51
0.95
1.00
0.0
5.0
1.38
WA
a.+
as
lose
2.24
0.86 1
0.81 1
Ito
Ito
2.00
WA
122
e
IOm
1.44
0.67
0.84
117
111
1.95
WA
20.7
1002
1.18
ado
0.83
1t3
12.3
I.Se
WA
a9
so
losefoso
4.96
am
0.02
17.8
17.0
3.40
WAjX2
Da41eT cwel
too
a46
Q65
0.et
14.0
11a
ae3
11.85
9
107d.107Mi05.100
IZ04
Q79
Q90
18.3
10.s
1463
24.90
wO Pallet
1000
12.68
ads
eel
Its
14.6
1a47
2a42
Qa
107s-1a'h. 10900000IOW
sale
Qe9
clog
21.2
21.2
30.89
52.74
wO Pand2
Ion
not
0.95
age
1.00
so
5.0
ado
1.10
za.ta4lab
not
025
0.95
1.00
ao
ao
0.68
1.10zaeeta11
111
5.61
a72
0.90
13.8
as
TAl
13.34
2D•
R16t2
119
0.83
Q9e
1.00
a0
ao
1.70
2.01a
RHe113
113
2.0
084
1.00
a1
5.0
5.95
WA
14
114
Z70
Q.77
0.96
at,
5.7
6.04
WA
T
eatltitvt/en we
140
114a
1.63
0.65
Q61
1Q7
at,
till
WA
CHMl40
1140
1.91
0.65
Us
a0
82
147
WA
omit. wel14C1140
015
0.09
ago
0.1
to
125
WA
0ttmt. t0Rits
too
0.72
ago
1Q3
62
4.05WA
150
11%
1.48
a73
0.01
as
5.0
2AI
WA
to
11e
1.91
a72
a90
at,
0.t321
wA
T
ost64dm HM
Ift
lift
age
0.75
023
6.o
a0
1.45 1
WA
a3 S'Typ
AWd
let
Tf6t
t13
0.71
am
all
5.0
is I
WA
2(1.7 I5
R
lec
1160
2.44
0.60
a.et
11.2
al
137 1
WA 1
/at,
ct01M
117
2.49
0.73
0.02
7.7
so
4.49 1
WA 1
2te
17
117.118
4.65
0.12
0.90
7.1
7.1
0.44 1
WA 1
tat
170
117■
2.79
0.74
0.93
ao
6.0
5.40 1
WA
219
nw gnMlmwM
Is
lie
tad
0.70
0.67 1
a7
5.7
4.44
WA
19.3
10
Ila
0.82
0.72
0.00 1
IZ3 1
0.3 1
10.04
WA
40.2
20
120
QQ7
0.81
1.00
10 1
5.0 1
Ise
NA
at,
12t
166
0.10
0.13
5.0
5.0 1
1.04
WA
45
21
119-120.121
11.15
0.52
0.65
fall
Ito 1
1025
WA 1
44.7 ileaftm
Pond 222
122
7.05
0.10
0.13
15.9
15.0
120Z-
22 122.113.114.114a.114D.1110.
115.11 ft.110+ 1 I ft. n o t.
11e0.117.I17a.110
34.82
a8l)
Q75
20A
2Q8
326084400a7
P&W 221
23
123
Q92
0.10
0.13
t2.1
12.1
0.17124
262
0.32
0.40
114
f14
1.0725
125
ass
0.3e
0.45
9.1
e.0
as726
120
170
0.48
0.50
131
111
3.30
WOPa103
Final Drainage and Erosion Control Report page 10
Rigden Farm Filing One September 30. 1999