HomeMy WebLinkAboutDrainage Reports - 07/01/1996FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR
3MONY MARKET P.U.D.,TWELFTH FILING
FORT COLLINS, COLORADO
Revised May 8,1996
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR
HARMONY MARKET P U D ,TWELFTH FILING
FORT COLLINS, COLORADO
0
April 1996
Prepared for
Bogaard Construction
5006 Blue Stem Court
Fort Collins, Colorado 80525
Prepared by
RBD Inc Engineering Consultants
A division of the Sears Brown Group
209 South Meldrum
Fort Collins, Colorado 80521
(970)482-6368
RBD Job No 673 003
1
:WINC
' Engineering Consultants
A division of The Sear Brown Group
209 S Meldrum
' Fort Collins Colorado 80521
970/4 2 922
may 8 1996
1 Mr Basil Hamdan
City of Fort Collins
' Utility Services Stormwater
235 Mathews Street
Fort Collins, Colorado 80522
' RE FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE HARMONY
' MARKET P U D TWELFTH FILING
Dear Basil
tWe are pleased to resubmit to you, for your review and approval, this Final Drainage and Erosion
Control Study for the Harmony Market P U D , Twelfth Filing All computations within this report
' have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria
All comments made by the Storm water Utility from the April 16, 1996 submittal have been addressed
at this time
We appreciate your time and consideration in reviewing this submittal Please call if you have any
questions
Respectfully,
' RBD Im
Pr ared
' Jim Aller
' Project N
' cc
1
1
673-003(A) Correspondence
H \USER\civil\projects\harmony 12t\harmktl2 rpt
Reviewed by
J
David K Thaemert P E
Water Resources
Project Engineer
' Denver 303/458 5526
TABLE OF CONTENTS
DESCRIPTION
PAGE
GENERAL LOCATION AND DESCRIPTION
1
Location
1
Description of Property
1
DRAINAGE BASINS
1
Major Basin Description
1
Sub Basin Description
1
DRAINAGE DESIGN CRITERIA
2
Regulations
2
Development Criteria Reference and Constraints
2
Hydrological Criteria
2
Hydraulic Criteria
2
Variances from Criteria
2
DRAINAGE FACILITY DESIGN 3
General Concept 3
Specific Details 3
Storm Water Quality 4
EROSION CONTROL 4
General Concept 4
Specific Details 4
CONCLUSIONS 5
Compliance with Standards 5
Drainage Concept 5
Storm Water Quality 5
Erosion Control Concept 5
REFERENCES 5
APPENDIX
VICINITY MAP 2
HYDROLOGY CALCULATIONS 3
INLETS 9
EROSION CONTROL 14
TABLES AND FIGURES 20
EXCERPTS FROM FINAL DRAINAGE REPORTS for 24
HARMONY MARKET P U D SECOND AND THIRD FILING (pocket) 26
DRAINAGE AND EROSION CONTROL PLAN (pocket) 27
I
FINAL DRAINAGE AND
' EROSION CONTROL STUDY
FOR THE
HARMONY MARKET P U D TWELFTH FILING
' FORT COLLINS, COLORADO
' I GENERAL LOCATION AND DESCRIPTION
' A ati n
The Twelfth Filing of Harmony Market P U D is located south of Harmony Road
' between Boardwalk Drive and Lemay Avenue It can also be described as being
immediately south of Harmony Road between the Red Robin Restaurant and the
Outback Steak House More specifically, this site is located in the Northeast Quarter
' of Section 1, Township 6 North, Range 69 West of the 6th Principal Meridian, City
of Fort Collins Lanmer County, Colorado
' B Description of Propea
The existing Harmony Market P U D has been developed in several phases and
' contains the former Pace Warehouse, Builders Square, Steele's Market, First Bank,
Taffy Lube, Lee's Cyclery, and several restaurants along the frontage of Harmony
Road
' The Harmony Market P U D Twelfth Filing site contains approximately 0 65 acres
' and is currently undeveloped and is sparsely vegetated The site slopes gently ( 1 7%)
from north to south The proposed purpose for the subject site is currently
understood to be retail usage
1
II DRAINAGE BASINS
A MaJor Basin Description
' The project site is located within the McClellands Basin No major drainage way
exists within the Harmony Market P U D development or immediately downstream
within the Oak/Cottonwood Farm site
' B Sub -Basin Description
' The Twelfth Filing of Harmony Market P U D lies within Basin A, as lard out in the
1
' Harmony Market P U D Overall Drainage Plan, amended with the Third Filing of the
P U D , also known as Steele's Market The Basin A catchment encompasses an area
which contains a parking lot access road, two restaurants and a portion of
Boardwalk Drive The completion of this project will fully develop Basin A (See
Overall Drainage Plan, provided in the back pocket of this report)
' Detention for Basin A is provided by Pond A, which has had no modifications to its
' catchment area since the original Report - Harmony Market P.U.D. Filing One Final
Total Site Preliminary Pond A provides a detention volume of 1 75 ac-ft and has a
release rate of 17 cubic feet per second
' III DRAINAGE DESIGN CRITERIA
' A Regulations
The City of Fort Collins Storm Drainage Design Criteria is being used for this subject
' site
B Development Criteria Reference and Constraints
1 As stated earlier, flows from the site contribute to Detention Pond A in Basin A,
shown on the Overall Drainage Plan for the Harmony Market P U D in the back
' pocket of this report The Harmony Market P U.D Overall Drainage Plan,
amended with the Third Filing, Total Site Prelinunary report considered this site to
be completely impervious This site is generally considered to be completely
' impervious with a coefficient of 0 95
C Hydrological Criterr
' The Rational Method is being used to determine run-off peak flows from the study
site Rainfall criteria for this study was obtained from the City of Fort Collins and is
included in the Appendix The 10- and 100-year rainfall criteria were utilized to
' determine the developed flows
D Hydraulic Criteria
1 All calculations within this study have been prepared in accordance with the City of
Fort Collins Drainage Criteria
' E Vanances from Criteria
' A variance for erosion control is sought The effectiveness during construction is
1 2
1
IV
1
1
1
72 9 during construction instead of the rainfall performance standard of 79 6 We
feel that the measures provided will effectively prevent erosion transport to adjacent
areas and any further measures are unnecessary
DRAINAGE FACILITY DESIGN
A General Concepi
All Storm water off -site and on -site, will sheet flow to the north area inlet in Pond
A' where flows will be detained and released As stated previously this flow
contribution was expected and accounted for in the calculations for Pond 'A'
Included in the back pocket of this report is the Drainage and Erosion Control
Plan for Harmony Market P U D, Third Filing
B Specific Details
Off -site Storm water flows form the adjacent berm will be taken east around the back
of the building in a trickle channel discharging to the parking lot then to a curb chase
at design point 1 Then the offsite flows will cross the access road and parking lot to
the north inlet of Pond A'
I
On -site stormwater is taken south to the north area inlet of Pond A' The roof areas
of basins 1,2 and 3 discharge to the parking area at the front of the building Basin
1 includes a small strip of land at the back of the building which receives off -site flows
from Basin 6 The storm water from this area is taken east around the building in a
trickle channel to the parking lot All Storm water then sheet flows south across the
access road and to the north Inlet of Pond A'
I
Basin 2 takes all of its flows to a 2 foot wide curb chase which discharges onto the
access road in Basin 5
Basin 3 takes all of its flows to a 2 foot wide curb chase which discharges onto the
access road in Basin 4
Basin 4 receives stormwater through the curb chase in Basin 3, Storm water then
sheet flows through the site access drive and across the access road to the north area
inlet of Pond `A
Basin 5 receives stormwater from Basin 2 through a curb chase The stormwater then
flows across the access road to the north area inlet of Pond `A'
k3
1
1 V
1
1
1
R
1
1
1
1
1
1
1
STORM WATER QUALITY
A General Concept
The water quality of storm water runoff must be addressed on all final design utility
plans Construction is anticipated to begin in Summer of 1996 We have sought to
find various Best Management Practices for the treatment of storm water runoff
Though there is little that may be done as most of the drainage facility is already
provided we have sought to improve Storm water quality with the methods called out
in the Erosion Control and Drainage Plan
EROSION CONTROL
V
B
General Concept
The Harmony Market P U D Twelfth Filing lies within the Moderate Rainfall and
Wind Erodibility Zone per the City of Fort Collins zone maps The potential exists
for silt movement during construction of the parking/driveways and building Thus
the new improvements will be subjected to both wind and rainfall erosion
Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites
and related calculations in the appendix, the erosion control performance standard
(PS) for the subject site during construction is 79 6 and after construction is 93 7
From the calculations in the appendix, the effectiveness(EFF) of the proposed erosion
control plan is 72 9, during construction and 98 07 after construction It is
anticipated that the construction duration of this project will be less than 8 weeks due
to the hmited amount of work to be completed, therefore the erosion control plan as
specifically detailed below, should meet the City of Fort Collins requirements A copy
of the erosion control calculations is included in the Appendix An erosion control
escrow cost estimate of $2 250 is also included in the Erosion Control Section of the
Appendix
Specific Details
Immediately upon completion of over lot grading the silt fencing shown on the
drainage and erosion control plan should be installed
In order to protect the curb chases from receiving excessive silt deposits, the curb
chases will have gravel filters installed around them
The above items can be removed once asphalt and landscaping in their respective
areas have been completed
4
VII CONCLUSIONS
' A Compliance with Standards
All computations within this report have been completed in compliance with the City
' of Fort Collins Storm Drainage Design Criteria
B Drainage Concept
The proposed drainage concepts presented in this report and shown on the Drainage
' and Erosion Control Plan are in compliance with the City of Fort Collins drainage
criteria This project was designed to be in conformance with the intent of the Overall
Drainage Plan for Harmony Market P U D
C Storm water Quality
' Because storm water quality has become a requirement the site has addressed this
storm water aspect We have designed the erosion control to reduce the sediment
which runs into the storm water system
D Erosion Control Concept
' The proposed erosion control plan adequately provides for the control of wind and
rainfall erosion from the study site A variance has been requested to allow an
effectiveness during construction 72 9 instead of the calclulated performance
' standard of 79 6
' The proposed erosion control concepts presented in this report and shown on the
Erosion Control Plan are in compliance with the City of Fort Collins erosion control
criteria
REFERENCES
' 1 RBD Inc HarmoU Market P.U.D. Second Filing Final Drainage ReportTotal Site
Preliminary - Revised Drainage Report_ Fort Collins, Colorado, August 13, 1990
' 2 RBD Inc, Harmony Market P U D Third Filing Final Drainage Report, March 1991
' 3 City of Fort Collins Storm Drainage Design Criteria and Construction Standards, May 1984,
Revised 1992
' 4 City of Fort Collins Erosion Control Reference Manual for construction Sites January 1992
1
5
I
1
1
1
r
1
APPENDIX
1/
11
lJ
1
t
VICINITY MAP
1
1
11
Z/
PKWY
W PROJECk10
W SITE
J
J
O
U
(n AN
Os
FF
I
WARREN
LAKE
lc�
HARMONY RD
N �
MAIL
CREfK
)RTNER
LAKE
VICINITY MAP
3/
I
1
11
1
t
1
HYDROLOGIC
CALCULATIONS
1
4-/
RBD Inc Engineering Consultants
RUNOFF COEFICIENTS
Project 673-003
HARMONY MARKET PUD 12TH FILING
This sheet calculates the composite "C" values for the Rational Method
JAM
05/07/96
Storm Drainage Design and Technical Criteria
5�
RBD Inc Engineering Consultants
673 003 TIME OF CONCENTRATION
SUBDIVISION STORM 10 yr cf = 1 00
HARMONY MARKET PUD 12TH FILING
CALCULATED BY JAM DATE 05/07/96
h= 1 870 1 C x CnD•o 5
S^(1/3)
tc=4+tL
SUB BASIN DATA
INITIAL/OVERLAND TIME
TRAVEL
TIME
FINAL
REMARKS
DESIG
AREA
C
LENGTH
SLOPE
tl
LENGTH
SLOPE
VELOCITY
tL
tc
(ac)
(ft)
(°h)
(min)
(ft)
(°h)
(fUs)
(min)
(min)
1
2
3
4
5
6
7
7a
8
9
10
11
12
1
008
078
0
001
00
310
PA
050
1 34
39
50
2
016
095
0
001
00
110
PA
340
357
05
50
3
017
095
0
001
00
100
PA
340
357
05
50
4
019
084
70
270
29
40
PA
490
430
02
50
5
005
053
40
1500
27
0
PA
060
147
00
50
6
017
037
40
350
57
0
PL
060
050
00
57
Note Column 7a codes the channel type for velocity calculations
PA = Paved Area PL = Pasture& Lawns GW = Grassed Watrerway
Storm Drainage Design and Technical Criteria
RBD Inc Engineering Consultants
6/
I
673 003 TIME OF CONCENTRATION
SUBDIVISION STORM 100 yr cf = 125
HARMONY MARKET PUD 12TH FILING DATE 05/07/96
CALCULATED BY JAM
t= 1 870 1 C x CnD 0 5
SA(1/3)
tc=t+tL
SUB BASIN DATA
INITIAL/OVERLAND TIME
TRAVEL
TIME
FINAL
REMARKS
DESIG
AREA
C
LENGTH
SLOPE
t
LENGTH
SLOPE
VELOCITY
tL
tc
(ac)
(ft)
N
(min)
(ft)
(°r0)
(fus)
(min)
(min)
1
2
3
4
5
6
7
7a
8
9
10
11
12
1
008
078
0
001
00
310
PA
050
1 34
39
50
2
016
095
0
001
00
110
PA
340
357
05
50
3
017
095
0
001
00
100
PA
340
357
05
50
4
019
084
70
270
11
40
PA
490
430
02
50
5
005
053
40
1500
21
0
PA
060
1 47
00
50
6
017
037
40
350
49
0
G
060
1 19
00
50
Storm Drainage Design and Technical Criteria
ROD Inc Enymenna Cerele rt
673-003 STORM DRAINAGE SYSTEM DESIGN DATA
SUBDIVISION STORM 10 yr (developed) d = 100
HARMONY MARKET PUD 12TH FILING
CALCULATED BY JAM DATE OSM7I98
DP
BASINS
tcl
ROUTING
FLOW TIME 111.1
tc
C
INTENSIT
AREA
DIRECT
RUNOFF
OTHER
RUNOFF
TOTAL
RUNOFF
STREETICHANNEL
PIPE
STREET
PIPE
REMARKS
LENGTH
CHANNEL
PIPE
SLOPE
CAPACITY
SLOPE
SIZE
CAPACITY
DESIGN
VELOCITY
DESIGN
VELOCITY
LOC
1
2
(min)
3
(R)
4
4s
(min)
5
(min)
0
(min)
7
8
(INhr)
9
(se)
10
(da)
11
(cis)
12
(cis)
13
(%)
14 149
(cfa)
15
I%)
18
(in)
17
(cfs)
18
(cfs)
/9
(Ws)
20
(cfs)
21
(Wa)
22
23
1
16
50
310
PA
39
89
057
457
025
07
07
050L
40
07
13
2
2
50
50
095
560
018
09
09
3
3
50
50
095
560
017
09
09
4
34
50
50
089
560
036
18
18
5
25
50
40
PA
02
52
085
553
021
10
10
408 L
103
10
39
8
6
57
57
037
535
017
03
03
site
123458
88
89
078
457
0IB2
29
29
Notes 1 Column 4a Ident fees the type of channel used to calculate the velocity, for the travel time calculations
2 Column 14a Identifies whether the street is a main arterial collector or local street for use In the street capacity calculations
Storm Dri D Ian nd T ct" I Crier!
RBD Inc E d One Cm a d
SUBDIVISION STORM 100 yr(developed) cf= 125
HARMONY MARKET PUD 12TH FILING
CALCULATED BY JAM DATE 05107196
DIP
BASINS
tci
ROUTING FLOW TIME (11.1
td
C
INTENSIT
AREA
DIRECT
RUNOF
OTHER
RUNOFF
TOTAL
RUNOFF
STREET/CHANNEL
I PIPE
STREET
PIPE
REMARKS
UENGTF
CHANNEL
PIPE
SLOPE
CAPACITY
SLOPE
ISLZEICAPACIT
DESIG
VELOCIT
DESIG
VELOCITY
LOC
(min)
(ft)
(min)
(min)
(min)
(INht)
(ac)
(cfs)
(cfe)
(crs)
(%)
(cfs)
(%)
(In)
(cfs)
(cfs)
(Ills)
(cfs)
(Ns)
1
2
3
4
4a
5
8
7
8
9
10
1t
12
13
14 149
15
18
I 17
I 18
19
20
21
22
23
1
16
50
310
PA
387
0
89
071
760
025
17
17
05
L
399
065
134
2
2
50
50
100
900
016
14
14
3
3
50
50
100
900
017
15
15
4
34
50
50
100
900
036
32
32
5
25
50
40
PA
O17
0
52
100
890
021
19
19
408
L
1034
099
392
6
6
50
50
047
900
017
09
09
site
123456
89
89
095
760
082
62
62
Notes 1 Column 4a Identifies the type of channel used to calculate the velocity for the travel time calculations
2 Column 14a Identifies whether the street Is a main arterial collector or local street for use In the street capacity calculations
R. Dnl.g D"gn rid T M W Cllt 4
V1
1
C
INLETS
24
I
1
1
1
1
1
1
1
1
1
1
1
t
CAPACITY OF 2 FOOT WIDE CURB CHASE
Worksheet for Rectangular Channel
Project Description
Project File c \haestad\fmw\project2 fm2
Worksheet HARMONY 12TH SIDEWALK CHASE CAPACITY
Flow Element Rectangular Channel
Method Manning s Formula
Solve For Discharge
Input Data
Mannings Coefficient
0 016
Channel Slope
0 020000 ft/ft
Depth
039 ft
Bottom Width
200 It
Results
Discharge
439
cfs Icy 3 =
Flow Area
078
ft'
Wetted Perimeter
278
ft �� Z
Top Width
200
ft
Critical Depth
053
ft
Critical Slope
0 008129 ft/ft
Velocity
563
ft/s
Velocity Head
049
ft
Specific Energy
088
ft
Froude Number
159
Flow is supercritical
05/07/96 FlowMaster v513
' 01 33 37 PM Haestad Methods Inc 37 Brookside Road Waterbury CT 06708 (203) 755-1666 Page 1 of 1
10'-O" MIN SECTION
5\8" X 2 -6 X 4 -6 A \
RAISED PATTERN NON- PLACE FIRST SCREW
SKID GALVANIZED 6 FROM FRONT EDGE
STEEL PLATE SEE OF PLATE
(AASHTO M-111) B DETAIL "A" B
L
A
PLAN VIEW
2-0' F/L 6" 8-0" N TS
SLOPE PLATE TO MATCH
SIDEWALK
3" 2'-0" 3"
N
4 5 ; �4� 1 2% SLOPE
_1 :
It A < 4" <n
2 1 7 1 /2"
s a
SLOPE 6' MIN 21 SECTION A -A
SLOPE
3'-0"
5 -6"
SECTION B-B
iz
I
1
11
1
1
I
I
■W,NC
Engineering Consultants
CLIENT 1 ✓dd �?.C�7 L "` >`� i JOB NO �.
PROJECT r� �Z*'�� CALCULATIONS FOR
_
MADE BYt1!VATE'I=CHECKED BY- SHEET OF
-
1 - -- -
-_- -fi- - -- - - - i --- _-
�,4 JIt `! Q_
e�L i"ni
Cq
- - - -
- - - --
- - — - r
4�Ae
1
I
ZIL
131
1
1
Triangular Channel Analysis & Design
Open Channel - Uniform flow
Worksheet Name aim
Comment capacity of trickle pan
Solve For Discharge
Given Input Data
Left Side Slope
4
00 1 (H V)
Right Side Slope
4
00 1 (H V)
Manning's n
0
016
Channel Slope
0
0050 ft/ft
Depth
0
38 ft 4 S
Computed Results
Discharge
1
19 cfs = 133
Velocity
2
11 fps
Flow Area
0
56 sf
Flow Top Width
3
00 ft
Wetted Perimeter
3
09 ft
Critical Depth
0
35 ft
Critical Slope
0
0069 ft/ft
Froude Number
0
86 (flow is Subcritical)
Open Channel Flow Module, Version 3 21 (c) 1990
Haestad Methods, Inc * 37 Brookside Rd * Waterbury, Ct 06708
141
I
11
EROSION CONTROL
27
1
1
1
I
1
1
1
1
1
1
1
RBD Inc
RAINFALL PERFORMANCE STANDARD EVALUATION
T w WVV
PROJECT Harmony Market PUD, 12th filing STANDARD FORM
CALCULATED BY JAM DATE 02/19/96
Developed
Erodlbilty
Asb
Lsb
Ssb
Lb
Sb
PS
Subbasln
Zone
(ac)
(ft
%
ft
1
moderate
008
430
090
2
moderate
016
110
180
3
moderate
017
100
240
4
moderate
019
130
260
5
moderate
005
40
270
Total
065
147
21
796
CA16%1VIrLC t.r�LliVl/'11 I%JI'IJ
Lb = sum(AILI)/sum(AI) _ (0 08 x 430 + + 0 00 x 0)/ 0 65
147 ft
Sb = sum(AISI)/sum(AI) _ (0 08 x 0 90 + + 0 00 x 0 00)/ 0 65
21 %
PS (during construction) = 79 6 (from Table BA)
PS (after construction) = 79 6/0 85 = 937
1 S/
1
' RBD Inc
1
1
EFFECTIVENESS CALCULATIONS
Total Site as one phase
, ,. ,W.
PROJECT Harmony Market PUD 12th filing STANDARD FORM B
CALCULATED BY JAM DATE 02/19/96
Erosion Control
C Facto
P Facto
Comment
Number Method
Value
Value
6 Gravel Finer
1
08
placed at curb chase
8 Sift Fence Barrier
1
05
placed at downstream property boundaries
9 AsphaR/Concrete Pavement
001
1
budding also considered paved
1 Bare Soil Packed and smooth
1
1
1 Bare Soil Packed and smooth
1
1
1 Bare Sod Packed and smooth
1
1
1 Bare Sod Packed and smooth
1
1
M O
S
BASIN
°h
ac
SITE
796
065
Practice C A P A Remarks
BASIN
BASIN
ae
SITE
DURING CONSTRUCTION
1
008
8 008 004 SIR Fence Barrier
2 w/o building
010
8 010 0 05 Sift Fence Banner
2 building
006
9 000 0 06 Asphall/Concrete Pavement
3 w/o building
007
8 007 004 Sift Fence Barrier
3-building
010
9 000 010 AsphaR/Concrete Pavement
4 w/o building
006
8 008 0 03 Silt Fence Barrier
4 building
002
9 000 002 Asphalt/Concrete Pavement
4 east asphalt
005
9 000 005 AsphaR/Concrete Pavement
5 construction
001
8 001 001 SIR Fence Barrier
5-easOng asphalt
005
9 000 005 AsphaR/Concrete Pavement
032676 0 438
Cnst [0 08A 00+ +0 05x0 01y0 65
= 050
Pnet = 0 8)40 084 50+ +0 05x1 OOyO 65
= 054
EFF = (1 C'P)100 = (1 0 50 0 54)100
= 7290
««< 79 6 (PS)
Assume paving not constructed within 6
weeks use gravel inlet filters at all area
inlets & sift fence at swales & downstream
perimeters
' RBD Inc
ii /
1
1
1
1
1
1
1
1
Total Site
ifo / J-V V J
PROJECT Harmony Market PUD, 12th filing STANDARD FORM B
CALCULATED BY JAM DATE 02/19/96
Erosion Control
C Facto
P Facto
Comment
Number Method
Value
Value
9 Asphalt/Concrete Pavement
001
1
Paved and constructed also building
16 Established Grass Ground Cover 70%
004
1
Lawns and openspace
19 Established Grass Ground Cover - 100%
002
1
Area not disturbed during construction
MAD 0 R
BASIN
PS
%
ac
SITE
937
065
MAJOR
SUB
AREA
Practice C' A P' A Remarks
BASIN
BASIN
ac
AFTER CONSTRUCTION
1
008
16 000 008 Established Grass Ground Cover 70%
2 w/o building
010
9 000 010 Asphalt/Concrete Pavement
2-building
006
16 000 006 Established Grass Ground Cover 70%
3 w/o building
007
9 000 007 Asphalt/Concrete Pavement
3-building
010
16 000 010 Established Grass Ground Cover - 70%
4 w/o building
006
9 000 006 Asphalt/Concrete Pavement
4 building
002
9 000 002 Asphalt/Concrete Pavement
4-exist asphalt
005
9 000 005 Asphalt/Concrete Pavement
5 construction
001
16 000 001 Established Grass Ground Cover 70%
5-wasting asphalt
005
9 000 005 Asphalt/Concrete Pavement
Cnet = [0 08x0 04+ +0 05x0 01 y0 65
= 002
Pnet = [0 08x1 00+ +0 05x1 OOyO 65
= 092
EFF = (1-C'P)100 = (1-0 02*0 92)100
= 9807
> 93 7 (PS)
RBD Inc
1
h
r_
1
C
1
11
11
1
EROSION CONTROL COST ESTIMATE
PROJECT
Harmony Market PUD 12th filing
#673-003
PREPARED BY
JAM
DATE
02/19/96
TY R EEDIN
Unit
Total
Method
Quantity Unit
Cost
Cost
Notes
Reseed/mulch
0 65 ac
$1 300
$845
See Note i�]
Subtotal
$845
Contingency
50%
$423
Total
$1 268
EROSION CONTROL MEASURES
Unit
Total
Number Method
Quantity Unit
Cost
Cost
Notes
6 Gravel Fitter
2 ea
$300
$600
8 Silt Fence Barrier
300 LF
$3
$900
Subtotal
$1 500
Contingency
50%
$750
Total
$2 250
Total Secun
$2 250
Notes 1 A<1 ac=$1300/ac, A=1-10 ac=$650/ac A>10 ac=$500/ac
[J
[J
CONSTRUCTION SEQUENCE
YEAR
1996 1997
MONTH
M I A I H J I J A I S O N I D J F
OVERLOT GRADING
WIND EROSION CONTROL
Soil Roughening
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
RAINFALL EROSION CONTROL
STRUCTURAL
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bogs
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other —Grovel Mulch
VEGETATIVE
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mots/Blankets
Other
STRUCTURES INSTALLED BY MAINTAINED BY
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON
ci
Z b/
1
1
1
TABLES AND FIGURES
1
1
1
1
1
1
34
1
71
1
1
1
1
1
1
1
1
1
1
1
i
1
1
1
1
1
1
1
0
U
Q
LL
A
P4GE 26
ESTABLISHED GRASS AND NACTORS
FORT COUINS, COLORADO
°4"
025
020
015
010
005 - - -- -
0000 10 20 30 40 50 60 70 80 90 100
ESTABLEG GRASS GROUND COVER (7)
FIGURE 5 1
TABLE 8—A
RAINrALL PERrORMANCE STANDARDS rOR PORT COLLINS, COLORADO
LENGTH
SLOPE (1)
(rT)
O
S
1
0
1
5
2
0
2
5
3
0
3
5
4
0
4
5
5
0
6
0
7
0
8
0
9
0
10
0
20
0
30
0
40 0 50 0
100
70
9
74
G
7G
8
78
4
79
5
80
3
81
1
81
6
82
1
82
5
83
0
83
4
83
G
83
8
84
0
84
7
84
3
84 9 84 9
200
72
0
76
3
78
2
79
5
80
5
81
2
82
1
82
5
82
8
83
2
83
6
83
9
34
0
84
2
84
3
84
8
84
9
84 9 84 9
300
72
4
77
0
70
8
80
0
80
9
81
6
82
5
82
8
83
1
83
5
83
8
84
1
34
2
84
3
84
4
84
8
84
9
84 9 85 0
400
72
G
77
4
79
1
30
3
01
2
81
8
82
7
83
0
83
3
83
7
84
0
64
2
84
3
84
4
34
5
84
0
84
9
84 9 85 0
500
72
7
77
7
79
4
80
5
81
3
01
9
82
8
83
1
83
4
83
0
84
1
84
3
84
4
84
5
84
6
94
9
84
9
85 0 85 0
600
72
8
77
9
79
5
80
6
81
4
82
0
33
0
83
2
83
5
83
9
04
1
34
3
84
4
84
5
84
6
84
9
84
9
85 0
700
72
3
78
0
79
7
80
8
31
5
82
1
83
0
83
3
83
5
84
0
84
2
04
4
34
5
84
5
84
6
84
9
84
9
85 0
300
72
7
78
1
79
7
80
8
81
6
82
2
83
1
83
4
83
6
04
0
04
2
84
4
84
5
84
G
84
6
84
9
84
9
85 0
900
72
7
78
2
79
8
80
9
81
7
32
2
83
2
83
4
83
6
84
1
84
3
84
4
84
5
84
G
34
7
84
9
04
9
85 0
1000
72
7
70
3
79
9
81
0
81
7
82
3
83
2
83
5
83
7
84
1
84
3
34
4
84
5
84
6
34
7
84
9
84
9
85 0
1100
72
6
78
3
79
9
81
0
81
7
82
3
83
3
83
5
83
7
84
1
84
3
84
5
84
6
84
6
84
7
84
9
84
9
1200
72
G
78
4
80
0
81
0
81
8
B2
3
03
3
83
5
03
7
84
2
04
3
84
5
04
6
84
G
84
7
84
9
84
9
ro
1300
72
6
78
4
80
0
81
1
81
3
82
4
83
3
83
6
03
8
84
2
34
4
84
5
84
6
84
6
84
7
84
9
85
0
a
1400
72
5
78
5
80
1
81
1
81
8
82
4
83
4
83
6
83
8
84
2
84
4
84
5
84
G
84
7
84
7
84
9
85
0
1500
72
4
78
5
80
1
81
1
81
9
82
4
83
4
83
6
83
8
84
2
84
4
84
5
84
G
84
7
84
7
04
9
85
0
1600
72
4
78
5
80
1
81
1
81
9
82
4
83
4
83
6
83
8
84
2
84
4
84
5
84
6
84
7
84
7
84
9
1700
72
3
78
5
80
1
81
2
31
9
82
4
83
4
83
6
83
8
84
3
84
4
84
5
84
6
84
7
84
7
84
9
1800
72
3
78
6
60
1
81
2
81
9
82
4
83
4
83
7
83
8
84
3
84
4
84
5
84
6
84
7
84
7
84
9
1900
72
2
78
6
80
2
81
2
81
9
82
5
83
5
83
7
83
9
84
3
84
4
84
5
84
G
84
7
84
7
84
9
2000
72
2
78
6
80
2
81
2
81
9
52
5
83
5
03
7
83
9
84
3
84
4
84
6
84
G
84
7
84
7
84
9
2500
71
9
73
6
80
2
81
3
82
0
82
5
83
5
33
7
83
9
84
3
84
5
84
6
84
7
84
7
84
8
3000
71
6
78
7
80
3
81
3
82
0
82
5
83
6
83
8
84
0
84
4
84
5
84
6
84
7
84
7
84
8
3500
71
4
78
7
80
3
81
3
82
0
82
6
83
6
83
8
84
0
84
4
84
5
84
6
84
7
84
7
84
8
4000
71
1
78
6
80
3
81
3
02
0
82
6
83
6
83
8
84
0
84
4
84
5
84
6
84
7
84
8
84
8
4500
70
9
78
6
80
3
81
3
82
0
82
6
83
7
83
9
84
0
84
4
84
6
84
6
84
7
84
8
84
8
5000
70
6
78
6
80
3
81
3
82
0
82
6
83
7
83
9
84
0
84
4
84
6
84
7
84
7
84
8
84
8
0
n
In
(l
Z
fl
TI
-1
m
A_
D
7
A
G
I
Olne
TIME IN MINUTES
Z411
I
I
I
I
I
I
I
EXCERPTS FROM
FINAL DRAINAGE REPORTS
for
' HARMONY MARKET P U D
SECOND AND THIRD FILINGS
1
1
15
Z=� i=.mow q
zFY
'
BASIN "A"
MP -"HOP
EETENT-ru'-N VOLUMES
PROJECT:
PACE
COMMENTS:
?.0: YEAR STnPPi �t L.o-tfl
'
MAXIM! ;., r:!..!J-Wit"IBLr_ RELEASE
(C,=
)
1.7
RATIONAL
EDUATION: 0
= CIA
C -
1
A(Area)
8.49
TIME OF CONC'E N-1 PAT ION
:-
TIME
CA
I
IDFLOIJ
OUTFLO34
STORAGE
(rdn)
(in/hr)
(cu ft)
(r_.a ft)
(cU ft)
(ac ft)
'---------------
`.i -------
---48 ---------
-----
------L-----
-?-^-_-c-----
5.
9
2-2---J96
10
8.48
7.3
37142.4
1020
36122.4
0.820256
15
3.43
6
45792
1530
44262
1.016115
'
20
8.43
5.2
52915.2
2)40
50875.2
1.167933
25
8.48
4.6
58512
2550
55962
1.284710
30
8.48
4.15
63345.6
3060
60285.6
1.383966
'
35
9.49
3.8
67670.4
3570
64100.4
1.471542
40
S.48
3.5
71232
4080
67152
1.541597
45
8.48
3.25
74412
4590
69222
1.602S92
50
8.48
3
76320
5100
71220
1.634986
'
55
8.43
2.9
78355.2
5610
72745.2
1.67
60
9.48
2.6
79372.8
6120
.73252.8
1.681652
70
8.48
2.3
81916.8
7140
74776.8
1.716639
'
90
8.48
2.05
83443.2
8160
75283.2
1.728264
90
8.43
1.95
94715.2
9180
75535.2
1.734049
100
8.48
1.7
96496
10200
76296
1.751515��E
'
110
3.48
1.55
86750.4
112.20
75530.4
1.733939
120
8.48
1.45
86531.2
12240
76291.2
1.751404
7EStc��-
l�v c13_5.A
4 ,34
�.._ �. -c.� c-f_ :�.�.� r...., m c- r..t'•.�rn. rite'
A
1.5'NIN
JI
LRWy—/
M,Iadoxi G11ADE • LOui. r
011,4
Q AT 1.5'OEPIH •51 Acfs
He• 5.5 AEs DEPTH -0.5'
0W Toef♦ OEPTH•1,25 I
HARMONY ROADSIDE DITCH DETAIL
NTS
WEST OF SITE ENTRANCE
yalp,,iiiii _
POND •' /
!;DDYD
ELLV •955H1 r
PERMANENT POND INFORMATION
POND •' /
!;DDYD
ELLV •955H1 r
PERMANENT POND INFORMATION
Required
Pond
Area
Design Release Rate
Storage
Design Slorc
lacresl
Ices)
TTO
lac-Itl
101 Y W!
A
8.48
L79
IT5/94.5
B
9.95
5.45
1.05
1. Will M
C.
TAB
5.05
1 51
IA7/9z.0
D
6E]
6.Z4
ZIM
S.Zalj P-s
E
I'll"
z.Ts
262
ZW/A70
F
2.11
0.45
0.45
0451.5
ax Naloa
iii"Ni
G
r
O.Ex
Oats
OaO/sT:E
L
GTE
0.54
Ole
015 "a
Ali PIPE N TO BE RAGGED
AT WNH0.E AND AMNOONEP
B
895
FF•94$
PACEeR� T
--al
1" •E•
Want POND
TEMPORARY POND INFORMATION
E DITCH TO Oli POINT K
10510E PITCH MT&1 ., 155HTJ �TWO EXIST. CONCRETE
IMIGATION
AN HEGI
RO
HARMONY ROAD
\ FF •9y.0 \ \
SUILDERS�IT DARE
� a
Requirsd
Pond
Area
Max. Release Rate
Storage
Design Storage
[acres,
aloe' O.Ecls/acre
lac-Itl
lac -It 41
H
I.21
0A4
0 Z5
1 O.F4/95.5
�' H1 la
all �V bL7 W�
rim' s
A
iI
I II' JI
♦ 6
M14 GREOE • 0.5'%
n 005,11
QAT IDEPTH • 9.4, AN
V - 9.4t H/"s
Will, . 0"
Q REQUIRED - 4 BG Ci's
SECTION A —A
NTS
DRAB WN DESIGNED CHECKED � EISpiFwring CAI5sW4nls
055-015 i50 al Coye Aienue 1155 e.euy lonnson Avo 5u1te IN Had SO Fmntaee Rd Wait Ewm 20E
APPROVED DATE PRDIECT NO. And Ca" 'ns Cnmado W625 C010i Syy11195 Norma, WiA Vail DObradal65)
yy]1A-a955 W5Wa10] %rommfiJal
or
S7EELE'S
IF AAO
L
G
DIZ
00 '
EXIST151L
SUMP INLET
EVANGELICAL
COAZMANT
TRURCH
QAY ERIHAON
flb FCTON,
SEE DETAIL 5HT G
I
IN
HIS
x 0 100 xm lm
GRAPHIC SCALE 1"�tlNl'
W -W NO" (,LL.
-
RQTEiL
1.
ALL DRAINAGE FACILITIES ARE TO HE
SIZED DURING FINAL DESIGN OF THE
FILING UNDER DEVEWPMENT.
Z.
SEE FINAL GRADING PLAN FOR GRADES
IN THIRD FILING.
DRAIN
E
].
SECTION B-B WILL BE FROM THE ENIGMAT
APEwill
AT DESIGN POINT HE TO A POINT TEAT
L Cli
r�15T
INVERT HATCHES EXISTING GROUND NEAR
RULE DRIVE.
A.
GRADED AREAS FOR PONDS AND SWALES
AND ROADSIDE DITCHES ARE TO BE
REVEGETATED ACCORDING TO THE LAI
I
SCARE PLANS.
5.
REVEGETATION OF AREAS THAT ARE DIS-
TURBED DUE TO CONSTRUCTION SHALL BE
IN ACCORDANCE WITH THE SPECIFICATIONS
ON THE LANDSCAPE PLANS.
EROSION CONTROL NOTES
Lmu�
ion of the Smele's Mahe[ building expansion, Place erosion come[ My bNes
meaer of the building expansion as shown on [be drainage and erosion control
pol of Nu segue. These My bales should remain in place until the building
s been erected including the roof dmin connection 10 [be existing detention pond
RTCH 114V111 MATCHES MISTING
GRAPE. RIMS PRNN NATUI
WTd RULE ORNE
iiEMPoNARY GRAVEL
fYl-pE-SAC
I L-.f&
RULE DRIVE
HARMONY MARKET III
LEGEND
eDEVELOPED RA5IN IOENTFIGTON
bb DEVELOPED BASINAREA IN ACRES
H2 HISTORIC BA51N IMNTIFICATlp
410G 41y10i IMAI N AREA IN ACRES
�•� H16TORIC DRAINAGE Vail Units
�••� DEVELOPED DRAINAGE BASIN LIVE,
PROPOSED STORM PAI ME,
WITH INLET OR MANHOLE
A DESIGN MINT
�aiamiixai EXISTING STORM PIPE WIN INLE[
Y
00 1 O YEAR STORM Poi
00 DATIONEAKAREA
ExiyTNG f N4GE CHANNEL
we FROUDE NUMBER
FF FINISH FLOOR
L FWWLINE
® IHVN T GROyION CONTROL
was — 1pwy1141a COMOUR
,95— IMPRD/tP KITE CONTOUR
fal EROdON CONTWL EiAdi
THIRD FILING OVERALL DRAINAGE PLAN I TU I y I
& EROSION CONTROL PLAN
DEVELOPED SITE HYDROLOGY
DESIGN
POINT
BASIN
AREA
(cc)
C
I
I (cN
OTy
(cle)
1
1.6
25
0.51
OJ
1.9
2
2
0.17
0.95
0.9
1.8
0
0
OIL-LO95-L
0.9
1.9
4
0,4
DM
0.92
1.0
2A
5
1,51
D"
0.75
1.8
4.9
6
6
0.17
1 0.39
1 0.4
09
or
e POND 'A'
1
I
'a
atti,r,_,
HARIAONY MARKET P.D.D. OVERALL DRAINAGE PLAN, EROSION CONTROL NOTES:
01111ET4DED 'WTH THE THWD FlUbi TOTAL SITE REIIIIRNIRY - _.<a-.o( Doping, the wit footing ,r,..
DETENTION POND 'A' 91PWARY . a. ._s� ro pion wawa be mna sa.
m awleprotect the Pro ti bon raw 9 a CeDuPRC4OSED me .e aoe.m e qo.x Oalaeevw.a uoon,CONOmON
The
INVERT OF AREA INLETS 4993,40 ray °boon eue n.e °' be mm aT wby e iandomm .
been ran'pe1ee
100—M OUSEL
4994.90
FREEBOARD
0'
DETENTION PROMDED
1.75 AC PT
RELEASE RAZE
1.70 CPS
Y-0-
0100 - 1.2 cis
DIDD = 0,375' CONCRETE TRICKLE PAN S
CWSTlei 40JENCE
SiWOMES'. INSTALLED BYE ITI. 1
Mi Y)
DATE wN WnTED APPROVED Be COI (A TVNI Nu
LEGEND
y '.� a« - EXISTING STORM SEWER ei INLETS
EXISTING CONTOUR (1INTERVAL)
�A21 PROPOSED CONTOUR
2 Si DESIGNAPON
4.64AC Si AREA
no�.l nnn. m..,�. BASIN BOUNDARY PRW
OVERALL DRAINAGE PLAN (BASIN A)
s.-....d.-SUBBASIN BOUNDARY
SITE BOUNDARY LIKE
Qj DESIGN PgNT
ROW DIRECTION
G- SET FENCE BARRIER
C/ CiRAVEL INLET FILTER
100 YEAR HW.
E TIER OF c(ELOR�
1-800-922-1967
ce 534-6700 ®:
City of Fort Collins, Colorado
UMXrY PLAN APPROVAL
SCALE 1'=50' APPROVED.
D6eolor of Eorlaeertry Date
CHECKED BY:
DESIGNED
acao
Mla
HARMONY MARKET P.U.D. TWELFTH FILING
MAO
MAY 19%
DAT
67
PROJEcr NO I
EnDinex9l` ComWINro D,°9, Ems",,"RAT', ` ;o`y'`aD'E;60 """ ""
°"r-ee'• °^® 9ro/W-YT) eo/Afa-ssn
BOGAARD CONSTRUCTION, INC.
APPPOY£D
Eaten It Eeateeeter Blifty
Date
CHECKED
BY'.
spirmembir Nutty
Date
CHECKED
BY.
ParIN 6 Recreatim
Date
CHECKED
BY:
Date
CHECKED
BY:
Dote
1
DRAINAGE AND
EROSION
7
3
CONTROL
PLAN