HomeMy WebLinkAboutDrainage Reports - 11/27/1995 (2)PROPERTY OF Final Fleport FINAL DRA1NAGE AN➢ EROSION CONTROL STUDY ALkRIET P.U.D., ELEVENTH FILLNG FORT COLLINS, COLORADO 44 1 1 1 1 1 FINAL DRAINAGE 4,ND EROSION CONTROL STUDY FOR HARMONY MARKET P U D , ELEVENTH FILING FORT COLLINS, COLORADO September 15, 1995 Prepared for Bogaard Construction 5006 Blue Stem Court I Fort Collins, Colorado 80525 Prepared by RBD, Inc Engineering Consultants 209 South Meldrum Fort Collins, Colorado 80521 (970) 482 6368 RBD Job No 673-002 1 T:01NC ' Engineering Consultants 209 S Meldrum Fort Collins Colorado 80521 303/482 5922 ' FAX 303/482 6368 September 15, 1995 ' ' Mr Basil Harridan City of Fort Collins Utility Services Stormwater 235 Matthews Street Fort Collins, Colorado 80522 ' RE FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE HARMONY MARKET P U D , ELEVENTH FILING ' Dear Basil i We are pleased again to submit to you, for your review and approval, this Final Drainage and ' Erosion Control Study for the Harmony Market P U D , Eleventh Filing All computations A ithin this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria The review comments offered by City Staff on the June 19 and August 2, 1995 Submittal have all been addressed at this point Please note there is a variance being requested within this report (Page 3) regarding the city's ' requirement for detention pond freeboard Before the submittal of this project you and I met about this criteria Since the Harmony Market P U D was approved with no freeboard on any of its ponds, and since we are over -detaining stormwater you agreed to allow less than 1 0' freeboard on Detention Pond G I ' We appreciate your time and consideration in reviewing this submittal questions I Respectfully, ' I RBD Inc Engineering ( I Consultants Prepared by Please call if you have any 40 q�O �\� W G1y0 lF 24766 9 :< CZ .� •C Perry bot Kevin W Gingery E Project ineer I Water Resources Project Manager Reviewed by ' Denver303/458 5526 t 1 1 1 1 TABLE OF CONTENTS GENERAL LOCATION AND DESCRIPTION Location Description of Property DRAINAGE BASINS Major Basin Description Sub -Basin Description DRAINAGE DESIGN CRITERIA Regulations Development Criteria Reference and Constraints Hydrological Criteria Hydraulic Criteria Variances from Criteria DRAINAGE FACILITY DESIGN General Concept Specific Details Future Construction EROSION CONTROL General Concept Specific Details CONCLUSIONS Compliance with Standards Drainage Concept Erosion Control Concept REFERENCES APPENDIX I VICINITY MAP HYDROLOGY CALCULATIONS DETENTION CALCULATIONS EXCERPTS FROM FINAL DRAINAGE REPORTS for HARMONY MARKET P U D SECOND AND THIRD FILING PIPES AND INLETS EROSION CONTROL TABLES AND FIGURES PAGE 1 1 1 1 1 2 2 3 3 3 4 4 5 5 5 6 6 6 7 7 M 3 9 15 24 27 34 11 I ' FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE HARMONY MARKET P U D ELEVENTH FILING FORT COLLINS, COLORADO t I GENERAL LOCATION AND DESCRIPTION ' A Location ' The Eleventh Filing of Harmony Market P U D is located south of Harmony Road between Boardwalk Drive and Lemay Avenue It can also be described as being located due south of the Tenth Filing (Lee's Cyclery) between the Second and Third Filings (Budder's Square #1580 and Steele's Market) of Harmony Market P U D, and bounded on the south by Oakndge Drive More specifically, this site is located in the Northeast quarter of Section 1, Township 6 North Range 69 West of the 6th Principal Meridian, City of Fort Collins, Lanmer County, Colorado ' B Description of Property The existing Harmony Market P U D has been developed in several phases and ' contains a Pace Warehouse, Builders Square, Steele's Market First Bank, Jiffy Lube Lee's Cyclery, and several restaurants along the frontage of Harmony Road ' The Harmony Market P U D Eleventh Filing site contains approximately 3 137 acres and is currently undeveloped The site is bordered on the East by Steele's Market and on the West by Builder's Square The proposed purpose for the subject site is ' currently understood to be retail usage ' II DRAINAGE BASINS A Ma-lor Basin Description ' The project site is located within the McClellands Basin No major drainage way exists wnthm the Harmony Market P U D development or immediately downstream within the Oak/Cottonwood Farm site ' B Sub -Basin Description The Eleventh Filing of Harmony Market P U D lies within three developed basins ' as land out in the Harmony Market P U D Overall Drainage Plan amended with the 1 ' Third Filing of the P U D , also known as Steele's Market The north portion of the property drains to Pond 'E', which will be completed with this project The south ' portion will dram to Pond 'G, which will be completed with this project Finally a small strip of land at the southeast comer of the Eleventh Filing will dram to Pond 'L' (see Overall Drainage Plan, provided in the back pocket of this report) III DRAINAGE DESIGN CRITERIA A Regulations The City of Fort Collins Storm Drainage Design Criteria is being used for this subject site ' B Development Criteria Reference and Constraints As stated earlier, flows from the site, are a part ofBasin'E' (12 58 acres) and Basin ' 'G (1 08 acres), shown on the Overall Drainage Plan for the Harmony Market P U D in the back pocket of this report This report includes the drainage design for the Steele's Market as well as the drainage design for the Eleventh Filing ' When the Builder's Square building was expanded in April of 1994, an amended drainage report was submitted by Professional Engineering Associates out of Michigan, and approved by the City of Fort Collins Stormwater Utility This report altered the previous design of Detention Ponds 'E' and'G' The building expansion re-routed some of site's stormwater from Pond 'G' into Pond 'D' The Eleventh Filing's Pond G thus became smaller, 0 20 ac-ft, and Pond 'D accepted more runoff ' , 3 25 ac-ft (see revision 2 on the Harmony Market O D P in the back pocket of this report) Pond 'G' originally was designed for 0 53 ac ft and Pond D for 2 50 ac ft ' Pond 'G' is being designed as a part of this project In conjunction with the Harmony Market P U D , Third Filing, Pond 'E was partially ' constructed, with a 2 75 cfs release rate dictated by the capacity of downstream facilities at the Oakndge West P U D First Filing This downstream development has a drainage release requirement of 0 2 cfs/acre for the maximum 100 year release rate ' Therefore the release rate for Basin "E" which now contains 13 45 acres of the entire Harmony Market P U D was determined to be 2 75 cfs, requiring a storage of 2 82 acre-ft, in a developed condition It is important to note that Pond 'E' was previously designed to include 178 acres of Harmony Market P U D , Eleventh Filing in a developed condition The rest of the property includes 108 acres which drains to Pond 'G' and a small 0 07 acre strip of land wluch drains to Pond 'L' This report ' intends to comply with the previous design for Pond 'E' by matching existing grades around the parking lot and raising the existing area inlet in the proposed parking lot 1 2 I Within the amendment to the drainage report for the Builder's Square expansion ' Pond 'G' was also affected The required size of Pond 'G decreased since the Builder's Square building expansion consumed some of its contributory area This consumed area was then, and is now, draining to the offsite Pond D (See Harmony Market O D P ) Currently, there are 108 acres within Basin'G, as per the revised Overall Drainage Plan for Harmony Market P U D , Third Filing This acreage dictates a release rate of 0 22 cfs and required pond size of 0 20 acre-ft, in a developed condition The calculations for this pond size are provided in the appendix of this report A small portion of the property in the southeast corner was previously designed to dram into Pond V. as per the Overall Drainage Plan This intent will not be altered ' during the design of this project as this part is already paved and there is no reason to disturb it ' C Hydrological Criter� The Rational Method is being used to deterrnme run-off peak flows from the study site Rainfall criteria for this study was obtained from the City of Fort Collins and is included in the Appendix within the Detention Section The 10- and 100-year rainfall criteria were utilized to determine the planned developed flows D Hydraulic Criteria ' All calculations within tlus study have been prepared in accordance with the City of Fort Collins Drainage Criteria E Variances from Criteria ' Two variances area being sought for the Harmony Market P U D , Eleventh Filing regarding detention pond freeboard First, the ponds at the Harmony Market P U D were approved without the use of freeboard and the space is limited on the Eleventh Filing to provide only 0 42' of freeboard as opposed to the city's criteria of 1 0' We feel tlus situation is acceptable, since there will exist some amount of freeboard to protect the building, and also because we have designed an overflow weir in the southeast corner of the pond This variance request holds for the proposed construction, and for the future building expansion this project may acquire ' Secondly, the depth of ponding in the Harmony Market P U D Pond 'E has from its beginning been designed to be 18" above the area inlets in the parking lots Since ' this project is required to finally complete Pond 'E', we area using the currently ' 3 ' designed pond size, which requires tlus ponding depth of 18" In other words we must use this depth, even though it is 6" above what the City now requests We must ' use it in order to accommodate the entire contributory area to Pond `E' IV DRAINAGE FACILITY DESIGN ' A General Concept ' The north basins of the site dram via curb, gutter, sheet flow and roof drams into Pond 'E', as laid out in the ODP for the Harmony Market P U D This pond is partially constructed and will be finished with the completion of this project The south basin will outfall from roof drams into the proposed Pond 'G' as delineated in the ODP as well Currently this pond is in an undeveloped condition, but will be ' completed with the Harmony Market P U D , Eleventh Filing A small strip of land along the southeast property hne will outfall to Pond V behind Steele's Market From the ODP, this offsite contribution was expected and Pond has been designed to ' accept it Included in the back pocket of this report is the Drainage and Erosion Control Plan for Harmony Market P U D , Eleventh Filing ' B Specific Details Basin 1 of the study site will be conveyed by a roof dram system and overland flow into the proposed Pond'G' directly to the south of the site building Pond 'G' has been ' designed to detainin excess of 16 acre-ft at a release rate of 0 22 cfs The 100-year HWL of this pond has been estimated at 4987 10, providing 0 90' of freeboard to protect the proposed building (FF = 4988 00) Due to the fact that the Harmony Market does not provide freeboard in any of its ponds, a previous agreement with the Stormwater Utility was made to allow less than 1 0' , especially since the Eleventh Filing is over -detaining The outfall for this pond, an 18" RCP with a flared end section, has already been ' constructed This outfall releases into an existing curb inlet along Oakndge Drive which in turn outlets to an existing channel to the south of Oakndge Drive This outfall will not be disturbed except during the installation of an onfice plate at the ' flared end section As stated before a small strip of property along the southeast property line, called Basin 5 will dram offsite to the existing Pond 'L', directly south ' of Steele's Market Basins 2, 3, and 4 comprise the north portion of the property The existing Steele's Market Detention Pond'E' was previously sized large enough to accommodate the proposed building on the Eleventh Filing property, as shown in the appendix of this report As part of the construction process for the Eleventh Filing, Pond 'E' will be ' finally constructed to aclueve the 100-year HWL of 4987 00' and the low point ' 4 7 L elevation at the area inlets of 4985 50', thus complying with the intent of the Overall Drainage Plan for the Harmony Market P U D The plaza area will be drained using ' area inlets and a piping system winch will connect to the existing area inlet in Basin 2 This design is being proposed to control excessive runoff and icing in the large plaza There is an existing area inlet at Design Point 2 and a 15" RCP connecting this ' property to the entire pond, as shown on the Overall Drainage Plan Basin 2 includes the parking area within the northern side of the site Runoff from it ' will flow via curb and gutter, then sheet flow to the existing area inlets in the center of Pond 'E' Since this parking area is surrounded by existing asphalt and curb and gutter, which is crucial to the proper construction of Pond 'E', the existing conditions ' will not be damaged During construction of the Harmony Market P U D , Eleventh Filing existing grades at the property lines will be tied in to and not disturbed Basin 4 consists of the north portion of the roof which does not dram to Pond 'G in the rear of the building, an area totaling 0 15 acres Drainage from the plaza area, ' approximately 0 15 acres in front on the building will be contained in Basin 3 There will be two area inlets installed in the most sunlit area of this plaza to route the runoff from it out of the pedestrian through -fare Roof drains conveying runoff from Basin ' 4 will be connected directly to these area inlets, so that stormwater from the roof will not sheet flow over the plaza These two area inlets will be tied to the existing area inlet at Design Point 2 by a 12" RCP ' Lastly Basin 0-1 is an offsite basin winch flows via curb and gutter into the existing curb inlets along the east flowhne of this access drive These inlets outfall to Pond D', as shown on the Overall Drainage Plan included in the back pocket of this report C Future construction ' In the future, it may be the case that the proposed building will receive an expansion to the south This expansion most likely will involve the construction of another 7500 ' square feet of building room, including a vehicle loading\unloading dock This building expansion will not mcur any additional pond storage, since Pond 'G', has already been designed with this project assuming this additional impervious area If this building expansion takes place, it will be necessary to regrade the Pond 'G' to allow for this consumed area by shifting the top contour (4988) to the south, as shown on the Drainage and Erosion Control Plan included in the back pocket of this report It is important to note that the floor slab of the loading/unloading dock to be constructed with this possible expansion will be about 4 feet lower than the 100- ' year HWL ofPond'G, to the south of it Since this is the case, it will be appropriate to install a private sump pit with a pump to dram this low lying area Also, since the dock's floor elevation will be lower than the pond, a retaining wall will have to be constructed along the south wall of the dock in order to prevent the dock from ' 5 .J ' of the building's floor slab If the top of wall is constructed as suggested here there will still be 0 70 feet of freeboard provided ' V EROSION CONTROL ' A General Concept The Harmony Market P U D , Eleventh Filing lies within the Moderate Rainfall and ' Wind Erodibnlity Zone per the City of Fort Collins zone maps The potential exists for silt movement during construction of the parking/driveways and building, as well as the regrading of Pond 'G at the rear of the proposed building until the disturbed ' ground is paved or revegetated Thus the new improvements will be subjected to both wind and rainfall erosion ' Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites and related calculations in the appendix, the erosion control performance standard for the subject site during construction is 77 10 % and after construction is 90 71% From the calculations in the appendix, the effectiveness of the proposed erosion control plan is 78 91%, during construction, and 98 99%, after construction It is anticipated that the construction duration of this project will be less than 8 weeks due to the limited amount of work to be completed, therefore the erosion control plan as specifically detailed below, should meet the City of Fort Collins requirements B ,Specific Details Given the size and scope of work to be completed for this construction project, we anticipate that installation of the curb, gutter, asphalt, and landscaping can be completed within six weeks after overlot grading begins If this is not the case then the area shall be reseeded according to the City of Fort Collins revegetation requirements ' After the overlot grading and utility installation has been completed, the parking/driveway surfaces will receive the curb, gutter, and pavement surfaces, for permanent erosion control After installation of the curb, gutter, and pavement ' surfaces the permanent landscaping surfaces (grass sod) will be installed to protect the bare ground After finished grading, Pond `G' shall be reseeded with a native grass or tall fescue and hay mulch applied to protect the seed In order to protect the pond outfalls from receiving excessive silt deposits, the area inlets will have gravel filters installed around them and the Pond'G' outfall pipe will have a straw bale barrier placed in front of it These items can be removed once asphalt and landscaping in their respective areas have been installed 1 6 I VII CONCLUSIONS ' A Compliance with Standards ' All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Cntena B Drainage Concept ' The proposed drainage concepts presented in this report and shown on the Drainage and Erosion Control Plan are in compliance with the City of Fort Collins drainage Cntena Tlns project was designed to be in conformance with the intent of the Overall Drainage Plan for Harmony Market P U D Tlus compliance includes the ' implementation of all recommend 100-year HWL's and pond volumes for Ponds'E' and 'G ' C Erosion Control Con The proposed erosion control plan adequately provides for the control of wind and rainfall erosion from the study site Through the construction sequence and proposed erosion control measures, the City of Fort Collins performance standards will be met ' The proposed erosion control concepts presented in this report and shown on the Erosion Control Plan are in compliance with the City of Fort Collins erosion control criteria 7 REFERENCES 1 RBD Inc, Harmony Market P.U.D. Second Filing Final Drainage Report, Total Site Preliminary - Revised Drainage Report- Fort Collins, Colorado, August 13 1990 2 RBD Inc, Harmony Market P.U.D. Third Filing Final Drainage Report 3 City of Fort Collins, Storm Drainage Design Cntena and Construction Standards, May 1984, Revised 1992 4 City of Fort Collins, Erosion Control Reference Manual for construction Site January1992 5 PAE, Inc, Final Drainage and Erosion Control Study for the Builder's Square Expansion Apnl 1994 8 I 1 1 1 1 1 APPENDIX 1 1 VA-14TOVIUMNs' 1 1 1 1 n I VICINITY MAP ' SCALE 1 "=2000' HYDROLOGIC CALCULATIONS M CARRIAGE WASH P U D PEC PEC 01-Aug-95 Project Harmony Market Eleventh Filing For Bogaard Construction Inc Project No 673-002 This sheet calculates the composite "C" values for the Rational Method Design Area Impervious ' C" Pervious C' A total ac A imp ac Percent Im ery Percent Pervious Comp C 1' 095 025 1 08 053 491 509 059 2 095 025 1 48 146 986 14 094 3 095 025 015 0101 667 333 072 4 095 025 015 015 1000 00 095 5 095 025 007 007 1000 00 095 0-1 095 025 020 020 1000 00 095 0-2 095 025 019 019 1000 00 095 * The proposed development and future development of Basin 1 both have the same 'c' value due to the proposed impervious parking lot and the future impervious rooftop M M M M M = M M RBD Inc STANDARD FORM SF 2 PEC 01 Aug 95 Project Harmony Market Eleventh Filing For Bogaard Construction Inc Project No 673 002 Tc = 1 87(1 1 C x Cf)D^0 5 S^(1/3) This sheet calculates the time of concentration for the 10 year storm STORM 10 yr (developed) cf = 1 00 DATE 01 Aug 95 SUB BASIN DATA INITIAL/OVERLAND TIME TRAVEL TIME COMPOSITE C FINAL tc REMARKS DESIG AREA C LENGTH SLOPE ti LENGTH SLOPE VELOCITY tL (ac) (ft) (%) (min) (ft) N (ft/s) (min) CALCULATIONS (min) 1 2 3 4 5 6 7 8 9 10 11 12 13 1 1 08 059 69 1 00 79 336 1 00 19 29 See c value sheet 109 into pond 2 1 48 094 162 1 00 38 106 1 00 19 09 See c value sheet 50 parking lot 3 0 15 072 40 1 50 39 50 080 17 05 See c value sheet 50 plaza area 4 0 15 095 73 1 00 24 42 1 00 1 9 04 See c value sheet 50 rooftop 5 007 095 0 001 0 0 16 1 50 2 3 0 1 See c value sheet 5 0 Pond L 0 1 020 095 19 200 1 0 130 060 1 5 1 5 See c value sheet 5 0 offsite 0 2 1 0191 0 951 231 2001 1 11 2501 0901 1 81 2 3 See c value sheet 1 5 0 1 offsite 313 Storm Drainage Design and Technical Criteria 2 _ lllMtTORMNAGEM PRE NARY WDESIGN DAT PROJECT Harmony Mkt 11 STORM 10 yr (developed) Cf = 100 CALCULATED BY PEC DATE 01495 m m m m m OP BASINS LENGTH Id FLOW TIME STREET IL PIPE 1 C INTENSITY AREA DIRECT RIMOFF OTHER RUNOFF TOTAL RUNOFF S7REET PIPE STREET PIPE REANRCS SLOPE CAPACITY SLOPE SIZE CAPACITY DESIGN VELOCITY DESIGN VELOCITY LOC (6) (m) wd (m) (mi) 0,W) ( ) (ch) (cfa) (Ch) (%) (d ) (%) (I ) (d) (c1a) (N) (Ch) (01 ) 1 2 7 1 5 6 7 8 8 10 11 12 17 11 d 15 16 17 16 iB 20 21 22 27 1 1 109 109 059 /72 108 28 28 R.ffld ppnd5 mpf 1 1 50 SO 085 560 015 08 Be Rung Ran nalK rWslda 7 7 50 50 072 560 015 06 06 Rung Ban plan 7 71 50 50 0M 560 070 11 1,4 150 12 /A 11 12 AH7 AF2(Am ft" ) 2 2 50 50 094 560 148 76 78 SA a11bw ems paddnp Id 2 201 170 50 07 57 092 575 178 66 as AIm BCp ntpmp17 C-1 0.1 50 50 085 560 020 11 11 OINK wwef Squm 62 02 50 so 095 550 019 10 10 OIIJI O%Mdp DIM 5 5 50 50 cos 560 007 01 01 CoddbL'J t Pa L RBD Inc STANDARD FORM SF 2 PEC 01 Aug 95 Project Harmony Market Eleventh Filing For Bogaard Construction Inc Project No 673 002 Tc = 1 87(1 1 C x COD10 5 S^(1/3) This sheet calculates the time of concentration for the 100 year storm STORM 100 yr (developed) cf = 1 00 DATE 01 Aug 95 SUB BASIN DATA INITIAL/OVERLAND TIME TRAVEL TIME COMPOSITE C FINAL tc REMARKS DESIG AREA C LENGTH SLOPE ti LENGTH SLOPE VELOCITY tL (ac) (ft) (°/a) (min) (ft) N (ft/s) (min) CALCULATIONS (min) 1 2 3 4 5 6 7 8 9 10 11 12 13 1 1 08 059 69 1 00 79 336 1 00 19 29 See c value sheet 109 into pond 2 1 48 094 162 1 00 38 106 1 00 19 09 See c value sheet 50 parking lot 3 0 15 072 40 1 50 39 50 080 17 05 See c value sheet 50 plaza area 4 0 15 095 73 1 00 24 42 1 00 1 9 04 See c value sheet 50 roof top 5 007 095 0 001 00 16 1 50 23 01 see c value sheet 50 Pond L 0 1 020 095 19 200 1 0 130 060 15 1 5 See c value sheet 50 offsite 02 1 0 191 095 23 200 11 250 090 18 23 See c value sheet 50 offsite 313 Storm Drainage Design and Technical Criteria •- 2 M M MRTOR(WAGMM PRE ARY WDESIGN DAT PROJECT Harmony Mkt 11 STORM 100 yr (developed) cf = 1 25 CALCULATED BY PEC DATE 01 A�95 FLOW TIME tL DIRECT OTRER TOTAL STREET PIPE STREET PIPE REAWIKS DP BASWS LENGTH I I STREET PIPE 1 C INTENSITY AREA RUNOFF RUNOFF RUNOFF SLOPE CAPACITY SLOPE SIZE CAPACITY DESIGN VELOCITY DESIGN VELOCITY LOG It) (m ) (M) (m) (m) 0�) ( ) (cls) (c11 (c1) 1%) f 11 1%) 1 ) (cts) (cl 1 (M) (d I (m ) 1 2 7 1 5 6 7 6 9 10 11 12 10 14 d is 16 17 16 19 20 21 22 20 1 1 66 86 059 770 106 61 61 Ru ffiit pmdhommol 4 / 50 50 095 900 015 11 14 Rm han nth mWd 0 0 50 SO 072 900 015 12 12 R.ff han paa 0 01 SO 50 0& 900 050 27 27 150 12 // 27 50 A41 A42(Ar Hel ) 2 2 50 50 094 900 116 133 100 SRM1 c pprWQM 2 204 170 50 06 56 092 660 176 157 157 Alm ON rd pmpddy 0.1 0.1 50 50 005 900 020 16 16 offo Bdwee ^ m 02 0-2 50 So CBS 900 019 17 17 Ch'W O Md9 Dd 5 5 50 so 095 900 007 06 06 CatdMl ml Patll � 4 W DETENFTION CALCULATIONS w µ K 7` +c � tt �� 't+ � y Wx'i T A � h At br 9 a I --- ------------------DETENTION-----------POND-------SI21NG-----BY---FAA---METHOD--------------------------- DEVELOPED BY ' JAMES C Y GUO PHD P E DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF COLORADO AT DENVER ---------=--------=--------------------------- -------------------------------- EXECUTED ON 06 15 1995 AT TIME 15 47 46 1 PROJECT TITLE Harmony Market P U D Eleventh Filing DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 1 00 ' BASIN AREA (acre)_ 1 08 - RUNOFF COEF 0 7 Runoff coefficient for the proposed and the future condition See Appendix Page 4 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100 00 INTENSITY(IN/HR) DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9 0 7 2 5 2 4 2 3 5 3 0 2 6 2 1 1 7 1 5 1 2 1 0 POND OUTFLOW CHARACTERISTICS MAXIMUM ALLOWABLE RELEASE RATE = 22 CFS ' OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = 22 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR COMPUTATION OF POND SIZE ' RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE FT ACRE FT ACRE FT ' 0 00 0 00 0 00 0 00 0 00 5 00 9 00 0 05 0 00 0 05 10 00 7 20 0 08 0 00 0 08 15 00 6 20 0 10 0 00 0 10 20 00 5 20 0 12 0 01 0 11 ' 25 00 4 70 0 13 0 01 0 12 30 00 4 20 0 14 0 01 0 13 35 00 3 85 0 15 0 01 0 14 40 00 3 50 0 16 0 01 0 14 ' 45 00 3 25 0 16 0 01 0 15 50 00 3 00 0 17 0 02 0 15 55 00 2 80 0 17 0 02 0 15 60 00 2 60 0 17 0 02 0 15 65 00 2 47 0 18 0 02 0 16 ' 70 00 2 35 0 18 0 02 0 16 75 00 2 22 0 19 0 02 0 16 80 00 2 10 0 19 0 02 0 16 85 00 2 00 0 19 0 03 0 16 ' 90 95 00 00 1 90 1 80 0 19 0 19 0 03 0 03 0 0 16 16 100 00 1 70 0 19 0 03 0 16 105 00 1 65 0 19 0 03 0 16 110 00 1 60 0 20 0 03 0 16 1 ' 115 00 1 55 0 20 0 03 0 16 120 00 1 50 0 20 0 04 0 16 125 00 1 45 0 20 0 04 0 16 ' 130 00 1 40 0 20 0 04 0 16 135 00 1 35 0 20 0 04 0 16 140 00 1 30 0 20 0 04 0 16 145 00 1 25 0 20 0 04 0 16 150 00 1 20 0 20 0 05 0 15 ' THE REQUIRED POND SIZE = 1634364 ACRE FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 120 MINUTES However according to the Harmony Market 0 D P the required storage volume Is 0 20 acre ft This report and design will ,conform to the O D P 1 1 1 1 1 1 1 ' RBD Inc Engineering Consultants 1 Harmony Market Eleventh Filing 'Protect For Bogaard Construction Inc Protect No 673-002 ' This sheet calculates the stormwater storage for a detention pond ' Pond Description Proposed condition with parking lot Pond to the south of proposed building ' Detention Pond Rating Curve Cumulative Elev Area Area Storage ' (ft) (ft2) (ac) (ac-ft) ------------------------ ------------------------ V = d/6*(A+4ABm+B) 498585 0 0 0 498600 203 000 000 PEC 01-Aug-95 4987 00 10 463 024 012 0 20 ac-ft stored at 4987 20' ' 4988 00 22,806 052 050 ' Area Capacity Curve ' oe I 05 ' v04 v <03 0 t vi 0 2 01 0 ' 49855 4988 49865 4987 49875 4988 Stage (it el) -�- Area -+- capac ty ' 01 Aug 95 ' RBD Inc Engineering Consultants 'Project Harmony Market, Eleventh Filing For Bogaard Construction Inc Protect No 673-002 ' This sheet calculates the stormwater storage for a detention pond Pond Description Future condition with building expansion Pond to the south of proposed building ' Detention Pond Rating Curve Cumulative Elev Area Area Storage (ft) (ft2) (ac) (ac-ft) ------------ 85 ------------------------ 0 -- 0 '4985 498600 203 000 498700 10,463 024 498800 16,388 038 Area Capacity Curve ' 04 03 u u <02 V t ' N 01 0 ' 49855 4986 49865 4987 St ge (ft 9 Area + capac ty PEC 01-Aug-95 ------ V = d/6"(A+4ABm+B) 0 000 012 0 20 ac-ft stored at 4987 25' 043 05 04 03 w A 02 01 0 49875 4988 01 Aug 95 1 PEC ' 01 Aug 95 'Project Harmony Market P U D Eleventh Filing For Bogaard Construction Co Project No 673 002 This page calculates the opening for an orifice plate Equation Q = CA((2gh)^1/2) Q = release rate C = discharge coefficient ' A = area of opening g = grav acceleration 322 ft/s^2 h = water depth above invert For a flow value of 0 22 cfs and a discharge coefficient of 0 60 Sharp edged orifice and a head value of 1 35 ft ' the diameter of the orifice should be 022 ft 'the orifice opening should be drilled at 269 in or 2 and 11 /16 in ' Now to half of the orifice diameter and use the new head value need subtract ' with a head value of 1 24 diameter of the orifice should be 023 ft 'the the orifice opening should be drilled at 2 74 in ' or 2 and 3 /4 in FINAL RESULT 1 i I 1 u 1 u 1 I EXCERPTS FROM FINAL DRAINAGE REPORTS for HARMONY MARKET P U D SECOND AND THIRD FILINGS 15 F .ter . - 4e.e{m6.i--- J, 11 i_b.—k-a. ��.�1�, I / r �jP HD, re- ri 1 �•. 11 ` r � �,I _ C �' L / � yl1M1v � T4 i i 1 FC V � 6� 0 1 t IFt,` j �5., r} �[tF. f �Ki� / {��' Syf z ! � i 4� .�lr Y_, 'e-1r I`Fi,t t S.� r t1� 4,1 t + h r ^ } liI f� r \ e � fF 740 PUILDEAS S; QUA UAAC 1 t` C C n w� 3 � o *y,� dn0r TVT A4 l;a tyy rit, 11 [ • Z M kGF•7E OS� STCCLC S 1 [r o6o IL 0, t IPQN L -"Wi p 1,. If r 990 low �.T cT o-i Lc DETAIL ,HT b ` n i P I �, minalmiss FF 0F0 t tl rcfbrcClst) EIC15T,Or. GUNP Nat EVAgG LICAE cOJt"A4r CsUMCK !e m ON TO t I 1 1 MASS DIAGRAM METHOD for DETENTION VOLU:•1ES PROJECT: HARMONY MARY•:ET, 3RD FILING COMMENTS: 100 YEAR STORM - pASIN E MAXIMUM ALLOWASLE RELEASE_ DESIGN RELEASE RATE RATIONAL EQUATION: 0 = CIA C Of 1 AREA = TIME OF CONCENTRATION = 2.69 cfs 2.75 cfs 1T.45 acres _ fIMF_ (min) CA I INFLOW ft)- OUTFLOW STORAGE (cl_1 ft) (cu ft) (ac ft) --(in/hr)-.(cu --------------------------- 5 1:7.45 9.1;1). 35315 a25 3549U 0.a147•'3 ' I U 1 Z1. 45 7. 30 5'091 1 165U 57261 1 . 3-1453'1 is 1:f. ?5 6.01 74-630 2475 70155 1.6105-N7 -1) - r 1 � . •.,, 5, ^f) 63-928 .. i!7U �' 8/)bL8 1 . 85i)96 4 ' 25 13. 45 4. 6(> 92305 4125 G8681:1 2. i 735812 0 13.45 4.15 100472 4950 95522 2.1?2871 35 13.45 ...BQ 107331 5773 1015` "S ? - . a4 ' 4u 43 1 5. 45 _ 1• .45 . 50 3.25 112`i80 114 6bUi? 10638U 2.442148 143 7423 110579 2.533997 5U 1.3.45 3.('PU 12105U 6250 112SOO ? 5^ . ,446 1 55 1 _ . 45 2. 00 124273 <73 ., . .5 . !77 I1S^i73 2.644695 - 58 99UU 115992 2.662809 70 13. 45 2 ZDI 1 ^<'i 927 1 155(1 1 18377 2.717561 80 13.45 -� c.!?..r 132348 13200 119143 2.735261 9'J 1o.4J 1.85 134366 14%5U 119516 2.743.653 ' 1.70 1371To 16 C)o 1206(;'O 2.770661 I'I) 13.43 1.53 1_:/J94 13131) 119444 2.742043 ' 120 13U 13.45 1..45 1.43 1.,2 140412 1.-a-4131 1921i4) 214'Cl 120613 2.769003 117.3 <.6g6566 140 1 .45 1.24 141?093 2^100 116995 2.6G 34U 150 13.4J 1; 1? 14-!)5U 2475U I1?3O(1 2.7387._9 _I60 _. . 1Z,.45 1.1 ' 145`i!>6 2640o 119500 2.743471 1 i C) 13. 45 1 . ! 79 1 ^, r l 22051) - 9 121 7 2.78a960 Io^0 13.45 1.OS 152523 '971)U 12232.- 2.S19628 1 i CUEh-T _ 1✓�EN%/^� joBHo 033-0/5" I, IIJCi PROJECT STC E G E' S / 1 r7" CALCUlAT1DH3 FOR -7r,'QM �QA/N�3GE ( Engineering Consultants MADE BYKtV DATECHECKEDBY DATE SHEET S OF S SIDE Off'/�IG6 Fore Patio (, - DE,�/(„c/ ,eECE.gSG "' 1 1 .2f7TE - O J5 1 I_ 1 Ora - _,ifeaew '- - 0 /S _ (e I li� ' (ZX7Z ZX2i - 1 IT ' I TSrRLL-ESr PKAGj 7G4L .5/ZE FoP- opjricC oPEft/Ny5_ - 1-5 - --- - - - - --' -- - - - USEo" D = 3 '*' ORIFICE cPE/✓ii,YG-- t �/✓ ,✓ORl� PffGHTE //✓/rEpI/.9TELJ�-_ ' BELOW /,UGET GfkTT�GhfLET%y— Q Q= 0 2 cs Fc� POND L _ j 51 cE O2/F/cE Fa c PONp E pE5(6J kEGEASE_�R,97-Er770= 2 ' rti+'r`-{:G /Yi 15S1 bra �l ra r�_�C�/C�i INCH r Z uScd -' YTT V }- - - - ' - I Ye/" Orjt,Cm P/afG - - _ 1 rwL 6Z 97r o /vu /s'RGP cur= Pa 6 1 S yrl of orrice , T S tie - g,�7, rn .Krf ` ee- �, , I Trr G r or,rl c. H = 97 0 - 00 68 = C"32 ' --- 17 LE55 3 u/Ta cEr✓�Cop G aC'iF�c6 I y 2(Zzt6o7) -1 D=os 9Ff-=6'71G I Tr% (e��e er,f,cL H= G 3Z- 1C��i6 ± w Z 7 5 ' J7- O S3Q FT -T ' CiSE ! D = 6 �2 � 621iF'I CE 6PE-7n j7'Z _ 1 ' 1 IrTE✓T,p��NCE Ta /S 'avTGET P/P�LEAt//.Vt MN 50l � z � Sr,5i 7 O'Ve _EiJTRP !CE ' /rI-% 1 1 LT L 11 1 I I Rwm Engineering Consultants CLIENT NEE/V/ 0,AJ JOB NO 6 3 3- 0 /.s PROJECT .57_EE "- S /YI1C % —CALCULATIONS FOR S77JQ/1'1 O,Z9/*119e MADE BY J=J1 DATE 7/'30 CHECKED BY DATE SHEET Z OF S DETE2/i,/N� PoNO VGcvrrES T - r 1 _ j1 g£v Aeev e-IL If ca-FT- _ /zz J97 9 -re = 2 9Z Frc=P7^ Pr2GuioE� -- - V = 3 (At Bt Aa) l� Z, 03 i roc-FTQw,eE� _ PoNo L ro r r� i it i 86 ao r� i --I - I -t � �'i � r, -T 10-- � �..s.Lj i SS/Bffl = - O• /3 AG-f7 PRovToc�d--- V. 3 46 aA6- 1 !r _ .. _ P6N� F' 1 _-! _ CPGNO oN /Vh� ENDOF'GOT� ,�uTucE�ailLtYiT- _ B2 O 1 O 83 0 2/) yGa 7,133 g3 S 7Sd /2�Z53 Z7� I l9J 3EG �3 = O yS� //G-FYfRQVJI�/P60 -- 6 yS �riG-i-T REQ!lI�EED `_ � I a Ir 1 I 1 I C Nttlxa-r- 033 -v 15 LI 1 I I March 21, 1991 Susan DLma Cayes City of Forz Collins storawarer Ltility 235 YaLLreas Street, P O Box 580 Fort Collins, Co 80522 IRE rar-mony lfarket, 3rd Filing, Interim Crading Plan ' Dear Susan To acco-L-nodate the developer's intent to limit the amount of ' graairg tiork necessary for constructing Steele's lfarket, the Site Grading Plan has been revised This revision is shown on the attached interim Site Crading Plan, and t,ould be in effect until ' adjacent portions of harmony ;arket kere aevelcped The calculations for the required detention srorage volume for Basins B and F nave Aeen revised to reflect the interim condition in trese basins lre revised configurations for the tvo ponds, D and F, will provide adequate retention for each basin for the 100 year storms, and the inueri-1 condition ' the lnzeri-i Site Crading Plan and the calculations have been at Lac�ed for your review Please call ne if you rave any quesziors ' Sincerely, ' Janelle { Ohy-Is, P Project Ei gireer ' Att tent ' cc 1 033-015 11 I 1 1 i 1 1 1 1 1 1 I CLI NT I�I��A IJ JOB hO 0,53 0/5 Rwlt4 PROJECT 6/j PELES MAf � CALCV..A-iONSFOR;:� Engineering Consultants NADEErZI DATE CHECKEDEY DATE SHEET- -OF 1_ - lQEE-DzD DNF,JE,NTL2>a �01-uME_' o MASS EL A>zZ7A 73 21� 0 - - -- - - - 21 G� 31g 00 �?0 /210 2�85 82� 35G9 b3 jDs- 0330 0 20 Pc rr > 0 ICE AcF7- �=A5)) IJ1I1Fo�M 51De6 - 07 roN-11zv?j5 ter,, VAL-VF, is rzEV�s >_ Folz V i� FA'�%D PA?—KI N61 A ZEA TD Try r— WE6T t> r 1I7AVED FA D5 0 /3 %lt VOU)M:. i 0 i aG Ow, ISO , � fr r���i ✓lP jD �ZAl _� 19�25✓ _ __ i ! i 0 1 i CUEnT I Lr IJMJ JOB NO _ 033 FJl S i ' WC PRO CT Engineering M�CALCULA-IONS FOR 5 n- Englneenng Consultants WADE 6Y`1nL/(+^DAT 3/19 CHECK*EDSY DA-E SHE,TI-q OF i- - - -- 1 UN?AV zAR EA5 = 17'r-�� _ WES7- 0F_ No�T r4 PA�/UNC� J oT ---I - - - 44 �2 A� _ No9rrl OF lol;iL x125Cr r _ - - -- - - - - - - --- -- 0 73-` CCr 1 1 ; �'AdED A2cA __ 0 25A� 0C_0 1 c , ' 1 ri ! 1 i I 1 ^ 2°ASS DIPCRP24 IiEIrOD for ' DL=D*NlION VOLLIdES ` ?ROJECT 1-Pti'ONY IiPR{ET, 3RD FILII%G 'COIniMENTS 100 MAR S_OE14 — BISIN �—, I24TER114 CRPDING PLAN '!AXIII'Lli ILLOtiaBL� R ELEMS ; _ 2 69 cis IDZSICN ZkS— -RAlr, R T _ 2 69 cfs 'RATIONPL LQL!ki1O'1 Q = CI-k C�Cf= 0 73 YR2A = 13 45 acres TTIZIE OF CONC::NTRATIOTJ TI'd: Ck 1 INFLOW OUTFLOW STORAGE ------------------ (�1n) --(in/nr) ---------------- (cu ft) (cu ft) (cu ft) (ac ft) 5 9 32 9 00 26510 ----------------------- 807 25703 0 590059 10 9 82 7 30 43003 1614 41391 0 950207 15 9 82 6 00 53020 2421 �50599 1 161591 20 9 82 5 20 61267 3228 58039 1 332402 25 9 82 4 60 67748 4035 1 4626d1 30 9 82 4 15 73344 4842 �63713 1 572594 35 t0 9 82 3 80 78352 5649 �68502 +72703 1 669023 9 82 3 50 82473 6456 76019 1 745165 ' 45 50 9 9 82 32 3 3 25 CO 86157 7263 73894 1 811165 55 28366 8070 80296 1 843354 9 82 2 SO 90723 8877 81246 1 378924 60 9 82 2 GO 91901 0684 82217 1 837446 70 9 82 2 30 94847 11293 835A'9 1 91801A 80 9 82 2 05 96614 12912 83702 1 921534 90 100 9 82 1 85 93087 IA526 83561 1 913292 ' 110 9 82 1 70 10011-9 16140 84009 1 928574 — 120 9 82 1 55 1004-"3 1775A 82C89 1 893284 130 9 82 1 45 102505 19363 83137 1 903566 ' 1c0 9 9 82 82 1 1 32 2A 101091 102269 20982 22506 180109 1 339056 79673 1 829052 150 9 82 1 19 105156 2d210 80946 1 858268 160 9 82 1 13 106511 25824 80687 1 852321 ' 170 9 82 1 09 109162 27438 3172A 1 376127 180 9 82 1 05 1113d2 29052 82290 1 889114 9 I I "k1 11 PIPES AND INLETS OU OPEN CHANNEL FLOW ANALYSIS FLOW IN =7 PIPE Developed by Dr James Guo Civil Eng Dept U of Colorado at Denver Metro Denver Cities/Counties and UD&FCD Pool Fund Study User= KEVIN GINGERY RBD INC FT COLLINS COLORADO ON DATE 06 19 1995 AT TIME 09 56 44 �• PROJECT TITLE HARMONY MARKET P U D ELEVENTH FILING (FOR PIPE DRAINING PLAZA) * DESIGN INFORMATION �IPE (EQUIVALENT) DIAMETER(INCHES) 8 13 ( USE A4 PIPE IN PARKING LOT) IPE ROUGHNESS MANNING N 0 013 `2 PIPELINE SLOPE (FT/FT) = 0 0090 FESIGN FLOW RATE (CFS) = 1 20 • NORMAL FLOW CONDITIONS FLOW CENTRAL ANGLE (DEGREE) = 360 00 LOW DEPTH (FEET) = 0 68 LOW AREA (SO FEET) = 0 36 LOW VELOCITY (FPS) = 3 33 SPECIFIC ENERGY (FT) = 0 85 PECIFIC FORCE (KLB) = 0 02 LOW FROUDE NUMBER = 0 00 NOTE FROUDE NUMBER=O MEANS FLOWING FULL •* CRITICAL FLOW CONDITIONS LOW CENTRAL ANGLE LOW DEPTH FLOW AREA LOW VELOCITY INIMUM SPECIFIC ENERGY INIMUM SPECIFIC FORCE SLOPE 1 1 (DEGREE) = 243 574 (FEET) = 0 52 (SO FEET) = 0 30 (FPS) = 4 06 (FT) = 0 77 (KLB) = 0 01 (FT/FT) = 0 0104 1 ' PEC 15-Sep-95 Project: Harmony Market, Eleventh Filing 'For: Bogaard Construction, Inc. Project No.: 673-002 'This sheet calculates the controlling condition for the area inlets in the plaza. Note that there are two inlets in the plaza, not a double inlet. ' Design Point: 3 Q100 is 2.70 cfs at the surface of the inlet. ' Use two (2) Neenah Model No. B-4990-BX Grate and Frame Weir equation: Orifice equation: ' Qw = C L H11.5 Qo = C A (2gH)AO .5 C = 3.0 C = 0.6 L = 2.71 ft A = 0.45 ft2 ' (50% clogged) H Qw Qo ' (ft) (cfs) (cfs) --- ---------- 0.00 0.00 ' 0.10, 4 26 0.69 0.20„„ {I Zit 0.97 0.30 1.34 ` 9 ' 0.40 2.06 9 37 0.50 2.87 3. ' 0.60 3.78 9 W 0.70 4.76 0.80 5.82;;>k ' 0.90 6.94 £ifs 1.00 8.13 21 0 o 02 04 16 o.e ' W.E1 ) i i 1 R-4990 Heavy Duty Trench Frames with Grated or Solid Covers MATERIALS All frames and grates are furnished standard in Gray Iron Class 35 for heavy duty use For extra heavy duty use see page 170 for Airport Trenches �p CAI���P.�OG�vofJ Standard Cover Dimensions Catalog Dimensions in inches Weight per lineal foot (without frame) No A B C Type A Type C Type D Type E Type P Frame R 4990 AX 8 11/2 6 19 22 19 22 25 12 R 4990 BX 10 11/2 8 24 27 29 27 31 12 R 4990 CX 12 11/2 10 28 31 40 36 37 12 R 4990 DX 14 1 Y2 12 33 35 52 47 45 12 R 4990 EX 17 1 yi 15 39 52 55 49 - 12 R 4990 FX 20 11/2 18 54 67 70 70 - 12 R 4990 GX 23 1 yri 21 60 77 85 - - 12 R 4990 HX 26 1 y4 24 71 100 85 - - 12 R 4990 JX 30 2 1 27* 100 1 120 1 100 - - 17 R 4990 KX 33 2 110 140 150 - - 17 R-4990 LX 36 2 120 130 185 - - 17 R 4990 MX[51 39 2 L48 130 200 180 - - 17 R 4990 NX45 2 150 245 210 — — 17 R 4990 OX 2 ' *Y4 Annular spacing Weight perfoot—includes both sides R-4991 Light Duty ' Trench Frames with Grated or Solid Covers Standard Cover Dimensions Catalog Dimensions in inches III eight per lineal foot (without frame) No A B C Type Type C Type D Type Type P Frame* R 4991 AX 8 116 6 12 15 22 17 — 12 R 4991 BX 10 11/2 8 14 18 28 27 — 12 R-4991 CX 12 1 Y2 10 13 23 34 23 — 12 R 4991 DX 14 1 Jh 12 16 22 27 28 — 12 R 4991 EX 17 1142 15 29 29 37 38 — 12 R 4991 FX 20 1 Yz 18 41 42 42 42 — 12 GX 23 1yi 21 51 51 55 51 — 12 'R4991 R 4991 HX 26 13,(2 24 44 58 65 63 — 12 R 4991 JX 29 1 J/z 27 71 79 74 74 — 1 12 R 4991 KX 32 1 Y2 30 52 90 86 87 — 12 4991 LX 35 1 j/z 33 120 — 100 105 — 12 'R R 4991 MX 38 1I/Z 36 95 120 110 115 — 12 R 4991 NX 44 1 42 1 15 155 120 115 — 12 R 4991 OX 50 1 y, 48 135 145 105 110 — 12 '-.reignT per TooT—incivaes ootn sides ' T!NOMINAL I6 ASPACE OPEN A SOLID GRATE ' Cr LID+-jII 1.�.. A L ♦ � Illustrating heavy duty trench frames and Type A grates to drain loading ramp Designs in this series are being used successfully in subway construction intersecting elevated highways and underpasses airport hangar doors ramps and other special purposes Illustrating trench frames with grated covers in the deck area around a municipal pool = NOMINAL A 16 ANNUL OPEN SOLID 71 SPACE GRATE LID m C ` LIGHT DUTY The above schematic drawings ident fy basic d mensions only and do not apply to all cover designs Bar and r b depths plate thicknesses and seat ng widths may vary on different sizes and styles If your project has des gn restr ct ons ask for approval drawings t28 NEENAH FOUNDRY COMPANY (41,4) 7 ZS -7 0Cp UDINLET INLET HYDARULICS AND SIZING ' DEVELOPED BY DR JAMES GUO, CIVIL ENG DEPT U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD ---------------------------------------------------------------- SER KEVIN GINGERY-RDB INC FT COLLINS COLORADO ON DATE 07-31-1995 AT TIME 10 02 52 t** PROJECT TITLE 4' CHUTE *** CURB OPENING INLET HYDRAULICS AND SIZING ' INLET ID NUMBER ItJ"ro FOi.1D E 71-lis C,9,TrE VJ%LL. HANPIE 1JvisC.1JG� F1-oy.�S ' INLET HYDRAULICS IN A SUMP --- -- - GIVEN INLET DESIGN INFORMATION ' GIVEN CURB OPENING LENGTH (ft)= 4 00 HEIGHT OF CURB OPENING (in)= 6 00 INCLINED THROAT ANGLE (degree)= 0 00 ' LATERAL WIDTH OF DEPRESSION (ft)= 2 00 SUMP DEPTH (ft)= 0 00 Note The sump depth is additional depth to flow depth STREET GEOMETRIES STREET LONGITUDINAL SLOPE (%) = 1 67 ' STREET CROSS SLOPE M = 2 00 STREET MANNING N = 0 016 GUTTER DEPRESSION (inch)= 1 50 ' GUTTER WIDTH (ft) = 1 00 STREET FLOW HYDRAULICS ' WATER SPREAD ON STREET (ft) = 11 13 GUTTER FLOW DEPTH (ft) = 0 35 FLOW VELOCITY ON STREET (fps)= 3 71 ' FLOW CROSS SECTION AREA (sq ft)= 1 35 GRATE CLOGGING FACTOR ($)= 50 00 CURB OPENNING CLOGGING FACTOR(%)= 10 00 INLET INTERCEPTION CAPACITY IDEAL INTERCEPTION CAPACITY (cfs)= 3 58 BY FAA HEC-12 METHOD DESIGN FLOW (cfs)= 5 00 FLOW INTERCEPTED (cfs)= 3 39 CARRY-OVER FLOW (cfs)= 1 61 BY DENVER UDFCD METHOD DESIGN FLOW (cfs)= FLOW INTERCEPTED (cfs)= 5 00 3 22 CARRY-OVER FLOW (cfs)= 1 78 ' iF -TAC. IQLr---t noFas I i-T ayse.-ro�- -ne MEDIIy� io -'L,E PD.2K_tQE:j Uo-T , 50 "Toe CA.•2Qj/OVCiZ. FLc�.] ' 1,31 LL.. 1-l&V E A Fb.-TVA t----------------------------------------------------------------------------- UDINLET INLET HYDARULICS AND SIZING DEVELOPED BY DR JAMES GUO, CIVIL ENG DEPT U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD ------------------------------------------------------------------------ SER KEVIN GINGERY-RDB INC FT COLLINS COLORADO kN DATE 07-31-1995 AT TIME 10 10 48 ** PROJECT TITLE 4' CURB OPENING *** CURB OPENING INLET HYDRAULICS AND SIZING ' INLET ID NUMBERe_-n�� ' INLET HYDRAULICS IN A SUMP GIVEN INLET DESIGN INFORMATION 1 GIVEN CURB OPENING LENGTH (ft)= 4 00 HEIGHT OF CURB OPENING (in)= 6 00 INCLINED THROAT ANGLE (degree)= 0 00 LATERAL WIDTH OF DEPRESSION (ft)= 2 00 SUMP DEPTH (ft)= 0 00 Note The sump depth is additional depth to flow depth STREET GEOMETRIES STREET LONGITUDINAL SLOPE (%) = 0 60 STREET CROSS SLOPE M = 1 00 STREET MANNING N = 0 016 GUTTER DEPRESSION (inch)= 1 50 GUTTER WIDTH (ft) = 1 00 STREET FLOW HYDRAULICS WATER SPREAD ON STREET (ft) = 21 44 GUTTER FLOW DEPTH (ft) = 0 34 FLOW VELOCITY ON STREET (fps)= 2 07 FLOW CROSS SECTION AREA (sq ft)= 2 41 GRATE CLOGGING FACTOR M = 50 00 CURB OPENNING CLOGGING FACTOR(%)= 10 00 INLET INTERCEPTION CAPACITY IDEAL INTERCEPTION CAPACITY (cfs)= 3 46 BY FAA HEC-12 METHOD DESIGN FLOW (cfs)= 5 00 FLOW INTERCEPTED (cfs)= 3 27 CARRY-OVER FLOW (cfs)= 1 73 BY DENVER UDFCD METHOD DESIGN FLOW (cfs)= 5 00 FLOW INTERCEPTED (Cfs)= 3 11 CARRY-OVER FLOW (cfs)= 1 89 1 1� N' rtG I 1 I 1 I ar- 1 IF i EROSION CONTROL 2/ 11 I RMINC Engineering Consultants 209 S Meldrum Fort Collins Colorado 80521 303/482 5922 ' FAX 303/482 6368 ' September 15, 1995 ' Mr Basil Hamdan City of Fort Collins Utility Services Stormwater ' 235 Matthews Fort Collins, CO 80522 ' RE Harmony Market P U D Eleventh Filing Erosion Control Cost Estimate Dear Basil ' This portion of the report 1s to satisfy the City of Fort Collins requirements for an erosion control security deposit for the Harmony Market P U D , Eleventh Filing The City of Fort Collins Current Cost Factors will be used in this estimate There will be approximately 2 86 acres disturbed within this project Using the city criteria of ' $650 00 per acre for sites less than 10 acres, and a 150% contingency, the total obligation of Bogaard Construction Company for a secunty deposit would be ' (2 86) x ($650 00 per acre) x (150% contingency) _ $2788 50 ' A cost breakdown of the erosion control measures that will need to be installed is listed below Temp seed & Mulch (2 86 ac @ $500 per acre) _ $1430 ' Straw Bale check dams (1 @ $150 apiece) _ $ 150 Inlet Filters (3 @ $200 apiece) _ $ 600 ' TOTAL x 150% CONTINGENCY = $3270 1 28 Denver3031458 5526 c 1 ' Therefore the larger amount or the amount of security deposit obligation should be in the amount of $3270 00 Please call with any questions regarding this estimate ' Respectfully, ' RBD Inc , Eng Consultants ?Proji E Cab ect ngineer t 1 I� 1 �II 1 9N ' This page outlines the rainfall performance standard evaluation PEC 19 Jun 95 Project Harmony Market P U D Eleventh Filing STANDARD FORM A For Bogaard Construction Co Project No 673 002 DURING CONSTRUCTION ' DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBASIN ZONE (ac) (feet % feet 1 MODERATE 108 280 10 ' 2 MODERATE 150 400 10 3 MODERATE 015 150 10 4 MODERATE 018 100 05 ' 291 NET 32402 097 7710 ' Basins 5 and 0 1 are already paved therefore erosion control is in place already 5 MODERATE 003 NA 01 MODERATE OFFSITE NA ' AFTER CONSTRUCTION This value is the during construction" value divided by 0 85 ' Its value is 90 71 % 1 This page calculates the effectiveness of the erosion control plan PEC 15 Sep-95 'Protect Harmony Market P U D Eleventh Filing STANDARD FORM B For Bogaard Construction Co Protect No 673 002 1 EROSION C Factor P Factor Comments CONTROL Value Value ' METHOD Gravel Inlet Filters/Straw Bates 1 00 080 3 Inlets 1 Bale 'Temporary Vegetation 045 1 00 Pond area Sod Grass 001 1 00 Pond area Native Grasses -Cover Crop 015 1 00 Parking lot Building Pond ' Asphalt/Concrete Pavement 001 1 00 Parking lot Building 1 1 1 1 1 MAJOR PS SUB- AREA BASIN % BASIN ac DURING CONSTRUCTION AFTER CONSTRUCTION 1 1 08 McClellands 77 10%, EFFECTIVE C' 045 001 EFFECTIVE P 080 1 00 EFFECTIVENESS 64 00% 99 00% 2 1 50 EFFECTIVE C 015 001 EFFECTIVE P 080 1 00 EFFECTIVENESS 88 00% 99 00% 3 015 EFFECTIVE C 015 001 EFFECTIVE P 080 1 00 EFFECTIVENESS 88 00% 99 00% 4 018 EFFECTIVE C 015 001 EFFECTIVE P 1 00 1 00 EFFECTIVENESS 85 00% 98 80% TOTAL 291 78 91 % 98 99% Since 78 91 % > 77 10% proposed plan is OK during construction Since 98 99% > 90 71 % proposed plan is OK after construction 1 I 1 1 1 1 n 1 rnNf:ZTP1 irTnnN gFni iFNrir YEAR 1995 1996 MONTH O I N I D I J I F I M I A I M I J I J I A I$ OVERLOT GRADING WIND EROSION CONTROL Sod Roughening Perimeter Barrier Additional Barriers Vegetative Methods Sod Sealant Other RAINFALL EROSION CONTROL STRUCTURAL Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other —Gravel Mulch VEGETATIVE Permanent Seed Planting Mulch ing/Seolont Temporary Seed Planting Sod Installation Nettings/Mats/Blonkets Other STRUCTURES INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON F3 i D n z TABLE 8-A -' FLOW RAINFALL PERFORMANCE STANDARDS FOR FORT COLLINS, COLORADO LENGTH SLOPE (1) (FT) 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 6 0 7 0 8 0 9 0 10 0 20 0 30 0 40.0 50 0 100 70 9 74 6 76 8 78 4 79 5 80 3 81 1 81 6 82 1 82 5 83 0 83 4 83 6 83 8 84 0 84 7 84 8 84.9 84 9 200 72 0 76 3 78 2 79 5 80 5 81 2 82 1 82 5 82 8 83 2 83 6 83 9 84 0 84 2 84 3 84 8 84 9 84 9 84 9 300 72.4 77 0178 8 80 0 80 9 81 6 82 5 82 8 83 1 83 5 83 8 84 1 84 2 84 3 84 4 84 8 84 9 84 9 85 0 400 72 6 77 4 79 1 80 3 81 2 81 8 82 7 83 0 83 3 83 7 84 0 84 2 84 3 84 4 84 5 84 8 84 9 84 9 85 0 500 72.7 77 7 79 4 80 5 81 3 81 9 82 8 83 1 83 4 83 8 84 1 84 3 84 4 84 5 84 6 84 9 84 9 85 0 85 0 600 72 8 77.9 79 5 80 6 81 4 82 0 83 0 83 2 83 5 83 9 84 1 84 3 84 4 84 5 84 6 84 9 84 9 85 0 700 72 8 78 0 79 7 80 8 81 5 82 1 83 0 83 3 83 5 84 0 84 2 84 4 84 5 84 5 84 6 84 9 84 9 85 0 800 72 7 78 1 79 7 80 8 81 6 82 2 83 1 83 4 83 6 84 0 84 2 84 4 84 5 84 6 84 6 84 9 84 9 85 0 900 72 7 78 2 79 8 80 9 81 7 82 2 83 2 83 4 83 6 84 1 84 3 84 4 84 5 84 6 84 7 84 9 84 9 85 0 1000 72 7 78 3 79 9 81 0 81 7 82 3 83 2 83 5 83 7 84 1 84 3 84 4 84 5 84 6 84 7 84 9 84 9 85 0 1100 72 6 78 3 79 9 81 0 81 7 82 3 83 3 83 5 83 7 84 1 84 3 84 5 84 6 84 6 84 7 84 9 84 9 1200 72 6 78 4 80 0 81 0 81 8 82 3 83 3 83 5 83 7 84 2 84 3 84 5 84 6 84 6 84 7 84 9 84 9 1300 72 6 78 4 80 0 81 1 81 8 82 4 83 3 83 6 83 8 84 2 84 4 84 5 84 6 84 6 84 7 84 9 85 0 ,. 1400 72 5 78 5 80 1 81 1 81 8 82 4 83 4 83 6 83 8 84 2 84 4 84 5 84 6 84 7 84 7 84 9 85 0 1500 72 4 78 5 80 1 81 1 81 9 82 4 83 4 83 6 83 8 84 2 84 4 84 5 84 6 84 7 84 7 84 9 85 0 1600 72 4 78 5 80 1 81 1 81 9 82.4 83 4 83 6 83 8 84 2 84 4 84 5 84 6 84 7 84 7 84 9 1700 72 3 78 5 80 1 81 2 81 9 82.4 83 4 83 6 83 8 84 3 84 4 84 5 84 6 84 7 84 7 84 9 1800 72 3 78 6 80 1 81 2 81 9 82 4 83 4 83 7 83 8 84 3 84 4 84 5 84 6 84 7 84 7 84 9 1900 72 2 78 6 80 2 81 2 81 9 82 5 83 5 83 7 83 9 84 3 84 4 84 5 84 6 84 7 84 7 84 9 2000 72 2 78 6 80 2 81 2 81 9 82.5 83 5 83 7 83 9 84 3 84 4 84 6 84 6 84 7 84 7 84 9 2500 7l 9 78 6 80 2 81 3 82 0 82 5 83 5 83 7 83 9 84 3 84 5 84 6 84 7 84 7 84 8 3000 71 6 78 7 80 3 81 3 82 0 82 5 83 6 83 8 84 0 84 4 84 5 84 6 84 7 84 7 84 8 3500 71 4 78 7 80 3 81 3 82 0 82 6 83 6 83 8 84 0 84 4 84 5 84 6 84 7 84 7 84 8 4000 71.1 78 6 80 3 81 3 82 0 82 6 83 6 83 8 84 0 84.4 84 5 84 6 84 7 84 8 84 8 4500 70 9 78 6 80 3 81 3 82 0 82 6 83 7 83 9 84 0 84 4 84 6 84 6 84 7 84 8 84 8 a m 5000 70 6 78 6 80 3 81 3 82 0 82 6 83,.7 83 9 84 0 84 4 84 6 84 7 84 7 84 8 84 8 Cl .Z A -i m A_ D t Is \ ! Jf . ¥ ,st } �� � , r , % ! . ` TABLES AND F GUR7S } y ��e ( - Aid 3 el No Text 1 Table 86 C Factors and P Factors for Evaluating EFF Values Treatment C Factor P Factor i BARE SOIL Packed and smooth 1 00 1 00 Freshly disked 1 00 0 90 Rough Irregular surface 1 00 0 90 SEDIMENT BASINITRAP 1 00 050111 STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG 1 00 080 SILT FENCE BARRIER 1 00 050 ASPHALT/CONCRETE PAVEMENT 001 1 00 ESTABLISHED DRY LAND (NATIVE) GRASS See Fig 8 A 1 00 SOD GRASS 001 1 00 TEMPORARY VEGETATION/COVER CROPS 045121 1 00 HYDRAULIC MULCH @ 2 TONS/ACRE 0 10i1 1 00 SOIL SEALANT 001 060,11 1 00 EROSION CONTROL MATS/BLANKETS 010 1 00 GRAVEL MULCH Mulch shall consist of gravel having a diameter of approximately 114" to 1 1 /2" and applied at a rate of at least 135 tons/acre 005 1 00 HAY OR STRAW DRY MULCH After plantino rass seed, apply mulch at a rate of 2 tons/acre (minimum) and adequately anchor, tack or crimp material into the soil Slope (% 1 to 05 006 1 00 o" to 10 006 1 00 11 to 15 007 1 00 16 to 20 011 1 00 21 to 25 014 1 00 25 to 33 017 1 00 > 33 020 1 00 ' NOTE Use of other C Factor or P Factor volues reported in this table must be substantiated by documentation (1) Must be constructed as the first step in overlot grading ' (2) Assumes planting by dates identified in Table 11-4 thus dry or hydraulic mulches are not required (3) Hydraulic mulches shall be used only between March 15 and May 15 unless irrigated (4) Value used must be substantiated by documentation 1 ' MARCH 1991 E 6 DESIGN CRITERIA Table 8 B C-Factors and P-Factors for Evaluating EFF Values (continued from previous page) Treatment C Factor P Factor CONTOUR FURROWED SURFACE Must be maintained throughout the construction period, otherwise P Factor = 1 00 Maximum length refers to the down slope length Basin Maximum Slope Length 101, (feet) 1 to 2 400 1 00 060 3 to 5 300 1 00 050 6 to 8 200 1 00 050 9 to 12 120 1 00 060 13 to 16 80 1 00 070 17 to 20 60 1 00 080 >20 50 1 00 090 TERRACING Must contain 10 year runoff volumes, without overflowing, as determined by applicable hydrologic methods, otherwise P Factor - 1 00 Basin Slope M 1 to 2 1 00 0 12 3 to 8 1 00 010 9 to 12 1 00 012 13 to 16 1 00 014 17 to 20 100 _ 016 >20 1 00 018 NOTE. Use of other C Factor or P Factor values reported in this table must be substantiated by documentation r - u� '- -� sue.•: i �^- 1 MARCH 1991 87 DESIGN CRITERIA