Loading...
HomeMy WebLinkAboutDrainage Reports - 06/10/1997No Text 1 1 1 1 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR HARMONY TOWNE CENTER P.U.D. CIRCUIT CITY STORE FORT COLLINS, COLORADO PREPARED FOR: CIRCUIT CITY 680 SOUTH LEMON AVENUE WALNUT, CA 91789 DECEMBER 23, 1996 REVISED: FEBRUARY 5, 1997 REVISED: MARCH 20, 1997 REVISED: MAY 2, 1997 (SHEET 8 OF 10) PREPARED BY: PARSONS & ASSOCIATES CONSULTING ENGINEERS 432 LINK LANE PLAZA FORT COLLINS, COLORADO 80524 (970) 221-2400 PROJECT NUMBER: 96.17 CTY D CE6tSObG D MAY 304W D uu PARSONS & ASSOCIATES, INC. CONSULTING ENGINEERS February 5, 190 Mr. Glen Schlueter ' Fort Collins Stormwater Utility 235 Mathews P. O. Box 580 Fort Collins, CO 80522 RE: Submittal of Final Drainage and Erosion Control Study for Harmony Towne Center ' P. U. D.; Circuit City Store Dear Glen, This drainage and erosion control report has been prepared to provide final design information for the proposed 28,000 sq. ft. retail building at the southeasterly corner of South College Avenue and Pavilion Lane, Fort Collins, Colorado. The parcel is currently the location of the College Inn Motel and has an approximate area of 2.4 acres. ' This report was prepared in conformance with the City of Fort Collins Storm Drainage and Construction Standards and with conformance to "Mail Creek and McClellands Major ' Drainageway Plan:" by Cornell Consulting Company, December, 1980. Sincerely, Parsons & Associates, Gary A. Odehnal, P.E. ' Project Engineer GAO/pf 1 1 432 Link Lane Plaza • Ft. Collins, Colorado 80524 • [9701 221-2400 TABLE OF CONTENTS I. INTRODUCTION 1 II. SITE DESCRIPTION 1,2 III. HISTORIC/MASTER DRAINAGE 2 IV. DRAINAGE CRITERIA 3 V. DRAINAGE UNDER DEVELOPED CONDITIONS 4 VI. EROSION CONTROL 5 EXHIBIT 1 VICINITY MAP APPENDIX A DEVELOPED DRAINAGE CALCULATIONS APPENDIX B EROSION CONTROL CALCULATIONS / COST ESTIMATE BACK POCKET EXHIBIT 2 I 1 1 [1 1 1 1 1 1 1 FINAL DRAINAGE AND EROSION CONTROL REPORT FOR CIRCUIT CITY, P.U.D. I. INTRODUCTION: This drainage and erosion control report has been prepared to provide final design information for the proposed 28,000 sq. ft. retail building at the southeasterly corner of South College Avenue and Pavilion Lane, Fort Collins, Colorado. The parcel is currently the location of the College Inn Motel and has an approximate area of 2.4 acres. This report was prepared in conformance with the City of Ft.Collins Storm Drainage and Construction Standards and with conformance to "Mail Creek and McClellands Major Drainageway Plan:" by Cornell Consulting Company, December, 1980. II. SITE DESCRIPTION: Circuit City P.U.D. is more specifically identified as a parcel of land situated in the southwest quarter of Section 36, Township 7 North, Range 69 west of the 6th Principal Meridian, City of Fort Collins, Larimer County, Colorado. The site is bounded on the north by the fully developed Pavilion P.U.D. and on the south by Schrader Country Store and east by Harmony Towne Center, P.U.D. Please refer to Figure 1 for a Vicinity Map of the area. -1- PROJECT SITh VICINITY MAP N. T. S. �1 1 1 1] 1 I� II The total proposed development contains approximately 2.39 acres. The site is currently occupied by the College Inn Motel at the northerly portion of the parcel. The existing site has relatively shallow slopes (approximately 1%) that drains to the east with no channelization or subsurface conveyance to Larimer No. 2. III ..HISTORIC/MASTER DRAINAGE: Circuit City, P.U.D. is located in the McClelland Drainage Basin. As detailed in the previous section, the approved Drainage Master Plan was prepared in 1980. This study identifies the master basin as Area 10 or Reach 6D and describes the basin as fully developed and connected by ponds and existing manmade conveyance elements. The Basin upstream of Larimer No. 2 will drain to the canal per the "Final Drainage Report for the Heart Special Improvement District" January,1985 by EPI. This report allowed for a 2 year Historic release to Larimer No.2 of 0.867 cfs/acre. The capacity of the Larimer No. 2 was established in the "Fort Collins Retail Center P.U.D. Final Drainage Report" by RBD Inc., September, 1985. This report details a total discharge of 240 cfs which is comprised of 155 cfs in irrigation flows and 85 cfs in stormwater flows. The Canal currently is concrete lined along the western edge of the Pioneer Mobile Home Park and is conveyed under Harmony Road in a 3'x 9' CBC. The proposed site is being developed in coordination with the Harmony Towne Center project to the south and east. The adjacent utilities will be extended onto the site or tied to existing systems planned for the Harmony Towne Center site, depending on the timing of proposed sanitary and storm sewer ' improvements. -2- 1 1 1 1 1 1 1 IV. DRAINAGE CRITERIA: Run-off from each of the site sub -basins was determined by the Rational Method, a widely accepted predictor of run-off from basins less than 200 acres. Flow capacities for swales, gutters, and open channels were determined using the Mannings Equation. All run-off coefficients and Mannings "n" were determined by tables and figures in "Fort Collins Storm Drainage Design Criteria Manual" and conforms to "Urban Drainage and Flood Control Manual" (UDFCM). Detention storage requirements were determined by the "FAA Method" as outlined in the UDFCM. -3- I 1 J 1 V. DEVELOPED DRAINAGE CONDITIONS For the following discussion, please refer to the Drainage and Erosion Control Plan in the back pocket of this report. As outlined above, the proposed lot is part of a larger, overall drainage plan that was detailed by the Harmony Towne Center, P.U.D. drainage study. Portions of College Avenue and the developed parcel will collect to inlets in parking areas and spill to the east. A proposed sub -surface collection system on the Harmony Towne Center site will collect these upstream flows and transfer them east to Larimer No. 2, as detailed in the Preliminary Drainage Report. ' Basins AB 1 7 1 n All on site and off site (College Avenue) flows will collect to area inlets in parking lots. These lots will serve as surface detention with maximum ponding depths of 1 foot per City of Fort Collins drainage criteria. Area inlets will be designed with orifice plates and drain to a sub -surface collection system easterly to Harmony Towne Center. There, the subsurface conveyance system will combine with the design system from Harmony Towne Center and spill to Larimer No. 2. The complete system is designed G to effectively detain the 100 yr return event, more frequent events will also be controlled by the system. Please refer to Appendix A for calculations of the 10 yr (initial) and 100 yr (Major) st�m events. Also included are final calculations of on site detention requirements. -4- VI. EROSION CONTROL: ' Wind Erosion: This site is located in an area designated as having moderate wind erosion potential. The anticipated ' construction will require disturbance of all natural features. Erosion control will be carefully planned in areas of construction, structural measures will be used to mitigate wind erosion during construction. ' Areas disturbed will require the installation of silt fencing and gravel mulch or black base pavement will ' most likely work for on -site stabilization during construction of building pads. ' Water Erosion: ' This site is located in an area of moderate to high potential for erosion due to storm run-off. ' Therefore, emphasis will be placed on control of water erosion damage. Silt fencing, straw bales and pavement/foundation paving and timing of construction will be carefully coordinated to minimize exposed surfaces for more than two months. The finished site will be largely covered by hard surface, ' providing adequate stabilization. The on -site slopes are very flat, erosion from embankments should not be a major consideration. 1 ' -5- 1 I 1J 1 1 APPENDIX A 1 1 0 1 1 1 1 DEVELOPED DRAINAGE CALCULATIONS 1 1 1 0 0 1 1 i31 PARSONS & ASSOCIATES CONSULTING ENGINEERS FL Collm. Colorado 80524 u 1 1 l u 1 l 1 CLIENT JOB NO PROJECT � �1'�',� �� 711 �y 4 CALCULATIONS FOR MADE BY lO DATE I `� CHECKED DATE SHEET OF lO I 1 0 I J 1 0 1 u 0 1 1 0 DETENTION VOLUME REQUIREMENTS Page: 100 Year Event of l o Pages Project Number: Project Title: Date: 96.17CTY CIRCUIT CITY PUD BASIN A-1/A-2` 19-Dec-96 Estimator: G.A. ODEHNAL File: CTYDETA.W01 Problem: Determine the total volume of detention required for the proposed development which consists of approximately 2.88 acres. All off -site basins will provide their own detention storage and release only the Masterplan Historic 2 year event to Larimer No.2. Given: a) Fully developed conditions b) The historic 100 year release = 2.5 cfs (per Masterplan 0.87cfs/acre) c) Basins Included: A-1/A-2 d) Mass Diagram Method of Detention Calculation Composite'C' PER URBAN DRAINAGE MANUAL Commercial CCf = (0.86) (1.25) = 1.00 CCfA = (1.00)(2.88)= 2.88 Time: 100 yr. freq. Time: Acumulated Outfall Volume: Storage Required: min. CCfA Inten. seconds Vol. (ft-3) O = 2.5 cfs ft -3 Ac-Ft 5 2.88 8.98 300 7,759 750 7,009 0.1609 10 2.88 6.97 600 12,044 1,500 10.544 0.2421 15 2.88 5.95 900 15,422 2,250 13,172 0.3024 20 2.88 5.23 1200 18,075 3,000 15,075 0.3461 30 2.88 4.06 1800 21,047 4,500 16,547 0.3799 40 2.88 3.44 2400 23,777 6,000 17,777 0.4081 50 2.88 2.95 3000 25,488 7,500 17,988 0.4129 60 2.88 2.57 3600 26,646 9,000 17,646 0.4051 90 2.88 1.88 5400 29,238 13,500 15,738 0.3613 Maximum Volume Required : 17,988 ft-3 or 0.4129 Ac.-Ft. USE 0.41 Ac - Ft I DETENTION VOLUME REQUIREMENTS Page: ' 100Year.Event,, 3 of 0 Pages Project Number: Project Title:' t"''` •` Date: 96.17CTY C/RCU%T C/T.Y PUD BASIN B-1 19-Dec-96 Estimator: G.A.ODEHNAL .. File: CTYDETB.WQ1 Problem: - Determine the total volume of detention required for the proposed development ' which consists of approximately 0.17 acres. All off -site basins will provide their own detention storage and release only the Masterplan Historic 2 year event to Larimer No.2. Given: a) Fully developed conditions b) The historic 100 year release = 0.15 cfs (per Masterplan 0.87cfs/acre) c) Basins Included: B-1 d) Mass Diagram Method of Detention Calculation Composite "C' PER URBAN DRAINAGE MANUAL Commercial CCf = (0.95)(1.25)= 1.00 •' ' CC(A = (1.00)(0.17)= 0.17 Time: 100 yr. freq. Time: Acumulated Ouffall Volume: Storage Required: min. CCfA Inten. seconds Vol. (ft-3) Q = 0.15 cfs It -3 Ac-Ft 5 0.17 8.98 300 458 45 413 0.0095 10 0.17 6.97 M 600 711 90 621 0.0143 15 0.17 5.95 ` 900 910 135 775 0.0178 20 0.17 523 1200 1,067 180 887 0.0204 30 0.17 4.06 1800 1,242 270 972 0.0223 40 0.17 3.44 2400 1,404 360 1,044 0.0240 50 0.17 2.95 3000 r 1,505 •. 450 1,055 0.0242 1. 60 0.17 2.57 3600 1,573 540 1,033 0.0237 .' 90 0.17 1.88 '5400 • 1,726 810 916 0.0210 Maximum Volume Required: 1,055 ft^3 or 0.0242 Ac.-Ft. ' USE 0.02 Ac - Ft CA u 1 1 1 I I 1 1 n 1 1 1 n DETENTION VOLUME REQUIREMENTS Page: 100 Year Event of I v Pages Project Number: Project Title: Date: 96.17CTY CIRCUIT CITY PUD BASIN B-2 19-Dec-96 Estimator: G.A. ODEHNAL File: CTYDETB.WQi ' - - Problem: ' Determine the total volume of detention required for the proposed development which consists of approximately 0.27 acres. All off -site basins will provide their own detention storage and release only the Masterplan Historic 2 year event to Larimer No.2. Given: a) Fully developed conditions b) The historic 100 year release = 0.24 cfs (per Masterplan 0.87cfs/acre) c) Basins Included: B-2 d) Mass Diagram Method of Detention Calculation Composite'C' PER URBAN DRAINAGE MANUAL Commercial CCf = (0.85)(1.25)= 1.00 CCfA = (1.00)(0.27)= 0.27 Time: 100 yr. freq. Time: Acumulated Outfall Volume: Storage Required: min. CCfA Inten. seconds Vol. (ft^3) Q = 0.24 cfs It -3 Ac-Ft 5 0.27 8.98 300 727 72 655 0.0150 10 0.27 6.97 600 1,129 144 985 0.0226 15 0.27 5.95 900 1,446 216 1,230 0.0282 20 0.27 5.23 1200 1,695 288 1,407 0.0323 30 0.27 4.06 1800 1,973 432 1,541 0.0354 40 0.27 3.44 2400 2,229 576 1,653 0.0380 50 0.27 2.95 3000 2,390 720 1,670 0.0383 60 0.27 2.57 3600 2,498 864 1,634 0.0375 90 0.27 1.88 5400 2,741 1,296 1,445 0.0332 Maximum Volume Required . 1,670 ft^3 or 0.0383 Ac.-Ft. USE 0.04Ac-Ft O c 7 Q 3 0 LL a m N •m c c m r U a U 0 C y co CA N � fS m ^ CO f� C C M O CO Cl) M m m c ' m e fn fn Q C C O O R m C C O N O O E m E ui ui r` ui ui C O U >m E fn ro n 0 0 j E F ri v o 0 m o m n 0) M 0 0 o cl� OR cq cq cq > IT 0) rn m coa m 0 0 0 0 0 u� 0 0 0 0 0 r rn U o in C w N M 0 0 m v LO J m E ^ j_ C_ N in u) O O E N N N N M C v m ^ O O O O N O- N N N N N O 0 0 0 0 0 in 0 0 0 0 0 ^ o 0 o n o m J C m U m m OD m m m U 0 0 0 O U 16161 fr — co n r` m ami N (D coN Q N O N N O O c m E N a N u in Z ¢ G m m C N C m O m o N N M 7 J ^O 5/10 3 0 E_ c cuO E `o c C m m 0 W m C C) O r In M 7 U v N N N r N Q Q 'C ^ co v n v v C C co O Cl) O O CO O O O O Q C C O O N m C C 0 0 W O O E m E m ui m N In C O U m c E TO E v> r co co n v o o 0 0 H 0) 0) O O pO M O CD m co O O O O O O U) O O O O O rn )n o )n C N r ch O O Cp r C to J m E ^ H C_ O O O q N m E c O N N N In N o z O O o 0 0 o o o o 0 O O O N O J C m U 0 0 0 0 0 m U U n ro P� rl m m m N O O 7 N Q O N N O O E a N m m ¢ a m m Z c O 'y C jm O 0 r N N C`D C 0 0_ O U � H r II U _ a c m ca c m m E Qi m O C m c O U 0 C m N m > Oi 0 C 0) Z) o o E c E u) v U 0 0 + m m LL C n � m OI r II CL c7 0 E c U N m m m m rn E E E C m F- 3 0 0 _ C 3 U m m LL O O N a m E m c E E c 0 E 'c_ U O 10 r N M V w w H O Z 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 1 I w TW 1 U = H S Cj z 3w w W w 0 zW I a- Z MGM 1 W [1f W x I O'O mmmo >w I ww F O pop w-S O = rn u) �l u't II ow Ww i I zo^1 II it w .0 Jm �z x o NII- a� �(D w O a I yw — 1 I. n O � L s, . t l �z Al N O Lin 0, I a Ty � m O_-Sc t l W , p `il WF aN Q o� \ p W W M �F aN U d p Ow Cd V V I 1 Oo �' d I I px p d> Ir � ___-I w z M� �� i� AZ 1 aw J � i J Oz'� mwll i I Oa I I _ O u 3 ^ 1.. Itz JW Liz I i I I mW NW tii f T w , I I 0 11 PARSONS & CLIENT / LI I V I� JOB NO. _ t(. I7 ✓` /I ' �1 IM Ir1- ASSOCIATES PROJECT CALCULATIONS FOR CONSULTING ENGINEERS FL CoWu. Colorado WS24 MADEBY DATE HECKED DATE SHEET OF I O J 1 1 1 1 1 1 1 6-16. BORROW PITS 135 work. By leveling at the stakes before and after excavation; data are obtained from which to compute the volume of borrow taken from the pit. Figure 6-8 shows a borrow -pit area over which 28 squares were originally staked out. The cross -hatched line represents the limits of the excavation. Squares are of such size that no important breaks, either in the original ground surface or in the pit floor, are assumed to lie between the corners of squares or between the edge of the excavation and the nearest interior corner. Those squares falling completely within the excavation arc outlined by a heavy line. Within that line each square excavated to the pit floor is the volume of a truncated square prism. Square 7, for example, has the surface corner points b, c, d, and e; after excavation, corresponding points on the pit floor arc b', c', el', and e' (see Fig. 6-9). The volume of the resulting prism is the product of the right cross -sectional area A and the average of the four corner heights bb', cc', dd' and ee'. In cubic yards, A 1/7 = d-(bb' d- cc' - dd' + ee') exactly 4x27 Each similar complete prism might be computed by the preceding method. However; when a number of such prisms adjoin one another, it is quicker to use the following relation which gives the total volume of n,rr number of complete prisms: A li = (Eh, + 2 Di, 3 Zh,j + 4 E114) (6-18) 4x27 In formula 6-18, A is the right cross -sectional area of the unit rectangular prism, not the total area of all the complete prisms; h, is a corner height found in only one prism; h, is one common to two prisms; h; is one common to three prisms; and h, is one common to four prisms. For example, ee' is an h,, rld' is an bz, and cc' is an h,. The total borrow -pit quantity also includes the wedge-shaped volumes lying between the complete prisms and the limits of the excavation. 111-V I NoWAA10 MOON ' Figure 6-8 Borrow pit. tit off. Ur e. . .l 1 ct i?iv /.� PARSONS & Ir-7 ASSOCIATES CONSULTING ENGINEERS CLIENT �17:f✓ Q PROJECT I% ,j//I (:�/GJ'J 1 JOB NO. `r I� 1 CALCULATIONS FOR Cif--JA0 M '{ '/ GINO �� f FL cotl�.. Jyolor.do J30524 MADE By OATE__�L�yj CHECKED DATE ✓ SHEET OF�O I I I I i I I I I I 11 I I I I 0 I i` _G u w .r i 1 74 d N rl N p O Go co OD7 to0 r-: O c N co 00 m Ol'LZ N f`N LZ N N 9l'LZTa��Ctc(C,MO4 £LZ 'LZ o, N�rzN CD Nl-__ >� I NI I N O t\ JQ J I omNO0m0 o:D I I Nozoo it (L �� I �aaw�(Y`Z' 2 W X0 a()�a� 0 Z WR�F1 I Ia !L JNOF-K W F- O WZPE>Zowx'p O E¢ m_U U ooN�¢ ^ Ow I =;xZ ZQZWw&-O YO�Ow t CL r UUUQF-ppp I u 10� OL II J F— UO Z N Ua C6 LZ c c c PARSONS & CLIENT CIY<VI4 Cil JOBNO. 96-1 CTY let ASSOCIATES PROJECT CIYCVIf C'fj CALCULATIONS FOR O it late CONSULTING ENGINEERS MADE BV ��fi DATE 3 9 &A0 3 21 q7 �/p�/ FL CuUm Cubr�de BOS24 I CHECKED DATE SHEET OF�� 1 1 1 1 ' PARSONS & Ir-1 ASSOCIATES CLIENT JOB NO. 9 V/ • k-T 1�� 1'C� S 1 PROJECT CALCULATIONSFOR ' CONSULTING ENGINEERS Ft Gtld, Gabrado 80524 //���ul MADE By GAQ DATE 9 CHECKED DATE f� SHEET OF 10 1 0 it 1 1 1 1 [I No Text I APPENDIX B I 11 I I I ' EROSION CONTROL CALCULATIONS I I I I I I [_1 I AND COST ESTIMATE I ' RAINFALL PERFORMANCE STANDARD EVALUATION 1 1 1 I I I I L 11 I I I I I PROJECT: Ct CSll�� STANDARD FORM A lr�;-� C{ COMPLETED BY: G, AOd t DATE: Ium-,�� DEVELOPED SUBBA§IN ERODIBILITY ZONE ASb (ac) Lsb (ft) Ssb M Lb (feet) Sb M PS M A - 1 I Ade,)zJ c, 0, u coo 1,01 �.88 0. iZ H 5 5-0 ,j h a y�l 99 5, 31 ' MARCH 1991 8-14 DESIGN CRITERIA 1 1 1 1 1 1 1 1 1 EFFECTIVENESS CALCULATIONS PROJECT: ClrcU;A C14 STANDARD FORM B COMPLETED BY: LA OcUr0 DATE: 1zl Erosion Control C-Factor P-Factor Method Value Value Comment P�,��n+, � �,a� , w�►k5 0.01 FFI1110 J i � i �cnCa- �t;lr1CY 1.00 V • 5t) 1.00 1.00 00 0_3D MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS GburgL 4J cC c / 1r U �d, �' flJ0 Y OIL _ 3- l �_VLl pr;�S w�iks 0.2q /V_ 3-7 �SU� GNU o.�.a A<c W+A. C o-A� MARCH 1991 8-15 DESIGN CRITERIA IJ U II ENGINEER'S COST ESTIMATE Page: FINAL 1 OF 1 Project Number: Project Title: Date: 9617-CTY CIRCUIT CITY PUD 20-Dec-96 Estimator: G.A.ODEHNAL File: Item #1: ALTERNATE #1 #2: ALTERNATE #2 Numbe Description of Item Unit Cost" Unit I erosion control as designe all disturbed areas seeded Quantity 11tern Cost Quantity Item Cost A EROSION CONTROL Native Seeding w/2 Tons of Straw Mulch (Crimped) $1,000.00 AC 0.85 $850.00 $0.00 Inlet Protection $150.00 EA 7 $1,050.00 $0.00 Silt Fence $3.50 LF 850 $2,975.00 $0.00 Native Seeding w/ 2 Tons of $650.00 AC 3.4 $2.210.00 Straw Mulch (Crimped) $4,875.00 $2,210.00 SUBTOTAL MULTIPLIER 1.5 1.5 TOTAL DEPOSIT $7,312.50 $3.315.00 TOTAL SECURITY REQ'D. $7,312.50 - unit costs are instaueo costs. PROJECT: CIRCUIT CITY P.U.J. SEQUENCE FOR 19 97 TABLE I CONSTRUCTION SEQUENCE COMPLETED BY: Cf10 STANDARD FORM C DATE: FEB. 6, 1997 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR 7997 MONTH APR. 1 VA ✓UNE JULY AUC. OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other PAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/ Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracin Asphalt Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/ Sealant Temporary Seed Planting Sod Installation Nettings/ Mats/ Blankets Other MST. xA' S DRAIN LEGEND EXISTING 1' CONTOUR EXISTING 5' CONTOUR PROPOSED CONTOUR ............ BASIN BOUNDARY A A - BASIN DESIGNATION B - AREA IN ACRES e C C . CWPOSITE RUNOFF COEFFICIENTS (10 V. EVENT) D D - DESIGN POINT DESIGNATION I O1 CHANNEL NUMBER PROPOSED STORM SEWER Ip INLET PROTECTION SILT FENCE F.F. FINISHED FLOOR ELEVATION 77////�//J7 100 YR HIGH WATER LINE (HWL) TABLE I LtlA4rM m swN RAw "NAG emaA„�v�rl.IM— w. FIA��nwmYwAlmm�— MIAMI AM w ww MMIM r iaw"MMINNw r MrAY Y ailw. wom NSA MINA e.RnnT mMMi aymwdmANN Set YasIFROXN O NI MAI m/ sNH a.. =m �M ms cummum, ME KENSINGTON DEVELOPED BASIN FLOWS BASIN DESIGNATION D(9aV PONT lm.5m NMBIA AREA AC DM CIS DFm CGS 1 A-1 aZlI IJ Ll zI Aa 'L•1 11.04 1111 $ 3Y 111 241 p s-1 an as 1.5 A e-a a.xx l.a ze FERTILIZER TSMLLY D RECD . 2. M MPROMD ANALYSIS. A I FgNOS OF A 0 PAVILION f MST. SAT S p1M1 EMST. 'F C\MB INUT DEIFNMM PDO IIXN it\i/'✓ MIM rWbrC: O4 1 Stw'N-K SbeSA pvAb. aB1 .VC-K 1w M. tiwA Ns 1!D W. F.F. — 5028.20 f / affA IMFi f P 100 yr H wl. c- 2 'IE�.• •.@:3 ii �7.�i�.�=ice i1f=Yi /E�oo• II II I II 11 � SEED MIX GAL asTuxsm uaAw IREMENTS (Ru esTweED AAus) ROUNDS ARMED ALCOILMO ro LABORATORY 9JIL AxYSs OF WEGEs KS/AA� a YIF T MS/AOwE 6 FOR gAllM. IN MSFMCE Of A Y.AL PUBES9IT MIEATGRASS VA A5 Y.B 5] VO PMIWS OR AVM MTRGi AND NO M aMIE 15.1 ]5 zx ASENNISIDo, ,� Y �S, PER ACRE. s¢faTs aAMA +OY U x0 TOTAL TO 17.6 GEED MIXTURES FOR SRs MM w5Mi SOL PROD s AUTAUNITY. SAYMITY M HIGH WMR TABi SHOULD BE OF ORED BY A TRAINED APEOAUSt if EA31. 1Y simm MAN EMST SAD STORY GRAN --------------- MM�f• 1.W GBAPNIC SCAIl I I 1 IY-M0. 4_ z"ice _ ADAM .4 CE"fFNDW AWD a-z I i III �pwplMbwN eymX m-n / I I r Rtlwia ml(1W rtY O.xS IRS V 1W Fit Hai P.x IP O p11FrnOx FWD e1055w-ft j I ' SIT: ; N�TRIM: 100 a-n r� n.Iww mlN OD y1: 0.15 [h GO Fit Hi arlff+-BARREL Mu ADDRESS WE ceMNTM VOLUME SHdam IN MEN IwK DESIGN FOR HARMONY O.mE aNTER. NCss. A„ Oi TEMPORARY 24' ORIFICE P:AM TO BE REMMI) FW OMNO APPROVAL OF ME HARMONY TOW LINTER FINAL ORAINALE PLAN BY OREAM BAPR91. O CARME PLATE TO BE Ali `ARDI a' OLLOMNG A PROVAL 5 THE HARMONY TOMB CENTER ni MI WAG Q PLAN! BY DROFL BARBELL MANi GOO} TO SFAK AS MOM urz(DInu 401 IN COVER). O} Y MADE PLATE -- r71-rr- I I I I I I I I M 11i .I MULCH (Au DSTJRBED AREAS) WEDRYAWND MORES SSRU SCARF LMANG MULOIES SHw. K USED Mm A PFRETMLAL ACCNTASIL MULCH DA75 OF USE APPLICAnW RATE STRAW OR HAY JM. 01 - CEO. SI x TWA/ACRE HILRAwc (F0.^D AN PAPER) YAP. IS - MAY 15 J/A MaiERM, cWTRa (RAM ON RIANNETS) JAN. 01 - DEC. 31 NOT AFPUCAME HAY M STRAN MULCH SHALL BE FREE OF I'MWs McmS AND AT LEAST 541 OFRE IN Is n'SUMYAR Dili GRASSE MAY MOM AaNA VE MASS MULCHING MATERIAL. F AVAIi ¢MEIIRWEq.IAD.. INS -F.L AT FAAMAA W I a+IYrs+ sixll: + A AMAmA i IN, "MAN + AS* $A I.NAr aFNF. a Ra r FNFrE r w Y r.w rr� .Nr«ArP V��w+maN M.rl+ .AY .rtl n..EIA.r B.4RrP wwwII i r.au•F .M.w w BirYl F ur ..F+E AFAYrF dYY. mwNAFn ArF N+W� wr+T1. F.arMA±. 'L=AwFFm w Mir wl.. rA.AM. Rww. r.Ai r rY F «.w rMAA r w.W rMMm .ede,iesF wr,PBw y�My.�yry�ry MA a w. �� yM A"L Iw,me mi Bie.r-s6n evM Y r�i�ii F+F MIY �i IFa AN"A w Miri w0 M w��rww�F AF MMy. YYnW YIYYwFib SAM AIRS. Mi r .Frr we rYr y_�_Iy�MW .rwLLl AFIrY . a F ENS �A wWA M Y rMBAM A/ir iwMANA EA�•N.N •yMA.MNI 2 Ar+...+.. _ wIMw.F a «Y'{}"'I INA a.M • (M+wO+Ar amew ANwA. Ai Brw AsNF++w r Y mIa eIr F +i. F :RAIrA� + sw F.Ir.:Fr...w�i I.ur .i.r r.A.M.• VIA,w A..R as Ymbee e, ,N r A1tRA4 wl �R w_ �D�M F wE1R. M r Awww we M /Yw Iw wl�++ h z A:RA�ii A wwr F"'r" a wYF w r .Fw w Aa-e r+MR.rnFWN •AAAF• . IArLNM r F�wWq M CN m.aW w ANI.1r� nrY Y r s.w W WALL MAE III � Mina OPENING WIRa PULE W. FORD AI/A$ -ORIFICE FLATS mIERI -x$.m -wma DRIVING-z DIAMETER FWD Bl T -ORIFICE yE1Nx -I S/Ie' OAMETET FWD WCMHR NWT OPENING -]' DIAMETER ORIFICE PLATE NOT TO SCALE 0 MAR 31W PARSONS & ASSOCIATES, INC. 432 Link lane Plaza Ft. Collins, Colorado 00524 CONSULTING ENGINEERS (970) 221-2400 96.17-CTY 11 HARMONY TOIFNE CENTER P. U.D., CIRCUIT CITY STORE 11 .-) '� GhaokAn BPO I DRAINAGE & EROSION CONTROL PLAN Jai