Loading...
HomeMy WebLinkAboutDrainage Reports - 09/16/1998'�Tv OF Report. nn- FINAL DRAINAGE AND EROSION CONTROL STUDY WOVENHEARTS MEMORY CARE C�7ME0w � SEP 19.98 1 1 1 FINAL DRAINAGE AND EROSION CONTROL ' STUDY WOVENHEARTS MEMORY CARE ' Prepared for: DELWEST CORPORATION 1211 S. Parker Rd., Suite 203 ' Denver, CO 80231 303-671-7151 Prepared by: JR Engineering, Ltd. 2620 East Prospect Road, Suite 190 Fort Collins, Colorado 80525 ' (970)491-9888 ' September 4, 1998 Job Number 9182.00 No Text I 1 I 11 11 11 1 TABLE OF CONTENTS TABLE OF CONTENTS INTRODUCTION PAGE 1.1 Project Location..............................................................................1 1.2 Site Characteristics..........................................................................1 1.3 Purpose and Scope of Report..............................................................1 1.4 Design Criteria..............................................................................1 1.5 Master Drainage Basin.....................................................:.............................I 2. EXISTING DRAINAGE SYSTEM............................................................................2 2.1 Major..........................................................................................2 3. DEVELOPED FLOWS 3.1 Criteria.....................................................................................................................2 3.2 Off -Site Flows..........................................................................................................2 3.3 Onsite Flows............................................................................................................2 3.4 Hydrologic Analysis of the Proposed Drainage Conditions....................................3 4. RUNOFF DETENTION AND RELEASE.......................................................5 5. STORMWATER QUALITY.......................................................................6 6. EROSION CONTROL..............................................................................6 7. VARIANCE REQUEST.............................................................................8 8. REFERENCES.......................................................................................8 APPENDIX A MAPS AND FIGURES APPENDIX B HYDROLOGIC CALCULATIONS APPENDIX C DETENTION POND CALCULATIONS APPENDIX D OUTLET STRUCTURE CALCULATIONS APPENDIX E STORMWATER QUALITY CALCULATIONS APPENDIX F EROSION CONTROL CALCULATIONS APPENDIX G SWALES, INLETS, AND PIPE SIZING INTRODUCTION 1.1 Project Location tThe proposed Wovenhearts Memory Care is located on a tract of land situated in the Northeast Quarter of Section 1, Township 6 North, Range 69 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site is bounded on the west by an existing development, Sterling House, on the north by the Evangelical Covenant Church, on the east by Lemay Avenue and on the south by Rule Drive. (See FIGURE 1 - VICINITY MAP.) 1.2 Site Characteristics ' The general topography of the site consists primarily of undisturbed soil with native vegetation. In general the site slopes to the southeast at approximately one-half to one percent. The Soil Survey of Larimer County Area, Colorado indicates the soils for this site are comprised of clay loam. 1.3 Purpose and Scope of Report ' This report defines the proposed drainage and erosion control plan for the proposed Wovenhearts Memory Care assisted care living facility, including consideration of all on -site ' and off -site runoff. 1.4 Design Criteria ' This report was prepared to meet or exceed the submittal requirements established in the City of Fort Collins' "Storm Drainage Design Criteria and Construction Standards" (SDDCCS), ' dated May 1984. Runoff computations were prepared for the 10-year and 100-year storm frequency utilizing the rational method. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, has been ' utilized. 1.5 Master Drainage Basin This site is in the Oak / Cottonwood Farm ODP — McClelland Basin. The master drainage plan tfor the basin was prepared by the Sear -Brown Group. According to the master plan, the SA918200\doc\drainrpt ' Page I I ' maximum allowable release rate is 0.5 cfs / acre for sites in the McClelland Basin. 2. EXISTING DRAINAGE SYSTEM 2.1 Major Basin ' Along the north property line, historical drainage has been concentrated in a swale from west to east at an approximate slope of one percent. Along the east property line, a ditch carries flow from development from the north in a southerly direction at an approximate grade of 0.25% to an existing storm sewer system under Rule Road. The existing 100-yr. design flow ' in this ditch is 29 cfs. Reference material is included in the appendix. Along the west property line sheet flow from Sterling House is directed southerly to an existing detention pond at an approximate grade of 1%. The Sterling House detention pond releases 7.5 cfs ' during the 100-year storm, to an existing 18" RCP storm sewer system on the south property line of the site. Flow continues in an easterly direction until the storm sewer connects to the ' storm sewer under Rule Drive at the intersection of S. Lemay Avenue. The site has historically drained by sheet flow from the northwest towards the southeast at an approximate ' slope of 0.5 — 1.0 %. The entire drainage from the site eventually enters the City's storm sewer system at the intersection of S. Lemay Avenue and Rule Drive. 3. DEVELOPED FLOWS ' 3.1 Criteria The Rational Method was used to determine both the 10-year and 100-year flows for the sub - basins indicated in this drainage report. A description of the hydrologic analysis is provided ' in Section 3.6 of this report. 3.2 Off -site Flows Drainage outside of the developed area does not flow onsite. 3.3 Onsite Flows Drainage within the developed area will surface flow to inlets and detention ponds with the exception of three basins, which will direct discharge. All grading has been designed to carry flows in a positive direction away from structures to the proposed drainage facilities. A qualitative summary of the drainage patterns within each developed sub -basin is provided in the following paragraphs. Detention and release rates are described in Section 4, "Runoff Detention and Release". S:\918200\doc\drai nrpt Page 2 Runoff from Sub -basin A is conveyed by surface flow to the south pond. A manhole will be installed on the existing 18" stone sewer and will receive flows from the south detention pond. The Sterling House's detention pond adds 7.5 cfs during the 100-year storm and we are adding 0.45 cfs for a total of 7.95 cfs. The storm sewer system has been modeled and calculations are included in the Appendix. Sub -basin Al is a portion of Sub -basin A. Runoff from this basin is conveyed by surface flow to a proposed 2' trickle channel. This channel drains the east side of the building to the parking area. Sub -basin B is a small area on the north side of the site that will not be disturbed. Runoff from Sub -basin B is conveyed by surface flow to the existing swale along the north property line. This area historically flows to this swale and the discharge to this swale from this site will not be increased by this development. ' Sub -basin C is a native grassed area that will have very little impervious area. Runoff from Sub -basin C is conveyed by surface flow to the north pond. This pond discharges into the ditch on the east property line through a 15" RCP with a 2.23" orifice to restrict release to 0.15 cfs. 1 LJ Sub -basin D is a small area on the east side of the site containing an existing drainage ditch. Offsite flow enters the basin from the north via 2-21" RCP's. Runoff from Sub -basin D is released undetained in the ditch along S. Lemay Avenue and routed under Rule Drive in an existing 27" pipe. The ditch will be improved with this project in accordance with requirements outlined for open channels in Section 7 of (SDDCCS). Flows in the ditch will not be increased due to development. The drainage ditch in Sub -Basin D is an existing conveyance element, which carries significant offsite flow (29 cfs), see Appendix A for the excerpt from the master plan Oak / Cottonwood Farm ODP — McClelland Basin. Therefore the drainage ditch in Sub -basin D is being considered a historic condition and is not included in detention calculations. Routing this flow through on -site detention areas was considered and it was determined that this option would create hardship for this property, would necessitate major drainage infrastructure improvements and could potentially endanger the welfare of the proposed building. Based on this information, a variance is being requested for this site to remove consideration of runoff from this basin from the calculations for this site. Sub -basin E is the atrium interior to the building and will be open to the outside. Runoff from SA918200\do6drainrpt Page 3 I 1 1 t 1 1 1 1 Sub -basin E is conveyed by surface flow to an inlet and piped to the north pond. Sub -basin F is a small area along the south property line. Runoff from Sub -basin F is released undetained to the curb and gutter on the north side of Rule Drive. The allowable release rate for the site was determined by using 0.5 cfs/acre. The area considered was the total lot area less the area contained in Sub -Basin D (see explanation above) for a total of 3.03 Ac. This 1.52 cfs was then reduced by the free release from Sub - Basin's B and F for a total of 0.60 cfs that needs to be detained on -site. The north detention pond will release 0.15 cfs and the south detention pond will release 0.45cfs. On -site drainage basins are shown on the Drainage and Erosion Control Plan included in the rear pocket of this report. 3.4 Hydrologic Analysis of the Proposed Drainage Conditions The Rational Method was used to determine both 10-year and 100-year peak runoff values for each Sub -basin. Runoff coefficients were assigned utilizing Table 3-2 of the SDDCCS Manual. As stated above, the Rational Method was used for all hydrologic analyses for the project site. The Rational Method utilizes the equation: Q = CJCIA (1) where Q is the flow in cfs, C is the runoff coefficient, Cf is the storm frequency adjustment factor, I is the rainfall intensity in inches per hour, and A is the total area of the basin in acres. The frequency adjustment factor, Cf is 1.0 for the initial 10-year storm and 1.25 for the major 100-year storm. The appropriate rainfall intensity information was developed based on rainfall intensity - duration curves in Figure 3-1 of this Manual. In order to utilize the rainfall intensity curves, the time of concentration is required. The following equation was used to determine the time of concentration: t,=to+t, (2) SA918200\doc\drainrpt Page 4 1 1 1 1 4. 1 1 where t, is the time of concentration in minutes, to is the initial or overland flow time in minutes, and t, is the travel time in the ditch, channel, or gutter in minutes. The initial or overland flow time is calculated with the equation: t, = [1.87(1.1- CCf )Los]/(S)oss (3) where L is the length of overland flow in feet (limited to a maximum of 500 feet), S is the average slope of the basin in percent, and C and Cf are as defined previously. All hydrologic calculations associated with the Sub -basins shown are attached in the Appendix of this report. Table 3.1 provides a summary of the design flows for all Sub -basins and Design Points (DP's) associated with this site. DESIGN T E .1 VE O AREA AREA C10 C100 GS� Tc (10) YT Tc (100) E Q (10) Q (100) POINT DESIG. (ACRES) (MIN) (MIN) (CFS) (CFS) A 2.17 0.54 0.68 12.5 11.3 4.99 11.54 B 0.15 0.28 0.35 11.9 11.9 0.18 0.36 C 0.63 0.28 0.35 11.5 11.5 0.74 1.52 D 0.49 0.26 0.33 12.6 12.6 0.52 1.06 1 E 0.02 0.47 0.59 5.0 5.0 0.05 0.11 F 0.14 0.14 0.45 8.1 5.2 0.24 0.56 OS 0.22 0.83 1.04 5.0 5.0 1.02 2.05 2 A+OS 2.39 0.57 0.71 12.5 12.5 5.80 11.85 3 C+E 0.65 0.29 0.36 11.5 11.5 0.80 1.63 4 Al 0.41 0.59 0.74 7.2 f 5.7 1 1.24 2.67 RUNOFF DETENTION AND RELEASE The site will contain two detention ponds, located on the southwest and northeast portion of the site. Both ponds are designed to detain runoff from the 100-year storm from the site. The south pond release rate will be controlled by a box -type grated outlet with an orifice on the outlet pipe. The north pond release rate will be controlled by an orifice on an outlet pipe. Details of the outlets are included on the Detail Sheet in the construction plans for the site. The 3.20" orifice on the outlet pipe of the south pond will restrict flows to 0.45 cfs, and the 2.23" orifice on the outlet pipe of the north pond will restrict flows to 0.15 cfs. The on -site S 1918200\doc\drainrpt Page 5 I release rate is equal to 0.5 cfs/acre in accordance with the Oak/Cottonwood Farm ODP master drainage plan and reduced by the amount of runoff that will be released undetained from the ' on -site basins. Detention and release calculations include the entire site and the north half of Rule Drive upstream of the site excluding Sub -Basin D. Considering S. Lemay Avenue, it is not possible to take these flows due to the physical limitations of the drainage channel on the west side of the road. Considering the north half of Rule Drive adjacent to the site, taking these flows on -site would require extensive modification of the roadways. Typically, in this ' situation, the allowable release from the site would be decreased by the amount of runoff generated by the adjacent half -street. In this case, reducing the allowable release from this site ' would effectively not allow any release from this site. Therefore flows from the north half of Rule Drive adjacent to the site and the west side of S. Lemay Avenue adjacent to the site have been allowed to continue to release as historically has occurred. Calculations are included in the appendix of this report. ' S. STORMWATER QUALITY As per The City of Fort Collins' Stormwater Utility, stormwater quality was considered in the design of structural Best Management Practices. A water quality riser pipe is incorporated into ' the outlet structure on the south detention pond. A water quality capture volume (including 20% additional volume for sediment storage) of 0.06 Acre-ft has been provided. ' Calculations for the riser pipe are included in the appendix of this report. 6. EROSION CONTROL ' 6.1 Introduction ' This section represents the Erosion Control Report for Wovenhearts Memory Care and was prepared to meet the regulatory requirements of the City of Fort Collins. This report was prepared following the guidelines and regulations set forth in the SDDCCS Manual. The proposed improvements cover approximately eighty percent of the site. No grading is ' proposed in the northwest portion of the site. ' The general topography of this site consists of undisturbed soil with native vegetative ground S A918200\doc\drainrpt Page 6 1 cover. Slopes range from one-half to one percent. 6.2 Soil Description In accordance with the Soil Conservation Service's (SCS) "Soil Survey of Fort Collins Area, ' Colorado," the soils on -site consist of the following: Rainfall Wind Hydrologic Soil Designation Erodibility Zone Erodibility Zone Soil Group Nunn Clay loam Moderate Moderate C 6.3 Erosion and Sediment Control Measures ' Erosion and Sedimentation will be controlled on -site by the use of silt fence, gravel ' construction entrance, and straw bale filters. Buried Type "L" riprap will be provided as permanent erosion control at the outlets of Pipes A, C, the 2 existing 21" RCP's, and the 2' curb opening in the parking lot. Riprap is not necessary for the overflow spillway at the north tdetention pond. Calculations are included in the appendix. t6.4 Dust Abatement During the performance of the work or any operations appurtenant thereto, the Contractor shall ' carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance, and to prevent dust which has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing a nuisance to persons. ' The Contractor will be responsible for any damage resulting from dust originating from his operations. The Contractor will carry out these dust abatement measures by providing a water ' truck, which will spray water as often as necessary to control dust nuisance. 6.5 Tracking Mud on City Streets ' Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required per the detail shown on the Plan, twith base material consisting of 6" coarse aggregate. The contractor will be responsible for S1918200\doc\drainrpt Page 7 1 clearing mud tracked onto city streets on a daily basis. 6.6 Maintenance All temporary and permanent erosion and sediment control practices must be maintained and irepaired as needed to assure continued performance of their needed function. Maintenance is the responsibility of the contractor. ' 6.7 Permanent Stabilization i 1 1 i 1 t Reseeding and mulching is required for all disturbed areas. Seeded areas shall be evaluated after one growing season to determine whether additional maintenance and/or weed control is required. Acceptance of seeded areas after the second growing season shall depend upon whether a satisfactory stand of grass is evident and weeds have been controlled. A satisfactory stand of grass is where 90% of the seeded area has an evenly distributed grass surface. Erosion control calculations, cost estimate, and schedule is included in the appendix of this report. 7.0 VARIANCE REQUEST A variance is being requested to not consider Sub -basin D in detention calculations for this site. This request is being made based on not increasing runoff to the drainage ditch in Sub -Basin D and treating this area as a historic condition. Because of the drainage ditch, it is not possible to prevent runoff from this basin from leaving the site. If this basin were considered in the runoff calculation for this site, the allowable release from this site would be negative. 8.0 REFERENCES City of Fort Collins, "Stone Drainage Design Criteria and Construction Standards," (SDDCCS), dated May 1984. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March 1969, and Volume 3 dated September 1992. SA9 I 8200\doc\drai nrpt Page 8 I 1 MAPS AND FIGURES 1 1 1 1 1 1 1 i 1 1 1 1 1 i i 1 1 i 1 1 5prin o Ca n Ct / $ Mt Vernon = E B y\o Ct C on Ct eO4 eat er Ct v''°\�Orr,/�} =C? Brittany Or o°ti ^dH �cDRia Ct by q C,r 3 SS a call° 1 n So\en'to Cr Pine Ct Cr 01 eOO^y Sandy Co �n Rare, Cl e W CI Cape Cod Cir Calera go Wheaton Dr c° Q O Lo Corl °' a i o J £ HARM NY RD. b VgOV NHEARTS = Oak, M RY CARE °akrld ° ° s as Oak, 10 Se Or e ti cp w 0 o c o En goo 14 c Jo. p' f Rule Or t. Rule Dr. o Live Oa4 tt M on Or. ou a b _ d 0 o R Ct i c Red Oa4 � @ o bert a t b o So toom sof.4 °a Oak Ct River ow / 1 White 0ak a \an Or 0 Ct Inu m U ° 'Spanish Oo4f ia Wister/ �Pussway Ct CPO Twlnberry CI Ot C- B^rherry Qiq is Belvedere CC rroc / °fit 1 u S id a Or Q i0a4 Leo p " in w U 0 o c of a in e Ro^r m nve Y°peY os pin n o wO>- Fi e Or (l ° Yo�o °O/ r ep Salon St s e•. i Or een`^ o SFO�'rw y Ql e n e4 C Southridge \n°v a F 1. u� V VV VICINITY MAP N.T.S. NICCLELLANDS BASIN ;WALE 302 _ ' 2 27RCP's304 ' E` 36'RCP- EXIST ' !.-.-:� 309 36" RCP EXIST. 3.10 ._ Y 27" RCP EXIST H • r LEMAY A twt ' rt ' , 39 cfs<ZOO -04 Qt�= 29 cfs _=j.'��r , f` Q1 = 3$ cfs jf t..; t ,1. Q100= 63 cfs ! } f 311 EXIST 12" „ I 24" RCP EXIST.RB G}e 05 INLT ! ;�� ,j of pitt/ s,�E 2O�AR:t �f I MULTI FAI 7.7AC OR BUS BUSINESS SERVI SERVICES '/ 207 OdLUNSW00D 3tt _ ■ - TREATMENT O CMPLEX CITY PAR[ MULTI. FA OR BUSIf\ SERVICI 31 u:# 1 1 ' APPENDIX B HYDROLOGIC CALCULATIONS k,1 f 1 JR Engineering, Ltd. 2620 E. Prospect Rd., Ste. 190, Fort Collins, CO 8525 1 1 1 1 t 1 July 20, 1998 LOCATION: WOVENHEARTS MEMORY CARE ITEM: COMPOSITE "C" CALCULATIONS COMPUTATIONS BY: DJC SUBMITTED BY: JR ENGINEERING, LTD. AREA DESIGNATION TOTAL AREA AREA OF ROAD/WALK RUNOFF COEFF. AREA OF BUILDING RUNOFF COEFF. AREA OF LANDSCAPE RUNOFF COEFF. COMPOSITE VALUE A 2.17 0.45 0.95 0.46 0.95 1.26 0.25 0.54 B 0.15 0.01 0.95 0.00 0.95 0.14 0.25 0.28 C 0.63 0.03 0.95 0.00 0.95 0.60 0.25 0.28 0 0.49 0.01 0.95 0.00 0.95 0.48 0.25 0.26 E 0.02 0.01 0.95 0.00 0.95 0.01 0.25 0.47 F 0.14 0.02 0.95 0.00 0.95 0.12 0.25 0.36 OS 0.22 0.18 0.95 0.00 0.95 0.04 0.25 0.83 A+OS 2.39 0.63 0.95 0.46 0.95 1.30 0.25 0.57 C+E 0.64 0.01 0.95 0.00 0.95 0.63 0.25 0.27 At 0.41 0.00 0.95 0.20 0.95 0.21 0.25 0.59 9182compc.XLS 1 1 1 1 1 t n 1 I (V N H O 1n m N ry n QJ 2 is P � p lV IV O CI O 9vN 6�rt m ry � ry N 1�1 l7 CI fV l7 O O 0 O O V O � � v ;p gXm C o lV m O m p N C o m j 8 1�1 N y O N m 8 t0 z J .5 n E -- o ei io N d N vi m o x N N ry lV G lV ry lV 5 $ V 4 g Y) 10Y lm`I N O b m N [r'1 N F9 W U 2 � c N c O a O o O s C O a O m S2 2 w O a 00 z N Q m U U W W O} W U Q m Q a H N C i� 1 1 1 1 1 1 1 1 s J Q � vi m N ro �i o vi ry N o ui ry N n vi 2 � LL N T, N O N Ol h N Yf p N lV O O N ♦ S Z F 3 W0W Wz J gg a N � O N y N u a v � 0 O h N N f N N N O !j Ol n YI a E B of of m ri m V O p O Y O N O N O N O a' J ^ m a E n lV N N OO n n CI yp 8 r 9 8 N ` 8 8 8 8 8 8 $ $ g W F N U � 2 q a N N O N O Y O O O O N N O O Z F w o. a m U O W N m Q a m � 7 Q❑ 9 K ■111111111111111111111 �111111111111111111111 � 111111111111111111111 �111111111111111111111 ■111111111111111111111 ■111111111111111111111 �111111111111111111111 ■ 1�1�1�1�1�1�1�1�191�1 ■ I�I�I�I�IB19191�I�IB1 ■ �IBI�1@I@I�1@I�1�1�1 1919191�1�1�111�1�1�1 i< 1 1 1 1 1 1 ■111111111111111111111 ��111111111111111111111 ■ 111111111111111111111 ■111111111111111111111 ■111111111111111111111 �111111111111111111111 ■ 1�1�1�1�111�1�1�111�1 ■ 1�1�1�1�1�1�1�1�1�111 ■ 1@I@1�1�1�111�1�1�191 ■ 1�1�191@1�1�1�1�191�1 ■ 1�1�1�1�111�1911191�1 ■1�1 �1�111�1�1�1�111 iC I 1 1 1 APPENDIX C DETENTION POND CALCULATIONS 1 I 1 1 I I 1 [1 t 1 SOUTH DETENTION POND DETENTION POND SIZING BY FAA METHOD Developed by Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado USER=JR Engineering LTD -Ft Collins ........................................... EXECUTED ON 06-10-1998 AT TIME 11:47:40 PROJECT TITLE: TYPE IN THE PROJECT TITLE DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 1.00 BASIN AREA (acre)= 2.38 RUNOFF COEF 0.71 DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) - 100.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 ISO INTENSITY 9.0 7.2 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0 '**** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE .45 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = .45 CPS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE ' ADJUSTMENT FACTOR. •"'* COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE-FT ----------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 9.00 0.11 0.00 0.10 10.00 7.20 0.17 0.01 0.16 15.00 6.19 0.22 0.01 0.21 20.00 5.18 0.24 0.01 0.23 25.00 4.68 0.27 0.02 0.26 30.00 4.17 0.29 0.02 0.28 35.00 3.84 0.32 0.02 0.29 40.00 3.50 0.33 0.02 0.30 45.00 3.25 0.34 0.03 0.32 50.00 3.00 0.35 0.03 0.32 55.00 2.80 0.36 0.03 0.33 60.00 2.61 0.37 0.04 0.33 65.00 2.47 0.38 0.04 0.34 70.00 2.34 0.38 0.04 0.34 75.00 2.20 0.39 0.05 0.34 80.00 2.06 0.39 0.05 0.34 85.00 1.97 0.39 0.05 0.34 90.00 1.88 0.40 0.06 0.34 95.00 1.79 0.40 0.06 0.34 100.00 1.70 0.40 0.06 0.34 105.00 1.64 0.40 0.07 0.34 110.00 1.58 0.41 0.07 0.34 115.00 1.51 0.41 0.07 0.34 120.00 1.45 0.41 0.07 0.33 THE REQUIRED POND SIZE = .3413179 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 90 MINUTES I I 1 t NORTH DETENTION POND -------------- DETENTION POND SIZING BY FAA METHOD Developed by Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado USER JR=neaea�====--------===== Engineering LTD -Ft CollinsCollins..... .. ne_ne== EXECUTED ON 06-10-1998 AT TIME 11:57:51 PROJECT TITLE: TYPE IN THE PROJECT TITLE ***' DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 2.00 BASIN AREA (acre)= 0.65 RUNOFF COEF = 0.36 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.0 7.2 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0 POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = .15 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = .15 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT ----------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 9.00 0.01 0.00 0.01 10.00 7.20 0.02 0.00 0.02 15.00 6.19 0.03 0.00 0.03 20.00 5.18 0.03 0.00 0.03 25.00 4.68 0.04 0.01 0.03 30.00 4.17 0.04 0.01 0.03 35.00 3.84 0.04 0.01 0.04 40.00 3.50 0.05 0.01 0.04 45.00 3.25 0.05 0.01 0.04 50.00 3.00 0.05 0.01 0.04 55.00 2.80 0.05 0.01 0.04 60.00 2.61 0.05 0.01 0.04 65.00 2.47 0.05 0.01 0.04 70.00 2.34 0.05 0.01 0.04 75.00 2.20 0.05 0.02 0.04 80.00 2.06 0.05 0.02 0.04 85.00 1.97 0.05 0.02 0.04 90.00 1.38 0.05 0.02 0.04 95.00 1.79 0.06 0.02 0.04 ----------------------------------------------------- THE REQUIRED POND SIZE = 3 880181E-02 ACRE -FT ' THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 65 MINUTES I 1 t 1 1 1 Project No.: 9182 Project Name: WOVENHEARTS MEMORY CARE SOUTH POND By: DJC Date: 6/12/98 Contour Elevation (ft.) Surface Area (sq. ft.) Incremental Volume (cu. ft.) Cumulative Volume (cu. ft.) 77.19 0 0 0 78.00 543 146.6 146.6 79.00 3889 1961.7 2108.3 79.10 4200 404.4 2512.7 80.00 7181 5061.8 5061.8 80.65 15002 7055.2 12117.0 80.70 15887 772.1 12889.1 80.80 18231 1704.6 14593.7 81.00 20036 3825.3 18419.0 81.50 28364 12037.6 30456.4 Volume = 0.70 ac-ft @ 4981.60 100-YR W.S.E. = 4980.80 Volume= 0.34 ac-ft NORTH POND Contour Elevation (ft.) Surface Area (sq. ft.) Incremental Volume (cu. ft.) Cumulative Volume (cu. ft.) 78.60 0 0 0 79.00 391 52.1 52.1 79.70 2230 829.4 881.6 79.90 2827 504.5 1386.1 80.00 3586 319.9 1706.0 80.70 6220 3390.1 5096.1 81.50 13439 7680.5 12776.5 Volume = 0.29 ac-ft @ 4981.50 100-YR W.S.E. = 4980.00 Volume= 0.04 ac-ft u q. YowrE DETE�f�"'� VawY`� 1 1 1 1 1 LOCATION: WOVENHEARTS MEMORY CARE ITEM: RELEASE RATE CALCULATIONS COMPUTATIONS BY: DJC SUBMITTED BY: JR ENGINEERING, LTD. AREA DESIGNATION TOTAL AREA RELEASE RATE REMARKS A 2.17 B 0.15 0.36 FREE RELEASE C 0.63 D 0.49 1 1.06 IOMIT E 0.02 F 0.14 0.56 FREE RELEASE OS 0.22 AREA OF LOT = 3.03 AC RELEASE RATE= 0.5 CFS/AC = 1.52 CFS RELEASE RATE - FREE RELEASE= 0.60 NORTH DETENTION POND RELEASE @ 0.15 SOUTH DETENTION POND RELEASE @ 0.45 June 11, 1998 1 1 1 ,.1 1 APPENDIX D OUTLET STRUCTURE CALCULATIONS ' JR Engumenip, W. 7/20/98 2020 E. P,ospe Rd., Se. 180, FM C hs, Cok rado e0525 LOCATION: WOVENREARTS MEMORY CARE ' ITEM: ORIFICE SIZING FOR POND OUTLETS COMPUTATIONS BY: DJC SUBMITTED BY: JR ENGINEERING, LTD. Submerged Orifice Outlet: ' release rate is described by the orifice equation, Q. = Crib sgrt( 2g(h-E.)) where Q. = orifice outflow (ds) C. - onfice discharge coefficient g = gravitational acceleration = 32.20 We A, = effective area of the orifice (ft?) E. = geometric center elevation of the orifice (ft) h - water surface elevation (ft) NORTH POND Q,= 0.15 ds outlet pipe dia - D = 15.0 in ' Invert elev, = 78.60 ft E, = 78.69 It h = 80.00 ft C. = 0.6 solve for effective area of orifice using the orifice equation A. = 0.027 ftz = 3.9 in2 ' ordlce dia. = tl = 2.23 in Check orifice discharge coefficient using Figure 5-21 (Hydmufic Engmeer 0g) d/ D = 0.15 kinematic viscosity, v = 1.22E-05 ft2/s Reynolds no. = Rea = 4Q/(ndv) = 6.41E+04 C. _ (K in figure) = 0.6 check ' Used= Z23 in A. = 0.027 ff2 Q= 0.15 ds SOUTH POND Q, = 0.45 cis ' outlet pipe dia = D = 15.0 in Invert elev. - 77.19 ft E,= 78.00 ft (Tailwater Elevation) It = 80.80 ft ' C. = 0.6 solve for effective area of orifice using the orifice equation A. 0,056 ft' = 8.0 in' ' orifice die. = tl = 3.20 in Check onfice discharge coefficient using Figure F-21 (Hytlraufic Engineering) d/ D = 0.21 ' kinematic viscosity, v = 1.22E05 ft2/s Reynolds no. = Rea = 4Q/(ndv) = 1.76E+05 C. _ (K in figure) = 0.6 check ' Use d = 3.20 in A. = 0.056 ft2 Q= 046 cfs Page 1 1 I 1 1 K19 9 DI-Mi 1 �I STORMWATER QUALITY CALCULATIONS 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 6/11/98 LOCATION: WOVENHEARTS MEMORY CARE ITEM: WATER QUALITY CAPTURE VOLUMES & OUTLET SIZING COMPUTATIONS BY: DJC SUBMITTED BY: JR ENGINEERING, LTD. From Urban Strom Drainage Criterial Manual, March 1969 (Referenced figures are attached at the end of this section) Use 40-hour brim -full volume drain time for extended detention basin Water Quality Capture Volume = WQCV = (required storage/12)•(tributary drainage area) DwQ = depth at outlet (1' minimum) MAJOR Trib. % Imperv. Requried Storage WQCV req. vol Dw0 req. area/row BASIN area (in. of runoff) WQCV •1.2 (in'/row) (ac) from Fig. 6-1 (ac-ft) (ac-ft) (ft) from Fig. 6-3 SOUTH DET. POND 2.39 57 0.24 0.05 0.06 1.0 0.33 WQ outlet sizing for South Pond From Figure 5-2, for 3/8 in. hole diameter Area of hole = 0.11 in for 4 in. diameter riser & 318 in. hole diameter # of columns = 3 Area provided/row = 0.33 in' Area Required/row = 0.33 in WQ outlet sizing for South Pond WQCV level at outlet = 1 ft 4 in. diameter riser with 3/8 in. holes in 3 columns Wgvol.xls DRAINAGE CRITERIA MANUAL (V. 3) STORMWATER QUALITY MANAGEMENT 03 0 WE C 9-1-1992 UDFCD 5 a xten 0-H tm Bash (Dry) D 1 tentl -Hour In In Drain 1, (let) nme 0 10 20 30 40 50 60 70 80 90 100 Percent Impervious Area in Tributary Watershed Source: Urbanos, Guo, Tucker (1989) Note: Watershed inches of runoff shall apply to the entire watershed tributary to the BMP Facility. FIGURE 5-1. WATER QUALITY CAPTURE VOLUME (WQCV) DRAINAGE CRITERIA MANUAL (V. 3) STRUCTURALSMPs 1 m 0A m m 0.4 E m m 0.2 a r #. 0.02 0.01 c U.ou i.0 2.0 4.0 6.0 Required Araaper Row (in.2 ) Source: Douglas County SO= Drainage and Technical Criteria, 1986. FIGURE 5-3. WATER QUALITY OUTLET SIZING: DRY EXTENDED DETENTION BASIN WITH A 40-HOUR DRAIN TIME OF THE CAPTURE VOLUME 9-1-1992 UDFCD I F.1W;j040U- it EROSION CONTROL CALCULATIONS t JR Engineering, Ltd. 2620 E. Prospect Rd., Ste. 190, Foil Collins, CO 80525 ' RAINFALL PERFORMANCE STANDARD EVALUATION 1 k PROJECT: WOVENHEARTS MEMORY CARE STANDARD FORMA COMPLETED BY:DJC DATE: 1 blun-98 DEVELOPED ERODIBILITY Asb Lib Ssb Ai • Li Ai • Si Lb Sb PS SUBBASIN(s) ZONE (AC) (Fn (%) (FT) (•/.) (�) A MODERATE 2.17 450 1.00 976.5 2.2 B 0.15 349 2.10 52A 0.3 C 0.63 270 2.50 170.1 1.6 D 0.49 469 1.48 229.8 0.7 E 0.02 20 2.00 0.4 0.0 F 0.14 291 1.37 40.7 0.2 Total 3.60 1469.90 5.02 408.3 IA 78.8% ' Ash = Sub -basin area Lsb = Sub -basin flow path length ' Ssb = Sub -basin slope Lb = Average flow path length = sum(Ai Li)/sum(Ai) Sb = Average slope = sum(Ai Si)/Sum (Ai) PS is taken from Table 8-a (Table 5.1, Erosion Control Reference Manual) by interpolation. An Erosion Control Plan will be developed to contain 78.8%of the rainfall sedimentation that would normally flow off a bare ground site during a 10-year, or less, precipitation event. 1 t ' std&ett.xls 1 of1 1 1 1 1 1 1 1 1 1 J I EWMOaYN. W. MO E. Ranp9a1 M.. 61R.1 IN, FM Cain. W 00525 EFFECTIVENESS CALCULATIONS PISORCCS: WOVENMEARTS MEMORY CARE STANDARDFORM B WOQL BY: WC DATE FAOSR)N COMR0. GFALIdI PFACIOR SB?DIW VA u VALUE C06A0'11? BARE SOIL Lee IW SWK)711CpID 14 RWOHENED QIWND IW 0.W ROADSM'ALKS 001 IW (RAVELFB.TFAS I.W O.W PIACEDATBOSSIS SILTFENCE 1.W 0.50 SIRAw MULCH 0.06 I.W PSTABLI9®GRASS OW I.W FROMM(RIOEM 51RAw BARRRRS I.W 0W FFF •(IrA'IW 5451DR SUB BASDIARES FAOSIWCONIROLMEIIIODS BASM BASW W) A 117 WO SVNY J 0,15 M. RWtaD:NED GR. 016 M. STRAW1M111.CH .M M. 1 NETC{ACIOR 035 NETPiAMR 0]6 EFF •(IrR'1W• 91. B 0.15 RO S/$V LR$ 001 Ac RW000DIED GR OW A SIRAW/MI m 0,14 Ac STRAW ll R NETC{ACTOR 0W NEPPiACTOR OR EFF'(IS'R'IW• 97. C 0.65 ROADSM1VALRS 005 Au 0.W(i@IED 4TC OW A SIRAWARR.CH QW M. NBF C{AMR 006 NET P-FACFOR ON EPY`II{•P)•IW• 956% D 099 ROADSN/ALRS 001 Ac RWGNENED G0. O.W M. S W/ARB.CII 0.M Ac NEI CfACIOR 0.% N PFACPOR 0W EHM(I-M-IW• 91.3% E 0.01 ROADR9VALR5 001 Ac. RWGID;I.'EO GR ON M. S W/MGLCH 001 M. NETCfAC Bw NEP PiAC10R I.W Ff'F-f1C'R'IW- %s F 0.11 ROADSM1V m 001 Ac. ROUGHENED GR. ON A,. STIAWi CH 0.12 A. STRAW BARRDA NEI C{ACTOR 005 NEP PfACDTR 0.SO EiF-IIrP)•IW- W4 TOTAL AREA- 5.0 zc TOTAL EFT- 93.W. REQUIRED PS - T9.6% Since 92.9%> 719%, the proposed plan is o.k. E P1 BASIN GFxlavausAr s'oSM rorRams0100s Oaf pelManAYrYn nc90naaamipnBfes. Dep0n06WInaOoO mM nq Ob a,twRR a «s6lla n16BCC nLMIPR W A NETCfACTOR• (O.45x,O1+066x ID*I10xO.W)12.1T 0.Feciw 9alues sa a erOslOn Wwdnamaes wNOA IFnaw W9pnli0bs M10m nroPip warn. NET P-FACTOR• (0.90 x 060 x I.DO x 0.5) s w6 & la1 M(* 0.15 ON 047 OW I 1 F1 U O O c W m o O c O \ o U Q N ' cl o Z a E 0 N N O N � O C � W O T W -- o U W N N U c_ z d T J O ice' N n W N n '' ) N O ' V E N Z O 5 O C L OU 1 I U � U N U O c 3 o° N o WC V i w 3 a N E Q U O n w U } o d r N N W � O Q W F C J O w Z O E O w m o > ° .6 D 3 O1 o m L C) y U N N ' O � w a w a > H U O U Z 0 n o n ' U O D W a c a o o ~ I I I U O a w N O) � rnQ O m a c a m o O m a m c\ ti U U O+ O U C n W n 0 ° O o w U y O N oN c mm� �. p O dm C N _.. ° VI .O wJ °10c � �c° ° O v_7 OEwo o :° UZ—n ovoo No c aoL mvCO.° °uE oo L w a0>O O we_:2� mzo O= I 1 JR Engineering, Ltd. 6/12/98 2620 E. Prospect Rd, Ste. 190, Fort Collins, CO 80525 1 1 1 1 1 1 1 1 WOVENHEARTS MEMORY CARE EROSION CONTROL COST ESTIMATE JOB NO. 9182.00 COMPLETED BY: DJC EROSION CONTROL MEASURES ITEM DESCRIPTION UNITS UNIT COST IQUANTITY I TOTAL COST 1 SILT FENCE LF $ 3.00 867 $ 2,601.00 2 GRAVEL CONSTRUCTION ENTRANCE EACH $ 500.00 1 $ 500.00 4 STRAW BALES LF $ 3.25 21 $ 68.25 COST $ 3.169.25 CITY RESEEDING COST ITEM DESCRIPTION UNITS I UNIT COST IQUANTITY I TOTAL COST 1 RESEED/MULCH ACRE I $ 500.00 1.8 $ 900.00 COST $ 900.00 TOTAL COST $ 3,169.25 TOTAL COST WITH FACTOR OF 150% $ 4,753.88 1 of 1 I I I H H I 1 1 1 1 1 1 1 APPENDIX G SWALES, INLETS, AND PIPE SIZING 1 ' Overflow Spillway Sizing LOCATION: WOVENHEARTS MEMORY CARE ' PROJECT NO: 9182 COMPUTATIONS BY: DJC SUBMITTED BY: JR ENGINEERING, LTD. i OVERFLOW SPILLWAY ' Size using the equation for flow over a weir Q = CLH3t' A + 5 'll elewailon where C = weir coefficient = 2.6 _� I H = overflow height '7 i�K L = length of the weir ' The detention pond has a spill elevation 0.5 ft above the design maximum water surface elevation Spillways will be designed with 0.50 ft flow depth, thus H = 0.5 ft ' Size using peak flows calculated with the Rational Method since they are greater than SWMM results SOUTH POND ' for Q (100) = 11.9 cfs (100-yr flow to design point 2 - assume outlet is fully clogged) Weir length required: L = 13 ft Use L = 24 ft (Flowline width @ drive entrance) V = 0.85 ft/s 1 NORTH POND ' for Q (100) = 1.6 cfs (100-yr flow to design point 3 - assume outlet is fully clogged) Weir length required: L = 2 ft ' UseL= 5 ft ' V = 0.36 ft/s 1 I SPILLWAY SOUTH DETENTION POND, Worksheet for Trapezoidal Channel Project Description ' Project File c:\fmw\918200.fm2 Worksheet SPILLWAY SOUTH DETENTION POND Flow Element Trapezoidal Channel Method Manning's Formula Solve For Discharge 1 U Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 ft/ft Depth 0.50 R Left Side Slope 4.00 H : V Right Side Slope 4.00 H : V Bottom Width 24.00 ft Results Discharge 38.49 fN/s Flow Area 13.00 ft' Wetted Perimeter 28.12 ft Top Width 28.00 ft Critical Depth 0.42 ft Critical Slope 0.017968 ft/ft Velocity 2.96 ft/s Velocity Head 0.14 ft Specific Energy 0.64 ft Froude Number 0.77 Flow is subcritical. Jun 12, 1998 08:55:37 None FlowMaster v4.1b Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 ' SPILLWAY NORTH DETENTION POND Worksheet for Trapezoidal Channel Project Description Project File c:\fmw\918200.fm2 Worksheet SPILLWAY NORTH DETENTION POND Flow Element Trapezoidal Channel Method Manning's Formula ' Solve For Discharge ' Input Data Mannings Coefficient 0.030 Channel Slope 0.010000 Wit ' Depth 0.50 ft Left Side Slope 4.00 H : V Right Side Slope 4.00 H : V Bottom Width 5.00 ft ' Results Discharge 9.15 fN/s Flow Area 3.50 ft' ' Wetted Perimeter 9.12 ft Top Width 9.00 ft Critical Depth 0.42 it ' Critical Slope 0.019206 ft/ft Velocity 2.62 ft/s Velocity Head 0.11 ft Specific Energy 0.61 ft ' Froude Number 0.74 Flow is subcritical. 1 ' Jun 12, 1998 None 085506 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-16W FlowMaster v4.1b Page 1 of 1 W U 11 t 1 I 1 1 r O O W m OR Qc�v r r r r r n n x O m N N N O O! N O N O Y c rn m m m m n m c 3^ n n n n n n n o Qv U CR O W O W V aND. Oage m o M o o N rn o r o m m n mn A n r n C D= 0 0 M N m N 7Q� U O M m 0 n T O n 7>� n n n n n n m M' o rn o m V N N N m n m uni o o voi m a^ o v o 0 o r U .. O N O N N m Q r O N N O n 0 O N A W O N N c p O'C 41 W N N N O m� U U U U Yl U 0 0 0 0 0 0 U U U U C1 a U N N_ N U U U U U U U C C C C C C C M N O N m 0 0 0 0 O Or N n O n r ap �(l Oi O W A y Ol^ N N c � J O m w a N w a"+q Nan a a a a a a R n If Q m a Q - ----------T -------------------------------------------- UDINLET: INLEHYDAAULICS AND SIZING DEVELOPED BY 'CIVIL ENG DEPT. U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD ---------- ------ ----------------------------------------------------- ER:JR ENGINEERS-DENVER CO .................................................. DATE 03-03-1998 AT TIME 10:52:35 ** PROJECT TITLE: INLET DESIGN *** GRATE INLET HYDRAULICS AND SIZING: Y Y r Y 1 1 1 INLET ID NUMBER: 10 INLET HYDRAULICS: IN A SUMP. GIVEN INLET DESIGN INFORMATION: INLET GRATE WIDTH (ft)= 2.00 INLET GRATE LENGTH (ft)= 2.00 INLET GRATE TYPE =Type 16 Grate Inlet NUMBER OF GRATES = 1.00 SUMP DEPTH ON GRATE (ft)= 0.00 GRATE OPENING AREA RATIO (`s) = 0.60 IS THE INLET GRATE NEXT TO A CURB ?-- NO Note: Sump is the additional depth to flow depth. STREET GEOMETRIES: STREET LONGITUDINAL SLOPE (0 = 1.00 STREET CROSS SLOPE (_) = 2.00 STREET MANNING N = 0.016 GUTTER DEPRESSION (inch)= 1.50 GUTTER WIDTH (ft) = 2.00 STREET FLOW HYDRAULICS: WATER SPREAD OK STREET (ft) = 1.30 GUTTER FLOW DEPTH (ft) = 0.11 FLOW VELOCITY ON STREET (fps)= 1.57 FLOW CROSS SECTION AREA (sq ft)= 0.07 GRATE CLOGGING FACTOR (o)= 50.00 CURB OPENNING CLOGGING FACTOR(°s)= 10.00 INLET INTERCEPTION CAPACITY: FOR 1 GRATE INLETS: DESIGN DISCHARGE (cfs)= 0.11 IDEAL GRATE INLET CAPACITY (cfs)= 0.85 BY FAA HEC-12 METHOD: FLOW INTERCEPTED (cfs)= 0.11 CARRY-OVER FLOW (cfs)= 0.00 BY DENVER UDFCD METHOD: FLOW INTERCEPTED (cfs)= 0.11 CARRY-OVER FLOW (cfs)= 0.00 ' SECTION A -A DEVELOPED Worksheet for Triangular Channel Project Description ' Project File x:\918200-wovenhearts\drainage\918200.fm2 Worksheet SECTION A -A DEVELOPED Flow Element Triangular Channel Method Manning's Formula ' Solve For Channel Depth ' Input Data Mannings Coefficient 0.030 Channel Slope 0.270000 % ' Left Side Slope 3.00 H : V Right Side Slope 3.00 H : V ' Discharge 30.21 ft'/s Results Depth 2.01 ft Flow Area 12.12 ft' Wetted Perimeter 12.71 ft Top Width 12.06 ft Critical Depth 1.45 ft Critical Slope 0.015678 ft/ft Velocity 2.49 fus Velocity Head 0.10 ft Specific Energy 2.11 ft Froude Number 0.44 ' Flow is subcritical. I I t ' 07/21/98 02:09:00 PM Hassled Methods, Inc. 37 Brookside Road Waterbury, CT 06706 (203) 755-1666 FlowMaster v5.15 Page 1 of 1 I SWALE B-B Worksheet for Trapezoidal Channel 1 Project Description Project File x:\918200-wovenhearts\drainage\918200.fm2 ' Worksheet SWALE B-B Flow Element Trapezoidal Channel Method Manning's Formula ' Solve For Channel Depth 1 t 1 I t Input Data Mannings Coefficient 0.022 Channel Slope 1.00 % Left Side Slope 4.00 H : V Right Side Slope 4.00 H : V Bottom Width 2.00 ft Discharge 2.67 ft /s Results Depth 0.32 ft Flow Area 1.06 ft2 Wetted Perimeter 4.66 ft Top Width 4.58 ft Critical Depth 0.31 ft Critical Slope 0.011892 ft/ft Velocity 2.52 ft/s Velocity Head 0.10 ft Specific Energy 0.42 ft Froude Number 0.92 Flow is subcritical. ' 07/20198 04:10:57 PM FlowMaster v5.15 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 1 ' OUTLET PIPE NORTH POND (PIPE A) Worksheet for Circular Channel 1 Project File x:1918200-wovenhearts\drainage\918200.fm2 ' Worksheet OUTLET PIPE NORTH POND Flow Element Circular Channel Method Manning's Formula ' Solve For Channel Depth ' Input Data Mannings Coefficient 0.012 Channel Slope 0.50 % ' Diameter 15.00 in Discharge 0.15 fN/s ' Results Depth 1.79 in ' Flow Area 0.08 ft' Wetted Perimeter 0.88 ft Top Width 0.81 ft ' Critical Depth 0.15 ft Percent Full 11.95 % Critical Slope 0.005025 ft/ft Velocity 1.81 ft/s ' Velocity Head 0.05 ft Specific Energy 0.20 ft Froude Number 1.00 Maximum Discharge 5.32 ft3/s Full Flow Capacity 4.95 ft /s Full Flow Slope 0.000005 ft/ft ' Flow is subcritical. I 1 ' 07/22/98 11:56:29 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.15 Page 1 of 1 ' OUTLET PIPE SOUTH POND (PIPE B) Worksheet for Circular Channel ' Project Description Project File c:\fmw1918200.fm2 ' Worksheet OUTLET PIPE SOUTH POND Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth ' Input Data Mannings Coefficient 0.013 Channel Slope 0.50 % ' Diameter 15 in Discharge 0.45 ft /s 1 LJ 1 'J 1 Results Depth 3.18 in Flow Area 0.19 ft' Wetted Perimeter 1.20 ft Top Width 1.02 ft Critical Depth 0.26 ft Percent Full 21.20 % Critical Slope 0.005335 ft/ft Velocity 2.37 ft/s Velocity Head 0.09 ft Specific Energy 0.35 ft Froude Number 0.97 Maximum Discharge 4.91 ft/5 Full Flow Capacity 4.57 ft'/s Full Flow Slope 0.000049 ft/ft Flow is subcritical. 'Jun 11. 1998 15:32:01 None FlowMaster v4.11b Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 ' OUTLET PIPE FOR ATRIUM DRAIN (PIPE C) Worksheet for Circular Channel ' Project Description Project File c:\fmw\918200.fm2 ' Worksheet PIPE C Flow Element Circular Channel Method Manning's Formula ' Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 1.85 % ' Diameter 12 in Discharge 0.11 fN/s 1 1 1 Results Depth 1.25 in Flow Area 0.04 ft' Wetted Perimeter 0.66 ft Top Width 0.61 ft Critical Depth 0.14 ft Percent Full 10.41 % Critical Slope 0.006183 ft/ft Velocity 2.54 ft/s Velocity Head 0.10 ft Specific Energy 0.20 ft Froude Number 1.68 Maximum Discharge 5.21 ft/S Full Flow Capacity 4.85 ft3/s Full Flow Slope 0.000010 ft/ft Flow is supercritical. 'Jun 11, 1998 15:33:40 None FlowMaster v4.1b Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 ' PIPE D Worksheet for Circular Channel Project Description Project File x:\918200-wovenhearts\drainage\918200.fm2 ' Worksheet PIPE D Flow Element Circular Channel Method Manning's Formula ' Solve For Channel Depth 1 11 Input Data Mannings Coefficient 0.012 Channel Slope 0.27 % Diameter 36.00 in Discharge 30.21 cfs ' Results Depth 24.46 in ' Flow Area 5.11 ft' Wetted Perimeter 5.81 ft Top Width 2.80 ft ' Critical Depth 1.78 ft Percent Full 67.95 Critical Slope 0.004001 ft/ft Velocity 5.91 ft/s ' Velocity Head 0.54 ft Specific Energy 2.58 ft Froude Number 0.77 ' Maximum Discharge 40.39 cfs Full Flow Capacity 37.54 cfs Full Flow Slope 0.001748 ft/ft ' Flow is subcritical. [] 07/22/98 11:59:48 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.15 Page 1 of 1 1 STANDARD EROSION CONTROL CONSTRUCTION PUN NOTES, JUNE 1997 THE CITY OF FONT COLLINS SMIRAWATER UTILITY EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SIZE. ALL REWIRED PERIMETER SILT FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTVTY (STOCKPILNG, STRIPPING, GRADING. ETC). ALL OTTER REWIRED EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN ME CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTON PLANS, AND EROSION CONTROL REPORT. PRE -DISTURBANCE VEGETATON MALL BE PROTECTED AND RETAINED WHENEVER POSSIBIE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE UNITED TO TIE AREA REWIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR TIE SHORTEST PRACTICAL PERIW O TME. ALL SOILS EXPOSED DURING LAND DISTURBING ACRVTY (STRIPPING, GRADING. UTILITY INSTALLATIONS STOCKPILING, FIWNG, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISCING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OMER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS ON WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTNTY FOR MORE TUN THIRTY (30) OATS BEFORE REQUIRED TEMPORARY RW PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY ONE STONMWAIER UTILITY. ME PROPERTY SHALL BE WATERED AND MAINTAINED AT Al TIMES DURING CONSWU0➢ON ACTIVTIES SO AS TO PREVENT MIND -CAUSED EROSION. ALL LAND DISTURBING ACTVTIES SHALL BE IMMEDIATELY DISCONTNUED MEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES AS DETERMINED BY ME CITY OF FORT COLLINS ENGNEERING DEPARTMENT. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES SHALL BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT IN ORDER TO ASSURE CGNTNUED PERFORMANCE ON THEIR INTENDED FUNCTON. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES. SHALL BE REMOVED AND DISPOSED O IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRANAGEWAY. NO SOL STOCKPILE SHALL EXCEED MN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE RWWENING, WATERING, AND PERIMETER SILT FENCING, ANY SUL STOCKPILE REMAINING AFTER W DAYS SHALL BE SEEDED AND MULCHED. CITY ORDINANCE PROHIBITS ME TRACKING, DROPPING, OR DEPOSITING OF SOBS ON ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY ME CONTRACTOR. SEE SHEET 5 FOR EROSION CONTROL DETAILS DESIGN POINT AREA DESIG. AREA (ACRES) C70 C100 I TO (10) (MIN) TO (1 DO) (MIN) 0 (10) (CPS) 0 (1W) (CFS) REMARKS A 2.17 0.54 1068 1 12.5 1 11.3 4.99 11.54 B 0.15 0.28 0.35 1 11.9 1 11.9 0.18 0.36 C 0.63 0.28 0.35 11.5 1 11.5 0.74 1.52 D 0.49 0.26 0.33 12.6 12.6 0.52 1.06 1 E 0.02 0.47 0.59 5.0 5.0 0.05 0.11 F 0.14 0.14 0.45 B./ 5.2 0.24 0.56 OS 0.22 0.83 1.04 5.0 5.0 1.02 2.05 2 A+OS 1 2.39 1 0.57 0.71 12.5 12.5 5.80 11.85 3 C-HE 0.65 0.29 0.36 11.5 11.5 0.80 1.63 4 Al 0.41 0.59 0.74 7.2 5.7 1.24 2.67 9A MA rcA r--- - - 1 B \ -- IS 2S \� so 00�Mn Mess % 'm NFHB Aw. ♦�'• / 1 EN9 PAN LEA` I II / STt7E/EAA)U4EP D HAIR LOT I CHAIN ir "VAX) II I I_ I Fl ...' AT EDv-MIS I I�j aP we JR2 PI ) / I `/ 5 Bz T A 4DI IV Miss an I I 111 I � I � � I I II i111\il- I I t Eo----------------- / - `F - 'T1W� aAIIWL l cns� sawrnawr J JS"9B LF 1°- W's W's see sess•'s "'s sess sess sess sess sees•ess sss MGM YAM' - - - - - - - - - - - - - - - - - � � MGM* � � ny`u]NV\'IA , Wit 1+11 � 1",� ENS , Of L'.'.iilPl \� 11 77'iR� bl 11c ')u� ifnwill aIM L 11� Mpr MIIBT P.flLt N9pT R/10 CONSTRUCTION SEQUENCE SIANOARJ ilP4 1 PIiOECi: Nn\£HXEARiS MEMgtY CARE WOUNDS FOR IVAN ONLY COPIFIED BY: DS DATE: 6/12M we oi�eY we www a eny iF� .Y^ a e11F a now Cmiml m p oM ey the CRY Engineer. wLMe m MIMM MN gP DOE Not; BFL JAN aE9 YM MI MY A•E a•uly •FB Canbrt Tea W,Ine MR,,0 Penm Baniw AI Any Saheb Vegelallw M Wa W1 se m Off" 11 !iM Dwbl CmN TNlmen oo/Basin Show Ba ve a SR Fence omen bond 9oga am, SSoa YIe�o1Nn Contow, r Aw ni�colo.L. nng _ ma FAA Pwmmmt e mulchon9/S beent ,I MI `�^e III 5W imlono0m Other aareiamae ROE MIfBxM.'IXY1 B INKMAN& NSTALUM BY. $ MACTH MAINTAINED BY: TF,`6L(BEB T£OEunPI/YVLMINO CONTRACTOR: NO Me OP11JAMINED BY ED DATE A19 IN , 6/12/9B APPROVED BY CITY OF FORT COLLINS ON'. New 4 r New. NeaaN DIED a nRaO. Nmw 101) YR WSE ELERUBROP SPILLWAY TYPICAL "MILE SECTION N.T.S SWALE CROSS SECTION DATA SOURCE X-SECT 10 D1o0 • .33 BE SR If CHANN SLOPE LOCI (FPS) B-B 10.34 0.43 1 I 1 4 2' t0X 2.52 A -A 201 2.87 3 3 D 0.27I 2.49 LEGEND - - - - - EXISTING CONTOURS - - -Y910- - - EXISTING INDEX CONTOURS - - - - - - - EXISTING EDGE ON PAVEMENT - - - - - - - EXISTING EASEMENTS - - - - - - - - - - - - - EXISTING FLOWUNE - - - - - - - EXISTING PROPERTY LINE - - - - - ------------------------- EXISTING DRAINAGE PIPE b, EXISTING DRAINAGE MANHOLE OVERTON POIU SUMMARY NORTH POND SOUTH POND REQUIRED PROVDED REWIRED I PROVDED 00-YR VOLUME 0.04 AC.PT. 0.29 ACFT. 0.34 ACFT. 10.70 ACFT. _ 00-YR W.S.E. 4980.00 4980.80 00-YR RELEASE RATE 0.15 CPS 0.45 CFS ORIFICE DIAMETER PROPOSED CURB AND GUTTER PROPOSED OUTFALL CURB h WTTER PROPOSED ROOF DOWNSPOUT (APPROX. LOCATON) PROPOSED STORM SEWER PROPOSED TRICKLE PAN SILT FENCE (SEE DETAIL SHEET) STRAW BALE DUE CHANNEL APPLICATION (SEE DETAIL SHEET) -r> -s-San ----- EXISTING SANITARY SEWER Q DESIGN PUNT ___ _____p-,Rp._«------ - EXISTING WATER PIPE BASIN NAME D EXISTING STREET LIGHT PERCENT IMPERMWS 4WD PROPOSED CONTOURS AREA (ACRES) Miss- PROPOSED INDEX CONTOURS -� FLOW ARROW PINK PAWmer-...-...---""- PROPOSED TOWLINE _ _ - men men GINNIE m DRAINAGE BASIN BOUNDARY - ------ - - --- - PROPOSED EASEMENTS Ermrv/ ® 6ONST. ENTRANCE (SEE DETAIL SHEET)sm 1W-YR INUNDATOR AREA ® GRAVEL PIPE FILTER (SEE DETAIL SHEETI City of Fort Collins. Col«ado UTILITY PLAN APPROVAL AR➢ DIRT ME DIRECT 9 ASN OF FINAL APPROVED: TPE R Ixl£T GRavSDR/CRPV DI of Engineering SayAXTP SEPTEMBER 4, 1998 CHECKED BY'. - Wet" a wen..mN uuly Dole CHECKED BY: Aamwls JIMMY Dole CHECKED BY: 40 20 0 40 80 Park, s R,,,W n Dow CHECKED BY: _ Dale SCAT£: 1- - 40 AwFICIA PvKINNUCH DAIS E NoCHECKED BY: FOR Np ON BOWS W DR MPREFRIN4 Lm. We 9 k dg Of zY m � 6 iM a d N R Ba 9 W pis ? M $I\IoalNl N m DO WO 0 y Do g l W it U Z Y J 0 Oa O W ¢ O f z ZO Y K Z Lj O N z Of W W SHEET 5 OF 6 0