Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDrainage Reports - 11/03/2008' City of Ft. Collin p oved Plans
®TT ®r Approved By
11-3 -a8
Stantec Consulting Inc. !OILT COLONS UT ate,
209 South Meldrum
' Fort Collins, CO 80521-2603
Tel: (970) 482-5922
Fax:(970) 482-6368
Stantec
' August 20, 2008
Mr. Wes LaMarque
' City of Fort Collins
Water Utilities--Stormwater
700 Wood Street
' Fort Collins, Colorado 80521
RE: Addendum to the Final Drainage and Erosion Control Study for Preston Center at Wild
Wood Business Park Third Filing
Dear Wes:
' We are pleased to submit to you, for your review and approval, this Addendum to the Final
Drainage and Erosion Control Study for Preston Center at Wild Wood Business Park Third
Filing. All computations within this study have been completed in compliance with the City of
Fort Collins Storm Drainage Design Criteria.
' We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Respectfully,
`An ho Willkomm PE
Project Manager
11
11
ADDENDUM
' FINAL DRAINAGE AND EROSION CONTROL STUDY
FOR PRESTON CENTER AT WILD WOOD BUSINESS PARK THIRD FILING
FORT COLLINS, COLORADO
1
' Project Description
The proposed development is located. in Southeast Fort Collins, immediately Northwest of the
intersection of Timberwood Drive and Ziegler Road. The project is located within Lot 3 of the
' Preston Center Third Filing and is approximately 1.44 acres.
Existing Conditions
Presently, the property has native grasses and brushes growing on the site. The topography of the
' site slopes to the southeast at 1.5% to 3.0%. The west portion of the site is located in the
existing detention pond for Preston Center Third Filing. The majority of the site is currently
t draining onto Timberwood Drive and enters an existing 10' Type R inlet near the intersection of
Timberwood Drive and Ziegler Road. A portion of the site does enter Zeigler Road and is
carried south to existing storm drain infrastructure. Entrances to the site have already been
' constructed off of Timberwood Drive and Ziegler Road, with curb returns provided. Detention
has been accounted for in existing Pond 304 of the Preston Center Third Filing.
Existing Basins.
Basin 109: This basin is 1.40 acres with a C-10 of 0.61, C-100 of 0.76, Q-10 of 3.0 cfs, and Q-
100 of 7.9 cfs. This basin contains the majority of the site with the drainage being planned to
' discharge directly into detention pond 304.
Basin 110: This basin is 1.43 acres with a C-10 of 0.18, C-100 of 0.22, Q-10 of 0.9 cfs, and Q-
100 of 2.3 cfs. This basin encompasses the entire detention pond 304.
' Basin 112: This basin is 1.14 acres with a C-10 of 0.65, C-100 of 0.81, Q-10 of 3.5 cfs, and Q-
100 of 9.0 cfs. This basin is primarily the north half of Timberwood Drive from Gifford Court to
Ziegler Road. Runoff from this area is conveyed via sheet flow and gutter flow to an existing 10'
' Type R inlet on Timberwood Drive and is piped south into detention pond 306 built with the
Timberwood Drive Improvements.
' Basin 113: This basin is 0.73 acres with a C-10 of 0.29, C-100 of 0.36, Q-10 of 0.8 cfs, and Q-
100 of 2.1 cfs. This basin is located west of Ziegler Road between the back of curb and the right -
of —way. This basin also consists of a historic farm site located west of Ziegler Road.
Project Improvements
This project will develop Lot 3 of the Preston Center Third Filing. Its intended use for this
' development is a bank with a drive though. Construction of parking, sidewalks, -curb and gutter,
and landscaping will also take place.
' Stantec Consulting Inc. 2 August 20, 2008
I
' Drainage Immprovements
Two 5' Type R inlets, 3 curb cuts, and expansion of the detention pond are the major drainage
improvements. Water quality will be provided through the existing detention pond.
The volume of the detention pond is required to be 1.7 acre-feet per the Final Drainage &
' Erosion Control Study for the Preston Center at Wild Wood Business Park Third Filing, prepared
by JR Engineering, dated July 2, 1998. At the current pond size, the 100-year water surface
elevation is at a 4925.24'. After expansion of this pond, the new 100-year water surface
elevation would be lowered to 4924.97'. For this project the existing outlet structure for
detention pond 304 will not be modified.
' The spillway elevations have been modified. The location of the spillway will be kept on the
same side of detention pond 304 but moved closer to the pond. Previously, there were two
' proposed spillways with the water overtopping the curb and gutter on the east and west sides of
the driveway. The Cache Bank improvements provide for one spillway on the west side of the
driveway, which allows flows to spill south onto Timberwood Drive. Should the pond overtop,
' flows will spill over the proposed curb and gutter and sidewalk, down the driveway, and onto
Timberwood Drive. The concrete curb and gutter and sidewalk will provide protection from
erosion in the event overtopping does occur. The spillway elevation ranges from 2924.98' to
2925.33'. (See appendix for calculations)
Basins Improvements
Basin 109: This basin has now been divided into 6 sub -basins (C-1 through C-6).
Basin C-6: This basin is 0.0.7 acres with a C-10 of 0.95, C-100 of 1.00, Q-10 of 0.3 cfs, and Q-
' 100 of 0.7 cfs. This basin is located in the south portion of the site and will convey runoff south
to a 5' Type R inlet located at design point C-6 via roof drains, sheet flow, and gutter flow. At
' this location runoff will enter an 18" RCP pipe and flow northwest towards the 5' Type R inlet
located at design point C-4. (See Appendix A for calculations).
Basin C-5: This basin is 0.12 acres with a C-10 of 0.80, C-100 of 1.00, Q-10 of 0.5 cfs, and Q-
100 of 1.2 cfs. This basin is located in the middle portion of the site and will convey runoff west
to a 2' curb cut located at design point C-5 via roof drains, sheet flow, and gutter flow. At this
' location Basin C-5 will combine with Basin C-4 and enter a 5' Type R inlet at design point C-4
in which the runoff will flow down the riprap and enter existing detention pond 304. (See
Appendix A for calculations)
' Basin C-4: This basin is 0.10 acres with a C-10 of 0.84, C-100 of 1.00, Q-10 of 0.4 cfs, and Q-
100 of 1.0 cfs. This basin is located in the west portion of the site and will combine flows from
' Basin C-5 at the 2' curb cut located at design point C-5. The runoff will be conveyed to existing
detention pond 304 via sheet flow, and gutter flow. Runoff will enter a 5' Type R inlet at design
point C-4. At this location Basins C-6, C-5, and C-4 will discharge west through an 18" RCP
into existing detention pond 304. (See Appendix A for calculations).
' Stantec Consulting Inc. 3 August 20, 2008
u
Basin C-3: This basin is 0.29 acres with a C-10 of 0.83, C-100 of 1.00, Q-10 of 1.2 cfs, and Q-
100 of 2.9 cfs. This basin is located in the north portion of the site and will convey runoff to
' existing detention pond 304 via roof drains, sheet flow, and gutter flow. A 2' curb cut located at
design point C-3 will convey the runoff north into Swale #1 which is apart of detention pond
304. (See Appendix A for calculations)
' Basin C-2: This basin is 0.10 acres with a C-10 of 0.92, C-100 of 1.00, Q-10 of 0.4 cfs, and Q-
100 of 1.0 cfs. This basin is located in the northwest portion of the site and will convey runoff to
existing detention pond 304 via sheet flow and gutter flow through a 2' curb cut located at design
point C-2. (See Appendix A for calculations)
' Basin C-1: This basin is 0.47 acres with a C-10 of 0.32, C-100 of 0.40, Q-10 of 0.5 cfs, and Q-
100 of 1.4 cfs. This basin located is north of the site and will convey runoff from the existing
' historic farm site to existing detention pond 304 via sheet flow.
Basin 110: This basin has been updated from 1.43 acres to 1.52 acres from a C-10 of 0.18 to
' 0.17, from a C-100 of 0.22 to 0.22, from a Q-10 of 0.9 cfs to 0.9 cfs, and from a Q-100 of 2.3 cfs
to 2.3 cfs. This basin encompasses detention pond 304 and has been expanded east and north
making the detention pond larger.
Basin 112: This basin has been updated from 1.14 acres to 1.20 acres from a C-10 of 0.65 to
0.59, from a C-100 of 0.81 to 0.74, from a Q-10 of 3.5 cfs to 3.4 cfs, and from a Q-100 of 9.0 cfs
to 8.7 cfs. This basin has increased in area with the addition of the runoff from the south side of
the building. Offsite runoff for this basin was reduced by adding an inlet at design point C76 to
capture flows intended to enter Timberwood Drive and also by the expansion eastward of
' detention pond 304, as once this area was planned for pavement and is now apart of detention
pond 304.
' Basin 113: This basin has been updated from 0.73 acres to 0.84 acres from a C-10 of 0.29 to
0.32, from a C-100 of 0.36 to 0.40, from a Q-10 of 0.8 cfs to 1.0 cfs, and from a Q-100 of 2.1 cfs
' to 2.7 cfs. This basin has been expanded to include runoff from the east portion of the proposed
building. This basin size has been decreased due to less area being routed back to the entrance to
the site off Zeigler Road. Shifting the high point north provides for less flow to be routed back
' to that intersection.
Erosion Control
' Temporary and permanent erosion control measures will be implemented prior to construction to
prevent transport of sediment from the. construction limits. Erosion control fabric and riprap will
be installed, at swale locations, and at the end of flared end sections. Wattles and straw bale
' dikes will be installed in swales. Silt fence will be constructed on the south and east portions of
the site. The contractor will be responsible for implementation and maintenance of a Storm
Water Management Permit and Plan granted by the Colorado Department of Public Health and
' Environment (CDPHE). If groundwater is encountered and discharged an NPDES permit will be
required.
' Stantec Consulting Inc. 4 August 20, 2008
1
I
1
H
0
1
7
1
1
Summary
Storm water revisions to the Preston Center Third Filing include addition of piping under the
parking lot, 2-5' Type R inlets, 3 curb cuts, and expansion to existing detention pond 304.
Basins have been modified with these improvements but C values and runoff rates have been
kept very similar to what was intended in the Final Drainage & Erosion Control Study for the
Preston Center at Wild Wood Business Park Third Filing, prepared by JR Engineering, dated
July 2, 1998.
The small changes in areas, runoff coefficients, and runoff rates are very minimal and considered
negligible, when looking at time of concentration to the existing detention ponds (Pond 304 and
also the existing detention pond on the southwest corner of the Ziegler Road/Timberwood Drive
intersection). Furthermore, with the expansion of Pond 304, the 100-year water surface elevation
has been lowered to not only mitigate ponding in the parking lot at the Cache site, but also allows
for a.smaller release rate, due to the head being lowered over the existing orifice control
structure, which will not be modified with the Cache Bank improvements. Erosion control
measures will be implemented to minimize the transport of sediment from the construction
limits. Water quality has been met with the runoff being conveyed into existing detention pond
304, which provides both water quality and detention.
' Stantec Consulting Inc.
61
August 20, 2008
References
' 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins,
Colorado, May 1984, Revised January 1997.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991, Revised January 1997.
4. Final Drainage & Erosion Control Study for Preston Center at Wild Wood Business Park
Third Filing, Prepared by JR Engineering, July 2, 1998.
5. Final Drainage and Erosion Control Study for .Timberwood Drive, Prepared by JR
Engineering, January, 1998.
' 6. The Urban Storm Drainage Criteria Manual (published by the Urban Drainage and Flood
Control District — Denver, Colorado — June 2001).
Stantec Consulting Inc.
August 20, 2008
VICINITY MAP
FRONT RANGE PROJECT VILLAGE I LOCATION
Kw
m> I
1 ` O O
� I " HP/AVAGO
HARMONY ROAD j
1' POUDRE VALLEY I INTEL I
HEALTH SYSTEM IMBERWOOD D
CAMPUS rr
1� TIMSERWOOD DR.1 Y o
a o
= o
PRESTON JUNIOR F
1I HIGH SCHOOL g
' PRECISION DR.
W
Z Q ROCK CREEK DR
Of FOSSIL RIDGE
1 HIGH SCHOOL
_m �� w
J
1 �W U) N
KECHTER ROAD
0
o ZACH
i ELEMENTARY
xX SCHOOL
L
/ O
s O
CDO
O
O =,
N
00
U �
O
1 N0 0 1500' 2250' 3000'
'N 1:1500
08.07.09
187010660
1 Stantec Consulting Inc. O'ient/Pfofec1
Client Desc.
209 South Meldrum Street Cache Bank and Trust
Fort Collins CO U.S.A
80521 Figure No.
970.482.5922 rue
S�f1b0C 970.482.6368 VICINITY MAP
1
RATIONAL CALCULATIONS
1
1
1
1
1
1
1�
1
1
1
1
1
1
1
1
1
D CO COLO M
N V
o o 0 o O
O O O O -
N CO O m co � O
m
0000
O
co co N
,009
O
O
N I I
� y
m
cn
CO n
o 0
ao
o 0
41 J
al
S
N
r
0 U
O
o N 0 0
U
n
N ^ p
� 'o
Lri
c m
>
C n
co
Z. y
N
0.
V R 1�
r
N
� O
�
0
Co
C co
y
CY) C)
tp
U
O V O
uJ U
O N 01 N to-gmNO
O O ON
[FFEL
0 0 0 0
0
U7 LO LOOn Of O cn
'Of
0 o o o
O
m
y N
01 O N c): C O
m M
ti
1
1�
1
1.
1
1
11
11
i
1
1
1
1
1
1
1
1
1
n 0 N
7 In th
N N t`7 V O to
M Ol t0 00 t0 0)
.0
.t0 i
O O O
0 0 0 0 0 0
O
t` <
l") t
0
tO
to
0
to N 0
o u
Lo N
N 0, tb tb OOD
t.
1m
O
N 11
Gr yco
7{
w
U
C m
N
� 0) to 0) CD
)•'
'�
m t0)
O N O CD
I- r
000
000 OO 0
t0
V
y
y to
C'Jto
r
tD N N 0
�W C
'N r
j
v
N O 0 R O.
m 0
N N (A
1n V to v v
't7
W;
n
m W)
jr
.0 m o
ro
0) n
r Ero
o
Nov
I.0Cno^ r-
r)
0) o
a
tt? Nv
N 0
— n
•dU
E
Oo000
.*
3
0
a
0
y
z
IT to
ON N
P2-0vM ht0 t0
CO
�m p~D
>
CI) N to
th O uD 'q 0 O
M N
t{Vpp
(00 1N M
'y N V, a to t6
0 O.
U
t0
..... N
to
L
40
9
C
m
�-
O O O_
V 000000
�N to
0—
N N
CD O O
'O 0 0 0 0 O O
�:O O
5
W
m
m 00f Off)
y to 0 to to
� to W O) O) 0) 0 O) 0
,N to
.0) 0
0 0 0
= 0 0 0 0 0 0
' p 0
CD
t0
10
O
a)
O N
rn N t+) t0
O
,� J
•�
F
W
�I
V
M I
J
O) r
G
Z o LL
a II
I E
1
O ti
F y y O
L) cmd O
Z dU'
O o
Um co
W O it
G
F N
CO
t
U
U
Y
Q
n
W
J
Q y C(0
N� 7 N00000
E
�i of ui )ri vi (ri vi
LL
0
MO C
N '- n N [D N (0 00
E
N o 0 0 0 0
r
U
u v
J
0 0 0 0 0 0 0 0 0
F
m M O N N p N V N
O
M n D N
m C M
0) ? O O O O O CD`y
E�
v o V LOSS r
NNLO
O 0) Ln O N V (0
E
v 6 6 o o o 0 00
F
� N 0) co
M C9 eg� cq
O N N O N N N N N
i
N
W O
C.O
C C
LO OO MOOD co (0
_
~ C
0 0 0 000000
J �
0 0 0 0 0 0 0 0 0
W
F- 0 o Q)
N
~ J
'- N N N N N
U
J
W \p
O0
� a.
a
a- a- cL
U
H
x n
co CD
��
Z
LO 00
0 rl- m rn
J
C
(D N O O N 00 0)
EcO
a
�Ov 0'NMNN
W
F-
a
z
5
w
(L
O0
o (D MAN
�NNNNN
U"
_F
z
H
�C NOto
On ONO tt O
M (D (n 7 R
`Z
J
F
n
U M
Q) N N N M p O N
N M M 0) W O p0 0)
Q
0
0 0 0 0 0 0 0 0
W U N
(O
O 7 n 0 M O N n
NaD
_Z
N
cr (0N
7 N— -O
Q
Q
O O O O O O O
m
z
CD
V) 0— O
m z
N M N M V (D (0
�� UUUUUV
(=p
LO
M
O
I
I
11
1
i�
J
1
Ll
J
A
G
Z LL Ooo
O
F-
[-
U �mo
Z U o
c
n
U p m
LL % ID
y
0 0
W o
F 0o
m
t
U
U
Y
Q
n
W
J
Q C
O
OOO OLLto
NoC�
F"tcn
Nmm (n(Om
�00000
r u
U U .Y
r
J _
O O O O O O O O O
C6 aD
N C N
m C(h
Y '
Lo 900 OOO
� E •-
co (ri of
C C V O 0)1n -ItN -CT(°
"�
E 4 6 o 0 0 0 0 0
}
H
N n O
OU W M N A CO CO CO CO 00
O N N O N N N N N
W
h
Ol (n to co 0 (p mm cp co
C
O
W
C —a 0 0 O O C)O O
0 0 0 0 0 0 0 0 0
1-
J
i
W
Q
2'
o e 0 0 R N 0 0 0 0 0 0
N N N N N
J
W m
aam�aa (9aQaaQaa
m
U
H
n LO
0^ On
N n (O (O M m
W
J
C '-
00 O 01
W
F
O
5
W
W
W
>
IL
0 n
Ooo 0000
O
v
J ("1
N N N N N
U)
Q
H
z
F-
r V (p
0 LO On
Z
0 (O I t) 7 V
W
J
F
n
U M GLOM
0) N N N M O (p
V
mmwmmrn
OQ
O
Q
O O O O O O O O
N
(A
O t n O m O N n
N m
Q' (vN
7 I N— O
Q
Q
O O C; 0 0 O O
m
z
.
m (n
O— O^
z
N m '- N (") -It(n Co
VUUUUU
m
T
N
l0
d
N
C `
o 0
(0 11
ryU
U N
C
0 3
O J
N
> W
o
N
a"
�a
c u
C J
° o.
U �
G >
N
„a
° a
oU
z m
ti
F
i
[J
i
i
11
i
i
i
.i
i
i
C Q) M O
V
(0 V r V V (`N')
OD 00 ((00 N O
O( h
0 0- 0 0 0
O O N m O
N
0) O 2000
c 000
0 0 0
O O O O O O
O O O O O O
00000
O O O O O
0
if
0 0 0 0 0 0
O O O O O
c
M
CO V V N O)
d' �0 M
00.-000
0 0 N C7N
0
Q N r N
- 0> V O O 1D
O N O O
C
�
U O O O
O O O O O O
0'
N N O V
'd N t0 N00
1� O m O N
V �N.--�O
m tN 00 /h
O
000000
T
VI O
c C (O n 00
(0 0 00 00 co 00
to '7 (00 N
- (") V t7
C
t7 V V V V
Cl) V Cl) m (")
O N
U U�Cl?
N N m V O VC
MrnCOcocorn
N V CO
c 00(Dm(a
0 0 0
0 0 0 0 0 o
O O o 0 0
V
N 00000
V N (O 7
E N (r 0)
Io Ui ((i lri (o
V L
N C
a >
m E
> C 0 O O
m E 600
000000
0 0
000000
0o CCU C;
E
_T
O
U.
y
rn
C
Cl o
O
O
0
a
0
F
L
of
O
N
J
O
N
_
y C N v
N 0 0 0 0 O
(V V N N
E N oo
rivi(ri(ri(o
p^CNU
(O
U (ri
vi U
U v a
n
h n U o
y O(N Cl)
N(h V NO
666 —a-
cu �-�-
UUUUVU
-ni L)
m
UUU Cv 5
N U F
UC
0 O 0
a
'M ONth Nt7 V la7O C �- V ° OZ
N o��� c�ticitiUti o—o
o
Q�
a
�o
oZ
a
0
N
Ll
I
7
L
1�
J
i
(0 O
O c
N M O
M I� r
00 (D m V M O)
M 0) ma N m
m O V m M
0) 00
O
U N m N
O N r' O.
V
N N m m N
It-
O 0
N 0 0 0
O O O O O O
O O O O O
O O O O O
O O O O O
O
vO
O O O
a 0 0 0 6 0
O 00 i 0 0
0 O
N=
N to Cl) O
M
m (D m V M 0)
M 0) m O N (D
m 0 It (D
'S
V
N m N
O N O
0) O0
N N m N V
In
N I, N
N m -It0) O O
O N O
N m m O N
O M
O U
O 66
0 0 0 0 0 0
0 0 0.- ( p
c 4)
d
N O 'Ith
0N m
0 0) O^ I�
V N 7 O
M (O m M
In N m 7
: Q
0 0 0 0 0 0
1
O O N
c t
C
0m0 O
M 0) m 0)) 0)) m
(D m V
M m
N
r of eo
(: of ai of o
of f
� of I: (o
of
a)
V
N a0
N I--Iq
OOOOOO
V 00000
LL7 0 f V f
U
O O O
O , —�: -
O r 000
U
� 0) N
(OM
N N Cl) [{ O 10
M W m m m 0)
N V' I� M
V m(OM m
O O O
0 0 0 6 ci C)
O O O O O
c
Y
N 0
N 0 0 0 o 0
N N V
E
�' ui of .
Iri Iri Iri ui to
ro vi 04 M
a > c
- to E
H
> C
cu
0 0 0
6ci
O O O O O O
docici
O O O O O
00000
T
V to
N
n a
_o 0
i � v
a �
H
t
c
N
J
NOOOOO
�!sr MN
E04
nrn
L6 to L6N L6
�(Dui��
m
mU
U (ri
�U
U a
rn
m (n V U O
.9
NM V MCO
UUU('-a-
6 C'i
C,i F0
U
U p
�
C
O CO
c . CD
$
M
N M 7 l0 (D C
UUUUUU
V O
.m
oUU°'O
o J
a
O O
O Z
a
0
N
a
r,
1�
fJ
1
1
1
4en C¢nic� THi �; hn'
0
o
'n
co
o
'r?
n
co
m
N
rn
[7
f0
O
�
N
!7
N
fV
fL1
m
N
('1
'(V
f�
N
fV
0)
CV
O
O
Q
N
O
E
cri ui
—� I-1191 l�lglglc4icllc4lcql�l�i
V E iO N� N N N cd N CV v
U OOOoOO10,1,01WIC010,101CMIMI-1col I 101CMI
O
0
0
ao
o
n
in
co
o CO
ao co
rn
m n
m
m o cn rn
o
co
to v
N co N
U
0
0
0 0
0
0 0
0
0 0 0 o c
d V
O
N
cm
N
h
O O f7
Q v
CV
O
O
O
I V
.- •-
•-
O O
.-
O O
C C
O
C a 0 0 0 0 a.
O
al I-INImII'lI10loldlold I lcql 110
U7
m
c0
a
?"o fon C" 4,- T lr"j ;c-; / I-�
RUNOFF COEFFICIENTS & % IMPERVIOUS
LOCATION: PRESTON CENTER 3rd FILING
PROJECT NO: 9177.07
COMPUTATIONS BY: A. Reed
DATE: 114100
Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria
Recommended % Impervious from Urban Storm Drainage Criteria Manual
Streets, parking lots (asphalt):
Sidewalks (concrete):
Roofs:
Lawns (flat <2%, sandy soil):
Equations
M
Calculated C coefficients & % Impervious are area weighted
C=E(Ci Ai) /At
Ci = runoff coefficient for specific area, Ai
Ai = areas of surface with runoff coefficient of Ci
n = number of different surfaces to consider
At = total area over which C is applicable; the sum of all At's
JR Engineering
2620 E. Prospect Rd., Ste. 190
Fort Collins, CO 8525
u
917707FLOW.XLS
�
�
�
�
I
I
I
�\
2
ƒ
Pr i4 a 7�; h%
)
a,!®! 6
�a
{\
C
ƒ)Cl
0���
22/
Z
!!@9§2!§!7|E2
§
;
�,��,.,=@d&®0
;{\
4
!
z�
RRaaa;a;ma■!a
a_D
\
/
?re 5- a„ (c„ 4e,- -7 ,) P 11;,�
O
Z
0
Q
Y F
N Z
W
w Z
130
o U
U.
�0
ai UJ
L_
F
C
m
Y
<Z
w
W
K
z
E
v
E
m
�
o
'-
w
Y
U d
n
N
N
tm'1
N
m
INNn
00
t0 N
t0
m
m
(p
U m
o
2
u 7
N
V
N
MAN
m
fV
m
{G.
fp
IN
Oi
g
U f
flc]w
F
3
n�mnnmou`�ia
`t
Oi�Oi
ennNU
9z,
cD0'c
o06ci
rn
0000006
¢m o
0
0
0 0
0
0 0
0
000
LU
mmmin
�noe?o
mo
ovN
nlno
�
W
~ L
N
N
V
Q
N
V N
N^
n
N
N
LU t
(m0
N
¢ J V v
L
N
N
N
O
N
N O
N N
A
m
N
N
N
O
N
_
J
Z
O N
O O
m
O�
A
N
m
f0
W
fD m
n
ci O
N
N fp
m
n
d
O
O
O
O t?
O
.¢.1
¢ U
LU
J«
O V
N
O
0
w
W
m
W
m n
W<
W
m
O
N
N
m
N
N
(O
m
F
0 0
0
0
0
0
0 0
0
0 0
0
0
O
Z �
[O O
O
t0
V
N
m m
0 m
tD
st
m
n
N
�
N
�
a
o
o 0
0
0
�nnmm
0
0
0 0
o.-'m
0
d
O
co
m
f
U)
to
<
Z
u.1
¢ Z
z�
m F N O
N
m
V
h ID n co O>
N
O
¢ a
o
Gri
0
CD
7
U
Y LL
U
a) _
LU `0
C _0
n E
'0 O
N UI
A
C
E
c In
ca ..
+
o E
E
E
E
E
m
w
J
X
O
LL
n
O
r
{?re via,.
LOCATION:
PROJECT NO:
COMPUTATIONS BY
DATE:
(env TL1 J
RATIONAL METHOD PEAK RUNOFF
(City of Fort Collins, 1 0-Yr Storm)
PRESTON CENTER 3rd FILING
9177.07
A. Reed
1 /4/00
10 yr storm, Cf = 1.00
JR Engineering
2620 E. Prospect Rd., Ste, 190
Fort Collins, CO 80525
DIRECT RUNOFF
CARRY OVER
TOTAL
REMARKS
Design
Tributary A C Cf tc i 0 (10)
from 0 (10)
O(10)tot
Sub -basin
Design
Point
(ac) (min (in/br) (cfs)
Point lots)
lots)
1
2
101
102
2.26
0.80
5.1
4.75
8.64
8.6
DoDo
Double Combination Inlet
3
0.28
0.74
5.0
4.87
1.00
10
.
10'T R Inlet
4
103
0.74
0.65
5.0
4.87
2.34
2.3
5' T pe R Inlet
5
104
1.16
0.80
5.0
4.78
4.40
4.4
5' Curb Cut
6
105
1.14
0.68
5.0
4.87
3.78
3.8
4' Curb Cut
7
106
1.02
0.69
5.0
4.87D
Area Inlet
8
107
108
0.53
0.63
8.0
4.14
1.39
1.4
Existing 4' Type R Inlet
9
109
0.48
0.47
11.2
3.63
0.82
0.8
Type C Area Inlet
1.40
0.61
12.3
3.48
2.96
3.0
4' Curb Cut
110
1.43
0.18
12.2
3.50
0.90
0.9
111
1.56
0.20
14.6
3.22
1.00
10
12
112
113
1.14
0.65
5.1
4.75
3.52
3.5
Existing 10' Type R Inlet
0.73
0.29
9.6
3.86
0.83
0.8
10
Total to Pond
10.45
0.63
15.1
3.17
20.86
20.9
Pond Outlet
Q=CtCiA
Q = peak discharge (cfs)
C = runoff coefficient
Ct = frequency adjustment factor
i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99)
A = drainage area (acres) I =41.44 / (10+tc)or 74
917707FLOW.XLS
1
(en 4e,— lit j
RATIONAL METHOD PEAK RUNOFF
(City of Fort Collins, 100-Yr Storm)
LOCATION: PRESTON CENTER 3rd FILING
PROJECT NO: 9177.07
COMPUTATIONS BY: A. Reed
DATE: 1/4/00
Release Rates
917707FLOWALS
100 yrStorm, Cf= 1.25
O = peak discharge (cfs)
C = runoff coefficient
i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99)
A = drainage area (acres) I = 84.682 / (10+ to)' 7975
Total area draining to Pond 304 =
24.20
acres
Allowable Release Rate for the 100-yr= 0.5 cis per acre =
12.10
ds
Allowable Release Rate for the 10-yrr 0.2 cis per acre =
4.84
ds
Pond Release Rate for 100-year =
7.39
cis
Pond Release Rate for 10-year =
3.01
ds
JR Engineering
2620 E. Prospect Rd., Ste. 190
Fat Collins, CO 80525
. DETENTION
POND SIZING
I
I
1
L
Preston Center Third Filing
Detention Pond 304
4925.0000
0.7456
4924.9700
0:7430
4924.0000
0.6270
4923.0000
0.4442
4922.0000
0.2515
4921.0000
0.0670
4920.2700
0.0003
304.txt
7-8-2008
1.7539 1.7290
1.7316 --> 1.7067 <-- 100-yr WSE
1.0671 1.0431
0.5316 0.5101
0.1838 0.1668
0.0245 0.0174
0.0000 0.0000
Page 1
DETENTION VOLUME CALCULATIONS
Rational Volumetric (FAA) Method
100-Year Event
LOCATION: Preston Center 3rd
?
PROJECT NO: 9177.07
COMPUTATIONS BY: A. Reed
'
DATE: 3/13/00
'
Equations: Area trib. to pond =
Developed flow = Qo CIA
10.38
= C (100) =
0.83
J
Vol. In = Vi = T C I A = T Qo Developed C A =
8.6
Vol. Out = Vo =K Qao T Release rate, QPo =
5.2
storage = S = Vi - Vo K =
0.98
J
Area, C value and discharge are only for tributary areas not intercepted by Ponds 301 and 302
j
Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67") rainfall
Required Storage Volume: 72036 ft3
1.65 acre ft
1
' 917707pnd.xls,FAA-100yr
JR Engineering
acre
acre
cfs (0.5 cfs/acre)
(from fig 2.1)
�o,5�6,� (e44cr 7�' l ; 11�7
Pond 304
Proposed Detention Pond - Stage/Storage
LOCATION: PRESTON CENTER THIRD FILING
PROJECT NO: 9177.07
COMPUTATIONS BY: ALR
SUBMITTED BY: JR ENGINEERING, LTD.
DATE: 3/I 3/00
V = 1/3 d (A + B + sgrt(A'B))
where V = volume between contours, ft3
d = depth between contours, ft
A = surface area of contour
Stage
Area
Storage
Storage
(ft)
(ft`)
(ac-ft)
(ac-ft)
Outlet invert -
4920.3
0
4921
3192
0.02
0.02
4922
11543
0.16
0.18
4923
16416
0.32
0.50
10-yr WSEL-
4923.9
20195
0.38
0.87
4924
20615
0.05
0.92 .
4924.07
21420
0.03
0.95
4925
32115
0.57
1.52
100-yr WSEL-
4925.24
34008
0.18
1.70
Spill elev -
4925.4
35269
0.13
1.83
4926
40000
0.52
2.35
917707pnd.xls
'
Overflow Path
Worksheet for Triangular Channel
'
Project Description
Worksheet
Overflow Path
'
Flow Element
Triangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
']
Mannings Coefficient
Channel Slope
0.013
0.020000 ft/ft
Left Side Slope
74.00 H : V
Right Side Slope
102.00 H : V
'+
I
Discharge
56.20 cfs
Results
'I
Depth
0.35 ft
Flow Area
11.0 ft'
Wetted Perimeter
62.29 ft
'
Top Width
Critical Depth
62.28 ft
0.48 ft
Critical Slope
0.003963 ft/ft
Velocity
5.10 ft/s
Velocity Head
0.40 ft
Specific Energy
0.76 ft
Froude Number
2.14
Flow Type
Supercritical
' Title: Cache Bank - Preston Center Third Filing Lot 3 Project Engineer: Kevin Warner
v:\...lcivil\drainage\flowmaster\cache.fm2 Sear -Brown Group FlowMaster v7.0 [7.0005]
' 7/9/2008 9:22 AM © Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
1
Cross Section - Overflow Path
Cross Section for Triangular Channel
Project Description
1
Worksheet
Flow Element
Overflow Path
Triangular Channel
Method
Manning's Formula
Solve For
Channel Depth
'
Section Data
1
Mannings Coefficient
Channel Slope
0.013
0.020000 ft/ft
Depth
0.35 ft
Left Side Slope
74.00 H : V
Right Side Slope
102.00 H : V
1;
Discharge
56.20 cfs
11
1
1
1
1
0.315 ft
V:1 0.0 u
H:1
N TS
1
1
1
1
1
Title: Cache Bank - Preston Center Third
Filing Lot 3
v:\...\civil\drainage\flowmaster\cache.fm2
11912001 9:23 AM © Haestad Methods,
Project Engineer: Kevin Warner
Sear -Brown Group FlowMaster v7.0 [7.0005]
Inc.
1
37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
11
11
STORMCAD MODEL
11
i
91
Scenario: 100-YR
,L
r�
f
Ali
1
Imo` P-1 - ---- ,.
FES-A-1 STI N-A-1
s;
\ STIN-A-2
�i
Title. Cache Bank - Preston Center Third Filing Lot 3
1�
v:\...\civihdrainage\stormcad\cache bank.stm Project Engineer: Kevin Warner Sear -Brown Group StormCAD v5.5 [5.50031
07/08/08 03:43:13 PM ©fiaestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1
c > 00 (D
O) O O
a) M
V
c O ~O
m N U
U U
N O
N m
c
O) 0)
m N 3
j L7 m
a
y O
O N
Y 6
O N U
F LL
�
U
c E
00 n
n 0)
m
c D
`vOv v
w n
DMms rn rn
a)
T�
= J
O
a
U 00 0)
N 'O C V
N
C
'D J 0
_
'7
E 00
m c n co
m c o 4 ci
N
^ NO
c C
-0>
v
o�w
CD
w
n w
E o c rn n
Ln
N
m c� v v
2? N N
n
A
N 2 > O O
O
j(7 A?E a ?
N
co
m c O 000
f
N
C > 4) ONi
cw
co
O
oo
m
. r�i, No
O
U
ami (D ^
G
ncd� 0) rn
r
w 7 V
C
T
7
o m m
$ m
C
V
c o o
c c o o
3
C
U
mo
S.
Lail
O
m K
N
cn
c c
N <n
U)
a
Y
0
N a N
m
V a) 7 V
af
n
M
O O
W O O
c
c O O
O
U
U
c
L � c
V)
D0
It
c OD C7
L
m
a)
m
N
m
m
N ID
co
c�0
0
J
3z
CA
c
°
L E
111
z
p
w
LL
y m
U
�
E
c
o
m m
d0
E
1
o
az
i
'
J
N
Z'Z
O
m
fn U)
y m M
I'CO
L 9 O
�
�
U
m >_ p
J
m N !
U O
•.
a d
m o
>o
c
^
o
co
a
3 > "
oN
F� W
0)
v r M
�p—
t
o (D rn
ac:
a v M
m—�
o `co N
o r) m
v
^ O 00
U
N �
'o O
O C V
0 rn
.-,
m N
rn
p
�
V C 7
_
J
W co co
T''t
� U
v�
N N
o
= U
C
00 O m
G O
O
E m^
rn rn rn
N N
V O
W
00 O ^
C
m ^ 0)
O
> .Cv
CN C C�
_N
C 7 O
W
O co 0>
D
o u? Cl?
0 p
O t0 C?
O C
Q
N ?: y�
O —
N N O
6
H L
(�
Z
a
m
J
•- N
QQa
Lh
Z Z
LL
U) U)
=go
�L
Boa
Y
0
dU
c E
co
WV)
V
d
0
a`
I
I
INLET AND CURB OPENING
SIZING.
I
0
if
CURB OPENING INLET IN A SUMP
j
Project = CACHE BANK
Jt
Inlet ID = STIN-A-1
urP Lu urp
---
Ovate r
Yd
H ,
1•
Lam'
Flow Direction
Pan
J
Gutter
n Information (Input)
h of a Unit Inlet
F
L =
5.00 ft
Depression, if any (not part of upstream Composite Gutter)
alocai =
2.00 inches
t of Curb Opening in Inches
H =
6.00 inches
Side Width for Depression Pan
Wp =
3.00 ft
Clogging Factor for a Single Unit (typical value = 0.1)
Co =
0.12
Angle of Throat (see USDCM Figure ST-5)
Theta =
63.4 degrees
Orifice Coefficient (see USDCM Table ST-7)
Cd =
0.67
Weir Coefficient (see USDCM Table ST-7)
C„. =
2.30
Total Number of Units in the Curb Opening Inlet
No =
1
Curb O enin Inlet Ca aci in a Sum
As a Weir
Design Discharge on the Street (from Street Hy)
Water Depth for the Design Condition
Qo =
Yd =
2.1 cfs
6.07 inches
Total Length of Curb Opening Inlet
L =
5.00 ft
Capacity as a Weir without Clogging
Q„ =
8.6 cfs
Clogging Coefficient for Multiple Units
Coef =
1.00
Clogging Factor for Multiple Units
Clog =
0.12
Capacity as a Weir with Clogging
Qwa =
8.1 cfs
As an Orifice
Capacity as an Orifice without Clogging
Qo; =
7.1 cfs
Capacity as an Orifice with Clogging
Qoa =
6.3 cfs
•. , .. V4YIIIU Qa = 6.3 cfs
Percentage for this Inlet = % / Qo = C% = 100.00 %
Note: Unless additional ponding depth or spilling over the curb is acceptable, a capture
percentage of less than 100% in a sump may indicate the need for additional inlet units.
CURB OPENING INLET A-1.xls, Curb-S 7/8/2008, 3:47 PM
I
A
L
1
Project = CACHE BANK
Inlet ID = STIN-A-2
CURB OPENING INLET IN A SUMP
WP Lu WP
nv Direction
gn Information (Input)
Ith of a Unit Inlet
L =
5.00 ft
I Depression, if any (not part of upstream Composite Gutter)
=
ht of Curb Opening in Inches
aloca,
2.00 inches
Width for Depression Pan
H =
6.00 inches
Sing Factor for a Single Unit (typical value = 0.1)
Wp =
3.00 ft
of Throat (see USDCM Figure ST-5)
Co =
Theta =
0.12
63.4 degrees
e Coefficient (see USDCM Table ST-7)
Cd =
0:67
Coefficient (see USDCM Table ST-7)
C =
2.30
Number of Units in the Curb Opening Inlet
No =
1
a a Weir
resign Discharge on the Street (from Street Hy)
Dater Depth for the Design Condition
Q. =
0.7 cfs
otal Length of Curb Opening Inlet
Yd =
4.96 inchesL
apacity as a Weir without Clogging
=
5.00 ft
logging Coefficient for Multiple Units
Qom; =
6.4 cfs
logging Factor for Multiple Units
Coef =
1.00
apacity as a Weir with Clogging
Clog =
Qwa =
0.12
6.0
s an Orifice
cfs
apacity as an Orifice without Clogging
Qo; =
5.9 cfs
apacity as an Orifice with Clogging
Qoa =
5.2 cfs
vyuw Q. = 5.2 cfs
Percentage for this Inlet = Qa / Qo = C /o = 100.00 %
Note: Unless additional ponding depth or spilling over the curb is acceptable, a capture
percentage of less than 100% in a sump may indicate the need for additional inlet units.
CURB OPENING INLET A-2.xls, Curb-S 7/8/2008, 3:47 PM
A
0
Worksheet - Curb Opening #1
Worksheet for Rectangular Channel
Project Description
Worksheet
Curb Opening #1
Flow Element
Rectangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
Mannings Coefficient
0.013
Channel Slope
0.005000 ft/ft
Bottom Width
2.00 ft
Discharge
1.23 cfs
Results
Depth
0.23 ft
Flow Area
0.5 ft'
Wetted Perimeter
2.46 ft
Top Width
2.00 ft
Critical Depth
0.23 ft
Critical Slope
0.005302 ft/ft
Velocity
2.65 ft/s
Velocity Head
0.11 ft
Specific Energy
0.34 ft
Froude Number
0.97
Flow Type
Subcritical
Title: Cache Bank - Preston Center Third Filing Lot 3 Project Engineer: Kevin Warner
7/8/ lciv8 4:3inagelflowmasterlcache.fm2 Sear -Brown Group FlowMaster v7.0 [7.0005]
7!8/2008 4:36 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
t
Cross Section - Curb Opening #1
Cross Section for Rectangular Channel
Project Description
Worksheet
Curb Opening #1
Flow Element
Rectangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.005000 ft/ft
Depth
0.23 ft
Bottom Width
2.00 ft
Discharge
1.23 cfs
I
i
0.23 ft
i
I
V:10. 01�
H:1
N TS
Title: Cache Bank - Preston Center Third Filing Lot 3 Project Engineer: Kevin Warner
78//\0drainage\flowmaster\cache.fm2 Sear -Brown Group FlowMaster v7.0 (7.0005]
/8/2008 4:36 PM © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
Worksheet - Curb Opening #2
.�
Worksheet for Rectangular Channel
Project Description
Worksheet
Curb Opening #2
Flow Element
Rectangular Channel
Method
Manning's Formula
- Solve For
Channel Depth
Input Data
Mannings Coefficient
0.013
Channel Slope
0.020000 ft/ft
j'
Bottom Width
2.00 ft
Discharge
2.10 cfs
Results
Depth
0.21 ft
Flow Area
0.4 W
Wetted Perimeter
2.42 ft
Top Width
2.00 ft
Critical Depth
0.32 ft
j
Critical Slope
0.005213 ft/ft
��■■
Velocity
5.02 f /s
(-�..
Velocity Head
0.39 ft
Specific Energy
0.60 ft
Froude Number
1.93
Flow Type
Supercritical
It
Title: Cache Bank - Preston Center Third Filing Lot 3 Project En ineer: Kevin Warner
v:\..\civil\drainage\flowmaster\cache.fm2 Sear -Brown Grou g
I7/8/2008 4:37 PM © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666FIowMaster v7.0 I Page 100051
Cross Section - Curb Opening #2
Cross Section for Rectangular Channel
Project Description
Worksheet
Curb Opening #2
Flow Element
Rectangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.013
Channel Slope
0.020000 ft/ft
Depth
0.21 ft
Bottom Width
2.00 ft
Discharge
2.10 cfs
--2.00 ft---
ft
V:10.01\
H:1
N TS
Title: Cache Bank - Preston Center Third Filing Lot 3 Project Engineer: Kevin Warner v:\...\civil\drainage\Aowmaster\cache.fm2 Sear -Brown Group t Engineer:
v7.0 [Warner 7.0005)
7/8/2008 4:38 PM © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
Worksheet - Swale #1
Worksheet for Triangular Channel
Project Description
Worksheet
Swale #1
Flow Element
Triangular Channel
Method
Manning's Formula
ra Solve For
Channel Depth
Input Data
r-y
Mannings Coefficient 0.035
I�
Channel Slope 0.028500 ft/ft
Left Side Slope 10.00 H : V
Right Side Slope 10.00 H : V
Discharge 2.88 cfs
Results
y
Depth
0.36 ft
Flow Area
1.3 ftz
Wetted Perimeter
7A7 ft
Top Width
7.13 ft
Critical Depth
0.35 ft
Critical Slope
0.032167 ft/ft
Velocity
2.27 ft/s
Velocity Head
0.08 ft
Specific Energy
0.44 ft
Froude Number
0.95
Flow Type
Subcritical
11
1'
Title: Cache Bank - Preston Center Third Filing Lot 3
v:\...\civil\drainage\Flowmaster\cache.fm2 Project Engineer: Kevin Warner
7/8/2008 4:42 PM © Sear -Brown Group FlowMaster v7.0 [7.00051
' Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
'
Cross Section - Swale #1
Cross Section for Triangular Channel
Project Description
.
Worksheet
Swale #1
Flow Element
Triangular Channel
Method
Manning's Formula
I
Solve For
Channel Depth
Section Data
Mannings Coefficient
0.035
L
Channel Slope
0.028500 ft/ft
Depth
0.36 ft
Left Side Slope
10.00 H : V
Right Side Slope
10.00 H : V
L
Discharge
2.88 cfs
11
ft
V:I0.0N\
H:1
N TS
Title: Cache Bank - Preston Center Third Filing Lot 3
v:\...\civil\drainage\fldwmaster\cache.fm2 Project Engineer: Kevin Warner
718/2008 4:42 PM © Haestad Methods, Inc. 37 Brookside Road Sear-Brown
Waterbury, CT 06708 USA +1-203-755-1666FIowMaster v7.0 [7.00051
1 1
Worksheet -Curb Opening #3
"
Worksheet for Rectangular Channel
Project Description
Worksheet
Curb Opening #3
"
Flow Element
Rectangular Channel
Method
Manning's Formula
Solve For
Channel Depth
Input Data
(� Mannings Coefficient
0.013
L,
Channel Slope
0.010000 ft/ft
Bottom Width
2.00 ft
Discharge
2.88 cfs
Results
RCN"'
0 ft
Flow Area
0.6
0.6 ftZ
Wetted Perimeter
2.65 ft
Top Width
2.00 ft
Critical Depth
0.40 It
Critical Slope
0.005235 ft/ft
Velocity
4.46 ft/s
Velocity Head
0.31 ft
Specific Energy
0.63 ft
Froude Number
1.39
Flow Type
Supercritical
31
11
11
11 Title: Cache Bank - Preston Center Third Filing Lot 3
v:\...\civil\drainage\Flowmaster\cache.fm2 Sear -Brown Group Project Engineer: Kevin Warner
FlowMaster v7.0 [7.0005]
`� 7/8/2008 4:39 PM ©Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1
Cross Section - Curb Opening #3
t
Cross Section for Rectangular Channel
Project Description
Worksheet
Curb Opening #3
Flow Element
Rectangular Channel
Method
Manning's Formula
l
Solve For
Channel Depth
Section Data
0.013
Mannings Coefficient
Channel Slope
0.010000 ft/ft
Depth
0.32 ft
Bottom Width
2.00 ft
{
L
Discharge
2.88 cfs
i
i
�I
11
0.32 ft
1 i
j 2.00 ft—
V:10.0i—\
H:1
N TS
i
Title: Cache Bank - Preston Center Third Filing Lot 3
v:1... lcivilldrainagelflowmaster\cache.fm2 Project Engineer: Kevin Warner
7/8/2008 4:40 PM © Haestad Methods, Inc. 37 Brookside Road Sear-Brown
bury, CT 06708 USA +1-203-755-1666FIowMaster v7.0 (Page 11
F i G
G
.yM-WeaMAaY��.
a
PnNn Al IuuARY
uc
llia14:H;
—ue
•^
PROPOSED
PROPOSED INTERMEDIATE
ENTERLIONiOUR
ROAD CENTERLINE
PROPOSED ROAD CENTERLINE
PROPOSED FLOWLNF
— — —
PROPOSED TIE
BOUNDARY LINE
EXISTING O
, ---- ---
E%IGROUND
MISTING RNO CONTOUR
t�g
DRAINAGE fll51N WITH BASIN NOJACRFS
®
DESIGN POINT
^
DRAINAGE FLOW ARROW
■
BASIN BOUNDARY
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
1-800. GRIDE CA �VATP
m922ml987
11HYPIE YOU NOR T�
ING OF UNDERGACCIND
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
APPRCI
City Engineer Date
CHECKED BY:
Water R WaeteNaW Utility Date
CHECKED BY:
Slommrater Utility Date
CHECKED BY:
Raft k Recreation Oats
CHECKED EY:
Traffic Ergineer Oota
CHECKED BY:
Date
THESE PLANS HAVE BEEN REVIEWED BY THE LDCAL
ENTITY FOR CONCEPT ONLY. THE RMEW DOES NOT
IMPLY RESPONSIBILITY BY THE RIMMING
DEPARTMENT, THE LOLL ENTITY ENGINEER, OR THE
LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OP
THE CALCULATIONS. FURTHERMORE, THE FEAR DOES
NOT IMPLY THAT OLMNTDIES OF ITEMS ON THE PUNS
ME THE FIN& OUINTBES REQUIRED. THE RMEW
SHALL NOT BE CONSTRUED IN MY REASON AS
ACCEPTMCE OF GINANCUL RESPONSIBILTIY BY THE
LOk ENI FOR ADDITIONAL QUANTITIES OF ITEMS
SHOWN THAT MAY BE REWIRED DURING THE
CONSIRUCRON PH SE.
�
n
f�
t5�g6!
u�8$oo�
BE z
IL
Mil
h
k
I
1-
m on
z
H
n
= Z
60
c� —
o
a
z
ap
y
C3 0
m
OWILL N
q i
W
z o
W
U
U
go
d
CL
o
P"t-seal
PRELIMINARY
xm ro aE u3E0 FOR wrgElRucTIDN
Amiicl Nu el 18701MO
M Halt POSDI-Wtin
—MIN JW m DTRe
OMWL ARM
OuAing ND C-142
Rewun Shut
0 Td 13
i
PRESTO N CE TER THIRD FILING
i
5
pxs aea
lA%%
w�
ao
O
Y
O
Q
m
a
w
n
x
�
a
U
�
ReimtlSeal
xy
w=
zo
N Z
m 8
Q Z
Z F
rw xa.: iaseoo-ea.
a. �,.W
w�
Dw g No. EX-M
Recision SW
0 ,m2
_________________________________ _______________
________HARMONY ROAD ICOLOIll NOWAY M
_- _x
,,—�,�/
\©,
WZ�P` ME
�Rf a WIN Ian
v1\d sA_13 3 SM
Z3 ® C-11 E ,+4
s -
one
24
her L
--�'
` 1.10 AIDr . \\L�J
THIMRWOOU DN —�
B 1 . ILL 'WKY
N'sR
uxor
40!L24'
CEryyTKW tµNE MpgFp
6p µ'-R
I.] AG
OETEKTIWI NaMW R[o.NIWv
Wee Ac-n
1.3 Ar rT
ACTUAL REIEMF NA%
MAN. eLLONAtlE IIF3EAY RAW
WILET CCIIgWIIS
43 ?9
LI 04
4-0 64
0.3 69
614/le• olA
MIIQ CPMMO
me aw W/
3 311C WA CWnU
IW 6
ALL op es S MO UIM OETK (M AND Ip
L mil A SIR NT Too REOEW PAWYLNL AND g3NRR[0 FOR YWW 1X.W A OA'9
BfELL W YRRY All WRM➢.
1 THEMIA I AND POa3 WtALL B[ [M311M11CW0 AS IN] FWRL SWP OF DWRLOL
p, TYPE
AND sDTED MY K ILY.
•. BY 6. 611'OS R HaWR IPIOEWNN
I
IIII]
an
J 1
s
I
bl
JI
W�
N
II
Rill
I+I
Al
it
it
11
dl
subba 9s.[It051ttt9N1FLLLIXI5ID114llIXiP1dB. NDIfS
LEGEND
Voted stwm.olx utwily IosM earned nepwlm rvM So "ll al
Napt
it '" dwd ttalan an m. into
/ DESIGN POINT
AS ran wimetw WI M1n=n„ mat to penv to mY I•na aboa p aNlmy
Offered
(era lM apart gad OWE: ill Other lean m Real canna mwwrw ma
BASIN CRITERIA
m had m to wan^ In the eewm=• le InMzt.a n far
N
Idwr,
s anfru=flm
ent w den. end wodw eanwal sat.
rDdua
a watt a
l Or
RI1NCiP COEFFICIENT
Pn-aM.Imme . rotate, 00 to pna tp ma retained fvw Rrmew
µpnaW.
w x. teed =• of a 't "va^Ian M I'mum to term •rw r I m Ian Mmwab
AREA IN ACRES
fb waflm. a • mcifest bi id of tend.
ed mind seirn•a earh9 land dMumny x6.xY (•vgon9. Voting- they nffael
FLOW OIRECTfH
ftoopinp,Mn^gf • C<) anal M limit n a ra.y.wm =ud'r'm to spinwq a`ww
■ • BASIN BWNDART
Ian
fan in We . anted. proo}cee mHest At rots If wY st ten aain•.carbide.ay wee aafwry
as ty fan man than thirty LION ern defw• un.a umpw Q, ar pwControlanml w
_ _ _ _ _ _ _ _ _ EXISTING PIPES
m traded n«wan rm�
ea (.(AS.rem/In.'m. mndfmpnp, meet a •Hand. yd
Stwn.atw ul
Ill PROPOSED INLET AND PIPE
a =e"mn. Mml
Therpxt. man be eatel and nontgmd at at times during`v.
-mmwlahoy
g to .raw. u1 land Mounting amdhw Arab be
NO FLARED END SECTION
MiMVYV,M rote Anon di , edi rajil wpw wh•of detel by the City of
Fort Cann. En
• SIDEWALK Cl
d MY and old an
M IvnNu (w All'ream
EROODN SALES
env wan �eN verbm and. it al fnenea
O oo�
hannid,r, If they httenchild Nelyi Ad banned
eye ntatemd
oncebe fa Re
e� + and m dear o �e n
IIIPROPOSED SWEET LOCATION
a eed..• m..tgedd.. any
No me mccal mat media tan (10) Went n fool. m w w wan M
`Ir tan
— EXISTING W CONTOUR
trader Ma nwf wf by weal r often f x Of
aq �e
ea, • I"m lna d MI mr• m a a dne'll
tww¢m
-------- EXISTING Y CDNTWR
CRY &dnwce wmalM the wadel & . Or d tag of wed w any alPROPOSED
S' CONTOM
ffictoree art, city street,y w n • Ali mwv wt mmvtm `Han la
of be tlwn. y by ue <an�wtw
PROPOSED ICONTOUR
ell �— l SWALE A -A CROSS SECTION
�I
" III °I I a ( s-T3 as
Y74
ux
III j1 ; I 0 . OM FT
III p
III e
I I +
To OF O . oll
SECOOMY Y WAY ..p]55
RWIMY 9lLMY-MORAm �N
g MAP
Wham L Rival Compmy
x:l
0 © R SET FENCE
Op INLET PKMCDON
O. CONSTRurnON ENTRANCE
ST SEDIMENT TRAP
AREA OF wunDAnIXI
® POND DEP1N MARKER
NOTE:
EROSION CONTROL DETAILS CAN BE POIND ON
SHEETS IB AND Ile
w
m
0
So
120
SCALE:
to w
so'
y AS�R�q
�gmdfggE
96Y��y4
3
A� W
�oRB p
i c4l b2
�b WEOq$ g
F�Orr20Ai
gol F
COLOAP
daoAm:: y o �
q "go
.red01 e Lgfi
W1 Y
!I$lilrc
l�
z
K oa i
City of Fart Collins. Colorado <O 1
U71llTY PLAN APPROVAL W w z i
Aw DWO'__ a-K I I OO U nO
CRY Intel Da. Z
CHECKED BY: NL �1124 2 0 CC I
k M t of Dad F— W
b/� N
CHECKED By.R�tmsm"nimx Whey "I'll
lSe GQ O'
a
CHECKED BT:
paY. A Rer1Rn and
CHECKED BY: Tans mold mM SHEET 10 OF20
CHECKED El JCB N0. REV
Pool 917
/.0/ 0