FINAL DRAINAGE REPORT
FOR
POUDRE RIVER BUSINESS PARK, SECOND FILING
CACHE LA POUDRE BASIN
PREPARED FOR
INTERNAL MEDICINE CLINIC
MAY 299 2001
PREPARED BY
STEWART & ASSOCIATES, INC.
103 SOUTH MELDRUM STREET
P.O. BOX 429
FORT COLLINS, CO 80521
TEL. 970-482-9331
FAX.970-482-9382
TABLE OF CONTENTS
1
Vicinity Map
2-4
Teat of Report
5-9
Runoff Calculations
10-13
Erosion Control Calculations
14-18
Water Quality Calculations
Appendix
Final Drainage Report
Poudre River Business Park, First Filing
Pocket
Grading Plan
Drainage & Erosion Control Plan
Poudre River Business Park, First Filing
Storm Sewer Plan & Profile
1
1
1
1
1
1
1
1
1
1
1
1
1
1
' May 29, 2001
C
11
7
1J
1
STEWAU&ASSOCIATES
Consulting Engineers and Surveyors
Mr. Basil Harridan
City of Fort Collins Utilities
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Basil,
The following is the final drainage report for Poudre River Business Park, Second Filing
situate in the Northwest 1/4 of Section 18, Township 7 North, Range 68 West of the 6th P.M., Fort
Collins, Colorado.
The Internal Medicine Clinic has their office on the lot adjacent to the site on the West. The
clinic needs more parking and so is developing the new lot for parking only. A building may be
constructed on the site in the future. The two lots have a common driveway and a common drainage
outfall system.
The site is in the Cache la Poudre River Basin and contains 0.7391 acres. The site has some
temporary parking on the Westerly half of the lot. That part of the lot has a ground cover of recycled
asphalt. The Easterly half of the lot has a ground cover of grass and weeds. There are many small
volunteer Siberian Elm trees and other native plants on the site. The site has a slight ridge running
East-West through it. The slopes to the North and to the South are approximately 1.0%. The site
is bounded on the West by the existing Internal Medicine Clinic parking lot, on the North by the
Cache la Poudre River trail, on the East and South by undeveloped land.
There is an existing 15" R.C.P. storm drain on the South side of Poudre River Drive and an
18" R.C.P. crossing Poudre River Drive, as shown on Sheets 4 and 5 of the drainage plans. There
is an existing 24" A.D.S. storm drain from the North side inlet to the existing area inlet in the parking
lot and continues down to the Cache la Poudre River. The final drainage report for Poudre River
Business Park, First Filing is enclosed in the appendix of this report. The 100 year runoff rate on the
First Filing is 7.98 c.f.s. The 100 year runoff rate on the Second Filing is 5.92 c.f.s. The total 100
year runoff rate is therefore 13.9 c.f.s. The existing 24 inch, N-12 A.D.S. pipe will carry 23 c.f.s.
There may be future lots that will use the balance of the capacity of the existing storm drain. The
runoff rate to the existing 4.0 foot curb inlet on the North side of Poudre River Drive is 1.00 c.f.s.
from the West and 0.51 c.f.s. from the East for a total of 1.51 c.f.s. The inlet is in a sump condition
and the capacity of the inlet is 5.0 c.f.s.
James H. Stewart and Associates, Inc.
103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522
970/482-9331 9 Fax 970/482-9382
Due to the site being adjacent to the Poudre River, there is no detention on the existing clinic
site and there is no detention planned on the new parking lot site.
The Poudre River Business Park Master Plan is divided into two basins. Basin I is the
Westerly half of the Master Plan and it drains to the existing drainage system. Basin II is the Easterly
' part of the Master Plan and it is undeveloped. This site is in Master Plan Basin I. The 100 year
runoff from Master Plan Basin I is 31.4 c.f.s. and the 2 year runoff is 9.6 c.f.s.. The capacity of the
24" N-12 A.D.S. pipe is 23 c.f.s.. Since the existing 24 inch ADS pipe has capacity for 23.0 c.f.s.,
and Poudre River Business Park First and Second Filings have a 100 year runoff rate of 13.9 c.f.s.,
there is capacity for 9.1 c.f.s. additional runoff There is approximately 16.9 c.f.s. runoff that will be
' developed in the 100 year event from the future lots in the Master Plan Basin I. On site storm water
detention could be required on future developments in order to use the existing 24 inch A.D. S. storm
drain.
' This site is divided into four sub -basins for the developed condition. Sub -Basin I is the
parking area which is being developed at this time. The area of Sub -Basin I is 0.479 acres and the
runoff rate for the two year storm is 0.92 c.f.s. and for the 100 year storm is 4.77 c.f.s. Sub -Basin
I drains to the existing area inlet and then to the Cache la Poudre River in the existing 24 inch A.D. S.
pipe.
Sub -Basin II contains 0.098 acres and is being left undisturbed at this time. It historically and
also will continue to flow on the surface to the Poudre River. The runoff rate for the two year storm
is 0.04 c.f.s. and for the 100 year stone is 0.18 c.f.s.
Sub -Basin III contains 0.313 acres and also is being left undisturbed at this time. It
' historically and also will continue to flow on the surface to the South. There will be no increase or
change in the runoff from Sub -Basin III. The runoff rate for the two year storm is 0.10 c.f s. and for
the 100 year storm is 0.46 c.f.s..
' Sub -Basin N contains 0.055 acres and is that part of the North half of Poudre River Drive
' that is having curb, gutter and walk constructed at this time. The runoff will flow to the existing curb
inlet on the North side of the street. The two year runoff rate is 0.12 c.f. s. and the 100 year runoff
rate is 0.51 c.f.s.
A water quality pond will be provided in the Northwest corner of the parking lot. A pit will
be constructed for the extended detention volume. The pit will spill the storm water volume, in
' excess of the extended detention volume, onto the driveway and the stormwater will flow to the
existing area inlet. A water quality riser pipe with water quality outlet holes will carry the extended
detention volume to the existing area inlet. The water quality plan is shown on sheets 4 and 5 and
' the detail of the water quality feature is shown on Sheet 7.
EROSION CONTROL: The site is in the moderate rainfall zone and in the moderate wind zone. A
' silt fence will be constructed along the North property line of the proposed parking lot prior to
beginning grading on the site. A strawbale area inlet filter will also be placed prior to beginning
grading on the site. Only the area in the parking lot will be disturbed. As soon as the rough grading
of the lot is completed, the curb and gutter will be constructed. As soon as the curb and gutter is
11
11
poured, the base material will be installed and then the asphalt can be laid. The only utility to be
installed is power to the area light. The irrigation system will then be installed.
The stormwater runoff calculations and the erosion calculations and the water quality
calculations are included as a part of this report. The grading plan and the drainage plan are also
included. Also the storm sewer plan and profile of the existing pipe to the Poudre River is enclosed.
The original drainage report for the First Filing is included in the appendix.
This drainage report and the design of the drainage system, were made in substantial
compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards.
If you have any questions during your review of this report, please call.
' Sincerely,
Richard A. Rutherford, P.E. L.S.
RAR/meh
1
I
11
* 5028
:. s
'3r
ro'.
I
I
11
I
I
11
I
I
I
I
I
11
i
I
d
I
STEWART&ASSOCIATES 103 S. LD1RFAX FORT
gCOLLINS, CO 80521
Consulting Engineers and Surveyors
By: i2.A, 24 Date: (a zV Client: TA) -re /;zA14t, ,den. Cz_�A.L. Sheet No. S of
Project: P n u n 2 R i✓ c e 8 clJ A V F s r P.4 . r SFc- o A, [2 FA i ,v
Subject: Az- ,P )eVAVOFF C Ai ui_A-rm - air-ro P-rc,
Li.5 T O Ie !G
1—
I
2.✓._ro`w;._A.P2_E.gj.
-
_W_I
{ _
I � Y
_ _ perz_v�o_ -
I
�� I
-{-
,
-.
;
Z02__IX_
1
—L
T,.f._I
i
I
- too
_ I
I
I
I
' I
i _
STEWART& SSOCIATES 10 4S82 g 3DRFM, F4O 9382
COLLINS, CO 80521
PH.Consulting Engineers and Surveyors
By: f} 2 Date: to Z Client: Z ni -ram ,P- xjA r . M ED i CLr U rr Sheet No. % of _
' Project: 2(2 o m 1p `c �,,''wicue -BuriA/ -r PACKr FECa.Uo Fir.i,c/1-
Subject: �TO P- M W ATF,P 9UAI0FF AL(-L1 A7/ONE
I
I
I
I
I
I
I
I
[1
I
I
I
I
i
i
I
QEV E(,U PAD Sys RASJN�
{
4-171
+
_
_;L.nM-PER�VIovl �%2E'.4 _�_.f0�3
- .. -
_ -
(0 2. 01�9:�.)
� DUX
I _ I I
i '�� � I
o
! ;_so�
{ i
I
I ,III{
;I
_X
I � I � II 1 ' , •
I-- �� I
3�u USES
T'G - ..{ M, ! 1 _too yc!._=_l•.zs X 0.. So_)x-L5.9s_x
0 -4-,
4 �7�C,F.r._
I ` I� I �
�_�
fi. I
f i _ _. _
�I
J
STEWART&ASSOCIATES
Consulting Engineers and Surveyors
103 S. MELDRUM, FORT COLLINS, CO 80521
PH. 482-9331 FAX 482-9382
By: ��?1Q 1� Date: to Izi Client: .T_,ir,c-- v A1A A1D, Cl-lAile Sheet No. 7 of_
I I ,
A of c An I_ I
-
n 9 t1 A-'r-
- ,
1
--I—
1
Zo-
_ - -�
TI — -!-`
-,
Q-zyk = i4, ZOOix _x D n =
D/`_%8 ,.04G'ct =1
s
1 ,O
if y
_D -o 7 —
If
fill
y,2-1 x-,0-i ZO X- 7._/G_�X.10 0 98
I �
I
��'�
1—I4—(_
I
l-
I;
j
F
3 Lai,
T-F
Zoe i /
-
,;
j-t--�-�
I �
-.__..-_ C�-z.� Vie._..
/,_ D.-
3
D_,
.l o-(G,�
� S-•-' !----
�
Q_lo yc
t I
_
�0.•-ZO!
. �2 CO.
STEWART&ASSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521
Consulting Engineers and Surveyors
PH. 482-9331 FAX 482-9382
By: RA 10 Date: Jlmlon Client: TA/TBRmA(- MED.C-1-INIr- Sheet No. P of_
Project: Fou pRi lc Ve5p- BustAje-_S--r FAek� Tc=:c0,yr->
Subject: S-roez��' WA7-,,=-P- PUA2005-AE- (2.At-C(JLA7-10,u-r
A
7- 0-0 J�--- -e-G-A
0.0 /S 0/
4
!0o,I_
TC
'A
u z7l
-i 7-
Z
6'
0-I
10 iz
x
-7--
X1 9
7
7 T 7-i
4
J
-7- ------
I J-7
1
I
I
I
I
I
I
I
I
I
11
I
I
11
I
I -
11
I
I
A4 A
4.70/, AG
0, i2
S7
.Q,27cFt
C'm
n-
-
31-3- A-, C.
6
G 0-
.-,J-5�,4,A-) AJ
I
1
1
1
1.
i
1
1
1
1
1�
1
i
1
1
i
1
1
RAINFALL PERFORMANCE STANDARD EVALUATION
-
PROJECT: Pov c
COMPLETED BY:
DEVELOPEDIERODI
SUBBASIN I Z
,SIR, - I I MOD
S. B,- lL I Mo
S• B. -ly I Mo
D
------------------------------------------------------
ge F-IVEZ 5Vri.U&.a PAI¢k,S•Bcovp STANDARD FORM A I
KA0- DATE: 1
------------------------------------------------------
BILITYI Asb I Lsb I Ssb I Lb I Sb I PS I
ONE I (ac) I (ft) i (%) I(feet) 1 (10) 1 (0) I
------- ------- I -------I------- I------- I
C-947C- 0,534.41 %Cf 0 1 /• � �0 1 I I I
1�ER•47E I 0.09844 ls0 1 1.0 -/o I I I I
ERa7E 1, 0 .31341 /30 1// /O I I I I
�S717,5.7 /b l
Jv Ir,4sLE
I I I I i I I
I I I I I I
I I I I
I I I I I I I
I I I I i I I
I I I I I I
I 1 I 1 I I = 1
I I I I I
I
I I I I I I
I I I I I I I
1
---------- ----------------
DI/SF-A:1989.
Wr
---------- ----------------
DI/SF-A:1989.
Wr
I
E]
.1
1
1
1
1
1
I
EFFECTIVENESS CALCULATIONS
PROJECT: Fouve.EKivese bu-rxivexv fAxk,%BCOdD Fit-,fAt STANDARD FORM B
COMPLETED BY: �A�Q. DATE: 6 /3ol gg
Erosion Control C-Factor P-Factor
Method Value Value Comment
B AK.G: ,fJo I L. /, o /. D 6.4zs4- .
EXIST Gje4SS 6,08 A D O. S7o 4c.
STRAW BALE /10 0.8
S A L T Fo c-c- /• � D, S
MAJOR
PS
SUB
AREA
BASIN
($)
BASIN
(Ac)
CALCULATIONS
�OVDRE
75,7
roTgc
l-oT
0.14s
wTD C = /•o x 6,4z.T� 0,08X o.SZo)
Iv7r� P = 0. 6U x o.so = a, ¢p
�•40>J x / Lb
o K 7 -75. 7
I
1
11
1
I
I
CONSTRUCTION SEQUENCE L.
PROJECT: Pou22S 2105C Bur,,vss.r S40k, fecouv tic iu` STANDARD FORM C
SEQUENCE. FOR goal ONLY COMPLETED BY: A e- DATE: Z p�
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
---- 2 o0I YEAR
MONTH �.T�F �M A• TI A'� S, �O
------------------------------------ ----- ----- T---- ---------------- ----L----i----�
OVERLOT GRADING
WIND EROSION CONTROL .
� I
Soil Roughing I
Perimeter Barrier I
Additional Barriers
Vegetative Methods
Soil Sealant I I I f I
Other i I
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettinos/Mats/Blankets
Other
STRUCTURES: INSTALLED BY MAINTAINED BY
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON
HOI/SF-C:1989
' JANt A_ *1, 1991 8-20 DESIGN CRITERIA
STEWAffrge SSOCIATES
Consulting Engineers and Surveyors
July 6, 1999
Mr. Basil Hamdan
Fort Collins Utilities
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
Dear Basil,
The following is the cost estimate of erosion control for Poudre River Business Park,
Second Filing, Fort Collins, Colorado.
1. 150 L.F. Silt Fence @ $3 $ 450.00
2. Inlet Filter Straw Bales $ 100.00
3. Reseeding 0.50 Acres @ $1,300.00 $ 650.00
Escrow = 150% X $ 650 = $975
Minimum Escrow = $ 1,000
If you have any questions regarding this estimate, please can.
Sincerely,
Richard A. Rutherford, P. . & L. S.
RAR/meh
A
James H. Stewart
and Associates. Inc.
103 S. Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
970/482-9331
Fax 970/482-9382
STEWART&ASSOCIATES 103 S. 9 LD1RUM, FAX FORT gOLLINS, CO 80521
Consulting Engineers and Surveyors
IBy: K�. A-, je Date: J,4u 4- 7Client: .! _,v Al A e, M 4! D1c. u xz; Sheet No. of
Project: BluD,eF Bur/A1ESr z0A p k 1, -fie r'0.ila /7:-/L
Subject: A 7- p_! A / i z A L [_ A -r/n ni c'
I
I
I
I
I
i
I
I
I
I
I
i
[1
I
1
l ` __b T, L ! LA, k 5 _ o f L B3AJJ. ii.,U 1Fj
- -•- � � P1,iJU J'6 }Tod-� X7.1u�NDED D E.T-EU.r/D/(JL_. -aw.
D. L
GOM1?DS.!TE .RvnloPF C_O.EFF/.G/_� UT 4 %J`o,
--
i
I
Ly
PTU-�-��',/_O -;.�
-711
I I I i _ 1p�s4-- - - �'. �00.1$S.—jAcI-T
-�
jo,�-� F X � -
D
I i
I � _�_ _.�_ � _� Iti 1 _�_;(iv.>4T�,e A�yr�•�- er_'E.u,O _- Sa.s1r 1
I I ,
TI' !
Ire _
{
��� i
T(O_ U TO._P3. I �i
_!...IU�IZ_E f'v.eF__A..« i A=7!._D.V_TL.ET -_9S.3
I
or-r-14
am n gs.
Ll
!- { i�
I i
i I- �- �- I #_
�- - - -
'bc F-
I
[1
i
11
U
1
I
L✓
1
STEWART&tSSOCIATES
Consulting Engineers and Surveyors
103 S. MELDRUM, FORT COLLINS, CO 80521
PH. 482-9331 FAX 482-9382
By: R A /7' Date: / /0 Od Client: -EA)r,5g(%A[_ Aeo/c./,vr-Cl-iyt Sheet No. /5�of
Project: a u 17,e c— l V E e- 13 US/ .v rIS 7A p- k
Subject: UJ A -iE P Q v 4 i- i C A Lr U z-A-f/o o_r
T
/ t1
Y
_
I
-
c 14.�.o w-
/ S X
R o ws _T ��_B
!t I —
i
i
_
,
f- - - _•411z
r
I
T
1, I
I '
r4
II f4
,
rl
71
1
-, -
I
�_
1. I, I_I _• , _� I t �, I 11
I I I
1 I I' I I l
I � I �' ! i_...� I j i I - � r....-_ I i -p-
,
i-f--- I !
i I •� i
I
.._I
' I
DRAINAGE CRITERIA MANUAL (V. 3)
STORMWATER QUALITY MANAGEMENT
O.P
0.�
IA
9-1-1992
UDFCD
xten
10-Hot
ed De
r Drain
entio
time
Basi
(Dry)
o•Z&
D
I
Hentic
-Hour
n Pon
Drain
Js (W
Time
t)
a
r
u lu 20 30 40 50 60 70 80 90 100
Percent Impervious Area in Tributary Watershed
Source:Urbancs, Guo, Tucker (1989)
Note: Watershed inches of runoff shall apply to the
entire watershed tributary to the 8 Facility.
FIGURE 5-1. WATER QUALITY CAPTURE VOLUME (WQCV)
DRAINAGE CRITERIA MANUAL (V. 3)
STRUCTURALBMPs
1
1
1
1
1
1
1
m 0.6(
F
0.0
0.0
O.DI85
Ac.Cr
■m
pr
�A
� �n
0.01
02 0.04 : 0.06 0.10 0.20 0.40 0.60 1.0 2.0 4.0 6.0
�N Required Area per Row (in.2 )
2
Source: Douglas County A;mr Drainage and Technical Crrrerie, 1986.
FIGURE 5-3. WATER QUALITY OUTLET SIZING: DRY EXTENDED DETENTION
BASIN WITH A 40-HOUR DRAIN TIME OF THE CAPTURE VOLUME .
9-1-1992
VDFCD
(15)
DRAINAGE CRITERIA,%IAMUAL (V. 3)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Threaded Cap
Water Quality Capture Volume
Level (including 20% additional
volume for sediment storage)
`i •,
Water Quality /
Riser Pipe (See Detail)
OUTLET WORKS
NOT TO SCALE
Notes: 1. Minimum number of holes = 8
. 2. Minimum hole diameter . 1/8' dia.
Rows
I
1-12" diameter Air
Vent in Threaded Cap
O O
Water Quality
4
Outlet Holes
O O O
4
� 7 7
Ductile Iron or
Steel Pipe
WATER QUALITY
RISER PIPE
NOT TO SCALE
Maximum Number of Perforated Columns
Riser
Hole Diameter, in.
Diameter
1/4-
11V
3/4'
1.
(in.)
4
6
12
12
9
8
16
16
12
g
10
20
20
14
10
12
24
24
18
12
Hole Diameter
Area of Hole
(in.)
(in.2 )
1/8
0.013
114
0.049
3/8
0.110
1/2
0.196
5/8
0.307
3/4
0.442
718
0.601
1
0.785
FIGURE 5-2. WATER QUALITY OUTLET FOR A DRY
9-1-1992 EXTENDED DETENTION BASIN
UDFCD
I
11
[I
I
I
I
I
I
I
I
I
1.
0
APPENDIX
I
1�21«
FINAL DRAINAGE REPORT
POUDRE RIVER BUSINESS PARK, FIRST FILING
STEWART & ASSOCIATES, INC.
December 7, 1988
I
I' Poudre River Business Park, First Filing is a 1.20 acre sibdivision
located on the East side of Lemay Avenue just South of the Cache la Poudre
' River. It is composed of a 0.69 acre lot for a medical office and Poudre
River Drive and Hoffman Mill Road.
' A small part of Poudre River Drive drains Westerly to Lemay Avenue
and then Northerly in the curb and gutter of Lemay Avenue to the Cache
la Poudre River. The balance of the dedicated streets and the lot will
' drain Easterly to a proposed storm drain along the Easterly line of Lot
1. The storm drain will have three curb inlets on Poudre River Drive
for on lot and street runoff. The drainage from the lot will drain
Easterly to an area inlet over the storm drain. Because of the close
' proximity to the Cache la Poudre River there is no onsite detention
provided.
There is an existing storm drain along the East side of Lemay Avenue -
that carries runoff from the Riverside Shopping Center to the Cache la
Poudre River. No storm water will be discharged into this storm drain.
There is no offsite storm water that enters Lot 1. No runoff from Lemay
' Avenue will enter the proposed project. There will be some storm runoff
from future lots on the South side of Poudre River Drive that will drain
into the street. The inlets on the South side of the street will be
' 6 foot inlets to allow the 100 year storm to enter the storm drain.
The area inlet in the parking lot will have an open area of 2.4 square
feet for the 100 year storm to enter the storm drain.
The runoff calculations and the grading plan are included as a part
of this report.
Richard A. Rutherford E. & L.S. �'CISTe°�''���'
5028 �
J•
SUBJECT-�L"✓62- Bus /N _S__ /�4p.� BY ---_DATE 9�ZS�?r>
' lf/1 �J✓ L—�l—----------------- SHEET NO. —
PROJECT NO.----------
1
' ToTAL A2EA = /, ZoA(-eEs LoT A)REA = 0•6,9 aczcs
' =M?E 2 ✓l0'✓S Ac E,q o') LbT / _ „SO
��rRvlovs '�REA o,v Lo7 / = 0• I°J A Z7,S%
x 0, '72s + O.zx o, z],s = 0,78
' -T z,—vtous .. A P iE;A of 5-r.'? T = 0, 4 1 Ac. _ go,+%
Pr-R.VLouS ia,-ZEA 6F— STR4�� E 1 - 010 Ac, _ 11.lo%
e = /x 0.804 _ o.z_x o•i9G 0.84-
87
25o�z l3 M✓Al,
pEv, Qzyrz = 0.78 x Z.2S x 0 6 9 = I•ZI c. FJ,
' 4.3 L
• Q ,00 _ l•LS X 0.78 x (0.4 ?C U, 69 =
osv
STZEaT 7,,
' DEv. Qzye = D• By-X Z. 4-.X b. Sl
Dew too
l•ZSX D 84 X7LkO•Sl = 3•E7 C•FS,
1 FUTU2E LOTS TO SooTH ZA)LC7-
' A C = 0. 85 3 ✓� ti.
bGv,Q z\/p- = 0• BSx Z,LS X Z- r� 4- =
pev. Q to yly = 0. 8s x 4 • o x z. 4 = e• y e c• Fs.
1
D6v, Q 100 ye = /• zSx O.BiX (o•,�} x Z.& ¢- _ l/o•% c•F.S.
SUBJECT
BY—�C.Gf�----- DATED./_Z,Z:aS
---------------
SHEET NO.--! 02,
1
-----------------------
l OTAL Cae F,zs7-Fi�•vG
?�
PROJECT NO.----------
1
1 00 y/L
OveeA PIPE
1
n = O. 0r(0
tVIEC.
"c:�� A) 09k-AFAI USI V (�
1
i�uT>'�= FD�MJLA
J
n
X O. OOE
0025 %3G�
Q ZQ,lv7 c,F.S.
V - Z8•G7 = .3.7Z f
/ T SEC,
7 7
1
Ch`AN.VEL l7EPr,y = �Z
1
%Jf = 3,*7Z -/sc� = p,Lp
3Z. Z x /h 2. vr,
C1 tl.S O•Gc �SO) x C SJ � I)
1
=
3,72, x
,0.,7
�D,OCS)
tlS
OLa
1
USE L�LA.SS, 1,Z K.iP
RAP.
"`i
M)iVIMVA4
1
. S6C. 8-z C .Ty 0,- Cr)1/1.JJ
S 00 P m D,2 g iN AG e C,e
1 7--= 44
SUBJECT Vr•/ __�_--,_- -. BY--S��----•DATE�2%
lH/------------------------- SHEET NO.- -5- C -�--
PROJECT-----
1
ROC/< `1Zr=; Fr_O,+'I F/q. S-% U ;e &qA) 5-roP-AA
2¢' NI£(TAr_G(%ArE2
be
QIDz•S = GZ gs R ¢ 4-0 Fw. E-7 V q�1�
2.
1 •
�cType
L P-tiT.4.1 G F)e P 0TE'G-r1o'u
Fk'OA'l Ffi•
UP— ',_F+0R2M D,2A/NA6S 44,�Uv�4c
1 - l 1 Aft- W47-Ejz Ds/vey = I �- , = zq" it% = D• -
Zz,r -
1 7•7•41L W= Z'
Z
I
I
1 z� 7.7 _ Z)or- gpp�e,4p
= z 3 FT
Ij
i
1
i
i
I
i
I
1 5,
i
In
1
I
AIVE�
�lOp �' I INLEt
isGAL �. ; I"=r�po,
1poupizf- lZiOl PAPIK , rII K69
m4oNv
Ry.[vKn—\
r?
/L 5110 ' y
@4 F4 urx r 11W
LEGEND
5g M155 e5 9a
t n
awax
' h5u
/mod\ 5130 '...�dw..
6 � ✓
fop
L
P p
V
.eP ,
.ems
i d°
Rlk4 R OR/ " �Z ✓
a
Ruk
s z
EXIST, SE
ER LINE
w w
EXIST WA
ER LINE
b 0—
EXIST SI
RAF DRAIN UNE
EXIST CC
LTWR
TwO SE.
CONTOUR
- -
EX15 '•
ELEY
e
v •'OSt
5MT L•Iv
N
SCALE: I" 20'
20 0 TO 10 w
ORIaIIIC SG4E' — t1ET
NOTE. -
Prior to a future building being constructed, and prior to
the pavement for Paddle River Drive bang extended, the
IT unitary sewer main and the water mom must be extended
to the further most property line.
h
�
i
N
w
v
In
0
Q
0
U�o"
U
N
o
V 1
y
O
E
/ ()
G(�
u
Q
WW
Z
//�
yz
o
W6
`
W o
N
V
W
rn
W
y
o
ffi
�
�
wo
vi
z
gg
d
0
i
0
U
y
2
�
g
4
R
N
O
2 2
2
U
p
2
V
m
O
>
�
O
�
J
City of
Fort Collins, Colorodo
�z
i
j
UTILITY PLAN APPROVAL
z
`
APPROVED:
City Ep/nser
are[
CHECKED BY.
€
wmer a w°a.we.r marry
out.
CHECKED BY:
JOB NUN
MR
sfom,waw UtnIH ooN
CHECKED BY,'
°-�-,�'
wn a�.or,°.
rote
CHECKED BY:
TronK myle..,
mle
sxfE*
xwefx
CHECKED BY..
4
0° 7
mt.
POUORE R/ItFR OR/VE-
LEGEND
RRC yy
R .I�
�t
v q\
BASIN I \
20,6GB SF
O.479 AC.
FWM
CgCyF
100
O
RFRr%R
BASIN Il /
SF
C 1 /
0.098 09E AC
UNDISTURBED AREA
BASIN IIl
\ q3 z 0 1J,621 SF
p0la_
N
SCALE: T"w2O'
10 0 20 10 BO
GIUPMC S - nw
11
_ ytr I. V....
`r^Wrasrwu O .v
PHHP HP PH HqPHkP Hp M.�
-= HHPP
d. w ...�a11.I..,.,, �.m a. HP"
ir...xs b In alww y�n�.mb. M�.m.a
,e...a_PHA.,..
s 5
EXIST, SPEi
ER LINE
W W
EXIST WA
ER LINE
o p
EXIST STT
RUORAIN LINE
DEVELOPED
V.eALVAGe
�Uh1MAEyT
64L
--
City of
Fort Collins, Colorado
_„r------
UST. co
uR
��—`
Ber.0
�f!
UALI7Y PLAN APPROVAL
PROPOSE
CONTOUR
Y
1
.]=tS_'
8ryy,
O /o,..
a vu
EXIST SPO
ELE✓.
-
APPROVED:
Z
J4Aa'
0.80
8...,
0.9Zcn
,. S/cn
cry c^vMw,
/yI e
e .5470
PROPOSEL
SPOT ELE V
{
CHECKED BY
..
DRAINAGE �LSIN LINES
SL
PORT,+.
o, ip
13r..,
o.Own
0.07w
O.Ig u:
PIP k we.L.vro. ulnry
oon
CHECKED BY
DININAG£ ROW ARROWS
O, 3/3..
0.2p
Hw. �.
I
O'/0•a
O./BLv
p.K e•
CHECKED BY
—.—.—.—.—. .-
SILT F£NCF
%4s txec,mNon
Lbh
0ns
s.,..,
alz..� l
0.z4P=Ar
a.A� .
CHECKED BY..-
IMM, Pq', r
Lt'
CHECKED BY..
mh
J
2
O
Q
U
O
�
p
y
R
N
W V
m
�
2
O
S
2
U
W
�
U
y
K
Lu
2
J
LL
W
�
2
O
SXEF XUMMR
5 oI 7
—
'
h
?
ry
r �
)9
i
ad d o
i
4
1��ot �l Sul
i .•__�:
�
r
Z
a� roENf
NI
JIB
7711
i eo
a
Y
4 r
�/
Uj
�.
'4
E
Nr
L
?bANT Ma 1GRIAI. FOE RGVEVITA11od AND G90510N
77
3
y N
/ 2
\
T
N
In
.,
EE'Y y
ONk
41
�
6L. A6 Y I'll% ANO ARRANGG PLAN7s N A MA NNF.12 / e
e 0 AWN V.
WII.�6e iRom 0 PULA'G0.LA
iN uKAI
00
C
LAOr�&A,PG. PLANT MAfl R", QJANIITIP�S WlbL
-
VARY OGPPNDINv ON AMouNT or vlstuR%eD
w
AREA ANo PLANt �PAGINCn.
OPL
C
♦Lf{.
N
[„✓
C9
o
-
o
ou :. -
1.
�
--.
�
-
-:
�✓
4
-
-
-
- -
_
_
-
_
_
I
N
_
--
-
— -
-
—
--
IN
—
:-
—
tt
c
C
`
1
73C,ti
i
t
—
3z
_
I
0•
,.
A
5
alff
—
-
L
1
{IN
I
ZO
I 1
Joe
lc�
NUMBER$
_.
OF