HomeMy WebLinkAboutDrainage Reports - 09/21/19951 1 1 1 Final roved Report FORT STORM DRAINAGE REPORT FOR BUILDING ADDITION AT 824 EAST LINCOLN AVENUE (LOT 1 PATRICK SUBDIVISION) PREPARED FOR R.C. HEATH CONSTRUCTION CO. PREPARED BY STEWART & ASSOCIATES, INC. 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80521 970/482-9331 September 14, 1995 ' STEWART946SSOCIATES Consulting Engineers and Surveyors ' September 14, 1995 1 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 ' Fort Collins, CO 80522 1] 1 t Dear Basil The R.C. Heath Construction Company has been contracted to construct a new building at 824 East Lincoln Avenue, which is the site of the Fort Collins Monument and Stone business. We have prepared a grading, drainage and erosion control plan and report for this proposed building addition. The site is located in the Cache la Poudre River Flood Plain. The present site drains south to the existing drain ditch along the north side of East Lincoln Avenue, and there is no storm water detention on the site. The ditch along the north side of East Lincoln Avenue drains easterly approximately 1.5 miles to Dry Creek. There are three separate buildings presently located on the property. One of the buildings will be removed and replaced with the proposed new building addition and some additional concrete paving. This will result in a net increase of 3147 square feet of hard surface. Also, there will be 3120 square feet of gravel surface added to the site. There is no offsite flow onto the property from the west which is the Odell Brewery. All runoff from the Odell property is captured onsite by detention facilities. Also, there is no offsite flow from the property to the east, which drains south to the Lincoln Avenue ditch. There is very little offsite flow from the old sugar factory lime waste area located to the north of the site. Approximately 0.06 acres of the south bank of the lime waste areas flows south onto the site. This south bank of the lime waste areas is covered with very heavy vegetation. This 0.06 acres is included in the sub -basin which drains to the proposed onsite detention pond. The upper part of the lime waste areas to the north is level except for humps and hallows, and there appears to be no appreciable drainage in any direction from it. ' We plan to provide a small detention area along the west side of the site to detain the additional water being generated by the additional hard surface. This pond will have additional volume necessary to hold the runoff from the new impervious areas and also the runoff from the entire sub -basin draining into the pond. This sub -basin is indicated on the plan. The pond will overflow south along the westerly edge of the existing paved driveway to the Lincoln Avenue James H. Stewart and Associates, Inc. 103 S. Meldrum Street — ' P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 11 ' September 14, 1995 ' Page 2 ditch. No overflow can flow west into the Odell Brewery pond because of the existing higher ground elevations along the west property line. ' The following pages of calculations show the determination of additional hard surface and the proposed detention ponding. The included plan shows the proposed site layout and grading to provide the detention ponding. The floor of the new building will be 1.5 feet above the 100 year stormwater elevation. The new revised map shows the Base Flood Elevation to be 4943.3 at the location of the new ' building. This new Cache La Poudre River study should be approved in a month or two, and according to Mike Grimm, a building permit can be issued after the approval. 1 1 1 1 The proposed detention pond will be located mostly in an earthen seeded area with a portion of the high water line encroaching on the proposed roadbase driveway. The bottom of the ponding area is on a flat slope (0.5 percent), which is consistent with existing flow conditions along the west side of the site. Slow flow and minor standing water will not be a problem in this ponding site so the owner prefers not to install a trickle pan. A variance is hereby requested from the City Criteria requiring a concrete trickle pan at this location. The site is located in a high rainfall erodibility zone and in a moderate wind erodibility zone. The new building will have a concrete slab floor. This slab, which will be constructed immediately, and the installation of the gravel roadbase will prevent both wind and rainfall erosion. A sediment trap shall be placed over the detention pond outlet to control the flow of sediment from the site. This is a fairly small reconstruction and building addition project, and the included plans and calculations, which are in compliance with City of Fort Collins Standards, will provide storm drainage facilities and erosion controls so that no surrounding or downstream properties will be impacted. Sincerely, Phillip I. Robinson Vice President rsc enclosures �Wlr If 118 If Lo ....... ....... yc E A If, Lum oil If C-)v -' / II / i 7rr , I I I y / it --- ------- Jul..... ..... ; . . - N if , , . If it ILI - A T�7 CY) .4,14 IRA I ... ....... 1 4. Ulf 1. 15% It Arm IT, it C\1 .11 11 If :�ti 17-1771 d. Lj . . . �as. . . . . . . II If 1-v ... ... .. age kk YAW 3NV z isoWiir. ...... - MIN :p T If ON L" F. IL 3A oila ,� o �, ---------- Lj Al uu JI A r FlDRIVE BUCKINGHANI STA 4954 Sill IT, 4953 1- �Ofz,. �q. 51 49 LOGAN , AVE sa 4947 Ff At !'N 04K X\ s LL0. U S19EET T_R E C T 821- E. Ll uj cc 0 a. LONE AE ' STEWART96SSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521 ' Consulting Engineers and Surveyors PH. 482-9331 FAX 482-9382 By: P/ 7:� Date: T Client: S. C- /lealti <fons-• Sheet No. of _ Project: Ale VJ J i o,: 4 of 8 Z4- F,-- Subject: gPnxa ralez F_x157 nc c�n�l i - oh re�GaS� �o�- -_.- _-'8.6I SFreT o_ —17 33 5F 1 g40L RDSUr�n }C E =_ 31 4-7 -5 F /.30D1 TI:O Al L i7vN0FF- G-E /Ll�rc'ATED R y 3/ `>`7 S F NE'W ff%' T,JSUFF/-YE a iq 7 z:�_(LUxI�U� F . Ale w _o� c' a ✓E;i S. yr fc. c'c :3_i_Z U'- 5 F '4�Dv 1.Oit/f l i�UN.o > (F /r, F.NE[c'/? r :� - . � Y . 3rzv S F NF v C-RA VE L IA 3 040.) %Q7L_ /'rDD).T(Dlt/AL �VNO✓=F �OLUMF =- _ 7G6 1-25¢_ .JOZZ L(J. FT. pT�Z'41 NI N(r To PlzU�pvSED ...P0,✓V11V r- AREA. = F_X�S71/V Con/Di710n/ -L1�1-{ i_<c/n/C/FV7 Fr<UM U, 6a85 AC. (73 (O.Z(/) t(Glos)(0 _'J C_s7oz)(4,5o t 9PG�r)(o.zs) — 07 7/ 3 1 1 1 Z912U - a.¢3 ZZ Niin; , i i STEWART&O SSOCIATES 10 S. 9 3DiRUM, FAX FORT gOLLINS, CO 80521 Consulting Engineers and Surveyors ' By: P 1 Il Date: Client: iZ_ G. 1- eoJ. Cwtif Sheet No. _ of _ ' Project: AA 13Ui�di ,c af- OIL E, LiAGo1✓► Subject: De }e 4 o h r e �-o/- O G ryas, -;-) Cl l-C I n l ) p o h Z_q 1 2.0 s>=_ U•:6G'9 � fF�, _ �_ ._ +�ZZ Co•so�_t(yZsd)(o:Qs) +/370d(o,2v)_ ' Z.0 _ 0.30, � s � M/'ssD►,�+-C�-2,�-: ! release 51eT«�i ' (0._ 7..0 �,25�.(US3�(O.L�QS� 3.13 I��7._. 300 1.5'77 Z0 S.Z 0.4�7 - ?.3Z _:_Z:�`li 6UG .. Z1�9_._.. 1,? .. 3_339... 90U Z939 ' ¢0_ 3.s _ _.... _. _ . _ _ J. s! 3.7 r¢,. 1 z o 0— SQ 3. 0 - 13 `f ¢C0 Z'3 1 0,0 Z �Z 1�/0 z3�¢ IzO_ 1 4s 0.G5' 34100 /d1 le-0 1. 0 5, 0- �-7 5 0 J s 4-00 t M1�XiMV/%A- p Tl •t/ r1F - GU. T . 0- i✓ - Z 5 S¢ r ✓U L(IM E O r- Pr�i POS ,r-� P �JN� + COn�OV(� ct�. /U1yMP Uiul �oi�nf ' 4-0.5 O /oU 0 ¢00 10 0 )9¢0 ¢- 2. U 3 ¢8d 20 4-0 1 - 731 _¢Z.Z ove4lo�l 3e30 Z771 cV Fr J So c s U. se 1RG�_ d;„ccM_e�C/. ,..o�en"q a RAINFALL PERFORMANCE STANDARD EVALUATION --------------------- PROJECT: --------- ---=---------- ------------------------- STANDARD FORA A COMPLETED BY: SZ¢ E_ DATE: S 1s 5- DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBASIN ZONE (ac) (ft). (%) (feet) M I (o) --------- 13145)N ----------- �9� ------- 0.005 ----- - 270 ------- U.5 ------- Z7U -------I------- 0.5 r�R�INM1) . TO NE+✓ DETENTION I 7Z POND .3 0 --------------------------------------------------------------------- inr icc 11inon I [1 i 1 EFFECTIVENESS CALCULATIONS -------------- ------------------ ------ ------------ PROJECT: 8Z4- E. Linculi, A✓e. STANDARD FORM B COMPLETED BY: DATE: Erosion Control C-Factor Method Value tJa - -- 77------------ (, U--- ex' 3+*7, V eq e+ot ; 0 r 0,03 concre-e s1c+b o.o'i ,travel driVe 0.05- sediMe��- troy �„U 4j5 0-0l 1 ------------------ MAJORI PS SUB 1 BASIN r3asi., dralni� -(%)--IBASIN 77.3 Pdn� i 1 � 1 1 1� 1 1 1 AREA -(Ac)- O.6c85 P-Factor Value Comment --+� ------------- 90 7 ---- 0,✓5 1.0 CALCULATIONS -------------- ----------------------- ex)si j;,) L/e4e a�On = 0, 0) Ac concreTe SIrnb = U.�7 ,ac y r6w le U16G(9S Ic= 0,�-o P = 0.5 S ( EFI= U. x rev = > )] --------------------------------------------------------------------- DI/SF-B:19B9 • CONSTRUCTION SEQUENCE PROJECT: STANDARD FORM C 'COMPLETED . SEQUENCE. FOR 19 q S ONLY BY: DATE: ' Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR RS 1 MONTH o M I s t I n- I- ---I-- I--I- OVERLOT GRADING I -I -I•- --I----I- I WIND EROSION CONTROL I j ' Sail Roughing i Perimeter Barrier I Additional Barriers Vegetative Methods I ' Soil Sealant j Other EXIST 3L-7GS 1 I RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other ConG•Siab GmAVEL vrzivF- VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other Ex157 \/EG, ------------------------------- STRUCTURES: INSTALLED BY ruuniniircu E)I VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED APPROVED BY CITY OF FORT COLLINS ON -HDI/SF-C:1989 JANUA Y 1991 8-20 DESIGN CRITc -TA I 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 STEWART&ASSOCIATES Consulting Engineers and Surveyors By: P )T� Date: S 9 r Client: Proiect: E, L.i n � n /h 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 G- 14eak Subject: Eros I O o (f on �1-0) (fOS4 . Sheet No. —of i-.l�eseccj. ^ 0 ��GcIE�_. a/'G_� 0.np) _ 20 , __,/�/1.ln1 Y�11/M — �t'%a, 0(i , ; , • , 1 � r of •1 In ' w w 4. 2iJ Y` ii _ WM1a:Gmv OR �.qe qe S T octal .>`t FORT CLIMAI i�./r/ f r11MI1� ILL. ' S.Y.- 1 L E L"mam c 1122 a, wrm L: EI L anrrvul A^SI0ELL I Small, I 1�1 OIT IFI 1 1:11 Mal Mal alhall, AI .ne. 6,11 a.va „pwy Mal Fa bad 9WL9' oy, Svrm R,a%i E'IM) =.'Iryp,l I.Y A.rW,. but iMary Mesh 12(SAN gbeToodRa. PROOF Obal III GRMELFILTFR SEDIMENT TRAP rve„pa mnh.a Of fOPT COLUNS COL If MCITY rmmaq to a.Nmm. $TOPM WATEP UTILITY at, — IT W plater mate, 0 3W 1 IP F Q \ I SCALC /"=2OI -` SITE 15 ZONED IG �EYIST. nIDL- FLOIR• iL.] I I EXIST ELPL. KdID. +s-o erlsr elms rzJw ++.a d ---1— ---J SO — — — — — "— _ \.AIR _ �..lemzx Emc1 �:1 �I ases� 1 f R I / i v.2 L R>—♦i O Tl ..nrzz > RILI I 4 2 �� -__--_ a — W ♦ r--- E<p✓,opoq low— , AVPpJa e4CP •♦ ♦ DeNsxoD �i_ ,EXIST. BLPa. TO REMAINar Fall ,ps•) -- FLGOR: (FJ.eJI '� /(Rli at EX15T. ELO6 TO REq MN A-1� < -- As c IG YEW - Ii,UI DING FLOOR - U/ S944- 6A5/N /0D ✓� W el'V1 vyaR 3 NOfTY f - ooc �1 R OIL hEW GxAVEL Me �—II ROnO eAS X,P, �E%IST JG Trt<AJE sVT?='+_E�' ��--- wL_ 1 ' FLOOR . IN,51% : EXIST iI ; — is ;A !G TO PLRI5Aa -1 i5 Ac a EXIST CQAJCa • I 1 ,-r rl _ y IIA EXIST PVMT Re � ENTIIry _v rLCT PI Pt 0 -.RRIN GN�JE �F UT i ESTIAR IT� EROS101�1 CONTROL PROCEDURES 1. THE CONTRACTOR SHALL CLERN OFF JAILV ALL MVO AND DEBRIS TRACKED ONTO Rivers 5T?EE75. 0-IN5IALL A SEDIMENT TRAP OVER THF�VlT[MiYN- POND OEl IMMEDIATE LV AFTER 6RADIN6 PoND. 3 RESEED ALL D15TURSED AREAS AT THE f{tlFTION OF THE OETENTION POND AND OUTFI PIPE 4 PLACE 6 IS FIX OF CLA55 6 BUSel Rlp RAP AT THE DO'NNSTRE•9M EhP OF TEE OUTCLOW PIPE Ceon,l ALL" L TY nK.,is. b.MOO ,mdnumb, RJl plow aMerya"d ltdom,ruAffluence whrn Jmx,l a,, the A,x.myx. IIJUObedelash" May arlM IMILLOmr lo,viS qe"a "I'dbe,liol If uFlulanJ aebha AE,h Al. mlae of than @rmry ncin8 rlea'aan,Yllalb0.lLewknlareM1all be rtsponnble fer ulJwonll unJerKroallJ uelaiex 2 rb,mAA, wLx puN Wcaplme by evatihn,IWa eJ Lerterdm, h,ebY,Rnnl rc.PhlmMLp mILc Cry, he a bchc&nn f udceap Wawah,For"I Mwa Wamwlam III la Juu p1m, uN alp lvvcl AU<, AR,O 10J U Thal Ass full Out ule FAIR'Mull "I I Ulleald hlM plel. .1 11 iF1I TMOLI v la A Of :_v Moor"la: Ur,maa 1 ®' J llL I r ar aaris led III Iv C I q, CO6519 wm 4 rOQMa J w J Mahluanaofa 44(,age Redo, Jell be All VARM I Of Jm pall hx'era. s rlrvrla mLn loxp am Ind by be cn.,mma,leJ atwr.0 ,u,.K, rmur,. ex. by,KIxI,=J msrve, a" e ...I.I lo,adI'rwaf OYMM urm"Ellah. Almileaaollaf Jnim ..all mast be III tome sannwalcr UllLpr Ixow,6priw lh tlrc wwua aLvY unJnu hrrc,upmry. Al L.IIIIEWT.1 . If Jouervl8 ix uyJ la m,kll aliLL,,,51w CmWmihn Cewamrul8 WaAcwaa UixLnKc Pnntil IncyuuN d I J, fc D .tll,ml- y J' Lorrvy wuera of Ue Vri ud Sulev 1 MR111tall an All Ift 1119 11111ply FAIL All Rath rfllo ldl II Prat far -SWROIOLE cr NatI FIJI ('111CIIII.m. A,t.,.ty.' For Ell mullColanJa III I,JT M1h, La CIA )LA 11 WC PE ALI 43N C hein C iftL U Dealer. Colwvlo 80222 94 ` a JCf L.I 2-VEKJ . ,MpMClp l ll IL, ePo,lc 5 gm Uui ss as <J UI JIxdemla .rnru rtxlrl Vau Jx,in .wld.1.rt»IhhfrM1l( t$I uAwJ, IMII rmLnnLJt. Aff, mavel Jemmyq rAli 311 dama8eor.Ill'I 1 Jraf ILCCJv's Lilua Ic P'aVeJY Lnainuin lu v,1,. waakwtivnLJlcrxmw JuinaBa fmLee in J¢Jcednpmnxil All mmma,tl,mm of We loJ JevnaBe auJ erhxim anlrvl aludY For NudnebV^Ie^I prepuN by SLeweLl k \UACMI .laa I'll brvmMmJ "Al, — y Es�ssu. L-_IRS- — e �� 1kv l4 `MMMEkC] ,o I '. T M. Lt - IS all 9 ' 5 F CL P55 LI L III PG FLIP �IVF a sRICTEa Iaf ., P< L �nlryCUT N P ` AREA�OF EA.S1N PPCNIN0 TO NE✓ EI = O.6L85 A. "NO R[LEASE a OSO Ffl OETENTON REGUIRED2554 GO. AT DETENTION RROJIDE9: N. FT NET ADDITIONAL /MPERVICVS f PEA,: 3147 sr TOTAL ADDITIONAL RUNOFF 6E N E Rq TOY EV NEW HAROSVRFAC[ AND NEW &RAVEL S V R FC L k OVRIN4 RM 100 ✓R STORM a )OEL CV. FT SITE l5 LOCATED W THE CRONE-LR-POVDRF RIVER FLOOD PLAUJ 4 C U EYI5TIN0 CONTOUR FINISH CONTOVR EXISTING SPOT ELEVATII" BASf> 60vNDOR( FIKA a-n91s- N� /- OR O N � Z ALL 0 a H N h i — O OR u W Q O 0 W SIR o