Loading...
HomeMy WebLinkAboutDrainage Reports - 06/28/2002L�uvm City of Ft Collins Approved Plans I n. Approved By Dale% J 1-------- -pAQVMTry OF FINAL DRAINAGE AND EROSION CONTROLSTUDY ODELL BREWING COMPANY SECOND EXPANSION North Star �*mo, design, inc. I April 2, 2002 Basil Hamdan City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 rRE: Final Drainage and Erosion Control Study for Odell Brewing Company Second Expansion [-1 I 1, I I Dear Basil, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control Study for Odell Brewing Company Second Expansion. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Michael Oberlander, P.E., L.S.I. ii 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone • 970-686-1188 Fax FINAL DRAINAGE AND EROSION CONTROL STUDY ODELL BREWING COMPANY SECOND EXPANSION Prepared for: ODELL.BREWING COMPANY 800 East Lincoln Avenue Fort Collins, CO 80524 Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970) 686-6939 April 2, 2002 Job Number 114-23 TABLE OF CONTENTS �j TABLE OF CONTENTS ......................... 1. GENERAL LOCATION AND DESCRIPTION �. 1.1 Location...................................................................................................................1 1.2 Description of Property............................................................................................I 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................1 2.2 Sub -Basin Description.............................................................................................2 3. DRAINAGE DESIGN CRITERIA 3.1 .Regulations..............................................................................................................2 3.2 Development Criteria Reference and Constraints...................................... ..............2 ' 3.3 Hydrologic Criteria..................................................................................................3 3.4 Hydraulic Criteria....................................................................................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept.......................................................................................................3 4.2 Specific Flow Routing.............................................................................................4 4.3 Drainage Summary...................................................................................................5 5. EROSION CONTROL 5.1 General Concept......................................................................................................5 6. CONCLUSIONS 6.1 Compliance with Standards....................................................................................5 6.2 Drainage Concept.....................................................................................................5 1 7. REFERENCES....................................................................................................................6 APPENDICES A Vicinity Map B Detention and Water Quality Pond Sizing C Figures and Tables D Excerpts from Previous Reports I iii I J 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location ' This project is located on Lot 1 of the Odell Brewing Company Subdivision. This project is located in the Northeast Quarter of Section 12, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. The project is located on the north side of Lincoln Avenue. The project is bounded on the north by vacant land, on the east Fort Collins Monument and Stone Company, on the west ' by Lot 2 of the Odell Brewing Company Subdivision. 1.2 Description of Property Presently, the Odell Brewing Company site consists of an 18,000 square foot building housing the brewery as well as associated parking. There are two existing detention ponds on the site. The pond on the east side of the site straddles the lot line between Lots ' 1 and 2 and is within a Detention Pond Easement which was dedicated on the final plat. The entire site drains to the south and the detention ponds release into the Lincoln Avenue roadside ditch. Improvements proposed with this project include a 2700 square foot building expansion on the south end of the existing building as well as the addition of 7 parking spaces in the parking lot. The building expansion will encroach. into the existing west detention pond. This pond will be moved east and the Detention Pond Easement will be vacated in the building expansion area. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the Old Town Drainage Basin. Previous drainage reports for the site have determined the release rate for the site. The outfall point for this ■ site is the north roadside ditch on Lincoln Avenue. 1 2.2 Sub -basin Description This site was split into 2 sub -basins in previous reports. Both basins drain from north to south and releases into the north roadside ditch of Lincoln Avenue after being detained. This ditch flows to the east to Dry Creek and ultimately the Poudre River. The existing drainage patterns will remain with the proposed improvements. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations ' This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual" specifications. Where applicable, the criteria established in the ' "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver Regional Council of Governments, has been used. ' 3.2 Development Criteria Reference and Constraints This site has had drainage studies prepared with the initial construction and the first expansion of the brewery. The most recent reports are the "Final Drainage and Erosion ' Control Report for Odell Brewing Company Expansion" by Shear Engineering, September, 1995 and the "Amended Final Drainage and Erosion Control Report for Odell Brewing Company Expansion and Fort Collins Monument and Stone" by Shear Engineering, November, 1995. Portions of these reports can be found in the Appendix. Glen Schlueter specified the requirements for the Second Expansion in a fax dated January 4, 2002. These requirements are as follow: • The expansion areas (both building and parking) will need to detain to the present release rate based on the new 100 year storm. • The detention associated with the expansion will be added to the design detention from the previous drainage reports. • The west pond, which accepts runoff from the parking area, will have a water quality structure added to its outlet and have water quality volume provided for the parking area only. • The west pond will not be required to provide water quality. 2 '! Drainage areas, historic and developed flows, and pond volumes specified in the past drainage reports were not checked with this report; it is assumed that these calculations are correct. 3.3 Hydrologic Criteria Runoff computations were not prepared for this project. Additional detention volumes were calculated by prorating the release rate for the basin: ' Expansion Release = ((Total Basin Release / Total Basin Area) * Expansion Area) ' The FAA method for detention pond sizing was utilized to determine the additional required volume based on a proposed "C" value for the expansion area of 1.0. Water ' quality volume for the east parking area was calculated using the method recommended in the "Urban Storm Drainage Criteria Manual". 3.4 Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria and are included in the Appendix of this report. 4. DRAINAGE FACILITY DESIGN ' 4.1 General Concept ' The site is split into two drainage basins (east and west). Both basins have detention ponds which release to Lincoln Avenue. In the Addendum to the First Expansion Drainage Report, the east detention pond was expanded to accept and detain flows for approximately 0.67 acres of the Fort Collins Monument and Stone site which is east of the brewery. This pond will continue to accept these flows. All of the existing improvements for the Brewery (except for the west detention pond) are ' on Lot 1. Lot 2 flows are accounted for in the detention calculations, but this lot is presently vacant. All flow patterns will remain the same as they are presently. 1 3 r,� I 11 4.2 Specific Flow Routing A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin Iw is the west basin (3.84 acres) and includes the west half of the brewery building, Lot 2 of Odell Brewing Company Subdivision which is vacant and the property between Lot 2 and Third Street. The building expansion is included in this basin. The building will be. expanded to the south into the existing detention basin. This detention area will be filled for the building expansion and expanded to the west in an existing Detention Pond Easement on Lot 2 ' The required detention prior to. the expansion was 10,400 cubic feet, the additional detention required for the building expansion is 794 cubic feet, the spillway will be set at an elevation of 4942.5 and the top of the berm will be set at 4943.0. The release rate ' from this pond is 0.9 cfs. ' Basin Ie is the east basin (1.85 acres) and includes the east half of the brewery building, the existing parking lot and 0.67 acres of the Fort Collins Monument and Stone site. The parking lot expansion is included in this basin. The parking lot will expand into the existing detention pond. This pond will be modified to provide the new required ' - detention volume as well as water quality volume for the entire parking area. The required detention prior to the expansion was 8,457 cubic feet, the additional ' detention required for the parking expansion is 213 cubic feet, the required water quality volume is 1,000 cubic feet, the spillway will be set at an elevation of 4942.4 and the top ' of the berm will be set at 4942.5. The release rate from this pond is 1.4 cfs. ' An error in the "Amended Final Drainage and Erosion Control Report for Odell Brewing Company Expansion and Fort Collins Monument and Stone" by Shear Engineering, November, 1995 was found with respect to the east pond volume. The calculations in this report show that the required volume was achieved at an elevation of 4942.5 but the spillway of the pond was set at 4942.1. Field survey verified that this pond is presently smaller than required. It is proposed to fill the existing spillway and provide a spillway that is 0.1 feet deep and 30 feet wide. The required volume can be achieved at this ' elevation. This spillway does not meet City criteria, but in the event of an outlet failure, 4 the pond will overflow to the south (Lincoln Avenue) and no buildings or other property will be damaged. ' 4.3 Drainage Summary ' This project will simply modify existing detention and outlet facilities to accommodate the proposed expansion — drainage patterns will be unchanged. All drainage facilities (including the detention ponds and inlets) will be maintained by the owner of the site. ' 5. EROSION CONTROL ' 5.1 General Concept r I H I J Erosion control for this project will simply include the placement of silt fence on the downstream side of disturbed areas and straw bales placed at the pond outlets to act as inlet protection. It is expected that construction will be staged out of the existing parking area. 6. CONCLUSIONS 6.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm Drainage Design Criteria Manual. Requirements set by Glen Schlueter for this project have been followed. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater detention of improved areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Pen -nit would be required. 5 7. REFERENCES 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. 3. "Final Drainage and Erosion Control Report for Odell Brewing Company Expansion" by Shear Engineering, September, 1995. 4. "Amended Final Drainage and Erosion Control Report for Odell Brewing Company Expansion and Fort Collins Monument and Stone" by Shear Engineering, November, 1995. 6 I 1 i I I 1 APPENDIX A VICINITY MAP A r IN Mur LLJ i Q�Oe Q y� LLJ U LLI _j Trimble J J O Ct U VIN DRIVE /-Burlington Northern / Railroad j Center Dr p '. c / Cw. �pvc0Cn Buckingham St / PROJE T LJ o -o °a� / 0,� SITE > Logan a s1 ° i d Loa n Ct i- j Ave Q V a*. 2 ;? o - Ld E Lincoln Ave 5` VICINITY MAP N.T.S. I o St :jnlsto St o St I� APPENDIX B ' DETENTION AND WATER QUAILTY CALCULATIONS 11 1 r M. MINIMUM ADDITIONAL WEST DETENTION VOLUME REQUIRED FAA METHOD (100-YEAR) LOCATION: ODELLS EXPANSION 2 WEST POND PROJECT NO: l 14-23 COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 3/26/02 Equations: A trib. To pond = 0.069 acre Building expansion Qo = CIA C (100) = 1.000 Vi = T C I A= T Qo Developed C A= 0.069 acre Vo =K QPo T QPo = 0.016 CIS (0.23 cfs/acre) S=Vi -Vo K= 1 (from fig2.1) Rainfall intensity from City of Fort Collins IDF Curve Storm Duration, T (min) Rainfall Intensity, I (in/hr) Qp (cfs) Vol. In Vi (ft') Vol. Out Vo (ft) Storage - S (ft) Storage I S (ac-ft) 5 9.95 0.69 206 5 201 0.0046 10 7.72 0.53 319 10 310 0.0071 15 6.52 0.45 404 14 390 0.0090 20 5.60 0.39 463 19 444 0.0102 25 4.98 0.34 514 24 491 0.0113 30 4.52 0.31 560 29 532 0.0122 35 4.08 0.28 590 33 557 0.0128 40 3.74 0.26 618 38 580 0.0133 45 3.46 0.24 643 43 601 0.0138 50 3.23 0.22 667 1 48 620 0.0142 55 3.03 0.21 689 52 636 0.0146 60 2.86 0.20 709 57 652 0.0150 65 2.73 0.19 733 62 671 0.0154 70 2.60 0.18 752 67 686 0.0157 75 2.47 0.17 765 71 694 0.0159 80 2.34 0.16 774 76 698 0.0160 85 2.25 0.15 790 81 710 0.0163 90 2.16 0.15 803 86 718 0.0165 95 2.07 0.14 813 90 722 0.0166 100 1.99 0.14 822 95 727 0.0167 110 1.87 0.13 850 105 745 0.0171 120 1.75 0.12 868 114 754 0.0173 130 1.66 0.11 892 124 768 0.0176 140 1.57 0.11 908 1 133 775 0.0178 150 1.48 0.10 917 143 775 0.0178 160 1.42 0.10 939 152 787 0.0181 170 1.36 0.09 955 162 794 0.0182 180 1.29 0.09 960 171 788 0.0181 190 1.23 0.08 966 181 785 0.0180 200 1.17 0.08 967 190 777 0.0178 Required Storage Volume: 794 W 0.0182 acre-ft ODELL'S EXPANSION 2 Proposed West Detention Pond - Stage/Storage LOCATION: ODELLS EXPANSION 2 WEST POND PROJECT NO: 114-23 COMPUTATIONS BY: MPO SUBMITTED BY: NORTH STAR DESIGN, INC. DATE: 3/27/02 V= 1 /3 d( A+ B+ sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Water Quality Volume Required = 0 CF Detention Volume Required = .11194 CF 10,400+794 Total Volume Required = 11194 CF 100 YR WSEL Stage (ft) Surface Area (ft`) Incremental Storage (ft) Total Storage (ft') 40.0 0 40.5 640 107 107 41.0 2130 656 763 41.5 5350 1809 2572 42.0 9350 3629 6201 42.5 12010 5326 11527 43.0 15560 6873 18401 detenticn.xls ODELL'S EXPANSION 2 West Detention Pond Outlet Sizing (100 yr event) LOCATION: ODELLS EXPANSION 2 WEST POND PROJECT NO: 114-23 COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 3/26/02 Submerged Orifice Outlet: ' release rate is described by the orifice equation, Qo = C,A, sqrt( 2g(h-E,)) where Qo = orifice outflow (cfs) ' Co = orifice discharge coefficient g = gravitational acceleration = 32.20 ft/s Ao = effective area of the orifice (ft`) Eo = geometric center elevation of the orifice (ft) h = water surface elevation (ft) Pond Outlet Q. = 0.90 cfs outlet pipe dia = D = 12.0 in Invert elev. = 39.90 ft ' Eo = 40.10 ft h = 42.50 ft - WSEL Co = 0.61 ' solve for effective area of orifice using the orifice equation A. = 0.119 ft` ' = 17.1 in` orifice dia. = d = 4.66 in ' Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/ D = 0.39 kinematic viscosity, v = 1.22E-05 ftz/s Reynolds no. = Red = 4Q/(ndv) = 2.42E+05 ' Co = (K in figure) = 62 check Use d = 4.5 in Ao = 0.110 ft` = 15.90 in Qmax = 0.84 cfs ' detention.xls ODELL'S WEST POND OUTLET PIPE Worksheet for Circular Channel Project Description Project File d:\haestad\fmw\culvert.fm2 Worksheet CULVERT Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth ' Input Data Mannings Coefficient 0.009 Channel Slope 0.004000 ft/ft Diameter 12.00 in ' Discharge 0.90 cfs ¢-- et�T F:p M Results 0� Depth 0.36 ft Flow Area 0.25 ftz ' Wetted Perimeter 1.29 ft Top Width 0.96 ft Critical Depth 0.40 ft Percent Full 35.95 ' Critical Slope 0.002754 ft/ft Velocity 3.54 ft/s Velocity Head 0.19 ft ' Specific Energy 0.55 ft Froude Number 1.21 Maximum Discharge 3.50 cfs ' Full Flow Capacity 3.25 cfs Full Flow Slope 0.000306 ft/ft Flow is supercritical. '03/28/02 09:24:47 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.15 Page 1 of 1 ODELL'S EXPANSION 2 West Emergency Overflow Spillway Sizing LOCATION: ODELLS EXPANSION 2 WEST POND PROJECT NO: 114-23 COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 3/26/02 Equation for flow over weir top of berm Q = CLH3'2 i apiVl elevation where C = weir coefficient = 3.1 _� H = overflow height L = length of the weir 0 100 yr WSEL Spillway will be designed with max 0.5 ft flow depth, H = 0.3 ft Size the spillway assuming that the pond outlet is completely clogged. . Q (100) = 6.0 cfs Spill elev = 42.50 ft Min top of berm elev.= 43.00 Weir length required: L= 12 ft Use L = 15 ft v = 1.08 ft/s (FROM SHEAR REPORT) . 100 yr WSEL = 42.50 ft detentionAs 1 1 1 1 1 1 1 1 1 MINIMUM ADDITIONAL EAST DETENTION VOLUME REQUIRED FAA METHOD (100-YEAR) LOCATION: ODELL'S ADDITIONAL EAST POND (7 PARKING SPACES) PROJECT NO: 114-23 COMPUTATIONS BY: MPO SUBMITTED.BY: North Star Design DATE: 3/26/02 Equations: A trib. To pond = 0.028 acre 7 parking spaces Qo = CIA C (100) = 1.000 Vi = T C I A= T Qo Developed C A= 0.028 acre Vo =K QPo T QPo = 0.021 cfs (0.76 cfs/acre) S=Vi -Vo K= 1 (from fig2.1) Rainfall intensity from City of Fort Collins OF Curve Storm Duration, T (min) Rainfall Intensity, I (in/hr) Qo (cfs) Vol. in Vi (ft) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 0.27 82 6 76 0.0017 10 7.72 0.21 128 13 115 0.0026 15 6.52 0.18 162 19 143 0.0033 20 5.60 0.15 185 25 160 0.0037 25 4.98 0.14 206 31 174 0.0040 30 4.52 0.12 224 38 186 0.0043 35 4.08 0.11 236 44 192 0.0044 40 3.74 0.10 247 50 197 0.0045 45 3.46 0.10 257 57 201 0.0046 50 3.23 0.09 267 63 204 0.0047 55 3.03 0.08 275 1 69 206 10.0047 60 2.86 0.08 284 75 208 0.0048 65 2.73 0.08 293 82 212 0.0049 70 2.60 0.07 301 88 213 0.0049 75 2.47 0.07 306 94 212 0.0049 80 2.34 0.06 309 100 209 0.0048 85 2.25 0.06 316 107 209 0.0048 90 2.16 0.06 321 113 208 0.0048 95 2.07 0.06 325 119 206 0.0047 100 1.99 0.05 329 126 203 0.0047 Required Storage Volume: 213 W 0.0049 acre-ft 3/26/02 i 1 1 1 I LOCATION: Odell Brewery Expansion 2 ITEM: East Water Quality Pond Sizing COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design, Inc From Urban Strom Drainage Criferial Manual, March 1969 (Referenced figures are attached in Appendix D) Use 40-hour brim -full volume drain time for extended detention basin Water Quality Capture Volume = WQCV = (required storage/12)'(tributary drainage area) MAJOR BASIN Trib. area (ac) % Imperv. Req. Storage (in: of runoff) from Fig. 5.1 WQCV (CF) DwQ (ft) req. vol WQCV "1.2 (ac-ft) req. area/row (in'/row) from Fig. 5-3 EAST POND PARKING 0.50 100.0 0.5 900 1.00 1080 0.15 WQ'outlet sizing for pond 1 From Figure 5, for 7/16 in. hole diameter Area of hole = 0.15 in # of columns = 1 Area provided/row = 0.15 inz Area Required/row = 0.15 in Use 1 columns of 7116" diam holes WQVOL.xls 1 1 1 i 1 1 1 1 i 1 1 1 1 1 1 1 detention.xls ODELL'S EXPANSION 2 Proposed East Detention / Water Quality Pond - Stage/Storage LOCATION: ODELLS EXPANSION 2 EAST POND PROJECT NO: 114-23 COMPUTATIONS BY: MPO SUBMITTED BY: NORTH STAR DESIGN, INC. ° DATE: 3/28/02 V=1/3d(A+B+sgrt(A"B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Water Quality Volume Required = 1080 CF Detention Volume Required = 8670 CF (8457+213) _ Total Volume Required = 9750 CF WQ ELE\ 100 YR WSEL Stage (ft) Surface Area (ft`) Incremental Storage Total Storage 39.1 0 39.5 380 51 51 40.0 1080 350 401 40.45 1836 649 1049 40.5 1920 740 1141 41.0 2920 1201 2342 41.5 3930 1706 4048 42.0 6300 2534 6583 42.4 10284 3284 9867 42.5 11280 1078 10945 ODELL'S EXPANSION 2 ' East Detention Pond Outlet Sizing (100 yr event) LOCATION: ODELLS EXPANSION 2 EAST POND PROJECT NO: 114-23 COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 3/26/02 Submerged Orifice Outlet: release rate is described by the orifice equation, % = C.A. sgrt( 2g(h-Eo)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.20 ft/s Ao = effective area of the orifice (ft`) Eo = geometric center elevation of the orifice (ft) h = water surface elevation (ft) Pond Outlet �+ Qo = 1.40 cfs outlet pipe dia = D = 12.0 in Invert elev. = 39.10 It Eo = 39.33 ft h= 42.40 ft -WSEL Co = 0.62 solve for effective area of orifice using the orifice equation Ao = 0.161 ft` = 23.1 in` orifice dia. = d = 5.43 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/ D = 0.45 kinematic viscosity, v = 1.22E-05 ft2/s Reynolds no. = Red = 4Q/(?cdv) = 3.23E+05 Co = (K in figure) = 0.62 check Use d = 5.5 in A o = 0.165 ft' = 23. 76 in Qmax = 1.44 cfs I 1� detention.xls ODELL'S EAST POND OUTLET PIPE Worksheet for Circular Channel Project Description Project File d:\haestad\fmw\culvert.fm2 Worksheet CULVERT Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.009 Channel Slope 0.005700 ft/ft . Diameter 12.0 Discharge 1.40 cf s ® FzOM StiF.A� Results Depth 0.42 ft O � Flow Area 0.31 ft' Wetted Perimeter 1.40 ft Top Width 0.99 ft Critical Depth 0.50 ft Percent Full 41.50 Critical Slope 0.002945 ft/ft Velocity 4.54 ft/s Velocity Head Specific Energy 0.32 ft 0.74 ft Froude Number 1.43 Maximum Discharge 4.18 cfs Full Flow Capacity 3.89 cfs Full Flow Slope 0.000740 ft/ft Flow is supercritical. 11 I I�03/28/02 FlowMaster v5.15 09:25:09 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 ODELL'S EXPANSION 2 East Pond Emergency Overflow Spillway Sizing LOCATION: ODELLS EXPANSION 2 EAST POND PROJECT NO: 114-23 CONIPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 3/26/02 Equation for flow over weir _ top of berm Q = CLH3rz + spill elevation where C =weir coefficient = 3.1 L H = overflow height L = length of the weir 0 100 yr WSEL Spillway will be designed with max 0.1 ft flow depth, H = 0.1 ft Size the spillway assuming that the pond outlet is completely clogged. Q = 3.0 cfs Spill elev = 42.40 ft Min top of berm elev.= 42.50 Weir length required: L= 31 ft Use L = 30 ft v = 0.59 ft/s 100 yr WSEL = 42.40 ft This spillway is shallow to provide for adequate detention volume which was not provided in past reports. The spillway has a capacity of 2 times the design discharge from the pond. detentionAs I n 2231MsX4 FIGURES AND TABLES 1' I I 1 DRAINAGE CRITERIA MANUAL N. 3) A 0. Ef Le 9-1-1992 UDFCD STORMWATER QUALITY MANAGEMENT 5 i M ntlo time Basi (Dry) 1 1 K-Hour Pon rain s (Wet) lme U eu Ju 40 50 60 70 80 90 100 Percent Impervious Area in Tributary Watershed . Source:Urbanos, Guo. Tucker (1989) Note: Watershed inches of runoff shall apply to the entire watershed tributary to the BMP Facility. FIGURE 5-1. WATER QUALITY CAPTURE VOLUME (WQCV) DRAINAGE CRITERIA MANUAL(V. 3) 0.6C m m 0.4C m v E > 0.2C m n m U 0.1C C7 0.0E 0.04 D"OZ4 0.02 0.01 0.02 STRUCTURAL BMPs mommmommip'Adrup'A"IrA PA m EmrYVAN VA NINA = 2 1 acre-feeti WQCv -,- --,j SOLUTION: Required Area per rid, A iA MINEV54004112A op'or dF4A ra 4 &JA'AIA ENEWAAME A JJAEA VAIAPAA FEPJA 1 VJA V4JJ iAAAWA PAF rJEA IN I Ar molmol IN 1001011 WA PA PJA 10010111 0.04 0.06 0.10 0.20 0.40 0.60 1.0 2.0 4.0 6.0 Required Area per Row (in.2 ) Source: Douglas County Storm Drainage and Technical Cntada, 1986. FIGURE 5-3. WATER QUALITY OUTLET SIZING: DRY EXTENDED DETENTION BASIN WITH A 40-HOUR DRAIN TIME OF THE CAPTURE VOLUME Rev. 3-1-1994 UDFCD 280 S Closed Conduit Floes ... Ree_Ivr2g&h do v� K .ter ,M. IO} I 10° 1.2 _ Rey _ 4Q ads, 0 Figure 5-21 Flow coefficient K and Rea/K versus the Reynolds number for orifices, nozzles, and venturi meters (20, 23) top scale with the slanted lines to determine K for given values of d, D, Oh and v. With K, we can then solve for Q from Eq. (5-31). The literature on orifice flow contains many discussions concerning the optimum placement of pressure taps on both the upstream and' downstream side of the orifice. The data given in Fig. 5-21 are for "corner taps." That is, on the upstream side, the pressure readings were taken immediately upstream of the plate orifice (at the corner of the orifice plate and the pipe wall), and the downstream tap was at a similar downstream location: However, pressure data from flange taps (1 in. upstream and 1 in. downstream) and from the taps shown is Fig. 5-19 all yield virtually the same values for K—the differences are no greater than the deviations involved in reading Fig. 5-21.` 0 For more precise values of K with specific types of taps, see the ASMF report on fluid meters (20). I 1 fJ 11 I i 1 I I [I I APPENDIX D EXCERPTS FROM PREVIOUS REPORTS ro !J 10, SHEAR Final Drainage and Erosion Control Report for ODELL BREWING COMPANY EXPANSION Fort Collins, Colorado Prepared for: Odell Brewing Company 800 East Lincoln Avenue Fort Collins, Colorado 80524 Prepared by: Shear Engineering Corporation Project No: 1485-01-95 Date: September, 1995 /a,/. c !'..II r•o� Cnlrr 12 6r Cnllinc Cr) RW;??) (970) 226-:;:�44' FAX (970) 282-0� 1 1 I I I UI P September 29, 1995 SHEAR ENGQiEEAING ' Project No: 1485-01-95 enxeoAnTunr Basil Hamdan 00,00 City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Odell Brewing Company Expansion; Fort Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for the Odell Brewing Company Expansion. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March, 1984, and the Erosion Control Reference Manual. The Report and Plans have been revised according to your comments dated August 14, 1995. If you have any questions or comments, please call me or Mark Oberschmidt at 226-5334. Shear Engineering Corporation BWS / meo cc: Doug and Wynne Odell 11 4836 S. Colle-e, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-0311 I Page 1 Final Drainage and Erosion Control Report Project No: 1485-01-95 I. GENERAL LOCATION AND DESCRIPTION: A. Location 1. The proposed Odell Brewing Company Expansion is located in the northeast 1/4 of Section 12, T7N, R69W of the 6th P.M., Fort Collins, Colorado. ' 2. More specifically, it is located at 800 East Lincoln Avenue. The project site is located in the northeast section of Old Town Fort Collins near the Poudre Rivcr. 1 3. The site is bounded on the south (across the street) by Link-n-Greens golf course, on the east by Fort Collins Monument and Stone, on the west by single family residential' development along Third Street, and on the north by vacant land. 4. The site is within the Poudre River floodplain. The. projected elevation of .the 100- year flood, as shown on the recently revised City of Fort Collins Flood Insurance Rate Map dated March 31, 1995 and endorsed by the Federal Emergency Management Agency (FEMA), varies across the site from west to east from-4945 feet to 4943.5 feet respectively. This revised map was provided by the Stormwater Utility. B. Description of Property 1. There is an existing 8000 square foot brewery and retail store on the 1.94 acre site (Lot 1, Subdivision plat of Odell Brewing Company). The brewery was built in 1994 and includes parking and loading areas. Detention was also provided. 2. The proposed expansion will consist of a 10,500 square foot addition to the existing building. ' 3. The site is located on Lot 1 of a 2 lot subdivision which was done as part of the original development of the Odell Brewing Company project. It is our understanding that lot 2 will not be developed at this time. It is our understanding that both lots are owned by the Odell Brewing Company. IL DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is located within the Old Town Basin as defined on the City of Fort Collins ' Master Stormwater Basin Map. a. The Basin fee rate for this basin is $4,150.00 per gross acre according to the development fee section of the City of Fort Collins Development Manual. It is our understanding that this may be reduced if detention is provided. 2. The flow pattern of this portion of Old Town Basin is generally easterly and southerly to the Cache La Poudre River. It is highly channelized as it is almost completely developed. Street and roadside ditches are the primary means of stormwater conveyance at this time. Page 2 Final Drainage and Erosion Control Report Project No: 1485-01-95 rII. DRAINAGE BASINS AND SUB -BASINS: ' A. Major Basin Description (continued) 3. It is our understanding, that there is no Master Drainage Plan presently in place for ' this area. 4. There are no irrigation facilities located on site or within 100' of the site. ' B. Sub -Basin Description 1. Runoff from the site flows to the east and southeast in an open ditch along the north side of East Lincoln Avenue. The ditch discharges into Dry Creek which in turn conveys the runoff to the Cache la Poudre River. 2. The site has approximately four (4') feet of relief from west to east in lot 1. 3. The proposed grading around the building will amend the two, (2) existing defined sub -basins defined by Water, Waste and Land Inc. (WWL) in the original drainage report for the Odell Brewing Company site. The sub -basins are on the east and west sides of the building (Sub -basins Ie and Iw). Lot 2 is located in Sub -basin Iw. Runoff from both Sub -basins will be routed through the detention ponds and out to the ditch on the north side of East Lincoln Avenue. 4. A small portion of the existing site (0.07 acres) drains directly into the ditch along the ' north side of East Lincoln Avenue. This was approved with the original and the amended report. M. DRAINAGE DESIGN CRITERIA: A. Regulations 1. Design Criteria from the City of Fort Collins Storm Drainage Design Criteria Manual and options for storm drainage improvements discussed by the City of Fort Collins were considered. B. Development Criteria Reference and Constraints 1. There are plans for widening East Lincoln and installing sidewalk on both sides of the street. This widening will also require the installation of storm sewer infrastructure. The storm sewer will replace the existing ditch along the north side of East Lincoln Avenue. It is our understanding, that these improvements will not happen in the immediate future. 2. There are two (2) existing detention ponds on the site that were constructed with the existing brewery in 1994. The existing outlets from the ponds convey stormwater runoff into a ditch along the north side of East Lincoln Avenue. These outlets will require modifications when the street widening is done. Page 3 Final Drainage and Erosion Control Report Project No: 1485-01-95 ' M. DRAINAGE DESIGN CRITERIA: B. Development Criteria Reference and Constraints (continued) 3. Detention is required in Old Town Basin. Detention ponds which were constructed with the original brewery will be expanded as necessary to facilitate the increase in runoff created by the expansion of the brewery. When Lot 2 to the west is developed, the pond on the west side of lot 1 will require further expansion. Easements are ' provided for this purpose. 4. During the approval process for the original brewery located on lot 1, it was decided that detention volumes would only be designed to accommodate the development of lot 1. Refer to the The Odell.Brewery Site - Amendment No. 1 to the Final Approved (3/11/94) Drainage and Erosion Control Report Dated May 9, 1994 (included in Appendix H of this report for reference). Therefore, the required pond size was reduced from that which was indicated in the original approved drainage report for ' the site. The change is listed in the table below. It must be noted here that there was an inconsistent use of units defining the required storage volume and the as -built storage volume of the two (2) detention ponds between the letter of the report and the calculations. This consisted of the use of cubic yards in the letter and cubic feet in the calculations. We have determined that the correct unit for the storage volume of the detention ponds is cubic feet. REQUIRED VOLUME IN DETENTION PONDS ' East Pond cubic feet West Pond cubic feet Original report 4,535 23,379 Amended report 4,535 10,400 ' VOLUME PROVIDED IN PONDS PER AS-BUILTS 4,591 11,093 C. Hydrological Criteria 1. The detention pond volumes were analyzed utilizing the same assumptions that were used in the original and amended reports by Water, Waste and Land Inc. The maximum allowable release rate is based on the peak 2-year 'flow for historic conditions as per the requirements of the Stormwater Utility and determined by WWL. ' 2. Revised detention pond volumes were determined using the Mass Diagram Method (Cumulative Runoff Method). The maximum allowable release rate is based on the peak 2-year flow for historic conditions which was provided by Water, Waste and Land Inc. in the original report for the Odell Brewing Company. Page 4 Final Drainage and Erosion Control Report Project No: 1485-01-95 ' M. DRAINAGE DESIGN CRITERIA: ' D. Hydraulic Criteria 1. Storm sewer and drainage channel capacities were based on the Mannings Equation. The Mannings coefficients are as suggested by the City of Fort Collins Storm Drainage Criteria Manual. IV. DRAINAGE FACILITY DESIGN: ' A. General Concept 1. The grading will create a high point at the rear of the proposed expansion (north side of the site). This high point along with the planned roof patterns will create a ridge running north to south through the property. Stormwater will be conveyed east and west from the ridge via overland and gutter flow. 16 2. Detention was provided with the original site development. Additional storage volume is required with the proposed expansion. B. Specific Details 1. The existing easternmost detention pond is situated on the east side of the access drive to the site. The following design data for the initial Odell Brewing Company site design was obtained from The Odell Brewery Site - Amendment No. 1 to the Final Approved (3/11/94) Drainage and Erosion Control Report, Dated May 9, 1994; artd•as-built information regarding the east detention pond. a. The required volume for the existing east detention pond (for initial design considerations) was determined to be 4535 cubic feet based on a total contributing area of 1.24 acres. The total available storage volume in the existing east pond is 4591 cubic feet. b. The maximum allowable release rate from the east pond is 0.90 cubic feet per second. The historic peak flow for the 2-year storm is used as the maximum allowable release rate from the east detention pond. Refer to pages 5 - 7 of WWL calculations in Appendix III ' c. The top of the east pond is at an elevation of 42.50 feet. 2. The existing westernmost detention pond is situated on the west side of the access ' drive to the site. The following data was taken from The Odell Brewery Site - Amendment No. 1 to the .Final Approved (3/11/94) Drainage and Erosion Control Report, Dated May 9, 1994 and as -built information regarding the west detention pond. i J Page 5 Final Drainage and Erosion Control Report Project No: 1485-01-95 ' IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) a. The required volume for the west detention pond (for initial design I considerations) is 10,400 cubic feet based on a total contributing area of 3.78 acres. This includes Lot 2 which is undeveloped at this time. The total available storage volume in the west pond is 11093 cubic feet. I i. Future expansion of the west pond will be required when lot 2 is developed. b. The maximum allowable release rate from the west pond is 0.9 cubic feet per second. The historic peak flow for the 2-year storm is used as the release rate from the detention pond. Refer to pages 5 - 7 of WWL calculations in Appendix c The top of the west pond is at an elevation of 42.50 feet. 3. The outfalls for the detention ponds will not be modified with this project. 4. The expansion of the brewery will require additional detention volume in the east ' pond only. Refer to pages 1-4 of the calculations in Appendix I for comparison of 'C' factors for the existing site and the site after the expansion. Refer to pages 5-6 of the calculations in Appendix I for the determination of detention volumes required due to ' the expansion. Refer to page 7 of the calculations in Appendix I for the volume provided in the east pond. The following table summarizes detention requirements for site. DETENTION POND SUMMARY East Pond. West Pond ' cubic feet cubic feet Original approved report . 4,535 23,379 Amended approved report 4,535 10,400 Volume provide in ponds per As-Builts 4,591 11,093 ' Required due to 4,974 11,059 pond volume expansion Additional volume required in ponds 383 none Total volume provided in ponds 7,724 11,093 There is approximately 0.50' of freeboard available Page 6 Final Drainage and Erosion Control Report Project No: 1485-01-95 ' V. EROSION CONTROL: A. General Concept 1. Erosion control measures are identified on the Master Drainage and Erosion Control plan. a. Maintenance of erosion control devices will remain the responsibility of the ' owner until the project is complete. B. Specific Details 1. Haybale dikes will be provided at the detention pond outlet structures only. 2. The site is generally self contained with all developed flows being conveyed to the detention ponds. Therefore, no other erosion control provisions are necessary. VI. EROSION CONTROL SECURITY DEPOSIT: A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C : SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. 1. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. i The cost to install the proposed erosion control measures is approximately $250.00. Refer to the cost estimate attached in Appendix I. 1.5 times to install the erosion control measures is $375.00. ii. Based on current data provided by the City of Fort Collins Storm Water Utility, ' and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 0.5 acres), we estimate that the cost to re - vegetate the disturbed area will be $ 650.00 ($1,300.00 per acre x 0.5 acres). 1.5 times the cost to re -vegetate the disturbed area is $975.00. The $1300.00 per acre for re -seeding sites of less than 1.0 acres was quoted to us by the City of Fort Collins Stormwater Utility staff. ' 2. The erosion control security deposit amount required for this project will be $1,000.00. See the Erosion Control Security Deposit Requirements document located in Appendix IV. 3. The erosion control security deposit is reimbursable. No deposit will be required at this time, since the deposit from the initial project has never been reimbursed to the owner. Page 7 Final Drainage and Erosion Control Report Project No: 1485-01-95 ' VII. VARIANCE FROM CITY STANDARDS ' A. Variance from City of Fort Collins requirements 1. No variances from the City of Fort Collins Stormwater Utility standards are requested for ' this project. ' VII. CONCLUSIONS: A. Compliance with Standards ' 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual. 2. Proposed drainage improvements generally conform with the recommendations of the City of Fort Collins Master Drainage Plan and the original drainage and erosion control report for this project site. 3. Proposed erosion control measures generally conform with the recommendations of the City of Fort Collins standards. B. Drainage Concept 1. The proposed drainage design for the Odell Brewing Company expansion is effective ' for the control of storm runoff with absolutely no downstream effects. 2. The proposed drainage design for the Odell Brewing Company expansion will have absolutely no effect on City of Fort Collins Master Drainage Plan recommendations. IX. REFERENCES: 1. City of Fort Collins "Storm Drainage Design Criteria and Construction Standards'; May, 1984 ' 2. City of Fort Collins "Erosion Control Reference Manual"; January, 1991 3. Drainage and Erosion Control Report for Odell Brewery Site; Prepared by Water, ' Waste & Land, Inc.; Project No. 404.2; Dated March 1, 1994; Approved 3/11/94 4. The Odell Brewery Site - Amendment No. 1 to the Final Approved (3/11/94) Drainage and Erosion Control Report; Dated May 9, 1994; Approved 6/13/94 1 1 APPENDIX I Drainage Calculations Erosion Control Calculations [1 11 FLOW SUMMARY FOR ODELL'S BREWERY EXPANSION DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc 12 I10 I100 Q2 Q10 Q100 DESIGN POINT SUB 2,10 100 BASIN(S) ac. min. min iph iph iph cfs cfs CEB rrr rrrrrrrr+rrrr+r++rrrrerrrr»rrrrrrrwrrtrrr•rrrr rrtrrwrrrrr rr rrr rrr r♦+wtrrwtrrrrrrrrr rr rrrrrrrrrrrrr E Ie 1.18 0.66 0.66 0.83 10.00 10.00 2.54 4.45 7.14 1.98 3.47 6.99 DST POND W 1W 3.84 0.29 0.29 0.36 34.50 33.00 1.34 2.40 3.97 1.49 2.67 5.488 DST POND STREET Io 0.07 0.73 0.73 0.91 5.00 5.00 3.29 5.64 9.30 0.17 0.29 0.592 UNDETAINED THESE FLOWS ARE FOR REFERENCE ONLY. ALL DETENTION CALCULATIONS ARE BASED ON CUHP METHOD. REFER TO PAGES 5 AND 6 OF CALCULATIONS IN REPORT 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 M 1 SHEAR ENGINE&RING CORPORATION EXISTING CONDITIONS COMPOSITE 'C' FACTOR FOR EAST BASIN PAGE 1 PROJECT :ODELL'S MICRO -BREWERY EXPANSION PROJ.NO. :1485-01-95 DATE: 07/22/95 LOCATION :800 E LINCOLN BY: MHO FILE :ODELCOEF NOTES :PRIOR TO EXPANSION RUNOFF SURFACE COEF. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 0.080 0.950 0.076 CONCRETE 0.000 0.950 0.000 GRAVEL 0.220 0.500 0.110 ROOPS 0.120 0.950 0.114 LAWNS SANDY SOIL FLAT < 24 0.000 0.100 0.000 AVERAGE 2 - 7% 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 21k 0.290 0.200 0.058 AVERAGE 2 - 74 0.530 0.250 0.133 STEEP >-7% 0.000 0.350 0.000 TOTAL AREA 1.240 0.491 C2 C10 C100 COMPOSITE C VALUE 0.396 0.396 0.494 USE 0.4 0.4 0.5 CONCLUDE: COMPARE WITH 'C' FACTOR BY WWL FOR ORIGINAL DEVELOPMENT PLAN C2 & C10 = 0.34 C100 0.43 HISTORIC CONDITIONS PRIOR TO ANY BUILDING C2 & C10 = 0.2 C100 = 0.25 1 SHEAR ENGINEERING CORPORATION DEVELOPED CONDITIONS COMPOSITE 'C' FACTOR FOR EAST BASIN PAGE 2 1 PROJECT :ODELL'S MICRO -BREWERY EXPANSION PROJ.NO. :1485-01-9$ DATE: 09/06/95 LOCATION :800 E LINCOLN BY: MEO FILE :ODELCOEF NOTES :POST EXPANSION ' RUNOFF SURFACE COST. CHARACTERISTICS AREA C C+A (acres) STREETS ASPHALT 0.430 0.950 0.409 CONCRETE 0.070 0.950 0.067 GRAVEL 0.000 0.500 0.000 ROOPS 0.210 0.950 0.200 LAWNS SANDY SOIL ' FLAT < 24 0.000 0.100 0.000 AVERAGE 2 - 7% 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 ' LAWNS HEAVY SOIL FLAT < 21, 0.240 0.200 0.048 AVERAGE 2 - 73 0.230 0.250 0.058 STEEP > 74 0.000 0.350 0.000 TOTAL AREA 1.180 0.780 tC2 C10 C100 COMPOSITE C VALUE 0.661 0.661 0.826 ' USfi 0.66 0.66 0.83 CONCLUDE: HISTORIC CONDITIONS PRIOR TO ANY BUILDING C2 fi C10 0.2 C100 0.25 ' EXISTING CONDI' SHEAR ENGINEERING CORPORATION NS COMPOSITE 'Cl FACTOR FOR WEST BASIN PAGE 3 PROTECT :ODSLL'S MICRO-BRSWERY EXPANSION PROT.NO. :1485-01-95 DATE: 07/22/95 LOCATION :800 8 LINCOLN BY: MEO PILE :ODBLCOEF NOTES :PRIOR TO EXPANSION RUNOFF SURFACE CORP. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 0.000 0.950 0.000 CONCRETE 0.000 0.950 0.000 GRAVEL 0.000 0.500 0.000 LOT 2 - 2 1.550 0.200 0.310 ROOPS 1 0.290 0.950 0.276 LAWNS SANDY SOIL FLAT < 2% - 0.000 0.100 0.000 AVERAGE 2 - 73 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 LAWNS HEAVY SOIL PLAT < 2. 1.070 0.200 0.214 AVERAGE 2 - 7% 0.870 0.250 0.218 STEEP > 74 0.000 0.350 0.000 ' TOTAL AREA 3.780 1.017 C2 CIO C100 COMPOSITE C VALUE 0.269 0.269 0.336 USE 0.27 0.27 0.34 ' NOTES: 1 - ROOF INCLUDES 0.17 AC FROM HOUSES ON 3RD ST 2 - C FACTOR FOR LOT 2 IS TAKEN FROM TABLE 3-3 LAWNS ,HEAVY SOIL, PLAT < 2% ' HISTORIC CONDITIONS PRIOR TO ANY BUILDING C2 & CIO 0.2 C100 = 0.25 SHEAR ENGINEERING CORPORATION DEVELOPED CONDITIONS ' COMPOSITE 'C' FACTOR FOR WEST BASIN PAGE 4 PROJECT :ODELL'S MICRO -BREWERY EXPANSION PROJ.NO. :1485-01-95 DATE: 07/22/95 LOCATION :800 B LINCOLN BY: MBO FILE :ODELCOEF NOTES :POST EXPANSION ' RUNOPP SURFACE COBF. CHARACTERISTICS AREA C C+A ' (acres) STREETS ASPHALT 0.000 0.950 0.000 ' CONCRETE 0.000 0.950 0.000 GRAVEL 0.000 0.500 0.000 . LOT 2 - 2 1.550 0.200 0.310 ROOFS-1 0.390 0.950 0.371 ' LAWNS SANDY SOIL _ FLAT < 2% 0.000 0.100 0.000 AVERAGE 2 - 7t 0.000 0.150 0.000 - STEEP > 7t 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 21% 1.100 0.200 0.220 AVERAGE 2 - 7t 0.800 0.250 0.200 STEEP > 7t 0.000 0.350 0.000 ' TOTAL AREA 3.840 1.101 C2 C10 C100 COMPOSITE C VALUE 0.287 0.287 0.358 USE 0.29 0.29 0.36 EX. CONDITIONS 0.27 0.27 0.34 NOTES: 1 - ROOF INCLUDES 0.17 AC FROM HOUSES ON 3RD ST ' 2 - C FACTOR FOR LOT 2 IS TAKEN FROM TABLE 3-3 LAWNS ,HEAVY SOIL, FLAT < 2% HISTORIC CONDITIONS PRIOR TO ANY BUILDING C2 & C10 = 0.2 C100 0.25 CONCLUDE: NEGLIBLE INCREASE IN IMPERVIOUSNESS WILL INCREASE POND VOLUME REQUIREMENT VERY LITTLE 1 1 1 1 1 1 1 1 1 i r SHEAR ENGINEERING CORPORATION PAGE 5 DETENTION VOLUME REQUIRED FOR EAST DETENTION POND PROJECT: ODELLS EXPANSION DATE: 0910619S PROJ.NO. 1485-01-95 PILE: OD13LCUHP BY MHO CUMULATIVE RUNOFF METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.83 RELEASE RATE: 0.90 CPS AREA: 1.18 ACRES TAKEN FROM CALCULATIONS BY WWL SEE PAGES 5 - 7 ATTACHED INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sec iph cfs cf cf cf ac-ft rrrrrrrrxrrrrxr r. xrrrrrrrrrrr rr rrrrr•rrrrtr rtrrr rrxrrrr♦rrrrrr rrsrrrrrrr 5 300 9.30 9.11 2732.5 270.0 2462.E 0.06 10 600 7.14 6.99 4195.7 540.0 365S.7 0.08 15 900 6.06 S.94 S341.6 810.0 4531.6 0.10 20 1200 5.21 5.10 6123.2 1080.0 5043.2 0.12 25 1500 4.63 4.S3 6801.9 1350.0 S451.9 0.13 30 1800 4.20 4.11 7404.3 1620.0 57B4.3 0.13 35 2100 3.81 3.73 7836.2 1B90.0 5946.2 0.14 40 2400 3.02 2.96 7098.7 2160.0 4938.7 0.11 45 2700 2.80 2.74 7404.3 2430.0 4974.3 0.11 50 3000 2.60 2.5S 7639.3 2700.0 4939.3 0.11 55 3300 2.43 2.38 7853:8 2970.0 4883.8 0.11 60 3600 2.30 2.25 8109.4 3240.0 4869.4 0.11 65 3900 2.17 2.13 8268.7 3510.0 4778.7 0.11 ♦rrrrrrtrrrrrrr.rrrrr.rrrtr»trrrrrxr rx rrrrrra rrtrtxrx•rrrrrxtrrrr rrrxr DETENTION VOLUME REQUIRED = 5946.18 cf > VOLUME REQUIRED WITH ORIGINAL BUILDING = 453S cf SHEAR ENGINEERING CORPORATION PAGE 6 DETENTION VOLUME REQUIRED FOR WEST DETENTION POND ' PROJECT: ODELLS EXPANSION DATE: 07/22/95 PROJ.NO. 1485-01-96 ' FILE: ODELCUHP BY HBO CUMULATIVE RUNOFF METHOD 'FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.36 ' RELEASE RATE: 0.90 CPS AREA: 3.84 ACRES INITIAL TIME: 5 MINUTES ' TIME INCREMENT: 5 MINUTES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATS VOLUME VOLUME VOLUME VOLUME ' min Dec iph cfe cf cf cf ac-ft rer+++++++rrr+++++++tr+rrrt•+rr++r rrtrrrrrerr rr+++rr+rtrrt rrrt++++r++»+ 5 300 9.30 12.86 3856.9 270.0 3586.9 0.08 10 600 7.14 9.87 5922.2 540.0 5382.2 0.12 15 900 6.06 8.3E 7539.6 810.0 6729.6 0.15 20 1200 5.21 7.20 8642.8 1080.0 7562.8 0.17 25 1500 4.63 6.40 9600.E 1350.0 8250.8 0.19 . ' 30 1800 4.20 5.81 10450.9 1620.0 8830.9 0.20 35 2100 3.81 5.27 11060.6 1890.0 9170.6 0.21 40 2400 3.60 4.98 11943.9 2160.0 9783.9 0.22 ' 45 2700 3.28 4.53 12242.5 2430.0 9812.5 0.23 50 3000 3.02 4.17 12524.5 2700.0 9824.5 0.23 55 3300 2.80 3.87 12773.4 2970.0 9803.4 0.23 ' 60 3600 2.60 3.59 12939.3 3240.0 9699.3 0.22 65 3900 2.43 3.36 13101.0 3510.0 9591.0 0.22 70 4200 2.30 3.18 13354.0 3780.0 9574.0 0.22 75 4500 2.17 3.00 13499.1 4050.0 9449.1 0:22 ' 80 4800 2.07 2.86 13735.5 4320.0 9415.5 0.22 85 5100 1.96 2.71 13818.5 4590.0 9228.5 0.21 '+++tr+•r+++rr++++rtr++.+++++t++rr+++++r++++rtrtrrr+++•+++++r+trrtrr+rr++ ' DETENTION VOLUME RBQUIRBD 9824.54 cf 4 VOLUME REQUIRED WITH ORIGINAL BUILDING (10,400 cf) ' COMPARE WITH VOLUME REQUIRED BY DETERMINING DIFFERENCE IN VOLUME BETWEEN 100 YEAR DEVELOPED AND 2 YEAR HISTORIC VOLUMES USE SAME ASSUMPTIONS AS WWL - PAGE 3 OF CALCULATIONS BY WWL ATTACHED Tc+ C+ Cf+ A. It -VOLUME Dec ac iph cf DEVELOPED 7200 0.28 1.25 3.84 1.44 13934.6 HISTORIC 7200 0.20 1.00 3.84 0.52 2875.4 DEVELOPED VOLUME- HISTORIC VOLUME = REQUIRED VOLUME - 11059.2 CONCLUDE:REQ'D VOLUME IN WEST POND PER PLAN BY WWL (cf) = 10400 REQ'D VOLUME IN WEST POND FOR EXPANSION (cf) = 11059 ASBUILT VOLUME IN WEST POND (cf) = 11093 > 11059 ' NO ADDITIONAL STORAGE VOLUME REQUIRED. SHEAR ENGINEERING CORPORATION AVERAGE END AREA METHOD FOR EAST DETENTION POND ' VOLUMBS PAGE 7 PROJECT :ODELLS MICRO-BREWBRY EXPANSION DATE: 09/06/95 PROJ. NO:1485-01-95 BY MEO LOCATION:800 E. LINCOLN PILE: ODELLAVG ' NOTES :EXPANDED POND ' CONSTANT: 65 - 1 SQ IN. FIRST EVEN CONTOUR 4939.5 FEET INVERT 41939.43 FEET TOP ELEV 4942.5 FEET INCREMENT 0.5 FOOT SCALE: 1. = 30 FEET rf rf rflr rf ltriii riirlf rt filfllfr if111rrt llf lflrY trl tf tf♦ ftltlftr BLBV PLANI- AREA AREA VOLUME CUM. CUM. CUM. METER (Al) (A2) (V1) VOLUME VOLUME VOLUME ft" READING eq in sq ft cf cf cy ac-ft effrf ef••frlrtrirrlrf!!fflr!!ef!!!tr!ltifrxr rxftrrr!!!lf trtf!!tlttrtx tei 4939.43 0 0.00 0 0 0 0 0.00 4939.5 27.08 0.42 375 13 13 0 0.00 40.5 2as 293 11 0.02 4940.5 97.79 1.50 1354 529 827 97.79 1.50 354 S29 31 0.02 4941 146.61 2.26 2030 846 1673 62 0.04 4941.5 228.8 3.52 3168 1299 2972 110 0.07 ' 4942 312 4.80 4320 1872 4844 179 0.11 4942.5 520 8.00 7200 2880 7724 286 0.18 r!!frlflrlr!!f!!flrrlrrr!l rrrrllflr•lrxf trerrf rf lfxlf»ilrr!lrrfrrllrtir FORMULAE:AS= (PLANIMETSR READING)/CONSTANT A2- (A1)tSCALE SQUARED VOLUME REQUIRED IN EAST POND (cf) = 5946 POST EXPANSION ASBUILT VOLUME IN EX. POND (c£) = 4722 REFER TO ASBUILT BY WWL VOLUME IN EXPANDED POND (cf) = 7724 CONCLUDE:BXPANDED POND VOLUME IS ADEQUATE DEFINE MORE EASEMENT FOR EXPANDED POND 1 1 1 M 1 1 SHEAR ENGINEERING CORPORATION PAGE 8 FLOW TO CONCENTRATION POINT E FROM SUBBASIN Is ' PROJECT: ODELL'S BREWERY EXPANSION DATE 09/06/95 FILE: ODELRAT PROD. NO.1485-01-95 NOTES: BY HBO 1 . _ AREA (A)= 1.190 ACRES , ' RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C 0.66 0.66 0.83 SEE SPREAD SHEET ATTACHED ON PAGE 2 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME '(Ti) ' = LENGTH 65 FEET SLOPE 7.00 4 - 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 ' Ti (min)= 7.14 7.14 6.74 TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE- L (ft) = 75 S (;) = 2 GRASSED SWALE V (fps) - 2.16 Tt(min)- 0.59 L (ft) = 155 S 1.2 GUTTER V (fps) = 2.16 Tt(min)- 1.20 L (ft) = 120 S (i) = 0.5 VALLEY PAN V (fps) = 1.5 Tt(min)= 1.33 ' L (ft) _? S (4) _? ? L (ft) _? S (4) _? ? V V (fps) (fps) _? _? Tt(min)= Tt(min)= 0.00 0.00 L (ft) _? S (4) _? ? V (fps) _? Tt(min)- 0.00 L (ft) _? - S (}) _? ? V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) 3.11 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 10.25 10.25 9.85 USE Tc = 10 10 10 ' INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.54 4.45 7.14 ' NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (C£s) 2 YEAR 10 YEAR 100 YEAR Q 1.98 3.47 - 6.99 CONCLUDE:FOR REFERENCE ONLY P c SHEAR ENGINEERING CORPORATION PAGE 9 FLOW TO CONCENTRATION POINT W FROM SUBBASIN Iw ' PROJECT: ODELL'S BREWERY EXPANSION DATE 08/24/95 FILE: ODELRAT PROJ. NO.1485-01-95 NOTES: BY MEO AREA (A)= 3.840 ACRES RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR c 0.29 0.29 0.36 ' SEE SPREAD SHEET ATTACHED ON PAGE 4 TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) ' LENGTH 280 FEET SLOPE 0.70 4 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 ' Ti (min)- 31.68 31.68 29.92 TRAVEL TIME (It) -L/(60•V) FLOW TYPE L (ft) 280 S (4) = 1.00 GRASSED SWALE V (fps) = 1.58 Tt(min)= 2.95 L (ft) _? S (4) _? ? V (fps) _? Tt(min)- 0.00 L (ft) =? S (t) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (i) _? ? V (fps) _? Tt(min)= 0.00 ' L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (t) _? ? V (fps) _? Tt(min)- 0.00 L (ft) _? S (t) =7 ? V (fps) _? Tt(min)- 0.00 ' NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 2.95 Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 34.63 34.63 32.87 USE Tc = 34.5 34.5 33 ' INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR 1 = 1.34 2.40 3.97 ' NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfe) 2 YEAR 10 YEAR 100 YEAR ' Q 1.49 - 2.67 5.49 CONCLUDE:FOR REFERENCE ONLY ' I SHEAR ENGINEERING CORPORATION PAGE 10 UNDETAINED FLOW TO STREET FROM SUBBASIN Io PROJECT: ODELL'S BREWERY EXPANSION DATE 08/24/95 FILE: ODELRAT PROD. NO.1485-01-95 NOTES: BY MEO AREA (A)= 0.070 ACRES RUNOFF COSP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.73 0.73, 0.91 70U ASPHALT/ 30% GRASS FLAT HEAVY SOIL TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH =7 FEET SLOPE _? 2 YEAR 10 YEAR 100 YEAR C =? ? ? Ti (min)= 0.00 0.00 0.00 TRAVEL TIME (Tt)=L/(60-V) FLOW TYPE . L (ft) = 140 S (i) = 1 GUTTER L (ft) _? S (4) _? ? L (ft) _? S (i) _? ? L (ft) _? S (4) _? ? L (ft) _? S (t) _? ? L (ft) _? S (t) _? ? 0 L (ft) _? S (4) _? RUNOFF (Q= CIA) (cfs) = 2 YEAR 10 YEAR 100 YEAR Q 0.17 0.29 0.59 ' CONCLUDE:LESS THAN ALLOWABLE RELEASE RATE 10 V (fps) = 2 Tt(min)= 1.17 V (fps) _? Tt(min)= 0.00 V (fps) _. Tt(min)= 0.00 V (fps) _? Tt(min)- 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 TOTAL TRAVEL TIME (min) = 1.17, i Final Approved I o a!e gsI SHEAR ENGINEERING CGRPGRA 0 1 Amended ' Final Drainage and Erosion Control Report ' for ODELL BREWING COMPANY EXPANSION ' and FORT COLLINS MONUMENT AND STONE ' Fort Collins, Colorado Prepared for: Stephen J. Miner Fort Collins Monument and Stone 824 East Lincoln Avenue ' Fort Collins, Colorado 80524 Prepared by: Shear Engineering Corporation Project No: 1485-01-95 Date: November, 1995 4836 S. College, Suite 12 Ft. Collins, CO 80525 (9 70) 226-5334 FAX (970) 282-031 1 I 1 1 1 i 1 1 1 1 1 1 1 1 a 1 4836 S. College, Suite 12 December 1, 1995 Project No: 1485-01-95 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Odell Brewing Company Expansion & Fort Collins Monument and Stone; Fort Collins, Colorado Dear Basil, This letter serves as the Amended Drainage and Erosion Control Report for the Odell Brewery Expansion and the Fort Collins Monument and Stone sites. The reason for this amended drainage report is that the owners of Fort Collins Monument and Stone have ask to release stormwater from their site into the the east detention pond located on the Odell Brewery property. The owners of the Odell Brewery property have consented to this request. The additional contributing area from the Fort Collins Monument and Stone site (0.67 acres) increased the storage requirement for the east detention pond. The following table, summarizes the storage information for the east detention pond. Contributing Area Volume Required Volume Provided cubic feet cubic feet Odell Brewery Expansion (1.18 acres) 5946 7724 Odell Brewery & Fort Collins Monument & Stone (1.85 acres) 8457 8683 A plan showing the vised g long with the appropriate calculations are attached for your review. The mylars are o attache proval of the revision. We would appreciate a quick turn around on this as both projects are unde onstruction at this time. If you have any questions or comments, please cc: Doug and Wynne Odell Fort Collins Monument and Stone Phil Robinson, Stewart & Associates or Mark Oberschmidt at 226-5334. w h a f- abovf re0T,9d <pradiA y 4Ur 9-a N L%ncol n ? Ft. Collins, CO 80525 (970) 226-5334 FAX (970) '_32-0 11 I LI 1 1 i 1 [1 1 1 1 1 'J 1 El APPENDIX I Drainage Calculations I', m row ID 6-,, r4,s, Acpoft 4!� CUN\J1"r", f}AA-,kN(,vq` zq C. LN,r-JN Ru�- Lo clj�) S7 p 6 TA� ------------------ oT it 4, 1 1� Ifi SHEAR ENGINEERING CORPORATION PAGE 1 DETENTION VOLUME REQUIRED FOR EAST DETENTION POND PROJECT: ODELLS & FORT COLLINS MONUMENT & STONE PROJ.NO. 1485-01-95 DATE: 11/28/95 PILE: ODMSCUHP BY MEO NOTES: - AREA INCLUDES SUB BASIN Ie (1.18 ac.) FROM ODELLS SITE & 0.67 ac. FROM FORT COLLINS MONUMENT AND STONE SITE. - RELEASE RATS BASED ON COMBINED RELEASE RATES (0.50+0.90) FROM THE SEPARATE SITES. CUMULATIVE RUNOFF METHOD FOR ' SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 0.77 ' RELEASE RATE: 1.40 CPS AREA: 1.85 ACRES INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sec iph cfs cf c£ cf ac-ft ++•rr++++w+r+r +++w++ar+r++rrrrrxr+r+rrr♦++wrrrrrr♦+++rrrr+e+r+rrrxrr rrr♦ 5 300 9.30 13.25 3974.4 420.0 3554.4 0.08 ' 10 600 7.14 10.17 6102.6 840.0 5262.6 0.12 15 900 6.06 8.63 7769.2 1260.0 6509.2 0.15 20 1200 5.21 7.42 8906.0 1680.0 7226.0 0.17 25 1500 4.63 6.60 9893.2 2100.0 7793.2 0.18 30 1800 4.20 5.98 10769.2 2520.0 8249.2 0.19 35 2100 3.81 5.43 11397.4 2940.0 8457.4 0.19 40 2400 3.02 4.30 10324.8 3360.0 6964.8 0.16 45 2700 2.80 3.99 10769.2 3780.0 6989.2 0.16 SO 3000 2.60 3.70 11111.1 4200.0 6911.1 0.16 55 3300 2.43 3.46 11423.1 4620.0 6803.1 0.16 ' 60 3600 2.30 3.28 11794.9 5040.0 6754.9 0.16 65 3900 2.17 3.09 120SS.S 5460.0 6595.5 0.15 r+r+rrr r+rrr♦+rerr+rrwrrrrrrrrrrrrxr+rrrrr*+rrrxrrrerrr wrrerrrrrrrr rrr+• DETENTION VOLUME REQUIRED = 8467 CF ' VOLUME PROVIDED IN EAST POND PER PLAN BY SHEAR ENGINEERING = 7724 CP ADDITIONAL VOLUME REQUIRED= 733 CF 1 1 P SHEAR ENGINEERING CORPORATION AVERAGE END AREA METHOD FOR EAST DETENTION POND 1 VOLUMES PAGE 2 1 PROJECT :ODELLS MICRO -BREWERY EXPANSION DATE: 11/28/95 PROD. NO:1485-01-95 BY MSO LOCATION:800 B. LINCOLN PILE: ODMSAVG 1 NOTES :POND EXPANDED FOR ADDITIONAL CONTRIBUTING AREA FROM PORT COLLINS MONUMENT AND STONE CONSTANT: 65 = 1 SQ IN. FIRST EVEN.CONTOUR 4939.5 FEET 1 INVERT 4939.43 PERT TOP ELEV 4942.5 PBBT INCREMENT 0.5 FOOT SCALE: 1. n 30 FEET rllrffff flrf lff! frl rlr lr Yflfirrf rff Yr llf llf rfftr fffflffr 1r 1f 11fr lrrf +r+f 1 STAGE BLEV PLANI- AREA AREA VOLUME CUM. CUM• CUM• METER (Al) (A2) (V1) VOLUME VOLUME VOLUME ft ft READING aq in aq ft c£ cf ry ac-ft 1 of++rrlr rf rfflrr♦+xxxrfflflffrrff rff erfxefffrlfxrrrffrexxrrrrf •rf rf rrrrl+f xf++rrr 0 4939.43 0 0.00 0 0 0 0 0.00 0.07 4939.5 27.08 0.42 375 13 13 0 0.00 0.57 4940 55.11 0.85 763 285 298 11 0.01 1.07 4940.5 97.79 1.50 1354 529 827 31 0.02 1.57 4941 146.61 2.26 2030 846 1673 62 0.04 2.07 4941.5 228.8 3.52 3168 1299 2972 110 0.07 1 2.57 4942 398 6.12 5511 2170 5142 190 0.12 3.07 4942.5 625 9.62 8654 3541 8683 322 0.20 rrrr rrrrr rrrrfxrf rrfff rr of r+f rrf rf rf rrrf refflf fret rr!lfrrr+flrlrfrrerrrlrrrrrr+xr 1 PORMULAE:A1= (PLANIMETBR READING)/CONSTANT A2= (A1)*SCALE SQUARED VOLUME REQUIRED _IN EAST POND (cf) 8457 1 VOLUME IN EXPANDED POND (cf) 6683 CONCLUDE:EXPANDSD POND VOLUME IS ADEQUATE 1 AN EMERGENCY OVERFLOW HAS BEEN ADDED TO THE SOUTH END OF THE POND AT AN ELEVATION OF 42.1 PERT. THIS IS 0.5 PERT BELOW THE TOP OF THE POWER VAULT LOCATED ALONG THE EASTERN PROPERTY LINE APPROXIMATE 100-YRAR W.S.SLEV. n 4942.47 1 PRBSBOARD PROVIDED n 0.03 VARIANCE APPROVED FOR LESS THAN ONE (1') FOOT OF PRBSBOARD WITH THE FINAL DRAINAGE AND EROSION CONTROL REPORT FOR ODELL 1 BREWERY EXPANSION 1 1 ODELL BREWERY EXPANSION FAdnage Notes O-CLIENT \ ODELL \ DRAINAGE \ DRGNOTES Project No: 1485-01-95 Date: 08/23/95 Revised: 11/28/95 PDetention Pond Summary East Pond West Pond ' Bottom of Pond elevation = 4940.30 feet = 4939.43 feet Top of Berm elevation = 4942.50 feet = 4942.50 feet Detention Volume Provided = 0.20 ac-ft = 0.25 ac-ft feet = 8683 cubic feet = 11093 cubic Detention Volume Required = 0.19 ac-ft = 0.25 ac-ft ' = 8457 cubic feet = 11059 cubic feet 100 year W. S. Elev. in ponds = 4942.5 feet = 4942.5 feet ' Finished Floor Elevation = 4946.5 feet = 4946.5 feet Total Contributing Area ' to Pond = 1.85 acres = 3.84 acres Maximum Allowable ' 100 year release rate (Historic Q2) = 1.40 cfs = 0.90 cfs Release rate from east pond is based on combined release rates from Odell site and Fort Collins Monument and Stone site (0.90+0.5) ' DRAINAGE MAINTENANCE NOTE- 1 Periodic maintenance and cleaning of the outlet structure by the ' owner is required to ensure that the structure functions properly. It is recommended that this maintenance be done on a semiannual basis and periodic inspections be done to determine when the structure ' needs to be cleaned out. 1 1 1 a I 01Y w Fear COLIYO, OMOIV90 UTRITY PLAN'APPROVAL jI1.1■', aBe9olTo.��%Lwen I ... VV '" '�_ OECRO BY• / _ 1' 01ECEN Br1/ CIS 1 CNECNEU BY / II\' NZ W Sfltf: fa9p��- P it s0 a, t Lill I r= I r- I I I I' I L—J I w wwrw mu.ree Ynrm / m AN at n e tell net An me me. arras / ...•........... .............................................".,................................m....... .. 3 NN W 310.1Y / Ae —la I 3,e09\ ACRES is I I I - I •I I .Las: I 1 PP [LEV: 4946.50 � kl i I I^ I I I LOT 2 FRGFo'SED I I FUTURE DEVELOPMENT / I I �I S I I IXP41$1ON mW', (1.ee ACREaq j I I IQ,, Y «• IF I i 1 j fil F.F.An .5 SerAm1 c nl \ I 1 3.84 e<rca a Nor e 1 I I II I l l Exlrn:e—� L-1 elm• 1y �� � I II iI \\1 \ I I esoro I; �y-�. f\ I ill 1 i\ i i` I E.F.-A�Fem i= / p I 1 1 I 1 11 I J I I I uc ANGas I \V AI ���jilt' II I On a' E'iPnuLLint It It `-_--- LJ !- , - r—--------- —t - r Y ESEYM _�-f —-_------- a --- — —05— I i/ i — �<I— _ btu __— � �— �3.1,1r•� _ ___ JILL_____ ___ ____ _ _ _ _ _ _ _ —l1�IM0(Gi 1.1141 AVFMR as, !!Kell h WOamylL^E E9ouet xrEmw rtxo Snnnx9'��Alr 5 0e1a DULY. 1995 uas„ amAn Gin SHEAR ENGINEERING CORPORATION I It B.W.S. ODELL INVESTMENTS LLC "36 50. COLLEGE AM SUITE 12, FORT COLONS. COLORA00 W525 mn 4 NWIed FdU �' 4M !m! eunue. re.m ecP_NaaA (9701 7211 1 FA%: (970) 282-0311 SOHSA9P• BOUNOMV DnvnWnPned_Su m EmtNad Fill III Wi"m urPoM devulm •49403 rn, -WNA]r t Topaf bnn de..nm 4942.59rm •wrzwrr Cnemim Volume Prni -020 Of IF •Oy nA -ew]at,NerM .IIm maa u+ tWennmvdwmInAt-.19ee.n it -W7,,N, ram - IQ" "me No IW rr, was s. I in pi .III feat -KnlrM Flnul,ed l^m Fhvelm-.19<65fa1 -K.Af lu T eminvAm itimid Nuei,num Allmnble W ]uenL.n me Mbndc Q31 •Lrnm •o.9Der. Pawn me J m, pM 61ow m mined! mime Mm fmn 0.1e0 the and i Wlln WhIi Nend Sme new Q 011 DRillIFTACTIMADEFFNIIII DI 1. Mill „Wmmw AM limi a the JAW YWum I the ' ll wmwnteed nn umnum rumnane propi 4'u rtmrv,rMrd fli 11,11 minw J If M- e m e nMemue! tau ,m ry1Mk MIAMI4 di w Memde, rlen J,e wri mM.mb nmma m. 1. P,ve..r.s.mw._,.. IN.°,ent 4MMifl'riF rwill ma":w ."dam. IM, ArMALLAMMA, MIAMI A Ili FILL Mil All ALL tin blichurepsAinnill ., Munl;'SO All OFF (III [Mi Sal ww oIMN,10 peas iaer 4 a' AAnd A tm J 0,71s .AM p W IMMILIFOLMI Mr Qi aw.an.i.w = w+ .u. .w..4 Ali J m w4ra� r mm r � _ _ lin VIA HIM w w"e�;v, men AN Ann If me Te ft :"•4,AM VAN Ann .m.. x. wel swe"behimil blind, DER GRADING, DRAINAGE & EROSION aNE CONTROL PLAN PPwEa wasNi. ;LL BREWING COMPANY EXPANSION 14B5-01-95 l 1 FORT COLLffiS• COLORADO _ C-3 "tl JAY 1996 The City of s Starmeater Utility aral countrad nepata must ee named at Whim, 24 hours How to or Ionlyrictlan DAY this Site All Soll"Ind oliffil "it al A, FIGIAL prior to of land ( G' 9 9 9� 9.). 9 sO SO 'called It the appropriate PAYS In tire I"It"ItIon Sequence as ci In the R pq PAY e 9 Pq 1 Idb IXYMUHII ItalsOnal two for the Oil L pill of Days ai Having. gradring. ull installations, 9p 9� tc) q nf,) ee coni by q 9 a4aNo land contall until m mil or other parroval ansion control is ,ctioty far mwe than ONLY, W Crq „ WTnq ,,trStarryw(la9 Utility d/ an "n q. J Installed uneu of w u opp o by the oe prapmyea 1 9 1 Mu rotlat'Cqn^N11 to eenw Nq P ymert Ife-carrad ill All told 9 li Sort be romec y O En9 9 Dualortment. Ali fivini J or r,ww,l 11 necessary after aCh runoff evat An AdAw to assure owtil q w eo as 601 to Coal thew Follow Id cry dt (a) feet I hilbight - m woe all a do BO deal eR ° ale aa. amill 'ad NiHmmull, at City C q or depol If I'll Or any IthIr matall Pat, City Harris e d .n devaeted mmera e a as owned p He Conteol CONSTRUCT_ ON�a FNiAE "� over I r" a aLAasrp uvwsu 02 n wprecto . Ago wun 4/le mm �m A, MAIL Im MAY MAY AN AL AUG My Are, UwwLpi . GUALONG CT.a..:matom. »7Al A. rvtveom MAaTA BY. zm® a. yea TaIIR.T,aDAM . MALMAT .. ow OF MR, cauxa a. -71 MOD ( EXISTING ASPHALT LOT All �I BEEN!= BRUNEI i I I I R LOT t DO / / Z I OEM ENFEW Pao EASSEPAR BY DO 1 F oO�DuiNT Z 1 o ,Tw WAR al / Q W LL ILA, EXISTING ASPHALT LOT Z 0. / W YEARA I 4942.50 EnS� mpa R WLET m Y I EXISTING BUILDING Ea pTNUNO A FFAA4946.20 \ Ig 5 AD or __ 1 R 4 \, 99991��Ss `� �I - A NOETENTa L' YI A9baT TO BE VAC ATL it ISol ow� Soso I i BY SEPARATE ttCVYEHTE LL I 1 �y I�GX �� ��✓ -- __ E%sorvcA ASPHALT LDT l DAY,{_�77�_s 9UITIUG PAT s�- E%PMISIOM Sir s a.. FF-a9a6 20 GROUND ADJACENT - ` `II TO BUILDING - " a94].50 Al RATw QUALITY ]t �ILL�VAA� V Y4 _ I' Ill WRET EX fS UTILITY EASEMENT All 4 All I Al ROTE eREM _ -_hY rs LU—LEY MWn W�i�GPE AND GOINGSo aI% [%SnMG GI1LEi FARE W 1YTNC� —tom MA _ 91BIMG-.IAIER MEIEN _ _ i _ _IMADM-a09E-RFNVyAV E gSTNO TREES d RIGH _ PIT TO "MN � \ _ \ OF w % TO RICH ll i -eN — A Ix � _ m t KIPS a fY �LLWAY ✓ My OS 0® a I _ all Rduux EXISTING ROADS DE DITCH TI'V —Yhrol — LINCOLN AVENUE > A! A i —AHATE 20 10 0 20 SCALE: 1' AS Al 20 CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800=922=1987 CAL. t BUSNESS DAYS IN ADVANCE BEIGE YOU D4 GO OR EXCAVATE TAW MAILL OF UNKRm D uEVFR Umms PRELIMINARY NOT FLIP IYWSWW/OPLW APRIL 2. 2002 DETENTION POND SUMMARY WEST EAST DETENTION REWIRED 11 194 CF 8,670 OF DETENTION PROVIDED 11.527 OF 81818 CF WATER QUALITY VOLUME REQUIRED 0 1080 CF WATER QUALITY VOLUME PROVIDED 0 1049 OF 100 Try HWEL 4942.50 494240 VAX RELEASE RATE SHEAR END. 0.9 CPS 1.4 CFS EXISTING CONTOURS "'- -- EXISTING INDEX CONTOURS — = = EXISTING STORM SEWER PROPOSED CONTOURS 41 PROPOSED INDEX CE NTEL ® PROPOSED STORM PIPE BASIN CRITERIA (SHEAR ENG.) 0.80 0. 100 TEAR RUNOFF CaFFICII AREA IN ACRES FLOW DIRECTION o m m m m e BASIN BOUNDARY (SHEAR ENG.) 4( X- SILT PENCE Ooemm%� EROSION BALES HIDES 1. WATER AND SEWER SERVICE TO THIS SIZE WU NBi I' Ll IED Al THIS PROJECT, 2. DRAINAGE BASIN DATA TAKEN FROM 'AMENDED FINAL DRAINAGE AND EROSION COAL REPORT FOR ODELL BREWING COMPANY EXPANSION AND FORT COLLINS MONUMENT AND STWE'. SHEAR ENGINEERING CORPORATION, NOMEMBER, 1995. City o/ Fort CLAIMS, Colorado UTILITY PLAN APPROVAL APPROVED" _ City EngAev CHECKED BY. _ Mbu, A waste.mer utility CHECKED SUN Storri Utility CHECKED BY: _ Parris M Recreation CHECKED By Traffic Enpmw CHECKED BY: _ `a 0 O G rc DIP Q- DE It Z Q out CL Z J 'O y_/N + Z W Q 0 U wYao cc coIII V^ N C) JZW LLI Q0o 0LUDO Q Z Q 0 SHEET 4 4 OF No. 114-23