Loading...
HomeMy WebLinkAboutDrainage Reports - 12/20/2001 (4)1 1 1 1 1 FINAL DRAINAGE AND EROSION CONTROL STUDY OAKRIDGE BUSINESS PARK, THIRTY-FIFTH FILING OAKRIDGE BUSINESS PARK PLAZA Prepared for: Rayno Seaser 344 E. Foothills Parkway, Suite 3-EB Fort Collins, CO 80525 Prepared by: North Star Design, Inc. 700 Automation Drive, Unit I Windsor, Colorado 80550, . (970) 686-6939 October 15, 2001 Job Number 137-01 North Star Awww design, inc. 1 October 15, 2001 Basil Harridan City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: Final Drainage and Erosion Control Study for ' Oakridge Business Park, Thirty -Fifth Filing Oakridge Business Park Plaza Dear Basil, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control ' Study for Oakridge Business Park, Thirty -Fifth Filing. I certify that this report for the drainage design of Oakridge Business Park, Thirty -Fifth Filing was prepared in accordance with the ' criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. �r Sincere ' Patricia Kroetc North Star Design, ii 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 970-686-1188 Fax TABLE OF CONTENTS TABLEOF CONTENTS............................................................................................................... iii 1. GENERAL LOCATION AND DESCRIPTION ' 1.1 Location...................................................................................................................1 1.2 Description of Property ............................................................................................1 ' 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................1 3. 2.2 Sub -Basin Description.............................................................................................1 DRAINAGE DESIGN CRITERIA ' 3.1 Regulations ........................ :...................................................................................... 3.2 Development Criteria Reference and Constraints...................................................2 2 3.3 Hydrologic Criteria..................................................................................................2 . ' 3.4 Hydraulic Criteria...........................................:........................................:...............3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept......................................................................................................3 4.2 Specific Flow Routing.............................................................................................3 4.3 Drainage Summary ........................:.........................................................................4 5. EROSION CONTROL 5.1 General Concept.....................................................................................................4 5.2 Specific Details........................................................................................................5 6. CONCLUSIONS 6.1 Compliance with Standards.....................................................................:..............5 6.2 Drainage Concept....................................................................................................5 7. REFERENCES.............................:......................................................................................6 ' APPENDICES A Vicinity Map B Hydrologic, Computations C Hydraulic and Detention Calculations D Erosion Control Calculations E Excerpts from Previous Reports F Figures and Tables I I iii Z' 1 GENERAL LOCATION AND DESCRIPTION 1.1 Location The Oakridge Business Park Thirty Fifth Filing (Oakridge Business Park Plaza) site is located in the Oakridge Business Park, P.U.D. This project is located in the Northwest Quarter of Section 6, Township 7 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the location map in Appendix A. The project is located on the north side of Oakridge Drive, between McMurray Drive and Wheaton Drive. The project is bounded on the south by Oakridge Drive, on the east by an existing cemetery and a proposed daycare, on the north by Harmony Road and on the west by an undeveloped lot. 1.2 Description of Property The entire project consists of approximately 2.8 acres of land. The land is currently undeveloped and slopes to the southeast at approximately 1%. The site currently drains into the existing Oakridge Drive on the south boundary and a small portion drains to Harmony Drive on the north boundary. The project will consist of two buildings and associated parking. Oakridge Drive along the south boundary and Harmony Road along the north boundary are existing and will not require any improvements. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the McClellands Drainage Basin.. More specifically, the site is a portion of Basin 230 of the Oakridge Business Park Master Drainage Plan, as prepared by RBD Inc., dated June 22, 1990 and updated April 1, 1996. An excerpt of the drainage schematic is shown in Appendix F. 1 2.2 Sub -basin Description ' Per the Oakridge Master Drainage Plan, Basin 230 requires detention and will have a 10 year release rate of 0.20 cfs per acre and a 100 year release rate of 0.50 cfs per acre. This ' detention pond (SWMM pond 47) discharges into McMurray Drive east of this site. The street and other drainage facilities eventually convey flows to the Regional Detention ' Pond #2 at the end of Keenland Drive. Per the Master Drainage Plan, developed flows from Basin 230 should be detained on site rand released into the street. The required detention was calculated utilizing the revised IDF curves which were adopted in March 26, 1999. Detention is provided on site in the southeast corner of the site and a portion of the parking lot. Portions of the Oakridge Business Park Master Drainage Plan and the subsequent update are included in appendix F. 1 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage ' Design Criteria Manual' specifications. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), 1984, developed by the Denver ' Regional Council of Governments, has been used. ' 3.2 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to previous calculations completed ' with the Master Drainage Plan for the Oakridge Business Park, P.U.D. by RBD Engineering Consultants dated June 22, 1990 and updated April 1, 1996. Detention for this site is provided on site as required in the above -mentioned report. In the event that the outlet pipe for the Detention Pond becomes clogged, the pond will overtop in the entrance drive and reach Oakridge Drive. The maximum overtopping elevation for the Detention Pond is 4975.12 and all of the buildings have finished floors above this elevation. 2 ' 3.3 Hydrologic Criteria ' Runoff computations were prepared for the 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub - basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub - basins and Design Points associated with this site. ' Detention required for this site is provided on site in the proposed detention pond in the southeast corner of the site. 3.4 Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the ' City of Fort Collins Drainage Criteria and are also included in Appendix C of this report. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept ' A majority of the runoff from this site will flow to the proposed detention pond in the southeast corner of the site and be released at a controlled rate into the existing Oakridge ' Drive. A small portion of the site will drain to Oakridge Drive on the south side of the site and a small portion of the site will drain north to Harmony Road. ' 4.2 Specific Flow Routing ' A summary of the drainage patterns within each basin is provided in the following paragraphs. Subbasin 1 contains the majority of the site including both buildings and parking lot ' between the buildings. Runoff from this basin flows southeast across the parking lot to a curb opening and into the proposed detention pond. Subbasin 0-1 contains a small portion of the site along the north boundary. Runoff will flow along Harmony Road to the east as it has historically done. Due to the desire to 3 I the existing trees along Harmony Road and to provide berms to buffer the site, regrading to bring this runoff back on site was not possible. The amount of flow being released is very small and does not exceed 0.2 cfs in the 100 year storm event. Subbasin 0-2 contains a small portion of the site along the southern boundary. Runoff from this basin will flow south to Oakridge Drive. This basin includes a small portion of ' the entry (south of the high point) and a landscape strip adjacent to Oakridge Drive. This flow will also be released undetained but does not exceed 0.4 cfs in the 100 year storm event. ' Required detention for this site was calculated using the predetermined release rates mentioned above (0.2 cfs per acre in the minor storm and 0.5 cfs per acre in the major storm). Due to site constraints and the inability to contain all of the stormwater runoff, ' the calculated allowable release rate was then reduced by. the amount of runoff that is released from Basin 0-2 into the street without detention. In the minor storm the ' calculated allowable release is 0.60 cfs (3.05 acres x.0.2cfs) minus the free release from Basin 0-2 (0.10 cfs) which gives the release rate of 0.51 cfs. In the major storm the ' calculated allowable release is 1.53 cfs minus the free release from Basin 0-2 (0.25 cfs) which gives the release rate of 1.28 cfs. 4.3 Drainage Summary This site is providing detention as required by the Oakridge Master Drainage Plan. Small portion of the site will be released undetained due to site constraints. Water quality enhancement will also be provided in the proposed pond. Flows will be released into Oakridge Drive at the predetermined rate of 0.2 cfs per acre in the minor storm and 0.5 ' cfs per acre in the major storm. The drainage facilities located on this site will. be maintained by the owners of the site. 5. EROSION CONTROL 5.1 General Concept This site lies within the Moderate Rainfall and Wind Erodibility Zone per the City of Fort Collins Zone Maps. The potential exists for silt movement from the site and into the 4 existing storm system during construction. Potential also exists for tracking of mud onto existing streets which could then wash into existing storm systems. Per the City of Fort Collins Erosion Control Reference Manual for Construction Sites and ' related calculations in Appendix D, the erosion control performance standard for the subject site is 79.4%. The erosion control plan gives a performance standard of 71.0%. ' The proposed plan does not meet the performance standard but the plan utilizes Best Management Practices to limit the amount of sediment that will leave the site. The plan is adequate to meet the intended purpose of erosion control. Additional measures will ' allow the plan to meet the performance standard but will not add to the practical effectiveness of providing erosion protection. The erosion control escrow amount is $4965. 5.2 Specific Details To limit the amount of silt leaving the site, several erosion control measures shall be implemented during construction. Silt fence shall be placed along the north and south ' boundaries and a vehicle tracking pad shall be installed at the entrance off Oakridge Drive to control the mud being tracked onto the existing pavement. During overlot ' grading, disturbed areas are to be kept in a roughened condition and watered to reduce wind erosion. 6. CONCLUSIONS 6.1 Compliance with Standards ' All computations that have been completed within this report are in compliance with the City Fort Collins Erosion Control Reference Manual for Construction of Sites and the Storm Drainage Design Criteria Manual. 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans ' adequately provide for the transmission of developed on -site runoff to the proposed detention in into pond the southeast comer of the site and the existing Oakridge Drive. The onsite drainage facilities (curb, pans and chases) will provide for the 10- year and the ' S 1 100- year developed flows to reach the proposed detention facility. The existing downstream facilities have been sized to accommodate the detention release from this site. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 7. REFERENCES 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated March, 1969, and Volume 3 dated September, 1992. 3. Final Report for Hydrologic Model Update for the Foothills Basin Master Drainage Plan by Anderson Consulting, Inc. dated July 15, 1999. 51 No Text r I APPENDIX B HYDROLOGIC COMPUTATIONS � � � . . . a 0 ) �— ca 0M .� 2 4 \� ad z ) \/ aE � \ L ± \k k LU \ (1)2 � 'E co � 2 )\ to {) )/, }§ it \E w )G ) 2$k /[(.. kE 0gx a) ) < a) j0. _ #0 $2) geCL )§§o E . C) J/.oq§§\ § ° ,{ ; km; 2 ) § U) ! # § § \`� \ 2 ) )§k $ ° ; 0 #!F k § m $ )># w a / §} ] § a]«] ,§2! a_§| k /2 )k�\ § §0 10M \2m ««£&! -$ $\ \� , \ m j § k � f § . . LL ;§ \0 k o. "uto w) / \ \ 2 ° & \ d$ \ (aw \2\\ ƒ w w� f� CR —(7E L) S @ § tuIr , OR 7 !!§ § _)? ; \ )E�«E § ll�CR $¥a § Q § « § 2/a \ ; ) E a 8 z a To § � § % a LL o - \E LLI ) { G _/ \ §\ \ 2 > »E § E 0_ / E \} \ k _ S 0 k � ) § ,) i LU )Z §S §b ,ui - B § LQ q$ m m =2} ! s � a )«C&t § Q }»« )�° E § E 3 G co \ §\)§MAE- a 2 § \ \\ J t ) ) \{ ; E co _] / § / 4 /f } § k § k \ \ — 3 t ƒ �— ) k ' 0U. § )E In w \ � LJJ \ k � � § ) k ƒ 2 g \ )§\d b \ \$� §w� #\6& 52\a k § 4\ k \ k .a § >.|)_ \ ƒ / -$/ \ 2 ) a E § ; ; \ « \ 2 ) \ z 2¥! ` ; 3LU � \ � 0 § . . � CL « k/ s e a « 0 ) � ] . \7a§ § .35, a / . # � / ..d� a \\)� _ } §Cd �0.uc !)o ]k\ . °m« \ § e « - � _ £ m` 0■f= )-(! \ / \ { ; ; ; \ « \ § ] / z - I 3 3 E 7- � \ \ APPENDIX C HYDRAULIC AND DETENTION CALCULATIONS C DETENTION POND SIZING BY FAA METHOD ' . Developed by Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado ' PROJECT TITLE: Oakridge 35°h - 10 year t**** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 1 BASIN AREA (acre)= 2.84 RUNOFF COEF = 0.63 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 10.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 1 INTENSITY 4.9 3.8 2.7 2.2 1.8 1.6 1.4 1.2 1.0 0.9 0.8 0.8 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = .51 CFS OUTFLOW ADJUSTMENT FACTOR = 1 ' AVERAGE RELEASE RATE = .51 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT ----------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 4.87 0.06 0.00 0.06 10.00 3.78 0.09 0.01 0.09 15.00 3.26 0.12 0.01 0.11 ' 20.00 2.74 0.14 0.01 0.12 25.00 2.47 0.15 0.02 0.14 30.00 2.21 0.16 0.02 0.14 35.00 2.02 0.18 0.02 0.15 ' 40.00 1.83 0.18 0.03 0.15 45.00 1.71 0.19 0.03 0.16 ' 50.00 55.00 1.58 1.49 0.20 0.20 0.04 0.04 0.16 0.17 60.00 1.40 0.21 0.04 0.17 65.00 1.35 0.22 0.05 0.17 70.00 1.29 0.22 0.05 0.18 ' 75.00 1.23 0.23 0.05 0.18 80.00 1.18 0.23 0.06 0.18 85.00 1.13 0.24 0.06 0.18 ' 90.00 1.09 0.24 0.06 0.18 95.00 1.04 0.24 0.07 0.18 100.00 .0.99 0.25 0.07 0.18 ' 105.00 110.00 0.96 0.94 0.25 0.26 0.07 0.08 0.18 0.18 115.00 0.91 0.26 0.08 0.18 ----------------------------------------------------- THE REQUIRED POND SIZE _ .1795016 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 85 MINUTES 1 I I I Ul 11 1 I L I I I I DETENTION POND SIZING BY FAA METHOD Developed by Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado PROJECT TITLE: Oakridge 35th 100 Year **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 1.00 BASIN AREA (acre)= 2.84 RUNOFF COEF = 0.78 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY (IN/HR) -DURATION (MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.9 7.7 5.6 4.5 3.7 3.2 2.9 2.4 2.1 1.8 1.4 1.2 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = 1.28 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = 1.28 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT. ACRE -FT ----------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 9.95 0.15 0.01 0.14 10.00 7.72 0.24 0.02 0.22 15.00 6.66 0.31 0.03 0.28 20.00 5.60 0.34 0.04 0.31 25.00 5.06 0.39 .0.04 0.35 30.00 4.52 0.42 0.05 0.36 35.00 4.13 0.44 0.06 0.38 40.00 3.74 0.46 0.07 0.39 45.00 3.49 0.48 0.08 0.40 50.00 3.23 0.50 0.09 0.41 55.00 3.05 0.52 0.10 0.42 60.00 2.86 0.53 0.11 0.42 65.00 2.74 0.55 0.11 0.43 70.00 2.62 0.56 0.12 0.44 75.00 2.50 0.58 0.13 0.44 80.00 2.38 0.59 0.14 0.44 85.00 2.31 0.60 0.15 0.45 90.00 2.23 0.62 0.16 0.46 I 95.00 2.16 0.63 0.17 0.46 100.00 2.08 0.64 0.18 0.46 105.00 2.01 0.65 0.19 0.47 110.00 1.95 0.66 0.19 0.47 115.00 1.88 0.67 0.20 0.46 120.00 1.82 0.67 0.21 0.46 125.00 1.75 0.67 0.22 0.45 130:00 1.68 0.67 0.23 0.44 135.00 1.61 0.67 0.24 0.43 140.00 1.54 ---------------- THE REQUIRED POND SIZE --------- _ .4660056 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE.POND STORAGE= 110 MINUTES '. 1 I I 11 I OAKRIDGE BUSINESS PARK PLAZA ' Proposed Detention / Water Quality Pond - Stage/Storage ' LOCATION: Oakridge Business Park Thirty Fifth Filing PROJECT NO: 137-01 COMPUTATIONS BY: PPK SUBMITTED BY: NORTH STAR DESIGN, INC. DATE: 10/15/01 V = 1/3 d ( A + B + sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Water Quality Volume Required = 0.068 Acre -Feet Detention Volume Required = 0.47 Acre -Feet Total Volume Required = 0.538 Acre -Feet W QC\� 10 YR WSEL 100 YR WSEL Overflow e/ev I f detention.xls Stage (ft) Surface Area W) Incremental Storage (ac-ft) Total Storage (ac-ft) 72.41 0 73 3961 0.02 0.02 73.37 7964 0.05 0.068 74.00 14780 0.20 0.22 74.08 16098 0.03 0.248 74.69 26098 0.32 0.538 75.00 31255 0.52 0.74 75.12 OAKRIDGE BUSINESS PARK PLAZA Detention Pond Outlet Sizing (10 yr event) LOCATION: Oakridge Business Park Thirty Fifth Filing PROJECT NO: 137-01 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design DATE: 8/6/01 Submerged Orifice Outlet: release rate is described by the orifice equation, Qa = CA sgrt( 2g(h-Eo)) where Qo = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.20 ft/s A, = effective area of the orifice (ft`) Eo = geometric center elevation of the orifice (ft) h = water surface elevation (ft) Pond Outlet Qo = 0.51 cfs outlet pipe dia = D = 15.0 in Invert elev. = 4973.25 ft Eo = 4973.45 ft h = 4974.08 ft - WSEL ' Co = 0.62 solve for effective area of orifice using the orifice equation Ao = 0.129 ft` 18.6 in` orifice dia. = d = 4.87 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/ D = 0.32 kinematic viscosity, v = 1.22E-05 ftZ/s Reynolds no. = Red = 4Q/(7cdv) = 1.31E+05 Co = (K in figure) = 0.61 check Use d = 4.87 in A. = 0.129 ff.` = 18.63 in ` r Qmax = 0.51 cfs .1 0AKRIDGE BUSINESS PARK PLAZA Detention Pond Outlet Sizing ' (100 yr event) LOCATION: Oakridge Business Park Thirty Fifth Filing PROJECT NO: 137-01 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design ' DATE: 8/6/01 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = Cok sgrt( 2g(h-Eo)) where Q. = orifice outflow (cfs) Co = orifice discharge coefficient g = gravitational acceleration = 32.20 ft/s Ao = effective area of the orifice (ft`) Eo = geometric center elevation of the orifice (ft) h = water surface elevation (ft) Pond 1 Outlet Qo = 1.28 cfs outlet pipe dia = D = 15.0 in Invert elev. = 4972.36 ft Eo = 4972.61 ft h = 4974.69 ft - WSEL ' Co = 0.64 solve for effective area of orifice using the orifice equation Ao = 0.173 ft` 24.9 in` orifice dia. = d = 5.63 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/ D = 0.38 kinematic viscosity, v = 1.22E-05 ftZ/s Reynolds no. = Red = 4Q/(ndv) = 2.85E+05 Co = (K in figure) = 0.64 check Use d = 5.6 in A, = 0.171 ft' = 24.63 in Qmax = 1.27 cfs detention.xls f 1 1 t i 1 1 1 1 1 1 1 1 1 1 1 1 1 OAKRIDGE BUSINESS PARK PLAZA Emergency Overflow Spillway Sizing LOCATION: Oakridge Business Park Thirty Fifth Filing PROJECT NO: 137-01 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design DATE: 8/6/01 Equation for flow over weir top Of IenT Q = CLH312 'Q H where C = weir coefficient = 3.1 spill elevation H =overflow height ~— � L = length of the weir 100 Yr WSEL Spillway will be designed with max 0.5 ft flow depth, H = 0.41 ft Size the spillway assuming that the pond outlet is completely clogged. Pond 2 Q (100) = 17.4 cfs Spill elev = 4975.12 ft Min top of berm elev.= 4975.62 Weir length required: L= 21 ft Use L = 24 ft v = 1.62 ft/s detentionAs 100 yr WSEL = 4974.69 ft Detention Pond Outlet Pipe Worksheet for Circular Channel Project Description Project File \\nstar\projects\137-01 egg & i\drainage\oakpark.fm2 Worksheet Detention Outlet Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 ' Channel Slope 0.50 % Diameter 15.00 in ' Discharge 1.28 cfs Results Depth 0.45 ft Flow Area 0.40 ft2 Wetted Perimeter 1.61 ft Top Width 1.20 ft Critical Depth 0.45 ft Percent Full Critical Slope 36,21 0.005256 ft/ft Velocity 3.19' ft/s Velocity Head 0.16 ft ' Specific Energy 0.61 ft Froude Number 0.97 Maximum Discharge 4.91 cfs ' Full Flow Capacity 4.57 cfs Full Flow Slope 0.000393 ft/ft Flow is subcritical. 08/0 6/01 - RowMaster v5.15 08:38:13 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 1 - Concrete Channel for Det Pond Release ' Worksheet for Rectangular Channel Project Description Project File \\nstar\projects\137-01 egg & i\drainage\oakpark.fm2 Worksheet Concrete Channel Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 0.50 % Bottom Width 2.00 ft ' Discharge 1.28 cfs Results Depth 0.24 ft Flow Area 0.48 ft' Wetted Perimeter 2.48 ft r Top Width 2.00 ft Critical Depth 0.23 ft Critical Slope Velocity 0.005290 ft/ft 2.69 ft/s Velocity Head 0.11 ft Specific Energy 0,35 ft ' Froude Number 0.97 Flow is subcritical. I u 08/06/01 FlowMaster v5.15 08:38:03 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 8/6/01 LOCATION: Oakridge Business Park Thirty Fifth Filing ITEM: Water Quality Pond Sizing COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design, Inc From Urban Strom Drainage Criterial Manual, March 1969 (Referenced figures are attached in Appendix F) Use 40-hour brim -full volume drain time for extended detention basin Water Quality Capture Volume = WQCV = (required storage/12)'(tributary drainage area) MAJOR BASIN Trib. area (ac) % Imperv. Req. Storage (In. of runoff) from Fig. 5.1 WQCV (ac-ft) Dwo (ft) req. vol WQCV •1.2 (ac-ft) req. arealrow (int/row) from Fig. 5-3 POND #1 2.84 60.0 0.24 0.057 1.00 0.068 0.46 WO outlet sizing for pond 1 From Figure 5, for 3/4 in. hole diameter Area of hole = 0.44 in' # of columns = 1 Area provided/row = 0.44 in Area Required/row = 0.46 in Use f columns of 3/4" diam holes e WQVOL.xls APPENDIX D EROSION CONTROL CALCULATIONS o o. Q o H a e e q a r Q QO 0 � o z a � o N v ' oG N 'a N N O h 0 a Hwy w o O O O w F N Q� C4 W Q a Csi o c f.; z A A W A m Z dp, o°we� E0 O � A A N W a z d d F Gcn O G O C > c0 •° � S c y N N L cd W C C y � � L d O T w � o Q C A O C O U ° � ¢ Q W o 0 E E � o`li a > II . ° OA V) 00 � = r a ° N °O o asCOL. 3 ° •� E � � d d w U p ¢arnacn a.¢5sa N X 0 0 w North Star Design 700 Automation Drive, Unit I Windsor, CO 80550 EFFECTIVENESS CALCULATIONS PROJECT: OAKRIDGE BUSINESS PARK, THIRTY-FIFTH FILING STANDARD FORM B COMPLETED BY: PPK DATE: 13-Apr-01 EROSION CONTROL C-FACTOR P-FACTOR METHOD VALUE VALUE COMMENT BARE SOIL 1.00 1.00 SMOOTH CONDITION ROUGHENED GROUND 1.00 0.90 ROADSAVALKS/BLDG 0.01 1.00 GRAVEL FILTERS 1.00 0.80 PLACED AT OUTLET SILT FENCE 1.00 0.50 STRAW MULCH 0.06 1.00 ESTABLISHED GRASS 0.08 1.00 FROM FIGURE 8-A STRAW BARRIERS 1.00 0.80 EFF = (I-C•P)• 100 MAJOR SUB BASIN AREA EROSION CONTROL METHODS BASIN BASIN (Ac) 1 2.81 ROADS/WALKSBLDG 1.93 Ac. ROUGHENED GR. 0.00 Ac. GRAVEL FILTER 0.88 STRAW BARRIER 0.00 Ac. NET C-FACTOR 0.32 NET P-FACTOR 0.84 EFF = (1-C' P)• 100 = 73.0% 0-1 0.14 ROADS/WALKSBLDG 0.00 Ac. ESTABLISHED GRASS 0.07 Ac. ROUGHENED GR. 0.00 Ac. SILT FENCE 0.07 Ac. STRAWIMULCH 0.00 Ac. NET C-FACTOR 0.54 NET P-FACTOR 0.75 EFF = (1-C' P)' 100 = 59.5% 0-2 0.20 ROADS/WALKS/BLDG 0.02 Ac. ROUGHENED GR. 0.00 Ac. STRAW/MULCH 0.00 Ac. SILT FENCE 0.18 STRAW BARRIER 0.00 NET C-FACTOR 0.90 NET P-FACTOR 0.55 EFF = (I-C•P)• 100 = 50.4% TOTAL AREA = 3.15 ac TOTAL EFF = 71.0% _ (94.0%•29.77 ac. +,. +99.6%'0.40 ac)/1.14 ac REQUIRED PS = 79.4% Since 71.0% < 79.4%, the proposed plan does not meet the performance standard Erosion.xls 1of1 North Star Design, Inc. 700 Automation Drive, Unit I Windsor, CO 80550 CONSTRUCTION SEQUENCE STANDARD FORM C PROJECT: OAKRIDGE BUSINESS PARK, THIRTY-FIFTH FILING SEQUENCE FOR 2001 ONLY COMPLETED BY: PPK DATE: 06-Aug-01 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new. schedule for approval by the City Engineer. 2001 2002 MONTH J A S O N D J F M A M Demolition Grading Wind Erosion Control: Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other Rainfall Erosion Control Structural: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other Vegetative: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation N ettings/Mats/Blankets Other BUILDING CONSTRUCTION STRUCTURES: INSTALLED BY: CONTRACTOR MAINTAINED BY: DEVELOPER VEGETATION/MULCHING CONTRACTOR: TO BE DETERMINED BY BID DATE SUBMITTED: APPROVED BY CITY OF FORT COLLINS ON: Page 1 APPENDIX E EXCERPTS FROM PREVIOUS REPORTS E MASTER DRAINAGE REPORT FOR THE O A R R I D G E B U S I N E 8 8 P A R R FORT COLLINS, COLORADO September 24, 1990 PREPARED FOR: EVERITT COMPANIES 3000 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO 80525 PREPARED BY:. RBD, INC. ENGINEERING CONSULTANTS 2900 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO 80525 100 YEAR 10 YEAR BASIN # CONTROL CONTROL REMARKS 340 YES NONE 330 NO If Possible, if onsite problems exist 320 NO if Cemetary 310 YES it Offsite from north of Harmony I_ 300 YES of Offsite from west to Lemay 290 YES of Existing 280 NO of Street 270. YES Is 1 260 YES 250 YES " Existing 240 NO Downstream street capacity is OK I230 YES " ' 220 YES 210 NO " From sump in Innovation to channel 200 NO " Possible YES*; Direct to Pond I, 160 NO " Internal street system73 120 NO " Possible YES*; Includes Comlinear 110 NO " Internal street system14 I' The 10 year storm model did not include an site specific detention for the Oakridae site. The above results indicate that control at Pond 1 is adequate to bring the 10 year release rate below the allowable 0.2 cfs per acre discharge. This includes offsite Basin 300. * There may be a need for local detention due to certain physical site constraints. As an example there may be flat topography that restricts longitudinal street grade. 2.2.2 Flow Characteristics ' STREET SYSTEM FLOW .DEPTH ' Page 8 of Appendix A is a sorted list of all the basins and conveyance elements with their respective flow depths. The internal street system was evaluated according to allowable flow ' depth. The City of Fort Collins criteria states that15 both local and collector streets may have an 18" depth of runoff in the gutter for the major (100 year) storm event and arterial ' streets .are only allowed a depth of 0.5' above the crown. There are no arterial streets internal to the Oakridge site. For comparative purposes only, the above mentioned evaluation is based on the arterial standard. 13 Ridge. West half of Harmony, Wheaton and a small portion of oak 14 East half of Harmony, Innovative, McMurry and about half ' of the easterly portion of Oak Ridge. 15 City of Fort Collins, Op. Cit., Table 4-4, page 4-6. I 1 , ' SUBBASIN CONNECTION ' - SUBBASIN BOUNDARY 300 ROUTING ELEMENT ' s13 BASIN DETENTION POND No 0 250 x 10 NODE 1 inch 500 ft. G SECTION NUMBER NAAS ' B113 IS OAKRIDGE DRIVE BETWEEN WHEATON DRIVE AND MCMURRAY DRIVE. BASIN 114 IS MCMURRAY DRIVE BETWEEN OAKRIDGE DRIVE AND HARMONY ROAD. BASIN 115 IS MCMURRAY DRIVE BETWEEN OAKRIDGE DRIVE AND INLETS AT ELEMENT 51. ' BASIN 116 IS INNOVATIVE DRIVE. BASIN 117 IS MCMURRAY DRIVE BETWEEN KEENLAND DRIVE AND INLETS AT ELEMENT 51. APPENDIX F FIGURES AND TABLES F DRAINAGE CRITERIA MANUAL (V. 3) 0. 0. 0. 9-1.1992, UDFCD STORMWATER QUALITY MANAGEMENT i xten ed De entior Basin (Dry) 10-Hot r Drain time s Detentic n Pon Js (W( t) I 1 -Hour Drain Time 0 10 20 30 40 50 60 70 80 90 100 Percent Impervious Area in Tributary Watershed Source: Urbanos, Guo, Tucker (1989) Note: Watershed inches of runoff shall apply to the entire watershed tributary to the BMP Facility. FIGURE 5-1. WATER QUALITY CAPTURE VOLUME (WQCV) DRAINAGE CRITERIA MANUAL(V. 3) STRUCTURAL BMPs 0.6 0 0.4 r7 o.( 0.( 0. 0.02 0 vid es FA I, WQCV = 2.1 acre-foo A114A I SOLUTION: Required Area or j Fjo, FANAPA VA III A FISFAV4ANVAPAI PAF VAN PA APJJAII VAAMI A loll ■ AREA 1 V4AA IPA F4ANOFAA IIIloll 0.04 0.06 0.10 0.20 0.40 0.60 1.o 2.0 n.v 0.v Required Area per Row (in.2 ) Source: Douglas County Storm Drainage and Technical Criteria, 1966. FIGURE 5-3. WATER QUALITY OUTLET SIZING: DRY EXTENDED DETENTION BASIN WITH A 40-HOUR DRAIN TIME OF THE CAPTURE VOLUME Rev. 3-1-1994 UDFCD No Text 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i i 1 1 280 S Closc(I Conduit Flow Red __ d K to, 10' 104 t0' 104 M�n to, 10' 10' 1o` Red = N 1 il�•r tfdv Figure 5-21 Flow coefficient K and Red/K versus the Reynolds number for orifices, nozzles, and venturi meters (20, 23) ------------ / BUILDING B � ((J/// FF=]8.50 SP�r1wmAYY 1 II jbj- � l - I\ it 1 / wh YEAR HMEI / .KTe.ee I T1 i� I L 2 / 1 I 1 P OAKRIDGE DRIVE _ ------------ NSTRUCTON PLAIN NOTES The STANDARD FROBON CONTROI GO City of Fort Collins Stormwater Utility erosion central Inspector must be notified at lease 24 hours prior to any construcDan on this site. All redfulrad perimeter silt fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All other required a orlon control measures Mall be installed at the appropriate time in the construction Sequence as IndcaledIn the approvM project ecaedue, aenstrucllan plane and erosken contra report. Pre -disturbance will shall be protected and retained wherever possible. Remerol or disturbance of existing vegetation shall be limited to the area required for immedbte conanDcllan operations and for the Shortest practical period of time. All soils exposed during land disturbing activity, (stripping. grading, daily Installation. Stockpiling, filing, etc.) shall be kept In a roughened Condition by ripping or disking along land contours u HI mulch, vegetation or other permanent erasion control Is Installed. No soils in areas outside propel street rights of way Shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. sudImulch, landscaping, etc.) is installed, unless olherMse approved by the Slormwaler Utility. The property shall be watered and maintained at all times during Construction activities as to prevent wind -Caused erosion. All land disturbing activities shall be Immedlately discontinued when fugitive dust Impacts adjacent properties, as determined by the City of Fort Collins Engineering Deportment. All temporary (structural) erasion control measures shall be Inapcted and repaired Or onstructed as sary after each runoff eveassure In order to continued performance of their Intended function. All retained sediments, particularly those an paved roadway surfaces, sholl be removed and disposed of in o manner and location so as not to cause their relents Into any drainageway. No sail stockpile shop exceed ten (10) feet in height, All sod stockpiles shop be protected From sediment transport by surface roughening, watering and perimeter all( fencing. Any soil stockpile remaining after 30 days Mall be seeded and mulcM1ed. City Ordinance prodibits the tracking, droppin9. or depositing of Bolls Or any other materld Onto City streets by or from any vehicle. Any Inadvertent deposited mated Mall be cleaned immediately by the contractor bibbibbi BUILDING A 1 H )FWwgNI.N AQ I � / W NOTE IF BOTH BUILDINGS AND THE ENTIRE SITE (PARKING AREAS, LANDSCAPING ETC.) ARE NOT COMPLETED DURING INITIAL CONSTRUCTION, AN AMENDED (de NEW) SEDIMENT / ERGSION CONTROL PLAN "a BE NEEDED FOR THE SECOND BUILDING AND REMAINING SITE WORK. DETENTION POND SUMMARY The STANDARD FROBON CONTROI GO City of Fort Collins Stormwater Utility erosion central Inspector must be notified at lease 24 hours prior to any construcDan on this site. All redfulrad perimeter silt fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All other required a orlon control measures Mall be installed at the appropriate time in the construction Sequence as IndcaledIn the approvM project ecaedue, aenstrucllan plane and erosken contra report. Pre -disturbance will shall be protected and retained wherever possible. Remerol or disturbance of existing vegetation shall be limited to the area required for immedbte conanDcllan operations and for the Shortest practical period of time. All soils exposed during land disturbing activity, (stripping. grading, daily Installation. Stockpiling, filing, etc.) shall be kept In a roughened Condition by ripping or disking along land contours u HI mulch, vegetation or other permanent erasion control Is Installed. No soils in areas outside propel street rights of way Shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. sudImulch, landscaping, etc.) is installed, unless olherMse approved by the Slormwaler Utility. The property shall be watered and maintained at all times during Construction activities as to prevent wind -Caused erosion. All land disturbing activities shall be Immedlately discontinued when fugitive dust Impacts adjacent properties, as determined by the City of Fort Collins Engineering Deportment. All temporary (structural) erasion control measures shall be Inapcted and repaired Or onstructed as sary after each runoff eveassure In order to continued performance of their Intended function. All retained sediments, particularly those an paved roadway surfaces, sholl be removed and disposed of in o manner and location so as not to cause their relents Into any drainageway. No sail stockpile shop exceed ten (10) feet in height, All sod stockpiles shop be protected From sediment transport by surface roughening, watering and perimeter all( fencing. Any soil stockpile remaining after 30 days Mall be seeded and mulcM1ed. City Ordinance prodibits the tracking, droppin9. or depositing of Bolls Or any other materld Onto City streets by or from any vehicle. Any Inadvertent deposited mated Mall be cleaned immediately by the contractor bibbibbi BUILDING A 1 H )FWwgNI.N AQ I � / W NOTE IF BOTH BUILDINGS AND THE ENTIRE SITE (PARKING AREAS, LANDSCAPING ETC.) ARE NOT COMPLETED DURING INITIAL CONSTRUCTION, AN AMENDED (de NEW) SEDIMENT / ERGSION CONTROL PLAN "a BE NEEDED FOR THE SECOND BUILDING AND REMAINING SITE WORK. DETENTION POND SUMMARY DETENTION REWIRED 1 0.47 At FT. DETENTION %tOMDED 1 0.74 AC.FT. 100 NOR H 1 4974.59 MAX RELEASE RATE I 1.26 CFS DRAINAGE SUMMARY TABLE OESION PdNT AREA DESIG. AREA ACRES CIO C10D To (10) MIN To (IM MM 0 (to) CFS 0 (100) Cis 1 1 2A4 Puss OJB 12.4 9.6 5.16 19 01 1 0-1 1 0.21 1 0.10 1 0.13 1 &a I &a 1 0.10 0.28 02 1 0-2 1 %10 1 O.i2 1 0.27 1 6.6 1 0.8 1 0.10 1 0.25 Y L - 30 15 0 W 60 SCALE: 1' 30' W 1 CONSTRUCTION SEQUENCE STANDARD FGN C M V, OAKRO¢ BUSINESS PARR NASA S MMM FOR trot A 2003 CdgFTED eY: PR-1 DATE 121 IN4M awe yap"hwA4Bmeve,wee oLmH1Ae a newt uposis fix, m ev GO all Majorpb ENGAWmadncotkne is YGId MWMY FCNUMY YMM ANIk MY I J11L Way Dendltkn theme Co,"Send Your Sal mupwig Some, pedmele eemel uhARv SNI Si Chin Achill Iranian Consul SIld""t TrW/eyN Hit otw, Stme swtlee Be re,ee Bm.b.e Sond bass Bae AN, P Cmeew Fu pv cmente OBI, w,t,tnm Pl Seea Pan^p/Sep rot Temp ... ry Soso rp H `nllnlR nge/Mn1e/B pnMtle BwtOlnc COXSTRUCTI STIIUCnaES MSIAIIED OR CONTRACTOR MAINTAINED BY: DE1fl(PEH IfRTATIONMULCIVNG cMTRACTBe: $9E➢ERINABO¢BLUl DATE SUBMITTED: APPROKO uY CITY M FORT COLLINS ON'. LEGEND Q1 DESIGN POINT BASIN CRITERIA O.BO O. RUNOFF COEFFICIENT AREA IN ACRES ROW DIRECTION BASIN BOUNDARY EXISTING PIPES ® PROPOSED STORM PIPE OfNoressitits EROSION BALES — — — — EXISTING 5' CONTOUR EASING 1' CONTOUR PROPOSED 5' CONTOUR PROPOSED 1' CONTOUR O� SILT FENCE O- CONSTRUCTION ENTRANCE Ac n o m m $him O � Cie 83G 13w. C an a' Nwb m �.0 as n al as a v g0 3`D.UL 4� 40 a 0 DO n a a N n 6 N O a e e O N O � Nz Y J� cr a a az�e 0 Qa (jj LL o W:r CIO U Z Pc*z W (A LLL LL N m N� CALL UTIUTY NOTIFICATION W CENTER OF COLORADO 0 cc 1-800SI922=1987 U LNL 2-BUSINESS DAYS IN ADVANCE i BEFORE YW BIG. GRADE. M EXCAVATE M L O r FOR THE G F MC Of NDERCAWND z uAKIN UTUTES Y Q City of Fort Collins, Colorado Q C UTILITY PLAN APPROVAL el APPROVED: GtY LtpTmer Dote SHEET CHECKED BY: Water At wmtewdw unity CHECKED BY:.0 Dole /11 Sushru w Unit Dow T CHECKED BY: PVXI a Rsreetlon CaU 4 OF 6 CHECKED BY: Tnflk Bremer Date CHECKED BY: JOa No. 137-01 pate