STORM DRAINAGE REPORT
FOR
IHOP RESTAURANT
OAKRIDGE BUSINESS PARK
FORT COLLINS, COLORADO
PREPARED FOR:
STUBBLEFIELD AND ASSOCIATES
ARCHITECTS
101 EAST GRAY, SUITE B
NORMAN, OKLAHOMA 73069
PREPARED BY:
FOR AND ON BEHALF OF ADG ENGINEERING, INC.
KONSTANTIN A. KONSTANTAKOS, P.E.
December 19, 2000
ADG JOB NO.6463
,.• s
e
so.
' a
i Iwo f
�qr��b A��a;�Paoe
• F OF CO�� , o
Leo®aI
II
2
1
1
1
1
DRAINAGE REPORT CERTIFICATIONS
ENGINEER'S CERTIFICATION
I hereby certify that this report for the drainage design of IHOP Restaurant was prepared
by me or under my direct supervision in accordance with the City of Fort Collins Storm
Drainage Design and Technical Criteria Manual for the owners thereof. I understand that
the City of Fort Collins does not and will not assume liability for drainage facilities
designed by others. /
. . 0 _, C e •
PW` a CxA. Konstantakos, P.E. 16187
I W % W1DG Engineering, Inc.
1
,♦
• FOF CO��•°
•W m
ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
INDEX
ITEM
PAGE
1, SCOPE AND PURPOSE OF REPORT
4
2. GENERAL LOCATION AND DESCRIPTION
4
3. PROPERTY DESCRIPTION
4
4. DRAINAGE BASINS AND SUB -BASINS
5
5. DRAINAGE DESIGN CRITERIA
5
6. DRAINAGE FACILITY DESIGN
5
7. CONCLUSIONS
6
6. EROSION CONTROL
6
APPENDIX
DESIGN COMPUTATIONS
8-16
VICINITY MAP
17
INTENSITY CURVES
18
EROSION CONTROL FENCE DETAIL
19
REDUCED COPY OF GRADING AND DRAINAGE PLAN ATTACHED
Y
ADG Engineering, Storm Drainage Report,. October 17, 2000 Job No. 6463
S
' 4
FINAL DRAINAGE REPORT
1. SCOPE AND PURPOSE OF REPORT
' The purpose of this report is to determine the drainage requirements for the IHOP
Restaurant Development in Larimer County. Proposed retention facilities are
' based upon data for 100 year frequency storms. All computations in this study
are prepared in accordance with the City of Fort Collins Storm Drainage Design
' Criteria and Construction Standards Manual and Urban Storm Drainage Criteria
' Manual by DRCOG.
2. GENERAL LOCATION AND DESCRIPTIONDESCRIPTION
a) The proposed development property is located in the North 1/2 Section 6,
Township 6 North, Range 68 West of the Sixth Principal Meridian City of Fort
Collins, County of Larimer, State of Colorado.
b) The site is located on the North side of Oakridge Drive and South of Harmony
Road.
' 3. PROPERTY. DESCRIPTION
a) The area of the development site is 1.17 acres.
b) The existing site is presently vacant.
c) There are no major or minor drainage ways across the existing site. The total
relief across the site is from elevation 4979.2 down to 4978.40. The slope is
' northeast with the drainage going to Oakridge Drive to an existing curb and
gutter.
d) There is no indication of any major irrigation or ditches having crossed the site.
' e) The purpose of the current development request is to add a building to the site.
The drainage of the proposed development will follow the final grading of the lot
' which will be as shown on the Drainage Plan. The runoff will be detained in one
proposed detention pond, with several sections of the one pond in the parking area
' ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
5
Southwest of the parking, and the second on the East side of the parking (see
' Drainage Plan attached).
4.
DRAINAGE BASINS AND SUB -BASIN:
'
MAJOR BASIN DESCRIPTION
'
a)
This site is part of the Oakridge Business park area and is included in the master
drainage study. Final master drainage study for the Oakridge Business Park, Fort
'
Collins, Colorado, September 1990, by RBD, Inc. Engineering Consultants.
SUB -BASINS
a)
The Historic drainage pattern for this site was sheet flow across the site from
North to South towards Oakridge Drive. The existing drainage pattern will be
modified for the proposed development only. (See Drainage Plan attached).
'
b)
The offsite flows are sheet flows around this site and will continue in the same
pattern.
'
5.
DRAINAGE DESIGN CRITERIA
'
a)
The drainage design follows the City of Fort Collins Storm Drainage Design
Criteria and Construction Standards Manual without deviation from the Criteria.
b)
There are no other studies, master plans or reports that effect this development.
c)
All of the development occurs in Basin "A, B, C, D, E, and F" which will get to
'
the proposed detention ponds.
'
6.
DRAINAGE FACILITY DESIGN AND REQUIRED 100-YEAR RELEASE
RATE OF 0.5`CFS/ACRE
'
a)
The drainage flows onsite for the proposed development.will be` captured in one
pond, several sections, proposed ponds located on the Southwest and Southeast
'
parking areas. The flows will be captured in the proposed double type 13 grade
tinlets
and conviened into the Southeast corner of the water quality control pond,
before the 0.5 cfs will be discharged into the Oakridge Drive.
'
ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
6
7.
CONCLUSIONS
' a)
The drainage of the proposed development will follow the new drainage pattern.
'
There will be one pond, several sections, added to the site to capture the runoff.
b)
The drainage system follows the Criteria and will therefore have a slight effect on
'
the major drainage way. The reduction in flow from the proposed development
by the addition of the Detention ponds will help, as there are no controls on the
'
present runoff.
' 8.
EROSION CONTROL
a)
Erosion control fence shall be used along the perimeter of the area that will be
'
effected by construction. The Erosion Control System will be required to be kept
in place until the surfaces are stabilized by the finish surfacing or landscaping to
prevent erosion.
' 9.
VARIANCE REQUEST
We request variance for:
a)
The Basin 'T" that releases into Oakridge Drive should be considered free release.
b)
From the detailed assessment of the basin that free releases from this site, it would
1
be impractical to try to capture these flows for detention. The flows could be
'
captured with a series of inlets at the entrance and directed into Pond WQ.
However, the elevation of this structure would be well below the water surface
'
elevation of Pond WQ, which would backflow through the structure. Another
option would be to use the series of inlets and direct the flows into a separate
1
pond that would probably need to be sectioned off from Pond WQ. However, this
'
would involve constructing some type of wall to separate the two sides of Pond
WQ and the orifice for the outlet from such a small pond would be very prone to
'
clogging. Although from calculations done in our office, the 100 year flows from
this basin is greater than the release rate for the remainder of the site, the volume
' ADG
Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
9
of water is much less that the flows from the entire site. Therefore, we request a
' variance allowing this free release into Oakridge Drive. The amount of flows that
' are free releasing are from the 100 year 0.763 CFS and for the 10 year is 0.299
CFS.
1
I
I
' ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
I
s
t
1
APPENDIX
IADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
n
9
DESIGN COMPUTATION
REFERENCE:
"City of Fort Collins Storm Drainage Design Criteria Manual" & (SDDC)
Construction Standards (1984, Rev. 1997)
Urban Drainage and Flood Control Criteria Manual. Volume 3.
DESIGN AREA: (Total Area)
Lot Area = 51,054 sq ft = 1.172 Acres
Building Area = 4,022 sq ft = 0.0923 Acres = 7.88%
Paving Area = 22,077 sq ft = 0.5068 Acres = 43.24%
Sidewalks Area = 5,767 sq ft = 0.1324 Acres = 11.30%
Landscaping Area = 19,188 sq ft = 0.4405 Acres = 37.58%
Total = 51,054 sq ft = 1.172 Acres = 100%
RUNOFF COEFFICIENTS (TABLE 3-3)
SURFACE C10
Roofs 0.95
Parking/drives 0.95
Landscape 0.10 sandy soils
C10 = (0.95) (0.0788) + (0.95) (.5454)+ (0.10) (3758) _ .6306
CI00= CIO x1.25
= 0.6306 x 1.25 = 0.7883 1.00 = 100%
62.42% Impervious
ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
R-M-P Medium Density Planned Residential District — designation for medium density
areas planned as a unit (PUD) to provide a variation in use and building placements
with a minimum lot area of 6,000 square feet.
R-L-M Low Density Multiple Family District — areas containing low density multiple family
units or any other istrict with
square feet
for one -family orutwo-familse in they dwDellings andaminimum 9,000 square ot area of 0
are feet form� t ple-fami y
' dwellings.
M-L Low Density Mobile Home District — designation for areas for mobile home parks
' x containing independent mobile homes not exceeding 6 units per acre.
M-M Medium Density Mobile Home District — designation for areas of mobile home
parks containing independent mobile homes not exceeding 12 units per acre.
B-G General Business District — district designation for downtown business areas,
including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total
floor area of the building.
' B-P Planned Business District — designates areas planned as unit developments to
provide business services while protecting the surrounding residential areas with
minumum lot areas the same as R-M.
H-B Highway Business District — designates an area of automobile -orientated busi-
nesses with a minimum lot area equal to 1/2 of the total floor area of the building.
B-L Limited Business District — designates areas for neighborhood convenience
centers, including a variety of community uses with minimum lot areas equal to two
times the total floor area of the building.
C Commercial District —designates areas of commercial, service and storage areas.
' I-L Limited Industrial District —designates areas of light industrial uses with a minimum
area of lot equal to two times the total floor area of the building not to be less than
20,000 square feet
I-P Industrial Park District —designates light industrial park areas containing controlled
' industrial uses with minimum lot areas equal to two times the,total floor area of the
building not to be less than 20,000 square feet.
' I-G General Industrial District —designates areas of major industrial development.
T Transition District — designates areas which are in a transitional stage with regard
to ultimate development.
' For current and more explicit definitions of land uses and zoning classifications, refer to the
Code of the City of Fort Collins, Chapters 99 and 118.
' Table 3-3
RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS
character of Surface Runoff Coefficient
' Streets. Parking Lots, Drives:
Asphalt .......Y........................................................................................ 0.95
95
Concrete............................................................................................. 0.
' Gravel................................................................................................. 0.50
Roofs.......................................................................................................... 0.95
Lawns. Sandy Soil:
Flat<2%.............................................................................................
Average2 to 7%..................................................................................
Steep>7%..........................................................................................
Lawns, Heavy Soil:
Flat<2%.............................................................................................
Average2 to 7%..................................................................................
Steep>7%..........................................................................................
IMAY 1984 3-4
0.10
0.15
0.20
0.20
0.25
0.35
DESIGN CRITERIA
ro
Volume will be released at a rate of 0.4931 cfs/ac for the 100-year event, according to
Oakridge Master Plan.
BASIN "A" Ql 0.4931 x 0.3943 = 0.1944 cfs
BASIN "B" Q,,,= 0.4931 x 0.2126 = 0.1048 cfs
BASIN "C" Q„o 0.4931 x 0.1811 = 0.0893 cfs
BASIN "D" Q,,,= 0.4931 x 0.1594 = 0.0786 cfs
BASIN "E" Q,,,= 0.4931 x 0.0387 = 0.0191 cfs
BASIN T" Q,,,= 0.4931 x 0.0830 = 0.0409 cfs
DESIGN AREA: Basin "A" =
0.3943 AC
Basin "B" =
0.2126 AC
Basin "C" =
0.1811 AC
Basin "D" =
0.1594 AC
Basin "E" =
0.0387 AC
Basin "F" =
0.0830 AC
DEVELOPED FLOWS:
Runoff Coefficient: C100 = 0.6306 C10 = 0.6306
BASIN "A" Developed Area 0.3943
Runoff Coefficient: CIO = 0.6306
L = 160 Ft S = 1.50% V = 1.1 Ft/Ft tc = 5 min.
Rainfall Intensity i100 = 9.95 in/hr. i10 = 4.87 in/hr.
Q100 = 0. 63 06 x 9.95 x 0.3943 = 2.474 cfs
Q 10 = 0. 63 06 x 4.87 x 0.3943 = 1.2.10 cfs
BASIN "B" Developed Area = 0.2126 AC
L = 80ft. S = 1.75% V = 1.86
Rainfall Intensity: i100 = 9.95 in/hr. i10 = 4.87 in/hr.
t = 80/1.86 x 60 = 0.717 min. Use 5 Min. Minimum
Q100 = 0.6306 x 9.95 x-0.2126 = 1.33 cfs
Q 10= 0.6306 x 4.87 x 0.2126 = 0.653 cfs
ADG Engineering, Storm Drainage Report, Job No. 6463, Feb. 20, 2001.
e
I
13
BASIN "C"
' Developed Area = 0.1811 AC
' Runoff Coefficient:
CIO =0.6306, L=135ft, S=.81%, V=0.86ft/ft
t
1
C
1
1
Rainfall Intensity = 9. 95'in/hr, tc = 135/0.86 x 60 = 2.62 min. Use 5 Min, Minimum
Q10= 0.6306 x 4.87 x 0.1811 = 0.5562 cfs
Q100 = 0.6306 x 9.95 x 0.1811 = 1.1363 cfs
BASIN "D"
Developed Area = 0.1594 AC
C= 0.6306) L= 70 ft, V = 1.23 ft/ft, S = 3.46%,
tc = 70/1.23 x 60 = 0.95 min Use 5 min.
Q10 = .6306 x 4.87 x 0.1594 = 0.4895 cfs
Q100 = 0.6306 x 1.95 x 0.1590 = 0.9976 cfs
BASIN "E" Pond WQ Basin
Area = 1684 ft.sq. = 0.0387 AC
C10=0.10, C100=0.125
Tc = 5 min.
Q10 = .10(4.87)(0.0387) = 0.02 cfs
Q100 = 0.125 (9.95)(0.0387) = 0.05cfs
BASIN "F" ENTRANCE BASIN
Area = 0.083 AC
C10 = 0.0624 x 0.95 Paved, Lands = 0.0206 is 0.0206 = 0.739
ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
1
14
11
C 100 = 0.924
Q10 =.739 x 4.87 x 0.083 = 0.299 cfs
Q 100 = 0..924 x 9.95 x 0.083 = 0.763 cfs
DETENTION POND RELEASE:
FOR SOIL GROUP "C"
Volume will be released at a rate of 0.50 cfs/acre for the 100 year event, according to
Oakridge Master Plan.
BASIN "A" Q100 = 0.5 x 0.3943 = 0.1972 cfs One Pond, Several portions
AREA = 0.9861, Total release rate from the entire site.
Total Release Rate from entire site
Totals = 0.5 x 0.9861 = 0.4931 cfs
ADG Engineering, Storm Drainage Report, December 19, 2000 Job No. 6463
'
"A"
Basi Are
0.3943
100-Year
"C" Volume
0.6306
"C" 1.25
0.78825
Area
0.9861
Release Rate
0.49605
DETENTION REQUIREMENTS
FOR
FAA" METHOD (Per City of Fort Collins)
Basins (A - E) Excluding "F"
TIME TIME INTENSITY 100 YEAR RUNOFF RELEASE REQUIRED
' MINUTES CUM. SEC. 100 YEAR "C" VOLUME CUM. TOTAL DETENTION
IN/HR FT.V3 FT. V3 FT. V3
1
I
r_
0
5
300
9.95
0.7886
2268.60
236.58
2032.02
10
600
7.72
0.7886
3640.00
473.16
3166.84
15
900
6.52
0.7886
4459.68
709.74
3740.86
20
1200
5.60
0.7886
5299.39
943.20
4356.19
25
1500
4.98
0.7886
5890.84
1182.90
4707.94
30
1800
4.52
0.7886
6394.87
1419.48
4975.27
35
2100
4.08
0.7886
6756.72
1656.06
5100.66
40
2400
3.74
0.7886
7078.47
1892.60
5185.83
45
2700
3.46
0.7886
7367.10
2129.22
5237.88
50
3000
3.23
0.7886
7641.53
2365.80
5275.73
55
3300
3.03
0.7886
7885.21
2602.38
5282.83 dd-
60
3600
2.86
0.7886
8119.43
2838.96
5280.47
'WQCV = 0.024 AC - FT
= 1045.44 Ft. cu.
Detention Pond
' = 0.1gSAC - FT
= 6y328.?-j Cu. Ft
1
1
TOTALVOLUME
ELEV.
AREA
74.50
0
75.00
320
76.00
792
76.41
77.00
1180
78.00
7416
78.40 15612
INC. VOL. CUM. VOL.
0.0
0.00
53.3
53.30
538.5
591.80
76.41
979.6
1571.40
2390.4
3961.80
7800.00
4469.0
8430.80
100 Year Volume needed 7963
ORIFICE SIZING
Total Allowable Pelease
Q = 0.4931
Solving for A:
WQCV @ 76.41
100 - Yr WSEL @ 78.34
A -Q- 0.4931
C 2gh .62 6 . - .5
A = 0.0.482 Ft. Sq. =71r z
r - as 40.0482 0.1239 ft. d = .2478 ft. 2.97=-3
Y'll 3.14
I
POND STAGE / STORAGE CALCULATIONS
POND WQ
ELEVATION SURFACE INCREMENTAL CUMULATIVE
AREA (Ft) VOLUME (Ft ) VOLUME (Ft )
74.5
0
0
0
75.0
320
53.3
53.3
76.0
492
538.5
591.8
77.0
1180
979.6
1571.4
78.0
1480
1327.2
2898.6
78.4
1580
611.9
3510.5
POND A
ELEVATION SURFACE INCREMENTAL CUMULATIVE
AREA (Ft) VOLUME (Ft) VOLUME (Ft )
77.4 0 0 0
78.0 4696 939.2 939.2
78.4 8676 2634.0 3573.2
POND B
ELEVATION SURFACE INCREMENTAL CUMULATIVE
AREA (Ft) VOLUME (Ft ) VOLUME (Ft )
77.7
0
0
0
78.0
1240
124.0
124.0
78.4
5356
1223.1
1347.1
78.7
5868
2287.9
3030.1
I
VICINITY MAP
H
SCALE - 1 1000
I I
No Text
EXTRA STRENGTH FILTER FABRIC
NEEDED WITHOUT WIPE MESH SUPPORT
STEEL OR
WOOD POST
STEEL OR
WQOD POST
36' HIGH MAX
VLOW
FLOW
�- W
10 rT MAX SPACING WITH
WIRE SUPPORT FENCE
6 FT MAX SPACING WITHOUT
...._._._.._._.,WIRE SUPPORT FENCE
POND!NG HT.
FILTER FABRIC
/ATTACH SECURELY
TO UPSTREAM
SIUE OF POST.
PLI14OFF 99 M1AA___
(RECOMMFtiDEED)
a STORACF HT.
MIN, .
4".6" TRENCH
WITH COMPACTED
BACKF4.L
--
STANDARD DETAIL
TRENCH WI?H NATIVE BAS,KFILL
NOTE
I. INSPECT AND REPAIR FENCE AFTER EACH
STORM EVENT AND REMOVE SEDIMENT WHEN
NECESSARY.
REX40VED SEDIMENT SHALL NE DEPOSITED
10 Arl AREA THAT WILL NOT CONTRIBUTE
SEDIMENT OFF -SITE, AND CAIJ BE PERMANENTLY
STABILIZED.
3. SILT FENCE SHALL BE PLACCD ON SLOPE
CONTOURS TO MAXIMIZE PONDING EFFICIENCY.
v ^a•
PONDING HT.
RUNOFF
r4. , B_
" GRAVEL
ALTERNATE DETAIL
TRENCH WITH GRAVEL
SILT FENCE
(ALT. TO STRAW BALE DIKE)
GENERAL NOTE:
CONTRACTOR WILL NOTIFY CITY OF PHASE WORK AND WORK WITH
CITY AGENT TO MAINTAIN PROPER EROSION CONTROL.
i
_ F'tty14L
SUBMITTAL
RAINFALL EROSION CONTROL
1. CONSTRUCTION SPECIFICATIONS
2. INSPECTION AND MAINTENANCE
3. SILT FENCE
4. AREA INLET FILTER STRAWBALES (CITY OF FORT COLLINS)
5. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT
6. MAINTENANCE- DETAILS
7. STRAWBALE DIKE, GENERAL INSTALLATION (CITY OF FORT COLLINS)
8. SILT FENCE- CITY OF FORT COWNS
9. STRAW BALE DIKE CHANNEL APPLICATION (CITY OF FORT COLLINS)
10. DRAINAGE MAP D-1 (24'X 36')
Construction
Specifications
The height of a
silt fence shall not exceed 36 inches.
'
Storage height
shall never exceed 16'.
The fence line
shall follow the contour as closely as
'
possible.
If possible, the
filter fabric shall be cut from a
continuous roll
to avoid the use of joints. When joints are
necessary, filter
cloth shall be spliced only at a support
post, with . a minimum
6—inch overlap and both ends securely
'
fastened to the
post.
Posts shall be
spaced a maximum of 10 feet a art and driven
securely into the
ground (minimum of 12 inches. Whgn extra
'
strength fabric
is used without the wire support fence, post
spacing shall not exceed 6 feet.
Turn the ends of the fence uphill.
A trench shall be excavated approximately 4 inches wide and
6 inches deep along the line of posts and upslope from the
' barrier. .
' When standard —strength filter fabric is used, a wire mesh
support fence shall be fastened securely to the upslope side
of the posts using heavy duty wire staples at least 1 inch
long, tie wires or hog rings. The wire shall extend into the
' trench a minimum of 2 inches .and shall not extend more than
36 inches above the original ground surface.
The standard —strength filter fabric shall be stapled or
' wired to the fence, and 6 inches of the fabric shall extend
into the trench. The fabric shall not extend more than 36
inches above the original ground surface. Filter fabric
' shall not be stapled to existing trees.
When extra —strength filter fabric and closer post spacing
are used, the wire mesh support fence may be eliminated. In
' such a case, the filter fabric is stapled or wired directly
to the posts.
' The trench shall be backfilled and the soil compacted over
the .toe of the filter fabric.
Silt fences placed at the toe of a slope shall be set at
' least 6 feet from the toe in order to increase pending
volume.
' Silt fences shall be removed when they have served their
useful purpose, but not before the upslope area has been
permanently `stabilized, and any sediment stored behind the
silt fence has been removed.
Inspection and Maintenance
' Silt fences and filter barriers shall be inspected weekly
and after each significant storm (1" in 24 hr.). Any
required repairs shall be made immediately.
' Sediment shall be removed when it reaches 1 /3 height
of the fence or 9 inches mnYimiim
1
1
1
1
1
1
C8x18.75 American Standard
Structural Steel Channel. —
Trash Rack Attached By Welding
W CV Level
3or4
1i—
H
Varies
2'-0' U.S. Filter* Stainless
to Steel Well —Screen
6'-0" (or equal) Per Tables
60-1, 60-2
I
2'-4"
Minimum
a' 4'-0" 8'
Bolt Down or
�Lock Down
I '—Rack Swivel Hinge
"+ Tres Rack
On 6"
4" Centers
Optional
Flow Control
Steel Perforated Orifice Plate _'
-Flow Control
Plate
Micro Pool W.S. 1 Outlet Pipe 18" IMin.
C8x18.75 American 3" Minimum
Standard Structural 1
Steel Channel Formed I
Into Concrete Bottom -
And Sides Of WC„..
Trash Rack Attached 1 -
By Intermittant Welds. - 4" - -
Section A —A
From Figure 6, Circular Openings Only
Well —Screen From
Attached To Chann
By Intermittant Weld
Steel Perforated
Flow Control
Plate
Ww,.
J FI )W
L Trosh Rack Attached 6"
By Intermittant Min. ,
Welding All Around
Section B—B — Plan View
From Figure 6, Circular Openings Only
Limits for this Standardized Design:
1. All outlet plate openings are circular.
2. Maximum diameter of opening = 2 inches.
*U.S. Filter, St. Paul, Minnesota, USA
Urban Drainage and
Flood Control District
Drainage Criteria Manual (V.3)
Foe: Detaoe.drg
Stainless Steel
Support Bars
No. 93 Stainless
Steel (U.S. Filter*
or Equal) Wires
0. 9" 0
Section C—C
From Figure 6, Circular Openings Only
R Value = (net open area)/(gross rack area)
= 0.60
Figure 6—a
Suggested Standardardized Trash Rack
and Outlet Design For WQCV Outlets
With Circular Openings
I
1
Table 6a-1: Standardized WQCV Outlet Design Using 2" Diameter Circular Openings.
Minimum Width (W,,,,,,.) of Concrete Opening for a Well -Screen -Type Trash Rack.
See Figure 6-a for Explanation of Tenns.
Maximum Dia.
Width of Trash Rack Opening (W) per Column of Holes as a Function of Water Depth H
of Circular
Opening
(inches)
H=2.0'
H=3.0'
H=4.0'
H=5.0'
H=6.0'
Maximum
Number of
Columns
< 0.25
3 in.
3 in.
3 in.
3 in.
3 in.
14
< 0.50
3 in.
3 in.
3 in.
3 in.
3 in.
14
< 0.75
3 in.
6 in.
6 in.
6 in.
6 in.
7
< 1.00
6 in.
9 in.
9 in.
9 in.
9 in.
4
< 1.25
9 in.
12 in.
12 in.
12 in.
15 in.
2
_< 1.50
12 in.
15 in.
18 in.
IS in.
18 in.
2
_< 1.75
IS in.
21 in.
21 in.
24 in.
24 in.
1
< 2.00
21 in.
24 in.
27 in.
30 in.
30 in.
1
' Table 6a-2: Standardized WQCV Outlet Design Using 2" Diameter Circular Openings.
US FilterT`t Stainless Steel Well -Screen] (or equal) Trash Rack Design
Specifications.
1
Max. Width
of Opening
Screen #93 VEE
Wire Slot Opening
Support Rod
Type
Support Rod,
On -Center,
S acing
Total Screen
Thickness
Carbon Steel Frame
Type
9"
0.139
#156 VEE
'/,"
0.31'
'/8'k1.0"flat bar
is"
0.139
TE .074"x.50"
1"
0.655
'/," x 1.0 angle
24"
0.139
TE .074"x.75"
1"
1.03"
1.0"x 1'/i'angle
27"
0.139
TE.074'x.75"
1"
1.03"
1.0"x 1'/2"angle
30"
0.139
TE.074"xI.0"
1"
1.155"
1'/,`kl'h"angle
36"
0.139
TE .074'x1.0"
1"
1.155"
I 'L`k 1%"angle
42"
0.139
TE .105"xl.0"
1"
1.155"
1 '/,`k 1'/"angle
US Filter, St. Paul, Minnesota, USA
DESIGN EXAMPLE:
Given: A WQCV outlet with three columns of 5/8 inch (0.625 in) diameter openings.
Water Depth H above the lowest opening of 3.5 feet.
Find: The dimensions for a well screen trash rack within the mounting frame.
Solution: From Table 61-1 with an outlet opening diameter of 0.75 inches (i.e., rounded up from 5/8 inch
actual diameter of the opening) and the Water Depth H = 4 feet (i.e., rounded up from 3.5 feet). The
minimum width for each column of openings is 6 inches. Thus, the total width is W = 36 = 18 inches.
The total height, after adding the 2 feet below the lowest row of openings, and subtracting 2 inches for the
flange of the top support channel, is 64 inches. Thus,
Trash rack dimensions within the mounting frame = IS inches wide x 64 inches high
From Table 6a-2 select the ordering specifications for an 18", or less, wide opening trash rack using US
Filter (or equal) stainless steel well -screen with #93 VEE wire, 0. 139" openings between wires, TE
.074" x .50"support rods on 1.0" on -center spacing, total rack thickness of 0.655" and'h" x 1.0" welded
carbon steel frame.
Table 6a
,
1V t1►th f I! U/11
IL f ll�
e
'!
.�'>aJ �11DVIJlQJL
/Iln
1g411i
0 a
0
0 0 0
a
p
❑
a
0
❑
D
a
o o a
❑ 0 a
Straw Bales Staked
;'
',
With 2 Stakes Per Bale
A
PLAN VIEW
1
'
Stal4e
Twine,
'
Runoff
'
a -compacted Soil
bIW Q
a�sp{�Gy Wes/
Filed WaEAaf-
SEGTION.A—A
Gen. ral Notes,:
I. Wedge loose straw between the staked
bales.
AREA- INLET FILTER
2. Inspect and. repair filters after -each
storm event. Remove sediment when
STRAW BALES
'
one half'of the filterdepth,has been
.
filed: Removed sediment shall bedeposited
CITY CIF FORT COLLINS, COLORADO
in an area tributary'to a
J sedimentfiltering or othermeasure.
STORMWATER UTILITY
3. Sediment shall be removed immediately
APPROVED BY;
from traveled way of roads.
DATE: 3—S'•7
REVISIONS:
�-2
1
TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT
'
Construction Specifications
The aggregate size for construction of the pod shall be 2—to 3—
inch stone. Place the gravel to the specific grade and dimensions
shown on the plans, and smooth it.
The thickness of the pad shall not be less than 6 inches. Use
t
geotextile fabrics, if necessary, to improve stability of the
foundation in locations subject to seepage or high water table.
'
The width of the pad shall not be less than the full width of all
points of ingress or egress and in any case shall not be less
'
than 12 feet wide.
The length of the pad shall be as required, but not less than 50
feet.
'
Locate construction entrances and .exits to limit sediment leaving
the site and to provide for maximum utility by all construction
vehicles. Avoid entrances which have steep grades and entrances at
'
curves in public roads.
The entrance shall be maintained in a condition that will prevent
'
tracking or flowing of sediment onto public rights of way. This
may require periodic top dressing with additional stone as
conditions demand, and repair and/or cleanout of any measures used
to trap sediment.
'
All sediment spilled, dropped, washed or tracked onto public
rights —of —way shall be removed immediately.
Provide drainage to carry water to a sediment trap or other
suitable outlet.
When necessary, wheels shall be cleaned to remove sediment prior
is required,
'
to entrance onto public rights —of —way. When washing
that
it shall be done on an area stabilized with crushed stone
drains into an approved sediment trap or sediment basin.
'
All sediment shalt be prevented from entering any storm drain,
ditch or watercourse through use of sand bags, gravel, strow
'
bales, or other approved methods.
'
Maintenance
Maintain the gravel pad in a condition to prevent mud or sediment
from leaving the construction site.
'
Replace gravel material when surface voids are visible.
After each rainfall, inspect any structure used to trap sediment
'
and clean it out as necessary.
Immediately remove all objectionable materials spilled, washed,
deposited on
or tracked onto public roadways. Remove all sediment
paved roadways witF: n 24 hours.
DIVERSION RIDGE REQUIRED
WHERE GRADE EXCEEDS 2% 2 % 0" GREATER
RDA WA ('j(�'fl) ll� +1 II
Y _�. r�!;'Y.=x•'.��� 1�F ri�i.�li 4l� '.' `, r it :F�
FILTER FABRIC
SECTION A - A
\ NOTE: /
USE ��++NNDBAGS, STRAW BALES
SPILLWAY
SEDIMENT BARRIER �� OR HER APPROVED METHODS
(STRAW BALE TYPE SHOWN) \ TO HANNELIZE RUNOFF TO BASIN
AS /REOUIRED.
SUPPLY WATER TO WASH /
WHEELS IF NECESSARY.
f
`I I >
FLOW
FLOW
Q
a 1
,�
.,)•�if'SyL w ."lf met fi„Ar<,;1 ;�'yyg a ..v.. �l �t y i �: o,Y l`j•.�t j:t
'� t �R<H r1)•t.� 1't � srt!T�;;1��.j. fA.._,`+� viz,{�` »�, �,, <•.i�
��f,.
R A
C;tAA
2 -3' COURSE
AGGREGATE'
(aj
i �, I
MIN 6 THICK 2' - •t Y� N
`
1
r' y-� J. ,. L i •.� r �, �. < k. f/, , ..
t
�lA 4 e� �r.s.1�
1 �,. I�•«7 _{0
.a
DIVERSIO:J RIDGE
W
50' MIN.
F40H]
NOTES: `
1. THE ENTRANCE SHALL BE MAINTAINED IN A
CONDITION THAT WILL PREVENT TRACKING OR
FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS —
OF —WAY. THIS MAY REQUIRE TOP DRESSING.
REPAIR AND/OR CLEANOUT OF ANY MEASURES
USED TO TRAP SEDIMENT.
2. WHEN NECESSARY. WHEELS SHALL BE CLEANED
TEMPORARY
PRIOR TO ENTRANCE ONTO PUBLIC RIGHT—OF—WAY.
GRAVEL
3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE
ON AN AREA STABILIZED WITH CRUSHED SfUNE
CONSTRUCTION
THAT DRAINS INTO AN APPROVED SEDIMENT TRAP
OR SEDIMENT BASIN.
ENTRANCE EXIT
I
I
[1
1. Excavate Trench,
4"Minimum Depth
f-
2. Place end Stake Straw
. Bales
Wedge loose
®. ®• tra w R aLween
® . • Bales
3. Backfill and Compaq Excavated Soil
Stakes % Straw Bale
Twine F
!� li mpacted Backfill
Filtered Runoff Runoff
�1i i )
MIN"
. '
► AIR 1111111_
' CROSS -SEC
Fneral Notes:
1. When used as a continuous perimeter
filter barrier the maximum tributary
' area is limited to 0.25 acres per 100
feet of barrier.
' 2. Inspect, repair, and replace
(if necessary) the filters after each
storm event.
' 3. All bales must be replaced after 12
months unless approval is granted by
the Engineering Division for longer use.
IN•-11i-I -111A1�lIIF�=
Tlo)J VIEW
STRAW BALE DIKE
GENERAL INSTALLATION
CITY OF FORT COLLINS, COLORADO
STORMWATER UTILITY
APPROVED BY:
DATE:
REVISIONS:
D-26
6.6
'
Steel ot-Wood Post—,
1
`'l
1
,
J1jY I �l, u
1 kill
'
Steel or
'
wood Post
Filter Fabric
Backfilled Trench
Filter Fabric
Attach Securely to Post
Compacted Backfill
Runoff
f.►00%~
LV:
T 111
Ion
MIN.
Uliilil—1 �IIII-=
SECTION VIEW
Lneral Notes:
1. The maximum tributary area is limited
to 0.25 acres.per 100 feet of fence.
2. Inspect and repair fence after each
storm event. Remove sediment when
' one half the height of the fence has
been filled. Removed sediment shall
' be deposited in an area tributary to a
sediment basin or other filtering
measure.
P—gll1Dul Approximately
Ipnu 4"x4" Trench
SILT FENCE
CITY OF FORT COLLINS, COLORADO
STORMWATER UTILITY
APPROVED BY:
DATE:
REVISIONS: D_28
6.7
1 Straw Bales Staked Wiih 2
SUKeS Par
1 Bale Point A Musa: Be Higher Then
Point B � �
lull a la
ull=lrIII='IIIIII
1 SECTION A —A
Flow
I
1 I
❑ a n ❑ a'" o' Q II
1
PLAN VIEW
i
Compacted 13afir M = —Ills--no —>>ullu luq�'nlll
1 I u—'u Iµ —PROFILE VIEW
1
jeneral Notes:
1. Inspect, repair, and replace,
(if necessary) the filters after each
storm event.
1 2. All bales must be replaced after 12
months unless. approval is granted by
1 the Engineering Division for longer use
Twine
In
Flow
STRAW BALE DIKE
CHANNEL APPLICATION
CITY OF FORT COLLINS, COLORADO
STORMWATER UTILITY
APPROVED BY:
DATE:
REVISIONS: D_27
6.5
4FA
ADG ENGINEERING, INC.
CONSULTING ENGINEERS /�6�
JOB NO. 6 DATE 0'Z.-20- O,.& LAND SURVEYORS PROJECT 1=N19Q FbfLT GoLc_iNS770 W. HAMPDEN AVE., SUITE 250 SUBJECTCRO5ln Con 2LENGLEWOOD, COLORADO 80110
PHONE: (303) 761-5142 BY A,-/4 ►< SHEET NO. j o F 5X: (303) 761-5143
A IN P)+LL, Tc-42,F=0R.vvl rS tl 5 TAiVDj P-D S
' Li SING- INPoF-migT(OH 5 F{Zow1 THE Drzigrryy
(A.N0 vRL.vES FRowtTk+-c- pcz-R�=e:�C2n✓Ir9(VC c- 5Tr9NORZD
1) cIT`{ Oiz FO(zr COLC,tN,5 7 IH-ce- ��2l�o�wr�4r1C6
L-S rc- D I rk i if G Po u L.O Gw I N G» nvKlvV 6- QL
Q�� crTY 07 T=v GO l.(.- IrvS 5i Acv0viZ-DS
L)13'8 r4S I N S a to Lb =. SUM CL i, X Qs6) s111. Asb
Sur) CSs6xgsb)/svmE
sb
' Ly `(t). 3q X 60 + 4bX O.21 I- o. I X l30 -t. '7DxO, t6 -i 5 �c o.04 �OXocae o6
' -7s.so
CJ,� --, C0.3y jcl•67 {.2•SoKO.21 �-o.00g�co.l8+ I.43�Co. (`+¢.SoXo•o4 �3.75)C�•og`�,
SEE s T4 ry O /I- I�D
' C c-v Fotzvvlar CC- s r ti Nq 40 %(F2orl T4vLc 9.1)
' TI+6?,C-7=D2-&j riH (sRostot4 C.oµTZoL'PCkS14 Wtc.C. BC-
�Dcr-V&(.O'QEp 'CO C0r{Tr9I14 %9.4051v OF (Hce SGplv►7(N7-
1,1d0aSrN 1.6NC-T44 W►D r4 FAN0 OIL s*'Izraw 1?19L j
S ( LT F FNC4- r� c .
RR I t4 F A -Lc. L ZO S ( ems t4 CpNTEOL EFt-6C-i IVEf��S
' FoR Gr4C-.N 501313)g15fel 6CTIvc-tvc-SS is CA(.6uc,14-Tc-9
�Y TK{E P70b -C.C7wING &C?u"" iron,
L/
Gv�Gj t7� Lvov FgL'l O��
-F�4L(0v (_ct(C.6: �WGInTZ�
'
ADG ENGINEERING, INC.
CONSULTING ENGINEERS
/^ G
JOB NO. DATE
2
8, LAND SURVEYORS
PROJECT (f4QC--C-1_"NS
770 W. HAMPDEN AVE., SUITE 250
OFAX:
C
SUBJECT ROS/Ol✓ CO/{'TL�OC,
S/�
LR!✓ �,I9[L✓Ll3TiONs
ENGLEWOOD, COLORADO 80110
PHONE: (303) 761-5142
BY ��} SHEET
NO. 2 Cl P
(303)761-5143
C-oNT?,oL M& +too G--
FA[ioZ t�->=14tYo2
G0mm6-iv7'S
'
VRLuC- VgLuE
'
SAeE So I u
d.' 00 !'00
swoill 6,vpfrl"5
Ro9D5/w/3cKs�f�1RK/Nrt
O.OL 1,00
56511v 81
P-Ou61+61VF0 GQouNI)
4-' 0 0 0 'qv
6T9,14w 13HRv'l>✓25
' 0 0 0.60
ebmJINS 'l, fi, Gi Dl
'
SI)pIrv1En,T- $19S114
1.0-0 0.50
PIMIC--S To 9[.c
SvJrBgslNs
'
91SINF14LL C-Q05(04
CoNTLZOL GFFFGT(VFKf-$
'OR SvB6�4SiN7 (-j-=K'rlYc�NC-SS G.A�-GuLwTt0(As
41?-kc- 13gs" 6NTI-F6-
PwV(-LO(AJ%-NG GWUKFIoi`1.
F FR = C.I- C
' 146T-'P- FPicr0Q, CA Xv►4c.Uc-')
KC-T C - 1=pr-ToR = C X va1-uE)/A ToraL
Su198prs(N A
rIET =tom- FAciDT?- CO' 3943 X ' 90) Q' 3 jS j
' N E--C = G-- R W c cF, = (0.3943 )< L-00
�ob
a.-3IS A)V.3%Zo> 100
' Su88Fls�(J B. NE?-C�F9�io2 (-'I.�996i 6or-13r
SvBCi�51N �fE7 P,Ft9cro(Z _ , i�oo
' (\I 'I ^ G - Fq [ To cz, O. l -70 0 1✓0 � C,S�r313H51N oc— -�- F�-LTo� = 0.136-1
NE'r- C. - 'FgcTOIZ p 150Q
12751�OiZ T�
ADG ENGINEERING, INC.
CONSULTING ENGINEERS
& LAND SURVEYORS
770 W. HAMPDEN AVE., SUITE 250
0FA
ENGLEWOOD, COLORADO 80110
PHONE: (303) 761-5142
X: (303) 761-5143
JOB NO. 6 4 3 DATE 2- z l O
PROJECT T 1' 0? ro A T GO L.C, l WV S
SUBJECT EROSION COZY! 0Cr_ ItVIV GA[,cuck i ror(s
BY 1C.. SHEET NO. 3 ^ F
' E'F"F5513 _ G. tc7) x IOD
q G, "1 %
cXp)xtoo
Q X7 X 0.1367)X/00
L: Fr' C1- GK�) boo
g8.o8%
Tom& NFT E PP v'Al_uE li7oTf,_ T NE ECV71TLa,. o6 19 Crz(- 73+ssin/
IS, G�L-Cuc AT&D A-S.
C FFNEI s L� ( EFFSbi.�Sb,D x As5q-� ASIDM.v6
' = �g$.3�X•3943 4- x.z1264 91.68g8•og)e, 4��.o 6
gg.72. -7g.4
INc.0 EFFhe•r tg GRcl9 TL--e T+414s �S(8S.iz�%78'4��
l
-rK-E PKO FOSC<D CRoS(oN (::-,ON ►2.0C. M&TC40DS WLLL. w1K-� lffC—
' C I T Y 0 F F 0 4>-T C-© c-, c- I N S 1�2, s qri i 'PRE. "v1 & Iv L S.
9 0 -� 5-
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RAINFALL PERFORMANCE STANDARD EVALUATION
PROJECT:
T^ ►+O F O R T
Cc L- L. 11l S
STANDARD FORM A
COMPLETED
BY: krv9• K-
DATE: Z-Z2—oi
DEVELOPEDIERODIBILITYI
Asb
---------------------------------------
I Lsb
I Ssb I Lb
I Sb I PS
SUBBASIN
I ZONE I (ac)
I (ft)
I (A) .1(feet)
I (o) 1 (a)
-- R ----I-----------
I-------
I MoDFRhW 0.31
I-------
1 Go
I-------I-------
1 1.6-7 1
I-------t------
1 1
-B
I �� 1 0.21 1
40
1 Z.So I
I I
C
0.00g
I
-7o
1'.,4 3 1
1 1
13,7S
I
11, o6 I
I
9 I-lS.90
---------------------------------------------------------------------I
DI/SF-A:1939
1
1
1
1
1
1
1
-------------------EFFECTIVENESS-CALCULATIONS-------------------------
PROJECT: 1=vAo p F O P- T c-o L. L IN S STANDARD FORM B
COMPLETED BY: t DATE: Z-7,2—o/
Erosion Control C-Factor P-Factor
Method Value Value Comment
I -------
--------------------------- --
----------------------
dn StoIL no 1' O D Srvtvor►1 6avoirIONS
Rout-► GNCLD G nip 1•00 0. yo
�IRIAw F319RFZ I GRS i•0v O• $O 13NK�N5 ,
Sg1)Irv1ENT BAstN 1 • op D • Sfl PPP�Ivs o r- L-L i
-------------------- ----- - I -5
----------------------------- ------------------I
MAJORI PS I SUB I AREA I I
BASINI (;) IBASINI (Ac) ICALCULATIONS
-----I------I-----I------i--------------------------------------------I
A I0'3`� .I �o►i�slwYkrs�P�}YKivJQ. •� g5to= g01M
_p,00go
WTI) Co.go X0'90l p 72
I I /
� Io.og
11� $
I I
I I
q3 73 79- 419
---------------------------------------------------------------------,
I/SF-B:1989
I
G 17 ©F ..... o.R T.... G_z2.C.C.W S._.
1
1 'R c- : TRo ;,. � cr . ...I. . 8. ,_.� + _ Ofikizr ti _ u s � n►..c s.s
1 .
1
1
1
1
�crz out .�Hor(.F dlscgc l.oN o.H . "M-.vc�v,
ZS,. ZCO �.� ... T if-6....... A..1ZEt4 . O t= .7"If_44- . Pee VALOPDX&T .
5 '� -�7.1� CUES, t1 f . ..e'f F .Cosj F1 R i ff F C Q$f Dttr�
..._. H E _ f2QJEGT w..cc� C3_ .
w L �, g c-.. �C� A _ tt E i M E-
O.F Tk4.C- .ISSc, c-►CI� o_ . THtC. ..L�IuDrr?&TC-P-%t,7.
v9- -cc, B.c- ant AI�F_E... A�ccovcvT.
6110 -L./( -0 low p�
Z'd e6S=60 i0 Oi 2nH
1
DG ENGINEERING, INC_
�`,
CONSULTING ENGINEERS
1
& LAND SURVEYORS
#FP:
ACEC
�'� ` \� �.—'
770 WEST HAMPDEN AVENUE. SUITE 250 •—r
1
ENGLEWOOD. COLORADO 80110
HONE (30J) 751-5142 ��
(303) 761-5143 i
3)
1------------------
FAX
1
FACSIMILE TRANSMITTAL SHEET
1
TO:_Ml( ��-�-6 r✓ S GILI.l1 G TC 2
1
FAX NO. 1— 9_7 O —
1
FROM: K 14
1
RE: G7zo
DATE: 'L S '2-V O
NUMBER OF PAGES (Including cover sheet):—
1
MESSAGE: C-1�11
L
1
1
1
1
If pages transmitted are incomplete please call 303-761-5142 immediately
j •d
ess=60 10 OT 2nH
-.x
7":' '"'P'sl �1F.^"'s `T'+ ?$-3hL"°1 .-c++: a q. �' ,: r.'c +, fA s".',:r v $ '<`*�::{ Nit`• v
WEST B.-D- EAST (II 1
7/4'-7/2" PER a.. I_1
E
CONCRETE WALK (4" THICK)
CONCRETE WALKS
#4 O 1
6 m
\ NO POND.
M1
/4 T6ON CE.
2 BARS THIN. -�-
HARMONY, ROAD _ 4979
e ?
,Eea OF vANINc a, .. ..
9
4977
�A
b90� f \H �'•o
x j4
V
WATFJi _ DUALITY, POND 4919
SS�LCCT�f06NN A -A. ,--•�..•r..rl ;,�
Lam+ Ae�+
rcm
-t4 O IY
SIDEWALK
(HEEL) 9V+
'Q.
raa
/4 O le COW.
1 BAR MIN.
A O m a M
sm, I ay
, r BAR DNA
RETAINING WALL DETAIL
10' 4
1R
all AN J
TIP
I.`
Q SPILL
VERTICAL CURB & GUTTER
MATCH EXISTING
4X
_ I lJFp
I
b� Il-
b rl
© CATCH 1
VERTICAL CURB & GUTTER
GENERAL NOTES
1, ALL PANNO M PAW NG 40 CARTEL $
SHALL BE CONCRETE.
2 REFER TO WAMAGE REPORT PON BASIN LEA,
M10 POND m
Jr REFER TO SHEET A -I FOR OIYFNSLN4 STE PLAN,
4. REFER TO RQT C-J FOR UTILITY EMOEPT.
4977
5 CONCRETE SOE`MAM TO BE
CONNECTED TO WALL( AT _
INTERSECTION MTH WMEATDN.
L1
E'
i
E
Is
All
AIIII11111
i
I
GENERAL NOTES:
L ALL SITE GRADING (EXCAVAIIGN, EMBANKMENT, AND COMPACTON) SHALL CONFORM TO THE
Oie RECOMMENDATIONS OF THE LATEST SOLS INNESTIGATION FOR THIS PROPERTY AND SHALL
TUNER BE IN CONFORMANCE WITH NE CITY OF FORT COLLINS "STANDARDS AND SPECEI-
CADONS FOR THE DESIGN AND CONMUCTION OF PUBLIC IMPROVEMENTS: (LATEST EDI➢ON),
2. NATURAL VEGETATION SHALE BE RETAINED AND PROTECTED WHEREVER POSSIBLE. EXPOSURE
OF SM. TO EROSION BY REMOVAL OR DISTURBANCE OF VEGETATION SHALL BE LIMITED TO ME
-- -Z AREA REWIRED FOR IMMEDIATE CONSTRUCTION OPERATION AND FOR THE SHORTEST PRACTICAL
PIERCE, OF THE.
3, TOPSOL SHALL BE STOCKPILED TO THE EXTENT PRACTICABLE ON THE SITE FOR USE ON AREAS
TO BE REIEGETATED, ANY AND ALL STOCKPILES SMALL BE LOCATED AND PROTECTED FROM
EROSIVE ELEMENTS.
4. TEMPORARY NE(ITATION SHALL RE WSTA11E0 ON ALL DISTURBED AREAS MERE PERMANENT
SURFACE IMPROVEMENTS ARE NOT SCHEDULED FOR INSTALLATION WNW 3 MONTHS.
7y VEGETATION 91ALL BE A VIGOROUS. DROUGHT TOLERANT, NATIVE SPECIES MIX. RETER TO
MLTION 226.00 OF "STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCIICN OF
nee+ PUBLIC IYMOVEMEHTS; LATEST EDITION, FOR SEEDING MIX PROJECT SCHEDULING SHOULD TAKE
ADVANTAGE OF SPRING OR rl PUNTING MASONS FOR NATURAL EERMINATIQN, BUT
SEEDED AREAS SMALL IRRI.A D. IF CONDITIONS W MERRIT
5. AT ALL TONES THE PROPERTY SHALL DE MAINTAINED AND/OR WATERED TO PREVENT WNO
CAUSED EROSION. EARNMORK OPERATIONS SMALL OF DISCONTINUED SEMEN VOTIVE OUST
SIGRFlCANRY IMPACTS ADJACENT PROPERTY. IF EARTHWORK IS COMPLETE OR DISCONTINUED
H AND EAST FROM THE SITE CONTINUES TO CREATE PROBLEMS, NE OWER/DEx LOPER SHALL
IMMEDIATELY INSTITUTE MITIGATIVE MEASURES AND SHALL CORRECT DAMAGE TO ADJACENT
PROPERTY.
6. TEMPORARY CUT/HHLL SLOPES SHALL NOT EXCEED A STEEPNESS OF 2:1 (H: V). PERMANENT
SLOPES SHALL NOT EXCEED 4:1 INN) IN AREAS TO BE SEEDED OR SODDED.
7. UTILITY CONSTRUCTION IS NOT APPROVED UNDER THIS PLAN.
INe W. TUBE OMNER/DEA.LOPER SHALL FROMM ANY ADDITIONAL DUST ABATFMCNI AND EROSION CONTROL
.. MFil DEEMED NFn"SSA'rr Illy..
GO GO 9. TEMPORARY FENCES SHAH BE INSTALLED KCMG ALL B NDMU 6 THE CONSTRUCT LIMITS
AS SHOWN ON THE APPROVED EROSION CONTROL PLAN, TO PREVENT GRADNG ON PROPERTY
Go NOT OWNED BY THE pEVFLOPER. IN ADDITION, THE CITY MAY REQUIRE ADDITIONAL TEMPORARY
FENCES IF FIELD CONDITIONS SO MERIT THEM,
Qj ID, Pill DOGS CURRENTLY ARE NOT PRESENT ON THE SM. IF THIS IS THE CASE, HOWEVER, IF
ANY RELOCATE ON FTE SITE PRIOR TO CONSTRUCTION (INCLUDING OVERLOT GRADING) YHEN THEY
MUST EITHER BE RELOCATED OR HUMANELY ERADICATED. IN ACCORDANCE WN THE CITY
OF FORT COLLINS MUNICIPAL CODE, CHAPTER 4.
BENCHMARK:
FOUND ALLOY CAP:
7-94 NORTHEAST CORNER EAST HARMONY RD. AND SOUTH LEMAY Al
ON THE NOMNMEST COWER OF A CONCRETE AREA INLET.
ELEVATION = 4955,07
FOUND ALLOY CAP:
9-94 SOUTHWEST CORNER EAST HARMONY RD. AND MCMURRY AW
ON THE NORTH SIDE OF CONCRETE RING OF A TELEPHONE MANHOLE.
ELEVATION - 4975.38
SQgR
LEGEND
g + M DONS RUC ION
LI
F
nNCGER7Y LANE
+ ._. — — RwDwC SETBACK
ON
-- - -- EASEMENT LINE
NEW cuxe
_- — EMSNNG NRB
J+
405 - �� D 8 £ z 2�_f CCU
�SI W N£OO 4 Nm y
4975 NN',R �R o i •
GE DRIVE IEn:
Uti&Nq- on
_ y -- �� GRADING PLAN
O4M1
L1K P1RB
©
CRb TYPE CJW
MO OI CONTOUR
EASMI CONTam
A
MSTmG SPOT MEVAMMI
Tc 7&90
MOPOSEO TOP CMR TALL
17g4D
WP u ROW TN.E MADE
4 79.10
MMv SPOT WADI
ROW ORECTIN Fo
A
ITS
RooF MAIN � 4
5.
SHED SURFACE t
City of Fort Collins. Colorado
UTILM PLAN APPROVAL
J(dE0 wL _
Wall Y T,YmmHv REPAY RY
P.MED a ---
aum.Mm, ONnb RAW
oaaEa
X� W
T•WM ByW,t — >Y
0.M
0
V3
F
c
mm
n
00
�•
00
c
Gi
9
M•m
L
m�00I
N
Y ase
M 9D
�A..r wh
fWEW�
]Gill
STORE NO
9569
LOCATIM.
OAKRIDGE
BUSINESS PARK
FORT COLLINS, CO
DATE 02-211-01
ISSUED FOR:
PEREIR
Ens
fANSIRIICTION
SCALE AS NOTED
MAN BY: WW DOYLE
" NO SOB
SHEET TITLE
GRADING
PLAN
SRI NO.:
C-2
OF
- - - ---- - - ----
RENSIOMS
Ia
a
a
I
POND
VOLUME
100 YR
W.S.
RELEASE
RATE
A
12,318 C.F.1
4978.40
-
B
11,353 C.F.1
4978.70
-
C
I 1,152 C.F.
4978.90
-
D
1,014 C.F.
4978.70
-
WO
1,045 C.F.
4978.40
_--
TOTAL
16,882 C.F.
-
0.49 CPS
DETENTION POND DATA:
{
i C
Bg
m o
r
m T' t 7.20'
e � rL
m \
I LA INLET
a P IM=7840 4
96 7@�
�Po
a _ \c I r
0
Q+R 1
0 0If
K o 0 0.1 0.6
z w ° A
O m y
6 w ^�
0 RA
So
qN
u p
s V
w ME SETH
n I
as
FYI
At ED
VD
f
4978
BENCHMARK:
FOUND ALLOY CAP:
7-94 NORTHEAST CORNER EAST HARLIONY RD. AND SOUTH LEMAY AAI
ON THE NORTHWEST CORNER OF A CONCRETE AREA INSET.
ELEVATION = 49M 07
FOUND ALLOY CAP:
9-94 SOUTNNEST CORNER EAST HARMONY RD. AND MCNVRRY AA..
ON THE NORM SIDE OF CONCRETE RING OF A TELEPHONE MANHOLE.
ELEVATION = 4975.38
PO /
ANSPOVT
4OL
of
308'O6' I
-�
V=ISO yd 3/Ac
3 Mea.
0 ID e0 M \/ \ P• •I i -
aOMlrarcaveteParmnn nL PvNd try F-.-
xaw 1 - m PARKEsEimatzd Sedlrnerrt Loe�
L-.
ii =77 Y1POND A
well �410
6
I F � � TaOjO
. 0.21 0.6
U� C
INLET T IJ �H
D P6 D B,.R (Doves) ae,,
SEE DETAIL 11R15 SHEET
RELEASE STRUCTURE
a
4
0O�
R9
6
p��N 40'�
N 89", 23=W
1s. r
Say 4,
SRJI WI MI RESS
bPof Splllwd� IOye. 9�rrn RUI
12•(Min)
L 7
AM
FIDW I
Us Pllad
aW Wire Mesh 12YMi A6aeTopaIips
Q PIPE OUTLET WITH GRAVEL FILTER
t
GENERAL N07S: TRH
I. Sediment not] be lemo.ed when one
hot( of the Eosin design depth has GTY OF FORT COWNS, COLORADO
Eem pled. STORMWATER UTILITY
2, ReenOHd Moment shothe depo5 ed ama0H0 B.
N an area VTuta,V l0 0 9edmenl DAR
xsas D-22
1n'm, nEa .TAT
v Att .` .E.R.,w
ILANE see
f f..'�.. N1.0946G5�ALL II .
1z
V D W c PA GHM
51nrM. ,+
TAIL L�13A69'
`.r
'A'
bb ^ K
a
!BENCH ORAINLC�S BS'29'8$ W
ORIFICE
b' 4
SHT C-5 134.'0
PLATE DETA/L
r
,b
tiG
� 7
I
wen w:•
LINE DmI,,
HrO
T
owo
' LAIDIl
FL >e
'ON
90'I
n1a,
r
F
I
- -
i
U.
sn�
fA
it'sE wi
�1
r r (SmogNA
s elrN is
men.
i
_.AO �00
• t O
,.1 �I R
NE D0� I
LJ
1 ] 11
f`
EIC I
IY
1
Q 1
_
_-I'1
F-
Rem wYM
1
-
p I
---
�-
Fw
-
� we 1p•If4B/LM
.IA�OIIstMWO.0 a
I
SS PLATE
s
(T`P1
I
'�
Section A A
SW r=Mme
E ::'
. M a. a
DDRAINAGE
PLAN
a
w F.
- a
11
T71
°H�m+NmP"w.w,
scale = zo
p,
7111� HOE
- 21 - 1/2- a HOLES
I
Si
WITH
OC. EACH WAY (PonPROPOSED
1
� ~
1ir ,^
C
nln
�,IIA\
e TAU
I EMBf.ODMENT Men
EMS' O
CENTERED OVER PROPOSED
mn eae 4
" 2.•a'
I Y a OUTIFT PIPE
At.'4%N
M y=,y
Fen.
kam-
ORIFICE
wBw PLATE
Section B-B - Plan View
N S
..�.ryw e. ceaa yny, P•r
Limits few this Slw<adlred Design:
Section C-C
I. NI ou Vet plate cpenM9• we coccow
rm ry, M i.r q..inY wry
w
WATER QLI AL_I TY AREA
2. MoNnum INN of opnin9 - 2 H[Mv
R Vduc - (net opm w Agcros ack
-
O
BASIN
AREA
C
0100 `IN
DID `fa
A
0.3943
0.
306
3.1400
1.5400
B
0.2126
0.6306
1.6920
0.8290
_
C
0.1811
3015
1.4420
0.706
D
0.1594
_0.
0.
306
1.2690
0.6210
E
0.0387
0.
250
0.7630
0.0200
LF
0.0830
0.
240
0.0500
0.2990
A
= BASIN DESIGNATION
�'. A
B
= AREA IN ACRES
C
RUNOFF COEFFICIENTS
n
0
G
57,0`3.48
C
SQ. FT,
1 AREA
2. C IS
5 IN ACREAGE
THE RUNOFF COEFFICIENT
1.
172 ACRES
3 0100
IS THE 100 YEAR
STORM
RUNOFF
IN CUBIC FEET.
4., 010
IS THE 10 TEAR STORM
RUNOFF
IN
CUBIC FEET.
BASIN KEY MAP
w.w RAW,
•U.S. FiEw, St. Paul. MunnoNE USA
_GEND
NOTE: DUE TO THE RESTRICTED AREA, ME RMP'S PROCEDURE CANNOT BE APPUED. City of Fort Collins, Colorado
0 BUILDING CCANR.mmTDN PROoH . T„N:�;�R aw UTILITY PLAN APPROVAL
APPR
PROPERTY ENE I EXISTING -,I - IL I .: 1 i,. _r4pm WE -
�
to
Cx7
O
r-1
T•
CJ
O
O
N
0
R'mm
c0
U 01�
.A I
Cfp
d m
��za
5 TOtE No.
9569
LOCATION:
OAKRIDGE
BUSINESS PARK
FORT COWNS, CO
DATE: 02-21i-01
IswED FDa:
PERMITS
BIDS
CONSTRUCTION
SCALE: AS NOTED
DRANK BY mow mn E
JOB NO: 5N
SHEF` TITLE
BUIEDING S Ta r TO 76 90 - FACPDsm men EPD 'FALL WI A E am ataNaeaEar RNmT DM* GRADING k
a 7B.w DRAINAGE PLAN
- - - EASTERN, LW[ PROPOSES Rpw ENE LaApE vYr VYtl1r 0.Y
RD R0.'( DRAM 'Hlam BY_
c _1
_- NEW CURB S. FINISHED SURFACE Paaway,A NtiYm Dow 91EET W.
--. EMITTING CURD . , DERNT N FORD LINT am BL _ 1Np1 Y/Iw 0.M D
B.SSW BIINOAR. [NEdm BC
-
0.Y OF.