HomeMy WebLinkAboutDrainage Reports - 08/27/2004I I I HOLIDAY INN EXPRESS & SUITES STO.RMWATER MANAGEMENT EROSION AND SEDIMENT CONTROL REPORT FORT COLLINS, COLORADO LIGHTOWLER JOHNSON ASSOCIATES INC. ARCHITECTS AND ENGINEERS FARGO, NORTH DAKOTA LJA PROJECT NO. 03030 STEVAN G. DEWALD September, 2003 Revision #1 Revision #2 Revision #3 Revision #4 I TABLE OF CONTENTS STORMWATER MANAGEMENT REPORT NARRATIVE SITE INFORMATION STORAGE AREA, RUNOFF CURVE COMPUTATION TIME OF CONCENTRATION CALCULATIONS TRAVEL TIME CALCULATIONS OVERLAND FLOW CALCULATIONS INTENSITY DURATION CURVE - 1975 TABULAR HYDROGRAPHS STORAGE VOLUME CALCULATIONS SYSTEM DETAILS SYSTEM PLAN AND PROFILE PIPE SIZING CALCULATIONS DETENTION SUMMARY EROSION CONTROL REPORT INARRATIVE SITE INFORMATION CALCULATIONS WQCV PROVIDED VOLUME AND AREA RAINFALL PERFORMANCE STANDARD EVALUATION EFFECTIVENESS SURETY SAND FILTER BASIN DESIGN PROCEDURE FORM SYSTEM PLAN AND PROFILE EROSION AND SEDIMENT CONTROL MEASURES EROSION CONTROL DETAILS ESTIMATED SITE CONSTRUCTION SCHEDULE 1 # NARRATIVE �'. Owner: Lamont Companies P.O. Box 1209 r Aberdeen, SD 57402 Erosion Control Consultant: Lightowler Johnson Associates, Inc. 700 Main Avenue Fargo, ND 58103 Purpose The following report is to describe a storm water management plan and provide i supporting calculations. It is also the purpose of this report to identify an Erosion control plan during and after construction and provide supporting calculations and details. Project Description Lamont Companies is proposing to construct a 4-story, 89 unit Holiday Inn Express located within Oak Ridge Business Park, Fort Collins, Colorado. The proposed structure is a wood frame, slab on grade construction. The project site covers approximately 2.073 acres. Existing Soils According to the Geo-technical Report generated by Kumar and Associates, Inc, native soils consist mostly of sandy lean clay underlain with poorly graded clayey sand and sand with clay and gravel. Site Conditions The site is mostly flat with grass and weeds. Currently all stormwater runoff is diverted onto Wheaton Drive, Oakridge Drive, the ditch along Harmony Road or infiltrates into the ground. Full detention for the 100-year storm event is to be provided with this development. Adjacent Areas Surrounding development consists of office and commercial development. The site is bounded by Oakridge Drive to the South, Harmony Road to the North and Wheaton Drive to the West. The East property line is adjacent to an existing International House of Pancakes restaurant. Storm Water Runoff Analysis The 100-year storm, using the City of Fort Collins computer spreadsheet was used to determine detention volume requirements to be 0.395 acre-feet. The 100 year storm was used to design all storm water apparatus The proposed storm water management system will consist of a series of PVC yard drains, downspout leaders, and PVC pipes that divert storm water to a Sand Filter Basin. Extended detention will occur in the parking lot. Storm water will also run overland to the Sand Filter Basin. The sand filter basin is to be 1 underlain with perforated drain -tile and connect directly to the outlet structure. The outlet structure shall have a 4.4" orifice to restrict the outflow rate to 1.2 CFS. A 15-inch (min.) RCP will connect the outlet structure to an existing city inlet located on Wheaton Drive. Overflow will take place through the inlet grate on the control structure. Emergency overflow will take place at the site entrances. The maximum designed ponding depth is 11.4 inches. A total of 0.395 acre-ft of storage is required for this site. The provided storage is 0.435 acre-ft. �. The existing 24-inch RCP located under Wheaton Drive (Conveyence element 34) has capacity for approximately 16 CFS. It currently transports 2.1 CFS from Basin 340 and up to 12.4 CFS from Basin 160 (street flow) for a total of 14.5 CFS. Capacity of the existing RCP would not be exceeded by introducing an additional 1.2 CFS. Sediment Control • All storm water has been directed to a Sand Filter Basin and will infiltrate into an under drain system prior to discharge. The SFB was designed according to the UDFCD i Drainage Criteria Manual (Volume 3). Temporary Stabilization Measures During construction, a vehicle tracking control pad will be used at the construction entrance on Oakridge Drive. Silt fence will be installed around the perimeter of the construction site prior to grading activities. The sand filter basin will be installed early during construction will provide sediment control during and after construction. Silt fence with rock filter outlets will be installed around the Sand filter basin and remain in place until pavement is installed. Hay mulch will be placed on all exposed areas. Temporary be crops will planted in areas where work will not resume within 30 days. Permanent Stabilization Measures Permanent landscaping will include a mixed sod, plantings, trees and shrubs. The sand filter basin will provide sediment control after construction is complete. The outlet structure and under -drain system shall be installed early in the project to ensure water quality is maintained. Construction Materials and Equipment The contractor shall store all construction materials and equipment and shall provide maintenance and fueling of equipment in confined areas on site from which runoff will be contained and filtered. Maintenance The erosion control measures will be inspected weekly during construction. Silt fencing will be checked for undermining and bypass and repaired or expanded as needed. Mulching of bare soils will be checked regularly and areas where it was lost or damaged will be re -mulched within seven working days when needed. Temporary vegetation shall be maintained and replaced if required. 11 Calculations Calculations for the sand filter basin are provided herein. Details for the erosion control measures can be found on Sheets C-7, C-8, C-9 & C-10. Details are also provided in this report. The calculated volume for WQCv was determined to be 0.043 acre-feet, 0.050 acre-feet is provided. The required filter surface area (Pond Bottom Area) was calculated to be 624 SF, 632 SF has been provided. The maximum depth of the Water quality pond is 1.375 feet. The maximum depth of the detention system is 2.325 feet. 11 11 a 11 if t, R 11 1� I I 11 I P 00•sN111031aodAl s P S911f1S 781310H SSMdX3 NM AVOIIOH i in HNnfa H19f Navd SSEIN]Sne 20CIIUvo Y J �g Alt! � 1 EE Pal CD O I 1 1 III .fie �I $ 1 M iy u 1 I I R E Imo' I I 1 I I I O = V Li s `v` `o ES �D Q, CY a cTL �e I Q Q g S o 0 0 $° o yu C. O n a n o �!1 Jill - _ - - -i-t -- E� � i• I w wl pp 3rIM3�Y qii Awkjnnaq s n Yam` r• �f - ^ vs L 2 ' 2:1 � .�• � �.�.. Sod -3- yt,..-,�Pi i�\ �� 31 / i� \ atS. Al I1z cut Si l s 4 'G�•4 a�?` r � �n.� � _+'.I� C / $ 4 / g r I. € _�� r ° — it r St S ' s!i 1 ` :'1 : -i� 1► - ill y'.---' � ' s�,t I ..—_ F>;;�� Eli .IL iLs ------------ 11 11 'I I I I I I I I 3 1 C: -1201 14 31 Is- 27 28 22 43 4.1 270, 23 I'4Elernari 1.01-1 to 1.24 O. L130. I 300, L I tic al do I Pond ;LEGEND! 10 YEAR r� PC, r STORM4 1 15, 5 %, of Bix !,:,v 3 �101\ I J, le 31 :3 14 - t. 28 4---2 2 FT its) r7 44 L7 L fee. zys'7 28 250 257I 34 � 270'. 12 V.Elollent to —20 P"Jb 7 0 CIL and NI 1%, 7 to 0 4 ILEGPond 2 100 YEAR STORMF4 I cor.-Oyalco Pond I Duinant I ROUTING SCHEMATICS No Text wool ��a��■ �Q�L'1�� �s� ��IDi�I�IDi�'! so no I 1 1 A rc= a(m+ ti TL �/V•fJ E� = bt l.L T1 � qs5 ry nJ. � (w y' Fro.-i TDF ,4bleF,y. 3--let 3-1 b 'A-* Co.-Ac-leA TG ile4 ut d cup— to Gvlli"y7.,%f,. rG Yc1.vl= c ho5 beta! u5CA -furAe5i/Vl Tr- i o ,�:,� L 7. �a C, F :� TL . i o M..� i _ 7.3a s=a.5'Po �= ativ R -tt = (2�ro s) = res s = 3 s= �.570 = 45 ('f It = (q5���.� �- 3 -Ff/s� _ � 5 - l . Z ✓yi;nl ?' = o. g 5 4 ( 7 m .J F 7 ik-o IC tMe �QC_L� 1CjIQ)n5 I I 1 i I I 1 I I I �ov C�;) D S 't 83(1 1 - (t:tc;�.5`� �15) .33 Toy = a5..g er,-. ri 3�' TA. c IF40) 3 C I.ZS (loc j r) 1 1 1.i-�1--Z5Y.5X s -ram �b y•3�. ��ti CO15)Tov _�.� � 'Too 1 y ten E.D E� toy_ Too: r, �.91a b � i• � �.�) . ,AT �70�_ i5.72 fi 9.bq No Text i 17 7.411 0.3927 45 52 51 42 IT Page I 10 Year I I I I u I I 01 10-Year--- Composite 'C-2.0731 Area Release Rate _ 0.75 �2.073 1.2 ------ j -� --- j - --- -T _ _M(_odified ,M. FATERID. - - ---- JUDIS �- - - Modified - C. LI _- T 5/951 Apr-98 N6v-98 DETENTION POND REVISED INTENSITIES-- SIZING T TIME I ETNI ETN NSITY! Q 10 Runoff curn yea -� j _Release Cum total Required Required Detention_ ! Detention TIME - - (mins) _Volume (secs) /ni hr) (cfs) (ft^3) (ft^3) _0_-- .01 1-- 0 0.00' 30.01 4.870 7.57 2271�3600__911.5 .0 [ 0.0000945 0.04 10 -0 001 3.70 5.- 526I 720.0 2806.20.064 20 00� 3.1904.96 44 I 1200 2.7401 10-80- .0 70.07715 3831 - - --- 255 - 4_26 -5112 -11500T_ 2.44� 3.79- , 5690+ - 1440.01 _ 1800.0( _ 3672.0 0.0843 3890.4� 0.0893 F---f----- 30 - - 1- 35 I- 1800 2.210 3... 6185 --- + ----- 2100 2.000 3.11 6530 2160.0 2520.0 4024.81 0.0924 ----- -- 40 - -- -- --- ---� 2400 1.830 2.85 -- -- 1 4010.0 0.0921 - - 6828 2880.0, 3948.5 0.0906 45 50! 2700 - 1.690 - 2.63 1 -7094 3000 1.580� 2.461 73701 3240.01- 3854.3 0.0885 _ 55 _-__- - 3300 1.480 7593 2.30 3600.0 t 3769.51 0_0865 36_33.4I 0_0834 601 _ _ 3600 1.400 2.18 7836 _3960.0 4320.01 - 3515.91 00807 _ 651--390_0� 707 1.320 2.05 j 8004T _ 1._25_01 4200 46800. - 332391 0.0763 - - - - i _ 1.9_4 i 8162 - 5040.0� 3122.4 0.0717 --- 75I 4500; 1.1903� -1.85 8326II -� - - - t---- 5400.01 -�- 2925.71 0.0672 -- 80r 4800T 1.140; 1.77; 85081 5760.0 2747.6! 0.0631 85 -------91 86 3 5100 1.090! 1.69j _ 86431 --- 6120.0!_ - -- -- -- 2522.91 0.0579 90 - -- --- 5400 1.050� 1.63T 8815� ---1.57 - _6480.0' -- I-- 23354 0.0536 -- - 95 10016000r_ 5700�-- 1.0108951 !! ----- 1 0.970j- 1_51T- 9049;--7200.O1 6840.01 _211_0.7 0.0485 1------- 1848.6' 0.0424 --- - 105; 110 L 6300 0.940j _ _1.46! _ 9207I 6600 0.9101 1.411 93381 7560 7920.01 1647.21 0.0378 141_7.8 0.0325 1151 _ -6900, 0.8801i 1.37 i 94401 8280.0 j 1160.41 - 120! 7200! 0.8601 1.34fi- 9627! 8640.0! _0.0266 987.0!- 0.0227 1_ Page 1 I I I I r� �I I I 2-year Composite 'C' 0.75 Area 2.073 Modified Modified Release Rate 1.2 M. FATER D. JUDISF C. Li 5/95 Apr-98 Nov-98 DETENTION POND SIZING REVISED INTENSITIES TIME TIME INTENSI 02 Runoff Release Required Required cum 2 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 0 0 0.00 0 0.01 0.01 0.0000 5 300 2.850 4.43 1329.311 360.0 969.31 0.0223 10 600 2.210 3.44 2061.599 720.0 1341.6 0.0308 15 900 1.870 2.91 2616.644 1080.0 1536.6 0.0353 20 1200 1.610 2.50 3003.777 1440.0 1563.8 0.0359 25 1500 1.430 2.22 3334.939 1800.0 1534.9 0.0352 30 1800 1.300 2.02 3638.115 2160.01 1478.1 0.0339 35 2100 1.170 1.82 3820.021 2520.0 1300.0 0.0298 40 2400 1.070 1.66 3992.598 2880.0 1112.61 0.0255 45 2700 0.990 1.54 4155.847 3240.0 915.81 0.0210 50 3000 0.920 1.43 4291.11 3600.0 691.11 0.0159 55 3300 0.870 1.35 4463.687 3960.0 503.71 0.0116 60 3600 0.820 1.27 4589.622 4320.01 269.61 0.0062 65 3900 0.770 1.20 4668.914 4680.0 -11.1 -0.0003 70 4200 0.730 1.13 4766.864 5040.0 -273.1 -0.0063 75 4500 0.6901 1.07 4827.499 5400.0 -572.5 -0.0131 80 4800 0.6601 1.03 4925.4481 5760.0 -834.6 -0.0192 85 5100 0.6301 0.98 4995.4121 6120.0 -1124.6 -0.0258 90 5400 0.6101 0.95 5121.3471 6480.0 -1358.7 -0.0312 95 5700 0.580 0.901 5140.0041 6840.0 -1700.0 -0.0390 100 6000 0.560 0.871 5223.96 7200.0 -1976.0 -0.0454 105 6300 0.540 0.841 5289.2E 7560.0 -2270.7 -0.0521 110 6600 0.520 0.81 5335.902 7920.0 -2584.1 -0.0593 115 69001 0.510 0.79 5471.165 8280.0 -2808.8 -0.0645 120 72001 0.490 0.7E 5485.158 8640.0 -3154.8 -0.0724 100 Year i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 This is to convert % imp. to a C value - - -- -- I---- --- - y -- -_ (must insert % imp_and C pervious). -. -- ------- Required detention L -- - -- - --!--- 19751NTENSITIES I i ft' -- acre-ft. 0.75-- ---�--- 13997.4 1 0.3213 'C' • 1.25 0.9375 -�- -- r--- Area _ _ 2073.acres _-, _--� __ ---� Modified I Modified Release Rate 1.2 _ _ 1M. FATE RID. JUDIS _ C. I -I_ 5/95' Nov-97! Nov-98 DETENTION POND SIZING I ------ TIME - ,- ------- --------0 TIME I_NTEN_SITYIQ100 - 1----- --- a.--equ --- 1 Ru_noff ;Release Required � R_equired _ I cum j 100 year ' I Volume I Cum total i Detentio_nDetention (mins) - (secs) (in/hr) (cfs) (ft^3) (ft"3)� (ft"3) (ac-ft) 0 0 0.001 0� 0.0 -- --0 -- - - .. 0 --- 0000 000 5, --- 300 8.500 16.52, -- - ..._.L--0 ---0 4955.77L, 360.01 4595.8E 7- -- - 0.1055 10 6001- 7 100 13.80�8279.04 , 720 0 7559.01 0.1735 15 900i- 6 000 - 11.66' 10494.56� 1080 0i 9414.6 _- 0.2161 _ 20 --- -- -1 - 25! 1200 5.200 10.11 - - - 1----- --- 15001 4.600 8.94 _ 12127.051 1440.0 10687 1�- 13409_72;- 8800:0 0.2453 ---- -- +---- - - f- - -- -_ _ 11609.7 - - 0.2665 301 1800�-- 4_200j 8.161 --------0.287 14692_39L--2160_0, 12532.4i 0.2877 -- 35� 21001 3 800i 7.39� - - 15508.631 2520.01 0.2982 40 _..._.------- 240013.500 i 6.80; ----- -12988.6� 16324.88 2880 0 13444 9' i- 0 3087 45, 501 27001 3.250� 6.32- -_.s.-.___-_.._ 3000 3.000 5.83117490_941 -- 17053.66: 3240.0; 13813.71 __._-_-_-___...._-.._..�..-.3813.-_._-... 3600.0! 13890.9i _.. 0.3171 0_3189 - -._... ----5' ---- ----' --- - -- 55; 3300 2.800 5.44 -- 17957.36t 3960.0! 13997.41 0.3213 60; -----..-._... 3600' 2.600! 5.05!18190.58; _- - ..----- 1-- _.---- 4320.Oi 13870.6) -_ --- - - 0.3184 4.ful 18569 551 4680 0' 13889.5; 0.3189 42001 -- 1 - -- _75; _ 4500i 2.150I I _4.18I 4.471 18773.611 50400j 13733.E! 03153 _ 18802.7615400.Oj 13402.81 0.3077 -r-- -------..._.... - -- 851 54000 1.950,---- 3.7t19327.49j_-6120-13207.5,- 0.3068 80; 4800 2.050 1 3.98 1 19123 4_3 5760.0 13363.4 90i __ � - _ 0.3032 -- 1.855� 3.60, 19414.94� 6480.0 12934.9 0.2969 _ 5700 j1.750' 3=I-- 40 ! 19385.791 6840.0 12545.8 _ _ 0.28_80 --- - 100 6000 1.7001 ---3.30 82 i 193.06 7200.01 12623.1 ! 62898 105; 63001 1.650! 3.21120202.031 7560.0j 12642.01 0.2902 -110 6600, 1.550; 3.011 19881.37! 7920 0 11961.4, 0.2746 - 115}69001.5001 _ 2.9_2! 20114.581 8280.0� 11834.6! _0.2717 120!_ 72001 1.4501 2_821 20289.491i 8640.0! 11649.5[-0.2674 125' 75001 1.380! 2.68 i 20114.581 9000.0! 11114.6 0.2552 130 7800i 1.300 2.53;' 1970E_46 9360.0 10346.5 _ 0.2_375 1351 8100 1.280' 2.49 20149.561 9720� 10429 66 0.2394 -1-- 4-0 -�-- 140; 8400 1.250i 2.431 20406.091 10080.01 10326.1� 0.2371 T-- - -- - -- -- 145T 8700 1.210� 2.35; 20458.57� 10440.01 10018.6i 0.2300 {-- - 150-i- 9000 i ----- -- -155r1 ---- -- 9--- +I -- --1.18-0 -2-.29r; -2-0--6- 9-.-3- -10-8-01 �----9-8--3-9--.-+! --- --0-..2-259 02251300, 1.160 220965; -11160.01 9805.8 1661- - 9600'20895.84�_11520.Oi- 9375.81 _0.2152 1651 9900 1.110E 2.1E 21356.43 11 1880.01 _ -_! _ _ _ _ i-- 9476.4 _0.2175 -170 10200; 1.100- 2.14E 21805.37; 12240.0_t_ 9565.4' 0.219E 175, 10500!--1.080! 2.10. 22038.581F 12600.0, 9438.6! 0.2167 Page 1 10 Year 10 year POST DEVELOPED 1975 INTENSITIES Composite 'C' _ 0.75 - � �- Area 7 _ 2.073 �------ _ -� _ �---- - --- Modified Modified -+- �- Release Rate _ - 1.2; __ ,M. FATER�D. JUDIS_H_C. LI -- I 5/_9_5 j _Apr-98 Nov-98 DETENTION POND SIZING--i- �,,Requirecl -TIME TIME_iIN_TENSITYi Q 10 Runoff�Release Required 10 year --- ----- -- - }--- --- -- _1 --- Volume Cum total Detention a entn t io i- -- -� --- {--(ft^3)' ---(mins) -- (secs) (in/hr)- (cfs) I- (ft^3) (ft"3)- i (ac-ft) - 5! 3001 5.650 8781 2635 360.Of 22750.0522 15 900 7.00; -0--.0---0-0- 4-98 0.07 3.700t 5.75{ 5.051 100.0.0 771000]__477.8I_ 80.01 4097.3 0.0941 - -_-_-..0 6064 4623�0.106 ---_ _._-_ 1500 2.900 2.6001 4.51 4.041 0.1139980218001 7276 60A!--- 5116.2 0.1175 r.._ __ __- 7673 2520_0 5152.7--_ 0.1183 40 24001 2.200 3.42 - - 8209 2880.0) 5329.1 0.1223 45' 2700I 2.0001 3.11 f -- 8396� 3240.0! 5155.7 0.1184 50 j 3000- - - 1.850�---2_88�- j --_86291---3600A j 5028_91 0_1154 _ - 55; 3300 1 730; 2.691 - 8876 3960.0 4916 1; 0.1129 U.1U04 - 65 -3900 1.500 2.33 i 90951 4680 Oi 4415.3) 0.1014 70 4200' 1.45012.251 94681 5040.0j 4428.4; 0.1017 - 75F 4500; 1.350' 2.10i 0 9445 540.01 4045.61( 0.29 -- _ - 801 4800r 1.3001 2.02! _ 97021 57600'_3941.61 0.0905 --- ------.--.851- 51001 -1.250 -- 1.941 --99121 6120.0 j 3791.51 0.0870 90! 5400! 1200'.1.87' 10075' 6480 0j 3594.8r 0.08-25 - - 951 5700j 1.150--1.79; 10191' 6840.0; 3351.41 0.0769 100' 60001 1.100' 1.71 r 10261 _7200.0 3_061.4- j----_ 0.0703- 105 6300, 1.0500 --1.63 - 10285 - 750_2_724.7j0,062_5 -- 110 6600 j -1.010 1.57 10364� 7920.0 2444. � 0.0561 115 69001 0 97171i 9 51 indnai a�an n? o,�c of -n neoo _ 120j 7200i 0.930 1.45 104111 8640.0; 1770.E 0.0406 125j -----_---- -- 75001 0.900 1.40i 104951 9000.Oi 149 00-34 f - 130! ;--- 7800 0.870 ., 90- i 135 81W _- 0.8401 1 10579: 9720.0! 858.500197 140184001 0.8101 1.2E 10579110080.01 498St14 1451 87001 -_-.___- 0.770 1.20i 104151 1040Oj- - -24- 1 -0. - 1501 90001 0.740! 1.151 103557, 10800.0i 445.4! 0.0102 155' -_.-_-- 9300! ._-_ 0.7101 1 10; _ 10_266' _ 11160.0 -894.0 0.0205 _ 1601 96001 0.7001 1.Ogr 10448; 11520.0, -1072.1 0.024E 165 9900i 0.680! 1061 1odR7i 11aRnnl --IdI-'l e�=nriz')A 1701 10200 _ 0.6601 _ _ 1.03 _ 10467 12240.01-1773.4 0.04071 175;,' 1050 0.650 1.01 10611! 12600.0i-1988.8;-0.0457 Page 1 J 1 I 11 2-year POST DEVELOPED 1975 INTENSITIES Composite 'C' 0.75 Area 2.073 Modified Modified Release Rate 1.2 M. FATER D. JUDIS C. Li 5/95 Apr-98 Nov-98 DETENTION POND SIZING TIME TIME INTENSI Q 2 Runoff Release Required Required cum 2 year Volume Cum total Detention Detention (mins) (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) (ac-ft) 0 01 01 0.00 0 0.01 0.01 0.0000 5 300 2.8501 4.43 1329.311 360.0 969.3 0.0223 10 600 2.2101 3.44 2061.599 720.0 1341.6 0.0308 15 900 1.8701 2.91 2616.644 1080.0 1536.6 0.0353 20 1200 1.610 2.50 3003.777 1440.0 1563.8 0.0359 25 1500 1.430 2.22 3334.939 1800.0 1534.9 0.0352 30 1800 1.300 2.02 3638.115 2160.01 1478.1 0.0339 35 2100 1.170 1.82 3820.021 2520.01 1300.0 0.0298 40 2400 1.070 1.66 3992.598 2880.01 1112.6 0.0255 45 2700 0.990 1.54 4155.847 3240.01 915.8 0.0210 50 3000 0.920 1.43 4291.11 3600.01 691.1 0.0159 55 3300 0.870 1.35 4463.6871 3960.01 503.71 0.0116 60 3600 0.820 1.27 4589.622 4320.01 269.61 0.0062 65 3900 0.770 1.20 4668.914 4680.0 -11.1 -0.0003 70 4200 0.730 1.13 4766.864 5040.0 -273.1 -0.0063 751 4500 0.690 1.07 4827.499 5400.0 -572.5 -0.0131 80 4800 0.660 1.03 4925.448 5760.0 -834.6 -0.0192 85 5100 0.630 0.98 4995.4121 6120.0 -1124.6 -0.0258 90 54001 0.6101 0.95 5121.3471 6480.0 -1358.7 -0.0312 95 57001 0.5801 0.90 5140.0041 6840.0 -1700.0 -0.0390 100 60001 0.5601 0.87 5223.961 7200.0 -1976.0 -0.0454 105 63001 0.5401 0.84 5289.26 7560.0 -2270.7 -0.0521 110 6600 0.5201 0.81 5335.902 7920.01 72584.1 -0.0593 115 69001 0.510 0.791 5471.165 8280.0 -2808.8 -0.0645 120 7200 0.4901 0.761 5485.158 8640.0 -3154.8 -0.0724 'i STORAGE VOLUME FOR DETENTION BASINS Version 2.00 Project : Oakridge Business Park 36th Filing, Holiday Inn Express User: SGD County : Larimer State: CO Checked: Date: 6-04 Subtitle: Drainage Area: 2.073 Acres Rainfall Frequency: 100 years Rainfall -Type: II 24-Hour Rainfall: 7.74 inches Runoff Curve Number: 75 Peak Inflow: 10.306 cfs Peak Outflow:. 1.2 cfs Runoff Volume: 4.8 inches Detention Basin Storage Volume: 2.58 inches or 0.4 acre feet 1� 1 I tI 1 'I tAGO,h1AIN AVENUESTOFF!('E 80i 2464 NiOFTH Cn.f:O?, _Et.B-? LIGHTOWLER JOHNSON ASSOCIATES INC-3RPCRP7F? FAX (70t ) 29?-7?G3 EMAIL Ii �tifG t'o�slerjct:nsc n.ccn WEES11,E:: n.i,Cnlavvle ehrsr.n,corn i 1 1 1 1 1 i 1 1 i 1 i i 1 i i 1 1 I II Z I I II I m I I r o l I zap I X_= II. I W I I I .I � h I` _ I Tli -..1,I l T _ _- n .. TF 1 _= - _j G iuy lr 4 I -J• 02 I lu 1 .I 1 M _ {{} O WO- -- �/.11� I •I K n�3 I � V Z� II Lm '-a+l� K�IV I C -'1-_- _ / N / I ...!._ 4 .I_ 1� �, I I �I •'1 00 Lf — _ O U> K� II II II II II n0 NC"= �O 2Z mN- 00 J ZZ {I U) O O Oyu � Z -H I I { c a c e oi rn a00 o r col �I al r�l N �i pl rnl aol r rnm rn. rn o MIT,I I � p , �J I_, , II I +. f tr r n '� I { I lb I J_ i I C IIZ i i J i t :- -pr i I T 7 j'i I j I- ! I i v 11I111 J I.l.:y_LJ' CI � IIi -i Zpllili! L I_.+ ill rI 1 . j- T T- T LIM .i �- I I i1 I.-Li-LIDI1 i ..� .i_i I�I 1 ' i , ! l411H, it I Ti itE I i _] ! I hill �I_ n=1 IIT I IIi !I.li:i II�III�I!II�� �rlrinl�Ir'r.lr.lr.;r rn �r' tOI rn,rn rn, 1A' aj MI fV rl�o rn'rn,rn rn,�lrnm D n1 a o: L rnrn! C W I n! z!I rno rncrnoalloaI rno: ornO; rnmn1 rn0n0! nrnn; n lvnvl mnn1n 12 Tom, CD 'I� 1 I.� I t; -� ®iill-'•,-i—i-.�_Y....�_-i•--'- ,--- TT- i I L' � n- �Ilil i31 t 0 ''i ijf F i 1i I � , I I� �,• i! ii j�! al C! Lf I 1'Ij!ull_,W_'il!'I_ In im I l l !�,� J. IW 1 i� l j� l � I4-4..I I_ I - T1 I -; CD � I. l�lllli !il'I�. lirw h; CN !! OO'' VCA; On l"D i N'' -*I p n n^ I; O! -L-OCR AI CACnACA @ CA' C, Ivcnl j O, t j 'I V l?LL f� O Orr OOO INO � N n O NWO' OO .= ,= � >^ Q d W O O i�- UU d O O O 1 O 1 O M N MENEEMEN i02 _[if ' W O O O O O N cN a O O O O O O O aQ Q o�N NN Ln N Q OO r i I r m Q N U N LL- ' 00 Ln cD O 00 cD Ln rn m f� Q W J Cif Q ' m Q mU O W LL- O~ O I I I I I I I F] Vol e. Art,% 'l3 9o5F 4qj C F. Ir CF o o o 10 8 5F MO 5F il57S*CF to C'r A T. F 'U&I 310raye u��U . BNP :5-1-oraje-, L4 �de A 90 5 F + 5,1 sp ocaer e4w-,:ka,j ?(Oujej rr"jor f-j smp Vo IIA Me o-o5A 0.060 AF 7-5 c O /13(4201 *31f AN f r = Lh 80.00 z ---------- PeWCA4i 4 -J rvl a e 0/0 Low It k 'Y y F� HOLIDAY INN EXPRESS & SUITES EROSION CONTROL REPORT FORT COLLINS, COLORADO LIGHTOWLER J.OHNSON ASSOCIATES INC. ARCHITECTS AND ENGINEERS FARGO, NORTH DAKOTA LJA PROJECT NO.03030 STEVAN G. DEI REGISTRATION NAL�G\a cC September, 2003 Revision #1 Revision #2 Revision #3 Revision #4 TABLE OF CONTENTS NARRATIVE SITE INFORMATION CALCULATIONS WQCV 'PROVIDED j VOLUME AND AREA RAINFALL PERFORMANCE STANDARD EVALUATION EFFECTIVENESS SURETY SAND FILTER BASIN DESIGN PROCEDURE FORM SYSTEM PLAN AND PROFILE EROSION AND SEDIMENT CONTROL MEASURES EROSION CONTROL DETAILS ESTIMATED SITE CONSTRUCTION SCHEDULE 1 I 1 NARRATIVE Owner: Lamont Companies P.O. Box 1209 ' Aberdeen, SD 57402 Erosion Control Consultant: Lightowler Johnson Associates, Inc. 700 Main Avenue Fargo, ND 58103 Purpose The following report is to describe a storm water management plan and provide supporting calculations. It is also the purpose of this report to identify an Erosion control plan during and after construction and provide supporting calculations and details. Project Description Lamont Companies is proposing to construct a 4-story, 89 unit Holiday Inn Express located within Oak Ridge Business Park, Fort Collins, Colorado. The proposed structure is a wood frame, slab on grade construction. The project site covers approximately 2.073 acres. 1 Existing Soils According to the Geo-technical Report generated by Kumar and Associates, Inc, native soils consist mostly of sandy lean clay underlain with poorly graded clayey sand and sand with clay and gravel. 1 I Site Conditions The site is mostly flat with grass and weeds. Currently all stormwater runoff is diverted onto Wheaton Drive, Oakridge Drive, the ditch along Harmony Road or infiltrates into the ground. Full detention for the 100-year storm event is to be provided with this development. Adjacent Areas Surrounding development consists of office and commercial development. The site is bounded by Oakridge Drive to the South, Harmony Road to the North and Wheaton Drive to the West. The East property line is adjacent to an existing International House of Pancakes restaurant. Storm Water Runoff Analysis The 100-year storm, using the City of Fort Collins computer spreadsheet was used to determine detention volume requirements to be 0.395 acre-feet. The 100 year storm was used to design all stone water apparatus The proposed storm water management system will consist of a series of PVC yard drains, downspout leaders, and PVC pipes that divert storm water to a Sand Filter Basin. Extended detention will occur in the parking lot. Storm water will also run overland to the Sand Filter Basin. The sand filter basin is to be 7 underlain with perforated drain -tile and connect directly to the outlet structure. The ' outlet structure shall have a 4.4" orifice to restrict the outflow rate to 1.2 CFS. A 15-inch (min.) RCP will connect the outlet structure to an existing city inlet located on Wheaton Drive. Overflow will take place through the inlet grate on the control structure. Emergency overflow will take place at the site entrances. The maximum designed ponding depth is 11.4 inches. A total of 0.395 acre-ft of storage is required for this site. The provided storage is 0.435 acre-ft. The existing 24-inch RCP located under Wheaton Drive (Conveyence element 34) has capacity for approximately 16 CFS. It currently transports 2.1 CFS from Basin 340 and up to 12.4 CFS from Basin 160 (street flow) for a total of 14.5 CFS. Capacity of the existing RCP would not be exceeded by introducing an additional 1.2 CFS. Sediment Control All storm water has been directed to a Sand Filter Basin and will infiltrate into an under drain system prior to discharge. The SFB was designed according to the UDFCD Drainage Criteria Manual (Volume 3). Temporary Stabilization Measures During construction, a vehicle tracking control pad will be used at the construction entrance on Oakridge Drive. Silt fence will be installed around the perimeter of the construction site prior to grading activities. The sand filter basin will be installed early during construction will provide sediment control during and after construction. Silt fence with rock filter outlets will be installed around the Sand filter basin and remain in place until pavement is installed. Hay mulch will be placed on all exposed areas. Temporary crops will be planted in areas where work will not resume within 30 days. Permanent Stabilization Measures Permanent landscaping will include a mixed sod, plantings, trees and shrubs. The sand filter basin will provide sediment control after construction is complete. The outlet ' structure and under -drain system shall be installed early in the project to ensure water quality is maintained. ' Construction Materials and Equipment The contractor shall store all construction materials and equipment and shall provide maintenance and fueling of equipment in confined areas on site from which runoff will be contained and filtered. Maintenance The erosion control measures will be inspected weekly during construction. Silt fencing will be checked for undermining and bypass and repaired or expanded as needed. Mulching of bare soils will be checked regularly and areas where it was lost or damaged will be re -mulched within seven working days when needed. Temporary vegetation shall be maintained and replaced if required. I Calculations Calculations for the sand filter basin are provided herein. Details for the erosion control measures can be found on Sheets C-7, C-8, C-9 & C-10. Details are also provided in this report. The calculated volume for WQCv was determined to be 0.043 acre-feet, 0.050 acre-feet is provided. The required filter surface area (Pond Bottom Area) was calculated to be 624 SF, 632 SF has been provided. The maximum depth of the Water quality pond is 1.375 feet. The maximum depth of the detention system is 2.325 feet. J., I 1 1 1 k I I i i e I i I I 0:)'SNY11001a0A to �j SIM)68 s� le S31111S V 1310H SS3i1dX3 NMI AVOPIOH DNITJ H191 xava SS3Nwsne 300JUVo �- E R E N 'III I ilR R H tl o� o d S d d 0 6 d dd `sa d a " ss e d d d YF a dddd d dd a c d 6 d 8 A S d a 3 14 v I 8 R R' R 3 3 e e y _ d d d .• d - - a n 2 R N k 2 II 2€ 8 ! yP gi 9 p I I _ � L I a■■��8� �I 1� a. b tz , R ;3! r l C> w�1 it •, _ __ � II V f.l I Q. L 1 L 6 o - =o@� v OO O O.__ dam d (cd d b d d d N i^ d d d d d d d o W < 0 0 0 W W Q I^ 1 I , 1 I 1 �1] 1 I; I! of III I I ' i I I 1 6 11 I 1 1 I 1 I I No Text DRAINAGE CRITERIA MANUAL (V. 3) 0.5C 0.4° 0.40 ' 0.35 IWOU ; - t s - 0.30 T O.3( - s 0.25 - � 0.20 0.15 0.10 0.05 0.00 0 Figure SFB-2 S-52 STRUCTURAL BEST MANAGEMENT PRACTICES 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.7 S0.8 0.9 1 Total Imperviousness Ratio (!-1, 1100) L.. Or75 FIGURE SFB-2 Water Quality Capture Volume (WQCV), 80'" Percentile Runoff Event Rev. 6-2002 Urban Drainage and Flood Control District It I 11 LIGHTOWLER JOHNSON ASSOCIATES INCORPORATED ARCHITECTS ENGINEERS 3o f to y9�6.3�s `c s � s` A faik B T�.l Aw•7q T64.1 o u,l 1%b%C, �9�1�.06 /oE6sf "14Yc�i �cF 63ai SF 60S Cr f 2d4sF 1375 sF 9MP �+ct.& `lviaS 46 9 5 F 1 SAS c V-a°I (A+B 4r) De- 5j ,) V,["--el _ L�5• �nJ Uo Provided . �! GF N4� . S •-� �19iz.00 �1/3X•bZ1Xsy3�roB6t (SM3X,ogb% : H4yGr H476.375-a AID ZVI a) (y3y. 6ilq., -, , 'j, iii cF �i977.75 T01�► Y. i3751 a964 * (nof 2/e0 c Lj0,cu i2 o.o't3 AF T 93SG0) sf 3 _ �oy�)K35Gd f 1SF tN AENUE FFICVE BOX 2464 NORTH DAKOTA 58108.2464 (701) 293-1350 (ND) 1218) 233.3512 (MN) FAX 1701) 293.1353 EMAIL: lia@lightowlerichnson.com VVEBSITE: www.liahtowl.ri..1...— ___ I. I '. I n I RAINFALL PERFORMANCE STANDARD EVALUATION MARCH 1991 8-14 DESIGN CRITERIA I. PAGE 23 tr r 1 O I C'. C'l�CCC • 1 I CDI C r Ln Ln Ln Ln i Cggqq 1 C I C+G1C`CNCCCCCC 1 I I G I rccctr.LnL1':LnlnLn 1 r I CCggqqCt~CDp 1 I 1 C 1 qC1 t, Ct D', C) I, C1 Ct m m C1COC I I . I C l c c v rrcc Ln Ln r r c c c 1 M 1 C g CO q C cc== C CC === Coco 1 1 G-N m m m Ct C'• Ct O, m C+ C'% 1 I C l c c r c c c c c r c c c c c c c c c r r I N I C g CC C q q C q co q= q q CcC co q q q q' I 1 1 C 1 C M r Ln to tC tD tD n n n n n n r:, n n n n g q q I I 1 OgCr'7ggqqqCqqq�qqqCqqq I 1 1 O I g N M r L r: L L t D L D t p L p L D t D n n n n n n n n n n C I C I q cc co co cc q C== C C= CCJ q q q CC co co C co cc JO I O i to O N M r r t.-)Ln Ln Ln to to to to t0 tD tD to LD tD n n n O I CC I encrcrccccccccrcccc�c�c� U I I co co q q CT cc C q co g C C q q q wCq co cc co 1 1 •• 1 O I r C1.-tNMen rCrC LL; Ln u.)Ln n Ln to Ln t1; tp tO Lo to Ln 1 1 .Z•. _ I n I CO O CO CO CO C C Cc C CO q= C O CO C CO g q q q CO C CO J 1 1 J I O I C Lo cc CD --. N N M M M rh C V. r Q• r C C ":r " ff Ln C 1 1 U I L o 1 M M r `n C C C r r r C C c C r C C r r r C c c c I I CO C co co O C C m g C q q q x q q w 1-- I O 1 �C 1 Ln N Ln nC CCCC.-+.•-r .+N N N NN M M M M MCC= Li I vLo I NM MMMM CCCC C.' cc�Qccccccccc 1 I Cf'C co cc co co co q cc co coC CgCgqCqqCCqq C I W 1 O 1 CL to 1 .-iq.. M C Lr.61) to tD n nn NIX)=CCgm Cnm CCG L+.. I O . I . . . . . . . . . . . I J r I N N M M M P• ) (' •: M M M M r •' 1 M M M M M i 7 M M M V. C <7 rn I LN I g q cc q q q co q C C q C C q co q C q q q q C q q C I I C 1 O 1 LD Ln C CD r•': c cLn Ln Ln to to to tO tD nnnr q CO C I I C 1 r I N N M M M M M en fnc n M M M M M M M M M M M M M Z I I CO C C CO C CO co g q q q C g q q co q q q q co G q q Q 1 1 I Ln I •"' ^Lf%n CO C C.--�NNM cn M rCrC Ln tf)u7 to to tp L/7 I . I . . . . . . . . . . . cn rn 4J i M I CC.. CC CCM.. CM..Gq co CLM'1 corn cocc cc0 wccq co U I 1 1 O I M N t D C C 1 C.• -. N N M M M c r C c c r L n L n Ln Ln t c' o Q 1 1 I [ •' : 1 G• -- .•-•. -- . -- • N N N N N N N N N N N N N N N N N N N . C I I CCC txgcogCqq=cC cc q co co cc ggC=q O I I Ln I Ln "-I CAN M r Ln tD n n nggqCt Ct Ct Ct Q1 m OOO C 1 I . . W 1 N 1 C1 C O .-+ .r .-..-..--i r...-.r ,� .-+ ..+ .r ..,. r+ .•, .r .r .� N N N N d 1 I n C g q q q q q c O q a q C D q q q c O q q q cL C C CJ 1 1 1 O T CLnC M Un t0ggC�'OCO.�.--r.--r.--rNNNNMMMM 1 1 1 N i p C0• o g co q co g q co q co co g q q q q cc C q q 1 1 1 L n 1 g N C r L !' 7 M M M qCO CT O+Ct C�C•1 tT Ct CtOOOO O O OC OG CCO . 1 I n n n n r� n n n n nn q Iq g q q q q q q q q CJ q 1 1 1 O 1 OrnCtO.- �NMMCr Ln Llf Ln Ln Lo tD to to l� n tp ce n n n n p q^ IS7 DO Co p Con N g q q q q q q q q I 1'. a co i • I c C C 1 I q q q I • 1 c C r 1 CC q q I 1 n n n 1 • I r C r I q CO CO 1 1 LD LO n 1 • 1 r r c 1 q CO I 1 LI•) tD t0 1 • 1 r r r t q cc CC I I C r 1 • 1 r r 1 CO CO I I C O 1 • 1 r c I q CO I 1 C: C1 I 1 M M 1 CO q 1 1 n n I • I M M I CO q I 1 tD LD 1 • '1 N N 1 q q 1 1 O O I 1 N N I q q 1 1 M M 1 q q 1 1 • 1 O O I q CO 1 1 tD tD 1 • 1 CYi q 1 n n 1 1 Ln 1 mCD r tD rl- q q n nn tD tD tD Lnr r M M N N Ct LD-cl - Ct tD 1 1 I 1 I O I O N N J. C. N N N N C. CV N" N N N N N N N r+ .--1 .-+ .r 0 0 I 1 I nnnnnnnn nnr,nnnnnnnnnnn�nn 1 OC9 F-- 1 00 I J Z L.L. 1 I L. W I J. 1 C C C C O O O O O C O pO 0 0 0 0 0 C O O C G C 0 1 M C Ln1.0 O r• N M r to tD r� C.r G` O Ln O Ln C Ln O I -- --- I TABLE 5.1, EFFECTIVENESS CALCULATIONS PROJECT: OuK-( fo Ns_ b, , �_ $,: I "" Yk .36 F,.; ,:�-Y STANDARD FORM B r� COMPLETED BY: :5(>k-13,c-' .455c,c..4 DATE: Erosion Control C-Factor P-Factor •r' Method Value Value Comment $pra So.I l,D !.v i lie r 1,0 0,5' Ro: 511"-It 0- 0 I 1.0 5:141-�.re �.c� p.? Iiv �. MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS 'L3o c (-,-A a e « 2.0 l _ z_r7 -3k)TD _ 0 C? � p \ I ; q 7 z �n r W r' MARCH 1991 8-15 DESIGN CRITERIA I I LIB Fs ; :i1^;'LEn JCt�fJSO+`J �� �'S��rI,gTES I I•:.'rePCG:.7rr I I i 1 I •1 MAIN AVENUE (701) 2?3-135C iNIM ST OFFICE BOX 2,164 (218I 2.3-3512 im:J1 WIGO, NORTH DAKOTA 531 i'F.-21c FAX (7671 -193-7353 EMAIL: !j; com VVEBSITG: v ^n^n.ii h!p alerioMscn.co n t Designer. Company: Date: Project: Location: 1. Basin Storage Volume lam% t+= _. A) TribularyArea's Imperviousness Ratio (i = I,/ 100) i = "" O ' B) Contributing Watershed Area (Area) Area = • � acres C) Water Quality Capture Volume (WOCV) (WOCV ' 1.0 ' (0.91 ' t� • 1.19 ' 1 + 0.78 WOCV = Q�'. watershed inches D) Design Volume: Vol = (WOCV / 12)' Area Vol = `a;.+OYA acre-feet 2. Minimum Filter Surface Area: (Vol/ 3) - 43.560 A, ip 612q square feet Fitter Surface Elevation Lu= `)l �b.J/77 3 feet r Average Side Slope of the Filter Basin (4:1 or flatter) 2 =� I3. Estimate of Basin Depth (D), based on fitter area # I D = 1._ // . feet �i 4. Oullet Works A) Sand (AS TM C-33) Layer Thickness (I a' min.) po �Q inches B) Woven Monofilament Fabric Between Sand 8 Gravel- _Carthage Mill, Carthage 15% Carthage MII, Carthage 15% (or equal) Other: C) Gravel (AASMTO No. 67; CDOT Section 703) Layer Thidmes (8' min.) p O inches D) Overflow Elevation At Top of Design Volume �p 1 h� beet (Filter Surface Elev. + Estimate of Basin De lh D) 5. Draining of porous pavement (Check A. or S. or C,answer D) Based ��,? Infiltration to Subgrade with Permeable on answers to SA through 5D, check the appropriate method Membrane: 5(C) checked and 5(D) = no A) Check box if subgrade is heavy or expansive day B) Check box tl subgrade is silly or clayey sends '" /� Underdrain with Impermeable Membrane: 5(A) checked C) Check or 5(D) =yes box 0 subgrade s well -draining soils D) Does tributary catchment contain land uses that may have ............... Underdrain with Permeable Membrane: 5(B) checked and 5(D) -no petroleum products, greases, or other chemicals present, such as gas station, yes no Other: hardware store, restaurant, etc.? 6. Describe Provisions for Maintenance drier w h L , ;- or r0 ' USDCM VOL 3 BMP Design Fonns v2.O3 (2DO20925).xls, SFB 2002-06 revision ij a W 0 iA n LO r` W J � it W w N LO C3 o n UJ N ¢ _� II 3 U�= O J W �m Lom m �o L aOf 0 in 'III =III Z =III= IIIIIIII W � I Z IIIIII o I IIIIII Z 0 III II M o W N U�� U rn J J Z o N.]WW ^ Q JW J J=m m Z in¢ I►>� w .o F ¢ a o�xx �_ Oc I0 . �mz wNwZ W N �� N r�N NW N�'omC O m mW� I N ~OuLi 3 o x0 BUJ Z W m V LjWOW Qd'6� �Q FdLO W N U3ZQ- —MW Ln O o I. ooaaww�J¢� UFO = go " =o NWZ w� N mouN WO,^M I U 2q 0L, �metV- aQ gZmg O N w= ZoNoa W<wJV>¢j=:C-) O dOE I I J 3vo C=C, ; 1 r I 1 1 t 1 1 1 i 1 1 1 t 1 l 1 -o T (N a -H I I WOVEN MONOFILIMENT FABRIC SEE SPECS. IN PROFILE VIEW 1 3n ' 8„ MIN. GRAVEL LAYER � til,�zV�, .y lam+ .. ✓ i_t_.� � ly ,..� _ 171 FILTER BED SECTION 1 I -PERF. HDPE PIPE AS SPECIFIED MIL POLY I I., 77.75 FL INLET GRATE i 76.375 SAND SURFACE-,,,,,, IM76.65 I I 7g�155r CROWN gg 22 5 15 INV � 75 20 NV..- 74.875 GRAVEL SURFACE` _ FILTER FABRIC 12" PVC ® 1.2% '" -' �' � ' -' I' � � =1' �--' I30 MIL POLY --I -I �74.90 BOTTOM 4" PERFORATED DRAIN PIPE I I 0w 1 ,I ID 42' 12" PVC #4 BARS 6" O.C.E.W GRATE FRONT �rl FABRICATED G; VANIZ D„ BA S 1-1/2 OPENINGS REMOVABLE 12" PVC --z--� CONCRETE OUTLET BOX C-10 NO SCALE I i 1 i 1 t 1 i 1 1 1 1 1 1 1 1 1 1 J 11 I H 11 I r 11 I I I I I A. Soil Erosion and Sedimentation Control Measures, Permanent Stabilization, and Maintenance 1. The erosion, sediment, stabilization and runoff control will be accomplished by the use of the following during and after construction: Establishment of temporary and permanent vegetative cover Non-structural measures Structural measures B. Establishment of Vegetative Cover Slopes shall not be left unattended or exposed for excessive periods of time such as the inactive winter season. 2. All existing gravel areas not utilized for driveway access are to be loamed and seeded. ' 3. The topsoil shall have a sandy loam texture relatively free of subsoil material, stones, roots, lumps of soil, tree limbs, trash or construction debris and shall conform with standards and specifications of Urban Drainage and Flood Control District (Denver, Colorado) the City of Fort Collins and Larimer County. 4. The seeding design mix shall be comprised of the following: TYPE LBS/AC INTERMEDIATE WHEATGRASS 2.5 WESTERN WHEATGRASS 4.0 BLUE GRAMA 0.75 SMOOTH BROME 3.25 GREEN NEEDLEGRASS 2.4 5. Early spring or late summer seeding is recommended. Lime and fertilization as required by soil testing to compliment or upgrade existing conditions. The seed mix shall be inoculated within 24 hours and before mixing and planting. 1 6. Temporary treatment shall consist of North American Green erosion control blankets such as S 150 or approved equal. They shall be incorporated into the work as warranted or as ordered by the engineer. Hay or straw applications ' shall be in the amount of 2 tons/acre. 7. Silt fence and other temporary protection shall remain in place until an acceptable stand of grass or approved ground cover is established. 8. All fill shall be thoroughly compacted upon placement in strict conformance with Colorado Standard specifications. I r r 9. Stockpiles of topsoil shall not be located near waterways. They shall have side slopes no greater than 2:1 and shall be temporarily seeded and/or stabilized. 10. The construction superintendent shall have overall responsibility for plan implementation and for seeing that the appropriate workers are aware of the provisions of the plan. The contractor must repair and/or reseed any areas that do not develop within the period of one year and shall do so at no additional expense. �! 11. All areas disturbed by construction shall be stabilized with paving or permanent seeding immediately following finish grading. Permanently seeded areas shall be protected during establishment with mulch. All seeded areas will be checked regularly to see that a good stand is maintained. All areas shall be fertilized and reseeded as necessary.-- '" ' 12. Reference the "Drainage Criteria Manual (Volume 3)" prepared by the Urban Drainage and Flood Control District. 13. Temporary hay mulch to be tacked in place with nylon mesh netting. 14. Maximum graded slope within the Site is to be 3:1, unless specified otherwise. C. Non -Structural Measures 1. Construction traffic shall be limited to access roads, drainage easements, and areas to be graded. 2. A stone stabilization pad is located at the site entrance along Oakridge Drive to reduce the tracking or flowing of sediment onto the public right-of-way. 3. The contractor shall maintain the entrance. The maintenance shall include top dressing with additional stone or additional length as conditions demand or as directed by the engineer. All sediments spilled, dropped, washed, or tracked onto the public right-of-way must be removed immediately by the contractor. 4. Topsoil shall be stripped from areas to be graded and stockpiled for later ruse. Stockpile location shall be subject to approval by the project engineer. A sediment barrier should surround all topsoil stockpiles. ' S. Silt fence shall be installed downstream outside the limits of any proposed construction as shown on the site plans and prior to the commencement of the rproposed alteration. 6. Rock filter outlets shall be installed with silt fence around Sand Filter Basin as indicated on Erosion and Sediment control plan and as required. I r 7. The contractor shall maintain the silt fence. Inspection shall be made after each storm event and repaired or replaced as warranted. The contractor shall clean the accumulated sediment if half of the original height of the fence becomes filled in with sediment. 1; 8. The contractor shall check the silt fence weekly for undermining or deterioration. 9. The construction superintendent shall have overall responsibility for plan implementation of non-structural measures and for seeing that appropriate workers are aware of the provisions of the plan. 107 Reference the "Drainage Criteria Manual (Volume 3)" prepared by the Urban Drainage and Flood Control District. D. Structural Measures 1. A parking lot pond detention system is used to control runoff. Pipe flow discharge from yard drains and building downspouts into the sand filter basin shall occur in an outlet box structure. The outlet box structure is designed to minimize flow velocity. 2. Overland discharge into the sand filter basin shall occur at curb openings as indicated on the site plan. Rip -rap aprons shall be placed on sand filter basin side slopes at curb opening locations. Runoff water quality is improved utilizing 6" to 12" stone rip -rap to lower discharge velocity. Rip -rap shall be underlain with ' geofabric. 3. A permanent cover shall be established in accordance with the vegetative cover provisions. The seeding shall extend to at least the design top width of the BMP's and include any other areas disturbed by construction activities. Activities shall be confined to within the limit of work as shown on the plans. 4. Vigorous vegetation shall be maintained on sand filter basin side slopes not covered with rip -rap by applying lime and fertilizer. Bare or eroded areas shall be immediately repaired and reseeded by the contractor. Sod shall not be placed on sand filter basin surface. 5. The contractor is responsible for maintenance and inspection of the detention area and storm water appurtenances up to a year after completion of ' construction. The Owner is responsible thereafter. 6. The contractor shall be responsible for maintaining the all•BMP's during construction and the detention area up to the acceptance by the Owner. The Owner shall be responsible thereafter for the detention area, and drainage system. The Owner shall inspect the detention area semi-annually and after major storms. I �l r 7. Rip -rap pads shall be inspected annually and after major storms. If repairs are needed, they shall be accomplished immediately. 8. The construction superintendent shall have the overall responsibility for structural measure implementation and for seeing that appropriate workers are aware of the provisions of the plan. 9. Reference the 'Drainage Criteria Manual (Volume 3)" prepared by the ' Urban Drainage and Flood Control District. - E. Maintenance: Short Term/Long Term ' 1. All disturbed slopes either newly created or currently exposed shall be seeded, protected, and maintained by the contractor following final grading and construction. The contractor shall check regularly all seeded areas to see that a good stand is maintained. 2. The contractor must repair or reseed any areas that do not develop within the period of one year and shall do so at no additional expense. 3. The contractor shall maintain all topsoil stockpiles and sediment barriers throughout construction. Extreme be care shall taken to ensure that sediments do not spill over the sediment barrier. 4. The contractor shall check silt fence on a weekly basis and after each storm for undermining or deterioration. The contractor shall clean the accumulated sediment if half of the original height of the fence becomes filled in with sediments. 5. The contractor shall maintain the stone stabilization pad at the site entrance. The maintenance shall include top dressing with additional stone or additional length as conditions demand or as directed by the engineer. All ' sediments spilled, dropped, washed, or tracked on the public right-of-way must be removed immediately by the contractor. ' 6. The contractor is responsible for maintenance and inspection of the detention areas during and up to a year after completion of construction. Maintenance shall include removing sediments and trapped oil from the sediment basins and maintaining the pipe outfall location on the property as needed. 7. The contractor shall maintain the drainage system throughout construction. The accumulated sediments in the detention areas shall be removed and drainage pipes flushed by the contractor at the end of construction. I� I 8. The Owner is responsible for the long-term maintenance of the above ground detention area and sand filter basin. The drainage system shall be checked semi-annually. Maintenance shall include removing sediments from the detention area and maintaining the pipe outfall location as needed. Sediment shall be removed from the sand filter basin when the sediment level reaches the rim of the outlet box structure. Sediment in the control structure and the outlet box structure shall be removed when sediment level reaches the lowest pipe inverts. Bi-annual sweeping of the parking lot is recommended to coincide with fall cleanup from leaves and spring cleanup from winter sanding activities. ' 9. The construction superintendent shall have overall responsibility for the maintenance program during the construction phase. The superintendent shall see that the appropriate workers are aware of the provisions of the plan. 10. After the first year and acceptance by the Owner, the Owner shall have overall responsibility for implementing the maintenance program. I t 7 DRAINAGE CRITERIA MANUAL (V.3) MAINTENANCE RECOMMENDATIONS 7.0 SAND FILTER EXTENDED DETENTION BASIN (SFB) 11 1 -- I TABLE SFB-1 Sand Filter Detention Basin Maintenance Considerations Required Action Maintenance Objectives Frequency Debris and litter removal Remove debris and litter from Routine — depending on aesthetic detention area to minimize dogging requirements of the sand media. ' Landscaping removal and replacement If the sand filter is covered with rock mulch, bluegrass, or other Every 2 to 5 years landscaping covers, the cover must be removed to allow access to the sand media. Replace landscaping cover after maintenance of sand ' media is complete. Scarify Filter Surface Scarify top 3 to 5 inches by raking Once per year or when needed to the fillers surface. promote drainage. Sand filter removal Remove the top 3 inches of sand If no construction activities take from the sand filter. After a third place in the tributary watershed, ' removal, backfill with 9 inches of new sand to return the sand depth to every 2 to 5 years depending on observed drain times, namely when it 18 inches. Minimum sand depth is takes more than 24 hours to empty 12 inches. 3-foot deep pool. Otherwise more ' often. Expect to dean out forebay every 1 to 5 years. Inspections Inspect detention area to determine if Routine — bi-annual inspection of the sand media is allowing hydraulic performance, one after a ' acceptable infiltration. significant rainfall. ' MR-8 9-1-99 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 3) CONSTRUCTION BEST MANAGEMENT PRACTICES VEHICLE TRACIUNG CONTROL Definition A stone stabilized pad located at points of vehicular ingress and egress on a construction site. Pumes To reduce the amount of mud transported onto public roads by motor vehicles or runoff. Note: Only applicable for sites greater than 2 acres In size 9" Minimum --/ VL Riprap (D50 = 6") Non -Woven Geotextile Fitter Cloth FIGURE C-8 Temporary Vehicle Tracking Control 9-1-99 Urban Drainage and Flood Control District C-33 DRAINAGE CRITERIA MANUAL (V. 3) CONSTRUCTION BEST MANAGEMENT PRACTICES (MgxIMUM) SILT FENCE INSTALLATION -NTS- STEEL OR 2'x4' WOOD POST (ANCHORED TO FABRIC) =I NOTE: EROSION CONTROL MEASURES SHALL BE MAINTAINED UNTIL LANDSCAPING IS COMPLETED, OR AS DIRECTED BY LOCAL JURISDICTION 1/2H (12-MIN) 1 SECTION r7& FABRIC MATERIAL (ACHORED IN TRENCH) 4'x4' TRENCH COMPACTED BACKFILL FLOW DETAIL SILT FENCE EROSION BARRIER Details provided to District by the City of Broomfield, Colorado FIGURE C-13 Silt Fence Erosion Barrier SF C44 9-1-99 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 3) CONSTRUCTION BEST MANAGEMENT PRACTICES 1. ', 3.2 Mulchin All disturbed areas must be mulched, or seeded and mulched, within 14 days after final grade is reached ' on any portion of the site not otherwise permanently stabilized. Areas that will remain in an interim condition for more than one year should also be,seeded (See Section 3.3.2). An example of mulching is shown on Figure C-5. To protect newly seeded areas and to provide temporary cover on other disturbed areas which will not require temporary revegetation, or which cannot be seeded due to seeding date limitations, a mulch should be applied consisting of: ;I 1. Clean, weed- and seed -free, long-stemmed grass hay (preferred) or cereal grain straw. Hay is preferred as it is less susceptible to removal by wind. Mulch should be applied evenly at a rate of two tons per acre. At least 50 percent of the mulch, by weight, should be ten inches or more in length. Mulch must be anchored. This can be accomplished mechanically by crimping or with the aid of tackifiers or nets. Anchoring with a crimping implement is preferred, and is the recommended method for all areas equal to or flatter than 3:1. Mechanical crimpers must be capable of tucking the long mulch fibers into the soil four inches deep without cutting them. An agricultural disk, while not an ideal substitute, may work if the disk blades are dull or blunted and set vertically. However, the frame may have to be weighted to afford proper soil penetration. On small areas sheltered from the wind and from heavy runoff, spraying a tackifier on the mulch is satisfactory for holding it in place. For steep slopes and other special situations, blankets, anchored with staples, may be required instead of mulch. 2. Hydraulic mulching shall be limited to those situations where it is too difficult to apply and anchor a mulch of long-stemmed grass hay or cereal straw; namely, slopes steeper than 3:1 9-1-99 Urban Drainage and Flood Control District C-21 1! 1 1 1 1 DRAINAGE CRITERIA MANUAL (V. 3) CONSTRUCTION BEST MANAGEMENT PRACTICES CHECK DAM pennition. Small temporary dam constructed across a swale or drainage ditch. Purposes To reduce the velocity of storrnwater flows and erosion of the swale or ditch. From: Virginia Soil and Water Conservation Commission, 1985 FIGURE C-21 Check Dam C-60 9-1-99 Urban Drainage and Flood Control District 1 1 I' 1, 1 1 _m CD � z < U w m N�� mCDm mz � �zm U LLJ Of N C 0 t -i 1 TOP OF CURB ' FLOW LIINE 1 1 1 1 1 CURB TAPER DETAIL NO SCALE 6" U.O.N. ' ESTIMATED CONSTRUCTION SCHEDULE 1. Survey and stake the drainage structures, detention area and the limited work and sedimentation barriers(]+ week) 2. Installation of all sediment and erosion control devices prior to any soil disturbances or in 1 their proper sequence and maintenance until permanent protection is established(]+week) 3. Place silt fence and construction entrance as shown in plans. 4. Clear and remove all existing vegetation, buildings, foundations, tanks, curbing, bituminous and concrete pavements, etc., in those areas where necessary. All remaining vegetation (if any) to be properly protected and to remain in its natural state. Topsoil to _ be stripped and stockpiled in approved area. The stockpiles to be protected by a row of -- sedimentation barrier. (2+weeks) 5. Install sand filter basin, under -drain and outlet structure. Temporary stabilization of those areas left exposed should be stabilized immediately. (1+days) ' 6. Layout location and of the proposed buildings and utilities. (1+ week) 7. Construction of all proposed utilities, positive drainage from site, and footings and foundation. (2+weeks) ' 8. Construction of main structure (ongoing) 9. Subgrade to be applied following rough grading and installation of improvements in ' order to stabilize pavement areas. (1+weeks) 10. Construction of proposed curbs. (2 days) ' 1 1. Paving of pavement areas. (1 week) 12. Fine grading of the remainder of the. (1 day) 1' 13. Stabilization of the site with permanent vegetative cover and landscaping. (I+week) ' 14. Removal of temporary sediment and erosion control devices after the completion of fine grading and permanent stabilization (1+week) 11 L