Loading...
HomeMy WebLinkAboutDrainage Reports - 08/24/2000I I PROPERTY OF Galloway. Romero & Assoc�ites O Sy M8 Design Engineering Planning Final Drainage Report for Kindercare Learning Centers, Inc. @ Oakridge ' APPROVED ##mil AT.rnvpd Reoe pireetm-of,Ru6lioaVerks - Date V i Director of Utilities Date El I I 1 Date: July 20, 2000 Prepared for: Kindercare Learning Centers, Inc. 650 NE Holladay Street, Suite 1400 Portland, OR 97232 (503)872-1300 Attn: Michael Salas Prepared by: Galloway, Romero & Associates 5350 DTC Parkway Englewood, CO 80111 (303)770-8884 (Fax)770-3636 Attn: Jeffrey K. Weeder 0 [ ,I t It ,1 ,1 Date: Project Name: Project Number: June 21, 2000 Kindercare Learning Center @ Oakridge ZK57.GRA ENGINEER'S STATEMENT: The enclosed drainage report and exhibits were prepared by me or under my direct supervision and is correct to the best of my knowledge and belief. Said drainage report has been prepared in accordance with the applicable City of Fort Collins criteria and is in conformance with the master plan of drainage for the effected area. PP�p REG�SI �; .�.SCH,yip•,F9 a" 33335 z: 1. C Schmidtlein, P.E. Registered Professional Engineer ■ State of Colorado No. 33334 I I SECTION INTRODUCTION HISTORIC DRAINAGE DRAINAGE CRITERIA DRAINAGE PLAN CONCLUSION REFERENCES TABLE OF CONTENTS APPENDIX A-1 Vicinity Map A-2 Runoff Coefficients A-3 Overland Time of Flow Curves A-4 Estimate of Average Flow Velocity A-5 Intensity -Duration -Frequency Curves A-6 Intensity -Duration -Frequency Tables A-7 Percent Impervious Calculations A-8 Developed Runoff Calculations A-9 Calculation of Required Detention Volumes A-10 Stage -Storage Calculations for Detention Pond A-11 Underground Detention Volumes A-12 Water Quality Capture Volume Calculations A-13 Orifice Sizing Calculations A-14 Erosion Control Rainfall Performance Standard Evaluation A-15 Erosion Control Effectiveness Calculations A-16 Construction Sequence A-17 Pipe Capacity Calculations A-18 Erosion Control Escrow Calculations Final Drainage Plan — Back Pocket of Report Erosion Control Plan — Back Pocket of Report i PAGE NO. 1 1 2 2 4 6 I Introduction �i This final drainage report is being prepared for Kindercare Learning Centers, Inc., the developer of the site, to fulfill the drainage requirements of the City of Fort Collins, State of Colorado. This report is to establish the site's final drainage characteristics. The report analyzes onsite runoff for the minor (10-year frequency) and major (100-year frequency) storms and routes these flows through the site. Specific details are contained within this study and are shown on the final grading and final drainage plan. Location Kindercare Learning Centers at Oakridge is a 1.42 acre site located in the northwest one -quarter of Section 6, Township 6 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. More specifically, the site is located on the northwest comer of McMurry Avenue and Oakridge Drive. The site is bounded on the west by a vacant lot, on the north by the Harmony Cemetery, on the south by Oakridge Drive, and on the east by McMurry Avenue. �} Proposed Development The proposed site will consist of a one-story child care facility that is 10,095 square feet in size i (footprint area). The developed site will consist of 48.0% (composite) impervious area. Historic Drainage Overall Basin Description and Drainage Patterns through property M The original site is unimproved. It consists of native grasses and weed vegetation. The site slopes southeasterly at approximately 1.0%. Existing improvements surrounding the site consist of trees and landscaping on both the north and east sides of the site. As much of the existing landscaping will remain as possible. This site is within the McClelland/Mail Creek Master Drainage Basin. 1 I r a t Design Criteria This report was prepared using criteria as outlined in the City of Fort Collins "Storm Drainage Design & Technical Criteria" and the Urban Drainage and Flood Control District's (UDFCD) "Urban Storm Drainage Criteria Manual". Various plans and reports for this site and the surrounding sites were reviewed. Below is a list of this information. Plan or Report Company Date 1. Master Drainage Report RBD, Inc. Engineering 6/22/90 for the Oakridge Business Consultants Park (Report and Plans Hydrologic Criteria Runoff for the minor storm, 10-year frequency, and the major storm, 100-year frequency, were calculated using the rational method. Where applicable, composite runoff coefficients were calculated for the individual basins by using the recommended runoff coefficients as indicated in Table 3-3 and Table 3-4 of the Storm Draina e Design Criteria and Construction Standards, City of Fort Collins. Times of concentration were calculated using the overland/travel time and urbanized basin method with the minimum time used for subsequent calculations. Rainfall intensities were derived from the City of Fort Collins Rainfall Intensity Duration Curve and I\ Tables, 1999. 'if Runoff Coefficients, applicable charts and graphs are included in the Appendix of this report. Drainage Plan General Concept The proposed site will be subdivided into five major basins: A, B, C, D, and E. An uncontrolled basin labeled UC-1 is' also identified. The site is composed of paved, roofed, and landscaped areas. 2 Specific Details Basin A, 0.440 acres consisting of roofed, pavement and landscaped surface characteristics, flows predominantly from the west side of the basin toward the east, to the detention pond located in the southeast portion of the lot (Above ground detention Pond). Discharges for the 10- year and 100-year storms were calculated to be 0.55 cfs and 1.40 cfs, respectively. �1 Basin B 0.244 acres consistingof roofing, pavement and landscaped surface characteristics, g, P P flows predominantly from the northwest portion of the basin towards the southeast to area inlet #2 where it enters the underground detention facilities. Discharges for the 10-year and 100-year tstorms were calculated to be 0.89 cfs and 2.17 cfs, respectively. Basin C, 0.246 acres consisting of pavement and landscaped surface characteristics, flows predominantly from the south portion of the basin to one of two area inlets (area inlet #4 and #5). �i Runoff is carried to the underground detention facilities via 12" RCP sloping @ 0.4%. Discharges for the 10-year and 100-year storms were calculated to be 0.32 cfs and 0.83 cfs, r, respectively. M� Basin D, 0.183 acres consisting of pavement and landscaped surface characteristics, flows j predominantly from the northwest portion of the basin towards the southeast to area inlet #3 where it enters the underground detention facilities. Discharges for the 10-year and 100-year storms were calculated to be 0.49 cfs and 1.28 cfs, respectively. Basin E, 0.257 acres consisting of pavement and landscaped surface characteristics, flows r predominantly from the northwest portion of the basin towards the southeast to area inlet #1 (Underground Detention Structure) where it enters the underground detention facilities. Discharges for the 10-year and 100-year storms were calculated to be 1.04 cfs and 2.56 cfs, i, respectively. Basin UC-I, 0.053 acres consists of pavement and landscaped surface characteristics. The runoff from this basin flows uncontrolled off of the site into either McMurry Drive or into Oakridge 3 Avenue. Discharges for the 10-year and 100-year storms were calculated to be 0.10 cfs and 0.26cfs, respectively. ,M Detention As set forth in the Master Drainage report for Oakridge Business Park, the release rate for the Kindercare site will be 0.50 cfs per acre for the 100-year storm event. The Kindercare site contains 1.42 acres, therefore the total allowable release from this site for the 100-year storm event is 0.71 cfs. Basin UC-1 releases 0.26 cfs for the 100-year storm, uncontrolled. As a result, the total allowable release rate passing through the orifice will be 0.45 cfs. The minimum total required detention volume, given a release rate of 0.45 cfs for the 100-year r' storm, is 9,072 cubic feet. The runoff is detained through the use of a 2.9" orifice within an orifice plate installed on the inside wall of a 5' diameter manhole. The majority of the runoff will be detained within a series of underground reinforced concrete piping and underground detention structures (manholes, inlet boxes, etc.). The piping will vary in size from 38"x60" elliptical pipe to 18" RCP. An above -ground detention pond will contain the remaining volume. The resulting 100-year water surface elevation is 4971.15. The controlled release through the orifice from the underground detention facility will be conveyed through a 1565, gallon sand/oil intereceptor for water quality purposes. Upon exiting the water quality structure, the detained flows will be conveyed toward the existing 18" RCP located in McMur y Avenue provided for the Kindercare site.. Conclusion t, Compliance with Standards This report has been prepared using the criteria and methods as described in the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards" and the "Urban Storm Drainage Criteria Manual". The proposed drainage facilities will adequately convey runoff from r 4 the minor and major storms and will provide adequate incidental detention based upon release rates determined by a master drainage study that includes the Kindercare site. Erosion Control Temporary erosion control for this site consists of silt fence, hay bales and vehicular tracking control devices. Silt fencing is to be placed along the south and east property lines. The sites access to Oakridge Drive shall be the initial grade to permit the installation of vehicular tracking control measures. The exact location of the gravel entrance shall be coordinated with the construction manager and the City public inspector. Prior to initiating the overlot grading, all silt fence shall be installed in accordance to the approved Erosion Control Plan. Permanent erosion control will consist of grass lined swales. Please refer to the Grading, Drainage and Erosion Control Plans for specific location of erosion control devices and notes. The erosion control measures will be inspected weekly during construction. Silt fences will be cleaned of excessive sediment and replaced if necessary. Straw bale barriers will be checked for sabotage and bypass and replaced or increased as necessary. Mulching of bare soils will be checked regularly and areas where it was lost or damaged will be remulched within seven working days when necessary. During construction, stormwater runoff will be directed through straw bale barriers to filter sediments prior to entering the right-of-way of McMurry Avenue. All runoff leaving the site will be limited to non -erosive velocity to limit land disturbance. The perimeter controls will be installed prior to any site grading. The intent of the erosion control measures listed above and described in this report shall be strictly adhered to during all construction. Erosion Control measures for this site can be found in the Appendix of this report. 5 11 I Storm Water Quality Control Water Quality Capture Volume (WQCV) has been calculated for the detention facility based upon the criteria listed in Volume 3 of the Urban Storm Drainage Criteria Manual. Stone water quality has been addressed by the installation of a 1565 gallon sand/oil interceptor on the outfall pipe. This interceptor will allow sediment to fall out before entering the public storm sewer system. To provide permanent stabilization measures, landscaping will be installed throughout nearly 50% of the site. The permanent landscaping shall include a wide variety of deciduous and evergreen trees and shrubs. Where possible, grass swales are being installed within the landscaping areas prior to draining into the area inlets located in the landscaping areas. These measures will intercept and settle out sediments before they reach the outlet structure of the detention pond and public storm sewer. These permanent stabilization measures shall be installed prior to the removal of any temporary erosion control devices utilized during construction. References 1. Master Drainage Report for the Oakridge Business Park, RBD Inc. Engineering Consultants, March 1990, Revised June 1990. 2. Storm Drainaize Desizn Criteria and Construction Standards, City of Fort Collins, May 1984 (with current revisions). 3. Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, March, 1986 (with current revisions). 6 J i, i I APPENDIX NOT TO. SCALE (B Table 3-3 RATIONAL METHOD RtWOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Character Of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt ...................................... 0.95 Concrete.. 0.95 Gravel.. 0.50 Roofs.. 0.95 Lawns, Sandy Soil: Flat <2% ..................................... 0.10 Average 2 to 7% .............................. 0.15 Steep>7% ............................... 0.20 Lawns, Heavy Soil: Flat <2% ..................................... 0.20 Average 2 to 7% .............................. 0.25 Steep>7% ..................................... 0.35 3.1.7 Time of Concentration Table 3-4 RATIONAL METHOD Fa QuEmm ADjasni=T FACTORS Storm Return Period Frequency Factor (years) Cr 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times Ct shall not exceed 1.00 Soo 400 30C F- W W LL r� 20C W U Z n 104 DRAINAGE CRITERIA MANUAL RUNOFF TO ---- mmmmm MEMO mommmmum soon HaPA NONE am NEEMENERA dog Pill MEMPA0,04 '40,FOPF P-APHAA p PRO MONO,= PONAPH 1201 .go m rmm"Po, me p1do %-.,a a; w - 0 1 mom mom Kagam a MENNEN OVERLAND TIME OF FLOW CURVES' 0 N W F- Z 0 2 z W to to 10 FIGURE 1 " DRAINAGE CRITERIA MANUAL 50 S: I— 20 Z W 0 W. W a 10 Z IN a O 5 cc W ayc 3 O U 2 Q W F- Q F- IL RUNOFF _MMNEIIII-Aww�.vi„i ffm _.■1,„„I-., " 11' 1111111il" moll �II/I_1_I-II■11/11,I,.11_-,IIIIII_IIII.III■III.I.11.■I,- -r-1111111,-III..II, F,11111 IIIIII/IIIIIIII-IIIIIIIIIIII, IIIIIIII' IIIIII1III,III,1111.1,- .2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND 0 ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: 'Urban Hydrology For Small Watersheds' Technical Release No. 55, USDA. SCS Jan. 1975. FIGURE 2 5-1-84 URBAN DRAINAGE 3 FLOOD CONTROL DISTRICT No Text I t City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (5 minutes - 30 minutes) Figure 3-1a Duration (minutes) 2-year Intensity in/hr 10-year Intensity in/hr 100-year Intensity in/hr 5.00 2.85 4.87 9.95 6.00 2.67 4.56 9.31 7.00 2.52 4.31 8.80 8.00 2.40 4.10 8.38 9.00 2.30 3.93 8.03 10.00 2.21 3.78 7.72 11.00 2.13 3.63 7.42 12.00 2.05 3.50 7.16 13.00 1.98 3.39 6.92 14.00 1.92 3.29 6.71 15.00 1.87 3.19 6.52 16.00 1.81 3.08 6.30 17.00 1.75 2.99 6.10 18.00 1.70 2.90 5.92 19.00 1.65 2.82 5.75 20.00 1.61 2.74 5.60 21.00 1.56 2.67 5.46 22.00 1.53 2.61 5.32 23.00 1.49 2.55 5.20 24.00 1.46 2.49 5.09 25.00 1.43 2.44 4.98 26.00 1.40 2.39 4.87 27.00 1.37 2.34 4.78 28.00 1.34 2.29 4.69 29.00 1.32 2.25 4.60 30.00 1.30 2.21 4.52 ED r i n 1 n City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (31 minutes - 60 minutes) Figure 3-1 b Duration (minutes) 2-year Intensity in/hr 10-year Intensity in/hr 100-year Intensity in/hr 31.00 1.27 2.16 4.42 32.00 1.24 2.12 4.33 33.00 1.22 2.08 4.24 34:00 1.19 2.04 4.16 35.00 1.17 2.00 4.08 36.00 1.15 1.96 4.01 37.00 1.13 1.93 3.93 38.00 1.11 1.89 3.87 39.00 1.09 1.86 3.80 40.00 1.07 1.83 3.74 41.00 1.05 1.80 3.68 42.00 1.04 1.77 3.62 43.00 1.02 1.74 3.56 44.00 1.01 1.72 3.51 45.00 0.99 1.69 3.46 46.00 0.98 1.67 3.41 47.00 0.96 1.64 3.36 48.00 0.95 1.62 3.31 49.00 0.94 1.60 3.27 50.00 0.92 1.58 3.23 51.00 0.91 1.56 3.18 52.00 0.90 1.54 3.14 53.00 0.89 1.52 3.10 54.00 0.88 1.50 3.07 55.00 0.87 1.48 3.03 56.00 0.86 1.47 2.99 57.00 0.85 1.45 2.96 58.00 0.84 1 1.43 2.92 59.00 0.83 1.42 2.89 60.00 0.82 1.40 2.86 a 0 D O w W a F Z W w W IL I I i I U v� W - p a a o W��oo W Gs a U Q WrA V u V O O w¢ Q Q¢ a a W at a. rL zO �[�xl W > z�-'v o 0 a a > � z W m U } o, o ON CD c o c [mil - O F �W uj U p � � t W ci. Q o 0 Q cn �^ w 70 y Q v N N Ip I W a < o r 0 Z a 1 m LL a �Wavo, � z o a m C7 Q O V F p a v 0 0 0 c 0 �o O E 0 m I S O a 4.. B y� q p N 8 9 _ 9 s z° .S O Y P P O C O_ W lc� uz yuz z LL Z z> a i C '� a C u 7 y z OtNil W> i a > z z W n o P P T OR �o u z ''1i n M YJ D'J N _ W O U O W LL n w- O 0, C ^! d Q V T V N I ° � W ti� ti T m r �e - ig 1 ' J > a io 3 z 0 z F - i m z 6 Q m :.; ° W Z, m O N O F' > W C W W W W W W C y y m C7 N z z Z zz zd z> 6> < ¢ LL r y, P "! LL O n Is N Oo n T O Cd z LL o _ ° W 6 .t.. W ? Cr o C o G W 2 W } 2 � O C C C Q S F W O N N J LL W S N x n r N T W LL J Q Q O r O N p O p O h Q o c o 0 0 0 W } 0 0 Q u m y ° 3 r, P, } rSO� K _ F Z u� G a i r F z O ¢ F O O rn UU UU y V yU U U z > z > zz zz zzQ zp ga a g v e w V— a = N m O ry h N ry O m wl z O w 0 a t m F Y) U N c m � J Q= N O p N p T J •� J Q — •L r r C V F= _ p F _ G N N � 41 � J 0 G S 0 0 C n O v C O N T � N C L s U v g v m 8 e ¢ " o - o W } 8 day p; a Q o o c c o 0 O y a z ¢ s c G ` ¢ y G I r.� I 11 i I DETENTION STORAGE VOLUMES 100 YEAR STORAGE VOLUME Minutes Area 100-Year Runoff Cum. Orifice Total Dev. Intensity Coefficient Runoff Discharge Storage A i Cdev Sdev Solf S (min.) (acres) (in/hr) (sec) (cf) (cf) (cf) 1 2 3 4 5 6 7 6 5 1.370 9.95 300 0.69 2842 136 2706 10 1.370 7.7 600 0.69 4410 272 4137 15 1.370 6.52 900 0.69 5586 408 5178 20 1.370 5.6 1200 0.69 6397 544 5853 30 1.370 4.52 1800 0.69 7745 816 6929 60 1.370 2.86 3600 0.69 9802 1633 8169 90 1.370 2.2 5400 0.69 11310 2449 8860 120 1.370 1.8 7200 0.69 12338 3266 9072 Column Description 1 Time of storm in minutes 2 Area of basin in acres 3 100-year intensity related to storm minutes in inches per hour 4 Time conversion 5 Runoff Coefficient for detained basin 6 Cumulative runoff in terms of storage (col. 2' 3' 4'5) 7 Orifice Discharge in terms of storage (0.45 " col. 4) 8 ICum.. Runoff storage - Orifice Discharge storage (col. 7 - 6) Orifice equation: Q = CA(2gH)2 where: Q = Discharge (cfs) C = Orifice Coefficient (0.6) ' A = Area of Orifice (ft) g = Gravity (32.2 ft/sec2) H = Head (ft) I I I I I I I PROJECT: Kindercare Learning Centers, Inc. LOCATION: Oakridge City of Fort Collins, Larimer County, Colorado Date: January, 2000 STAGE -STORAGE -CALCULATIONS FOR DETENTION POND(100YR) ELEVATION AREA (Square Feet) DEPTH INCREMENT (Feet) INCREMENTAL VOLUME (Cubic Feet) TOTALVOLUME (Cubic Feet) 70 0 0 0.5 143 70.5 857 143 0.5 630 71 1713 773 0.15 276 71.15 1970 1,049 1 Required 100 Year Pond Volume Actual 100 Year Pond Volume 100 Year Water Surface Elevation i I 9,072 cubic feet 9,147 cubic feet 71.15 elevation feet zk57-JKW-revised final drainage report calculations.xls Actual Pond Volume (ponds) 08/07/00 6:08 PM I i 11 1 1 �I LLLJ 1 I I [1 I PROJECT: Kindereare Learning Centers, Inc. LOCATION: Oakridge City of Fort Collins, Larimer County, Colorado Date: January, 2000 DETENTION VOLUME WITHIN INLET STRUCTURES LENGTH (ft) WIDTH (ft) AREA (sf) TOP ELEV. INV. ELEV. DEPTH (ft)l VOLUME (cf) Inlet #2 3.33 1.92 6.39 71.15 67.75 3.40 22 Inlet #3 3.33 1.92 6.39 71.15 68.25 2.90 19 Inlet #4 3.33 1.92 6.39 71.15 68.70 2.45 16 Inlet #5 3.33 1.92 6.39 71.15 68.90 2.25 14 Inlet @ detention pond 3.33 1.92 6.39 70.00 67.60 2.40 15 Detention Structure 29.50 3.00 88.50 71.15 67.25 3.90 345 5' Manhole 19.60 71.15 67.00 4.15 81 Total 512 DETENTION VOLUME WITHIN UNDERGROUND PIPING LENGTH (ft) DIAMETER (in) # OF PIPES AREA (sf) VOLUME (cf) 34"x53" RCP 48 42 1 10.2 490 38"x60"RCP 88 48 3 12.9 3406 38"x60"RCP 88 48 2 12.9 2270 29"x45" RCP 106 36 1 7.4 784 19"x30" RCP 156 24 1 3.3 515 12" RCP 153 12 1 0.79 121 Total 7586 DETENTION POND VOLUME SUMMARY TOTAL PONDS 1049 STRUCTURES 512 STS 7586 Total 9147 Izk57-JKW-revised final drainage report calculations.xls Actual Pond Volume (pipes) 08/07/00 6:08 PM WATER QUALITY CAPTURE VOLUME (WQCV) POND # 1 Basin Imperviousness = 47.6 Basin Area = 1.423 acres Note: Use 40 hour detention time for extended detention basin Estimated brim -full storage volume in watershed inches of runoff (from Figure A-14) = 0.25 WQCV = ((Required Storage)/12)'Area = 0.02965 acre-feet WQCV = 1292 cubic feet i 1 1 1 1 1 f 1 1 1 1 1 1 1 1 1 1 PROJECT: Kindercare Learning Centers, Inc. LOCATION: Oakridge City of Fort Collins, Larimer County, Colorado DETENTION POND ORIFICE CALCULATIONS(100YR) DETENTION POND INFORMATION/ DATA 100-Year Allowable Developed Release 0.71 cfs Undetained Basins (UC-1) Release 0.26 cis 100-Year Release from Detention Pond 0.45 cfs 100-Year Required Volume 9,072 cubic ft 100-Year Water Surface Elevation 71.15 ft Pond Outlet and Orifice Elevation 67.00 ft Proposed Orifice Size (Diameter) 2.9 inch Calculated 100 Yr Release Through Orifice 0.45 cfs Orifice equation: Q = CA(2gH)o.s where: Q = Discharge (cfs) C = Orifice Coefficient (0.6) A = Area of Orifice (ft) g = Gravity (32.2 ft1sec2) H = Head (ft) Orifice Size Galloway, Romero Associates zk57-JKW-drainage report caiculations.xis Orifice Calculations 06121/00 9:38 AM LE C �J Ll I EFFECTIVENESS CALCULATIONS PROJECT: 9,Jt,«',v- @ pak�; )'t . STANDARD FORM B COMPLETED BY: DATE: 14 eo Erosion Control C-Factor P-Factor Method Value Value Comment(9a,w) gl�' Fo...7..en o.o l 1•00 ,Ily .UM - - 6C^4.1 ?�.Stc%ffsc 0.00 1.00 OQ1 .OfD .l=9 .11L Z04 1.00 1.0 tHi 113 .loa .032 OOS salt f(kt 1,00 opf HP 7 V,kt MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS (O.o l)-114 + (.obi ,o9q + '15 i PG = EFF = '4 vao _ .iO4k �8 tFF G I D. z3a C z o�) . rz5 .Lt O • 17t � . a p �g•� 0. INS Gc �,Ob) 1lz } �l1;� : 2} �IKS FrF °/s Zlb EFF oil 0% q-14 ' MARCH 1991 DESIGN CRITERIA RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: f tart @ OA k•; d3 t STANDARD FORM A COMPLETED BY: (,.Ilo�a7 , ��ruo Acsep"Jes DATE: DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) M (feet) M M A MOD 0.4" 335 0.3:�94 MOo 0.3aj ylo 1.63' C MOD 0, Z30 3y`1 1.3Z/ fh°D o.14S 2oZ D 9�'� E Moil o.21L iO 1 35q 2al S �.�� % (ZSs's ,451 Hto tr ,301 + 3ti'i W ,2..30 + 202 AF ,Iqr }io !•,ziG�/�.359 = 21 8 4• 1.43 4 301 + 112-*.230 4+ O.q:h * .Wt 4-0,"�Z * AIL) I.3S 1 e �.0} Lm MARCH 1991 0 DESIGN CRITERIA r SEQUENCE PROJECT: k- 1srr--" a oAa r*3L STANDARD FORM C ' SEQUENCE FOR 10 Z.ocU ONLY COMPLETED BY: ( ler.�ay, ICoMc�B j fK�M'o�eS DATE: 1 4 00 Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for ' approval by the City Engineer. Yr MONTH S� w l AJ4 I �* I «�. I �• I oE�• I I I I i I ' OVERLOT GRADING WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters ' Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other ' VEGETATIVE: Permanent Seed Planting Mulching/Sealant ' Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other 1 �STRUCTURESs INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED 1 APPROVED BY CITY OF FORT COLLINS ON C I q-16 MARCH 1881 DESIGN CRITERIA 19" x 30" RCP from Inlet to Outfall MH Worksheet for Circular Channel Project Description Project File f:\kinderca\zk57\calcs\zk57flow.fm2 Worksheet 19" x 30" RCP from Inlet to Outfall MH Flow Element Circular Channel Method Manning's Formula Solve For - Full Flow Capacity 1 Input Data Mannings Coefficient 0.013 Channel Slope 0.003800 ft/ft Diameter 24.00 in ' Results ' Depth Discharge 2.00 ft 13.94 cfs Flow Area 3.14 ft2 Wetted Perimeter 6,28 ft Top Width 0.00 ft Critical Depth 1.35 ft Percent Full 100.00 Critical Slope 0.006036 ft/ft Velocity 4.44 ft/s Velocity Head 0.31 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 15.00 cfs Full Flow Capacity 13.94 cfs Full Flow Slope 0.003800 ft/ft 1 I I 1 ' 06/21/00 FlowMaster v5.13 10:11:36 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 34"x53" RCP from Structure to Outfall Worksheet for Circular Channel Project Description Project File f:\kinderca\zk57\calcs\zk57flow.fm2 Worksheet 34"x53" RCP (42" Diameter) ' Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.002100 ft/ft Diameter 42.00 in Results Depth 3.50 ft ' Discharge 46.10 cfs Flow Area 9.62 ft' Wetted Perimeter 11.00 ft Top Width 0.00 ft Critical Depth 2.12 ft Percent Full 100.00 Critical Slope 0.004528 ft/ft Velocity 4.79 ft/s ' Velocity Head Specific Energy 0.36 ft FULL ft Froude Number FULL Maximum Discharge 49.59 cfs ' Full Flow Capacity 46.10 cfs Full Flow Slope 0.002100 ft/ft r i 1 i @ '01/04/00 Galloway, Romero & Associates 05:41:06 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 PlowMaster v5.10 Page 1 of 1 38"x60" RCP from Inlet 2 to Inlet 1 Worksheet for Circular Channel ' Project Description Project File f:\kinderca\zk57\calcs\zk57flow.fm2 Worksheet 38"x60" RCP from Inlet 2 to Inlet 1 ' Flow Element Circular Channel Method Manning's Formula Solve For . Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.004400 ft/ft Diameter 48.00 in Results Depth 4.00 ft ' Discharge 95.28 cfs Flow Area 12.57 ft2 Wetted Perimeter Top Width 12.57 0.00 ft ft Critical Depth 2.96 ft Percent Full 100,00 ' Critical Slope 0.005465 ft/ft Velocity 7.58 ft/s Velocity Head 0.89 ft ' Specific Energy FULL ft Froude Number FULL Maximum Discharge 102.49 cfs Full Flow Capacity 95.28 cfs Full Flow Slope 0.004400 ft/ft r ul 1 06/21/00 0 10:12:29 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.13 Page 1 of 1 Project Description 29"x45" RCP from Inlet 3 to Inlet 2 Worksheet for Circular Channel ' Project File f:\kinderca\zk57\calcs\zk57flow.fm2 Worksheet 29"x45" RCP from Inlet 3 to Inlet 2 Flow Element Circular Channel ' Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.003800 ft/ft Diameter 36.00 in Results ' Depth Discharge 3.00 ft 41.11 cfs Flow Area 7.07 ft2 Wetted Perimeter 9.42 ft Top Width 0.00 ft Critical Depth 2.09 ft Percent Full 100.00 ' Critical Slope 0.005500 ft/ft Velocity 5.82 fUs Velocity Head 0.53 ft ' Specific Energy FULL ft Froude Number FULL Maximum Discharge 44.23 cfs ' Full Flow Capacity 41.11 cfs Full Flow Slope 0.003800 ft/ft L C 11 011121/00 10:13:03 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.13 Page 1 of 1 I 1 12' RCP from Inlet 4 to Inlet 3 Worksheet for Circular Channel Project Description Project File f:\kinderca\zk57\calcs\zk57flow.fm2 Worksheet 12" RCP from Inlet 4 to Inlet 3 Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.004700 ft/ft Diameter 12.00 in Results ' Depth Discharge 1.00 2.44 ft cfs Flow Area 0.79 ft= Wetted Perimeter 3.14 ft Top Width 0.00 ft Critical Depth 0.67 ft Percent Full 100.00 ' Critical Slope 0.007564 ft/ft Velocity 3.11 ft/s Velocity Head 0.15 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 2.63 cfs ' Full Flow Capacity 2.44 cfs Full Flow Slooe 0.004700 ft/ft 011/21 /00 (D ' 09:59:44 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMasler v5.13 Page 1 of 1 12" RCP from Inlet 5 to Inlet 4 Worksheet for Circular Channel ' Project Description Project File Worksheet Flow Element Method _ Solve For Input Data f:\kinderca\zk57\calcs\zk57flow.fm2 12" RCP from Inlet 5 to Inlet 4 Circular Channel Manning's Formula Full Flow Capacity Mannings Coefficient 0.013 Channel Slope 0.002000 ft/ft Diameter 12.00 in Results Depth 1.00 ft Discharge 1.59 cfs Flow Area 0.79 ft' Wetted Perimeter Top Width 3,14 It 0.00 ft Critical Depth 0.54 ft Percent Full 100,00 ' Critical Slope 0.006341 ft/ft Velocity 2.03 fUs Velocity Head 0.06 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 1.71 cfs ' Full Flow Capacity 1.59 cfs Full Flow Slope 0,002000 ft/ft i A . 11 06/21/00 5 1 10:00: 10:00:AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 FlowMaster v5.13 Page 1 of 1 1 1 1 1 1 1 Kindercare at Oakridge Business Park, 31st Filing LOT 1 Kindercare Learning Centers, Inc. EROSION CONTROL ESCROW CALCULATION Item Description Oty Unit l ! Unit Price : Total Cost EROSION CONTROL Silt fence 268 lin.ft. $3.00 $804.00 Temporary Construction Entrance 24 cu.yd. $50.00 $1,200.00 Straw Bales 60 each I $12.00 $720.00 Sediment traps at Outlet Structure 1 each $1,505.00 ( $1,505.00 Sediment traps Excavation 200 cu.yd. 1 $3.50 $700.00 Subtotal( ! $4,229.00 150% Contingency I I $2,114.50 EROSION CONTROL TOTAL i $6,343.50 OR 1.423 ACRES X $655/ACRE $932.07 150% Contingency $466.03 EROSION CONTROL TOTAL -- $1,398.10 SECURITY AMOUNT SHALL BE: $6,343.50 9 zk57ots-erosion control escrow calcs.x!s ConstiuctlonCosts 1 of 1 06/21/00 11:44 AM N'Ir In9I CATCH CURB AND GUTTER(./I PART NOT To swE (PmwIE) I I I I I I 11z A PART OF BASIN UC-1 •I 0 zf-o' (sTmICILRa) .In ln- Ir `�. Tam. R• M TYPICAL SPILL CURB(./I PAIN NUT IO sc9E IPBNAIE 11 QIO;0632 US 010 _ AD PUTS 211._ 1- M'XSr `Q x e eo• I I MI m• I I x Rep- I I M' A W' I I x' KINDERCARE AT OAKRIDGE BUSINESS PARK, 31 st FILING PRELIMINARY AND FINAL PUD LEGEND LOCATED IN THE NORTHWEST 1/4 OF SECTION 6, TOWNSHIP 6 NORTH, RANGE 68 WEST _�MO, EXISTING CONTOA OF THE 6th PRINCIPLE MERIDIAN TOUR CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO N SOW EAISNWND SPOT "E EV.IaN ® Pepv D SPOT E Aw -------- -DIp I R A n RESIGNATION 10 YEM Ux0,FCOEFFpIRr1 O,aIIIBODIES" W YEAR RUNOFF COEFFICIENT r' p R' n FEL m UC-1 II a \\ 0 ID 20 BASIN ,wu IN WERES P Hl w _Ew_—iP"MEeu �i aLOw\\ LE�mWAN , I� PNt Rix "E righ (l aio I-20BOUNDARYw rew, OUR PIKE FLOW Mwwro__-_—_ \ am \ PEET°E PSECONDw INr N vela Pd'OSp 1USERSf l[N HAD IEM PUMOFF In CHAINP ] I 5� �qLX epEI1CF➢I OIW if[I PER SECOND CURB uW x �WI U/ II d P PxsHeo nwn W-_ nzs HE NO npnw:; __-- r91___ __________ ]Los NEW W. NASan ne-w:w }ee.w R.M F RI E MERSECT W.n;uss II IIQ _ o .v rLOEJxE p air—.Ie"Aft"D I sN - sff[ i L RN N w pwneo,:°.:°' ,a or ePw,E 11a x'xW'sTs II III ]z I 'T :1:.{M-W.ei TOO 'Aeasls 11 �y�l ) - rIn Re' sEcmrr aF ,e• srs w Nwrl Pwr L�1 fl EOSrI,E 10'_MY %U2 uon[I/Hu L J ioI l°O v Lae PONr )rR.RS F - IaE�y1ARA 10 ~ ),:]5-pnS[3=51 , ® \ ]CENT off` S"fw NE W,W EYS,IW CE.—s,5 — FT611NC S,pIN SEWER —nsPaPWEo nwr sEAm a ."_ -_ � ' ' )IA51 `� T ® IR4WWIN5,BEO IN L J I I ME OF ED,NENTR I a MAIN S l SUMMARY RUNOFF TABLELid ars F (o�i ONE. _I PASD FEAR 10 MEEAR F IW.FM DID-Lw as W o A oe, 0.0 0. Olpro.eR rss OIW-ase os I Io .1 � d R O.MA 0.es rm Opp-z1a CES / W tUR r➢ Qi I1 I I- lA" c Oul" asz o.zR au O OzM Dee am 1 I E aAl , pa R.Se U AD \ �8b 0-1 am am 0.49 alo pze 5' V OIW05A0 CPS I I III I I [n3 I) Sp ALLEY ParfA R i4M1if SALE GMIE NrO ,MME x I Hftim N°IEISTEDEEI IENym� ED SRNs �p � f 1 o1 DR korq u; IO.W)QIII _ '- __F--TUN ,roE IO NMI Ran A PlAiT OF 4gep�.- bLIRI __ Wall Hil OF ]Sls WE �W6)O0 ]m BASIN UC-1 1 w1'r�i-': s 4 B Ib �I as g9 iW �R a I I FE 41 ID,4 I I I ��TI1II rz)RN a-szaR Qurz RUT) r-E RML.a WwEIc - 12-DO W Iµ BEFORE a ICE' os. I1WeuwuE) rxKmJ5 -e,30 I VOLTSR) 1 1/! DOE AIR MEET RDe f I, x N eo.n R lev CPEHNT: PLA" Ile TIHONA Bee - WE. PATE TO SLOPE slflW,wE awE lO a,IHET AW am. AuR) R• WE Se• z9-0 pEMXO aME1Pl wwn w ICE 9i. VOI PAN:R amlc[ mEM-ea. GE-4- COIItrEC,YIX (m,) ORIFICE PLATE DETAIL (IM-r� ORIFICE) UNDERGROUND DETENTION STRUCTURE SECTION MCI NINFOSCAUE a in THRU LENGTH SECTION THRU WIN CALL UTILITY NOTIFICATION CENTER NO�Ff COLORADO 2-1987 RASHRACK DETAIL CALL E B"ADVANCE BEFORE MEADOW STORES Ill TO INTERSTATE 25 ' GENERAL NOT AL L SIB ISEWERNCOHSW,RUCTIdI $TOIL BE IN MNFdUY11GE 'MIH CNY OF STORM ME SEWER EN THE ME FAR TYPE SHOWN ON THE INS. CUPOPMEM TO THE POLOOMPAS 5PEgNG1ATES A µfIONFOO CED Cwp1CREEFE PIK (MR), ASTN C]9. CUSS III, INSTALLED M1H IIXIEUE D ROMMECK SEAL B. PV[CRAF NM PIP EDR GE THfl H Xr SAPS MEET 1 REWIPEMENTS Or ] EYE AND D WALL THICKNESS Or SON ls, ]. TIPTOE Or O STORM SEWS SINUES ME THE PoflIZON PSIESFROM CENTER OF STRUCTURE l VOTED _ VUNE IEPEFOBE [CIIS SHOWN ME ADITUTHIMEAIE AND POUlO VAm E TO VENIIGLL ABIGNMENT NIO STRUCTURE EXCAVATION Up R OCKET) OV (OPEN ORAS FISSI N) BY STATEONLDIX1L SUWSWIED IN A rLWNEfl 5. SIUHM ADD SW"MY SEWD PPE SHAPE BE BECIXD CLASS 9'ILTERMAN B, E CHAIONDRG� L MER 10A NNECIURAL PUNS MR EY/GT LOCATIONS OF AND DLEASE REFER TO SOBS REFURT FOR SUMP PREPARATION ADD PAVEMENT n FTFNTION SUMMARY TARI F NOTE: AL, E CI P"OPM WITHIN PROPERTY LIKES ARE CdIWL1® PMATE MA) SIWL BE H EO BY M1 OWNER ON WENCH TIME F.'GA]TY R LTATED. Ill 44T EIEVATF ME AT FLMLK UP ESs OTHER NOTED. BENCHMARK BENCIMNe: CHY M FONT CLYLMs - A DEFENDED MASS CAR SET IN E NORTH SCE Cr A CONCRETE N FI FIRED F A TELEPHONE RPUBOSNE MANHOLE HOLEw E SgTMWERT CORNER OF IVMICNY RD. c AVE LLEVATI . 4110 OF ME am-]R.IO UNDER a TCPSUVMED IaP F 1M IS RIP N E . • . PIKE II OBWULAR ED DEEP eayMC Iz' RFP DETENTION POND SPILLWAY HOT TO SCALE (P ATO City of Fort Collins, Colorado UTILITY PLAN APPROVAL OULD: Date Y 91neer KED W. lPa e'er &-WaelTlmlT Date KED BY:_IJI Date KED BY: Par" A Recrei Dote KED BY --- rr_aRT­c_Tn­Ippte g,neer KED BY: Dale KmdPgCSDW UE Anin9 Cenlere. Irc. TWIT -- -- - - - 950 NI HOIII Steel OwT Eynnery Pgnip Sm(e 1400 ,ym CeUcne. Oregon wn2 [nyeemq uwMe will ... sw-a]R-IM HE ME) TWOR no-.. DRAINAGE AND GRADING PLAN PRELIMINARY AND FINAL PDD 2 OF 6 I I I I I I � I N KINDERCARE AT OAKRIDGE BUSINESS PARK, 31 st PRELIMINARY AND FINAL PUD LOCATED IN THE NORTHWEST 1/4 OF SECTION 6, TOWNSHIP 6 NORTH, RANGE 68 WEST OF THE 6th PRINCIPLE MERIDIAN CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 0 10 20 I ° I \ $CALL 1•_20 �I MISSILES UL. ® NIASYIS I I � • ENINLRE 1 (SIE ttlAl 1M SHEEP ' I I I � I IF APE 0 �0,'� ,,DRIVE Gbe°D9e fGIkl�1L4HI : HH qx pR E RAW AT FENCE NMFr6 SIWL BE Ixs1Au[O As FIRST STEP IN N E CAVWIe malm6 yEm, H z. FENCE WIDE CR THE EXCEED O ENGINEER! BUSINESS RANI SINE BE !REQUIRED r. TO HE DETAILS CONANED LW TANS 91EE1. DE SILT RNCE BWRPA ILL BECIM OILED M E M ON THE EROSION CONSUL SEEN PRMR TO OeFRDI GREECE ] u0flf WANT MTOIIIL (IN ONE MG EUO DISTULIMPING SPEW B DONE FEES 5 E H M BEFORE EWN AT A TIME I LACE SOR BE O USEUNE IIINC SIPIF9IM OF ME ABUTMENT MFAS. ,. TIE MLA WILL BE SIMIHZED IMMEDIATELY WEER ALL STRIPnM I GRAPHIC 5 THE CPETMCTDN EVSEIRWMTNCE T STEELGERML WOONDLry TIMPLEMENTATION HB PTAN ALSO HE RESPONSIBLE ETOR SEEING FHAT TYPE Tlox wOPHFAS xB SVONMIMSME AWMEOTIE PROPOSE PLANT TxNNIE B Oi OIE B. CLEA P ROW PROJECT WRRXIAND E AND LBONL' NAND SURPLURIVES S ANDMUMCCMTT SUL WIEFINS E ANNEP POOENCTION DEVICES WHEN NOE AT L TEMPORARY LARGER IHEO PEA BY TIDE CCIFTE OTTI`R MAINTENANCE: AFTER SIONFiVxr RCAGO NNFEELLW LEE FOLLOWING CE ITEMS BE HALL CCHHEYEASE ND N MIED �CIIM 1. CREEP CRACKEERSSA ID CONSUMPTION M ONTO PALE °HIS MAY REWIRE FMROOtic TOP O, (WED ED, SOARED ONTRACKED STAFF LOUR MARIETE OR WE GIGO ROADWAY MUST BECSTEE1VE u WTaY PROJECT SCHEDULE III J FILING LEGEND I. THE CPU MFORT COLLINS SORDONAIER UUTILITY SOURCESURPLUSINSPECFOR MOST RE Mrflm AT HEMP 21 MORS PRIOR 10 LW CONSTRUCTION ON THIS WE. x. ILL REQUIRED PERINFLER SILT FENCING SHALL BE INPUT a� TO NISI LAND DISNROM 1 TRENDS, 17T. ALL WHENTM REQUIRED EROSION COMXOL UREA UI gULEII EIIN Pr THEAPPROPRIATE THE IN R D SEQUENCE AS �wCMA`D w CURACY PROJECT SCHEDULE, SONi1RIA'Iryry FILMS. M O S' AMC DSNRWC[EOFE EGETATIION WALL BE UM91D TO TH WAMV. REQUIRED FOR ISLUM CONSTRUCTION OPERATIONS WADD FW THE SHOP AUCTION- MERGED M TIME ALL SOILS ExOSEO STRIPS LAND MIAMI SCHATITY (SIMMONS. CNpNG, a➢LT FIRSTALLSOUS SHE WRITING , FILLING, ETC) WALL BE ROUGHENED CONORION BY FRID Y ON PUMPS N: LAND CONTOURS D III MULCH. YE OR OTHER PERMANENT EROSION TR CONOL MODERN IS INSTALLED, MY OILS IN MG OUTSIDE IBWECITX STREET FEE OF WAY SW.LL RESIN EXPOSED BY USE q FOR MORE WAR THIRTY (AI) WM BEFORE REWIRED 1ENPORMY OR ANEN REROSIONT CONTROL (e6. SEO/MULCH, LMDSC.MNG, EIS.) IS INSTALLED. UHNEss OTHERWISE MPROJEO BY THE SIORLMAlER NAM. S. PIE PROPERTY SIN LW BE WATERED AND MNXIAwED lLHLLE9 DURING CO UCTION ASIMRES SO AS INU-WISED FIGURE AL LEARN T SMALL BE IMMEDIATELY DELI ND MIEN r TM1E RUSH ACTS ApMCEM PRCPEMIEs, As DETERMINED THE OF COLLINSWE ENGEWERIIG DEPARTMENT. -IO- - WEST Cp1rpF B. ALL TEMPg (SHOUTEDPN PAGE CONTROL MEASURES S1NLL RE INSPECTED MO REPAIR M EIXI PRXWQEV MHOS RECONSTRUCTED AS ERCRSSAN AFTER EVE EVENT N GAP 10 ASSUME CONTINUED PEWORWNCE xCED FUNCTION ALL FUNDED S P YMANOR USERS ASCII WALL MANNER AND a IN n SO US Ip CAUSE THEIR LEASE IWO ANY DPAR MAY. ® VNC3IUNBEO EMIRS p 7, NO SUL STONPIIE SALL EXCEED TEN (10) FER W FLUID. ME STRIP INCORRECT SIULL BE -SIS--- pIS11NC SICR4 SEWED PROPLECIFLOATING FROM SUBHEADING. SITE WEANSPORT PER MED ARY EVIL SMOCRPNE REPORTING AFTERENT GUYS BE SEEMED ANDPERE WLCHEO. —SE, — PRLPoSED SIOR° POWER CAR TI mllUxS TIE PRINCIPLE CW OR DEPOSING OF SI OUT ANDE DARNY � WILLED o snLE1T By W nEO OTOTHER SPRIG A PPRI w KEm _ -���—mV LoxE ^� HE SHELL BE CLWIEo MRWT[LY BY THE MIPK'Igl BBB ® SIINW DATE WARMER GENERAL DRAINAGE PLAN NOTES T. STORM Sp2R WATM CONSTRUCTION M CIM1 OF STREET, SMIMDMTS NFORARY STATE O ANARY CURLER At MI OF EXECUTIONCOF THE OMEW p SPECIFICATIONS CU CoxSTRUCIIOH 1 �EnvTL[ THIS ANY G THRIVE FRS EEXECUTI TAGREEMENT KM fR THE A TEORADO OR THE DEVELOPIS MENT H RE-EXAION MINATIONOF REQUIRE WE PLY DIECITY ISER W140 TMT 1Xp RUE YW CONFORM TO PIOMWS 5IA INTO CUMRXTMAT THATOURMESE z THE AD[ LOCATION AND NUMBER Or KM KNOWN UNDERGROUNDBE ME APMOXIMATE NDER GR HYPE AND -STORMDIE DIUWIHGS. T WELL BE E TIEMCO TW70 N VENEY TTHi Max Wo LLICAUSM Or ALL UNDERGROUND ELS ES ALONG TIER E OF THE RN. COMMENCING fICINC NEW CONSTRUCTION, THE CONTRA M WALL BE REWARDABLE rM MCATIx6 UNKNOWN UNIX FpMUO WRITER. 3 DIE ENGINEER WHO IRS PREPMEO THESE PWB BY DOES / TODDY MERE AILMONSr Lry TO THE CRY BE POn1 BENEFICIARY OF CULL HSOAS Ep1Nl0 MANY SAID xEER s WORK. w MY ERRORS MD SECTIONS cgNANNED x THESE WAYS MPRwAL LEI � ,TI6 MO GE ESE PLAINS BY 2 DIRECTOR a MINFERP49 s WL NOT RELEASE 0 HC O RIM CARRYING IIESE CLASS OF ALL STE RESPONSIBILITY VRTNER THE ENGINEER CIRCLES AGREES 10 p 1r . IKKD IMRMUVX ME) MDEYMFY THE CRY B OFFICERS AND EMPLOYEES FROM AND TOP AIL IMBMICs S WASX° DS WHICH MAY ARSE FROM MT ERRORS WHOOMMSONS COMPOSED IN HE P THESE UNTS. _._ ] Q a PIE� A PIE r0 THE CWMF REEMENT OF MY CONSTRUCTION, DIE CgR FOR CELL ONE THE CM EEGWEEMM MPMIKNI (910-221-6") AND THE EROSION CONTROL FOUS OI (970-Ul-eW) } B• SMYUN NTY-FOUR (21) HOURS Ma NOTICE. K � ��� /WLEGICNARSC !. "PAIILRNSAME O WENT GOP FKILITIES SOUL BE THE REMDNQMIUM1 OF IIIE POPE �} TEMPORARY GRAVEL R MI RECOMMENDATIONS OF THE FEEL WNNMF AND EROSION CONTROL STUDY FOR THIS f� CONSTRUCTION ENTRANCE pEMIOPMENT BY (ENGINEERING HIM) WILL OF COMPLIED WITH. MT TO SOIL z. PAWS TO TORT mmECIAN AO ATC PIAECE BY THE nn. CFERTwWTION THE COMPACT T IxES BY A DISSECTED PROP99ARR Ix O MO AFFA O 0 TIE SIORMWATER UIONY. [pgyyyAERLLY.p[HLpQyy115, CERIIFIGICN OF ALL DAMAGE I �I 0 BPMw AND rN1RENQNO $IRS mD ONE 1 ll II lily II II GET MANE III /PRIMED RUMFI II ML AlOTS APRIL BE SUBM 0 THE SICURREATER THIRTY AT LINT FEE WEEKS PRIOR 10 THE NOTE: EASE of ACELIIrICAIe TOE11 OGwR :. DMD LOT UNIFICATION. As SPSIHED W THE A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE nm� TEDCH ANn`'EsJr MUST fl SEBMITED 10 THE DISSUADER UTILITY AT LEAST TWO WEEKS MUST BE PROVIDED. THE PAD WILL BE 50' LONG TEMPERATE or occuPANCY FOR SUCH LOT. R 25' WIDE AND CONSTRUCTED W/6' THICK It e. IF gwATRNT6 E Dsro Ho INSTALL UJILTES, A STATE CONSTRUCTDN DEWCERIN WASTEWATER DISCHARGES PERMIT IS PROVIDED I M BSGHRE Is PRO A STORM SEWER. CHANNEL. IRRIGATION DITCH,1 I/2' CRUSHED RUCK PER DOUGU$ COUNTY OR AM WARES OF THE ENDED STAVES. REQUIREMENTS. 'ESKAWAIM D TPIEcudI STATE MG'OLO ION INFORNATRGIN, RESU E run saSMANDs EARRxo ENT OF H ALTH, CONTACT R GOnKAMCOMDE SMwD. M xpCOL RWATERW222- 5Ox ELATION WQCD-RNDx, ]CO cI DOE c DRAW OOzxz-ISJO'OI.zrExnox: ERNns EMrapc[4[Xr s[clrorv. Px: (]0]'e9z-]s9O). 10, KNCFRA RK: Sn DE FORT CORERS SA 1 9-94 DESCRIBED M RANGE W SET IN THL MONTH SIDE IELEHWBK WNMLE AT THE SOUTHWEST FORMER GF XMYpW RD. AND MCMURMY ACT PUBLISHED E ELNAIIOI . 4975, X'. PER FMRIC— eAcvBlEo 1RENLNI EMEN BF FI.BRc I/_ NSI IMrBIEH FM TO Wi6 I HOOKElRl AND D COMPACT TE FECAVAIM ART AM EKlM T Wo THE 1REROH. SALT FENCE DETAILS MT TO SLUE