HomeMy WebLinkAboutDrainage Reports - 05/01/1990MOINC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
April 13, 1990
Ms. Susan D. Hayes
Stormwater Utility Department
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
RE: OAKRIDGE WEST - SECOND FILING - SUPERTOTS LEARNING CENTER
FINAL DRAINAGE REPORT - REVISED
Dear Susan,
RBD Inc. is pleased to submit this letter and accompanying cal-
culations and Drainage and Grading Plan as the final drainage
report for the Oakridge West Second Filing, a planned unit
development, proposed by the Everitt Companies.
This 1.14 acre site is located within the McClellands Major
Drainage Basin of South Fort Collins, Colorado, as shown in the
vicinity map (Figure 1). It is bounded on the east by Lemay
Avenue, on the north by the Evangelical Covenant Church, and on
the west and south by undeveloped property. The site presently
is covered with field stubble and natural grasses, and slopes in
a southeastern direction where it drains into an existing storm
drain inlet at the northwest corner of Lemay Avenue and Rule
Drive. A ditch running along Lemay Avenue also crosses the site
which conveys present stormwaters north of the site (refer to
Figure 2).
The project site has been divided into two sub -basins (Basins A &
B) as shown on the Drainage and Grading Plan. A composite runoff
coefficient "C" was calculated for each sub -basin and used in
computing the runoff and the storage detention. The Mass Diagram
Method was used to compute the storage volumes for each basin.
The ponding area west of the building and the parking lot area
will provide the storage volume for Basins A and B, respectively.
The Detention Pond Information Table on the Drainage and Grading
Plan summarizes the storage volume analyses.
This site has been included in the area recently analyzed in the
Master Drainage Study For The Oakridge Business Park (by RBD,
Inc.) which was submitted to the City of Fort Collins for review
in March 1990. This study was completed in cooperation with the
Stormwater Utility Department staff and recommends that this area
not be required to provide staged detention. Based on the fact
Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado (719) 598-4107
this study will likely be
tion volumes and outflow
based on a 0.5 cfs/acre
rates were calculated to
Pond B. These release
proposed 30" storm drain
approved in the near future, the deten-
release rates for this development were
release rate. These outflow release
be 0.21 cfs for Pond A and 0.37 cfs for
outflows are then discharged into a
pipe.
Realizing that the remote chance that the drainage report
referenced above may not be approved by the completion of
construction, provisions have been made it restrain flows to the
YL 0.2 cfs/acre rate. These provisions consist of resizing the
orifice openings and allowing deeper ponding depths. Ponding
depths in both areas will still be under 1.2 feet. Notes have
been added to the plan requiring the contractor to confirm the
orifice sizing before installing the orifice plates.
Offsite flows include the runoff from the basin areas north and
west of the site (refer to Figure 2). Runoff flows from the
north have been previously calculated in the Harmony Market
P.U.D. Filing One Final report (revised 4/89 by RBD, Inc.) to be
15.8 cfs for the 100 year historic storm (which is greater than
the, 100 year developed storm). The runoff from the church site
was calculated to be 1.7 cfs for the 100 year developed storm
found in the Storm Drainage Report For The Evangelical Covenant
Church P.U.D. - Phase 1, dated March 29, 1985 by James H. Stewart
and Associates, Inc. Thus, the offsite flow north of the site is
17.5 cfs. A 30" storm drain pipe will replace the existing ditch
that traverses north to south along Lemay Avenue and convey these
offsite flows through the site. Offsite runoff west of the site
will collect in Pond A up to an elevation 4982.0. Once at this
elevation, the runoff will continue to flow in a southeasterly
direction until discharging into the existing drainage swale and
into the storm drain inlet at the northwest corner of Lemay
Avenue and Rule Drive.
Should the ponding water surface elevation in either pond rise
greater than the elevations shown in the Detention Pond Informa-
tion table the following will occur:
Pond A will continue to drain water through the area inlet up to
elevation 4982.0. At this point, overflows would follow the ex-
isting flow pattern as the offsite flows coming from the west as
mentioned above.
Pond B, however, runoff will overflow onto the church parking lot
to the north at elevation 4980.65 and then drain through the
church's release outflow system. The church's release outflow
system consists of a 6" PVC pipe and berm located east of their
parking lot and west of the drainage swale. Assuming the berm
height (4980.64) to be the 100 year ponding water surface eleva-
tion for the church site, additional flows would overtop the berm
and discharge into the drainage swale. If the ponding water sur-
face elevation continued to rise up to 4980.85, overflows would
then surcharge onto Lemay Avenue and flow south until reaching
the storm drain inlet at the northwest corner of Lemay Avenue and
Rule Drive.
The downstream drainage conditions at HealthCare International
(HCI), south of the proposed site development, have been reviewed
as to the impacts of the runoff, from the proposed site
development. The HCI storm drainage system has been designed for
existing flows of Q100 = 24.2 cfs from runoff flows to the north.
The total runoff from the proposed site and to the north add up
to be 18.1 cfs. This reduction in runoff can be attributed to
the onsite detention as the land develops.
When the recommendations from this report are implemented, along
with the City of Fort Collins drainage criteria, this site will
drain stormwater in a safe and controlled manner.
Please call if you may have any questions or concerns.
Sincerely,
RBD, Inc. AA,,
Thomas M. Ochwat
Project Engineer
C
Stan Myers
Project Manager
cc: 035-110A
ttttiFy�i
ema a'ti `.
V
�r O
44
FIGURE 1
\\\ Harmony/Market P.U.D. 1 15.8
OAKRI�GE.DRIVE
� ✓ J
Existing Swale
<990 -'
f
Evangelical
/ I / Covenant
—�f l Church/
o I r I
J Storm Dr'ii
r l / I
I /
l
/Temporary Gravel / m
/ Cul—de—sac
Storm
C- Type
/ RULE DRIVE
cis
cts
n Pipe
Existing
Swale
Drain Inlet
R
w
Z.
W
Q
>
Q
w
-I
TEM. Oakridge West P.U.D.
Engineering Consultants
OFFSITE RUNOFF — FiQure 2
•
RMINC
Engineering Consultants
G
CLIENT L,_Ul r'
JOB NO. 0035-- 1.40
PROJECT Se1P�?brS CALCULATIONS FOR _z6r,0,,z-,e,�
MADE BY7Wa_DATE 1. CHECKED BY DATE SHEETOF
v�
INC
Engineering Consultants
CLIENT I -JOB NO. 6 3 S 2100
PROJECT Cla�77Yrs CALCULATIONS FOR
MADE BY f-AU DATE?- YL CHECKEDBY DATE SHEET 2,OF o2
1�
- j
-�
^ . ���
` DATE: ���
4-13-90 --
PROJECT: OAKRIDGE WEST 2ND FILING
JOB NUMBER: 035-110
DESIGN ENGINEER: SAM
BASIN DESIGNATION = BASIN B
MASELEASE BATE: 0'2cfo/ac
DETERMINE EXISTING Q FOR 2 YEAR STORM
=====================================================================
HISTORIC RUNOFF COEFFICIENT .2
BASINSLOPE: 1.5 PERCENT
BASIN LENGTH 190 FEET
AREA: .739 ACRES
HIST TC = 1.87*(1.1—( 1 *
))*SQRROOT 190 ))/
^ 1/3 = 20.26855
HISTORIC OUTFLOW IS SUPERCEDED BY: .148
.2
1.5
MINUTES
CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
==================================================================
DEVELOPED STORM: 100
DEVELOPED RUNOFF COEFFICIENT
CCFAC =
.739
.72
=
DURATION
MIN
5
10
15
30
45
60
90
120
180
360
*
.6651001
GROSS VOL.
CU. FT.
1819.714
2801.401
3567.597
4932.382
5926.041
6249.28
6752.095
6895.758
7470.404
8332.372
YEAR STORM
.72
1.25
OUTFLOW VOL.
CU. FT,
44.4
88.8
133.2
266.4
399.6
532.8
799.2
1065.6
1598.4
3196.8
*
DETENTION VOL.
CU. FT
1775.314
2712.601
3434.397
4665.982
5526.441
5716.48
5952.895
5830.157
5872.004
5135.573
REQUIRED DETENTION -VOLUME IS 5952.895 CU. FT. OR
.1366597 ACRE FEET
' DATE:
PROJECT: OAKRIDGE WEST 2ND FILING
JOB NUMBER: 035-113
DESIGN ENGINEER: SAM]
BASIN DESIGNATION = BASIN A
0. RELEASE RATE: 0'2cfa/oc
DETERMINE EXISTING Q FOR
=====================================================================
2
YEAR STORM
HISTORIC RUNOFF COEFFICIENT
.2
BASIN SLOPE:
1.5
PERCENT
BASIN LENGTH
220
FEET
AREA: .408
ACRES
HIST TC = 1 87*(1
^
^ —
1 ( 1
*
.2
))*SQRROOT
220
>)/
1.5
21.81007
MINUTES
HISTORIC OUTFLOW
IS SUPERCEDED BY:
.08
CUBIC FEET PER SECOND
DETERMINATION OF
==================================================================
DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
DEVELOPED STORM:
`
100
YEAR STORM
DEVELOPED RUNOFF
COEFFICIENT
.44
CCFAC = .44
*
1.25
*
.408 =
.2244
DURATION
GROSS VOL.
OUTFLOW VOL.
DETENTION VOL.
MIN
CU. FT.
CU. FT.
CU.^FT
5
613.9584
24
589.9584
10
945.1729
48
897.1729
15
1203.682
72
1131.682
30
1664.15
144
1520.15
45
1999.404
216
1783.404
60
2108.463
288
1820.462
90
2278.109
432
1846.109
120
2326.579
576
1750.579
180
2520.461
864
1656.461
360
2811.283
1728
1083.283
REQUIRED DETENTION
VOLUME IS
1846.109
CU. FT. OR
4.238083E-02
ACRE FEET
-
DATE: 3-3-90 MAX. RELEASE BATE: 0.5cfa/oc
PROJECT: OAKRIDGE WEST SECOND FILING
JOB NUMBER: 035-110
DESIGN ENGINEER: TMO
BASIN DESIGNATION = BASIN A
DETERMINE EXISTING Q FOR 2 YEAR STORM
=====================================================================
HISTORIC RUNOFF COEFFICIENT .2
BASIN SLOPE: 1.5 PERCENT
BASIN LENGTH 220 FEET
AREA: .408 ACRES
HIST TC = 1.87*(1.1—( 1 * .2
))*SQRROOT 220 >)/ 1.5
21.81007 MINUTES
HISTORIC OUTFLOW IS SUPERCEDED BY: .2 CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
==================================================================
DEVELOPED STORM: 10)
DEVELOPED RUNOFF COEFFICIENT
CCFAC =
.408
.44
=
DURATION
MIN
5
10
15
30
45
60
90
120
180
360
*
.2244
GROSS VOL.
CU. FT.
613.9584
945.1729
1203.682
1664.15
1999.404
2108.463
2278.109
2326,579
2520.461
2911.283
REQUIRED DETENTION VOLUME IS
3.350331E-02
YEAR STORM
.44
OUTFLOW
VOL.
CU.
FT.
60
120
180
360
540
'
720
1080
1440
2160
4320
'
.
1459.404
ACRE
FEET
*
DETENTION VOL.
CU, FT
553.9584
825.1729
1023.682
1304.15
1459.404
1388.462
1198.109
886.5794
360.4605
—1508.717
CU. FT. OR
' --
DATE: 3-3-90
PROJECT: OAKRIDGE WEST SECOND FILING
JOB NUMBER: 035-110
DESIGN ENGINEER: TMO
BASIN DESIGNATION = BASIN B
MAX. RELEASE RATE: 0'5cfa/uc
DETERMINE EXISTING Q FOR
=====================================================================
'
2
YEAR STORM
HISTORIC RUNOFF
COEFFICIENT
.2
BASIN SLOPE:
1.5
PERCENT
BASIN LENGTH
190
FEET
AREA: ,739
ACRES
HIST TC = 1.87*(1.1—(
1
*
.2
))*SQRROOT
190
))/
1.5
20.26855
MINUTES
HISTORIC OUTFLOW
IS SUPERCEDED BY:
.37
CUBIC FEET PER SECOND
DETERMINATION OF
DETENTION POND VOLUME
FOR DEVELOPED
CONDITIONS
DEVELOPED STORM:
100
YEAR STORM
DEVELOPED RUNOFF
COEFFICIENT
.72
CCFAC = .72
*
1.25
*
.739 =
.6651001
DURATION
GROSS VOL.
OUTFLOW VOL.
DETENTION VOL.
MIN
CU. FT.
CU. FT,
CU. FT
5
1819.714
111
1708.714
10
2801.401
222
2579.401
15
3567.597
333
3234.597
30
4932.382
666
4266.382
45
5926.041
999
4927.041
60
6249128
1332
4917.28 '
90
6752.095
1998
4754.095
120
6895.758
2664
4231.758
180
7470.404
3996
3474.403
360
8332.372
7992
340.3721
REQUIRED DETENTION
VOLUME IS
4927.041
CU. FT. OR
.110093
ACRE FEET
\
No Text
CLIENT �c �/{�JOB NO. 03 J '�.�r 0
INC PROJECT - L 0C_67iCf'2rrs CALCULATIONS FOR
Engineering Consultants MADE BVTK_0 DATE
2�CHECKED BY DATE SHEET i OF 3
•
CLIENT r � JOB NO.
RMINC - PROJECT :k-• TS CALCULATIONS FOR e9e;oeic r
Engineering Consultants MADE BY 'f_P'tW DATE I d �CHECKEDBY DATE SHEET - OF 3
CLIENT �2�� JOB NO,TmiD3J ISO
INC PROJECT IL1.4647PtS CALCULATIONS FOR Dallela
Engineering Consultants MADEBYYXn DATE%AZAICHECKED By- DATE SHEETOF
t.
TmiDNC
Engineering Consultants
CLIENT uFw r't' t),ga.p&e bJl=YTa JOBNO.
PROJECT S_ ,m ITS CALCULATIONS FOR
MADEBY---*"- DATE i CHECKED BY DATE SHEET I OF
7