Loading...
HomeMy WebLinkAboutDrainage Reports - 04/16/2004'Ine1.Aptt ate 04 FINAL DRAINAGE REPO T FOR LOT 3, MULBERRY/LEMAY CROSSING FILING NO. 1. SITUATE IN THE CACHE LA POUDRE BASIN & FEMA 100-YEAR FLOOD PLAIN PREPARED FOR EILEEN TURGEON AND DIANA MAY FEBRUARY 18, 2004 PREPARED BY STEWART & ASSOCIATES, INC. P.O. BOX 429 103 SOUTH MELDRUM STREET FORT COLLINS, COLORADO 80522 TEL: 970.482.9331 FAX: 970.482.9382 NIULHRY LMY XING IM Amg ❑rtAM TABLE OF CONTENTS 1 VICINITY REPORT 2 & 3 TEXT OF REPORT 4 & 5 RUNOFF CALCULATION 6 DETENTION POND MASS DIAGRAM 7-12 EXTENDED DETENTION 13-16 EROSION CONTROL CALCULATIONS 17 FIRM PANEL MULBRY LKIY RING LT3 ding rpl d.c (1) VICINITY MAP SCALE: 1 "=2000' z E. LINCOLN AVE. F (iH�o<N Li Ln � qt� Q N wE. MAGNOU z O� J = ST. P \ D E. MAGN LIA ST. 0 fN \ SITE E. AYRTLE ST. E• MULBERRY STREET �2 _ f CgCy F QS/O �4 p pUO� f E. ELIZABETH ST. (2 STEWART&ASSOCIATES Consulting Engineers and Surveyors February 19, 2004 Mr. Basil Harridan Stormwater Utilities City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Basil. The following is the Final Drainage Report for Lot 3, Mulberry / Lemay Crossing, Filing No. I which is situate in the Southwest 1/4 of Section 7, Township 7 North, Range 68 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. The site is in the Cache la Poudre River Basin. The area of Lot 3 is 10,183 square feet. The lot is zoned C-Commercial . The proposed use is for a drive -up coffee house named "Beantrees." This site is all in the FEMA 100-year flood plain per Firm Panel No. 080102 0004C dated and revised March 18. 1996. A copy is included in the pocket of this report with our site located on it. The base flood elevation of this site is 4,932 shown on Sheet 3 of the Utility Plans included in the pocket herein. Therefore. the building and HVAC regulatory flood protection elevation is 4,934. The building is designed for a drive-thru coffee house with some sit-down area. It will be slab -on -grade construction and both the finished floor elevation and the HVAC slab will be constricted at elevation 4,934.10 feet. A FEMA Elevation Certificate will be completed and approved before the Certificate of Occupancy is issued by the City of Fort Collins, Colorado. A variance to the Poudre River Dryland Access Requirement was approved on January 22. 2004. All floatable materials (bike rack, trash bin, tables, chairs, etc.) must be anchored. This project is in compliance with Chapter 10 of the City Code. Also, a flood -plain use permit for this site has been completed. The site is bounded on the North by Magnolia Street, on the West by 12th Street, on the South by Supermarket Liquors and on the East by Lot 4, Rohrbacker P.U.D. The site slopes from North to South at an approximate slope of 0.7%,. The ground cover is dry -land grass and weeds. The historic site is one basin. The two-vear runoff rate is 0.07 c.f.s. and the ten-year ninotf rate is 0.11 c.f.s. and the 100-vear historic rate is 0.30 c.f.s. The developed site is also one basin. The two-year runoff rate is 0.14 c.f.s. and the ten-year runoff rate is 0.23 c.f.s. The hundred-vear runoff rate is 0.64 c.f.s. A detention pond is being constructed 'between the coffee house and the East line of Lot 3. The required volume is 959'cubic feet. The required water quality volume is 235 cubic feet. The discharge from the pond will be to 12th Street at the two-year historic rate of 0.07 c.f.s James H. Stewart and Associates, Inc. 103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522 MULRRY LEI Y XING 1. ri dmg npu d"I 970/482-9331 • Fax 970/482-9382 EROSION CONTROL: The wind credibility is moderate and the rainfall erodibility is high. A silt fence will be constructed along the South property line and along the back of the East walk for 12th Street. The water quality structure and the detention pond will be constructed at the beginning of the project. The contractor will remove mud from 12th Street daily. The stormwater runoff calculation and the erosion control calculations and the water quality calculations are enclosed as a part of this drainage report. This drainage report and the design of the drainage system are in compliance with the City of Fort Collins Storm Drainage specifications and criteria. If you have any questions regarding this report please call. Sincerely, Richard A. Rutherfor , P.E. & L.S. RAR/meh MULBRY LMY XING LT3 dmg rpt.doc STEWART&ASSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521 PH 482 Consultin3 En"ineersanc Surveyors -9331 FAX 482-9382 BY f� Date: r so -LaiL 14 10 3 Client: N tDIA dJa r'� [ Sheet No. _4; of _ Project: l h r Y L M )r-7 i Z Al Subject: l tTnp lc 12 tlRzn ce r, ALGVLA r, Nss To R I c R AS- /,v At2EA = 0,Z338 A,, .=Mt'c,e-v,o✓r Aecq = 0,003-7 Ae, /.6 0/0 T'E e- v to Us A-C EA = 0. Z301 Aa, 9 8. 4- °/a C = (0-9sx0.e/(') i- (0,zo x 0"T8I-) = 0.0[s t 0.01 6,2! i TC, 0Zy0e. = 0- z r X /-34- X 0-Z33e = 0, 07 c.F.s QIoy2 = O.ZI X Z,29x 0,Z338 = C). !/ C.F,S. /.zsx 02) x 4187 x 0.Z338 = 6,30c.fs. STEWART&ASSOCIATES 103 S. MELDRUM, FORT COLLINS, CO 80521 Consulting Engineers and Surveyors PH. 482-9331 FAX 482-9382 BY: L.A iC — Date: X)pv. I+ 7on3CIient:F„!Sheet No. <Sof_ Project: —b 2T. ,-%� U l__ E -E sv Subject: f) ,e V _D E V &L 0 PED E>Aslm AREA = O-Z338 Ac. =M PEev�ovS Ap.,rA = O.OgoAc,. 38,5 Pe ,e v I o as A PEA = 0.14- 4- A c, 6, /' s C = (0,9s X 0.385) {- (O.ZO X 0. �/5) = 0.34G t 0.123= r t Tc = l8-7 1 —0,38) 21$'/z o, c,7 i3 = z z AA i N Q Zyk = 0, 38 n 1,53 X 0. Z336 = 0, f 4- C•FS'. 0 10yQ = O. 38 X 2.(0/ X 0.Z338 = 0.23 c,F s. Te=19 Q1ooy= /�ZSx0.38XS,-7SX0,z33$ = 0.(o¢G,/=.5. -co cr- w cc: 0 LL 0 LU cl: D 0 LU m (D z 0 CC CQ cl: cl: co -j D 2 I ca w CD 6 Lu 0 CW) N It 91 N co N co 00 00 0 co llo!�? a) CD I- C\i m (M,gy) C\j GO CD CO N In ce) 0 N qt m W m CO o r co No- 6 c6 N co N co 0 M co M w Lo u O LO qt N m W LO LO CO to "t -.0- N 14: cn r- 0 cn m co qt 'tt U- U- --: M m 4 — LO -: LO w W' -q- N R* co M* MLO m cc' (6 64 N m LO CNA m m CAS m m 0 N co co co 4 0 z CD CD 0 0 0 C) 0 0 C) 0 0 C) 0 0 0 CD 0 0000 (D m LO m N N cli LO 0 0 w M N 0 W,-t o Nq- w m N m 0 CD cq 0 0 0 "t 0 0 O.M m w CD cc 0 q- LO 0 0 �MMMMNNNNNrrrrrr z LU 0 C) q C) o o o C) o C) 0 Lci C5 Lfj L6 C'4 c; m 0 m 0. v 1.0. '%Y 0. Lf) Lo. LO 0. Co C) N 6 CO C5 (n C) LO mtocDo 0 1 Lri LLJ OD STEWART&ASSOCIATES Consulting Engineers and Surveyors f By: ---,/5GA Date: Client: Project: Subject: /5 103 S. MELDRUM, FORT COLLINS, CO 80521 PH. 482-9331 FAX 482-9382 Sheet No. % of -rAZZ:w = p. Z34'6 71 _ G/. 7 D7 5 rr-7 Jam• / , raj: ,Sfv/�� r = go, 0 3 32,d - ZZ3 Z ��/✓+P/!/�'I Jim � � � � /�'J Q'/ a?. 9 STEWART&ASSOCIATES 102 DiFAXR, FORT gOLLINS, CO 80521 Consulting Engineers and Surveyors PH. 8933/� By: JVC - r) Date: _�/-Oy Client: /y/'G/C� /J %o/ y Sheet No. - of Project: 40 7 Subject: /Z G °� ae ' : I 1 • i yJ DRAINAGE CRITERIA MANUAL (V. 3) STORMWATER QUALITY MANAGEMENT a.5(.00 Note: Watershed inches of runoff shall apply to the entire watershed tributary to the BMP Facility. FIGURE 5-1. WATER QUALITY CAPTURE VOLUME (WQCV) 9-1-1992 UDFCD DETENTION POND HIGH WATER LINE I4*:� CONTOUR AREA AVERAGE AREA INTERVAL 1 194.0 ='REQ.yOLU L----- CUMMULATIVE HIGH WATER s •ft•) sq.ft. VOLUME cu.ft. VOLUME cu.ft. LINE ft.) 31.0 0.0 - -- 517:5 103.4 103.4 31.3 1,035.0 4132.0 F. 1,633.5 i,f16.9 ':1;220.3 2,232.0 . 32.0 2,625.6' 1,307i8 2.528.1 -- 32.51 3,019.0 1. FOR THE FIRST CONTOUR VOLUME A CONIC SHAPE WAS ASS - i- k. nc.,.,Dvve) tulrrtHENUE IN COUNTOUR ELEV.) 2. FOR THE REMAIMDER OF THE VOLUMES BETWEEN CONTOURS (SECTION 9.2) VOL. = DEPTH/3 (A +(AB) ^ .5 + B) FOR: Uniform Sides sec.(9.2) 3. HWL=(VOL.REQ.-VOL.LOW CUML)*3/(AREA LOW+AREA HIGH+(low area*high area) ^ .5) 31.99 =. HWL POND. ORIFICE SIZING nPIr.IMA1 nr=¢Ir_nI nATA 0.07 = Allowable Des. Release Rate cfs 31.00 = Flowline Orifice Elevation ft 0.65 = Orifice Coefficient (Cd) 0.99 = Avaliable Driving Head(ft VERT. CIRCULAR PLATE 2.01 _= Outlet Area s inches 0.80 Circular radius inches 0.92 = Actual Hvdraulic'Driving Head VERT. SQUARE PLATE 2.00 =.Outlet Areas inches .>: 1.41 =Side for S O enin9(iriches 0.93 Actual Hvdraulicbrivin Haad(ft)_ NOTE: 1. VERT. PLATES WILL BE PLACED AT PIPE FLOWLINE 0' N _ DRAINAGE CRITERIA h1ANUai ry, 3) 10, 6. 4. 2.1 1.0 m 0.6C t • 0. s. / 0.02 0' STRUCTURAL E%iPs SOLUTION: Required Area per i MIA '"" c.0 4.0 b.0 D, (/ Required Area per Row (n.2 ) SOUMO: Douglas County Storm Drainage and Technical Criteria. 1986. FIGURE 5-3. WATER QUALITY OUTLET SIZING: DRY EXTENDED DETENTION BASIN WITH A 40-HOUR DRAIN TIME OF THE CAPTURE VOLUME 9-1-1992 UDFCD DRA';NAGE CRITERIA MAINUAL (V. 3) 0Z; .STRUCTURAL B,kipg Threaded Cap Water Quality Capture Volume Level (including 20% additional volume for sediment storage) Gravel (1-1/2'to 3' Rock) Around ?erforated Riser Filter Fabric Water Quality Riser Pipe (See Detail) Notes: 1. The outlet pipe shall be sized to control overflow into the concrete riser. 2. Alternate designs include a Hydrobrake outlet (or orifice designs) as long as the hydraulic Performance matches this configuration. Notes: 1. Minimum number of holes = 8 2. Minimum hole diameter - 1/8' dia. Access P (Min. 3 ft) OUTLET WORKS NOT TO SCALE 1-1/2" diameter Air Vent in Threaded C Water Quality Outlet Holes Ductile Iron or Steel Pipe rER QUALITY HISER PIPE NO E am Removable & Lockable Overflow Grate for Larger Storms Outlet Pipe —► Size Base to Prevent Hydrostatic Uplift Maximum Number of Perforated Columns Riser Hole Diameter, in. Diameter (in.) 1/4' 1/2' 3/4' 1' 4 8 8 6 12 12 9 8 16 16 12 g 10 20 20 14 10 12 24 24 18 12 Hole Diameter Area of Hole (in.) (in.2 ) 1/80.013 1 /4 . 0.049 /2 0.110 1 18 0.196 ' // 3/44 3 0.307 7/ 0.442 1 1 0.601 0.785 FIGURE 5-2. WATER QUALITY OUTLET FOR A DRY 9_1_1992 EXTENDED DETENTION BASIN UDFCD 4B • 63 L1J/ CONSTRUCTION SEQUENCE PROJECT: Lor 3. Mvc f3Eeav/Len,a�y CPA FFiGiN6 (la STANDARD FORM C -Iub, SEQUENCE. FOR 20—4- ONLY COMPLETED BY: R. A, P. DATE: o¢ Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. 2 YEAR MONTH I T ----------------------------i----�--- OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Veoetative Methods j Soil Sealant Other I RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving) Other I VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting) Sod Installation Nettings/Mats/Blankets Other I STRUCTURES: INSTALLED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HOI/SF-C:1989 IN MAINTAINED BY -D ---w---------+--------- APPROVED BY CITY OF FORT COLLINS ON RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: I-o-r 3, Mvi.BE�eer%Ls,Kgy Cr2asri�-,F4-"vc4',.' STANDARD FORM A COMPLETED BY: e 41P. DATE: ----------------------------.-- ----------------------------- DEVELOPEDIERODIBILITYI Asb I Lsb I Ssb Lb SUBBASIN I ZONE I (ac) I (ft) I M .I(feet) (b) i (S) --------- I-----------I-------I-------I----- -------I-------I ro,A�ags�Nl 81614 I 0 Z3 Ac,l z4D I o.4c/o I zoo I o.� ------- 17Z,Z -------------------------------------------------------------------- Cis) EFFECTIVENESS CALCULATIONS ----------------------------------------------------------------------� �PRO,JECT:CoT 3,Muc.BecRy/oc-^A7, G,coar,uc,FALw6 V#-t STANDARD FORM B COMPLETED BY: Q, A, ,e, DATE: Fig IS�Zooq� Erosion Control C-Factor P-Factor Method Value Value Comment ---------------------------------------------------------- BA Q GROVAZ> O, zZ SEaIMENTTieAP /, p D.Sa SILT FENGE 1.0o , 6.86 CO✓1CVet(t.'FOUNDAr#ON 0.61 I. 00 Q. O I A[. MAJOR BASIN To :'A L B.v s1 u PS SUB BASIN AREA (Ac) 0.Z3Ac --------------------------------------------- CALCULATIONS ------------------- 0.01xo,ol� . a.z3 0.23 W rD . P _ 0,50)( o- go = 0. 4,o E P P • (0- 4-6 x 0.4-0) X /00 = R6, 6 C>k --------------------------------------------------------------- )I/SF-6:1989 STEWART$,ASSOCIATES Consulting Engineers and Surveyors February 19, 2004 Mr. Basil Harridan Stormwater Utilities City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Basil, The following is the cost estimate for the erosion control measures for Lot 3, Mulberry / Lemay Crossing, Filing No. 1. Silt Fence, 240 L.F. @ $3 per L.F. $ 720.00 2. Extended Detention Pond $ 1,200.00 3. Reseeding 0.2337 acres @ $650 per acre $ 152.00 Escrow for site = 1920 x 1.5 = $ 2,880.00 If you have any questions regarding this estimate, please call. Sincerely, Gam a. Richard A. Rutherford, P.E. & L.S. RAR/meh "l\lliyy\ r"' ��D'� JJs�t 5028 � H James H. Stewart and Associates, Inc. 103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522 MI II.HRY LAI Y XING 1.T3 Amg q,1 A,ic 970/482-9331 • Fax 970/482-9382 BUCKINGHAM STREET LOGAN AVE SEUv" 1 MEAEL-' o 77-- / a ti LINCOLN 1 / W / w -�4 ZONEAE i I / ENUE / LaU1NCE COUIIIY =.6i_A wOT INCLUDED ZONE A fi� IJ Ir r- LEMAYDS, «) PROFILE BASELINE EAST MAGNOLIA STREET NE AE -- -- FIRM PANEL OSOl02- 0004 C, MArrcH �8, i996 2 { N