Loading...
HomeMy WebLinkAboutDrainage Reports - 04/07/2009n 1 1 I 1 11 1 0 I I 1 11 t 1 1 S.A. MYERS, LLC Paul Bennett, PE Cky of Ft. COMM PIO1.is 1318 Tarryton Drive ApprpvW Fort Collins, CO 80525 Hate 4- %- D q (970)-219-1357 (ph) — - S)).6l V%OPERTY OF !'ORS' COLUNS UTD-I US FINAL DRAINAGE AND EROSION CONTROL REPORT FOR OAKRIDGE CORPORATE CENTER MINOR AMMENDMENT FOR PARKING LOT EXPANSION LOT 1 OAKRIDGE BUSINESS PARK SECOND FILING, P.U.D. and A PORTION OF TRACT C OAKRIDGE VILLAGE NINTH FILING CITY OF FORT COLLINS, CO 80525 PREPARED FOR: Bhavikatti Architecture LLC 18947 E Baker Place Aurora CO 80013 DATE: MARCH 3JWHt 2009 PREPARED BY: PAUL BENNETf, PE 1 1 I t 1 I I I I I hereby certify that this report for the preliminary drainage design of OAKRIDGE BUSINESS PARK PARKING LOT EXPANSION was prepared by me (or under my direct supervision) for the owners thereof and it meets or exceeds the criteria in the Larimer County Stormwater Design Standards. Paul James Bennett, PE Registered Professional Engineer State of Colorado No. 40178 2 i I 1 I I r i 11 11 TABLE OF CONTENTS Property Location.............................................................................4 • Section, Township, Range • Local Streets • Major open channels • Surrounding Developments PropertyDescription.........................................................................4 • Area • Ground Cover • General project description DrainageBasins and Sub-Basins........................................................4-5 • Major basin drainage characteristics • Nearby irrigation facilities • Floodplain considerations • Historic drainage pattern on subject property • Off site drainage patterns and their impact • Individual on site basin descriptions & runoff calculations DrainageDesign..................................................................................6 • Previous drainage studies • Drainage impact on existing infrastructure • Runoff method • Design rainfall & recurrence intervals • Detention storage (calculations, outlet, overflow) • Water quality Conclusions.........................................................................................7 References..........................................................................................7 Appendices..........................................................................................8 A- Major and minor storm runoff computations for historic and developed conditions B- Detention pond sizing, outlet sizing, overflow weir sizing C- Water quality calculations D- Original Drainage Report Exhibits............................................................................................... FEMA FIRM Map Developed Drainage map 3 t I I 7 r Property Location The subject parcel of land is located in the City of Fort Collins City Limits. There are two parcels which are undergoing changes with this Minor Amendment. The two parcels are: "Lot 1 Oakridge Business Park, Second Filing, P.U.D." and the second parcel is "A portion of Tract C Oakridge Village P.U.D. Ninth Filing". The first parcel is 4.00 acres in size and the second parcel is 0.21 acres. The parcels are located in the NW quarter of Section 6, Township 6N, Range 68 West, 6"' P.M., City of Fort Collins, Colorado. Wheaton Drive (80' ROW paved road) abuts the property on the west. The adjacent parcels to the south are developed single family home sites. The parcels to the north are developing with single family home sites. To the east of this parcel are also developed single family home sites. Property Description Being that this parcel is currently developed the ground cover on this lot consists mostly of asphalt paving with landscape islands. This parcel slopes from south to north at an average slope of 1.5%. This parcel and the neighboring parcels are served by a regional detention facility. There is more discussion of this regional facility in the Detention portion of this report. The property owner wishes to add more parking to better serve his tenants. This increase in parking results in about 9600sf of additional impervious area on these two parcels. The NRCE soil type in this area is SCS type `C'. The property is located in the Fossil Creek Basin. Drainage Basins and Sub -Basins The existing drainage pattern on this site is from south to north at a slope of around 1.5%. There is an existing open channel on the north boundary of this site which sits in a drainage easement. This open channel is known as the Lower McClellands Creek (herein after referred to as the Creek). There are no irrigation facilities on this site. There are offsite drainage considerations for this site that are discussed in more detail below. In general there are offsite flows from the south that will continue to flow in the existing manner and they will continue to flow into the Creek where they are routed the regional detention facility. Both offsite and onsite flows flow overland via curb and gutter and concrete pans where they are directed into the Creek. According to FEMA FIRM Map 08069C1000F this property is located in floodplain area'X', areas determined to be outside the 0.2% annual chance floodplain. There are no floodplain areas that show up on or near this property on the City of Fort Collins Floodplain Maps. Please see attached FIRMette map at the end of this report. Basin 1 This basin is 1.16 acres and consists of some offsite developed land to the south (Single Family) which flows overland into the subject parcel and it includes half of the building roof and some parking area. Existing Conditions runoff calculations for this basin are based upon the development as it is today. The Developed Conditions runoff calculations for this basin are based upon the proposed parking expansion. The existing 2yr, 10yr, and 100 year flows are 1.25, 2.13 and 6.02cfs respectively. The developed 2yr, 10yr, and 100 year flows are 1.41, 2.41 and 6.42cfs respectively. This basin will continue to flow in its existing manor even with the proposed site improvements. The newly developed flows due to the proposed improvements will be detained and treated for water quality as described below. The additional proposed impervious coverage in this basin is very minimal. Please see Appendix A for runoff calculations. G1 r I I I d I r 1 1 Ll I 11 Basin 1A This basin is 0.25 acres and is a sub -basin of Basin 1. This basin consists of the onsite area of Basin 1 that will be developed. Existing Conditions runoff calculations for this basin are based upon the development as it is today. The Developed Conditions runoff calculations for this basin are based upon the proposed parking expansion. There is discussion in the detention pond portion of this report that explains why this basin was derived. The existing 2yr, 10yr, and 100 year flows are 0.24, 0.41 and 1.27cfs respectively. The developed 2yr, 10yr, and 100 year flows are 0.36, 0.61 and 1.49 cfs respectively. This basin will continue to flow in its existing manor even with the proposed site improvements. The newly developed flows due to the proposed improvements will be detained and treated for water quality as described below. Please see Appendix A for runoff calculations. Basin 2 This basin is 0.26 acres and consists of parking and landscape area. This basin will receive the majority of the proposed impervious coverage. Existing Conditions runoff calculations for this basin are based upon the development as it is today. The Developed Conditions runoff calculations for this basin are based upon the proposed parking expansion. The existing 2yr, 10yr, and 100 year flows are 0.21, 0.35 and 0.96cfs respectively. The developed 2yr, 10yr, and 100 year flows are 0.41,0.70 and 1.27cfs respectively. This basin will continue to flow in its existing manor even with the proposed site improvements, although the slopes and travel times will be less. The newly developed flows due to the proposed improvements will be detained and treated for water quality as described below. Please see Appendix A for runoff calculations. Basin 3 This basin is 0.28 acres and consists entirely of rooftop area. This basin will not receive any new development. This basin was originally calculated only to determine the rooftop flows for the purpose of sizing an underground roof drain pipe size. After discussion with the City this roof drain system will not be installed and these flows will flow overland across the parking lot. The existing and developed 2yr, 10yr, and 100 year flows are 0.47, 0.81 and 1.43cfs respectively. The flows from this basin will continue to flow in an existing manor and will continue to be detained and treated at the regional facility. Please see Appendix A for runoff calculations. Drainage Design There was a drainage study done for this property when it developed in 1984. This report is attached in Appendix D, since this original report there has been a regional drainage study done for this area which outlines and sizes a regional detention facility. It was determined that it would be more cost effective and timely to not explore the capacity of this regional detention facility and just detain and treat the increased flows due to this parking lot expansion on site. Thus there are two small detention and water quality ponds proposed with this report to accommodate this increase in runoff. The Rational Method was used to determine the existing and developed runoff from this parcel. Runoff calculations are attached in Appendix A. Design rainfall and recurrence intervals were obtained I i from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual. Additionally the Urban Drainage and Flood Control District Volumes I and 2 were used for calculations. Please see the developed IDF curves in Appendix A. rThere are two proposed detention ponds for this site. Pond 1 will be in Basin 1 and Pond 2 will be in Basin 2. The increase in 100-yr flows (developed minus existing) will be detained and released. A variance is requested so that each pond will pass through and release un-detained the 100-yr existing flows. The justification for this variance is the fact that these flows are being detained and treated at a regional pond. Each Pond will detain the 100-yr increase in flows due to development. For Basin 1 the release rate (100-yr Existing flows) is 6.02cfs. For Basin 2 the release rate (100-yr Existing flows) is 0.96cfs. No open channel calculation has been done on the adjacent creek but the flows should not be increasing due to the proposed detention. Detention pond calculations have been performed using the mass diagram method. It was found that by sizing Pond 1 by using the data for the entire Basin 1 this pond was drastically and incorrectly oversized due to the fact that the large area quantity was used in the calculation. Thus sub -basin lA was delineated in order to more appropriately determine the pond size. The quantities from the sub -basin were used solely for the purpose of sizing the pond and the quantities from Basin 1 were used to size the release structure for the 100-yr existing flows. Furthermore, the detention quantities which were generated by using the mass -diagram method were increased by 20% at the request of the City of Fort Collins Stormwater Department. ' Pond 1 has a required volume of 241cf for the 100-yr storm and Pond 2 has a required volume of 479cf for the 100-yr storm. Please see the detention pond specifications and release structure drawings in Appendix B. ' Water quality has been examined utilizing Volume 3 of the UDFCD manual. Efforts were made to separate existing flows from developed flows in order to not overwhelm the water quality features since the features are only sized for the increase in flows. This is the reason for the proposed underground roof drain. Basin 1 will have a fair amount of additional flow but there was no obvious cost effective way to separate these flows. Pond 1 has been specified with a Porous Landscape Detention Water Quality Feature and will perform well in this application. This basin will have a Volume of 74cf. This Water ' Quality Feature will need an under drain as is shown on the attached drawings. Pond 2 has also been specified with a Porous Landscape Detention Water Quality Feature and will perform well in this application. This basin will have a Volume of 146cf. This Water Quality Feature will also need an under drain as is shown on the attached drawings. Please see Appendix C for Water Quality computations and ' design drawings. The proposed detention ponds will provide their required storage as well as their required water ' quality storage. The ponds will release flows in a historic manner into the adjacent open channels. The flows will be released via a concrete weir. One foot of freeboard has not been provided for these ponds and is not required for parking lot detention. However it has been verified and noted on the grading and drainage plans that the 100-yr WSEL for the ponds is at least one foot below the finish floor elevation of the building. The 100-yr WSEL is for Pond 1 is 4967.31 and for Pond 2 the 100-yr WSEL is 4967.53. Please see the detention pond specifications and release structure drawings in Appendix B. ' Additional water quality and erosion control measures are shown on the attached Erosion Control Plan. These measures consist of both temporary and permanent solutions. Silt fence, Vehicle Tracking ' 6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Control and Inlet Protection details are used for temporary solutions and Permanent Seeding and Porous Landscape Detention are used for permanent solutions. Conclusions The proposed development of this site will not significantly alter the historic drainage pattern in this area. The increase of flows due to development will be detained in the proposed detention ponds. Water quality has been provided. All disturbed areas will need to be re -seeded with a native grass blend. References 1. City of Fort Collins Storm Drainage Design Criteria and Construction Standards, April 12, 1999. 2. Urban Drainage and Flood Control District Volumes 1,2,3, June 2001 with August 2006 revisions. 7 APPENDIX A 1 ■ I . \\\@q; ?■ [)« cU 6 = z22ess \� k)�) / a ) E ( ( ) ) \\! ! 2(\\ � ) ) {E■mGa ` « (efmm> ] \!§ara > ® >±oSe2 Sm ( § \<<<„ § } § « ƒ \ ){ 6 y y {\ ƒ \ \ \ \\ \ \ \ } F O C � o o �a O � � Q Q Q ❑ > Q ' 7. < a F � 1 z z z vvv 5 5 5 E E E 0 0 0 N V N t�V N O V M M M N N N N z Q 4 Z U o c o 0 3 a U uzo,000 o o � o Q U b r b m U 9199 Qz Q Q lL ° r Q Z m R Z C- Q N M 0 a 1 7 0 F G Z C Ci U Z F h 41 Z z Z a ' X F O z Y C a a ' CL F Z J Gs7 F C O a O O M N W L O m r\ o — ao i p a m c uai �im� C > C < � Z w Q i 'rn 1 G C F N N N 0 0 o Z Z Z E E E 0 0 0 O LL M Q M OO a U N 0 0 0 N b CO W .b C nt M [ry M �z rz pQQ„aOi� oar Z U o 0 0 0 7 C CL �Kv%00 a 4.�Nry N Q U o 0 o c Q Z a Q F a c z a m Z 7- z - Q N M o� 1 z o ' u U Z F N z 0 N 7 Q ' X C U 7_ 1 z a ' z c� F Z c.7 F a z 0 a CC O W N 3 cW7 m O G a o Y co z Q a F 1 1 roa nr U q N 'L U o L a o c S W F � oeiee G Q O U 0 0 0 0 Q <- � 4 I F Q Z In Z F- � N Is a z�0000 0 z�W��� w 0} o 0 0 Qz� z Q a F N �oSS z w O o 0 0 a W O a f O Y � c w 3 1 C � - o Q ¢rY0 it Y � u y�M MAD U Z s m y LL V N� N a a M b T E � �viar V ,., Zallor _j W n0000 1 00 v�10O W a. O ^v�000 o n O 6 F_ F Z � v F ❑ z oot-:o ��UFv+�n z W nnnoo ono kki N N N O O O U h.an n o cioo O Q 0 V N < a d F a z z m V z •- Q_ N M n a 0] Q W N Mze o m h D O C < Q + a L yi W G. U z o FI Q co L > F - F- 3 F I U o O F Q m N Cl z Q a [Fn 1 1 F [- FV- N N N N N N z uQ0000 a ULsj y� U Vl r Y1 e a N r 0 0 0 0 Q � Q Q u C F Q c z v, m Q•-• Q N rn ^ � a I 1] 1 I LEI J C ? N La1 O V m M - 'O C Q m z Y ma Z Q � i 1 1 1 1= F a o d U N 0 c; 0 Co (n M M Nl r C �Gj fs. O U O O O O z F LzU� CL U p O p O O 0 F� O6 0 0 N N N c o o d < z Q Q Z h e m m z r- ro �' Oa 1 1 z 1 0 z 0 1 U C w a O w w 1 a z 0 7 a 1 w F i z Y C 1 C w F z w U 1 F 0 1 Q U o 3 �m m i G O O z a a i N i 1 i 1 i 1 1 O O LL ? Q N O G �oroo a U ¢ W O G N O N O 0 z z U � �4 ono 'none eo f+l F %oo o c A o r room U o 0 0 0 V a � a F A I 1 I 1 11 1 City of Fort Collins OF data Time 2- r 10- r 1 00-r Min inch/hr inch/hr inch/hr 5.00 2.85 4.87 9.95 6.00 2.67 4.56 9.31 7.00 2.52 4.31 8.80 8.00 2.40 4.10 8.38 9.00 2.30 3.93 8.03 10.00 2.21 3.78 7.72 11.00 2.13 3.63 7.42 12.00 2.05 3.50 7.16 13.00 1.98 3.39 6.92 14.00 1.92 3.29 6.71 15.00 1.87 3.19 6.52 16.00 1.81 3.08 6.30 17.00 1.75 2.99 6.10 18.00 1.70 2.90 5.92 19.00 1.65 2.821 5.75 20.00 1.61 2.741 5.60 21.00 1.56 2.671 5.46 22.00 1.53 2.611 5.32 23.00 1.49 2.551 5.20 24.00 1.46 2.491 5.09 25.00 1.43 2.441 4.98 26.00 1.40 2.391 4.87 27.00 1.37 2.341 4.78 28.00 1.34 2.29 4.69 29.00 1.32 2.25 4.60 30.00 1.30 2.21 4.52 31.00 1.27 2.16 4.42 32.00 1.24 2.12 4.33 33.00 1.22 2.08 4.24 34.00 1.19 2.04 4.16 35.00 1.17 2.00 4.08 36.00 1.15 1.96 4.01 37.00 1.13 1.93 3.93 38.00 1.11 1.89 3.87 39.00 1.09 1.861 3.80 40.00 1.07 1.83 3.74 41.00 1.05 1.80 3.68 42.00 1.04 1.77 3.62 43.00 1.02 1.74 3.56 44.00 1.01 1.72 3.51 45.00 0.99 1.69 3.46 46.00 0.981 1.67 3.41 47.00 0.961 1.64 3.36 48.00 0.95 1.62 3.31 49.00 0.94 1.60 3.27 50.00 0.92 1.58 3.23 51.00 0.91 1.56 3.18 52.00 0.90 1.541 3.14 I 11 I �� I 53.00 0.89 1.52 3.10 54.00 0.88 1.50 3.07 55.00 0.87 1.48 3.03 56.00 0.86 1.47 2.99 57.00 0.85 1.45 2.96 58.00 0.84 1.43 2.92 59.00 0.831 1.42 2.89 -60.001 0.821 1.401 2.86 Ln O O 00 cV Ln 00 L N N lD . L T O _T _T _T M T O O O O O 1-4 Ln ^ l0 0000 cn N C1 lD Q1 Ln m O p i1 p O O II II O 11 N N ry O N N x CC Xcn i 4 N o a n O /I I vi �' l' r r i � O O a--1 h' P O O Vl O - O I O O O O O O O O O O O O O O O O O O O O O O O O Ol 00 I,: t0 t11 4 M N r4 O i--I 1 1 1 1 1 1 1 i 1 1 1 DRAINAGE CRITERIA MANUAL (V. 1) s0 30 t.- 20 1 RUNOFF FAN � . I . �i�/Illt� 1r m MENEM �� NUNN ■ i I i I Imo' FAWAWAUFAVM�MMENENNE .2 .3 .6 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND Figure RO-1--Estimate of Average Overland Flow Velocity for Use With the Rational Formula 08/2006 Urban Drainage and Flood Control District RO-13 DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table 110-6- Runoff Coefficients, C Percentage Imperviousness Type C and D NRCS Hydrobqic Soil Groups 2- 5 10- 25 50-yr 100 0% 0.04 0.15 0.25 0.37 0.44 0.50 5% 0.08 0.18 0.28 0.39 0.46 0.52 10% 0.11 0.21 0.30 0.41 0.47 0.53 15% 0.14 0.24 0.32 0.43 0.49 0.54 20% 0.17 0.26 0.34 0.44 0.50 0.55 25% 0.20 0.28 0.36 0.46 0.51 0.56 300,6 0.22 0.30 0.38 1 0.47 0.52 0.57 35% 0.25 0.33 0.40 0.48 0.53 0.57 4090 0.28 0.35 0.42 0.50 0.58 4546 0.31 0.37 0.44 0.51 0.59 50% 0.34 0.40 0.46 0.53 0.60 55% 0.37 0.43 0.48 0.55 M0.58 0.62 60% 0.41 0.46 0.51 0.57 0.63 65% 0.45 0.49 0.54 0.59 0.65 70% 0.49 0.53 0.57 0.62 0.68 759; 0.54 0.58 0.62 0.66 0.68 0.71 8090 0.60 0.63 0.66 0.70 0.72 0.74 85% 0.66 0.68 0.71 0.75 0.77 0.79 90% 0.73 0.75 0.77 0.80 0.82 0.83 950% 0.80 0.82 0.84 0.87 0.88 0.89 100% 0.89 0.90 0.92 1 0.94 0.95 0.96 TYPE B NRCS HYDROLowc Sons GROUP 0% 0.02 0.08 0.15 0.25 0.30 0.35 5% 0.04 0.10 0.19 0.28 0.33 0.38 10% 0.06 0.14 0.22 0.31 0.36 0.40 1590 0.08 0.17 0.25 0.33 0.38 0.42 20% 0.12 0.20 0.27 0.35 0.40 0.44 25% 0.15 0.22 0.30 0.37 0.41 0.46 30% 0.18 0.25 0.32 1 0.39 0.43 1 0.47 35% 0.20 0.27 0.34 0.41 0.44 0.48 40% 0.23 0.30 0.36 0.42 0.46 0.50 45% 0.26 0.32 0.38 0.44 0.48 0.51 5010 0.29 0.35 0.40 0.46 0.49 0.52 55% 0.33 0.38 0.43 0.48 0.51 0.54 60% 0.37 0.41 0.46 0.51 0.54 0.56 65% 0.41 0.450.94 .54 0.57 0.59 70% 0.45 0.49.58 0.60 0.62 75% 0.51 0.64.62 0.64 0.66 80% 0.57 0.59.66 0.68 0.70 85% 0.63 0.66.72 0.73 0.75 90% 0.71 0.73.78 0.80 0.81 95% 0.79 0.81.85 0.87 0.88 100% 0.89 0.90 0.95 0.96 08/2006 Urban Drainage and Flood Control District RO-11 DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3-41ecommended Percentage bnperAousness Values Land Use or Surface Characteristics Percentage Impevviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family Muni -unit (detached) 60 Mufti -unit (attached) 75 Ha:ff-acre lot or larger w Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off -site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 See Figures RO-3 through RO-5 for percentage imperviousness. CA = KA + (L31i3-1.44i2 + 1.135i - 0.12) for CA-2: 0, otherwise CA = 0 CCo = KC" + (0.858i3 — 0.786i 2 + 0.774i + 0.04) Cg = (C A + Ccn )12 082006 Urban Drainage and Flood Control District (RO-6) (Rai) Ras APPENDIX B ' Cumulative Runoff Method for Sizing Detention Ponds -POND 1 1 I I u .1 i .1 -_ 1 Design Storm Release Rate Area Runoff Coefficient Initial Time Time Increment 100- cfs I00-yr release acres Legend input variable minutes calculation minutes fixed input 1.27 0.25 0.78 5.00 1.00 Inflow Inflow Release Storage Storage Time Intensity Rate Volume Volume Volume Volume min i h cfs cf cf cf ac-ft 5.00 9.95 1.94 582 381 201 0.00 6.00 9.31 1.82 654 457 196 0.00 7.00 8.80 1.72 721 533 187 0.00 8.00 8.38 1.63 784 610 175 0.00 9.00 8.03 1.57 846 686 160 0.00 10.00 7.72 1.51 903 762 141 0.00 11.00 7.42 1.45 955 838 117 0.00 12.00 7.16 1.40 1005 914 91 0.00 13.00 6.92 1.35 1053 991 62 0.00 14.00 6.71 1.31 1099 1067 32 0.00 15.00 6.52 1.27 1144 1143 1 0.00 16.00 6.30 1.23 1179 1219 40 0.00 17.00 6.10 1.19 1213 1295 -82 0.00 18.00 5.92 1.15 1247 1372 -125 0.00 19.00 5.75 1.12 1278 1448 -170 0.00 20.00 5.60 1.09 1310 1524 -214 0.00 21.00 5.46 1.06 1342 1600 -259 -0.01 22.00 5.32 1.04 1369 1676 -307 -0.01 23.00 5.20 1.01 1399 1753 -353 -0.01 24.00 5.09 0.99 1429 1829 -400 -0.01 25.00 4.98 0.97 1457 1905 448 -0.01 26.00 4.87 0.95 1481 1981 -500 A -1 27.00 4.78 0.93 1510 2057 -547 -0.01 28.00 4.69 0.91 1536 2134 -597 -0.01 29.00 4.60 0.90 1561 2210 -649 -0.01 30.00 4.52 0.88 1587 2286 -699 -0.02 31.00 4.42 0.86 1603 2362 -759 -0.02 32.00 4.33 0.84 1621 2438 -817 -0.02 33.00 4.24 0.83 1637 2515 -878 -0.02 34.00 4.16 0.81 1655 2591 -936 -0.02 35.00 4.08 0.80 1671 2667 -996 -0.02 36.00 4.01 0.78 1689 2743 -1054 -0.02 37.00 3.93 0.77 1701 2819 -1118 -0.03 38.00 3.87 0.75 1721 2896 -1175 -0.03 39.00 3.80 0.74 1734 2972 -1238 -0.03 40.00 3.74 0.73 1750 3048 -1298 -0.03 41.00 3.68 0.72 1765 3124 -1359 -0.03 42.00 3.62 0.71 1779 3200 -1422 -0.03 43.00 3.56 0.69 1791 3277 -1486 -0.03 44.00 3.511 0.68 1807 3353 -1546 -0.04 Page 1 of 2 45.00 3.46 0.67 1822 3429 -1607 -0.04 46.00 3.41 0.66 1835 3505 -1670 -0.04 47.00 3.36 0.66 1848 3581 -1734 -0.04 48.00 3.31 0.65 1859 3658 -1799 -0.04 49.00 3.27 0.64 1875 3734 -1859 -0.04 50.00 3.23 0.63 1890 3810 -1920 -0.04 51.00 3.18 0.62 1898 3886 -1989 -0.05 52.00 3.14 0.61 .1910 3962 -2052 -0.05 53.00 3.10 0.60 .1922 4039 -2116 -0.05 54.00 3.07 0.60 1940 4115 -2175 -0.05 55.00 3.03 0.59 1950 4191 -2241 -0.05 56.00 2.99 0.58 1959 4267 -2308 -0.05 57.00 2.96 0.58 1974 4343 -2369 -0.05 58.00 2.92 0.57 1982 4420 -2438 -0.06 59.00 2.89 0.56 1995 4496 -2501 -0.06 F60.Obl 2.86 0.56 2008 4572 -2564 -0.06 LVI CI 0.00lac-ft ?A - r- L i d- Page 2 of 2 ' Cumulative Runoff Method for Sizing Detention Ponds- POND 2 fl 11 11 t 1 Design Storm Release Rate Area Runoff Coefficient Initial Time Time Increment 100- r cfs 100-yr release acres Legend input variable minutes calculation minutes fixed input 0.96 0.26 0.81 5.00 1.00 Inflow Inflow Release Storage Storage Time Intensity Rate Volume Volume Volume Volume min i h cfs cf cf cf ac-ft 5.00 9.95 2.10 629 288 341 0.01 6.00 9.31 1.96 706 346 360 0.01 7.00 8.80 1.85 778 403 375 0.01 8.00 8.38 1.76 847 461 386 0.01 9.00 8.03 1.69 913 518 395 0.01 10.00 7.72 1.63 975 576 399 0.01 11.00 7.42 1.56 1031 634 398 0.01 12.00 7.16 1.51 1086 691 394 0.01 13.00 6.92 1.46 1137 749 388 0.01 14.00 6.71 1.41 1187 806 381 0.01 15.00 6.52 1.37 1236 864 372 0.01 16.00 6.30 1.33 1274 922 352 0.01 17.00 .6.10 1.28 1310 979 331 0.01 18.00 5.92 1.25 1346 1037 310 0.01 19.00 5.75 1.21 1380 1094 286 0.01 20.00 5.60 1.18 1415 1152 263 0.01 21.00 5.46 1.15 1449 1210 239 0.01 22.00 5.32 1.12 1479 1267 212 0.00 23.00 5.20 1.10 1511 1325 186 0.00 24.00 5.09 1.07 1544 1382 161 0.00 25.00 4.98 1.05 1573 1440 133 0.00 26.00 4.87 1.03 1600 1498 102 0.00 27.00 4.78 1.01 1631 1555 76 0.00 28.00 4.69 0.99 1659 1613 47 0.00 29.00 4.60 0.97 1686 1670 15 0.00 30.00 4.52 0.95 1713 1728 -15 0.00 31.00 4.42 0.93 1731 1786 -54 0.00 32.00 4.33 0.91 1751 1843 -92 0.00 33.00 4.24 0.89 1768 1901 -133 0.00 34.00 4.16 0.88 1787 1958 -171 0.00 .35.00 4.08 0.86 1804 2016 -212 0.00 36.00 4.01 0.84 1824 2074 -249 -0.01 37.00 3.93 0.83 1837 2131 -294 -0.01 38.00 3.87 0.82 1858 2189 -331 -0.01 39.00 3.80 0.80 1873 2246 -374 -0.01 40.00 3.74 0.79 1890 2304 -414 -0.01 41.00 3.68 0.78 1907 2362 455 -0.01 42.00 3.62 0.76 1921 2419 498 -0.01 43.00 3.56 0.75 1934 2477 -542 -0.01 44.00 3.511 0.74 1952 2534 -583 -0.01 I Page 1 of 2 45.00 3.46 0.73 1967 2592 -625 -0.01 46.00 3.41 0.72 1982 2650 -668 -0.02 47.00 3.36 0.71 1995 2707 -712 -0.02 48.00 3.31 0.70 2008 2765 -757 -0.02 49.00 3.27 0.69 2025 2822 -798 -0.02 50.00 3.23 0.68 2041 2880 -839 -0.02 51.00 3.18 0.67 2049 2938 -888 -0.02 52.00 3.14 0.66 2063 2995 -932 -0.02 53.00 3.10 0.65 2076 3053 -977 -0.02 54.00 3.07 0.65 2095 3110 -1016 -0.02 55.00 3.03 0.64 2106 3168 -1062 -0.02 56.00 2.99 0.63 2116 3226 -1110 -0.03 57.00 2.96 0.62 2132 3283 -1151 -0.03 58.00 2.92 0.61 2140 3341 -1201 -0.03 59.00 2.89 0.61 2155 3398 -1244 -0.03 60.00 2.86 0.60 2168 3456 -1288 -0.03 S`JN Ict 0.01lac-ft J Page 2 of 2 Calculations for Outflow Project: Calculations By: Project No.: 2008-148 Pond ID: Pond 1 Oakridge Buisness Park Date: 02/02/09 Type of Outlet•: Circular Or' ice Type of Outlet: Weir Diameter =M inches Length = 2.01 Invert=ft Height = 1.00 Centroid Elevation =ft 100-yr Runoff- 6.02 100-yr WSEL=ft Head=ft Orifice Coefficient = Weir Coefficient = 3 Orifice Area =sf Max. Discharge = 0.00 cfs Max. Discharge = 6.03 0 Calculations for Outflow Project: Calculations By: Project No.: 2008-148 Pond ID: Pond 2 Oakridge Buisness Park Date: 02/02/09 Type of Outlet: Circ far Orifice Type of Outlet: Weir Diameter = inches Length = 0.91 Invert= ft Height = 0.50 Centroid Elevation \-. ft 100-yr Runoff-- 0.96 100-yr WSEL= ft Head= 0. 0 ft Orifice Coefficient = /0.6 Weir Coefficient = 3 Orifice Area = 0.00 sf Max. Discharge = 0.00 cfs Max. Discharge = 0.96 I I 1 N j J 1 Q . � z 1 o �- 1 w = w 1 U � � -U 1 �z O z 00 U O 1 � L � W z o D p v I Qo D v v p a D ' /r \` T Ll ) pa a p o c Q v p ' d a p a p 1 0 W o c p D o p. a c p Q W W 9 v 8 p V. Q a' o '_ D a ,A�r' 1..� LLik ry D - o e O a � o D 8 a p Da W v p a v D a Wa 1 � r� r 1 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 z O Z LU 0 LLI O0- Z U w U) 0-0 Oz U<1 wU) C)o �o IRTn I z 0 U W (n Wcn n-�,-- Dz U w Q APPENDIX C t 1 1 1 1 Design Procedure Form: Porous Landscape Detention (PLD) Designer: Paul Bennett, PE Company: SA Myers, LLC Date: February 2, 2009 Project: Lot 1 Oakridge Buisness Park, Second Filing, P.U.D, Parking Lot Expansion Basin 1 Location: Fort Collins 1. Basin Storage Volume ( I, = 100% if all paved and roofed areas u/s of PLD) I, = 72.00 % A) Tributary Area's Imperviousness Ratio (i = la / 100) 1 = 0.72 B) Contributing Watershed Area Including the PLD (Area) Area = 3,920 square feet i AG(`CaSei C) Water Quality Capture Volume (WQCV) /iuYrcr-t/IQ1�� WQCV = 0.23 watershed inches tWQCV=0.8' f0.91 "13-1.19"Iz+0.78.01 D) Design Volume: VolpLD = (WQCV / 12) `Area Vol = 74 cubic feet 2. PLD Surface Area (APLD) and Average Depth (da,.) APLD = 100 square feet (from 74.31 square feet to 148.63 square feet) (day.: = (Vol / APLD), Min=0.5% Max=1.0') da,. = 0.74 feet 3. Draining of PLD (Check A, or 8, or C. answer D) Infiltration to Subgrade with Permeable Based on answers to 3A through 3D, check the appropriate method Membrane: 3(C) checked and 3(E) = no A) Check box if subgrade is heavy or expansive clay .. Underdrain with Impermeable B) Check box if subgrade is silty or clayey sand X Liner. 3(A) checked or 3(E) = yes C) Check box if subgrade is well -draining soil `X ` Underdrain with Non -Woven Geotextile Fabric: D) Check box if underdrains are not desirable or 3(B) checked and 3(E) = no if underdreins are not feasible at this site. 16-Mil. Impermeable Membrane with No Underdrain: E) Does tributary catchment contain land uses that may have 3(D) checked - Evapotranspiration only petroleum products, greases, or other chemicals present, such as gas station, esnoOther: hardware store, restaurant, etc.? IL_J 4. Sand/Peat Mix and Gravel Subbase (See Figure PLD-1) A) Heavy or Expansive Clay (NRCS Group D Soils) Present; 18" Minimum Depth Sand -Peat Mix with 8" Gravel Layer. 16-Mil. Perforated HDPE Underdrain Used. Impermeable Liner and a 3" to 4" Perforated HOPE Underdrain. B) Silty or Clayey Sand (NRCS Group C Soils) Present; Perforated HOPE Underdrain Used. X 18" Minimum Depth Sand -Peat Mir with 8" Gravel Layer and a 3" to 4" Perforated HDPE Underdrain w/ Non -Woven Pemeable Membrane. C) No Potential For Contamination And Well -Draining 18" Minimum Depth Sand -Peat Mix with Non -Woven (NRCS Group A or B Soils) Are Present; Underdrains Elliminated. Pemeable Membrane and No Underdrain (Direct Infiltration). D) Underdrains Are Not Desirable Or Are Not Feasible At This Site. 18" Minimum Depth Sand -Peal Mix with An Additional 18" Minimum Layer Sand -Peat Mix or Sand-Class'A' Compost Bottom Layer (Total Sand -Peat Depth of 36"). 16-Mil. Impermeable Liner Used. E) Other: Other: notes: WQBASINI, PLD 2/2/2009, 10:44 AM i 1 1 1 t 1 1 1 1 1 .1 1 A 1 1 1 1 Design Procedure Form:. Porous Landscape Detention (PLD) Designer: Paul Bennett, PE Company: SA Myers, LLC Date: February 2, 2009 Project: Lot 1 Oakridge Buisness Park, Second Filing, P.U.D, Parking Lot Expansion Basin 2 Location: Fort Collins _ 1. Basin Storage Volume ( I, = 100% if all paved and roofed areas uls of PLO) I, = 81.00 % A) Tributary Area's Imperviousness Ratio (i = 1.1100 ) i = 0.81 B) Contributing Watershed Area Including the PLO (Area) Area = 6,534 square feet //lLt"Lax +�-- C) Water Quality Capture Volume (WQCV) WQCV = 0.27 watershed inches (WQCV =0.8'(0.91'13-1.19-I'+0.78-M D) Design Volume: Volpw = (WQCV / 12)' Area Vol = 146 cubic feet 2. PLO Surface Area (APO) and Average Depth (dg,) APtD = 200 square feel (from 145.77 square feet to 291.55 square feet) (dw: = (Vol / APLD), Min=0.5', Max=1.0') dam, = 0.73 feet 3. Draining of PLO (Check A. or B, or C, answer D) Infiltration to Subgrade with Permeable Based on answers to 3A through 3D, check the appropriate method Membrane: 3(C) checked and 3(E) = no A) Check box if subgrade is heavy or expansive Gay Underdrain with Impermeable B) Check box if subgrade is silty or clayey sand Liner: 3(A) checked or 3(E) = Yes C) Check box if subgrade is well -draining soil . X - Underdrain with Non -Woven Geotextile Fabric: D) Check box if underdrains are not desirable or 0 3(B) checked and 3(E) = no if underdrains are not feasible at this site. 16-Mil. Impermeable Membrane with No Underdrain: E) Does tributary catchment contain land uses that may have 3(D) checked - Evapotranspiration only petroleum products, greases, or other chemicals - present, such as gas station, Other. r--yes —ono hardware store, restaurant, etc.? 4. SandlPeat Mix and Gravel Subbase (See Figure PLD-1) A) Heavy or Expansive Clay (NRCS Group D Soils) Present; 18" Minimum Depth Sand -Peat Mix with 8" Gravel Layer. 16-Mil. Perforated HDPE Underdrain Used. Impermeable Liner and a 3" to 4" Perforated HOPE Underdrain. B) Silty or Clayey Sand (NRCS Group C Soils) Present; Perforated HOPE Underdrain Used. X 18" Minimum Depth Sand -Peat Mix with 8" Gravel Layer and a 3" to 4" Perforated HDPE Underdrain w/ Non -Woven Pemeable Membrane. C) No Potential For Contamination And Well -Draining 18" Minimum Depth Sand -Peat Mix with Non -Woven (NRCS Group A or B Soils) Are Present; Underdrains Elliminated. Pemeable Membrane and No Underdrain (Direct Infiltration). 0) Underdrains Are Not Desirable Or Are Not Feasible At This Site. 18" Minimum Depth Sand -Peat Mix with An Additional 18" Minimum Layer Sand -Peat Mix or Sand-Class'A' Compost Bottom Layer (Total Sand -Peat Depth of 36"). 16-Mil. Impermeable Liner Used. E) Other: Other: Notes: WQBASIN2, PLO 2/2/2009, 10:45 AM . o `° 3 m -0 0 0 _>1 _ 0) o a E U E y N C >. m T E a) o E 'mC',cLi ami d c cd cc coQa O S+C Q C C O p CO cc CL e ' �' 0 U c• E c) co m CO U °' CL cc N O d ,., N :� cc a) = t C cc r_ 4) m 0 0 'or moy ) ya co a taU)3 u, > �$ 3 c 3 o v E 3 m o c °- ,e F- au)) _ m o o - w w. v Nc Owcmi Q� U oN 3m yyE c 0 Z �) o �? o m ami m 0 Fo�pa d 'ov -- n: a) c N o co # N y M O 0 a m yr c m Oo 0o o m m o A co w vm c m m J.o w v CL O y rn m w I j�`` > r� LD aXi (A a d y 0) n v@ t m c E n m ! o :��:_, , U v o— T'o a) >, a) u) a) : o m LU 0 0 c n a) F c 'o I- v co m c a) I'G i t: _j H a) a) d 0 m e c � c >Z a)1 Co�Ja) Lam! UQ) U rn > c > `� GrHAJ— U Q Q o= N L L C Q'CN CO m `-_I p::JaJ co > U � > >i f0 Z Q Q 0 [ J ' m m o U t� 1 c o mE ,G U CO } C d m'C J— U x.'0 O:? U a , .� . m ... a) `C O) O p p a1 �.1Trt Ci`!:=p 'O C 'O L •O C T III ' Q O BJ.=,N f0 �a) ET caNrm 1-0 °mCoca)Ev (D Z m 0) 3 0-0Q (Ca to C C 0 C C x o a) L - zw OJ UR' amp SCo c 7 W lL zw a) U) E O y Mn O O 0) :�..... i Q t d E d~ m mo SD `J o a co`r°_joo:3CL o m Q Q. I APPENDIX D i I 1 1 1 1 1 1 1 1 4;�' ``,;.�,�,� STORM DRAINAGE REPORT l5 `� FOR LEMAY-HARMONY SPECIAL IMPROVEMENT DISTRICT #78 (OAK RIDGE PORTION)bwf February 27, 1984 TO CITY OF FORT COLLINS FROM JAMES H. STEWART AND ASSOCIATES, IN,C. CONSULTING ENGINEERS I STORM DRAINAGE REPORT FOR LEMAY-HARMONY SPECIAL IMPROVEMENT DISTRICT #78 (OAK RIDGE PORTION) INTRODUCTION: That portion of the proposed Oak Ridge Subdivision which is to be included in the Lemay-Harmony Special Improvement District (S.I.D:) #78 is located in the'West half of the Northwest 1/4 of Section 6, Township 6 North, Range 68 West of the Sixth P.M. in the City of Fort Collins, Colorado. The site is zoned mostly Business, with some Residential. A primary reference is'. the McClelland and Mail Creek Major Drainageway Plan, December 1.980.. In this report, this study will be referred to as the McClelland Drainage Study. EXISTING DRAINAGE: .The McClelland Thalweg moves through the rth 1/4 of the proposed area in a Southeasterly.direction (See Exhibit #11. Drainage.moves toward the McClelland Thalweg South from Harmony and North from a mild ridge running. East and West through the Rule property. From this.same ridge, runoff moves South to an existing thalweg running East and West which is located approximately 500 feet North of the Oak Ridge South property line. 'Drain- - -age moves North to this thalweg from Mail Creek Ditch, which is located South of the Oak Ridge South property line (See Exhibit #1). PROPOSED SITE DRAINAGE: 1.. Oak Ridge Business Park, First Filing. The Oak Ridge Business Park, First Filing, is, shown as Phase 1 -on Exhibit #l. Proposed drainage in this area is described in the Oak Ridge Business Park, First Filing, Storm Drainage Report and the reader is referred to this report. The inlets as shown on Exhibit #1 show size of opening in parentheses. Several changes in the.original report have.been.made. Inlets A through D have been relabeled as follows: - Inlet A = SDI-3 Inlet.B = SDI-4 - Inlet C = SDI-2 Inlet D = SDI-1 (SDI = Storm Drain Inlet). -1- The inlets labeled .SDI-1, SDI-2 and SDI-4 each receive a 10-year design flow of 2.0 cfs. The inlet SDI-4 has been increased to a ' 10-foot-long inlet so that it can receive runoff from the East- bound lanes of Harmony Road once curb and gutter are placed along Harmony. This additional flow from Harmony equals 5.0 cfs. . The total flow entering inlet SDI-3 is 7 cfs. tThe storm drain between SDI-2 and the outlet into McClelland's Thalweg was increased from a 21-inch to a 24-inch to handle the ' additional flow from Harmony Road. Everything else is the same as spelled out in the Oak Ridge Business Park, First Filing, Storm Drain Report. The reader is referred to this report for specifics. . ' 2. Improvements to McClelland's Thalweg. McClelland's Thalweg, as it traverses through the Oak Ridge . property, is intercepted by two streets, Oak Ridge Drive and Wheaton Drive. At Oak Ridge, the 10-year developed flow equals 59.0 cfs and is carried under the road by three 36-inch culverts. The two inlets, SDI-12 and SDI-139 receive runoff from the street. The two are connected to one another via a 15-inch line. Another 15-inch-line exits SDI-13 and empties into McClelland's Thalweg. on the downstream side. Inlet SDI-12 receives 3.86 cfs and Inlet ' SDI-13 receives 2.51 cfs. The three 36-inch culverts have enough capacity to carry the 10-year combined channel and street flow which will not surcharge the system. All of the 100-year fully - developed flow, which equals 171 cfs, will be carried under the road at Oak Ridge (i.e., no overtopping will.occur). The 10-year developed flow to be carried under Wheaton is 90.0 cfs. ' This will require two 42-inch culverts. Two inlets, SDI-10 and SDI-11, receive runoff from the street. The two are connected.to one another via a 15-inch line. Another 15-inch line exits SDI-10 1 and empties into McClelland's Thalweg on.the downstream side. Inlet SDI-10 receives 3.63 cfs and Inlet SDI-11 receives 4.32 cfs. The 100-year fully -developed flow at Wheaton. Drive equals 367 cfs. Of this total, 214 cfs will pass throughthe culverts, while.the re- maining 153 cfs will pass over the top of Wheaton Drive with a depth at the crown not exceeding six inches. The channel sections for the improved McClelland Thalweg were. designed to carry 100-year flows"under fully -developed conditions. The channel sections vary as the thalweg moves across the Oak ' Ridge property. The locations of varying channel sections are shown in Exhibit #1 and the section details are shown on Exhibit #2. These sections are labeled A -A, B-B and C-C.. The off=site, 100-year fully -developed flow from McClelland's basin, after detention, equals 55 cfs. This flow enters the I -2- I 1 � proposed Oak Ridge site via an existing 27=inch by 44-inch arch pipe under Lemay and Harmony. Channel Section A-A,is designed to handle the off -site flow of 55 cfs. ' As the thalweg moves from Harmony to Oak Ridge Drive, the on - site runoff equals 1.1:6 cfs (A = 15.6 acres, C = 0.85 acres). This flow is added to the 55.0 cfs off -site flow. and equals a . 1 total of 171 cfs. Channel Section B-B is designed to handle this total flow: Similarly, the thalweg continues from Oak Ridge.Drive'to 1 Wheaton Drive, accumulating additional runoff from.a total -area of. 42.0 acres, which includes most of Oak Ridge Business Park,First Filing. The total flow, which includes the 55.0 cfs off -site flow, equals 367 cfs. Section C-C was designed to handle this total flow: 3. Storm Drain Design from Rule Drive to. Keenland Drive: The storm drain system'which carries the runoff from areas A, B, C, D and E is designed to carry 10-year fully -developed ' flows which will empty into the existing thalweg, located just East of the Wheaton - Keenland.intersection. (See Exhibit #1). Inlet SDI-9,1 ocated on the Northwest.corner of Wheaton and Rule, has a '24-inch stub -out which receives.a ' flow of 25.5 cfs and is transported South down Wheaton via a 24-inch storm drain .until it is intercepted by runoff from Area B.• At this point, the combined 10-year fully -developed ' flow from Areas A and B equals 48 cfs, and the storm drain in- creases to a 30-inch pipe, which goes all the way to:the manhole at the intersection of Wheaton and Keenland. ' This manhole also receives runoff from half the street of Rule Drive and Keenland Drive, and that portion ,of Wheaton between .Rule and Keenland. This 10-year flow equals 5.7 cfs.and empties ' .into Inlet SDI-8 (See Exhibit #1). A 15-inch line exits SDI-8 and taps directly into the side of the 34-inch by 53-inch oval _pipe which.carries runoff from Open Channel "A". ' Additional runoff enters the same manhole via.a 34-inch by 53-inch elliptical pipe. This is accumulative runoff from Area C and 240 off -site acres West of Lemay Avenue. Three.30-inch.culVerts (de- ' termined by others) carry. a 10-year existing -condition flow of 53 cfs from off -site under Lemay and empty into Open Channel "A". Open Channel "A" also.earries 10-year fully -developed runoff from Area C which, when combined with.the off -site flow, equals a total ' of 71 cfs. This total flow is conveyed to the manhole at the intersection of Wheaton and Keenland Drive via the 34-inch by 53-inch elliptical pipe. The combined 10-year flow which exits this manhole via a 38-inch by 60-inch elliptical pipe.equals 104 cfs. This flow then emptiesinto the existing thalweg East of the Wheaton-Keenland Drive intersection. ' -3- ' Inlets SDI-6 and SDI-7, located on the Northeast corner of Wheaton and Keenland, receive a total flow of 8.4 cfs.(4.2 cfs each) from Area D for 10-year fully -developed conditions. This flow is conveyed via a 15-inch and 18-inch..pipe to SDI-71 which 1 is located on the South side of Keenland. Inlet SDI-T receives 4.1 cfs from Area.E for 10=year fully -developed conditions: The total 10-year fully=developed flow from Areas D and E equals 11.7 cfs and empties into.the existing thalweg East of the Wheaton-Keenland intersection via an 18-inch pipe. The runoff for the remainder of land between.Area E and the South property. 1 line of Oak Ridge will find its way overland to.this thalweg. 4.. Major Storm Design from Rule Drive to Keenland Drive.. Open Channel "A" is designed to carry the 100-year off -site 1 existing -condition :flow West of Lemay and. the 100-year fully - developed flow from half of Area:C. This. total flow equals 125 cfs. See Exhibit #3 for a section detail of Open Channel "A". The portion of 125 cfs that is not taken 'by the storm drain system will spill -over the intersection into the existing -thalweg,'located on the East side of the Wheaton.- Keenland intersection. Runoff from Areas A, B and.half of C under 100-year fully developed conditions finds -its way down Wheaton Drive, where it is carried to and through the intersection of Wheaton and Keenland into the existing thalweg East of this intersection. The 100- year runoff for fully -developed conditions.from Area D spills over the intersection after the storm drain system reaches its capacity. The 100-year total flow at the entrance to the exist- ing thalweg just East of the Wheaton - Keenland intersection is 300 cfs. of this total, 116 cfs will pass through the culvert, ' while the remaining 184 cfs will overtap the Wheaton - Keenland intersection with a depth at the crown not exceeding six inches. 1 Designed by .Guy F. McCabe °- ' Written by Don J. McClelland 1 .- -4- [l 1 L l c.�Oi iPUTATIONSCa1STiEW ' lames H. Stewart & Associates, Inc. 214 N. Howes St. Ft. Collins, CO 805?1 13WIJ •;>33$ 3y:Date 'O/3 Client: FVeri ><!- En ie; prise ( Sheet No. : of LL '.hkd By: Date Project: Oalr if 15051 "es s pint'r 2-n Job No. 1 r .. ffrrlt......1\\\ Subject Lv�- ..1 o. F . : O«_ _ •;L id.. e_! 13 vs v keSS csL�—t2� �;✓i1_Td r44 lhk a:-.n_ y .I �, i � i�Vafvr�t� cirrG� an 1 ;: 'de:✓,2.t,`.aPr�ff:du. R esSS_e� 1 w i. :.',p...:...r:�d_o4-1 _ I -f�, - .-- ' e 41 res moo':..: r.b.. (},A'rinCi^+5 :u _ _. o •i s �fv c '.:, �ns+ir(i f'c.-I& 7:An O� 40'4 Jo 1 - �,.�-.�Z f , t : i Tom• LT(t 1 � �-.` i • : 1 ¢i9-}�,1 cFrc . f. f, I -;1 -� --�-; z --- ) uo.•."_ ti [ 1, u Ire - o 7`,_i..s_.wL� 1 ' i 1 I 11 11 I / / / / / IXIETINO it RYINS LINN" :L1IXTlF9fEEIIl1®® m1mmoglow �. . ( I � I I I ' APPROXIMATE LOCATION IIJJIIIII,,��aa{jI�j1j1jj OF ADJACENT STORM � FACILIRES (TYP) — — — — xx I (Umeat m nine TA IN4.U' \\ \D�arc tit,\ \\ 1 \ \ got GIDEWALK HASE� ROOF GRAIN 1 SWALE l \ 3' CONCRETE P \\ SIOEWAtK CHASE ` PAN LOT 1, CAKRIDGE BUSINESS %RK SECOND FILING, P.U. D` 4800 WHEATON DRIVE 2 STORY CONCRETE BUIIfI G \ E.F=4S74.18 LEGEND BASIN SIZE (ACRES) m0 YR FLOW (CFS) DESIGN POINT FmFaNss — RywP,ragml Ryan Ellx iIDe ECave1' (itl,M PO Gamma P2B53P STORM PPE (680) e000350 APPLICANT ` BnsriMem auNRlun uc 10947 E Better Place ` Auva CO 50013 ♦ J J \ LOCATION Win OF ADJACENTNKTIE OF POJACENT STORM ♦\ _ (TIP) 0 w w 120 o9 J Ql E �FACIUTIES ♦ N C O u CONCRETE PAN �'� \ �\ 4' CONCRETE PAN �NR *40 N. \ \\ W BENCWARK / \ RECOI£RED p113ELED'%' IN O NCRETE PAN New 29brea4.leaJ E-Vr \ 1 1 \ \ 1 / PART OF TRACT ., \ yy OAKRIDGE MULAGE P.U.O. \ NINTH FILINGSWALE ell, \ 4 \ (DRAINAGE, UTILITY AND \ 4' CONCRETE PAN LANDSCAPE EASEMENT \ PAN FOR ROOF DRAIN ROOF GRAN //WADC/2C/y NECKED l'Wo NECKED .......•-'�\W HECKED HECKED UTILITY PLAN City Engineer BY Winter a Wgatewnter utility BY StormwOter Utility BY Pert h Recreemn BY: Traffic Engineer w w U� Oz = J Q Z d w K� UQ U0 ZQ Z K Y U O �a Q O JI% THE EXISTING FINISH FLOOR ELEVATIONS SHOWN ARE A MINIMUM OF 1' ABOVE THE 100—YEAR WATER SURFACE ELEVATIONS FOR THE PROPOSED PONDS. anum I � I I I I I APPROkkCENT LOCATION Es ADJACENT STORN Tjj — FACILITIES (iYP) — — _... _ I�IW�CI'I I 400 ♦ 0 AItPROXWTE STORM EX. HASL FACILITIES (TIP) TION IX. SIDEWCE ♦ IX. 3' CONCRETE PAN ♦ NEW 2' SIDEWALK CHASE DETENTION POND 1 ♦♦ \ REOD 100—YR VOLUME-241CF REOD WOCV=24CF ` PWMDO-315CF TOTAL VOLUME 100—YR WSEL-4967.31 WO WSEL=4966.31 POROUS LINCSCAPE DETENTION (SEE DETAIL SHEET T) 2' CURB C LEGEND WIN SIZE (ACRES) too YR FLOW ICES) DESIGN POINT 1770!NPPE IX. 4CONCRETE PAN }w-� (LOWER Matl:tLM03 CI®f) \ NEW 2 CHASE ' 101 \ -V. UNITS OF 100-YR PONDING AREA / \ \ ARE SHADED GYP) x' case cur ♦ L DETENTION PONO2 REOD 100—YR VOLUME=479CF REOD WOLV=146CF i TOTAL VOLUME PRWDED=656CF \ 100—YR WSEL=4967.53 ` ^ / WO WSEL-4967.0 POROUS WIDSCAPE DETENTION \ \ W/ UNDERDRNN (SEE DETAIL SHEET )) 4' 2'WIN x 6" TALL CURB CUT \ NEW Y' pM3E IX. 4' CONCRETE PANU. PAN \ ` ROOF DRAINR TRACT C, ` \ /\ �OAKRIDGE VILLAGE P.U.D., / EX. ROOF DRMN • NINTH FILING City 0 Fort Collins, Colorado (DRAINAGE. UTILITY AND UTILITY PLAN APPROVAL LANDSCAPE EASEMENT APPROVED: City En9Tneer DAI NECKED BY: r DAl Water h Wastewater Utility 6xnoB trcF4 �o�.wes •.,.,ram NECKED BY' scormwater uunv DAl {(CHECKED BY* Parke x Reareman DA- `�> NECKED BY: _ ONAL EN TraKc Engineer DA �U�oS Hrrvrn Try mm N N m E O n O N N L E n y = m A � > gQ W O t has 2 ~ 1— aN N way cis 0 as n of 1- Tn w0 0 Lu a Oa O LU a L) a:0 wz_ 09 LU UT y W 0 Ya o 0