Loading...
HomeMy WebLinkAboutDrainage Reports - 04/13/1994DRAINAGE AND EROSION REPORT for Convenience Store, Gas Station and Car Wash At The Market At Horsetooth Commons P.U.D At Horsetooth Road and South Shields Street Fort Collins, Colorado by ADVANCED PROFESSIONAL ENGINEERING INC. P.O. Box 1391 Fort Collins, CO 80522 Phone A Fax (303)-484-0533 Project # 69-7N-27-124 March 28, 1994 ADVANCED PROFESSIONAL ENGINEERING INC. A ' REGISTERED PROFESSIONAL, CONSULTANT ENGINEERS AND LAND SURVEYORS P.O. BOX 1391, FORT COLLINS, COLORADO 80522-1391 USA ' p PHONE & FAX (303) 484-0533 March 28, 1994 ' E Wickham Gustafson Architects c/o Bob Gustafson 1730 South College Ave. Suit 202 Fort Collins, CO 80525 ' RE: Drainage and Erosion Report for Convenience Store, Gas Station And Car Wash at Horsetooth Road and Shields Street, ' Fort Collins, Colorado. Dear Bob: tThis is the final drainage and erosion control report for the proposed convenience store, gas station and car wash with two ' drive -ways and parking lots to be located At the Northwest corner of Horsetooth Road and Shields Street. The legal description of the site is Lot 1 of The Market At Horsetooth Commons P.U.D. a Replat of Tract D of Horsetooth Commons PUD, in the City of Fort tCollins, State.of colorado. The hydrology data and the hydraulic analysis presented here are in compliance with the City of Fort Collins " Storm Drainage Design Criteria", dated May 1984. The data and the analysis are determined based on the historic, proposed developed conditions and according to the Drainage Master Plan for Foothills Basin ' (Basin G), dated February 1981. A variance is requested here for the size of the orifice to be installed at the inlet of the 15 inch storm drainage pipe, from 2 ' inch to 4 inch, since a 2 inch is very small and may plug the entrance which will cause obstruction of flow at the inlet and since the size of the pipes downstream are large enough (15 inch ' and 36 inch) to carry 0.94 cfs instead of 0.50 cfs. If you have any further questions or need any more information please feel free to call me at (303)-484-0533 Sincerely, k d Colorado Reqistered H ' SUBDIVISION PLANNING AND DESIGN - SOIL AND GEO-TECHNICAL INVESTIGATIONS - FOUNDATION, STRUCTURE DESIGN AND INSPECTION - DRAINAGE, FLOOD CONTROL PLANNING AND DESIGN - ENVIRONMENTAL ASSESSMENT - CONSTRUCTION MANAGEMENT TABLE OF CONTENTS Title ?Age - INTRODUCTION 1 SITE LOCATION AND CONDITIONS 1 HYDROLOGY AND HYDRAULICS ANALYSIS 2 PROPOSED CONSTRUCTION 5 SUMMARY 6 DISCUSSION 7 DETENTION POND SIZE 7 EROSION CONTROL REPORT 9 OVERLAND TIME OF FLOW 16 RAINFALL INTENSITY DURATION CURVE 17 l I DRAINAGE REPORT ' INTRODUCTION This drainage report provides the hydrology data using City of ' Fort Collins rainfall data and utilizes hydraulic analysis to determine historic, existing and proposed drainage conditions for the proposed convenience store, gas station and car wash to be located at Northwest Corner of Horsetooth Road and Shields ' Street. The site legal description is Lot 1 of The Market At Horsetooth Commons P.U.D., a Replat of Tract D of Horsetooth Commons PUD. This drainage report is prepared and compiled based ' on the following references; 1- Storm Drainage Criteria, City of Fort Collins, May 1984. ' 2- Drainage Master Plan for Foothills Basin (Basin G), by Resource Consultants, dated February 1981. 3- The Market at Horsetooth Commons PUD Plat by King & Associates, approved and recorded on July 1987, # M-74-1438. ' 4- Drainage, grading and Utility Plans for The Market at Horsetooth Commons PUD Tract D by Redpeak Engineering dated January, May and revised in June 1987. All plans were approved by the City of Fort Collins July 1987. 5- As built survey, topographic and contour maps prepared by Advanced Professional Engineering Inc., October 1993. ' SITE LOCATION AND CONDITIONS The site is located at Northwest Corner of Horsetooth Road and ' South Shields Street, Fort Collins, Colorado. The site is bordered by S. Shield Street on the East side, Horsetooth on the South side and by three other private drives along the West, ' Northwest and North sides. The site is located in the Foothills basin (Basin G). The site is part of The Market At Horsetooth Commons P.U.D., which is located in Southeast 1/4 of Section 27, Township 7 North, Range 69 West of the 6th P.M. All the streets have curbs, gutters and sidewalks. There are two curb cuts and driveways existing on two of the private drives. The existing condition of the lot is vacant and situated in a depression below the adjacent streets. The existing general topography of the site is relatively flat with slight overall ' slope of 1.7%.from Southwest to Northeast. The runoff is drained by an intake storm drainage box connected to an 15 inches storm sewer. The ground is covered with local Hay, native grasses and wild weeds which grow all over the field. There are no trees on ' the property. The total area of the site is 0.906 acres or 39,475 square feet. The total area was obtained from the recorded Plat of The Market At Horsetooth Commons PUD, by King & Associates, ' approved and recorded on July 1987, # M-74-1438. [] 11 1 HISTORIC DRAINAGE CONDITIONS The site is part of Tract D of Horsetooth Commons PUD. The site is called area III in the drainage study by Redpeak Eng., June 1987. The site has a native hay ground cover. The topography of the site is generally flat with a slight slope of 1.0% from West to East. The runoff was generally flowing from West to East as a sheet flow. Under historical conditions for grass land with 1.33% slope is equal to 0.30 (based on Redpeak Eng. report Appendix I). HYDROLOGY DATA AND HYDRAULICS ANALYSIS The site is part of the Market at Horsetooth Commons PUD Overall Drainage & grading Plan dated January 1987. Which is also a part of the Drainage Master Plan for Foothills Basin (Basin G), dated February 1981. This report will present and discuss the historic, existing and the proposed conditions. Since the site had been developed, streets, curbs, gutters and sidewalks have already been built around the lot. There are two curb cuts and drive approaches existing on two of the private drives. The total area involved in this drainage study is 39,475 square feet or 0.906 acres gross. Since the area is far less than 200 acres, the Rational Method to calculate the storm runoff quantity can be used. The site is zoned commercial (business), although a 10 year initial historic storm is assumed, this report will use the 2 year initial historic storm since Redpeak Eng. report used the 2 year historic storm (from table # 3-1, page 3-1 Storm Drainage Design Criteria). The historic runoff is calculated for the site as follows; I. Estimated runoff quantity "Q" in cfs, under historic conditions for 2 year storm, based on design storm frequencies for natural ground area; 1. The Rational Method runoff coefficient for 39,475 square feet under historic conditions for grass land with 1.33% slope is equal to 0.30 (based on Redpeak Eng. report). 2. Time of concentration in minutes; T� = 1.87 x (1.1 - CXCf) x (L1 1/2 = 21.08 SI/j Where; TC Time of Concentration, minutes A Area of the site in acres = 0.91 acres S = Slope of basin S8 = 1.33% Cf = Frequency adjustment factor for 10 yr = 1.0 C = Rational Method Runoff Coefficient = 0.30 L Length of Basin in feet = 240 feet Also, from Figure 3-2, Ta = 21.0 minutes 2 3. Precipitation in inches/hour using Rainfall Intensity Duration Curves for 2 year frequency for City of Ft. ' Collins, from figure 3-1. I = Rainfall intensity = 1.80 inches/hour ' 4. Runoff quantity for undeveloped conditions; Q = C (C{) IA Where; ' Q = Flow quantity, cfs A = Total area of basin = 0.91 acres ' C = Runoff coefficient = 0.30 Cf = Frequency adjustment factor = 1.0 I = Rainfall intensity = 1.80 inches/hour Then Q2 = 1.0 x 0.3 x 1.80 x 0.91 - 0.50 cfs Qio = 1.0 x 0.3 x 3.2 x 0.91 - 0.87 cfs ' And Qioo = 1.25 x 0.30 x 5.10 x 0.91 = 1.73 cfs ' EXISTING DRAINAGE CONDITIONS The streets, curb, gutter and sidewalks are already built around the site as part of development of The Market PUD. The existing ' flow around the streets is a gutter flow as shown on the drainage plan of Redpeak Eng. The runoff along the South side of Horsetooth Road drains along the gutter to the East and via a t sidewalk chase inlet on Shields Street at the corner. The runoff along the East side of South Shields Street drains along the gutter to the South and into the storm drainage intake at the ' corner of Richmond Dr., and Shields Street. The runoff pattern of the streets is not changing. According to Redpeak Eng's drainage report and plans, the ' northwest portion of lot 1 is used as 100 year flood and as a detention pond (A) for Area I of Tract (D). This portion of lot 1, which includes also portions of streets (private driveways) is ' equal to 3,485.00 square feet or 0.08 acres. This area is draining into detention pond (A). ' The Existing drainage condition over the undeveloped area is a sheet flow over the entire site from the Southwest to the Northeast with an average slope of 1.7%, which help provide a sufficient drainage condition. There is a 2x3 feet intake storm ' drainage box connected to a 15 inch• reinforced concrete (RCP) storm sewer pipe, which is connected to a 36 inch RCP main storm sewer line. In Redpeak drainage report, the report shows a four inch orifice to be installed on the inlet of the pipe. 1 3 ' The following is the site data; Site Area Gross = 39,475 S.F. ( 0.91 Acres) ' Net _ 33,421 S.F. ( 0.767 Acres) Street R.O.W 6,054 S.F. (15.3%) Conc. Drive & Side Walk = 11350 S.F. ( 3.4%) ' Undeveloped Area 32,071 S.F. (81.3%) II. Estimated runoff quantity "Q" in cfs, under existing ' conditions for 10 year storm, based on design storm frequencies for existing paved, concrete and natural ground areas. ' 1. The runoff coefficient for roof, concrete and pavement is equal to 0.95. The runoff coefficient for grass with a slope of 1.7% is equal to 0.20. ' land Cover Area Area Runoff sq.ft. Acres Coeff. ' Perimeter streets 61,054 0.14 0.95 Sidewalks/Curb & Gut. 1,350 0.03 0.95 Natural Open Space 32,071 0.74 0.20 ' Total Area 39.475 0.91 0.34 ' 2. Time of concentration in minutes; A = Area of the site in acres = 0.91 acres S = Slope of basin S% = 1.70% ' Cf = Frequency adjustment factor for 10 yr = 1.0 C = Weighted Runoff Coefficient = 0.34 L = Length of Basin in feet - 190 feet (from the ' highest point at the Southwest corner to the existing intake drainage box). Then ' TC 16.5 minutes, from Figure 3-2. 3. Precipitation in inches/hour using Rain Fall Intensity Duration Curves for 2 year frequency for City of Ft. ' Collins, from figure 3-1. I = Rainfall intensity = 2.05 inches/hour ' 4. Runoff quantity for existing conditions; ' Q2 = 1.0 x 0.34 x 2.05 x 0.91 - 0.63 cfs Q,0 = 1.0 x 0.34 x 3.6 x 0.91 = 1.11 cfs ' Qioo = 1.25 x 0.34 x 5.85 x 0.91 = 2.25 cfs 1] 4 I ' PROPOSED DEVELOPMENT The proposed construction consists ofdone story building, convenience store, gas station with ' attached car wash, a paved parking lot, two driveways and landscaped areas. The following is the site data; ' Site Area Gross = 39,475 S.F. ( 0.91 Acres) Less R.O.W. Net = 33,421 S.F. ( 0.767 Acres) Building Area 3,125 S.F. ( 7.9%) Parking & Drives = 19,138 S.F. (48.5%) Landscape Area = 11,158 S.F. (28.3%) Street R.O.W 6,054 S.F. (15.3%) ' DEVELOPED DRAINAGE CONDITIONS III Estimated Runoff Quantity "Q" for 100 year in cfs for the developed conditions; The runoff coefficient for Roof, Concrete and pavement is equal to 0.95. The runoff coefficient for grass is equal to 0.20. land Cover Area/sq.ft. Area/acre Runoff/Coeff. ' Building Area = 3,125 S.F. 0.07 0.95 Parking & Drives = 19,138 S.F. 0.44 0.95 Street R.O.W = 61054 S.F. 0.14 0.95 ' Landscape Area = 11,158 S.F. 0.26 0.20 Total Area = 39,475 S.F. 0.91 0.74 BASIN DELINEATION: The site including the private driveways and ' the surrounding area is divided into 3 basins. The following are the three basins; ' Basin "A" is the main basin for the site which includes the building, gas pump area and the parking lot, it is called area III in Redpeak drainage report. The total area of Lot 1 is equal 39,475 square feet. Total area of basin "A" is 30,407 square feet or 0.70 Acres. Since the slope of this basin is toward the northeast and since the existing storm sewer inlet box is in the northeast corner, then the location of the detention pond is chosen at the northeast corner of the lot. Basin "A" runoff drains into a 2x3 feet intake storm drainage box connected to an 15 inches reinforced concrete (RCP) storm sewer pipe, with a 4 t inch orifice. The 15 inch storm sewer pipe is connected to a 36 inch RCP main storm sewer line (see drainage plan). ' Basin "B" is for area I and area II (Redpeak drainage report) which includes the northwest portion of the site (Lot 1) and portions of private driveways. The area of lot 1 that is located in basin "B" is 4,716 square feet or 0.11 Acres. All of basin "B" ' drains through detention pond "A", which drains into the inlet H- 3 (Redpeak drainage report). The inlet is connected to 15 inch storm sewer pipe which is connected to a 36 inch RCP main storm ' sewer line. Portion of lot 1 is used as 100 year flood and detention pond (A) for Area I of Tract (D). This portion of lot 1 is also draining into detention pond (A). (see drainage plan). ' 5 ' Basin "C" is that portion along the north side of Horsetooth Road and along the west side of Shields Street. The area of Lot 1 that is located in basin "C" is 4,300 square feet or 0.10 Acres. ' Portion of basin "C" runoff drains into a storm drainage inlet at the northwest corner of Horsetooth Road and Shields street. The inlet is connected to a 36 inch RCP main storm sewer line. The ' other portion of the runoff drains south along the west side of Shields Street and into an inlet at the southwest corner of Shields Street and Richmond Drive (see drainage plan). ' BASIN "A" The total area contributing to basin A runoff is equal to 30,459 ' square feet. The net area contributing to the detention pond on lot 1 is equal to the followings; ' land Cover Area/sq.ft. Area/Acr Runoff/Coeff. Building Area = 3,125 S.F. 0.07 0.95 Parking & Drives = 19,138 S.F. 0.44 0.95 ' Street R.O.W 2,254 S.F. 0.05 0.95 Landscape Area 5,942 S.F. 0.14 0.20 Total Area = 30,459 S.F. 0.70 0.80 ' 1. Calculated composite runoff coefficient is equal to C = (0.07+0.44+0.05)x0.95 + 0.14x0.20 = 0.80 0.70 2. Time of concentration in minutes; Basin Length -flow path; ' Overland Flow from high point to he gutter 70 feet with slope of 0.4%, then T� = 6.5 Min. Gutter Flow for 260 feet with 1.0% Slope and an average velocity of 2.0 fps, then TC ' = 2.2 Min. Total TC = 6.5 + 2.20 = 8.70 minutes, ' 3. Precipitation in inches/hour from figure 3-1. I = 7.30 inches/hour ' 4. Runoff quantity for proposed development; ' Qz = 1.0 x 0.80 x 3.0 x 0.70 = 1.68 cfs Q,0 = 1.0 x 0.80 x 5.20 x 0.70 = 2.90 cfs ' Qioo = 1.25 x 0.80 x 7.30 x 0.70 = 5.11 cfs 1 6 I ' SUMMARY OF RUNOFF The developed area is divided into three basins "A", "B" and "C". ' The total runoff for the 100 year major storm is equal to Qoo = 5.11 cfs. The developed runoff from basin B and C is minima . The total runoff for the 2 year minor storm for the entire area is ' equal to 0.50 cfs. The difference between 100 year storm and 2 year storm which is equal to 4.61 cfs will be required to be detained. The discharge out of the detention pond will be limited ' to the allowable historical release flow of 0.50 cfs. A 4 inches orifice will be installed at the inlet of the 15 inches storm sewer pipe to regulate the flow. ' Orifice equation to determine discharge through a 4" pipe orifice is: Q = AxV = AxC(2xgxh)1/2 Where g = 32.2 ft2/sec. A = Area of the orifice, V = Velocity of flow. h = Head of water in feet, C = Discharged Coefficient. Then the discharge = 0.087x0.6(2x32.2x 5.0)1/2 = 0.94 cfs. DISCUSSION 1 According to the City of Fort Collins's Drainage Design Criteria, a detention pond is needed to detain the difference between the ' 100 year major flood storm and the 2 year minor flood storm. The following assumptions have been considered in determining the location, type and size of the detention ponds; 1. No other off site runoff is entering the proposed developed. Except for basin B and C runoff there is no other runoff from lot 1 is exiting the site. ' 2. Since the slope of the site is toward the Northeast, and since the storm sewer inlet box with 15 inches storm sewer ' pipe is in the Northeast corner, then the location of the detention pond is chosen at the Northeast corner of the lot. The site of the detention pond is shown on drainage plan. 3. All surface drainage from the site except basin B and C will be directed to the Northeast and into the detention pond, then through the 15 inch storm drainage sewer pipe, then ' into a 36 inch storm sewer pipe along the west side of Shields Street. ' 4. The historical and developed runoff of lot 1 as determined in this report is within the values of that in Redpeak drainage report, which is already planned in Drainage Master ' Plan for Foothills Basin (Basin G), dated February 1981. 5. The existing flow around the streets surrounding the site is a gutter flow as shown on drainage plan. The runoff along north side of Horsetooth Road drains along the gutter to the east, then south along Shields Street into a sidewalk inlet ' 7 1 I I 1 1 [1 1 1 1 d IJ at the northwest corner of Shields and Horsetooth Road. The inlet is connected to 36 inches RCP storm sewer pipe draining south along Shields Street. The runoff along west side of South Shields Street drains south along the gutter into storm drainage intake at southwest corner of Richmond Dr., and Shields Street. Drainage runoff pattern of all streets is still the same as planned by Redpeak report. DETENTION POND SIZE Mass Diagram; Total Discharge Historic Required Time I CfCA Q,00 Volume QZ Volume Storage Min. Sec. In /hr Acre cfs Ft3 cfs Ft3 Ft3 5 300 8.6 0.70 6.0 1,806 0.50 150 11,656 10 600 7.2 0.70 5.0 3,024 0.50 300 2,724 20 1,200 5.2 0.70 3.6 4,368 0.50 600 3,768 30 10,800 4.15 0.70 2.9 5,229 0.50 900 4,329 40 21,400 3.5 0.70 2.5 5,880 0.50 1,200 4,680 60 3,600 2.6 0.70 1.8 6,552 0.50 1,800 4,752* 90 5,400 .1.87 0.70 1.3 7,068 0.50 2,700 4,368 120 7,200 1.43 0.70 1.0 7,207 0.50 3,600 31,607 180 10,800 1.05 0.70 0.7 7,938 0.50 5,400 2,538 From the Mass diagram the maximum difference between 100 and 2 year storm is 4,752 cubic feet, which is required to be detained. Discharge out of detention pond will be limited to the allowable historical release flow of 0.50 cfs by using a 4" orifice. STORAGE VOLUME The volume needed to be retained is 4,752 cubic feet. The volume in the detention pond area is the storage volume between contour line of 5079.70 feet and contour line of 5081.50. The volume needed is determined using the following formula; Volume = d (A + B + (AB) 1/2 ) 3 Where; d = Depth between contour line ft. A = Surface area of top contour line. B = Surface area of bottom contour line. I t Storage volume between contours 5,079.70 and 5,080.00 is: A = 600.00 sq. ft., Surface area at contour line 5,079.70. B = 1,200.00 sq. ft., Surface area at contour line 5,080.00. ' with a depth of d = 0.30 feet, Then V, = 265.00 cubic feet Storage volume between contours 5,081.00 and 5,080.00 is: A = 1,200.00 sq. ft., Surface area at contour line 5,080.00. B = 3,317.00 sq. ft.,,Surface area at contour line 5,081.00. with a depth of d = 1.00 feet, Then V, = 2,170.00 cubic feet ' Storage volume between contours 5,081.00 and 5,081.50 is: A = 6,265.00 sq. ft., Surface area at contour line 5,081.50. B = 3,317.00 sq. ft., Surface area at contour line 5,081.00. ' with a depth of d = 0.50 feet, Then V, = 2,357.00 cubic feet The drainage inlet box has the size of 2.2x3.67x3.2 which can ' hold 25.84 ft3. Then total volume of detention pond is equal to = 25.84 + 265.00 + 2,170.00 + 2,357.00 = 4,817.84 ft3. Total storage volume provided by detention pond is equal to 4,817.84 ft3, which exceeds the needed storage volume of 4,752 ft3. The slope of the detention pond should not exceed 4:1. The inlet drainage box should be cleaned once a year at least before the ' rain season. The flow through the 15" storm seer pipe will be restricted to the allowable flow of 2.year storm of O.,Sp cfs by installing a 4" orifice at the inlet. The finished floor ' elevations of the proposed building is 5083.00. The high water line is at 5081.50. II EROSION CONTROL REPORT ' INTRODUCTION ' This erosion report provides the wind and rainfall erosion control plan using City of Fort Collins wind and rainfall data, for the new proposed convenience store, gas station and car wash to be located at Northwest Corner of Horsetooth Road and Shields Street, in the city of Fort Collins, State of Colorado. The total area of the site is 0.91 acres or 39,475 square feet. WIND AND RAINFALL EROSION CONTROL DURING CONSTRUCTION The entire site is in a moderate wind and rainfall erodibility zone. The undeveloped portion of the site is covered with local, native and wild grasses and weeds. There are no trees on the property. The development will consist of one story building of ' 2,515 square feet to be used as a convenience store, which is attached to 610 square feet car wash. A paved small parking lot and two driveways, staging and vacuum area totaling 19,138 square feet. The total landscaped area is equal to 11,158 square feet. ' There are 6,054 square feet of paved streets as half wright-of- away. The following is a break down of the site; ' 9 1 I ' Site Area Gross = 39,475 S.F. ( 0.91 Acres) Less R.O.W. Net = 33,421 S.F. ( 0.767 Acres) Building Area = 3,125 S.F. ( 7.9%) ' Parking & Drives = 19,138 S.F. (48.5%) Landscape Area = 11,158 S.F. (28.3%) Street R.O.W = 6,054 S.F. (15.3%) ' The landscaped area will be covered with sod, irrigated lawn, shrubs and trees (see landscape plan). All runoff flows from the ' site will be directed toward detention pond on site and then through drainage box inlet into 15" storm sewer pipe. WIND EROSION CONTROL PLAN Since the total area of the site is equal to 0.91 Acres which is less than one acre, then according to the City of Fort Collins ' Storm Drainage Criteria, May 1984, a wind erosion control plan is not required, but a rainfall erosion control plan is required. ' RAINFALL EROSION CONTROL PLAN The existing conditions of the site is covered with local, native and wild weed and grasses. Since the inlet drainage box and storm ' sewer pipe are in existing on site at the location of the detention pond then an area inlet filter will be installed around the existing drainage inlet box. The filter can be consisted of hay or straw bales to be placed around drainage inlet (as shown in the drainage plan) to prevent erosion and sediments from entering the storm sewer system. A silt fence is also proposed around the site as a silt and sediment trap which will reduce any ' additional erosion effect. A strip of 18' x 18' x 6" deep of gravel or crushed rocks are to ' be laid on the bare ground surface at both driveways during construction period to prevent dropping of sediment, silt and deposits from the work site to the streets. ' A = Area of the site in acres = 0.91 acres S = Average slope of basin = 1.70% Flow path (Labl) = 290 feet RAINFALL WIND ' 100% moderate 100% moderate 1 10 ' RAINFALL PERFORMANCE STANDARD Lb = Lebl = 290 feet ' Sb = 1.70% ' Performance Standard = 78.80% ( from table 8-A) RAINFALL EROSION CONTROL EFFECTIVENESS EFF = (1 - C x P) x 100 where EFF = Effectiveness M C = C-Factor (cover factor) P = P-Factor (Practice factor) ' Erosion Control C-Factor P-Factor Area Method Value Value Ac. Comment Established Grass 0.04 1.00 0.26 At landscaped area ' Roads & Streets 0.01 1.00 0.14 Existing Roughened ground 1.00 0.90 0.51 Construction site Sediment trap 1.00 0.50 N/A At inlet ' Straw filter 1.00 0.80 N/A At inlet Silt fence 1.00 0.50 N/A Around the site. ' Net C-Factor = (0.04x0.26 + O.01x0.14 + 1.Ox0.51)/0.91 = 0.59 (grass) (Street) (rough ground) Net P-Factor =(1.Ox0.26+1.Ox0.14+0.9x0.51)0.5x0.8x0.5/0.91 =0.19 (grass) (Street) (rough ground) ' EFFebl- (1 -C x P) x 100 _ (1 - (0.59 x 0.19) x 100 = 89% > 78.8% ' Since the net EFF is greater than PS (89% > 78.80%), the proposed erosion control methods will meet the City of Fort Collins requirements. 11 RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: Lot 1, The Market at Horsettoth Commons STANDARD FORM A COMPLETED BY: Advanced Professaional Eng. Inc. DATE: 3/30/94 DEVELOPED ERODIBILITY Asb Lsb.. Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) (%) (feet) M M Basin A Moderate 0.406 190 1.7 190 1.7 78.8 MARCH 1991 9.14 DESIGN CRITERIA 1 C [1 1 1 EFFECTIVENESS CALCULATIONS PROJECT: Lot 1 The Market at Horsetooth Commons STANDARD FORM B COMPLETED BY: Advanced Professional Eng Inc. DATE: 3/30/94 Erosion Control C-Factor P-Factor Method Value Value Comment Established Grass 0.04 1.0 0.26 acres at landscaped Roads & Streets 0.01 1.0 Already existing 0.14 Ac. Roughened ground 1.0 0.9 0.51 ac. construction area Sediment trap 1.0 0.5 At inlet Straw filter 1.0 0.8 Silt fence 1.0 0.5 Around the site MAJOR PS SUB AREA BASIN ($) BASIN (Ac) CALCULATIONS A 78.8% Net C-Factor=(0.04x0.26+O.O1x0.14+1.Ox0.51)/0.91=0.5 Net P-Factor=(1.Ox0.26+1.Ox0.14+0.9x0.51)0.5xO.8x0.5/ = 0.19 EFF.=(1-CxP)x100 _ (1 - (0.59 x 0.19) x 100 = 89% more than 78.82 %I ' MARCH 1991 8.15 DESIGN CRITERIA ' CONSTRUCTION SEQUENCE ' PROJECT: Lot 1 The Market at Horsetooth Commons STANDARD FORM C SEQUENCE FOR 19 94 ONLY COMPLETED BYs Advanced Professional EngDATEs3/30/94 ' Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Enginoer. ' YEAR 1994 1995 MONTH IAIMIJIJIAISIOIN IDIJ IF I M ■ I OVERLOT GRADING ' WIND EROSION CONTROL Soil Roughening Perimeter Barrier Additional Barriers ' Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL ' STRUCTURAL, Sediment Trap/Basin Inlet Filters Straw Barriers ' Silt Fence Barriers Sand Bags Bare Soil Preparation ' Contour Furrows Terracing Asphalt/Concrete Paving ' Other VEGETATIVE: ' Permanent Seed Planting Mulching/Sealant Temporary Seed Planting ' Sod Installation Netting,/Mats/Blankets Other STRUCTURES, INSTALLED BY General Contractor MAINTAINED BY _ Schrader Oil Co. ' VEGETATION/MULCHING CONTRACTOR General Contractor ' DATE SUBMITTED3hn./94 APPROVED BY CITY OF FORT COLLINS ON I MARCH 1991 9-16 DESIGN CRITERIA I [1 [1 1 1 1 0 1 1 COST ESTIMATE FOR EROSION CONTROL PLAN The erosion control plan requires the following: 1- Silt fence is proposed around the site. 800 liner feet of silt fence x 4 feet high of 6 mill at $ 20.00/100 feet long = 20 x 8 = $ 160.00 2- 10 pieces of hay or straw bales to be placed around drainage inlet. 10 pieces x $ 4.0 = $ 40.00 3- A strip of 18' x 18' x 6" deep of gravel or crushed rocks are to be laid on the bare ground surface at both driveways during construction period. The cost = 18x18x0.5x2 = 324 cubic feet = 12.00 cubic yard The cost = $ 250.00 4- 6,000 square feet of landscaped grass at the end of project cost = 6,000 x $ 0.25 = $ 1,500.00 Total cost = 160.00 + 40.00 + 250.00 + 1,500 = $ 1,950.00 Then 150% of the cost = 1.5 x 1,950.00 = $ 2,925.00, which is greater than the $ 1,000.00 minimum. 12 I 1 wz9 Vo Q:U 0 _ �v \1 �nl SOITHS�__-_—_ ....... ..... X 7LE 0 ; 41 754) LL 4) 'a Cq 0) W C.) M 4) Cl) � . 4) CO x uj w 0 cc Vf; 0 0 UC) LL w C o a ca 'ro ro-.s c 0 c 0— z Or 0 'a .2 VO '00 co, or ceg C 4) 11 r C o rn Q'i 2 '0 0 C4 0.- U Z 0 .0 E IV t: C 0 0g 0 9O'm 0 M"6 CL.0 10- ii 1* A" ............ 6012INS I " . . . . . . . . . . . t. 0 cn E Co 0 LM CL E moo z 4) *a CD U) cc ch U. D CO cn .J 0 z 0 cc 1-- 0 cc 4a :3 .11 0 Cl) 0 0 Cf) LL w cc m M at .2 2 -Z w to Ln m r- 'D 'o o or -0 (D u 4) '00 0 0,7 Sy Z 0) V 0 S 4110 , 09 0 0 C q N CX es U CD 0.! No Text No Text 6tormttor Mantas 1. 1f desatesing is "ad to mats It uti I it l at, a Rate ^c.. construction DasatermP wastewater Discharge Perms it required it discharged into s storm sewer, channel, irrigation ditch, or any warars of the United State• w 3. All Construction activities nn this site must comply with the S State of Colorado Permitting Process for Ltormater Discharges p Associated with Construction Activity For Information, please contact Colorado Department of Held Motor Guallty control E,j/ Division wQCp PS P=, 4300 Cherry Creel Drive South, Denver, IT/ Colorado 80222 153o Attention permits and Enforcement Section J Phone (303) 6921550 2 I 3. Prior to final inspection and acceptance by the City, a L certification f the drainage facilities by a registered engineer, YI _ most be submitted to and approved by the Ste rlmltter Utility. ALI t. Maintenance f all onslts and affairs drainage facilities will Ay be the responsibility of the owners s of the property. She owners 'I of the property at the present are Schrader Oil Co. ; Y „II T a / , 1�1 04 cps a .. Ir IA 0 55 \ RE j /1.A 21 I PpNO A IF AREA /r Cal =i[ &a ol U BASIN B d � �� � � J- � � ` - �TE 5 R I .. Vol LI ad, 5 �� k- e5 a a i - n.}., FAR san 7 508 10 A is aadd IF f'wa=5\ 5 �5e' 1 C i0]0 cum wedFDIC ! 4 / q e,.ez 9 z5 . n I i a a4M Ads 5,e ' L /.sue ��sm. I —_ .,� CDlaFIan 1 w E Sr `t� \ a,sr i an•i3 H. i TORE vat / /- - _aF-•c - k S_ n / .� \ ss `_ .r .w a ai o1 5 a�2 so i'Ear Last 5 wzIF qz,g A70 A / rwwpE owe PD i - �oev &' \ cI IAllulISE on IF JJ } 44 _IF SNn 39.a]s 1It 906 cr feet3,�{. r` 20 Iftl \ !,t , ea6tz Owl An e0ezo0 ��war. DECEL wE z 'awz.At 6esA._ _. . -., - �\ acres« _ r: IF on, III / II �HnRTTOOTH AVEb1kJ� / �• TYPICAL SECTION GRASS LOVED CHANNEL rYP nL SEI CONCRETE AD [role T iCw LE PAN 10 score G,. CLIC Veal Food Code =0,42 dnc •. 1_ yl Yl .wY OL NISL DATA: Site Are 6voe.e IF 09,475 S.P. 1 U.11 Acres) Lend RAM" Net - 33,421 S.F. C, 167 Lyres, H ildirg 111 3,125 S.F. 7.19) talking A F i - L9 30 5-1". 148.A) nddce from -e 11 1 6 .,I. 120. 1%) e2roet 8.0.14 - EFTA F.E. INS. 1\) 'A' �uNtt trill! wre 'At :;A I lECCI Sr4k_ GJT P K4[111iREV iI LALWN Z &h-1 y VMMARY OF µAIHAGE IV 1�0 P_ 1 - (tllJLITED INTO 67Y Historic Existing pevelaped / '1 L. Area Acred 0.91 0 91 0.70 1 4 240 nJ 26d.J L 1 Iel[h 1 : tl 3i0 :90 :e360 - 330 T:m 23.0 8 70 Ad. J '(F (' hrl 0.50 [.US ],loin / . Runoff [ 1 y (oft] 0.50 16 31 1.60 Runoff f 10 y 1_ 1=foI 0.8] It .90 Runoff for 100 yr lots) 1.73 2.a3 5.11 �. fly WTb 4 lTdAdEl BY Y/ECM1l.E fo HATCu 1 pESLNS[OX PO$0 6S0Ml < ORIGILE FELL ELATE Aliownblo I'll retel9e . p,s` -ty. A 6 inches orifice 'i1 he installed at the inlet of CM 15 The Jiff na - 4.61 fa. mats StOTM sewer pipe to regulate the flea. VI-VIld renpl R, 1. 1 Ro,two. Swi- volume, provided - e,. 81' 84 LL, feet.I 100 year high water RRS,, COI 50 Alan Inlet v , s,NA1,L DRAINAGE p]?SM-f419Y1 0 0 t 1 V: y IaQ', CI,Iddl 12. 0 12 EtHao Depth =001 RR 0.41 feet De pth f2, 25 en.. lope AREA IM ET FILTER STRAW BALES I led Al A, rl s.,.� T ^,, e % .i -Ne "�<ompwle Zj • �� . : "_, Ptww Were, I _ Li r. I - I_, Rid p LuuI I cI rtc I 01 .o ))SGINA SL _23 Lfln cl�nf rn nIh'OLPLAF. In[.s;