Loading...
HomeMy WebLinkAboutDrainage Reports - 09/01/2006I, 'i TST, INC. CONSULTING ENGINEERS PROPERTY OF COY of Ft. Coll' A fans FORT �� ����pproved BY July 27, 2006 Mr. Basil Harridan City of Fort Collins Storm Water Division P.O. Box 580 Fort Collins, CO 80522 Re: Maple Hill Project No. 0953.0003.00 Dear Mr. Harridan: We are pleased to submit to you, this addendum to the Final Drainage Report for Maple Hill. This report was prepared based on Urban Storm Drainage Criteria and City of Fort Collins criteria. In the Final Drainage Report for Maple Hill, it was stated that ST-7 would receive offsite flows from the Lind Property PDP. However, due to a re -design of the Lind Property drainage system, ST-7 will no longer need to receive this flow. Because this phase of the Maple Hill project has not yet been constructed, ST — 7 will be resized for the reduced flow requirement. Flow from County Road 52 that was assumed to enter ST-7 from basin OF1-3 will now be entering the Lind Property storm drainage system. These changes are per the Lind Property PDP and Maple Hill PDP County Road 52 Improvements sheets CS304 11 of 41, the Lind Property Filing 1 CS 453 61 of 82 and CS 454 62 of 82 revised 3/25/05. Additionally, per the final grading plan for the Maple Hill Subdivision, the area of OF1 — 2 increased while the areas of B3 and D1 were reduced. For the purposes of this addendum, the impact of decrease in runoff from B3 and D1 was as not considered because it is conservative. However, ST — 7 has been sized to convey the full runoff from OF1 —2. As shown in the attached calculations, the area directly draining to ST-7 will result in a flow of 5.84 cfs at the flared end section (previously 62.2 cfs), and 6.25 cfs after the area inlet (previously 66.6). Due to this flow reduction, the pipes were able to be resized to 18" pipes as shown in the attached LID Sewer analysis. Basin OF1 — 4 drains to a grated manhole area inlet. A 50% capacity reduction factor has been used to size this inlet which will require a minimum open area of 0.85 ft2 to convey the 100 — year flow without encroaching on any residential lots or public right of way. The 100 — year flow used to size this area inlet was 1.98 cfs, the peak runoff from basin OF1 — 4. Updates have been made to the storm and utility construction plans. We look forward to your review and will gladly answer any question�,y9Y9 i %°PPaale. Sincerely, TST, INC. CONSULTING ENGINEERS 6 UCT 32935 7 Wig. ti ;mer • '� •�' /;` 748 Whalers Way, Bldg, D Fort Collins, CO 80525 (fie--� D. awson .•' 4� Ar,i, ;'PE 970.226.0557 metro 303.595 * 9103 SDJ/DBUm f 9 fax 970.226.0204 info@tstinc.com Enclosures ■ www.tstmc.com L W i O V= S W) v) 00 - N N N h Cl) �O �c av Y ^ IN a W AN 00 V Itt N -It v1 O\ M O\ M .Vi O -+ --� Y ^ v) N v1 vl rr 0' ad �c 00 -It V v) v1 r- Q, vi vi wz w „ F L Y �o O 00 a, M O v) v) v) v1 CA z_ W F z v) v1 M N y N in N C N cn N U L N N N N ao W N -� zoU 0�ItCIR cn cn U U o 00 o c p4 7 N M t V O v F-- r� V'a' O O O M q V �F z .0U T1 W 0 VY n M v1 en N en en en M Aa O oa �C pQLL�Cv1 N T C O a) �+ U c 0 U d =-. cu r O N .V. a� C d y ^ co �CL 0Q` o O L 2 0 CL Lq -0LL o d N IM.. m C v 3v i o O 0 L r Qao c o a cD c D O (1) N CL H CO w Q c rn c M uN L Cm r CL V c a ST-7 WSEL = 5000 ft NeoUDS Results Summary Project Title: Gillespie Farm Project Description: ST-7 Output Created On: 7/28/2006 at 10:16:58 AM Using NeoUDSewer Version 1.5. Rainfall Intensity Formula Used. Return Period of Flood is 0 Years. Sub Basin Information rF-- Time of Concentration F Manhol Basin ,Overland Gutter Basin Rain I Peak Flow e Area * C (Minutes), (Minutes) (Minutes) In our) (CFS) ID# F-67-1 1.06 5.0 0.0 0.0 6.26 6.2 1.00, 5.0 0.0 0.0 6.26 I L 1.00 5.0 0.0 0.0 6.26I 6•2 F 3 0.33 5.0 0.0 0.017.44 5.8 , The shortest design rainfall duration is 5 minutes. For rural areas, the catchment time of concentration is always => 10 minutes. For urban areas, the catchment time of concentration is always => 5 minutes. At the first design point, the time constant is <= (10+Total Length/180) in minutes. When the weighted runoff coefficient => 0.2, then the basin is considered to be urbanized. When the Overland Tc plus the Gutter Tc does not equal the catchment Tc, the above criteria supersedes the calculated values. Summary of Manhole Hydraulics Design Manhol Contributing Rainfall Rainfall peak Water e * Area C Duration Intensity [Ground Elevation Elevation Comments ID # (Minutes) (Inch/Hour) (CFS) (Feet) (Feet) r 0 F-6 0.0 0.00 6.2 -5666.661 5000.00 I 1 2.33 5.0 F 2.68 6.2 5018.52 5000.14 r 2 r 1.33 5.0 F 4.69 F 6.2 5014.11 F 5008.76 F 3 0.33 FF 5.0. 17.44 F 5.8 F 5009.73 5 F 5010.69, Surface Water Present Summary of Sewer Hydraulics Note: The given depth to flow ratio is 1. Manhole ID Number F Calculated Sewer rewerDiameter Rise ID # Upstream Downstream ha a Inches (FT) p ( ) ( ) Suggested Existing Diameter Rise Diameter Rise Width ( ) ( ) (Inches) (FT) (Inches) (FT) (FT) -F 1 Round 13.7 18' 18 N/A: 12 ,F -2�-FRoundF 14.8 F 18F 18. N/A 23 ,FF2 Round 15.9, 18 18, N/A Round and arch sewers are measured in inches. Box sewers are measured in feet. Calculated diameter was determined by sewer hydraulic capacity. Suggested diameter was rounded up to the nearest commercially available size All hydraulics where calculated using the existing parameters. If sewer was sized mathematically, the suggested diameter was used for hydraulic calculations. Design g Full ' Normal Normal Critical Critical Full Sewer ID(CFS) Flow [(Flow Depth Velocity Depth Velocity Velocity Froude Number Comment CFS) (Feet) (FPS) (Feet) (FPS) (FPS) _ . 1 _ 6.2 12.9 6.74 7.2 0.96 5.2 3.5 1 "F 12 , . 6.2 10.5; 0.83, 6.2 0.96 5.2 3.5 L33 23 5.8 8.2 0.94 5.0 0.93 5.1 33 6.99 F A Froude number = 0 indicated that a pressured flow occurs. Summary of Sewer Design Information Invert Elevation Buried Depth Slope �(Feet) stream, Downstream Upstream Downstream Sewer ID % (Feet) (Feet) (Feet) Comment 1.50 4997.40 4996.00 19.62 2.50 1 12 1.00 50F80 5003.35 4.81 13.67 23 660 F 5009.72 5007.77 -1.49 4.84 Sewer Too Shallow' Summary of Hydraulic Grade Line F-1 Invert Elevation Water Elevation T--7I Sewer Length g Surcharged Length g g �Fpstream Upstream p Downstream �Fcondition, Sewer ID# (Feet) ( (Feet) (Feet) IDownstreamI (Feet) (Feet) (Feet) 1 I 93.6.1 93.61 4997.40.1 4996.001 5000.141 5000.001 Pressured 12 444.651 0 5007.80, 5003.35 5008.76 5000.14. Jump 23 324.9;� 0, 5009.72 5007.77 5010.69 5008.76 Subcritical y Summary of Energy Grade Line Upstream Manhole Juncture Losses Downstream Manhole Energy Sewer Bend Lateral ' Energy Sewer Manhole Elevation Friction 1D # ID # Bend K Lateral K Manhole Loss Loss Elevation Coefficient Coefficient 11D # (Feet) (Feet) (Feet) (Feet) (Feet) I ' 1 1— 5000.33 0.33 0.20 0.00 1.00 0.00 1 0 5000.00 12 F 2 5009.18 8.85 0.03 0.01 1.00 0.00 � 5000.33 23 5011.08 1.87 0.03, 0.01 1.00 0.02 5009.18 Bend loss = Bend K * Flowing full vhead in sewer. Lateral loss = Outflow full vhead - Junction Loss K * Inflow full vhead. A friction loss of 0 means it was negligible or possible error due to jump. Friction loss includes sewer invert drop at manhole. Notice: Vhead denotes the velocity head of the full flow condition. A minimum junction loss of 0.05 Feet would be introduced unless Lateral K is 0. Friction loss was estimated by backwater curve computations.